Stocks/5347.KL

5347.KL

Tenaga Nasional Berhadv3 4.5/10 · 2026-11-12
Utilities·Regulated Electric
12.50 MYR
73.0B MYR market cap
2.2% div yield
v3 Rating
4.5/103.5–5.5
Setup
3.0/102.0–4.5
Fair Value
12.00 MYR9.50 MYR–15.00 MYR-4%
DCF (10%)
10.00 MYR-20%
Base IRR
+8%+3%–+12%
Visibility
moderate±23%
Rating
Revenue (TTM)
68.8B MYR
Owner Earnings
MYR 7.0B
Next-Yr Owner Earnings
MYR 1.5B
Growth
+5.5% × 10y
P / Next-Yr OE
48.6x
Net Debt
MYR 77.0B

Tenaga Nasional Berhad engages in the generation, transmission, distribution, and sale of electricity in Malaysia, the United Kingdom, Kuwait, the Republic of Ireland, Australia, and internationally. It operates and maintains thermal and hydroelectric power plants; and operates and manages the National Grid that is connected to Thailand's transmission system, as well as Singapore's transmission system at Senoko. The company also supplies fuel and coal for power generation; generates, distributes, supplies, deals in, and sells various energy sources, as well as provides related technical services; develops district cooling systems; operates and maintains co-generation works; manufactures, sells, and repairs distribution, power, and earthing transformers; and owns, develops, and manages dry bulk terminals. In addition, it provides turnkey contracting services to transmission substations; repair and maintenance services to heavy industries and other related services; operation and maintenance services to telecommunication equipment and data centres; higher education, telecommunication, and IT infrastructure solution and services; research and development services in the areas of engineering, information technology, business, accountancy, and liberal studies; and training courses. Further, the company offers insurance and reinsurance, technical and laboratory, consultancy, and other services; manufactures and distributes power and general cables, and aluminum rods; operates an integrated district cooling systems for air conditioning systems of office buildings; assembles, manufactures, tests, reconditions, and distributes high and medium voltage switchgears and control gears for transmission and distribution of electric power; and operates wind assets. It primarily serves commercial, industrial, and residential customers. The company was founded in 1949 and is headquartered in Kuala Lumpur, Malaysia.

2-Year Price History

$12.74-5.5%
$12$13$13$14$14$15Initial target $12.00 · 2026-11-12volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-12

Rating
4.53.5–5.5
Setup
3.02.0–4.5
Fair value (MYR)
12.009.50 – 15.00
Upside vs 12.50
-4%
DCF (10%)
10.005.00 – 15.50-20%
Base IRR
8%3% – 12%
Visibility
moderaterange ±23%
Sentiment
6/10
Reputation
5/10
2026-11-12 · claude-opus-5-5 · priced at 12.80

Tenaga Nasional is Malaysia's state-linked monopoly grid and main generator: a AAA-rated regulated utility earning a 7.3% allowed return on a fast-growing asset base, with data-centre load (1.26 GW live, 8.35 GW secured plus about 5 GW more queued) driving 5-6% demand growth. At RM12.80 (close 12 Nov 2026, near the bottom of its 12.50-14.82 one-year range, after the September sell-off over TNB absorbing RM120-150m of household bill relief), the market prices it as what it is: about 15x core earnings, about 7x EV/EBITDA, a 4.1% dividend, and EV of about 0.9x PP&E plus right-of-use assets. The cash economics are less attractive than the headline. Capex of RM18-21bn a year roughly equals EBITDA after tax, so unlevered free cash flow is near zero. Net debt including PPA leases is about RM77bn, plus a RM13bn employee-benefit liability. Every ringgit of growth capex earns roughly 7.3%, below our 10% hurdle. Our unlevered DCF at 10% gives about RM10/share; an equity-level view (4% yield plus 5-6% EPS growth funded by cheap 4.2-4.7% fixed-rate debt) gives an 8-10% return. That makes it fairly to slightly over-priced on our yardstick, with real policy risk: RP5 resets the WACC from 2028, the government is reviewing the AFA and subsidy framework for January 2027, and it has already used TNB as a fiscal shock absorber (the RM10.6bn tax PYA, subsidy absorption). Rating 4.5: no mispricing we can name. Interest 3: a well-run, durable utility that the market understands well, with no variant view, no buyout angle and too little volatility for a covered-call floor setup.

A deep dive would have to establish: Will RP5 (2028-2030) keep the allowed return near 7.3% and stop the government from pushing subsidy costs onto TNB, so that the RM18-21bn a year capex programme compounds earnings at about 6% instead of just growing debt?

Owner earnings, TTM
MYR 7.0BMYR 5.8B – MYR 8.0B
Realistic peak profit
MYR 10BMYR 8.5B – MYR 12B
Growth rate
5.5%3.0% – 7.0%
Years of growth
105 – 15
Market cap
MYR 75BMYR 74B – MYR 76B
EV
MYR 152BMYR 148B – MYR 166B
Net debt
MYR 77BMYR 75B – MYR 91B
Capital return / cap
4.1%3.8% – 4.5%
P/E
15.5×14.5× – 16.5×
EV/EBITDA
7.0×6.8× – 7.6×
FCF yield
1.0%-0.5% – 3.0%
Projected FCF, base case (MYR millions)
Y1MYR 1.5B-MYR 1.0B – MYR 3.0B
Y2MYR 1.8B-MYR 1.5B – MYR 4.0B
Y3MYR 2.0B-MYR 2.0B – MYR 5.0B
Y4MYR 3.5B-MYR 1.0B – MYR 6.5B
Y5MYR 4.9BMYR 0M – MYR 8.0B
Competition: TNB has a regulated monopoly on the Peninsular grid and retail supply; in generation it competes with IPPs such as YTL Power and Malakoff in Energy Commission tenders (NEWGEN26, LSS6, CRESS), where returns are capped by PPA terms.
Governance: Government-linked company (Khazanah, EPF, PNB, KWAP) whose regulator is also its controlling shareholder's government; it was made to absorb RM120-150m of household bill relief in Sept 2026 and took a RM10.6bn retained-earnings hit after losing the reinvestment-allowance tax case in 2025.
Research (expand)

What it does. TNB owns Peninsular Malaysia's transmission and distribution grid (a monopoly regulated under Incentive-Based Regulation, with a 7.3% WACC under RP4 for 2025-27), about half of national generation (Genco), the retail franchise, and small international renewables (UK, Australia). Fuel costs pass through monthly via the new AFA mechanism.

What the market believes. A safe, slow-growing GLC bond proxy with a data-centre kicker. Sell-side is almost unanimous (20 buy, 1 hold, average target about RM16.7), yet the stock fell from 14.60 in July to 12.80. The September decision to make TNB absorb RM120-150m of expanded bill relief reminded holders that the regulator is also the shareholder's government. Q3 results come on 19 Nov; RP5 parameters are expected during 2027.

What it earns. H1-26: operating profit RM4.54bn, EBITDA RM10.8bn, core PAT RM2.3bn (+5%, of which RM160m came from newly recognised contingent capex). FY26E EBIT is about RM9.4bn; at a 24% tax rate, unlevered owner earnings (NOPAT, assuming maintenance capex roughly equals D&A of about RM12.5bn) are about RM7.0bn. Real free cash flow is much lower: TTM operating cash flow of RM16.1bn less capex of RM16.9bn is about -RM0.8bn before lease and interest payments. Group capex is RM18bn in 2026, more than RM50bn of new gas, pumped-hydro and repowering projects are queued, and RP4 regulated capex steps up to RM13-15bn. No stock-based compensation of note.

Projection (unlevered FCF, RMbn). EBITDA grows about 6% a year to about RM28.9bn by 2031 and capex runs at RM19-21bn: 2027 1.5, 2028 1.8, 2029 2.0, 2030 3.5, 2031 4.9. In year 5 it will be the same thing it is now, a durable regulated utility growing 4-6%, in the 'neither' bucket and highly durable. Valuing year 5 at 7x EBITDA (today's multiple) gives a terminal value of about RM202bn and EV of about RM135bn. Less RM77bn net debt including leases, that leaves about RM58bn, or RM10.0/share at 10%. Counting the pension liability would cut this to about RM7.8. At 18x year-5 NOPAT (the top of our 'neither' band), value falls to about RM6.5. The DCF is harsh because the business borrows at 4.2-4.7% fixed: in equity terms (yield 4.1% plus EPS growth of about 6% at a constant P/E), holders earn about 8-10%. Fair value of about RM12, slightly below the price.

Multiples paid. P/E about 15.5x core, EV/EBITDA about 7.0x, EV/NOPAT about 21x, P/B 1.4x, dividend yield 4.1% (63% payout, a flat 25 sen interim).

Management, risks, competition. CEO Shamsul and CFO Badrul are credible and blunt (they admitted cost pressure, overruns beyond the opex allowance eating into returns, and Q2 Genco provisions for state charges). Risks: RP5 WACC cut (management wants 7.8%, the government pushes back); further subsidy burdens if fuel stays high; the KWIE fund running down (RM900m owed by government entities); non-fuel opex inflation; Genco growth capex earning thin PPA returns; the RM10.6bn tax-litigation hit shows the state can take equity value. Competition: none in grid; IPPs (YTL, Malakoff, 1MDB-legacy plants) compete in generation tenders such as NEWGEN26 and LSS6.

Sentiment: 6/10. Analysts love it and local institutions (Khazanah, EPF, PNB, KWAP) anchor the register, but foreign money has drifted out on policy-intervention fears, and the price sits in the bottom 13% of its yearly range.

Financials — Adjusted

Adjusted · TTM 2026-Q1 · MYR

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue68788+16%67723+19%56737-8%61559-16%73183
Gross profit40163+406%39365+671%5107+22%4173-51%8539
Operating expenses3120631403-1260-931-870
▸Adj EBITDA21139+17%19943+31%15281-7%16369-21%20812
▸Adj OCF14750-24%15341-15%17956+3%17463+86%9378
CapEx-16276-16246-11264-10571-8429
Adj FCF-1526-121%-905-114%6692-3%6892+626%949
Interest expense40053995409844034346
▸Adj net income4064-6%3191-23%4135+29%3199-15%3760

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA75612100%6383100%13163100%16059100%18908100%21099100%
FCF (OCF−capex)3348744%233837%-905-7%1007663%21028111%9494%
Net income1679822%109817%476836%469929%277015%346316%
▸Capital returned1949326%-340-5%431933%1055866%1049055%-5534-26%
Buybacks-24.00.000.000.00-24.00.00
Dividends107610.002969307425382181
Interest paid178239813995409844034346
Debt paid down-9067-1321-264433863573-12061
▸Reinvestment5437072%390661%18240139%911757%978752%1332063%
Capex (PP&E)4955330431624611264105718429
Intangibles & M&A2518-0.6027.83.401633854
Leases signed (net Δ)22998641966-2150-24184037
Retained / other2929839%365957%-1257-10%361322%1330970%997547%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)202819198355205056204771205922
▸Liabilities (total)150312145381142486142766144956
Net debt (incl. leases)7599976760660707192784126
Net debt / Adj EBITDA3.603.854.324.394.04
Net debt / Adj FCF----9.8710.488.6
Adj EBITDA / interest5.284.993.733.724.79
Shares outstanding58295824581057975774
Dilution (YoY)+0.0%+0.3%+0.2%+0.4%+0.3%
Employees12000--------
MarginsTTM2025202420232022
Gross margin58.4%+45.058.1%+49.19.0%+2.26.8%-4.911.7%
Adj EBITDA margin30.7%+0.329.4%+2.526.9%+0.326.6%-1.928.4%
Adj OCF margin21.4%-11.622.6%-9.031.6%+3.328.4%+15.612.8%
Adj FCF margin-2.2%-14.6-1.3%-13.111.8%+0.611.2%+9.91.3%
Net income margin7.0%-1.57.0%-1.28.3%+3.84.5%-0.24.7%
Adj NI margin5.9%-1.44.7%-2.67.3%+2.15.2%+0.15.1%
ROIC (adj, after-tax)4.9%4.4%3.5%2.6%4.0%
Cost of debt4.5%4.5%4.7%4.7%4.6%

Earnings Calls

3 calls

Earnings Call · 2026 Q2

2026-08-28

Tenaga Nasional Berhad (TNB) reported a resilient first half of FY2026. Core PAT, adjusted for forex and MFRS 16, rose 5.3% to MYR 2.3 billion. Revenue grew 7.5% (about MYR 2.5 billion more), driven by an 8% rise in units sold. Commercial demand grew 13.7% and now makes up 39% of volume. EBITDA rose MYR 509 million to MYR 10.8 billion, though margin slipped to 30.8% from 31.6% on cost pressure. Reported PAT was lower because last year included a roughly MYR 370 million forex gain, and finance income fell about MYR 160 million. The effective tax rate was 29.3%, with management still targeting about 24% for the year, realized mainly in Q3 and Q4. An interim dividend of MYR 0.25 per share was declared, a 63.2% payout on adjusted PATAMI, in line with prior interim dividends. Data centers are the fastest-growing load. Consumption more than doubled to about 4 TWh and load reached 1.26 GW, but data centers are still only 6% of sales. The secured pipeline is 61 projects and 8.35 GW, of which 42 projects (5.65 GW) are already connected. The data center task force recently approved 19 more applications with another batch pending, adding a backlog of more than 5 GW on top of the roughly 8 GW projected over three years. System peak demand hit a record 22,014 MW on 6 August. Management raised its 2026 demand growth forecast to 5-6%. Operationally, generation equivalent availability improved to 87.9% from 86.1%, and distribution SAIDI was 23.45 minutes. Genco's net energy generated was up 10%. Management said Q2 Genco weakness came from minor demolition and combustion inspection work, plus state regulatory charge provisions. Genco's H1 adjusted PAT was MYR 420 million, and the CEO said full-year PAT should exceed MYR 600 million. CapEx for H1 was MYR 7.1 billion, of which MYR 5.6 billion was regulated and MYR 1.5 billion nonregulated. Full-year guidance is unchanged at about MYR 18 billion (MYR 13 billion regulated, MYR 5 billion nonregulated), with delivery weighted to H2. About MYR 700 million of contingent CapEx has been recognized, contributing roughly MYR 160 million to PAT. Base CapEx is 58% of the RP4 MYR 26 billion allocation, so contingent CapEx must make up most of 2027 spending. The 12.7 GW generation pipeline runs through 2033, with 6.6 GW of legacy assets to be retired by 2030. TNB bid for NEWGEN26 gas capacity and is assessing LSS6. Funding was strong. TNB issued MYR 6.55 billion at blended rates of about 4.0-4.2%. Average borrowing cost is 4.65%, with 96% fixed, and RAM maintained the AAA rating. Receivables were MYR 4.7 billion, with around MYR 900 million in regulated receivables outstanding, including about MYR 380 million of AFA claims on the KWIE fund. Nonfuel OpEx was elevated in Q2 on repair and maintenance, staff and IT costs, and management expects it to moderate in H2. OpEx remains within the RP4 budget. RP5 CapEx and the 7.3% return will be set in later negotiations.

Analyst Q&A (19)
▸
H1 regulated CapEx was MYR 5.6 billion and nonregulated MYR 1.5 billion against full-year guidance of MYR 13 billion and MYR 5 billion. Will spending accelerate in H2? How much of the regulated spend is contingent CapEx, and is it flowing into earnings?
Daniel Wong · Hong Leong
The team says it will deliver, since construction spending ramps up once groundwork is done, and guidance is unchanged. About MYR 700 million of contingent CapEx has been recognized and contributed roughly MYR 160 million to H1 PAT.
▸
Excluding the contingent CapEx earnings, would earnings have grown at all? Is the MYR 13 billion on a cash flow basis, and when does a project start earning?
Daniel Wong · Hong Leong
Regulated earnings overall are growing from both base and contingent CapEx, which drives core PAT growth. The guidance is for assets capitalized onto the balance sheet, not cash spent. Cash goes into work in progress until milestones are met, and capitalization depends on how a project is defined, such as by cable section, and earns the 7.3% return.
▸
Has RP4 allocated budget for the ASEAN Power Grid, or will its CapEx only start in 2028 under RP5?
Daniel Wong · Hong Leong
RP4 has only minimal allocations, such as a few hundred million for land acquisition, and not the full project. A larger allocation is likely under RP5 once there is more clarity.
▸
How many new ESAs were signed in Q1 and Q2, and what is the split?
Max Koh · RHB
Five ESAs totaling about 862 MW were signed in H1, with 11 projected for the full year. The executive said they would provide the quarterly split.
▸
Are the planned new capacity expansions under the current NEWGEN26 or separate? Which projects have already been secured?
Isaac (Chee Chow) · Affin Hwang
Projects need Suruhanjaya Tenaga and PETRA approval through an initial notification, then a levelized study and negotiation. NEWGEN26 and LSS6 are separate bids closing around November, and TNB has bid for NEWGEN26. TNB has received letters of notification for Paka 1 and Paka 2 (2,800 MW), Ulu Jelai pumped storage (700 MW) and Kapar (2,100 MW), implying over MYR 50 billion of CapEx over five years.
▸
Does TNB prefer CRESS or LSS, and who bears the fluctuation risk in the DayOne deal?
Isaac (Chee Chow) · Affin Hwang
There is no preference, as both offer benefits and returns. Under CRESS, most of the risk is transferred to and borne by the offtaker.
▸
What will regulated CapEx look like in 2027, the last RP4 year, and will contingent CapEx ramp up?
Colin Lee · Macquarie
Base CapEx is already 58% of MYR 26 billion. Three-year regulated spend is guided at 70-80% of the MYR 43 billion allocation, so about MYR 13-15 billion is needed in 2027. Contingent CapEx must make up most of it, supported by demand, LSS and CRESS projects.
▸
How do you expect Genco's net energy generation to trend for the rest of the year after the 10% H1 growth?
Noah · Khazanah
The CEO expects consistently strong performance on disciplined maintenance, with some patches of maintenance and hopefully no major incidents.
▸
Will elevated Q2 nonfuel OpEx, including staff and IT costs, persist in H2?
Hazmy Hazin · CLSA
The rise reflects repair and maintenance on a bigger asset base, computer licenses, training and staff costs from scaled-up delivery, plus the annual performance cycle. It should moderate in Q3 and Q4.
▸
With inflationary pressure, is 7.3% still a good run rate for RAB return in RP5?
Hazmy Hazin · CLSA
It is too early to say. TNB hopes to enter negotiations at 7.3% but expects pushback. Overheads will rise gradually, including from phasing in the minimum living wage over three years.
▸
How much does the KWIE fund owe TNB and how much buffer remains?
Hazmy Hazin · CLSA
The fund's balance is confidential but management believes it is sufficient. About MYR 900 million is outstanding from government entities, including about MYR 380 million of AFA, and the regulator is watching how the fund is used.
▸
Is it getting harder to get data center approvals, and is the 5 GW on top of the 8 GW shown?
Hazmy Hazin · CLSA
The task force approved 19 applications recently and is set to approve about 33 more, bringing backlog to more than 5 GW, which is in addition to the roughly 8 GW projected over three years.
▸
Genco profit fell from about MYR 300 million to under MYR 100 million in Q2 with no major one-off. What explains the roughly MYR 200 million difference?
Unknown Analyst
The CFO did not think the cost difference was MYR 200 million. Besides minor demolition and inspection work, there were provisions for state regulatory charges that are being negotiated or disputed. Tax is mainly at TNB, not Genco.
▸
Is the roughly MYR 400 million AFA being recovered from KWIE only a cash flow issue and not a P&L one?
Unknown Analyst
The government decided to cover part of the AFA via the KWIE fund. Claims for May and June have been submitted, and July is being processed. The MYR 380 million is part of the MYR 900 million regulatory receivable and is a payment-timing issue.
▸
What steps can manage cost inflation, and should EBITDA margins compress further into the full year and next year?
Rachel Tan · UBS
Cost pressure comes from the larger asset base, since MYR 13 billion of 2025 capitalization drives 2026 R&M, plus staffing. TNB is shifting to preventive, predictive and risk-based maintenance and running productivity and cost-saving programs, with results expected around year-end and early next year.
▸
Given higher demand forecasts, what is the sense on RP5 CapEx, which was suggested last quarter could be lower?
Rachel Tan · UBS
It is too early to say. The team is compiling projections for the RP5 proposal, which will reflect demand forecasts, and higher sales also lift profitability.
▸
Since the 7.3% regulated return covers nonfuel OpEx, shouldn't cost increases just be timing differences with no EBITDA margin impact?
Fong · CIMB
The return assumes a certain OpEx level, and costs above the approved budget would erode margin. Not every cost is covered by the regulated return.
▸
Is regulated OpEx within the RP4 budget?
Fong · CIMB
Yes, it is within budget, so there is no concern.
▸
Can you give full-year adjusted PAT guidance for Genco?
Fong · CIMB
Genco made MYR 420 million in H1 against an internal KPI of MYR 600 million. The CEO said he is confident of exceeding MYR 600 million.

Web Traffic

tnb.com.my
Web rank#403,677
Est. visits/mo1.2M
Traffic YoY▼ 60.3%
Traffic QoQ (12w)▲ 25.3%
Web Rank History
#403,677+29,446
rankest. visits/mo
200k300k400k500k600k360K1.4M2.4M3.5M4.5M05-1908-2512-0103-0906-1509-2111-16

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q113.0B3.8B1.9B$0.33$0.33 – $0.331
2019 Q213.0B3.5B1.9B$0.33$0.33 – $0.331
2019 Q313.0B3.1B1.6B$0.28$0.28 – $0.281
2019 Q413.2B3.2B1.5B$0.26$0.26 – $0.261
2020 Q112.5B3.2B1.5B$0.26$0.26 – $0.261
2020 Q211.3B2.5B1.0B$0.18$0.18 – $0.181
2020 Q311.6B3.0B1.2B$0.21$0.21 – $0.211
2020 Q412.0B2.7B1.2B$0.21$0.21 – $0.211
2021 Q110.8B5.2B1.2B$0.21$0.21 – $0.211
2021 Q212.3B5.0B1.1B$0.18$0.18 – $0.181
2021 Q312.1B5.1B1.2B$0.21$0.21 – $0.211
2021 Q412.0B5.5B1.3B$0.23$0.23 – $0.231
2022 Q115.7B5.2B1.1B$0.19$0.19 – $0.191
2022 Q218.8B5.3B1.1B$0.19$0.19 – $0.191
2022 Q318.8B5.4B1.1B$0.19$0.19 – $0.191
2022 Q414.7B5.5B1.1B$0.18$0.18 – $0.181
2023 Q213.3B4.5B443M$0.08$0.08 – $0.081
2023 Q317.0B5.4B1.2B$0.20$0.20 – $0.202
2023 Q413.7B6.0B1.6B$0.27$0.21 – $0.322
2024 Q113.6B5.3B1.1B$0.19$0.17 – $0.212
2024 Q215.0B3.4B1.4B$0.24$0.24 – $0.241
2024 Q314.4B5.2B991M$0.17$0.17 – $0.171
2024 Q414.4B5.2B1.0B$0.18$0.18 – $0.181
2025 Q116.0B5.3B1.1B$0.20$0.19 – $0.212
2025 Q216.8B5.8B1.4B$0.24$0.23 – $0.252
2025 Q316.1B5.5B1.1B$0.20$0.19 – $0.202
2025 Q415.5B5.6B1.1B$0.19$0.19 – $0.202
2026 Q117.1B5.7B1.2B$0.21$0.20 – $0.222
2026 Q218.2B6.0B1.4B$0.24$0.23 – $0.252
2026 Q317.3B5.8B1.2B$0.21$0.21 – $0.212
2026 Q415.9B5.6B1.1B$0.19$0.18 – $0.202
2027 Q119.5B6.0B1.4B$0.24$0.24 – $0.241
2027 Q220.0B6.2B1.5B$0.26$0.26 – $0.261
2027 Q320.4B6.0B1.3B$0.23$0.23 – $0.231
2027 Q420.9B8.0B2.9B$0.49$0.49 – $0.491
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Results: In its Q1 FY2026 results released on May 25, 2026, Tenaga Nasional Berhad (TNB) recorded a 6.6% year-on-year (YoY) revenue increase to RM17.10 billion. Net profit rose 4.4% YoY to RM1.09 billion, driven by lower fuel costs and a 7.0% surge in electricity demand—largely led by the commercial sector. The group reported a massive Automatic Fuel Adjustment (AFA) over-recovery position of RM861.7 million due to lower fuel prices. Sequentially, profit after tax fell 10.2% from Q4 FY2025 due to a normalized effective tax rate of approximately 31%.
  • Sukuk Issuances & Financing: TNB established a RM10.0 billion Sukuk Wakalah program in April 2026. The inaugural tranches of its Sustainability Sukuk program—consisting of RM1.5 billion for hydro projects in March 2026 and RM1.0 billion for solar projects in May 2026—were both heavily oversubscribed by five times. This strong investor demand positions TNB well to lead financing under Malaysia’s National Energy Transition Roadmap (NETR).
  • Operational Expansion of TNB GenCo: TNB’s generation arm (TNB GenCo) has emerged as a structurally stronger earnings contributor. Its normalized profit after tax reached RM219 million in Q1 2026, compared to a quarterly average of RM109 million in previous years. This recovery is supported by digital initiatives and maintenance optimizations that boosted the fleet's plant availability factor to 91% in Q1 2026 (up from a trough of 75% in Q1 2024).
  • Energy Transition Milestones: At the Energy Transition Conference 2026 (ETCon26) in June, TNB's Chairman announced that the utility has delivered 4.3 GW in renewable energy capacity to date. The company has sealed 15 new partnerships focused on solar development, battery storage (BESS), and hybrid hydro systems to facilitate the transition toward a net-zero 2050 target.
▸ Thesis-test Findings
Malaysia Energy Commission RP4 Regulatory Parameters

The Regulatory Period 4 (RP4) framework runs from July 1, 2025, to December 31, 2027. Suruhanjaya Tenaga (the Energy Commission) approved an allowed Capital Expenditure (CAPEX) of RM42.82 billion (comprising RM26.55 billion base and RM16.27 billion contingent CAPEX) and an allowed Operating Expenditure (OPEX) of RM20.78 billion. While the regulatory rate of return was maintained at 7.3% (unchanged from RP3), the base electricity tariff was set at 45.40 sen/kWh. RP4 introduced a pivotal structural reform by replacing the Imbalance Cost Pass-Through (ICPT) with the monthly Automatic Fuel Adjustment (AFA) mechanism.

  • Bull Case Impact: The near-doubling of allowed CAPEX compared to RP3 (which was RM20.55 billion) significantly expands TNB's Regulated Asset Base (RAB), providing structural earnings growth. Furthermore, shifting fuel cost adjustments from a 6-month cycle (ICPT) to a monthly cycle (AFA) dramatically improves working capital, reduces timing mismatches, and lowers receivables risk.
  • Bear Case Impact: Under the new schedule, average network and retail charges were actually reduced by 5.6% (from 13.75 sen to 12.98 sen per kWh), leading to some questions about whether cost-cutting could impact long-term system stability in an increasingly intermittent renewable grid.
Johor Data Center Power Grid Connection Timelines

TNB is executing a RM43 billion grid modernization program designed to accommodate rapid data center expansion, particularly in active development corridors like Johor. Under its fast-track "Green Lane Pathway," TNB has reduced connection timelines for data centers from the typical 36–48 months down to just 12 months. As of March 2026, TNB has successfully energized 33 projects under this framework, supplying 36 operational data centers with a planned pipeline capacity approaching 4.5 GW. In April 2026, TNB secured an Electricity Supply Agreement (ESA) for Racks Central’s 100-MW AI data center phase in Johor.

  • Bull Case Impact: Rapid grid connections have accelerated immediate energy demand, translating into a 7.0% year-on-year commercial demand surge in Q1 2026, confirming data centers as a massive, high-growth revenue catalyst.
  • Bear Case Impact: Reports from early 2026 highlighted that Johor rejected up to 30% of new data center applications in late 2024 because of grid delivery bottlenecks rather than generation shortfalls. Factors like late-stage planning issues, misaligned utility timelines, and lack of clarity on substation financing could constrain TNB's ability to smoothly ingest the massive 11 GW of pending electricity applications.
ENEGEM Electricity Export Capacity and Singapore Commercial Agreements

The Energy Exchange Malaysia (ENEGEM) was established in April 2024 to facilitate cross-border green electricity trading. It initiated its pilot phase by exporting 50 MW of renewable energy to Singapore's Sembcorp Power Pte Ltd under a 2-year Renewable Energy Supply Agreement (RESA), which commenced on December 13, 2024. In September 2025, Malaysia's energy ministry (PETRA) launched a new ENEGEM auction to expand Singapore exports toward the program's current 300 MW ceiling. Additionally, in January 2026, TNB signed Phase 2 of its Energy Wheeling Agreement with Laos and Thailand to expand cross-border trading.

  • Bull Case Impact: Cross-border sales through ENEGEM utilize excess local supply to generate valuable foreign-exchange gains, wheeling charges, and grid-usage revenues for TNB's transmission infrastructure.
  • Bear Case Impact: The near-term financial impact remains limited. The 300 MW ENEGEM export cap is modest compared to Malaysia's 27.6 GW of installed capacity. More importantly, the Malaysian government clarified that ENEGEM revenues are mandated strictly for upgrading and reinforcing the national grid rather than direct corporate profit-seeking, capping the near-term margin expansion potential of cross-border RE sales.