Stocks/AAC.ST

AAC.ST

AAC Clyde Space AB (publ)v3 5.0/10 · 2026-11-08
Industrials·Aerospace & Defense
94.60 SEK
704M SEK market cap
v3 Rating
5.0/103.5–6.5
Setup
6.5/105.5–7.5
Fair Value
98.00 SEK55.00 SEK–150.00 SEK+4%
DCF (10%)
105.00 SEK+11%
Base IRR
+11%-5%–+26%
Visibility
wide±48%
Rating
Revenue (TTM)
351.4M SEK
Owner Earnings
kr5M
Next-Yr Owner Earnings
-kr20M
Growth
+11.0% × 8y
P / Next-Yr OE
--
Net Debt
-kr160M

Headquartered in Uppsala, Sweden, and established in 2005, AAC Clyde Space AB (publ) specializes in delivering comprehensive solutions and services to the global small satellite industry. The company's reach extends across Sweden, the UK, continental Europe, the United States, and Asia. Its extensive product portfolio includes command and data processing systems, power management units (batteries, electrical power systems, solar arrays), advanced laser and radio communication modules, lightweight structural components, and propulsion mechanisms. They also supply various payloads and complete plug-and-play systems for satellite attitude determination and control. Beyond hardware, AAC Clyde Space offers a "space as a service" model, providing data subscriptions, delivery, customer portal access, insurance coverage, and data protection. Furthermore, the company operates the EPIC spacecraft platform. Their diverse client base encompasses governmental bodies, commercial enterprises, and academic institutions. The company rebranded to AAC Clyde Space AB (publ) in November 2019, having previously operated as ÅAC Microtec AB (publ).

Valuation v3 Opus worker · 2026-11-08

Rating
5.03.5–6.5
Setup
6.55.5–7.5
Fair value (SEK)
98.0055.00 – 150.00
Upside vs 94.60
+4%
DCF (10%)
105.0050.00 – 180.00+11%
Base IRR
11%-5% – 26%
Visibility
widerange ±48%
Sentiment
6/10
Reputation
7/10
2026-11-08 · · priced at 95.20

AAC Clyde Space is a SEK ~780m Swedish/Scottish small-satellite builder that has finally got a real backlog — SEK 1,197m, ~2.5x revenue, anchored by the EUR 60m+ EUMETSAT EPS-Sterna weather constellation — plus a genuinely attractive maritime/EO data business (SEK 60.8m recurring in 2025, SEK 40.0m in H1 2026 at ~36% EBITDA margin). It screens far cheaper than its only listed peer (~1.3x EV/sales and ~14x EV/2026E EBITDA versus GomSpace at ~4.8x sales), carries no bank debt and ~SEK 170m net cash after three 2026 raises, every analyst is above the price (Redeye SEK 144, DNB Carnegie SEK 120-152, SB1 Markets SEK 129) and anchor shareholder Bonnier Capital just paid SEK 105.58 for more stock. The problem is that none of it becomes owner earnings: strip acquisition-surplus amortisation and the ~SEK 45m of guided 2026 EBITDA converts to roughly zero after the SEK 35-40m a year of capitalised development, facilities and satellite replacement needed just to stay current — and the SEK 20-27m a year of that capitalised development which gets impaired proves it was a cost, not an asset. Management has missed guidance in four of the last five years, dilutes nearly annually (SEK 105m raised in H2 2026 alone, after a 1:50 reverse split in 2023), and ~SEK 650m of the SEK 768m book equity is goodwill and intangibles from the 2018-21 acquisition spree. Guidance of SEK 440-510m at a 10% margin needs an H2 of SEK 260-330m revenue versus H1's 180m at a ~14% EBITDA margin it has never achieved — and the Q3 report lands 12 November, four days away. My 10% DCF, with FCF still negative in 2027 and only ~SEK 64m by 2031 on a 17x year-5 multiple, gives about SEK 105 a share and an 11% base IRR, below hurdle. Rating 5.0: cheap against peers, not cheap against cash, no capital return, and a dated binary sitting right in front of it; sentiment is mid-spectrum (down 44% from the May high but still 3x the 2024 low, loudly bullish retail, no forced seller, 0.76% short) rather than the blood-on-the-ground we want. Research rating 6.5: the one question that matters is resolvable within days and worth 40-55% up to the analyst zone or 25% down to the SEK 74 low.

A deep dive would have to establish: Does H2 2026 actually deliver SEK 260-330m of sales at a ~14% EBITDA margin (Q3 report 12 November), and what is the true cash margin and post-2028 revenue cliff on the fixed-price EPS-Sterna contract once capitalised development and satellite replacement are charged as costs?

Owner earnings, TTM
kr5M-kr25M – kr35M
Realistic peak profit
kr85Mkr30M – kr150M
Growth rate
11.0%3.0% – 18.0%
Years of growth
84 – 14
Market cap
kr778Mkr760M – kr800M
EV
kr620Mkr540M – kr700M
Net debt
-kr160M-kr220M – -kr80M
Capital return / cap
-2.0%-6.0% – 0.0%
P/E
40.0×20.0× – 100.0×
EV/EBITDA
14.0×11.0× – 17.0×
FCF yield
1.0%-4.0% – 4.0%
Projected FCF, base case (SEK millions)
Y1-kr20M-kr70M – kr25M
Y2kr15M-kr45M – kr60M
Y3kr45M-kr20M – kr95M
Y4kr58M-kr10M – kr115M
Y5kr64M-kr5M – kr135M
Competition: A crowded, structurally low-margin smallsat bus and subsystem market (GomSpace, Kongsberg NanoAvionics, Open Cosmos, EnduroSat, Satlantis, Rocket Lab/Terran Orbital, plus OHB/Airbus/Thales insourcing) where AAC's own CEO says he walks away from the largest constellation bids because the margins would barely cover cost; the one defensible position is the ESA/UKSA-backed maritime VDES/AIS data niche.
Governance: No fraud flags and a candid CEO, but a long record of missed guidance and over-promising (a 2021 forecast of 5x sales by 2024), a 1:50 reverse split in 2023 after years of value destruction, near-annual dilutive share issues (~SEK 105m raised in H2 2026 alone at SEK 110 and SEK 105.58), and ~SEK 650m of goodwill/intangibles making up most of the SEK 768m book equity.
Research (expand)

What the company does

AAC Clyde Space (Uppsala HQ, engineering in Glasgow, plus Delft/Hyperion, Gothenburg/Omnisys, Virginia/SpaceQuest) runs two segments.

Products & Missions (~78% of H1 2026 sales). Subsystems and whole small satellites for institutional and commercial customers: electrical power systems, solar arrays, batteries, on-board computers, ADCS, propulsion, radio/laser comms, structures, the EPIC platform and turnkey missions. Flagship is EPS-Sterna — payload and avionics for EUMETSAT's six-satellite microwave sounder weather constellation via prime OHB Sweden, worth over EUR 60m, signed in two parts across Q1 and Q2 2026 after ~3 years of political delay inside EUMETSAT. Second is SKAO, a EUR 12m contract for Band 1 feeds for the Square Kilometre Array in South Africa; first pre-production feeds shipped August 2026 with "the bulk of the production still to be done."

Data & Services (~22% of H1 sales, SEK 40.0m, ~36% EBITDA margin). AAC owns and operates satellites and sells data: AIS/maritime domain awareness (Sedna-1/2 operational, Sedna-3/4 in build for early-2027 launch, YMIR-1 demonstrating VDES), Earth observation (VIREON-1/2 launched on Transporter-16 on 30 March 2026, first light 25 June, revenue service from Q3 2026), and INFLECION, an ESA/UK Space Agency co-funded VDES constellation — Workstream 1 signed June 2026 at EUR 10.9m for development and in-orbit demo of 12 satellites, service demo complete early 2029, ~EUR 4.4m capitalised. The US Coast Guard has a CRADA to evaluate VDES on Sedna-2. Recurring data revenue was SEK 60.8m in 2025 vs SEK 39.4m in 2024 (+54%).

The investment case

Bull: a company that spent 2021-25 as a sub-scale, loss-making, serially diluting cubesat shop has in one year tripled backlog to SEK 1.2bn, put its first commercial EO satellites in orbit, repaid its entire bank overdraft, turned Q2 operating cash flow to +SEK 106.8m, and attracted Bonnier Capital as a 15%+ anchor. Revenue guided +61% in 2026, consensus ~+25% in 2027. European sovereign demand for space (weather, maritime ISR, secure comms, defence) is in a structural upcycle and AAC is one of very few listed pure plays. Against GomSpace at ~4.8x 2026E EV/sales, AAC at ~1.3x looks like a gross relative mispricing; analysts agree (Redeye base 138 / fair 144, range 80-160; DNB Carnegie 120-152; SB1 buy 129 on 2028E revenue SEK 623m at a 16% adj. EBITDA margin).

Bear: the gap to GomSpace is earned. Revenue is fixed-price institutional contract engineering the CEO himself calls margin-poor, and the backlog is concentrated in one contract substantially recognised by end-2027 and finishing in 2029 — a visible cliff, not an annuity. And the money never reaches owners.

What it earns today (real free cash flow)

FY2025: net sales SEK 295.3m (-16.3%), EBITDA SEK 17.5m, EBIT SEK -40.0m, net SEK -46.6m, operating cash flow SEK -24.0m (from +53.7m) as customer prepayments were recognised as revenue. D&A and impairment SEK -57.4m, of which SEK 16.3m is amortisation of acquisition surplus (non-cash, excluded) — so ~SEK 41m against operating assets, including SEK 27.4m of impairment of previously capitalised development. Investments in non-current assets SEK 39.1m.

H1 2026: sales SEK 179.6m (+21.6%), EBITDA SEK 8.0m. Q2: sales SEK 112.0m (+51.9%), EBITDA SEK 10.7m (9.6%), EBIT SEK -2.9m, operating cash flow +SEK 106.8m, investing SEK -18.6m (H1 -31.5m). Cash SEK 126.9m, zero drawn of the SEK 50m overdraft (SEK 43.7m a year earlier), equity ratio 73%, equity SEK 767.5m on total assets ~SEK 1,049m with ~SEK 648m of intangibles. September 2026 added a Swedbank facility of up to SEK 80m.

Unlevered owner earnings, 2026E. Guided EBITDA ~SEK 45m (10% of ~SEK 455-470m; I haircut the midpoint for history), less warrant/LTIP cost ~SEK 2m, less cash tax ~SEK 2m (large carry-forwards across SE/UK/NL/US), less maintenance capex. The maintenance line is the whole argument: AAC spends SEK 40-70m a year on capitalised development and tangibles, and the recurring portion is not optional — subsystem families must stay current to win the next bid, and operated satellites have 5-7 year lives, so the constellation is a replacement treadmill (Sedna-3/4 are explicitly part renewal). That SEK 20-27m a year of capitalised development gets impaired is the clearest evidence it was an expense. Recurring maintenance ~SEK 35-40m, so unlevered owner earnings ~SEK 5m — call it zero, range -25m to +35m depending on how much current spend you grant as growth.

So the multiple we are really paying: EV = SEK 778m market cap (8,173,289 shares at SEK 95.20) less ~SEK 170m net cash (SEK 126.9m at June + ~SEK 61.5m net from the July directed issue at SEK 110 + SEK 40m of October warrants at SEK 105.58, less H2 burn and lease liabilities) = ~SEK 620m, i.e. ~14x 2026E EBITDA, ~1.3x sales, effectively infinite on owner earnings. EBITDA-to-owner conversion is ~10%, not the 50-60% a decent industrial throws off — that is why a 14x EV/EBITDA is not the bargain the peer comparison implies. Be sceptical of the net cash too: much of it is Sterna customer advances sitting against contract liabilities inside the SEK 282m of total liabilities, so it is working capital, not a war chest. After-tax interest is immaterial (no bank debt), so the equity yield on owner earnings is also ~0.6%.

Projected free cash flow (SEK m, before interest, after stock comp and reinvestment)

| Year | Revenue | EBITDA | Capex / cap. dev. | FCF |

|---|---|---|---|---|

| 2027 | ~580 | ~75 (13%) | ~70 + WC unwind | -20 |

| 2028 | ~650 | ~100 (15.5%) | ~75 (INFLECION peak) | +15 |

| 2029 | ~700 | ~120 (17%) | ~60 | +45 |

| 2030 | ~760 | ~140 (18%) | ~60 | +58 |

| 2031 | ~830 | ~155 (19%) | ~65 | +64 |

That is a 12% revenue CAGR with margins expanding to peer-best levels and no further programme stumbles — a friendly path. 2027 is still cash-negative, so at least one more raise or a drawn Swedbank facility is likely; I assume ~SEK 100m of further equity near today's price, taking the count to ~9.2m shares.

What kind of company it is in 5 years

Base case: a SEK 800-850m revenue European institutional space supplier growing high single digits, with maybe SEK 250-300m of genuinely recurring maritime/EO data revenue at 35-40% margins and ~SEK 65m of real FCF — a decent, durable niche business, not a corpse, but not a compounder with pricing power either. That earns 15-20x FCF; I use 17x = SEK 1,105m enterprise value. Confidence is low: the spread between "Sterna executes, INFLECION becomes a paid service, data hits SEK 300m" and "fixed-price overruns, VDES stays a grant-funded demo, Sterna rolls off in 2029 and revenue falls back to SEK 500m at 8% margins" is enormous, and this management record does not justify narrow ranges.

Fair value and the multiples we are paying

DCF at 10%: PV of 2027-31 FCF ~SEK 107m, plus PV of the year-5 value (1,105 x 0.621) ~SEK 686m = EV SEK 793m, plus ~SEK 150m net cash = equity ~SEK 943m over ~8.9m diluted shares = SEK 105 a share. Base IRR from SEK 95.20 to a 2031 equity value of ~SEK 165/share is about 11% — below the 14% hurdle, in the friendly case.

I set fair value at SEK 98, a touch under the DCF. The DCF is terminal-heavy (86% of value is the year-5 number) and I am not penalising it for that, but I am discounting for what the DCF cannot see: no owner earnings today, a negative capital-return yield (this company takes money in, it does not give it back), book equity that is mostly goodwill, and a near-certain further issue. Bear SEK 55-65 (guidance cut plus a dilutive raise into weakness); bull SEK 150-175 (H2 delivers, 2027 guided at SEK 600m+, half the GomSpace multiple gap closes).

Why this is not a Bumble/Edenred/First Watch setup: all three were cases where demonstrated cash flow was on sale. AAC has the fear and the chart but not the cash — no 2.5x EV/EBITDA, no 8% dividend, no SEK 70m of owner earnings hiding behind growth capex. It is closer to the Green Mountain pattern (pay up for an obviously larger future company), except Green Mountain was growing 70% in a category it led, while AAC grows 25% in a category where it tells you it walks away from the biggest contracts because the margins are insulting.

Management, risks, competition

Luis Gomes (CEO since 2019) is candid and technically credible, and the Q2 call is notable for refusing a bad IRIS-2-type constellation deal rather than chasing the headline: "a lot of revenue with a loss makes no sense." Right instinct, credit given. But the record is poor: a 2021 forecast of a 5x sales increase by 2024 that never arrived; a downward 2025 revision in November 2025 followed by a further SEK 22m miss in February; a US supplier making unauthorised component changes that wiped out most of Q1 2026 EBITDA; the SKAO technical dispute that blocked ~SEK 30m of 2024 revenue; the three-year Sterna wait. Guidance here has been a hope, not a floor.

Risks in order: (1) the H2 2026 execution gap — H2 needs 1.5x H1 revenue at a never-achieved margin, with Q3 on 12 November; (2) fixed-price risk on a technically challenging Sterna where AAC absorbs variances; (3) the 2029 Sterna cliff; (4) further dilution, near-annual, with the Swedbank facility only delaying it; (5) impairment of ~SEK 650m of intangibles if the plan slips; (6) data monetising slower than the capex (VIREON's revenue potential was explicitly withheld on the call); (7) First North Premier listing, so no index bid and a thin institutional base.

Competition: a crowded, structurally low-margin smallsat bus and subsystem market — GomSpace, Kongsberg NanoAvionics, Open Cosmos, EnduroSat, Satlantis, Terran Orbital/Rocket Lab — plus primes (OHB, Airbus, Thales) insourcing. The defensible asset is the maritime VDES/AIS niche, where ITU spectrum, ESA/UKSA co-funding and the US Coast Guard relationship give a first-mover position that is hard to replicate quickly. If anything deserves a premium it is that, not the hardware.

How investors and analysts feel: 6/10

Not hated, not euphoric. Down 44% from the SEK 170.60 May 2026 high and sitting 21% up the 1-year range (73.80-176.00) — but still ~3x the October 2024 level of SEK 34, so this is air coming out of a 2025-26 European defence/space run, not capitulation. No forced seller, no index deletion, no fund liquidation. The marginal buyer is committed: Bonnier Capital took 15.3% in Dec 2025/Jan 2026 (second tranche 590,228 shares at SEK 84.13) and exercised all its warrants at SEK 105.58 in October 2026 for SEK 40m; the July directed issue was placed at SEK 110 with institutions including Nowo Global Fund. Short interest is negligible at 0.76% of capital with no publicly disclosed holder (Citadel Securities fell below the threshold in July 2026) — neither a squeeze nor a professional bear thesis. Analysts are uniformly 26-55% above the price, but Redeye and Edison are commissioned by the company, so treat them as the bull case written down. Swedish retail on the Placera forum is loudly bullish and blaming a shorter for the decline — the classic retail-held story-stock posture, the opposite of the sentiment setup we want to buy into.

Covered-call lens: not a setup. IV is high and the stock is near the bottom of its range, but the other half — predictable forward earnings and a valuation floor — is absent. No earnings, no dividend, no floor beyond mostly-goodwill book equity. Writing calls here is writing calls on a binary print.

How customers feel: 6.5/10

Institutional customers keep coming back, the strongest available evidence: ESA with repeat awards including INFLECION Workstream 1; EUMETSAT and OHB choosing AAC for Sterna after the Arctic Weather Satellite prototype worked; UKSA co-funding the VDES constellation; SKAO moving into production; the US Coast Guard entering a CRADA on Sedna-2. The legacy Clyde Space power systems and Hyperion subsystem brands are well regarded in the cubesat community and fly on many third-party missions. Against that, the product has been late: the SKAO dispute, a US supplier non-conformance that halted deliveries, and VIREON commissioning stretching from a March launch to a Q3 revenue start all land on customers. Trend slightly improving as the company scales into prime-contractor work, but delivery reliability is the thing a deep dive should check with the primes.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · SEK

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue351-4%295-16%353+28%277+41%197
Gross profit96.1-64%156-13%179+35%132-2%136
Operating expenses141-49%199+3%192+19%161-12%184
▸Adj EBITDA10.1-68%8.38+726%1.01-42.1-49.0
▸Adj OCF13.3-38%-2.69-148%5.56-57.8-67.2
CapEx-55.6-49.6-32.4-124-12.8
Adj FCF-42.3-52.3-26.8-182-80.0
Interest expense12.420.06.334.089.43
▸Adj net income-31.6-48.4-18.9-33.4-45.1
▸Owner's earnings-40.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA66.6100%11.9100%16.4100%51.7100%5.39100%-18.9
FCF (OCF−capex)-223-335%1.7815%-122-744%24.447%-121-6.33
Net income-157-235%-16.9-142%-46.1-281%-5.58-11%-41.6-771%-46.5
▸Capital returned-86.5-130%-77.9-653%-28.5-174%6.3312%4.0876%9.43
Buybacks-109-51.8-57.40.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid49.79.7820.06.334.089.43
Debt paid down-27.0-35.98.860.000.000.00
▸Reinvestment403606%68.1570%59.2360%58.4113%17443.6
Capex (PP&E)26546.649.632.412412.8
Intangibles & M&A1203.260.2436.350.829.4
Leases signed (net Δ)17.918.29.34-10.2-0.881.44
Retained / other-207-310%86.2722%-73.9-450%-11.8-23%-171-35.7

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)1026896989938881
▸Liabilities (total)243185286276218
Net debt (incl. leases)-41.37.11-44.2-18.7-34.9
Net debt / Adj EBITDA-4.100.85-43.6----
Net debt / Adj FCF----------
Adj EBITDA / interest0.810.420.16-10.3-5.19
Shares outstanding8.176.705.835.704.06
Dilution (YoY)+18.0%+14.9%+2.3%+40.4%+1.7%
Employees210--------
MarginsTTM2025202420232022
Gross margin27.3%-45.652.9%+2.350.6%+2.847.8%-21.169.0%
Adj EBITDA margin2.9%-5.72.8%+2.50.3%+15.5-15.2%+9.7-24.9%
Adj OCF margin3.8%-2.1-0.9%-2.51.6%+22.5-20.9%+13.3-34.2%
Adj FCF margin-12.0%-3.2-17.7%-10.1-7.6%+58.1-65.7%-25.0-40.7%
Net income margin-6.5%-0.3-15.6%-14.0-1.6%+13.5-15.0%+8.6-23.7%
Adj NI margin-9.0%+2.8-16.4%-11.0-5.4%+6.7-12.1%+10.9-22.9%
ROIC (adj, after-tax)-4.5%-5.2%-5.5%-9.0%-9.0%
Cost of debt--40.6%------

Earnings Calls

4 calls

Earnings Call · 2026 Q2

2026-08-13

AAC Clyde Space characterized the second quarter as a foundational quarter in which both sides of its strategy advanced. The established Products & Missions business continued to execute large hardware programs, while the Data & Services business moved closer to becoming a meaningful growth engine. The company completed signing the second part of the Sterna contract, bringing the payload and avionics scope into active execution, and signed the next phase of INFLECION covering 12 satellites. It also continued commissioning VIREON-1 and VIREON-2, launched in March, and announced first light from VIREON-1. The company is focusing resources on VIREON-1 to begin commercial service, while VIREON-2 proceeds through normal testing. Financial performance was strong and broadly in line with expectations. Net sales increased approximately 51% year over year, EBITDA reached SEK 10.7 million compared with a loss or materially lower result in the prior-year period, and operational cash flow was positive. The order backlog approached SEK 1.2 billion, giving the company substantial revenue visibility because a large portion of expected revenue is already contracted. AAC therefore reiterated full-year guidance of SEK 440 million to SEK 510 million in net sales, an EBITDA margin of 10%, and positive operational cash flow. Sterna was a major contributor to quarterly Product & Mission revenue and is expected to remain the dominant contract in that business line for the next two years. Management said the program is broadly on target and delivering according to plan. At the same time, VIREON is expected to begin generating revenue in Q3, with imagery already being collected and customer preparations underway. Revenue should ramp normally for a data-and-services satellite, reaching full contribution around next year. Management declined to provide the satellite’s full revenue potential but said the investment is expected to produce attractive revenue and profit. The longer-term objective is for Products & Missions and Data & Services to represent roughly equal portions of the company. Data & Services growth will include maritime intelligence from the VIREON satellites and INFLECION constellation, as well as tracking, communications and related services. AAC also described progress on the Square Kilometre Array Observatory project. Prototype Band 1 feed systems have been shipped to South Africa for testing, with most production revenue still ahead, although delivery timing depends on SKAO’s construction schedule. Regarding large programs such as IRIS² and maritime ISR procurements, management said AAC is technically well positioned but will only pursue opportunities offering acceptable margins and risk. Large constellations can involve intense price competition, and licensing may sometimes be preferable to direct production. Contract timelines vary considerably: government programs can take two to three years, while the average is roughly one to one and a half years. Management expects Q3 and Q4 to remain busy and maintained its guidance.

Analyst Q&A (17)
▸
Asked whether the first half represented hardware execution through Sterna and future growth through VIREON and INFLECION.
Kaarlo Airaxin
Management agreed. Hardware remains the company’s foundation, while Data & Services is the growth engine being developed for the future.
▸
Asked whether the hardware and Data & Services developments were of different relative importance.
Kaarlo Airaxin
Management said the two areas are equally important in different ways. Sterna demonstrates the company’s engineering and hardware capability, while Data & Services offers substantial long-term growth potential. The goal is for the two businesses to become roughly equal in size over time.
▸
Asked whether VIREON-2 was performing well.
Kaarlo Airaxin
VIREON-2 is progressing through normal commissioning and testing, but the company is prioritizing VIREON-1 to begin service and revenue generation.
▸
Asked how much Product & Mission revenue in the quarter came from Sterna.
Kaarlo Airaxin
Sterna represented a large and important share of quarterly Product & Mission revenue, although it was not the only contributor. It is expected to remain the dominant products contract for the next two years.
▸
Asked when VIREON would begin generating revenue and how investors should think about its ramp to a meaningful contribution.
Kaarlo Airaxin
Revenue from VIREON is expected to begin in Q3, with imagery already being captured and customer preparations underway. A normal ramp-up is expected, with full revenue contribution from the satellites anticipated around next year.
▸
Asked for an explanation of the SKAO project and what to expect going forward.
Kaarlo Airaxin
SKAO is the Square Kilometre Array Observatory, an international radio telescope project with antennas in South Africa and Australia. AAC Clyde Space is supplying Band 1 feed systems for the South African portion. Prototype units have been shipped for testing, with results expected later in the year; subsequent deliveries depend significantly on SKAO’s construction schedule.
▸
Asked how much revenue remained from the SKAO Band 1 feed-system project.
Kaarlo Airaxin
A substantial portion of the EUR 12 million contract’s revenue remains, because the design and initial units are complete but most production is still ahead.
▸
Asked how well positioned AAC Clyde Space’s power and data-handling products were for larger LEO and MEO platforms.
Kaarlo Airaxin
The company is engaged in discussions around large programs such as IRIS² and believes its products are technically well suited. However, it will only participate where margins and risk are acceptable. Large constellations can be highly competitive and commercially aggressive, so AAC may instead pursue licensing or other structures if appropriate.
▸
Asked whether declining an order could reflect a decision to avoid poor margins rather than weak competitiveness.
Kaarlo Airaxin
Management confirmed that not winning an order can be preferable if the proposed pricing and terms create excessive risk or inadequate margins. The company is pursuing other constellation opportunities but will bid only when the economics make sense.
▸
Asked about quarterly EPS-Sterna revenue and whether the project’s contribution was satisfactory compared with other revenue streams.
Kaarlo Airaxin
Management said Sterna was broadly on target and contributing in line with plan, and that it was satisfied with the project’s contribution relative to expectations.
▸
Asked about the full revenue potential of VIREON-1.
Kaarlo Airaxin
Management declined to disclose VIREON-1’s full revenue potential, saying that would reveal too much of the business plan. It stated that the project is expected to generate attractive revenue and profit and therefore makes economic sense.
▸
Asked what supported the reiterated full-year guidance and which second-half milestones were most important.
Kaarlo Airaxin
Confidence comes from delivering according to plan in Q2 and expecting continued execution in Q3. The backlog is strong and contains a large portion of the year’s expected revenue, although additional milestones remain to be completed.
▸
Asked whether the company could provide a 2027 revenue expectation.
Kaarlo Airaxin
Management said it was too early to provide 2027 revenue expectations.
▸
Asked how well positioned AAC Clyde Space was for the U.K. Coastal Maritime ISR service procurement.
Kaarlo Airaxin
AAC believes it could participate in the U.K. Coastal Maritime ISR procurement, either independently or with partners. Its role will depend on the final requirements and where investment in additional capabilities is justified.
▸
Asked how long it typically takes to progress from initial discussions to signing a contract.
Kaarlo Airaxin
The timing varies widely by customer and contract. Government programs can take two to three years from initial contact to contract, while commercial deals may be quicker. Management cited roughly one to one and a half years as a general average.
▸
Observed that long negotiations with governments may provide greater certainty and solid customers once completed.
Kaarlo Airaxin
Management agreed that lengthy government negotiations can ultimately result in dependable customers and payment. Government contracts are attractive because, once selection is known, the remaining process is largely procedural, despite taking time.
▸
Asked whether the coming quarter could also be expected to be very busy.
Kaarlo Airaxin
Management expects Q3 and Q4 to remain busy, whether through new contracts or delivery against existing orders, and expects momentum to continue.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q115M-38M-42M$-6.42$-6.42 – $-6.421
2019 Q315M-38M-42M$-6.42$-6.42 – $-6.421
2020 Q124M—0M$0.00$0.00 – $0.000
2020 Q224M—0M$0.00$0.00 – $0.000
2021 Q340M—0M$0.00$0.00 – $0.000
2021 Q461M—0M$0.00$0.00 – $0.000
2022 Q165M—0M$0.00$0.00 – $0.000
2022 Q280M—0M$0.00$0.00 – $0.000
2022 Q370M—0M$0.00$0.00 – $0.000
2022 Q479M—0M$0.00$0.00 – $0.000
2023 Q181M-2M-10M$-1.47$-1.47 – $-1.471
2023 Q289M—0M$0.00$0.00 – $0.000
2023 Q380M—0M$0.00$0.00 – $0.000
2023 Q489M—0M$0.00$0.00 – $0.000
2025 Q369M-5M-20M$-2.80$-2.91 – $-2.691
2025 Q491M-3M-21M$-2.90$-3.02 – $-2.781
2026 Q182M4M-13M$-1.80$-1.87 – $-1.731
2026 Q2109M14M-6M$-0.80$-0.83 – $-0.771
2026 Q3124M16M-1M$-0.20$-0.21 – $-0.191
2026 Q4168M28M7M$1.05$1.01 – $1.091
2027 Q1135M17M-1M$-0.20$-0.21 – $-0.191
2027 Q2143M16M-3M$-0.40$-0.42 – $-0.381
2027 Q3151M23M4M$0.50$0.48 – $0.521
2027 Q4152M18M-1M$-0.10$-0.10 – $-0.101
v2 analysis (legacy, 2026-08-18) — for comparison onlyclick to expand

Thesis

AAC Clyde Space has moved from a speculative, persistently loss-making satellite builder toward a potentially valuable space-infrastructure and data-services platform. The SEK 1.2B backlog, including the large EPS-Sterna awards, materially improves revenue visibility. The strategic appeal is reinforced by VIREON, INFLECION and government/defense demand, but most of the value remains dependent on execution over the next two years rather than on demonstrated recurring cash flow today. The latest quarter supports the recovery thesis: revenue increased year over year, EBITDA was positive and management reiterated its 2026 guidance. However, gross profit was unusually weak in the TTM period, adjusted FCF remains deeply negative, capex and development spending are substantial, and the company has a history of contract delays, supplier problems and equity dilution. VIREON's commercial potential is still largely unproven, and management declined to quantify its revenue opportunity. The likely path is improving operating results but continued uncertainty around cash conversion and dilution.

Trade Signal

Trade rating
-2.4/10
No trade
Horizon
~3mo
gpt-5.6-luna2026-08-18 · saw 119.40 SEK-20.8% since

No trade, with a mildly bearish bias: the stock is above the analyst's fair value and offers insufficient compensation for negative cash flow, execution risk and probable dilution despite a valuable contracted backlog.

Temporary mispricing-1.5

The stock fell from SEK 147 in January to about SEK 103 in February, then rallied to SEK 170 by late May following the EPS-Sterna awards, the SpaceX launch and stronger guidance/backlog visibility. It subsequently declined to SEK 119 by August as the initial contract euphoria faded and investors focused on delivery timing, profitability and dilution. After the 13 August earnings release, the stock moved from SEK 122 the prior day to SEK 129.8 and then back to SEK 119.4, a roughly flat-to-negative reaction despite positive EBITDA, 51% year-over-year sales growth and reiterated guidance. The May rally likely overshot near-term fundamentals, while the latest reaction is not a clear panic dislocation. The repricing toward execution risk is mostly justified and may persist until cash generation is demonstrated.

Market view+2.0

The stock is viewed constructively by thematic and retail investors after the large EPS-Sterna awards, with bulls emphasizing backlog visibility, European space and defense demand, and a transition toward recurring data services. Bears focus on the long history of losses, project-accounting and schedule risk, negative free cash flow and dilution. The price surged from roughly SEK 105 in February to SEK 170 in May on contract and program optimism, then retraced to about SEK 119 as investors questioned monetization and cash conversion. Sentiment is positive but no longer euphoric; positioning appears speculative rather than a deeply crowded consensus long.

Inflectionwindow ~3mo+2.5

There is a potentially meaningful operating inflection as Sterna revenue scales and VIREON begins commercial service, with Q3/Q4 2026 providing the first evidence. However, the market is already aware of the SEK 1.2B backlog, 2026 growth guidance and VIREON opportunity. The incremental surprise would need to be better-than-expected customer conversion and cash generation, not merely contract execution. Near-term inflection is therefore positive but largely expected and highly execution-dependent.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and VIREON commercial revenue update — Expected in late 2026; evidence of first-light customer conversion, initial data revenue and continued positive EBITDA would support the recovery thesis.
  • ▲2026-11 to 2027-02 · Q3/Q4 2026 guidance execution — The company must deliver against SEK 440–510M full-year sales guidance and approximately 10% EBITDA margin; another timing or margin miss would hurt credibility.
  • ▲H2 2026 to 2027 · EPS-Sterna production and delivery milestones — Progress on the SEK 902M of microwave, power and data-handling contracts should improve backlog conversion confidence, although most revenue is recognized from 2027 onward.
  • ▲H2 2026 to 2027 · Additional VIREON customer contracts or VIREON-3/4 funding — Commercial conversion is the key proof point for the higher-margin Data & Services strategy; failure to convert imagery interest would weaken the bull case.
  • ▲Late 2026 to 2027 · SKAO and INFLECION delivery milestones — Further production revenue and successful execution would diversify AAC beyond Sterna and support the recurring-services narrative.
  • ▼Over the next 6-12 months · Equity financing or further share issuance — The company has weak cash conversion and recurring development needs; additional capital raising could cap upside and dilute existing holders.
Flow-5.5

Net flow is negative. TTM dilution was approximately 21%, including the Bonnier directed issue, and there is no active buyback or demonstrated free-cash-flow-funded capital return. A strategic shareholder provides some sponsorship, but future equity needs and ongoing development spending are the dominant flow risks.

Floor / Ceiling+1.5

The SEK 105M net cash balance provides some support, but it is not a hard floor because the business has negative owner earnings, meaningful satellite development requirements and a history of dilution. The backlog is valuable only if delivered at acceptable margins. There is also a valuation ceiling created by the absence of positive free cash flow and the likelihood that future funding may be required.

Buyability

Moderate but not compelling. Contracted backlog, Swedish/European defense relevance and potential recurring VIREON/INFLECION data revenue can attract thematic and growth buyers, but current negative owner earnings, substantial development spending and a 21% TTM dilution rate make it difficult for fundamental buyers to underwrite today.

Fear vs Greedfear 7/10 (-2.0)greed 8/10 (+3.0)

Fear pulls slightly stronger than greed at SEK 119.4. The backlog and contract wins are real, but the stock already capitalized much of the improvement while cash conversion, margins and dilution remain unresolved. I would rather wait for proof of owner earnings than pay for the VIREON and Data & Services option value today.

Valuation

Our Target
650M SEK-8%
Market Should Pay
553M SEK-21%
target ×0.85 (fear discount)
Current Market Cap
704M SEKSlightly bearish
What Changed
transcript · 2026-08-13
+8%fair value on this information

Q2 showed that Sterna is actively contributing to revenue and is broadly on target, the backlog approached SEK 1.2B, VIREON-1 achieved first light, and management expects VIREON revenue to begin in Q3. The company also reiterated 2026 sales, 10% EBITDA-margin and positive operating-cash-flow guidance. These developments are genuinely incremental versus the prior quarter, although management still provided no 2027 outlook or quantified VIREON revenue potential.

▸ How the cases moved

The quarter modestly raised the base case: base equity value moves from roughly SEK 820M to SEK 875M as Q2 execution, the near-SEK 1.2B backlog and reiterated guidance reduce near-term delivery risk; base probability rises from 0.48 to 0.50. The bull case moves from roughly SEK 1,800M to SEK 1,905M and probability from 0.18 to 0.20 because Sterna is broadly on target and VIREON reached first light. The bear case remains material, with value moving from roughly SEK 270M to SEK 255M and probability declining from 0.34 to 0.30, not disappearing because gross-profit quality, cash conversion and VIREON monetization remain unresolved.

2-Year Plausible Outcomes
bear30%
255M SEK
rev -10%/yrOE $10M

Sterna execution suffers further timing or cost problems, while VIREON customer conversion is slow and Data & Services remains subscale. Revenue declines modestly as project timing shifts, and owner earnings remain barely positive after necessary satellite investment. The company survives because of its net cash position, but the market assigns only a modest earnings multiple.

▸ Valuation

15x SEK 10M owner earnings = SEK 150M equity value + SEK 105M net cash = SEK 255M equity

base50%
875M SEK
rev +20%/yrOE $55M

The company delivers the bulk of the Sterna backlog broadly on schedule, with SKAO and INFLECION contributing progressively. VIREON begins commercial revenue but ramps more slowly than the long-term opportunity suggests. Revenue grows strongly from the depressed 2025-26 base, margins recover but remain below mature-space-services potential, and owner earnings become positive after elevated development spending.

▸ Valuation

14x SEK 55M owner earnings = SEK 770M equity value + SEK 105M net cash = SEK 875M equity

bull20%
1.9B SEK
rev +40%/yrOE $100M

Sterna executes cleanly and converts its exceptional backlog into high-quality revenue, while VIREON reaches commercial scale and INFLECION/Data & Services becomes a meaningful recurring-growth engine. Gross margins recover toward historical levels, satellite development spending is absorbed by a larger revenue base, and owner earnings reach approximately SEK 100M. The combination of contracted growth, defense relevance and recurring data revenue earns a premium multiple.

▸ Valuation

18x SEK 100M owner earnings = SEK 1,800M equity value + SEK 105M net cash = SEK 1,905M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is SEK 716M. I set the analytical target below that figure at SEK 650M because the scenario math does not fully capture the company's weak current cash conversion, substantial recurring capex/development requirements, project-accounting risk, execution history and probable future dilution. The SEK 105M net cash balance provides meaningful protection, but it should not be treated as excess cash while the business is still consuming capital.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now4/10
Trajectory7/10
Risk7/10
Governance6/10
Insolvency prob (2yr)8%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • €10.9 Million ESA Contract for INFLECION (June 2026): On June 9, 2026, AAC Clyde Space signed a €10.9 million (approximately SEK 119 million) contract with the European Space Agency (ESA) to lead Workstream 1 of the INFLECION maritime intelligence program. Co-funded 50% by the UK Space Agency, the project covers the development, build, and in-orbit demonstration of a 12-satellite VHF Data Exchange System (VDES) constellation, with launch and testing scheduled for completion in early 2029. Approximately €4.4 million of the contract value is expected to be directly recognized as revenue by AAC Clyde Space.
  • Significant EPS-Sterna Constellation Orders (March & May 2026): Following the formal green light of EUMETSAT's EPS-Sterna weather constellation, prime contractor OHB Sweden awarded AAC Clyde Space two massive contracts:

* In March 2026, a €76.3 million (approximately SEK 820 million) order was secured to supply 20 microwave radiometers. Developed by AAC's subsidiary Omnisys, about 50% of the revenue will be recognized progressively as the first six instruments are delivered by the end of 2028.

* In May 2026, the company secured an additional €7.6 million (approximately SEK 81.9 million) contract from OHB Sweden for power (Starbuck PCDU) and data handling (Sirius DHS) systems for the same 20 satellites. Deliveries will run from 2027 through 2029, with 70% of the contract value expected to be recognized by late 2027.

  • Successful SpaceX Transporter-16 Launch (March 30, 2026): Seven satellites built by AAC Clyde Space reached orbit on SpaceX's rideshare mission. The payload featured the first two proprietary Earth Observation satellites for the company’s own constellation (VIREON-1 and VIREON-2), several client satellites built on the modular EPIC platform, and multiple CubeCAT laser communication terminals.
  • Q1 2026 Financial Results & Strong 2026 Guidance (May 13, 2026): Q1 2026 net sales fell 8.5% year-over-year to SEK 67.7 million, with EBITDA dipping to negative SEK 2.7 million. Management attributed this soft start to the late finalization of the Sterna contract and a supplier component delay in their U.S. (Fairfax) operation. However, due to the massive Sterna awards, the order backlog tripled to a record SEK 1,111.1 million. For the full-year 2026, the company issued positive guidance of SEK 440–510 million in net sales (representing 61% year-over-year growth at the midpoint), an EBITDA margin of ~10%, and positive operational cash flow.
  • Bonnier Capital Directed Share Issue (January 2026): On January 2, 2026, an Extraordinary General Meeting approved a directed share issue to Bonnier Capital, raising SEK 49.6 million. This transaction established Bonnier Capital as the company’s largest shareholder with an approximate 15.4% stake.
▸ Thesis-test Findings
EUMETSAT EPS-Sterna schedule delays 2026

Prior to its final green light, the €1 billion EPS-Sterna program experienced several months of political delays in late 2025 as member states requested extra time to finalize their national budgets. This deferred the final EUMETSAT Council approval to January 19, 2026, which consequently delayed contract signatures and weighed on AAC’s Q1 2026 financial performance. However, since entering the full execution phase, there are no reported schedule delays. In a May 29, 2026 progress report to the Coordination Group for Meteorological Satellites (CGMS), EUMETSAT confirmed that the program is "progressing well overall," design activities are advancing as planned across both system and ground elements, and early technical results are positive. The launch of the first six satellites remains firmly on schedule for 2029, supporting a strong bull case that execution is now proceeding smoothly.

AAC Clyde Space VIREON first light customer conversions

While the first two VIREON Earth Observation satellites were successfully launched in late March 2026, they are currently undergoing an on-orbit commissioning phase that will test and calibrate the onboard systems and payloads. During the May 2026 Q1 earnings call, management noted that while market interest in VIREON is strong, true commercial customer conversion remains at an early stage. Securing new commercial contracts is dependent on the satellites reaching "first light"—the collection and validation of initial high-quality camera imagery to prove data resolution and performance. On the positive side, an initial forest monitoring data contract with the Scottish Government (partially funded by Scottish Forestry under the Canopy project) is already locked in. Confident in eventual conversions, AAC Clyde Space has already initiated component procurement for the next satellites in the constellation, VIREON-3 and VIREON-4.

Swedish space sector funding and government grants 2026

In March 2026, the Swedish government proposed adding SEK 400 million (~€36.5 million) to its Spring supplementary budget to bolster national space activities. While this is a positive signal for the national ecosystem, the funding is heavily concentrated: SEK 386 million is allocated as a capital injection to SSC Space AB to enhance launch infrastructure and military security at the Esrange Space Center, and SEK 14 million is granted to the Swedish National Space Agency (Rymdstyrelsen) to expand its capacity to process space activity permits. Additionally, in January 2026, Sweden committed SEK 1.3 billion specifically to acquiring reconnaissance and surveillance satellites for national defense. While these developments do not represent direct commercial grants to AAC Clyde Space, they indicate a highly supportive sovereign environment and a rising focus on national space capabilities that could yield future defense-related procurement opportunities for domestic satellite manufacturers.