Stocks/052690.KS

052690.KS

KEPCO Engineering & Construction Co., Inc.v3 3.8/10 · 2026-11-28
Industrials·Engineering & Construction
65,600.00 KRW
2.5T KRW market cap
2.1% div yield
v3 Rating
3.8/102.5–5.5
Setup
3.5/102.5–5.0
Fair Value
52,000.00 KRW33,000.00 KRW–88,000.00 KRW-21%
DCF (10%)
50,000.00 KRW-24%
Base IRR
+2%-8%–+11%
Visibility
wide±53%
Rating
Revenue (TTM)
566.7B KRW
Owner Earnings
KRW 50.0B
Next-Yr Owner Earnings
KRW 40.0B
Growth
+12.0% × 5y
P / Next-Yr OE
62.5x
Net Debt
-KRW 120.0B

KEPCO Engineering & Construction Co., Inc. engages in the provision of engineering services. It operates through the following divisions: Nuclear Power, Nuclear Reactors, and New Energy business divisions. The Nuclear Power business division engages in the design, maintenance and performance improvement of nuclear power plants. The Nuclear Reactor business division refers to the system design of nuclear power plants. The New Energy business division focuses on non-nuclear power such as thermal power, renewable energy, and eco-friendly energy business. The company was founded on October 1, 1975 and is headquartered in Gimcheon-si, South Korea.

2-Year Price History

$65600.00-0.6%
$60.0k$80.0k$100.0k$120.0k$140.0k$160.0k$180.0kvolNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-28

Rating
3.82.5–5.5
Setup
3.52.5–5.0
Fair value (KRW)
52,000.0033,000.00 – 88,000.00
Upside vs 65,600.00
-21%
DCF (10%)
50,000.0027,000.00 – 92,000.00-24%
Base IRR
2%-8% – 11%
Visibility
widerange ±53%
Sentiment
3/10
Flow
5/10
2026-11-28 · claude-opus-5-5 · priced at 65,600.00

KEPCO E&C is the state-controlled architect-engineer and sole reactor-system designer behind Korea's APR1400, the design role in every 'Team Korea' nuclear build at home and abroad (Shin-Hanul 3-4, Czech Dukovany 5-6, and bids in the US, UAE, Vietnam, Turkey and Saudi Arabia). The 2025-26 nuclear mania took it to 194,800; it has since fallen 66% to 65,600 (Nov 27 close, the latest, as Nov 28 is a Saturday). Drivers: a 3Q26 operating-profit miss (10.8bn KRW vs about 15bn expected), a pre-tax loss from more than 7bn KRW of FX losses on euro contracts, Kiwoom cutting its 2026E operating profit 26% to 55bn, KHNP ending Dukovany construction talks with Daewoo/Doosan on Oct 29, and the fight over Westinghouse stakes. Even after the fall the stock sits on about 61x 2026E earnings, 33x EV/EBITDA and a 2% owner-earnings yield. Real free cash flow has been negative for three years because of working capital. The bull case needs margins to rise from about 9% to 20% on a revenue base that doubles by 2031, which is the sell side's own model. My DCF, with margins reaching about 15% and an 18x exit multiple, comes to about 50,000 KRW per share. I set fair value at 52,000 for real but undated pipeline optionality and a parent-driven 60% payout. Rating 3.8: still expensive for an order-lumpy engineering firm, but a short cannot be placed and the ownership leaves no governance trap. Setup 3.5: there is no variant perception beyond 'it has fallen a lot', and the catalysts (UAE Barakah 5-8 and Czech Temelin decisions in 2027-28) are undated.

Flow: Foreign and institutional investors have been net sellers since the June 2026 peak, and retail money in the nuclear-theme ETFs launched in Aug 2025 is running out. KEPCO's 53.1% is a stable non-seller, and there is no buyback and no share issuance. The selling looks to be running rather than ending.

A deep dive would have to establish: Will Team Korea win enough large APR1400 orders abroad (UAE Barakah 5-8, Czech Temelin, the US, Vietnam) by 2028 for KEPCO E&C's margins to roughly double, the only path that justifies more than 60x earnings?

Owner earnings, TTM
KRW 50BKRW 35B – KRW 65B
Realistic peak profit
KRW 165BKRW 100B – KRW 240B
Growth rate
12.0%4.0% – 20.0%
Years of growth
53 – 8
Market cap
KRW 2500BKRW 2490B – KRW 2510B
EV
KRW 2380BKRW 2330B – KRW 2420B
Net debt
-KRW 120B-KRW 170B – -KRW 80B
Capital return / cap
1.7%1.2% – 2.2%
P/E
61.0×45.0× – 80.0×
EV/EBITDA
33.0×28.0× – 38.0×
FCF yield
2.0%1.2% – 2.7%
Projected FCF, base case (KRW millions)
Y1KRW 40B-KRW 10B – KRW 80B
Y2KRW 70BKRW 20B – KRW 110B
Y3KRW 95BKRW 40B – KRW 145B
Y4KRW 115BKRW 50B – KRW 180B
Y5KRW 130BKRW 60B – KRW 210B
Competition: A domestic monopoly in APR1400 design; abroad it competes as part of Team Korea against Westinghouse, EDF/Framatome and Rosatom, constrained by Westinghouse IP terms.
Governance: A state-controlled company (KEPCO 53.1%) whose main customers are its own group (KHNP), so policy, not minority holders, sets contract margins and project choices.
Research (expand)

What it does

KEPCO E&C (한전기술) designs nuclear plants: architect-engineering for whole plants (Nuclear Power, about 69% of 2025 revenue), NSSS reactor-system design for the APR1400, its highest-margin unit (Reactor, about 18%), and thermal and renewable engineering (New Energy, about 15%, low margin). In Korea it is effectively the only house that does this design work, so every APR1400 built domestically or by Team Korea abroad flows through it. 2025: revenue 518.8bn KRW, operating profit 35.5bn, net income 85.4bn (inflated by about 68bn of one-off non-operating gains).

What the market believes

The market believes the nuclear renaissance is real but slow and less profitable for Korea than hoped. Westinghouse IP and royalty terms cap overseas margins, Czech revenue is arriving with FX losses, and 2027 lacks new large-plant revenue (Kiwoom expects 'meaningful margin improvement from 2028'). The 66% drop has removed the mania but has not made the stock cheap: at 65,600 the market cap is about 2.5tn KRW and EV about 2.38tn.

What it earns

Underlying 2026E operating profit is about 55bn KRW (9M actual 27.9bn plus a 4Q guide of 27bn). Taxed at 22% that is about 43bn; adding D&A of about 18bn and taking off maintenance capex and software of about 9bn gives owner earnings of about 50bn, a 2.1% yield on EV. Reported free cash flow was -33bn in 2024, -19bn in 2025 and about -22bn estimated for 2026, because receivables and contract assets absorb cash on long design contracts.

Projection (unlevered FCF, bn KRW)

2027: 40; 2028: 70; 2029: 95; 2030: 115; 2031: 130. Assumes revenue near 1tn by 2031, an operating margin of about 15% (Kiwoom has 21.5%), and continued working-capital drag. In year 5 it is a 'neither' business tilting toward growth: a monopoly designer with a lumpy, decade-long order book, worth about 18x FCF. DCF at 10%: PV of FCF about 325bn, plus PV of terminal value about 1.45tn, plus net cash about 120bn, gives about 1.9tn, or about 50,000 KRW per share. The bull case (Kiwoom's path, 22x) gives about 90,000. The bear case (Team Korea wins little abroad, margins stay at 10%, 12x) gives about 27,000. The price assumes something close to the sell-side path.

Korea

The controller is the state: KEPCO (015760.KS, itself majority government-owned) and one related holder own 53.1% combined. Foreigners own about 13.8% and the National Pension Service holds a stake. There is no family, so there is no succession issue and none of the incentive to keep the price low. A related-party dependence matters more: KHNP and KEPCO group utilities are the main customers and set contract terms, so policy rather than the market sets margins. Capital returns follow the parent's need for cash: DPS was 999 KRW for 2024 (65% payout), 1,347 for 2025 (60%), and about 1,050 is expected for 2026 (payout near 100% of depressed earnings). The value-up plan sets a minimum 40% return ratio and a ROE target of at least 9% for 2027. There are no buybacks. Treasury stock is small (about 0.5% of issued shares by the vendor count; not verified). There is no preferred line. Net cash fell from about 170bn to about 95-120bn, used up by working capital and dividends rather than by affiliate deals. Minorities get a pro-rata dividend of about 2% because KEPCO needs cash. That is reliable but small. Value reaches holders only if orders turn into margin.

Risks and competition

Risks: Westinghouse IP and royalty constraints, KHNP's bargaining power over contract terms, euro FX, policy reversal under a future government, and execution delays at Czech and Shin-Hanul. Competitors abroad are Westinghouse/Bechtel, EDF/Framatome and Rosatom. At home there are none.

Sentiment

Sentiment is 3/10: retail and the nuclear ETF crowd have been burned, while brokers still rate it Buy with targets of 120-145k.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · KRW

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue566671+12%518768-6%553363+2%545092+8%505291
Gross profit108594-30%112682-32%166335+31%126823+14%110987
Operating expenses54256-55%77229-31%111529+14%98261+20%81946
▸Adj EBITDA72364+23%56987-25%76296+60%47674-3%48908
▸Adj OCF120798+0%98404-35%150728+32%113980+9%104620
CapEx-7915-5490-5926-7237-2809
Adj FCF112883-1%92914-36%144802+36%106743+5%101811
Interest expense12767.178.996.1344
▸Adj net income52964+428%16569-61%42657+83%23366+41%16627
▸Owner's earnings48000--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA300318100%37029100%56987100%97763100%62986100%45554100%
FCF (OCF−capex)4057414%-63807-172%2382642%4302544%3358053%39499%
Net income21029070%1580243%85368150%5851260%3265452%1795439%
▸Capital returned12424541%44085119%3853768%2074821%1116418%971021%
Buybacks0.000.000.000.000.000.00
Dividends128663512453800519592107669054
Interest paid69711167.178.996.1344
Debt paid down-5115-72704651077302312
▸Reinvestment-11307-4%632817%-9311-16%60656%761312%-22003-48%
Capex (PP&E)2745159905490592672372809
Intangibles & M&A-38496-21.6-14432-39.5-29.9-23973
Leases signed (net Δ)-262360-369179406-839
Retained / other-44479-15%-107760-291%-2120%2239523%2254236%1855641%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)791989885545946847855009816503
▸Liabilities (total)197591260579369373307700273089
Net debt (incl. leases)-46219-169131-159356-99425-45341
Net debt / Adj EBITDA-0.64-2.97-2.09-2.09-0.93
Net debt / Adj FCF-0.41-1.82-1.10-0.93-0.45
Adj EBITDA / interest572849967496142
Shares outstanding38.238.238.038.038.0
Dilution (YoY)+0.4%+0.5%+0.0%+0.0%-0.1%
Employees2466--------
MarginsTTM2025202420232022
Gross margin19.2%-11.521.7%-8.330.1%+6.823.3%+1.322.0%
Adj EBITDA margin12.8%+1.211.0%-2.813.8%+5.08.8%-0.99.7%
Adj OCF margin21.3%-2.519.0%-8.327.2%+6.320.9%+0.220.7%
Adj FCF margin19.9%-2.717.9%-8.326.2%+6.619.6%-0.620.1%
Net income margin4.2%-16.416.5%+5.910.6%+4.66.0%+2.43.5%
Adj NI margin9.3%+7.43.2%-4.57.7%+3.44.3%+1.03.3%
ROIC (adj, after-tax)7.6%4.4%7.3%3.9%3.7%
Cost of debt----------
v2 analysis (legacy, 2026-07-28) — for comparison onlyclick to expand

Thesis

KEPCO E&C is the sole domestic architect-engineer for Korea's nuclear fleet and the lead technical partner on Team Korea's export wins, most notably the €12B Dukovany APR-1400 contract in the Czech Republic that formally closed in May 2026. Domestically, the finalized 11th Basic Plan mandates two new large reactors plus Korea's first commercial SMR by 2038, and KEPCO E&C has a structural monopoly on the design work behind all of it. The balance sheet is pristine — net cash position, essentially no debt, decent dividend payout — which removes solvency risk almost entirely. The earnings stream, however, is lumpy: quarterly EBITDA and net income swing wildly (Q1'26 EBITDA -40% QoQ, revenue -45% QoQ) driven by contract-milestone timing and working-capital swings tied to government/utility receivables rather than any deterioration in the underlying franchise. Cash conversion has historically lagged reported profit (cumulative FCF only ~27% of cumulative claimed EBITDA) because receivables build during ramp phases, then unwind — visible in the TTM period's large positive working-capital swing. The forward story is one of a design-engineering monopoly entering a multi-year global nuclear build cycle, with real optionality in Poland and the Philippines off the back of the Czech reference project, offset by execution/regulatory risk (grid bottlenecks, EU subsidy scrutiny) and inherent quarter-to-quarter noise.

Trade Signal

Trade rating
-5.5/10
Short
Horizon
~9mo
Claude2026-07-28 · saw 88,800.00 KRW-26.1% since

Short: even after a 54% crash from euphoric highs, KEPCO E&C still trades at ~3x our analyst's base-case fair value on stretched multiples (47x EV/EBITDA, 76x P/E) with the Dukovany/11th Basic Plan catalysts already priced in and no new inflection to justify the premium.

Temporary mispricing-2.0

The stock ran from ~90,000 in Dec 2025 to a peak of 194,800 in late April 2026 on euphoria around the Dukovany contract closing (May 2026) and the 11th Basic Plan nuclear buildout narrative, then has round-tripped down 54% from that high to 88,800 as the initial excitement faded and no fresh confirmatory catalysts have landed since (fuel loading and the technical support agreement were incremental, already-expected steps). The decline looks like a durable unwind of a speculative overshoot rather than a new dislocation to buy — the stock is simply normalizing back toward where it was before the mania, and even at these levels it trades at ~47x EV/EBITDA and 76x trailing P/E, still far above historical multiples (30-50x EV/EBITDA even in prior cycles) and way above our analyst's base-case fair value of ~1,130,000M vs 3,378,263M market cap.

Market view+3.0

Sell-side is aggressively bullish (avg PT ~203,000, implying 100%+ upside) riding the monopoly nuclear-design/Dukovany-export narrative, while retail/technical sentiment has flipped to 'Strong Sell' after the 54% drawdown from highs. This is a classic split: institutional analysts anchored on a multi-decade nuclear renaissance story, momentum/technical traders capitulating. The stock is neither uniformly loved nor hated — it's polarized, with a stale sell-side consensus still extrapolating peak enthusiasm multiples rather than digesting how expensive the stock became.

Inflectionwindow ~1mo-1.0

The genuine business inflection (Dukovany contract closing, 11th Basic Plan mandating two reactors + first SMR, KEPCO/KHNP JV structure) already happened and was already priced in extremely aggressively during the Jan-April 2026 run-up to 194,800. There isn't a new step-up coming that the market doesn't already know about — the upcoming Aug 18 earnings is more about confirming execution/cash conversion than revealing new information. Consensus sell-side targets already bake in a bullish multi-year revenue ramp, so the inflection is priced, not missed.

Catalysts
  • •2026-08-18 · Q2/H1 2026 earnings release — Market watching for margin/cash-conversion recovery signs; could go either way given noisy working capital.
  • ▲H2 2026-2027 · Poland/Philippines follow-on export bid decisions — Would validate Dukovany as export reference and support bull case, but timeline uncertain.
  • ▼ongoing/2026-2027 · EU foreign subsidy regulatory scrutiny on Czech deal — Cleared once but residual regulatory friction risk for European expansion remains.
  • ▲2026-2027 · Domestic 11th Basic Plan reactor/SMR contract awards — Confirms monopoly pipeline execution; incremental positive but largely expected.
  • ▼2026-2027 · Grid transmission bottleneck legislation/implementation — National Power Grid Act only partially addresses constraints that could delay buildout pace.
Flow+1.0

Net cash balance sheet with a dividend (~2% yield) and no TTM dilution — modest positive flow support, no aggressive buyback or major insider selling flagged, no lockup overhang mentioned. Not a strong forcing mechanism either way.

Floor / Ceiling-4.0

There is real support from net cash (~150-220,000M across scenarios) and a monopoly franchise with government-backed demand visibility, but at 3,378,263M market cap the floor is far below current price (analyst bear case 556,000M, base case 1,130,000M) — the 'floor' argument supports a price roughly a third of today's, not today's price itself. No credible acquirer or buyback is defending current levels; the ceiling is effectively the market's own euphoria, which has already started deflating.

Buyability

This is a real, liquid, well-covered large-cap with genuine strategic scarcity value (monopoly nuclear AE, government-mandated pipeline, marquee export win) — so there are real buyers (sell-side-driven institutional flow, nuclear-theme funds) who want to own it on dips. That cuts against a clean short thesis: the story is exciting enough that squeezes on any positive headline (new export win, strong earnings) are plausible. But at 47x EV/EBITDA and 76x P/E even after the crash, it's priced for a scenario well beyond the analyst's base case, making it vulnerable to further mean reversion once headline momentum fades further.

Fear vs Greedfear 3/10 (+2.0)greed 7/10 (-1.0)

Fear dominates — even after a 54% drawdown, the valuation multiples are still historically stretched (EV/EBITDA nearly matching the 2025 peak of 56.9x, P/E over 76x) relative to a base-case fair value roughly a third of the current price; the 'nuclear renaissance monopoly' story is real but the market is paying a decade of flawless execution upfront.

Valuation

Our Target
1.1T KRW-58%
Market Should Pay
1.2T KRW-52%
target ×1.15 (greed premium)
Current Market Cap
2.5T KRWBullish
What Changed
financials release · 2026-07-07
-4%fair value on this information

The Q1'26 filing itself shows a sharply weaker quarter than the prior one — revenue down 45% QoQ, Adj EBITDA down 40% QoQ, Adj net income down 56% QoQ, and negative operating cash flow (-28,028) driven by working-capital consumption. The major strategic catalysts (Dukovany contract close, 11th Basic Plan, KEPCO/KHNP JV mandate) were already known/reported via news before this filing, so they are not new information from the report itself; the incremental new information is that near-term earnings momentum is softer and choppier than the headline growth narrative suggests, with cash conversion again lagging reported profit this quarter.

▸ How the cases moved

Base case equity value roughly unchanged (1,130,000) as the long-term pipeline thesis is intact; bear case probability nudges up slightly (0.12->0.15) reflecting the visible near-term earnings/cash softness and reminder of execution lumpiness; bull case unchanged in magnitude but probability trimmed slightly (0.38->0.35) since the quarter offers no incremental confirmation of accelerating conversion.

2-Year Plausible Outcomes
bear15%
556.0B KRW
rev +2%/yrOE $38000M

Grid transmission bottlenecks (addressed only partially by the new National Power Grid Act) delay both domestic reactor buildout and the pace at which Czech/other export revenue is recognized; EU subsidy/regulatory friction slows follow-on wins in Poland/Philippines. Margins compress back toward historical lows, growth stalls near flat, and the market treats the stock as a cyclical E&C shop rather than a monopoly nuclear platform.

▸ Valuation

7x EBITDA of 58,000 = 406,000 EV + net cash ~150,000 = 556,000 equity

base50%
1.1T KRW
rev +12%/yrOE $65000M

Dukovany engineering work ramps steadily, domestic 11th Basic Plan projects (two large reactors + SMR groundwork) proceed on a normal government timeline, and margins gradually improve as one-off item volatility normalizes. Revenue growth in the low-to-mid teens driven by contract mix shift toward higher-value design work; working-capital swings continue but net cash keeps building.

▸ Valuation

10x EBITDA of 95,000 = 950,000 EV + net cash ~180,000 = 1,130,000 equity

bull35%
2.2T KRW
rev +25%/yrOE $110000M

Dukovany serves as a credible export reference that converts into additional large-reactor and SMR mandates (Poland, Philippines), the KEPCO/KHNP JV structure accelerates bid wins, and domestic pipeline execution is clean. KEPCO E&C re-rates as a scarce, monopoly nuclear-design franchise riding a multi-decade global nuclear renaissance, commanding a premium multiple.

▸ Valuation

13x EBITDA of 150,000 = 1,950,000 EV + net cash ~220,000 = 2,170,000 equity

▸ Target Rationale

I discount modestly below the probability-weighted model value because owner earnings quality is real but noisy (working-capital driven swings make near-term cash conversion unpredictable), and because large international projects like Dukovany carry meaningful execution/regulatory tail risk (EU subsidy scrutiny, grid bottleneck constraints on domestic buildout) that isn't fully captured in a clean multiple-on-EBITDA framework. The monopoly position and net-cash balance sheet argue against discounting further.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now6/10
Trajectory8/10
Risk4/10
Governance6/10
Insolvency prob (2yr)1%
Outcome uncertainty6/10

Recent Research & News

Recent Research & News

2026-07-28

Company news

In May 2026, KEPCO E&C's "Team Korea" consortium formally closed a landmark €12 billion contract to build two APR-1400 reactors at the Dukovany site in the Czech Republic. KEPCO E&C subsequently signed a specific design and licensing technical support agreement with Energoprojekt Praha in June 2026 to begin the project’s engineering phase (Sources: The Platinum Capital, Chosunbiz). Domestically, the company reached a significant milestone with the initial fuel loading of Saeul Unit 3 in January 2026 (Source: KEPCO E&C). Furthermore, the South Korean government recently restructured its nuclear export framework, mandating a joint venture between KEPCO and KHNP to streamline overseas bids; KEPCO E&C remains the designated lead for architecture and engineering (Sources: MK News, Chosunbiz).

Thesis findings

The bull case rests on South Korea's finalized 11th Basic Plan for Electricity Supply and Demand, which mandates two new large-scale reactors and the nation's first commercial Small Modular Reactor (SMR) by 2038 (Sources: Kim & Chang, IEEFA). As the sole domestic provider of nuclear architect-engineering, KEPCO E&C has a monopoly on this design-intensive pipeline. The Czech project serves as a critical "export reference" to unlock further opportunities in Poland and the Philippines. Conversely, the bear case emphasizes structural grid bottlenecks; the recent National Power Grid Act was required specifically to address transmission constraints that threaten new plant feasibility (Sources: Law.asia, IRENA). Additionally, while the EU recently cleared a foreign subsidy investigation into the Czech deal, regulatory friction remains a persistent risk for European expansion (Source: NucNet).

Market opinion (price-aware)

The market views 052690.KS as a polarizing value play. Despite trading near ₩91,800–₩100,000 following a sharp 32% decline over the last six months, sell-side analysts remain aggressively bullish (Sources: Investing.com, Investing.com UK). The consensus 12-month price target is approximately ₩203,000, implying over 100% upside (Sources: Alpha Spread, TipRanks). However, the name is currently "hated" by technical traders; retail sentiment is weighed down by a "Strong Sell" signal and a high trailing P/E of 108 (Sources: TradingView, SniperIQ). The prevailing narrative is a split between short-term technical weakness and long-term institutional optimism regarding multi-year revenue visibility from the 2026 Czech contract. Investors are now focused on the upcoming August 18, 2026, earnings release for signs of fundamental recovery (Source: SniperIQ).