Stocks/2330.TW

2330.TW

Taiwan Semiconductor Manufacturing Company Limitedv3 6.0/10 · 2026-10-19
Technology·Semiconductors
2,180.00 TWD
57.8T TWD market cap
1.1% div yield
v3 Rating
6.0/105.0–7.0
Setup
4.0/103.0–5.0
Fair Value
2,550.00 TWD1,800.00 TWD–3,500.00 TWD+17%
DCF (10%)
2,500.00 TWD+15%
Base IRR
+10%+0%–+20%
Visibility
moderate±33%
Wall Street
(13 buy, 5 hold)
Rating
Revenue (TTM)
4944.8B TWD
Owner Earnings
TWD 2548.0B
Next-Yr Owner Earnings
TWD 2100.0B
Growth
+20.0% × 5y
P / Next-Yr OE
26.9x
Net Debt
-TWD 2985.4B

Taiwan Semiconductor Manufacturing Company Limited (TSMC) specializes in the comprehensive production cycle of integrated circuits and various semiconductor devices, including their fabrication, assembly, rigorous testing, and worldwide distribution. The company's global reach extends significantly across Taiwan, mainland China, Japan, the United States, Europe, the Middle East, and Africa. Utilizing advanced complementary metal oxide silicon (CMOS) wafer fabrication techniques, TSMC engineers a diverse portfolio of semiconductors, encompassing logic, mixed-signal, radio frequency, and embedded memory solutions. Beyond manufacturing, they also offer extensive client support, dedicated account management, and specialized engineering expertise, in addition to producing critical masks. Their innovative components are fundamental to a wide range of applications, including mobile communications, high-performance computing systems, automotive electronics, and the rapidly expanding Internet of Things (IoT) sector. Founded in 1987, the enterprise is headquartered in Hsinchu City, Taiwan.

2-Year Price History

$2260.00+112.2%
$1.0k$1.2k$1.4k$1.6k$1.8k$2.0k$2.2k$2.4kInitial target $2550.00 · 2026-10-19volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-10-19

Rating
6.05.0–7.0
Setup
4.03.0–5.0
Fair value (TWD)
2,550.001,800.00 – 3,500.00
Upside vs 2,180.00
+17%
DCF (10%)
2,500.001,500.00 – 3,700.00+15%
Base IRR
10%0% – 20%
Visibility
moderaterange ±33%
Sentiment
8/10
2026-10-19 · claude-opus-5-5 · priced at 2,420.00

TSMC is the world's dominant leading-edge foundry, and it is printing record numbers. In 3Q26 (reported Oct 15, 2026) revenue was NT$1,494bn (+51% YoY), gross margin 66.4%, operating margin 58.7%, net income NT$763bn and EPS NT$29.43 (+69%). Q4 guidance is US$52.3-54.3bn (about +58% YoY), full-year 2026 USD growth is now about 44%, and 2026-28 capex will be 'significantly higher'. Net cash is NT$2.99tn. At the NT$2,420 close (Oct 16 and Oct 19, down about 6% from early-October highs on an AI and neocloud-debt selloff and worries about Arizona margin dilution), the stock trades at about 24.6x trailing EPS of about NT$98, about 22x 2026E (about NT$111) and about 17x a 2027E of about NT$140. Trailing EV/EBITDA is about 16x and the trailing FCF yield only about 2.4%, because capex absorbs about 40% of operating cash flow. My 10% DCF (FCF rising from about NT$2.1tn in 2027 to about NT$4.6tn in 2031, 4% terminal growth) gives about NT$2,500 a share, so the market is pricing roughly the base case. There is no 40% mispricing here. The business is superb and improving, and a 10x multiple on 2029-30 earnings is visible if AI demand holds, but the price already assumes most of that. Return from here is roughly 10%/yr, mostly earnings growth, with real tail risks: the AI capex cycle turning, Taiwan geopolitics, US tariffs, and TWD appreciation. Rating 6.0: a quality compounder at a fair price, fine to own but not a 50%-in-a-year setup. Research rating 4.0: the open questions (durability of AI capex past 2027, the cross-strait discount) can't be settled by more digging.

A deep dive would have to establish: Whether AI-driven leading-edge and CoWoS demand can sustain roughly 20%+ revenue growth through 2029-30, so that the 2026-28 capex wave earns its return rather than leaving TSMC with overcapacity and diluted margins in a 2028-29 air-pocket.

Owner earnings, TTM
TWD 2548BTWD 2500B – TWD 2600B
Realistic peak profit
TWD 6000BTWD 4000B – TWD 8500B
Growth rate
20.0%10.0% – 28.0%
Years of growth
53 – 8
Market cap
TWD 62755BTWD 62755B – TWD 62755B
EV
TWD 59770BTWD 59770B – TWD 59770B
Net debt
-TWD 2985B-TWD 3100B – -TWD 2800B
Capital return / cap
1.2%1.0% – 1.5%
P/E
24.6×21.8× – 26.0×
EV/EBITDA
16.4×15.5× – 17.5×
FCF yield
2.4%2.0% – 2.8%
Projected FCF, base case (TWD millions)
Y1TWD 2100BTWD 1400B – TWD 2800B
Y2TWD 2700BTWD 1600B – TWD 3700B
Y3TWD 3400BTWD 1700B – TWD 4800B
Y4TWD 4100BTWD 1800B – TWD 6000B
Y5TWD 4600BTWD 1900B – TWD 7000B
Competition: Effectively a leading-edge monopoly: Intel 18A/14A and Samsung SF2 are the only alternatives and have not taken meaningful share, while TSMC's CoWoS packaging remains the default for AI accelerators.
Governance: none flagged
Research (expand)

What the company does

TSMC makes chips for other companies. In 2025 it ran 305 process technologies for 534 customers, and it effectively has a monopoly on leading-edge logic (N3, N2, and A16/A14 next) and on CoWoS advanced packaging for AI accelerators. In 3Q26 the HPC platform was 68% of revenue and smartphones 21%. Nodes of 7nm and below were 79% of wafer revenue (N2 8%, N3 33%, N5 28%) and North American customers 79%. Nvidia, Apple, AMD, Broadcom, Qualcomm and the hyperscaler ASIC programs all depend on it.

Note: the context pack warned that the 3Q26 transcript might belong to another company. It is TSMC's own call, hosted by Jeff Su, TSMC's IR director, and all the figures below were checked against TSMC's 3Q26 Management Report.

The investment case

  • AI demand still exceeds supply. Management says AI accelerator demand could grow faster than the mid-to-high-50s% CAGR it guided for 2024-29, and that CPU and agentic-AI demand comes on top of that. N2 capacity more than doubles in 2027. Interest in A14 (volume production 2028) is ahead of where N2 was at the same stage. Nearly 20 fabs are in progress.
  • Pricing power. Gross margin rose from 59.5% in 3Q25 to 66.4% in 3Q26 even while N2 ramped and overseas fabs diluted margins. Management says there is "no ceiling on profitability", and the long-term floor of 56% or more is now far below actual results.
  • Balance sheet and returns. Cash and marketable securities are NT$4.02tn against NT$1.03tn of interest-bearing debt, so net cash is NT$2.99tn. ROE is 45%. The quarterly dividend was raised to NT$7.00 (ex-date Dec 10), and management has committed to a steadily rising dividend.

What it earns today and at maturity

  • Trailing four quarters (4Q25-3Q26): net income about NT$2.55tn (505.7 + 572.5 + 706.6 + 763.1) and EPS about NT$98.3. Free cash flow was about NT$1.48tn (368.6 + 348.2 + 287.4 + 476.6). D&A ran at NT$220bn a quarter and is climbing fast.
  • 2026E: revenue about NT$5.6tn (US$176bn, +44%) and EPS about NT$111 (Q4 at guidance midpoint, 31.8 TWD/USD, roughly 17% tax). Capex is US$60-64bn, about NT$1.97tn.
  • 2027E: about +30% revenue and EPS about NT$140, though 2027 capex probably reaches US$75-85bn.
  • Maturity (about 2030-31): if the 25% revenue CAGR holds through 2029 and growth then fades to the mid-teens, revenue reaches about NT$12tn (about US$380bn). At roughly 50% net margin that is net income of about NT$6tn (EPS about NT$235) and FCF of about NT$4.5tn once capex intensity eases toward the high-20s% of revenue.

Fair value and the multiples we are paying

  • Valuation: market cap NT$62.76tn (25,932m diluted shares × NT$2,420) and EV about NT$59.8tn. That is P/E 24.6x trailing, about 21.8x 2026E and about 17x 2027E. EV/EBITDA is about 16.4x trailing and about 11x 2027E. FCF yield is 2.4% trailing and the dividend yield about 1.2%.
  • DCF at 10%: FCF of NT$2.1tn, 2.7tn, 3.4tn, 4.1tn and 4.6tn for 2027-31, plus a 4% terminal value. The explicit years are worth about NT$12.3tn, the terminal value about NT$49.5tn, and net cash adds NT$3.0tn, for about NT$2,500 a share.
  • Fair value: NT$2,550, with a range of NT$1,800-3,500. Sell-side targets are clustered around NT$2,600-3,300; Goldman, for example, is at NT$3,300.
  • Base-case return: 2028 EPS of about NT$166 at 18-20x is NT$3,000-3,300, plus about NT$100 of dividends. That is roughly 8-12% a year over three years.
  • Path to a 10x multiple: today's price is about 10x EPS only in about 2031. The multiple compresses fast, but it is not the 3-4-year path to 10x we look for.

Risks and competition

  • AI capex cycle. Neocloud leverage (the CoreWeave debt scare drove this month's selloff), hyperscaler capex fatigue, and power or HBM bottlenecks could all bite. Because the 2026-28 capex wave is committed, a demand air-pocket in 2028-29 would hit margins hard.
  • Geopolitics. Taiwan strait risk is a permanent multiple cap, and US Section 232 tariffs are a further threat.
  • Overseas margin dilution. Management guides to 2-3% now, widening to 3-4%, as Arizona, Japan and Germany ramp. Tool-price inflation adds to this.
  • Currency. TWD appreciation is a headwind: each 1% move costs about 0.4pt of gross margin.
  • Competition. Intel 18A/14A, with an IDM customer now expanding its own capacity, and Samsung SF2 are the only alternatives. Neither has taken meaningful leading-edge share, and TSMC now says it would act as a CoWoS backup for Intel EMIB customers. The GlobalFoundries interposer deal points to back-end tightness, not lost share.
  • Customer concentration. HPC is 68% of revenue and a handful of AI customers dominate it.

How investors feel (8/10)

Investors love it. It is the consensus AI-infrastructure 'safe' compounder, owned by every EM and global tech fund, and the stock is up about 50% this year (about NT$1,585 on Jan 2 to NT$2,420). The post-print dip (from about NT$2,585 on Oct 7 to NT$2,420) came from sector profit-taking on AI-debt and rate fears and on margin and capex worries, not from anything wrong in the quarter. There are no forced sellers, the stock isn't priced as a deep-value name, and implied volatility doesn't make covered calls on it unusually attractive. The setup is quality at a fair price, without a fear discount.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · TWD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue4944817+36%3809054+32%2894308+34%2161736-5%2263891
Gross profit3255972+52%2281294+40%1624354+38%1175111-13%1348355
Operating expenses392340+14%345185+14%302301+19%253645+12%227076
▸Adj EBITDA3609936+46%2601313+31%1984849+37%1453657-7%1558533
▸Adj OCF3679225+59%2554457+41%1811584+38%1317131-11%1487788
CapEx-1709925-1381756-964982-953254-1089626
Adj FCF1969300+99%1172701+39%846602+133%363877-9%398162
Interest expense576012370104951199911750
▸Adj net income2469078+57%1705697+46%1166201+41%829087-17%1004409
▸Owner's earnings1850000--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA10815577100%2914538100%2705471100%2079130100%1523361100%1593077100%
FCF (OCF−capex)379105535%118352641%93664835%86119641%28871319%52097333%
Net income678828563%204210670%171788363%117326856%83849855%101653064%
▸Capital returned166441315%45283016%43906416%34701917%20965214%21584714%
Buybacks8720.000.000.020.00872
Dividends1847643440853466779363055291722285234
Interest paid49332271712370104951199911750
Debt paid down-2334349260-40085-26531-94069-82009
▸Reinvestment568853853%128284644%138983951%96505546%95217263%109862669%
Capex (PP&E)5670739128112113817569649829532541089626
Intangibles & M&A4154-108952440.000.000.00
Leases signed (net Δ)136452814284073.5-10829000
Retained / other217182020%73450225%50471119%52467125%910606%31687620%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 2,757 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)100528887933024669176555321974964459
▸Liabilities (total)30096602472229241249320783302046627
Net debt (incl. leases)-2950991-2004011-1438105-758545-698326
Net debt / Adj EBITDA-0.82-0.77-0.72-0.52-0.45
Net debt / Adj FCF-1.50-1.71-1.70-2.08-1.75
Adj EBITDA / interest627210189121133
Shares outstanding2593225931259332593225929
Dilution (YoY)+0.0%-0.0%+0.0%+0.0%+0.0%
Employees65152--------
MarginsTTM2025202420232022
Gross margin65.8%+6.959.9%+3.856.1%+1.854.4%-5.259.6%
Adj EBITDA margin73.0%+4.968.3%-0.368.6%+1.367.2%-1.668.8%
Adj OCF margin74.4%+10.867.1%+4.562.6%+1.760.9%-4.865.7%
Adj FCF margin39.8%+12.630.8%+1.529.3%+12.416.8%-0.817.6%
Net income margin51.5%+7.845.1%+4.640.5%+1.838.8%-6.144.9%
Adj NI margin49.9%+6.544.8%+4.540.3%+1.938.4%-6.044.4%
ROIC (adj, after-tax)29.6%25.1%20.8%18.0%26.3%
Cost of debt0.6%1.2%1.0%1.3%1.4%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-10-15

TSMC reported third quarter 2026 results that beat its own guidance. Revenue rose 17.6% sequentially in New Taiwan dollars and 16.2% in U.S. dollars to $46.7 billion, above the high end of the third-quarter guidance. Gross margin fell 1.3 percentage points sequentially to 66.4%, mainly because of margin dilution from the initial ramp of the 2 nm process. Operating expenses were 7.8% of net revenue, operating margin was 58.7%, EPS was TWD 29.43, and return on equity was 45.5%. By technology, 2 nm contributed 8% of wafer revenue, 3 nm 33%, 5 nm 28%, and 7 nm 10%, so advanced nodes (7 nm and below) made up 79% of wafer revenue. By platform, HPC rose 22% quarter over quarter to 68% of revenue, smartphone rose 10% to 21%, IoT rose 5% to 4%, automotive rose 23% to 4%, and DCE fell 12% to 1%. On the balance sheet, cash and marketable securities reached about TWD 4 trillion, or $126 billion. Operating cash flow was about TWD 920 billion, third-quarter CapEx was TWD 443 billion ($13.8 billion), and cash dividends of TWD 156 billion were paid. Accounts receivable turnover days fell and inventory days fell by about 5 to 82 days, mainly because wafer shipments increased. For the fourth quarter of 2026, TSMC guided revenue to $52.3 to $54.3 billion, a 14% sequential increase at the midpoint and roughly 58% year over year. Guidance assumes an exchange rate of 31.8 TWD per U.S. dollar, with gross margin of 65% to 67% and operating margin of 56.5% to 58.5%. Gross margin is expected to fall about 40 basis points sequentially at the midpoint, driven by the steep 2 nm ramp and dilution from overseas fabs, partly offset by productivity gains and capacity optimization across nodes. Management said overseas fab dilution is closer to 2% for now but will widen to 3% to 4% over the latter part of the five-year period as more U.S. fabs ramp, and that it will work to improve the cost structure in Arizona. The company still expects to be the most cost-efficient manufacturer in every region. Full-year 2026 revenue growth is now expected to be about 44% in U.S. dollar terms. Management said demand for leading-edge technologies remains extremely robust, while consumer and price-sensitive segments face pressure from rising component prices and macroeconomic uncertainty, so TSMC is being prudent in its 2027 planning. The 2026 capital budget of $60 billion to $64 billion was reiterated, and CapEx for 2026 through 2028 is expected to be significantly higher than in the past three years. Tool supply is tight, and TSMC is working with suppliers well in advance. Management reaffirmed a commitment to profitable growth and a steadily rising dividend. On AI, management cited growing demand from agentic AI, the shift from chatbots to AI assistants, adoption of open-source models, agentic AI CPUs, and networking chips. It said semiconductors will remain central to the AI megatrend and that all major AI players are working with TSMC. TSMC is building a very large capacity pipeline, with nearly 20 fabs in progress worldwide, including 13 leading-edge and advanced packaging fabs in Taiwan and five to six overseas. TSMC is also sending its own teams to check data center build-outs and power supply in the U.S., and says customers appear well prepared. N2 entered high-volume manufacturing in the fourth quarter of 2025, and its capacity is expected to more than double in 2027. A14 risk production is on track for 2027, with volume production in 2028, and management expects A14 to be a bigger node than N2, with more customers engaging early. For N3, TSMC is adding a new Tainan fab (volume production in the first half of 2027), an additional Tainan fab (first half of 2028), a second Arizona fab (volume production in the third quarter of 2027, slightly ahead of plan), and a Japan fab (2028). It is also converting 5 nm tools to 3 nm and optimizing capacity across N7, N5, and N3. During the Q&A, management said demand still exceeds supply and it cannot yet say whether 2027 will be tighter. It reiterated that AI accelerator demand growth had been guided to the mid-to-high 50s percent CAGR for 2024 to 2029 and that demand has not slowed. It declined to give a new capacity growth rate, saying the advanced-node share drives capacity growth. It is evaluating a Texas site and discussing possible use of a customer's planned fab, but any such fab must be run by TSMC. High NA EUV is planned for 2030 once the technology and cost are mature, and management said there is no ceiling on profitability, though margins will not jump quickly. Management said it does not allow customers to sublet or auction capacity, with only very small exceptions through mask licensing. It said CoWoS remains the main advanced packaging choice, that 5x reticle production is in volume, and that it is working toward 9x and 14x. CPU demand is not included in the AI accelerator growth definition. Pricing varies by segment, location, and technology, and the GlobalFoundries interposer arrangement is part of a strategy to address a back-end shortage.

Analyst Q&A (16)
▸
How does TSMC see AI revenue growth, how does it reconcile capacity needs with risks such as data center power, funding, HBM, advanced packaging, and laser supply, and how will it avoid overbuilding?
Laura Chen · Citi
Management said it uses a detailed capacity planning process that considers CSP CapEx, data center build-outs, financing, power, and component supply. It believes demand still exceeds supply and it is working to narrow the gap.
▸
Is there an update to the AI accelerator CAGR (previously mid-to-high 50s percent for 2024 to 2029)? Also, how will High NA EUV around 2030, rising CapEx intensity, pricing power, and long-term gross margin and capital returns be affected?
Laura Chen · Citi
Demand is extremely robust with no sign of slowdown, and the growth rate could be higher than the high-50s figure. High NA is planned for 2030 and improves productivity. CapEx will be much higher, and there is no ceiling on profitability, but margins will not rise dramatically overnight. The strategy is to help customers succeed.
▸
Will wafer tightness be greater in 2027 than 2026? Can wafer capacity growth reach 10% or more in the next couple of years?
Gokul Hariharan · JPMorgan
Demand is very high and the gap with supply is still large. Management cannot say whether the gap will widen or narrow because customer demand keeps rising. Wendell Huang said it is too early to give a capacity growth percentage, and that growth is mainly driven by advanced nodes.
▸
What are the plans for overseas expansion, especially in the U.S. and Texas, and what is the engagement with a customer such as SpaceX or Tesla? Is it similar to the Japan and ESMC arrangements?
Gokul Hariharan · JPMorgan
TSMC is evaluating sites outside Arizona, including Texas, and is discussing with a customer's planned Terafab whether TSMC can use that capacity. Discussions are ongoing. Any fab must be run by TSMC, and no conclusion has been reached.
▸
Is there a secondary wafer market where customers pass allocations to others? Is it small, customer-specific, or an emerging trend?
Krish Sankar · TD Cowen
This is not a new strategy. TSMC does not allow customers to sublet or auction capacity. Mask licensing agreements are possible in certain cases, but this is not common practice, and the amount is very small.
▸
Competitors may adopt High NA EUV earlier than TSMC, which starts in 2030. Is that a competitive disadvantage?
Krish Sankar · TD Cowen
TSMC adopts tools only when they are mature, cost-effective, and ready for mass production. High NA is expected to be mature by 2030, and a 12-inch photomask is being developed with ASML by 2031. TSMC does not see a disadvantage and is confident it remains the best at advanced technology.
▸
An IDM customer is expanding capacity aggressively and may insource more. How will TSMC handle this? Does A14 being bigger than N2 include server CPUs from that IDM customer?
Charlie Chan · Morgan Stanley
TSMC treats all customers fairly, whether IDM or fabless, but considers internal capacity when planning its own. A14 is already seeing more customer interest than N2 at the same stage, and management expects A14 to be a bigger node. It does not comment on specific customers.
▸
As reticle sizes grow, can SoW and 3.5D packaging win customers? If a customer chooses Intel EMIB-T and lacks capacity, will TSMC support CoWoS as an alternative?
Charlie Chan · Morgan Stanley
TSMC's advanced packaging is very competitive. It is in production at 5x reticle size with excellent yield and is working on 9x and 14x. CoWoS is still the main choice for customers, and cost reduction is in development. Management said it would be willing to act as a backup if a competitor cannot deliver, with a priority on smooth product introduction.
▸
How should CapEx beyond 2026 be viewed compared with revenue growth, given stronger demand and tool price inflation? Will higher tool prices increase 2027 CapEx?
Sunny Lin · UBS
It is too early to give a number beyond 2026. CapEx for 2026 to 2028 will be significantly higher than in the past three years to support customers. Tool price inflation is real, but most CapEx is tied to long-term demand. Revenue should still grow faster than CapEx if TSMC does its job right.
▸
Why is overseas margin dilution widening to 3% to 4%? Is the Arizona second-phase expansion accelerating, and is a third phase being pulled forward?
Sunny Lin · UBS
TSMC is accelerating expansion everywhere, including in the U.S., to meet strong demand. The 3% to 4% dilution applies to the latter part of the five-year period and has not changed.
▸
Is AI demand shifting toward more efficient compute, such as CPUs and networking, and away from accelerators? What does this mean for manufacturing and packaging opportunities?
Haas Liu · Bank of America
AI demand is extremely robust. Management said it is not able to comment on whether demand is coming more from accelerators or CPUs. Demand for agentic AI CPUs is rising, and total demand is still well above supply.
▸
Will running conventional power delivery for mobile and Super Power Rail for HPC and AI at the same time make yield learning and manufacturing harder, and what does that mean for gross margin?
Haas Liu · Bank of America
The situation differs from past years because smartphone and AI and HPC demand are arriving together. TSMC is prepared for this and believes it is managing the learning curve reasonably well, and customers are satisfied.
▸
Have power grid constraints led to lower customer forecasts? Could tighter power supply accelerate adoption of Super Power Rail?
Arthur Lai · Macquarie
Power supply is one factor TSMC considers, and it has studied U.S. power supply, which it describes as so far so good. Power constraints have not changed customer behavior. Backside power adoption depends on each product, with some accelerators using it and mobile phones generally not.
▸
Does the AI demand growth framework, including the mid-to-high 50s CAGR, include CPUs? If CPU forecasts rise significantly, when will the AI demand growth numbers be updated?
Arthur Lai · Macquarie
CPU demand is not included in the AI accelerator calculation because TSMC cannot tell which CPUs are conventional server CPUs versus AI server CPUs, and it depends on customer allocation. The narrow definition remains. Jeff Su added that CPU demand is part of TSMC's business but outside that definition.
▸
There are reports of significant price increases across mature and advanced nodes. Do increases apply to existing contracts or only to incremental capacity?
Sahej Singh · Stifel Financial
Pricing strategy depends on market segment, location, and technology. Prices in the U.S. may differ from those in Taiwan. TSMC aims to have its value recognized and maximize shareholder value.
▸
How does TSMC think about strategic choices between buying from specialty foundries, such as the GlobalFoundries interposer announcement, and providing services in-house?
Sahej Singh · Stifel Financial
The GlobalFoundries deal is part of TSMC's overall back-end supply strategy. The top priority is helping customers succeed with full front-end and back-end support. TSMC has a back-end shortage and is working with GlobalFoundries to support customer products with enough capacity.

Web Traffic

tsmc.com
Web rank#341,500
Est. visits/mo1.6M
Traffic YoY▼ 55.1%
Traffic QoQ (12w)▼ 24.2%
Web Rank History
#341,500+375
rankest. visits/mo
150k200k250k300k350k400k604K2.7M4.9M7.0M9.1M05-1908-2512-0103-0906-1509-2111-16

Analyst Coverage

Analyst Coverage
Analyst Ratings
13
5
Buy: 13Hold: 5Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q1220.3B153.1B64.0B$2.47$2.27 – $2.6111
2019 Q2236.7B153.1B66.1B$2.55$2.35 – $2.6920
2019 Q3286.8B181.1B97.2B$3.75$3.45 – $3.9612
2019 Q4316.4B202.0B114.6B$4.42$4.06 – $4.6711
2020 Q1310.3B204.7B116.1B$4.48$4.12 – $4.7317
2020 Q2309.0B200.3B110.6B$4.26$3.92 – $4.5110
2020 Q3343.4B243.2B126.9B$4.89$4.50 – $5.1710
2020 Q4363.5B258.6B137.3B$5.29$4.87 – $5.6015
2021 Q1360.5B259.7B135.3B$5.22$4.80 – $5.5210
2021 Q2372.1B263.2B135.6B$5.23$4.81 – $5.5310
2021 Q3412.9B283.3B149.8B$5.78$5.31 – $6.1113
2021 Q4436.1B301.6B161.7B$6.24$5.73 – $6.5910
2022 Q1471.9B330.3B186.0B$7.17$6.60 – $7.5820
2022 Q2522.9B373.7B220.7B$8.51$7.83 – $8.9912
2022 Q3604.9B419.4B266.2B$10.26$9.44 – $10.8511
2022 Q4637.7B447.0B287.9B$11.10$10.21 – $11.7318
2023 Q1518.2B337.2B191.8B$7.40$6.80 – $7.8210
2023 Q2479.2B328.7B172.8B$6.66$6.13 – $7.0410
2023 Q3540.8B373.5B191.1B$7.37$6.78 – $7.7915
2023 Q4617.9B415.5B224.4B$8.65$7.44 – $10.5422
2024 Q1584.4B413.4B215.6B$8.31$7.94 – $8.8424
2024 Q2659.5B444.5B237.0B$9.14$8.61 – $9.9423
2024 Q3749.7B518.8B298.0B$11.49$10.40 – $12.1523
2024 Q4856.5B606.9B371.8B$14.34$13.51 – $15.7323
2025 Q1837.0B590.1B353.2B$13.62$12.77 – $14.3822
2025 Q2920.9B607.0B375.3B$14.47$13.64 – $15.9524
2025 Q3967.5B647.3B412.5B$15.91$14.91 – $16.7222
2025 Q41031.5B715.7B471.6B$18.18$16.49 – $19.7520
2026 Q11120.8B801.5B542.5B$20.92$19.92 – $22.0622
2026 Q21266.0B931.2B627.6B$24.20$22.79 – $26.4721
2026 Q31463.9B1084.4B740.3B$28.55$26.33 – $31.0324
2026 Q41712.1B1247.6B857.6B$33.07$31.83 – $34.5621
2027 Q11733.9B1287.8B871.0B$33.59$30.58 – $37.0519
2027 Q21861.0B1386.1B932.8B$35.97$33.68 – $38.368
2027 Q32021.2B1534.2B1035.5B$39.93$37.38 – $42.588
2027 Q42142.1B1635.9B1097.5B$42.32$39.62 – $45.1314
2028 Q12100.7B1622.0B1062.6B$40.98$38.36 – $43.6914
2028 Q22286.8B1757.8B1153.6B$44.48$41.64 – $47.4310
2028 Q32472.6B1915.7B1261.3B$48.64$45.54 – $51.879
2028 Q42615.4B2031.4B1331.8B$51.36$48.08 – $54.769
v2 analysis (legacy, 2026-07-16) — for comparison onlyclick to expand

Thesis

TSMC remains the indispensable foundry for the global AI buildout, with advanced nodes (7nm and below) now 77% of wafer revenue and 2nm ramping into high-volume production. Q2 2026 revenue of $40.2B and record gross margins confirm pricing power and near-monopoly status on leading-edge logic. Management raised full-year 2026 CapEx guidance to $60-64B (from $52-56B) and layered on an additional $100B Arizona investment, signaling extreme conviction in a durable, possibly still-underestimated AI demand curve (reinforced by 'Agentic AI' driving renewed CPU demand alongside accelerators). The company is running near maximum utilization with a 'very big' unconstrained demand gap in 3nm/CoWoS capacity. Risks are less about the underlying business quality (which is exceptional) and more about scale of capital commitment, cyclical normalization risk in 2027+, customer concentration (Nvidia ~60% of 2026 advanced packaging capacity), Taiwan geopolitical exposure, and a live ITC patent investigation with tail risk of import restrictions. Net debt is deeply negative (net cash position), dividends are growing, and dilution is essentially zero — this is one of the highest-quality compounders globally, priced for continued execution.

Trade Signal

Trade rating
-4.3/10
No trade
Horizon
~6mo
Claude2026-07-16 · saw 2,462.74 TWD-11.5% since

TSMC is a phenomenal business but the market has already re-rated it far ahead of the analyst's probability-weighted fair value (-37%), with unanimous bullish sentiment, a 33.5x P/E versus historical 10-20x, and no visible incremental catalysts the market doesn't already expect — a moderate short/trim on valuation stretch, not a bet against the franchise.

Temporary mispricing-2.0

The stock is up 121% over the past year and 47% over 3 months, well beyond any single earnings beat — this is sustained multiple expansion (P/E from ~20x to 33.5x, P/S from 9x to 15.6x) driven by the broader AI-capex narrative and TSMC's own guidance raises (Q2 beat, Q3 guide up, capex raised to $60-64B, +$100B Arizona). Each leg up tracks real news (record margins, CoWoS pricing power, 2nm ramp), so this isn't drift — it's the market re-rating TSMC as the indispensable AI-era foundry. Today's earnings reaction (+1% on an in-line/positive print) shows most of the good news is already priced in. This looks like a durable re-rating, not a dislocation likely to snap back quickly, but the pace and magnitude of multiple expansion has outrun even the bull-case scenario math.

Market view+8.0

Consensus is unanimously bullish — 13 buy / 5 hold / 0 sell, no bears left standing. The narrative is TSMC as the only credible full-stack leading-edge foundry for the AI buildout, with CoWoS sold out, Nvidia booking 60% of packaging capacity, and Agentic AI reinvigorating CPU demand. Retail and institutional enthusiasm both very high given the stock is near its 52-week high (-2% off). There is essentially no bear camp being paid attention to; risks flagged (ITC investigation, Taiwan geopolitical concentration, capex scale/duration risk) sit in the footnotes, not the price. This is a loved, crowded consensus long priced for continued perfection.

Inflectionwindow ~3mo+1.0

The big inflection — 2nm hitting volume, HPC becoming 66% of revenue, CoWoS pricing power — is already disclosed and largely reflected in raised guidance and consensus numbers (Q3 guide of $44.6-45.8B already bakes in the ramp). Margin dilution from 2nm/overseas fabs in H2 is guided, not a surprise. The next real data points (2nm yield ramp, Arizona output, whether AI capex digestion begins) are more likely to test the bull case than exceed it. There's limited room for a positive surprise the market doesn't already expect, and real risk that the multiple has run ahead of the delivery calendar.

Catalysts
  • •2026-10 · Q3 2026 earnings — Guided $44.6-45.8B; watch gross-margin dilution from 2nm ramp vs offsetting utilization gains.
  • •H2 2026 · 2nm mass-production yield/ramp updates — Market has priced smooth ramp; any yield hiccup is a real re-rating risk down.
  • ▼late 2026 · ITC investigation ruling (Longitude/Marlin patent case) — Tail risk of a partial import ban on advanced chips into the US, currently under-discounted.
  • ▼ongoing · 2026 capex execution / potential further capex raises — Capex now $60-64B + $100B Arizona; scale/duration risk rises, could pressure FCF and worry investors on capital discipline.
  • ▼H1 2027 · AI capex digestion signals from hyperscaler customers — Bear case explicitly cites earlier-than-expected AI capex digestion; a slowdown here would hit the multiple hard.
  • ▼2027 · Arizona Fab ramp / Apple-Intel packaging partial diversification — Signals of customer diversification away from pure TSMC reliance, longer-term share risk.
Flow+2.0

No dilution (0% TTM), self-funded massive capex from operating cash flow and $110B cash pile, and a rising dividend (TWD 24/share for 2026). No signs of insider selling flagged. This is a net-neutral-to-mildly-positive flow picture — not a buyback-driven squeeze, but no supply overhang either.

Floor / Ceiling+2.0

Real floor exists from net cash, a genuine ~25% FCF margin business, an unmatched moat, and a growing dividend — this is not a story stock, cash generation is real. But at 33.5x TTM earnings and P/FCF of 63x, valuation offers no floor near current levels beyond fundamentals re-rating down over years; there's no hard ceiling either (no overhang, no controlling seller), but the sheer size of the AI-capex bet (now $60-64B/yr) and full analyst consensus with zero sell ratings suggest limited incremental buying power at these levels — the next big buyer has to believe in an even larger AI supercycle than already priced.

Buyability

Extremely buyable in the sense that TSMC is a top-3 global tech holding for every large-cap fund, ETF, and semiconductor-exposed portfolio — there is no structural impediment to owning it, and it pays a real, growing dividend with a strong capital-return history. The question isn't whether it CAN be bought, but whether the next marginal buyer is paying for growth that's already fully priced — which is the actual risk here, not investability.

Fear vs Greedfear 4/10 (+1.0)greed 8/10 (+2.0)

Greed dominates the market's read on this name right now — a flawless print at all-time highs with unanimous buy ratings is exactly the setup where a small stumble (margin miss, capex fatigue signal, or ITC headline) causes an outsized drawdown; I feel more fear than the tape currently expresses.

Valuation

Our Target
38.5T TWD-33%
Market Should Pay
40.4T TWD-30%
target ×1.05 (greed premium)
Current Market Cap
57.8T TWDSlightly bullish
What Changed
transcript · 2026-07-16
+4%fair value on this information

The market already knew Q2 revenue would be strong (May monthly data and Q2 guidance were public). What's genuinely new: full-year 2026 CapEx guidance raised again to $60-64B (from $52-56B just one quarter ago), an additional $100B Arizona investment (total Arizona commitment now ~TWD265B), an unusually strong Q3 guide ($44.6-45.8B, above prior trajectory), 2nm revenue contribution beginning at 3% with 3nm/5nm still 63% combined, and explicit management commentary that prior 5-year AI CAGR/capacity-growth assumptions (2nm 70% CAGR) are now 'likely even larger.' Also new: management flagged a 3-4pp gross margin headwind in 2H from the 2nm ramp, and analysts' repeated attempts to get multi-year capex/CAGR numbers were consistently deflected — a mild dodge pattern around long-term capital intensity.

▸ How the cases moved

Bull case equity value nudges up modestly (management explicitly signaling AI demand is stronger than prior 5-yr CAGR assumptions, packaging fully sold out with 10-20% price increases) and bull probability shifts slightly higher (0.25→0.30); base case largely unchanged in value but reaffirmed with higher confidence; bear probability trimmed slightly (0.20→0.15) given demonstrated pricing power and sold-out capacity reduce near-term demand-air-pocket risk, though the larger capex base slightly raises the execution/dilution-of-returns risk embedded in the bear narrative.

2-Year Plausible Outcomes
bear15%
24.6T TWD
rev +10%/yrOE $1638000M

AI capex digestion begins earlier than expected, Samsung/Intel claw back some leading-edge share, the ITC import-ban tail risk partially bites, and overseas/2nm margin dilution persists longer than guided. Growth decelerates to low-teens and the market de-rates the multiple on fear of a capex-driven margin air pocket.

▸ Valuation

15x NI (1,638,000) = 24,570,000 equity value (net-cash position already embedded in NI-based equity multiple)

base55%
48.7T TWD
rev +22%/yrOE $2565000M

AI supercycle continues at a moderating but still strong pace (~20-25% revenue CAGR); 2nm/A16 ramp smoothly, margin dilution from overseas fabs and node transitions stabilizes near the 56%+ gross-margin floor management targets, and net margins settle around 40%. Massive capex is absorbed without balance-sheet stress given the net-cash position and rising OCF.

▸ Valuation

19x NI (2,565,000) = 48,735,000 equity value

bull30%
67.6T TWD
rev +30%/yrOE $3074000M

Agentic AI and broader compute buildout accelerate demand beyond current guidance; CoWoS/advanced packaging pricing power (+10-20%/yr) and full utilization drive margin expansion even as capex scales; TSMC captures outsized share of the entire global AI silicon economy with essentially no credible near-term competitor at the leading edge.

▸ Valuation

22x NI (3,074,000) = 67,628,000 ≈ 67,600,000 equity value

▸ Target Rationale

I trim ~5% below the probability-weighted model value to reflect that the scenario math doesn't fully price in geopolitical tail risk (Taiwan concentration), the live ITC investigation, and the sheer scale/duration risk of a capex program now running at $60-64B/yr plus a fresh $100B Arizona commitment — execution and capital-allocation risk rises with the size of the bet even though management's track record is excellent. Earnings quality and moat strength argue against a larger discount.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality9/10
Situation now9/10
Trajectory8/10
Risk4/10
Governance8/10
Insolvency prob (2yr)1%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Record-Breaking Q1 2026 Financial Results: In April 2026, TSMC reported consolidated revenue of NT$1,134.10 billion (approx. US$35.90 billion), a 35.1% year-over-year (YoY) increase in NT$ (40.6% in USD). Net income rose by 58.3% YoY to NT$572.48 billion. Gross margins reached a record high of 66.2%, driven by strong capacity utilization, cost-control efforts, and immense pricing power in advanced nodes (7nm and below accounted for 74% of wafer revenues).
  • Exceptional Q2 Momentum: TSMC guided Q2 2026 revenue to land between US$39.0 billion and US$40.2 billion. In June 2026, the company reported record monthly revenue for May 2026 of NT$416.98 billion (US$13.17 billion), representing a 30.1% YoY increase and placing TSMC on track to outperform the high end of its quarterly guidance.
  • Unprecedented Capital Expenditure: TSMC’s capital expenditure guidance for 2026 is projected between US$52 billion and US$56 billion to support aggressive sub-3nm node and advanced packaging expansion.
  • Next-Gen Transistor & Packaging Breakthroughs: In June 2026, TSMC, ASML, and Imec demonstrated a world-first scalable complementary 2D-material (MoS2 and WSe2) transistor integration flow on a 300mm wafer at a 50nm pitch. The test achieved a 94% operational yield, paving the way for post-silicon logic devices. Furthermore, TSMC is accelerating development on its next-generation Chip-on-Panel-on-Substrate (CoPoS) panel-level packaging, qualifying pilot lines ahead of planned mass production in the next 2 to 3 years.
  • Labor and Geopolitical Risks: To prevent employee walkouts following internal rumors of a 15% bonus cut, TSMC management promised faster bonus growth in late May 2026. On the litigation front, the U.S. International Trade Commission (ITC) is actively investigating TSMC following patent infringement complaints from Longitude Licensing and Marlin Semiconductor, presenting a tail risk of potential import bans on certain advanced chips.
▸ Thesis-test Findings
TSMC Arizona Fab 2 Construction & Yield Rates

TSMC's Arizona Phase 2 facility (Fab 21 Phase 2), configured for the advanced 3nm node, has entered pilot/risk production roughly six months ahead of its internal schedule as of May 2026. Commercial mass production has been moved forward to early 2027 (accelerated from previous 2028 targets) due to strong client demand. The customer profile is already booked out for the first 18 months of volume production, with Apple, AMD, and Nvidia confirmed as major clients. Although official mass-production yield rates for Fab 2 have not yet been finalized due to the facility's current pilot phase, Fab 1 (Phase 1, N4 process) has been operational in Phoenix since late 2024 and is successfully generating yields comparable to TSMC's Taiwan fabs.

CoWoS Packaging Supply Capacity vs. Demand Forecasts

The supply-demand gap for high-demand CoWoS (Chip-on-Wafer-on-Substrate) advanced packaging is expected to narrow from ~20% in mid-2026 to roughly 10% by the end of 2026, with conditions improving further into 2027. This is driven by TSMC's rapid capacity expansion, with internal CoWoS capacity targeted to reach 120,000 to 130,000 wafers per month by the end of 2026 (up from ~75,000 in late 2025). Including OSAT partners, total industry output will approach 200,000 wafers per month. Nevertheless, at the June 2026 annual meeting, CEO C.C. Wei emphasized that CoWoS capacity remains extremely tight and fully sold out through 2026. Nvidia alone has booked roughly 60% of TSMC's 2026 advanced packaging capacity. Because of this severe bottleneck, advanced packaging prices are rising by 10% to 20% annually, providing TSMC with massive margin expansion.

Intel Foundry IFS Outsourcing Percentage (N3/N2 Nodes)

Intel has shifted away from its previous strategy of attempting to bring its external foundry reliance to zero, committing instead to a permanent multi-foundry hybrid approach. Intel currently outsources approximately 30% of its wafer production to third parties, with TSMC acting as its primary advanced supplier. Intel utilizes TSMC's N3/N3B nodes to manufacture the critical compute chiplets for its flagship Arrow Lake and Lunar Lake client processors. While Intel plans to manufacture its next-generation Panther Lake (compute tiles) internally on its own 18A node, it has guided a long-term permanent outsourcing target to TSMC of 15% to 20% of its wafers. TSMC's dominance over N3 and the upcoming N2 node remains solid; AMD and other players have already signed on as first-adopters of TSMC’s N2 node starting in late 2026/2027. However, to mitigate TSMC's supply bottlenecks, Apple reportedly reached a preliminary agreement in mid-2026 to utilize Intel's domestic packaging/foundry capabilities.