Stocks/AEL.AX

AEL.AX

Amplitude Energy Limitedv3 5.0/10 · 2026-11-26
Energy·Oil & Gas Exploration & Production
1.62 AUD
483M AUD market cap
v3 Rating
5.0/104.0–6.0
Setup
4.5/103.5–5.5
Fair Value
1.75 AUD1.15 AUD–2.50 AUD+8%
DCF (10%)
1.60 AUD-1%
Base IRR
+12%+0%–+24%
Visibility
moderate±39%
Rating
Revenue (TTM)
285.8M AUD
Owner Earnings
A$150M
Next-Yr Owner Earnings
-A$33M
Growth
+5.0% × 3y
P / Next-Yr OE
--
Net Debt
A$170M

Amplitude Energy Limited engages in exploration, development, and production of natural gas and low-cost oil in Australia. It operates through Southeast Australia and Cooper Basin segments. The company is involved in the exploration, evaluation, operation, and care and maintenance of natural gas assets in the Gippsland and Otway basins. It also produces and sells crude oil, as well as explores and evaluates additional oil targets. The company was formerly known as Cooper Energy Limited and changed its name to Amplitude Energy Limited in November 2024. Amplitude Energy Limited was incorporated in 2001 and is headquartered in Adelaide, Australia.

2-Year Price History

$1.53-22.7%
$1.5$2.0$2.5$3.0Initial target $2.10 · 2026-10-16Initial target $1.75 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.04.0–6.0
Setup
4.53.5–5.5
Fair value (AUD)
1.751.15 – 2.50
Upside vs 1.62
+8%
DCF (10%)
1.601.00 – 2.40-1%
Base IRR
12%0% – 24%
Visibility
moderaterange ±39%
Sentiment
3/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 1.53

Amplitude Energy (ex-Cooper Energy) is a purely domestic south-east Australian gas producer whose base business is running at records: FY26 underlying EBITDAX A$192m, the September quarter at 81.7 TJe/d and A$10.69/GJ, roughly A$230m a year of EBITDAX now. At A$1.53 (25 Nov close; the pack's 1.61 is stale), ~300m shares, the equity is ~A$460m and EV ~A$630m, under 3x EBITDAX. The drilling risk that crushed the stock in March has largely passed: Juliet and Annie-2 both delivered, ahead of schedule and under budget, and the East Coast Supply Project took FID in September, adding ~45 TJ/d net from 2028. But the test showed the cheap multiple is mostly the market correctly pricing a depleting asset base. 2P reserves are ~6 years of production. ECSP is sanctioned for a plateau of 'at least four years'. Sole should start declining around 2030-31, and a decommissioning liability (likely low hundreds of millions, with a history of overruns and an ASIC complaint alleging understatement) sits outside net debt. Redone with a 2030-31 decline, year 5 valued as a run-off at ~3x FCF and ~A$100m PV of abandonment, the DCF is ~A$1.60 a share, about the price. Fair value is A$1.75 including Nestor (81% chance of success, result due around December 2026) and backfill optionality. Rating 5.0: fairly valued to slightly cheap. The FY29 earnings doubling is a short plateau, not a re-rating story. Setup 4.5: Nestor and Artisan completion are dated, but there is no clear reason the market is wrong.

Flow: Nothing notable: no buyback, and the A$150m raise of Sept 2025 is done. Capex is funded from cash flow and the A$480m RBL, with net debt peaking at ~A$200-250m around mid-2027. A Nestor dry hole (result due ~December 2026) or ECSP overruns could bring a new raise of perhaps 10-15% of the shares.

A deep dive would have to establish: How long can Sole and the ECSP fields keep Orbost and Athena full after 2030, and what will abandonment really cost, i.e. is this a 6-year run-off or a long-lived infrastructure owner with backfill?

Owner earnings, TTM
A$150MA$110M – A$185M
Realistic peak profit
A$215MA$150M – A$290M
Growth rate
5.0%-5.0% – 15.0%
Years of growth
31 – 4
Market cap
A$460MA$440M – A$480M
EV
A$630MA$570M – A$760M
Net debt
A$170MA$120M – A$250M
Capital return / cap
0.0%0.0% – 3.0%
P/E
8.0×5.0× – 12.0×
EV/EBITDA
2.7×2.2× – 3.5×
FCF yield
24.0%15.0% – 30.0%
Projected FCF, base case (AUD millions)
Y1-A$33M-A$100M – A$30M
Y2A$170MA$90M – A$220M
Y3A$225MA$140M – A$290M
Y4A$188MA$100M – A$260M
Y5A$140MA$60M – A$210M
Competition: Competes with Esso/Woodside Bass Strait (declining), Beach, Santos/Queensland gas piped south and future LNG imports. Its edge is low-cost brownfield supply through plants it owns close to Victorian demand.
Governance: A history of Orbost operating failures, BMG decommissioning overruns, an ASIC complaint (2025-26) alleging understated decommissioning liabilities, two dry holes in 2026 and a discounted equity raise in Sept 2025; no shareholder returns yet.
Research (expand)

What it does. Amplitude produces gas for Victoria, NSW and SA from offshore fields, through two onshore plants. Orbost processes the Sole field (100% owned); after years of sulfur-unit problems it now runs above 70 TJ/d. Athena (50%) takes Casino-Henry-Netherby gas, which is in decline. There is also a small Cooper Basin oil interest. About 80% of gas is sold under fixed-price, CPI-linked contracts; the rest goes to the Victorian and Sydney spot markets. At 30 June 2026, 2P reserves were 163 PJe (about 6 years of production) and 2C resources 311 PJe.

What the market believes. After two dry wells in Feb-Mar 2026 the stock fell from ~A$3.1 to ~A$1.3. It sits at A$1.53, in the bottom fifth of its range, even after the Juliet discovery, FID and a strong Annie-2. The market prices a short-life gas producer: a capex-heavy FY27 (A$320-390m, plus A$58m for Artisan), net debt rising toward ~A$200-250m, a weak exploration record, soft near-term east-coast prices and policy risk.

What it earns. Run-rate EBITDAX is ~A$230m (Q1 FY27 revenue A$83m). Taking off maintenance capex (~A$35m), normalised tax (~A$40m) and restoration (~A$10m) leaves unlevered owner earnings of ~A$150m, on an EV of ~A$630m.

Projected unlevered FCF (calendar years, A$m).

  • 2027: about -33 (the last ECSP capex plus the Artisan payment)
  • 2028: ~170
  • 2029: ~225 (ECSP adds ~16 PJ a year at ~A$12/GJ)
  • 2030: ~190 (Sole begins to decline)
  • 2031: ~140

Year 5. A shrinking business. The ECSP plateau runs to ~2032 and Sole tails off in the early 2030s. Value comes from run-off cash plus backfill options: Patricia Baleen, Nestor, the Sole 2C, Longtom tolling, and spare capacity at Athena (150 TJ/d). Year 5 is worth ~3x FCF. Confidence in that is moderate-low; the backfill is the swing factor.

Fair value.

  • DCF: PV of five years of FCF ~A$495m, plus terminal ~A$260m, gives an EV of ~A$755m. Less ~A$170m net debt and ~A$100m PV of decommissioning leaves ~A$485m of equity, ~A$1.60 a share.
  • Fair value is A$1.75, with Nestor and other options.
  • Base IRR is ~12%. EV/EBITDA ~2.7x; P/E ~8x FY27.

Management, risks, competition. CEO Jane Norman fixed Orbost (unit costs down a third since FY24) and is plain about failures. The risks:

  • Sole declining early.
  • Decommissioning cost overruns (BMG ran past A$250m; Minerva may double).
  • Soft spot prices: the ACCC forecasts a Q4 2026 surplus, and the reservation scheme adds domestic supply from mid-2027.
  • A Nestor dry hole.
  • Another equity raise (Sept 2025 precedent).

Competitors are Esso/Woodside, Beach, Santos/Queensland gas and future LNG imports. No dividends or buybacks yet.

Sentiment: 3/10. Holders were burned in March, coverage is thin, and the stock fell ~20% in November despite good well news.

Thesis test

  • Depletion (challenge right). 2P is ~6 years of production, Sole runs above nameplate, and the sole sell-side forecast shows a cliff in FY30. CY30-31 EBITDAX cut to A$300m/240m and the terminal multiple to ~3x, about -A$0.50/share.
  • Decommissioning (challenge right). The pitch said 'net of abandonment' but deducted nothing. Taking ~A$100m PV (amount unverified, overrun history) is -A$0.33/share.
  • ECSP full-cycle returns (framing, no value change). The sunk capex is irrelevant to a point-forward DCF. It does confirm the FY29 'doubling' is a short plateau, which is already in the terminal cut.
  • November fall / prices (partly right). Near-term supply is loose and prices are softer, but ~80% of base gas and half of ECSP are on fixed contracts. CY29 trimmed slightly; small effect.
  • Dilution (mostly rejected). Annie-2 came in under budget with no contingency used, and FY28 FCF covers the rest. A tail risk only.
  • Conclusion. The pitch's 'market anchored on dry holes' story doesn't survive. The low multiple fairly prices a depleting producer with abandonment liabilities. AEL is fairly valued, with modest Nestor and backfill optionality. Pass.
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-161.816.06.52.102.0012%5
2026-11-261.535.04.51.751.6012%3

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242022
Revenue286+7%286+7%268+22%219+7%204
Gross profit-14.0-119%-14.0-119%73.0+162%27.8-28%38.5
Operating expenses15.9+10%15.9+10%14.4-69%47.2+160%18.2
▸Adj EBITDA93.3-54%93.3-54%204+110%97.1+23%78.8
▸Adj OCF180+32%180+32%136-5%143+147%57.8
CapEx-17.5-17.5-58.1-51.4-15.3
Adj FCF163+108%163+108%78.2-14%91.3+115%42.5
Interest expense20.020.027.818.59.64
▸Adj net income-20.6-231%-20.6-231%15.7-23.4-200%23.4
▸Owner's earnings110--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2026

Where the Cash WentTotal2026202520242022
▸Claimed: EBITDA295100%93.3100%146100%9.92100%45.4100%
FCF (OCF−capex)85.429%163175%31.221%-15142.594%
Net income-193-66%-27.2-29%-41.3-28%-114-10.6-23%
▸Capital returned-24.9-8%6.327%-12.4-8%-88.5-892%69.6153%
Buybacks-144-1440.000.000.00
Dividends0.000.000.000.000.00
Interest paid76.020.027.818.59.64
Debt paid down42.8130-40.2-10760.0
▸Reinvestment13746%16.017%64.644%44.2446%14.131%
Capex (PP&E)14217.558.151.415.3
Intangibles & M&A0.000.000.000.000.00
Leases signed (net Δ)-5.23-1.546.54-7.16-1.14
Retained / other18663%177189%71.449%-44.2-445%-17.5-39%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 3.2 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242022
▸Assets (total)13241324117612231200
▸Liabilities (total)821821799806702
Net debt (incl. leases)34.334.3238241-78.1
Net debt / Adj EBITDA0.370.371.172.49-0.99
Net debt / Adj FCF0.210.213.052.64-1.84
Adj EBITDA / interest4.654.657.345.258.18
Shares outstanding300300252240148
Dilution (YoY)+19.1%+19.1%+4.9%----
Employees140--------
MarginsTTM2026202520242022
Gross margin-4.9%-32.1-4.9%-32.127.2%+14.512.7%-6.218.9%
Adj EBITDA margin32.6%-43.432.6%-43.476.0%+31.744.3%+5.738.7%
Adj OCF margin63.1%+12.263.1%+12.250.8%-14.365.2%+36.828.4%
Adj FCF margin57.0%+27.857.0%+27.829.2%-12.541.7%+20.820.9%
Net income margin-9.5%+5.9-9.5%+5.9-15.4%+36.7-52.1%-46.9-5.2%
Adj NI margin-7.2%-13.1-7.2%-13.15.9%+16.6-10.7%-22.211.5%
ROIC (adj, after-tax)-3.5%-3.5%6.8%-2.3%2.4%
Cost of debt13.8%13.8%9.4%7.9%5.0%

Earnings Calls

2 calls

Earnings Call · 2026 Q4

2026-08-17

Amplitude Energy reported another strong year of operational and financial delivery in FY26, with record production, revenue, underlying earnings and cash generation. Group production increased 3% to 27.6 petajoules equivalent, or 75.5 terajoules equivalent per day, toward the upper end of upgraded guidance. Sales revenue rose 7% to $285.8 million, supported by higher volumes and a 5% increase in average realized gas prices to $10.36 per gigajoule. Group unit production costs declined to $2.07/GJ, while underlying EBITDAX increased 12% to approximately $191.8 million, producing a margin of about 67%. Adjusted cash from operations reached $191 million. Reported statutory earnings were affected by an approximately $100 million pre-tax write-off of Isabella and Elanora exploration costs, which management classified separately because offshore exploration expenditure is irregular and lumpy. Orbost was the principal operational success. Average production reached 66.5 TJ/day, with the facility now operating above its prior 68 TJ/day nameplate capacity. The sulfur removal system became much less of a constraint, absorber cleans fell from 21 to four, and downtime continued to decline. Daily production records approached 74 TJ/day during the final six weeks of the year. Management’s focus is now on sustaining throughput and further improving reliability. Athena also performed well, averaging 8.5 TJ/day on Amplitude’s share after its planned maintenance and recording only 0.7% reliability loss. Cooper Basin production was affected by field decline and flooding but improved after three new Callawonga wells came online. The company’s continuous-improvement program delivered approximately $13.4 million of annualized cash-flow benefits in FY26, taking cumulative benefits since FY24 above $50 million. Operational efficiencies at Orbost were the largest contributor. Gas marketing and trading initiatives generated more than $1.5 million above Victorian daily spot prices by optimizing sales timing, market destinations and trading profiles. The company is also replacing its internal ERP system, with $6–7 million of FY27 implementation costs expected to support later administrative savings. Amplitude enters FY27 with a substantially stronger balance sheet. Net debt declined more than $200 million during FY26 to $37.6 million, cash was approximately $138 million, and the reserve-based lending facility provided significant additional liquidity. FY27 capital expenditure guidance is $250–310 million, primarily for ECSP drilling, well completions and long-lead development items. The ECSP remains the central growth initiative and is on track for first gas in 2028. Annie and Artisan underpin the project, with foundation offtake agreements secured with EnergyAustralia and AGL, FEED complete and development FID expected in the near term. Artisan’s acquisition is awaiting final regulatory approvals and should provide procurement, infrastructure and gas-composition advantages. Juliet drilling has commenced, with results expected in September; its location beneath the existing CHN pipeline means a discovery could be highly economic. Nestor remains an optional well, with a decision expected after Juliet and driven mainly by cost and joint-venture priorities. Patricia Baleen is progressing through FEED as a complementary brownfield restart. The initial offshore work would involve replacing a problematic subsea component, followed later by plant modifications; longer-term production is expected at roughly 4–5 TJ/day. FY27 priorities are completing ECSP drilling safely and on schedule, reaching FID, optimizing Orbost above 70 TJ/day where market conditions permit, maintaining operated-plant reliability below 1%, advancing Patricia Baleen and continuing margin expansion.

Analyst Q&A (11)
▸
Asked whether the Nestor well decision is binary—drill it if Juliet fails and do not drill it if Juliet succeeds—and asked how future exploration expenses will be treated in underlying NPAT.
Gordon Ramsay · RBC Capital Markets
OG Energy wants to wait for the Juliet result before deciding whether to drill Nestor. The boards of both partners will then decide. Approvals, long-lead items and one remaining Transocean Equinox rig slot are already available. Exploration costs are being treated below the line because offshore drilling campaigns are lumpy and management wants underlying business performance to remain visible.
▸
Asked how the domestic gas reservation proposal affects the decision to commit to Nestor, including whether the company might defer or abandon the well despite geological support.
Nik Burns · Jarden Australia
The Annie and Artisan project base is approximately 80% contracted through EnergyAustralia and AGL, supporting confidence in proceeding. Management sees strong demand from southern gentailers for additional, diverse gas supply and expects a more workable domestic reservation policy after industry feedback. Nestor could provide flexibility to lift Athena toward its approximately 150 TJ/day capacity and serve peak demand; the company expects a policy exposure draft or consultation in the second half of September.
▸
Asked whether Amplitude plans to drill another well to access the contingent resource booked at Sole.
Nik Burns · Jarden Australia
The additional Sole volume is booked as contingent resource and remains a future option. There are no firm plans to drill currently; timing will depend on gas prices, drilling costs and whether a rig is already in the area.
▸
Asked what work and expenditure are involved in relifing the Athena plant.
Nik Burns · Jarden Australia
Athena relifing is expected to involve an intelligent pig run on the pipeline, replacement of the gas-to-gas exchanger bundle, and a few minor controls upgrades. Management characterized the required plant work as relatively minor.
▸
Asked whether regulatory uncertainty, particularly a potential domestic gas reservation policy, could prevent completion of the Artisan acquisition or permit renegotiation of its terms.
James Bullen · CGF
Management expects the Artisan transaction approvals to be received by the end of calendar 2026 or early 2027 and remains confident of completion. The acquisition is economically attractive because it leverages the existing ECSP program, allows shared long-lead orders, helps blend down CO2 and may avoid the need for amine treatment at Athena. Existing attractive-priced GSAs and strong gentailer demand support project economics, and management does not expect the transaction to be materially affected by the reservation policy.
▸
Asked for more detail on the duration of the planned Orbost shutdown included in FY27 guidance.
Stuart Howe · Bell Potter Securities
The planned statutory Orbost shutdown is currently expected to last 10 days.
▸
Asked how much the Nestor decision will depend on Juliet's geology and results versus the overall exploration budget.
Stuart Howe · Bell Potter Securities
The Nestor decision is driven primarily by cost and the joint venture partner's desire to see exploration results after substantial spending, rather than concerns about geology. Juliet's success would provide some positive statistical support because of the prospects' proximity, but Nestor is considered geologically independent.
▸
Asked about the likely incremental cost and scope of restarting Patricia Baleen, given the possibility of using the ECSP rig and related subsea activities.
Nik Burns · Jarden Australia
Patricia Baleen costs are split between offshore subsea work and later plant modifications. The offshore work, potentially coordinated with ECSP umbilical and flow-line installation, involves retrieving the existing umbilical, removing the problematic UTA and replacing it. Initially, production can flow through the plant's high-pressure side; modifications to the low-pressure side would be needed later for sustained production of roughly 4–5 TJ/day. Approximately 60% of the cost is expected to be subsea work in 2028 and about 30% plant work roughly 18 months later.
▸
Asked how a potential Longtom restart would be timed and interact with production from Patricia Baleen and Sole.
Nik Burns · Jarden Australia
Longtom would be developed after Sole production is completed. A technical study found that restarting Patricia Baleen was the most economic option, with existing infrastructure making the project attractive. Longtom could subsequently use the plant if it secures approvals and capacity is available, while Amplitude may also consider its own backfill options after Sole depletion.
▸
Asked whether the Sole debottlenecking shown in the 2028 production chart reflects already-delivered capacity or further production available from the current plant configuration before Patricia Baleen restarts.
Nik Burns · Jarden Australia
The Sole debottlenecking shown in the 2028 production illustration largely represents work already delivered, with current potential approaching 75 TJ/day. Further gains before Patricia Baleen would come mainly from improving uptime and reliability. The additional restart contribution could lift production toward approximately 80 TJ/day.
▸
Asked how management and the board plan to deploy the significant cash build expected after ECSP comes online, given lower restoration costs.
Declan Bonnick · Euroz Hartleys
Once ECSP spending subsides and cash generation increases, the company expects to apply a conventional capital-management framework. It will balance investment in future growth opportunities with potential shareholder returns through several mechanisms.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q4133M98M15M$0.05$0.05 – $0.051
2025 Q2134M103M4M$0.01$0.01 – $0.011
2025 Q378M—0M$0.00$0.00 – $0.000
2025 Q4142M82M9M$0.03$0.03 – $0.031
2026 Q178M—0M$0.00$0.00 – $0.000
2026 Q2144M27M-48M$-0.16$-0.16 – $-0.161
2026 Q4163M121M31M$0.10$0.10 – $0.101
2027 Q2163M118M29M$0.10$0.10 – $0.101
2027 Q4167M143M47M$0.16$0.16 – $0.161
2028 Q2172M117M29M$0.10$0.10 – $0.101
2028 Q4180M170M67M$0.22$0.22 – $0.221
2029 Q2188M160M59M$0.20$0.20 – $0.201
2029 Q4196M97M15M$0.05$0.05 – $0.051
2030 Q2205M90M10M$0.03$0.03 – $0.031
v2 analysis (legacy, 2026-08-18) — for comparison onlyclick to expand

Thesis

Amplitude has moved from a balance-sheet-constrained, inconsistent producer toward a credible cash-generating gas company. Orbost's improved reliability and throughput are the most tangible part of the thesis: the company is now operating above its historical nameplate capacity, with lower unit costs and stronger realized pricing. Net debt reduction materially lowers near-term financial risk. The next phase is much more capital intensive. FY27 capex of AUD250–310M is largely tied to ECSP drilling, completions and long-lead items, so current free cash flow will not translate directly into shareholder distributions. ECSP has attractive contracted demand and infrastructure synergies, but the project still carries execution, regulatory, geological and cost risk. The Isabella and Elanora disappointments demonstrate that exploration upside is not dependable, while the statutory loss and large below-the-line adjustments reduce confidence in headline earnings. The most likely outcome is a successful but imperfect transition to a larger southern-Australian gas platform, with value driven by Orbost cash generation and the probability-weighted ECSP development rather than by current-year EBITDA alone.

Trade Signal

Trade rating
+5.2/10
Buy
Horizon
~6mo
gpt-5.6-luna2026-08-18 · saw 1.65 AUD-2.1% since

Buy, with execution and funding risk: the market is valuing an improving cash-generating gas producer near the analyst's bear case while assigning limited value to the contracted ECSP growth platform.

Temporary mispricing+5.0

The major move was a sharp fall from AUD3.13 in January to AUD2.30 in February, followed by a rebound toward AUD2.73 in March before the late-March Isabella pressure-depletion result and the earlier Elanora water-bearing result drove a collapse to roughly AUD1.59. The stock then drifted lower through June to AUD1.32 as investors discounted exploration risk, capital intensity and delayed growth, before recovering to AUD1.65 by August 18. The initial exploration-related repricing was justified, but the subsequent decline appears to have overshot the deterioration because Orbost operations, cash generation and the ECSP foundation remained strong. The latest earnings release produced only an 8% move, implying the market is still underreacting to the operating improvement. This is a likely temporary valuation dislocation, though it will close only if Juliet/FID and funding milestones arrive without dilution or delay.

Market view-4.0

The stock appears disliked and largely ignored rather than euphorically positioned. The market has focused on the failed Isabella and Elanora exploration outcomes, the 2028 timing of ECSP, capital intensity and dilution, which drove the fall from AUD3.21 to AUD1.65. Bulls can point to the Orbost turnaround, net-debt reduction, premium local gas pricing, foundation offtake agreements and strong cash generation. The bearish narrative is stale regarding current operations, but remains valid regarding funding and project risk. The immediate post-results 8% rise suggests some recognition, not crowded ownership.

Inflectionwindow ~1mo+5.0

The business has already delivered a meaningful operational inflection at Orbost, with production above the former 68 TJ/day nameplate, lower unit costs and record cash generation. The next inflection is ECSP: Juliet results and FID could make the 2028 Annie/Artisan growth path more investable. This is not fully reflected in the depressed price, but the analyst's base case assumes successful execution, contracted demand and roughly AUD130M owner earnings; therefore the upside is partly anticipated in fair value rather than wholly undiscovered. The inflection is positive but staged and capital-intensive.

Catalysts
  • ▲2026-09 · Juliet drilling results — Expected in September; a commercial discovery would improve confidence in ECSP economics and near-term growth optionality.
  • ▲H2 2026 · ECSP development FID and Artisan acquisition approval — FID and completion of the Artisan transaction would reduce project uncertainty, though funding and capex discipline remain key.
  • ▲2026-10 to 2027-07 · FY27 quarterly production and operating updates — Sustained Orbost production above 70 TJ/day, low downtime and firm realized gas prices would validate the cash-generation thesis.
  • ▲H1 2027 · Patricia Baleen FEED and restart decision — A credible brownfield restart could add incremental production, but it is secondary to ECSP and may require further capital.
  • ▲2027 · ECSP drilling, completions and long-lead procurement milestones — On-time execution supports first gas in 2028; delays or cost overruns would materially challenge valuation.
  • ▲2027-08 · FY27 results and capex/cash-flow update — The market will test whether strong operating cash flow can fund the AUD250–310M investment program without substantial new dilution.
Flow-4.0

Underlying operating cash generation is positive, but expected net share flow is unfavorable. Trailing dilution of approximately 14% is a major warning sign, and FY27's AUD250–310M capex program could require additional debt or equity despite the improved balance sheet. No meaningful buyback or imminent tender support is identified. Successful ECSP milestones could attract new buyers, but supply risk is more immediate than squeeze fuel.

Floor / Ceiling+1.0

There is no hard asset floor at today's price: cash of roughly AUD138M is offset by approximately AUD176M of debt, and FY27 capex will absorb much of the operating cash flow. The operating business generates a high reported FCF yield, but that is not a reliable near-term equity floor while ECSP spending is elevated. The bear-case valuation of about AUD480M, close to the current market capitalization, provides some downside reference but not a committed support level. The main ceiling is funding and execution: cost overruns, project delays or further equity issuance could cap the rerating.

Buyability

Buyable for specialist energy investors: it is a real, improving Australian gas producer with strong Orbost execution, premium southern-market pricing and contracted ECSP demand. However, FY27 capex is very heavy, the 2028 growth payoff is distant, and 14% trailing dilution makes it less attractive to generalist buyers until funding and project execution are clearer.

Fear vs Greedfear 6/10 (+1.0)greed 7/10 (+2.0)

Greed is stronger, but only moderately: the stock is priced near the bear-case equity value despite record production, improving Orbost reliability, 17% reported FCF yield and a potentially valuable 2028 gas platform. Fear is justified by the large capex step-up, exploration failures, dilution history and the fact that most of the major growth value is still prospective rather than producing.

Valuation

Our Target
1.0B AUD+107%
Market Should Pay
1.1B AUD+117%
target ×1.05 (greed premium)
Current Market Cap
483M AUDSlightly bearish
What Changed
transcript · 2026-08-17
+8%fair value on this information

The genuinely new information is the completed FY26 outcome rather than another interim indication: production finished near the top of upgraded guidance, Orbost demonstrated sustained operation above its prior nameplate capacity, FY26 adjusted cash generation was strong, and net debt fell to approximately AUD38M. The market also received clearer detail on FY27 capex of AUD250–310M, a roughly 10-day Orbost shutdown, and the fact that Isabella and Elanora exploration costs will produce an approximately AUD100M pre-tax statutory write-off. The favorable operating data were partly anticipated after the strong Q2 and prior operating updates, so the surprise is positive but not transformational.

▸ How the cases moved

The full-year result raises the base case from roughly AUD1,200M to AUD1,300M as production reached the upper end of guidance, Orbost reliability improved and net debt fell by more than AUD200M. The bull case is broadly maintained near AUD2,520M: ECSP remains on track and foundation offtake is supportive, but the AUD250–310M FY27 capex requirement prevents a further increase. The bear case improves modestly from roughly AUD450M to AUD480M because liquidity and balance-sheet risk are lower, although the approximately AUD100M exploration write-off and failed Isabella/Elanora wells keep downside meaningful. Probabilities shift from approximately bear 0.28, base 0.52, bull 0.20 to bear 0.25, base 0.55, bull 0.20.

2-Year Plausible Outcomes
bear25%
480M AUD
rev 0%/yrOE $60M

Orbost remains operationally improved but production declines, domestic gas policy or weaker pricing limits realized prices, and ECSP spending overruns or slips beyond 2028. Isabella and Elanora are unrecoverable and further exploration consumes cash. Owner earnings settle near AUD60M as sustaining capex and interest absorb much of operating cash flow.

▸ Valuation

8x AUD60M owner earnings = AUD480M equity value

base55%
1.3B AUD
rev +12%/yrOE $130M

Orbost sustains production around or modestly above 70 TJ/day, gas prices remain firm, and ECSP reaches first gas around 2028 with Annie and Artisan substantially supporting the project. FY27 capex is heavy but broadly controlled, while Patricia Baleen remains a later-stage option. Owner earnings rise to approximately AUD130M as production and margins improve.

▸ Valuation

10x AUD130M owner earnings = AUD1,300M equity value

bull20%
2.5B AUD
rev +25%/yrOE $210M

Orbost reliability and throughput remain excellent, gas prices stay elevated, Juliet or Nestor adds confidence and ECSP starts on schedule with strong contracted demand. Artisan closes without material delay, production approaches the targeted 100–120 TJ/day platform, and high operating leverage produces substantially higher cash earnings despite development spending. Owner earnings reach approximately AUD210M.

▸ Valuation

12x AUD210M owner earnings = AUD2,520M equity value

▸ Target Rationale

The probability-weighted discounted scenario value is AUD1,071M. I set the analytical target at AUD1,000M, below the arithmetic model, because the model necessarily compresses several risks into scenario probabilities: the unusually large FY27 capex program, potential development overruns, exploration and regulatory uncertainty, and the gap between adjusted and statutory earnings. The improving balance sheet and contracted ECSP demand prevent a deeper discount, but current owner earnings do not yet justify valuing the company on peak adjusted EBITDA.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now7/10
Trajectory8/10
Risk6/10
Governance6/10
Insolvency prob (2yr)3%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Artisan Gas Field Acquisition (May 2026): Amplitude Energy signed a binding Sale and Purchase Agreement (SPA) to acquire a 50% interest in VIC/L35, containing the Artisan gas field in the Offshore Otway Basin, from Beach Energy. The transaction involves an upfront cash payment of $58.3 million net, plus a future production royalty. The acquisition consolidates Amplitude's footprint alongside its discovered Annie field, potentially accelerating East Coast Supply Project (ECSP) gas production to 2028 and boosting total targeted production capacity from 75 TJ/d to 120 TJ/d.
  • AGL Energy Gas Sales Agreement (April 2026): Amplitude executed a binding long-term Foundation Gas Sales Agreement (GSA) with AGL Energy. Under the contract, Amplitude will supply approximately 20 PJ of gas over a four-year period beginning in the second half of 2028. Pricing is linked to oil benchmarks, reflecting tight domestic supply dynamics and securing long-term demand for the ECSP development.
  • Q3 FY26 Quarterly Performance (April 2026): Amplitude reported a strong operational performance with quarterly group production of 6.86 PJe, tracking toward the upper end of its upgraded full-year guidance of 73-77 TJe/day. The company achieved a record quarterly revenue of $74.1 million, driven by a record average realized gas price of $10.74/GJ (+4% on Q2 FY26). Cash and cash equivalents grew to $96 million.
  • Subsea Umbilical Contract Award (April 2026): Amplitude awarded JDR Cable Systems a contract to supply subsea control umbilicals for the ECSP. The contract involves approximately 18 km of hydraulic control umbilicals scheduled for installation in late 2027 to tie back gas production to the Athena Gas Plant.
▸ Thesis-test Findings
  • AEL Isabella prospect drilling results Otway Basin:

In late March 2026, Amplitude announced that flow testing at the Isabella sidetrack well (ST-1) in permit VIC/L24 revealed pressure depletion, leading the joint venture to assess the gas discovery as non-commercial in its current location. The well has been plugged and abandoned. Coming shortly after a water-bearing result at the Elanora-1 well in February 2026, this represents a near-term blow to Amplitude’s exploration-led growth thesis. However, the company maintained that its broader ECSP timeline, budget, and first gas targets for 2028 remain on track, leveraging other high-probability targets (Juliet and Nestor) alongside its existing discovered Annie resource.

  • Australian East Coast domestic gas supply deficit 2026 forecast:

The Australian Energy Market Operator's (AEMO) March 2026 Gas Statement of Opportunities (GSOO) pushed back projected peak-day gas shortfall risks in southern Australia by one year to 2029 (with deficits by 2030) due to moderating demand and infrastructure commitments. However, regional disparities remain highly acute for the near term. The Australian Competition and Consumer Commission (ACCC) projects that southern states face an immediate 26 PJ deficit in Q2 2026 that will require Queensland surplus gas and storage withdrawals to manage. In addition, a potential Q3 2026 east coast shortfall of 12 PJ was flagged in ACCC's March report, leading the federal government to issue a notification of intent regarding the domestic gas security mechanism. While the pushback of the structural shortfall to 2029 marginally softens the mid-term bull case, immediate southern supply tightness continues to support premium pricing for Amplitude's localized gas production.

  • Orbost gas plant operating performance and processing updates:

The Orbost Gas Processing Plant (OGPP) demonstrated exceptional operational progress in early 2026. Following the implementation of various improvement initiatives (specifically loading new H2S polisher media), the plant overcame historic foaming and fouling limitations. During Q3 FY26, Orbost operated above its prior nameplate capacity of 68 TJ/d, setting new performance records with a 7-day average production rate of 71.0 TJ/d and a 30-day average rate of 70.2 TJ/d. This operational breakthrough is a strong indicator for the bull case, as steady high-capacity throughput allows Amplitude to maximize sales (especially higher-priced spot volumes) from its Sole gas field into the supply-constrained southern market.