AG

First Majestic Silver Corp.v3 4.0/10 · 2026-11-03
Basic Materials·Silver
$12.33
$5.6B market cap
0.2% div yield
v3 Rating
4.0/103.0–5.0
Setup
4.5/103.5–6.0
Fair Value
$10.00$6.50–$17.00-19%
DCF (10%)
$9.00-27%
Base IRR
-3%-15%–+12%
Visibility
wide±53%
Wall Street
$25.50 target(1 analyst last quarter)(4 buy, 6 hold, 1 sell)
Rating
Revenue (TTM)
$1.8B
Owner Earnings
$340M
Next-Yr Owner Earnings
$130M
Growth
+5.0% × 3y
P / Next-Yr OE
46.8x
Net Debt
-$830M

First Majestic Silver Corp. is a North American mining company dedicated to the exploration, acquisition, development, and operation of mineral properties, primarily concentrating on silver and gold output. The company fully owns and operates a portfolio of significant mining assets. In Mexico, these include the San Dimas Silver/Gold Mine (71,868 hectares in Durango and Sinaloa), the Santa Elena Silver/Gold Mine (102,244 hectares in Sonora), the La Encantada Silver Mine (4,076 hectares in Coahuila, complemented by 1,343 hectares of surface rights), the La Parrilla Silver Mine (69,478 hectares in Durango), the Del Toro Silver Mine (comprising 3,815 hectares of mining concessions and 219 hectares of surface rights in Zacatecas), the San Martin Silver Mine (12,795 hectares across 33 mining concessions in Jalisco), and the La Guitarra Silver Mine (39,714 hectares). Beyond Mexico, its holdings extend to the Jerritt Canyon gold mine, spanning approximately 30,821 hectares in Elko County, Nevada. Additionally, First Majestic maintains an interest in the Springpole project, a gold and silver prospect encompassing around 41,913 hectares in Ontario, Canada. Established in 1979, the firm initially operated as First Majestic Resource Corp. before adopting its current name, First Majestic Silver Corp., in November 2006. Its corporate headquarters are located in Vancouver, Canada.

2-Year Price History

$14.10+118.9%
$10$15$20$25$30Initial target $10.00 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
4.03.0–5.0
Setup
4.53.5–6.0
Fair value (USD)
10.006.50 – 17.00
Upside vs 12.33
-19%
DCF (10%)
9.005.00 – 16.00-27%
Base IRR
-3%-15% – 12%
Visibility
widerange ±53%
Sentiment
4/10
2026-11-03 · claude-opus-5-5 · priced at 14.10

First Majestic is a well-run, net-cash, 4-mine Mexican silver/gold producer (San Dimas, Santa Elena, La Encantada, 70% of Los Gatos) adding a Nevada gold restart (Jerritt Canyon, H2 2027). It printed record cash in H1 2026 ($418M FCF, $1.25B treasury) because silver averaged $64-86, but silver has since crashed 58% from its $121 January peak to about $49 (gold about $3,880), and AG has round-tripped from $32 to $14.10 (NYSE close 2026-11-03 from the pack; consistent with the $14.77 seen on Oct 24). The problem for a buyer is that the stock still prices higher metal than today's. At spot metals I get about $730M of 100%-basis EBITDA but only about $340M of attributable unlevered owner earnings once Mexican taxes and mining duties (about 37%), the reserve-replacement treadmill (sustaining capex plus the underground development and drilling needed to keep 5-10 year mine lives going) and the 30% Los Gatos minority are taken out. That puts the EV of about $6.1B at roughly 8.4x spot EBITDA and 16-18x owner earnings, a P/E of about 21x. A 5-year DCF at spot metals, with Jerritt Canyon and the mill expansions included and a 10x exit for a depleting miner, gives about $9 a share. To justify $14 you need silver back around $75 or more. Positives: no real leverage (0.125% converts), a dividend of 2% of revenue, small buybacks, a strong exploration record at Santa Elena (+90Moz), and trusted operators. Negatives: a $1.28B SAT tax reassessment that is mostly unprovisioned, a labour dispute at San Dimas, and Jerritt Canyon's history of losing money. Sentiment is in a post-mania liquidation, not yet capitulation. Analysts still sit at Buy with C$30-42 targets that assume much higher silver. Rating 4.0: not a short into a commodity flush, but not cheap either. This is leveraged silver beta, not a mispriced business. Research 4.5: the main open question is the silver price, and more work cannot resolve that.

A deep dive would have to establish: Whether silver near $50 is a durable floor or still mid-flush, and what the Q3/Q4 2026 prints and Jerritt Canyon pre-feasibility imply for spot-price free cash flow and the SAT exposure.

Owner earnings, TTM
$340M$230M – $480M
Realistic peak profit
$460M$330M – $850M
Growth rate
5.0%0.0% – 12.0%
Years of growth
32 – 5
Market cap
$7.0B$6.9B – $7.0B
EV
$6.1B$5.8B – $6.5B
Net debt
-$830M-$1.0B – -$550M
Capital return / cap
1.0%0.5% – 2.5%
P/E
21.0×15.0× – 32.0×
EV/EBITDA
8.4×6.0× – 11.5×
FCF yield
5.0%3.0% – 7.5%
Projected FCF, base case (USD millions)
Y1$130M-$50M – $400M
Y2$355M$120M – $700M
Y3$400M$150M – $780M
Y4$395M$130M – $780M
Y5$390M$100M – $780M
Competition: A price-taker against Pan American, Hecla, Fresnillo and Endeavour, with its edge in high-grade district-scale Mexican land, exploration success at Santa Elena and its own mint; it has no pricing power.
Governance: No fraud or leverage concerns, but the CEO is combative toward analysts and refused questions on a $1.28B mostly unprovisioned SAT tax reassessment, and he speculates with shareholders' metal inventory.
Research (expand)

What the company does

First Majestic (NYSE/TSX: AG) mines silver and gold in Mexico. It runs San Dimas (Durango, gold-heavy, with a Wheaton gold stream), Santa Elena (Sonora: Ermitano plus the new Navidad and Santo Nino discoveries), La Encantada (Coahuila, pure silver) and a 70% stake in Cerro Los Gatos (Chihuahua, silver-zinc-lead, acquired with Gatos Silver in January 2025). Jerritt Canyon in Nevada is a gold mine on care-and-maintenance that is being restarted for H2 2027. Revised 2026 guidance is 14.6-15.5Moz of attributable silver and 128-135koz of gold, with AISC of $27.7-28.8 per AgEq oz at a fixed 75:1 ratio. It also runs First Mint, a retail bullion mint that gets a premium on part of the silver it sells.

Recent results and what changed

  • Q1 2026: revenue $477M, realized silver $86, FCF $224M.
  • Q2 2026: revenue $415.5M, realized silver $64, EBITDA $252M, FCF $195M after $47M of cash taxes. Treasury was $1,253M at June 30, of which $159M is restricted reclamation bonding. Marketable securities were another $155M. Shares outstanding: 492.7M.
  • Q3 2026 production: 3.44Moz silver and 29.6koz gold. A 12-day labour dispute at San Dimas cut its silver 41% year on year. The buyback was renewed at 10M shares (about 2%); only 1.7M shares were bought last year, at C$23.38.
  • Q3 financials: due Nov 4-5.
  • Metals: silver hit $121.64 on Jan 29 and closed around $49 on Oct 30, down 58%. Gold is about $3,880. Drivers: Fed hike odds for December, JPMorgan expecting solar demand to fall about 30%, and margin-driven liquidation. Managed-money longs are at their lowest since Q1 2024. Q4 2026 and 2027 will be reported at metal prices 25-45% below H1's.

What it earns today (at spot: Ag ~$50, Au ~$3,900)

I scaled Q2 (Ag $64, Au $4,347, EBITDA $252M) to spot, letting royalties and profit-sharing fall a little. That gives about $180M of EBITDA a quarter, or about $730M a year on a 100% basis. Revenue is about $1.38B (about 17Moz silver at 100%, 130koz gold, plus Los Gatos zinc and lead). Cash opex, G&A and expensed exploration run about $650M a year. Stock comp (about $20M a year) is already inside EBITDA.

  • Less cash taxes: Mexico's 30% income tax plus the 8.5% special mining duty and the 1% extraordinary duty come to about 37% of EBIT (EBIT about $510M after about $215M of D&A), so about $190M.
  • Less maintenance capex of about $160M. That is $62-70M of guided "sustaining" capex plus roughly $90M of underground development and near-mine drilling. Mexican vein mines with 5-10 year reserve lives must spend this every year just to hold output. That is the treadmill, and company "AISC" leaves most of it out.
  • That leaves about $380M of unlevered owner earnings on a 100% basis. Less the 30% Los Gatos minority (about $45M after tax), that is about $340M attributable. Only about 47% of EBITDA reaches owners.
  • Add about $35M of after-tax interest income on net cash: about $375M, a 5.4% owner-earnings yield on the $6.95B market cap.
  • Trailing figures look much cheaper: TTM EBITDA is about $1.0B, so about 6x EV/EBITDA, and annualized H1 FCF was over $800M. Those figures are flattered by $64-86 silver that is gone for now. Screeners will flag this as cheap. It is not.

Balance sheet.

  • Cash about $1.1B. My Q3 estimate is about $1.2B, after about $150M of FCF less dividends, buybacks and minority distributions.
  • Securities $155M and about $60M of excess metal inventory.
  • Convertibles: $350M of 0.125% notes due 2031 (convert at $22.36) and about $55M of 2027 notes.
  • Leases $28M. About $150M of the $286M taxes payable is treated as debt-like.
  • Net cash is about $830M, so EV is about $6.1B.
  • The SAT dispute (San Dimas/Primero transfer pricing on the old Wheaton stream) has $1.28B (MXN 22.3B) of gross reassessments for 2010-2018. Only the 2012 year is accrued. A smaller FMP dispute was settled for $10.1M in Q2. I deduct an expected $250M. A bad outcome could be $500M-plus, about $1 a share.

Projected free cash flow (attributable, before interest, after SBC, taxes, all capex including growth)

Assumes spot metals held flat. Production grows from Los Gatos reaching 4,000tpd, the Santa Elena mill reaching 3,500tpd with Navidad and Santo Nino feeding it, and Jerritt Canyon starting in H2 2027. I model Jerritt at about 90-110koz a year at $2,000-2,300 AISC from 2028, so roughly $150M of EBITDA.

| Year | EBITDA (100%) | Cash tax | Capex (maint + growth) | NCI | FCF |

|---|---|---|---|---|---|

| 2027 | ~800 | ~210 | ~410 (JC ~150, expansions, heavy drilling) | ~50 | ~130 |

| 2028 | ~940 | ~250 | ~280 | ~55 | ~355 |

| 2029 | ~960 | ~255 | ~250 | ~55 | ~400 |

| 2030 | ~950 | ~250 | ~250 | ~55 | ~395 |

| 2031 | ~930 | ~245 | ~240 | ~55 | ~390 |

Sensitivity: each $10/oz of silver is worth about $90M a year of attributable FCF, or about $1.80 a share of DCF value. Each $500/oz of gold (counting Jerritt) is worth about $1.40 a share.

What kind of company in 5 years

Not a corpse and not a compounder. It will be a larger, flat-production miner: about 15-17Moz of silver plus about 230koz of gold once Jerritt runs, with district-scale land and a record of replacing reserves through drilling. Its value will depend on the metal price rather than on its own growth. The market pays 8-12x FCF for that kind of depleting producer through the cycle. I use 10x. My confidence in volumes is moderate. Jerritt Canyon lost money for First Majestic in 2021-23 and the restart plan is pre-feasibility. My confidence in the metal price, which drives most of the value, is low.

Fair value and multiples

  • DCF at 10%, 10x exit, plus $830M net cash, less $250M SAT: about $9.0 a share ($5 at $40 silver, about $16 at $75).
  • Multiples at spot: EV/EBITDA about 8.4x, P/E about 21x, owner-earnings yield about 5%.
  • Base-case IRR from $14.10 at flat spot metals: about -3%.
  • Fair value about $10. I add a little above the DCF for the modest contango in the forward curve, the Santa Elena exploration upside and the scarcity premium silver equities usually get, since few large liquid primary-silver names exist.
  • What the price implies: about $75 silver, roughly halfway back to the January peak.
  • Covered calls: IV is about 50%, which makes call premiums rich. But this is not a valuation-floor setup with predictable forward earnings, so it is not a classic covered-call candidate. Covered calls only make sense for someone who wants silver exposure anyway.

Management, risks, competition

Keith Neumeyer is the founder, CEO and a large holder. The operators are competent: integrating Gatos went smoothly, La Encantada was turned around, and costs per tonne are disciplined. Capital allocation is shareholder-friendly in form: no equity raises, 0.125% converts, a dividend of 2% of revenue and an active NCIB. The amounts are small, though; capital return is about 1% a year. His tone toward analysts and on tax disclosure is combative. In the Q3 2025 call he refused tax questions. Holding metal in inventory "for higher prices" is a commodity bet with shareholder money; it was right in 2025 and wrong in H2 2026. COO Steve Holmes retired and was replaced by Dave Howe in May 2026.

Risks:

  • Silver price, by far the biggest.
  • The SAT reassessments.
  • Mexican politics: mining-concession reform, duty increases, the open-pit ban.
  • Labour (the San Dimas dispute).
  • Cartel security.
  • Jerritt Canyon capex overruns.
  • Peso strength raising costs.

Competition and peers: Pan American, Hecla, Endeavour, Fresnillo and SSR. Miners are price-takers, so the moat is ore-body quality and district land. AG trades at a premium multiple to peers for pure-silver exposure.

Sentiment: 4/10

This is a post-mania hangover. Silver is down 58% from a parabolic January peak, AG is down 56% from $32, and FINRA short interest rose from 17M to 26M shares (about 5% of float, 2.6 days to cover) between July and September. Speculative silver positioning is at a 2.5-year low. That is fear, but not capitulation: AG is still up about 2.5x from two years ago, and the $50 silver support has only just broken. Analysts are still bullish: 6-8 brokers, mostly Buy (HCW, BMO, Cormark; Scotia at Hold), with targets of C$30-42 (about US$21-30). Those targets were trimmed only slightly in October and assume much higher silver than today. That gap is the risk: estimate cuts are still coming once Q3 and Q4 are reported at lower prices. There is no forced seller or buyout angle; the market cap is too large and the buyer universe is small. Buy only if you want silver exposure and believe silver is bottoming. As a business valuation, it is fairly to fully priced.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue1753+81%1268+125%564-2%576-8%624
Gross profit935+259%451+390%91.9+92%48.0-66%141
Operating expenses142+75%83.2-13%95.7-58%227+26%180
▸Adj EBITDA1034+154%636+422%122-51.5-154%96.3
▸Adj OCF807+147%555+517%90.0+149%36.2+319%8.64
CapEx-199-216-115-147-214
Adj FCF608+355%339-25.1-110-205
Interest expense16.517.817.617.612.8
▸Adj net income332+246%139-91.5-156-155
▸Owner's earnings450--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1416100%778100%686100%114100%-24583.9100%
FCF (OCF−capex)47534%39150%35151%36.832%-85.9-218-261%
Net income1339%31040%17425%-102-89%-135-114-136%
▸Capital returned-277-20%43.16%-127-18%-34.3-30%-54.1-106-126%
Buybacks-3354.50-40.1-94.5-92.9-112
Dividends47.820.09.885.305.906.74
Interest paid78.012.317.817.617.612.8
Debt paid down-67.96.35-11437.315.2-12.6
▸Reinvestment68248%17322%40.26%10693%151212252%
Capex (PP&E)843151216115147214
Intangibles & M&A-1490.00-1540.005.500.00
Leases signed (net Δ)-12.321.8-21.8-9.17-0.88-2.28
Retained / other93666%35345%64294%80.070%-28.6-110-131%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 44 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)50314686198019762110
▸Liabilities (total)15811519629618699
Net debt (incl. leases)-913-658-15.368.161.9
Net debt / Adj EBITDA-0.88-1.03-0.13--0.64
Net debt / Adj FCF-1.50-1.94------
Adj EBITDA / interest62.635.76.93-2.937.52
Shares outstanding493491302302302
Dilution (YoY)+62.7%+62.7%+5.2%+7.6%+4.0%
Employees40000.000.000.000.00
MarginsTTM2025202420232022
Gross margin53.4%+26.535.5%+19.216.3%+8.08.3%-14.222.5%
Adj EBITDA margin59.0%+17.150.1%+28.521.6%+30.6-8.9%-24.415.4%
Adj OCF margin46.0%+12.443.8%+27.816.0%+9.76.3%+4.91.4%
Adj FCF margin34.7%+20.926.7%+31.2-4.5%+14.7-19.2%+13.7-32.9%
Net income margin22.5%+14.713.7%+31.8-18.1%+5.4-23.5%-5.2-18.3%
Adj NI margin18.9%+9.111.0%+27.2-16.2%+10.8-27.1%-2.2-24.9%
ROIC (adj, after-tax)15.2%7.8%-0.2%-8.8%-1.9%
Cost of debt5.1%7.0%7.2%6.9%5.4%

Earnings Calls

5 calls

Earnings Call · 2026 Q1

2026-05-12

First Majestic Silver's Q1 2026 earnings call highlighted an exceptionally strong start to the year, characterized by record financial performance and significant operational progress across its portfolio. CEO Keith Neumeyer noted that despite the historical trend of soft first quarters, the company exceeded the midpoint of its production guidance for both silver and gold, producing 3.5 million silver ounces and achieving a silver purity of 66%. Financial highlights were dominated by a 95% year-over-year revenue increase to $477 million, driven by an average realized silver price of $86.35 per ounce, compared to $33.10 in the previous year. The company’s operating cash flow reached $311 million ($0.63 per share), and its treasury swelled to over $1.1 billion. A key strategic move during the quarter was the decision to hold back approximately 676,000 ounces of silver and 2,700 ounces of gold from sale, valued at $63 million, in anticipation of higher future prices. Operationally, First Majestic is focusing on margin expansion and efficiency. Margins grew fourfold to $52 per ounce compared to $13 per ounce in Q1 2025. While production costs rose slightly due to increased throughput from lowering cutoff grades—a move intended to extend mine life—the overall cost per tonne of $170 was the lowest in recent periods. The company addressed its All-In Sustaining Costs (AISC), noting that a shift in the silver-to-gold price ratio to a fixed 75:1 added roughly $3 per ounce to the reported figures. Management also highlighted their low exposure to diesel (only 5% of total energy costs) due to a successful transition to liquid natural gas and grid power. Individual asset performance was robust. La Encantada returned to high profitability with a $30 million profit in Q1, aided by the transition to a self-hauling truck fleet that improved mill throughput. Santa Elena’s mill expansion to 3,500 tonnes per day is on track for H2 2026, supported by exploration successes at the Santo Ni%o and Navidad discoveries. At Los Gatos, the company is ramping up to 4,000 tonnes per day with third-party contractor assistance. Neumeyer also debunked rumors regarding a significant collapse at Los Gatos, clarifying it was a minor 10-meter ramp issue that resulted in only 2.5 days of downtime. The restart of Jerritt Canyon remains a primary focus, with $75 million in capital expenditures planned for 2026. The company recently hired Alex Thompson as Managing Director for the site and expects production to commence in H2 2027. Exploration remains aggressive, with over 300,000 meters of drilling planned company-wide for the year. Leadership changes were also finalized, with David Howe succeeding Steve Holmes as COO. The call concluded with a discussion on the company's record dividend payment, which was quadrupled following a policy change to return 2% of quarterly revenue to shareholders.

Options

Chain Snapshot (daily)

Call IV (ATM)97%
Put IV (ATM)35%
ATM Spread1.9%
Call $OI (near money)$19.3M
Put $OI (near money)$10.4M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$14.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$11.00$3.85/$4.7032$0.01/$0.13125
$12.00$3.50/$3.704,918$0.14/$0.204,174
$13.00$2.26/$2.9872$0.29/$0.556,484
$14.00$1.84/$2.11543$0.56/$0.612,194
$15.00$1.18/$1.5014,988$0.95/$1.066,786
$16.00$0.94/$1.041,016$1.39/$1.641,458
$17.00$0.67/$0.699,339$2.15/$2.343,212
$18.00$0.42/$0.485,867$2.85/$3.101,960
Snapshot: 2026-11-04

Short Interest

Short % of Float5.7%
Short Shares27.7M
Days to Cover3.0
Change (vs Prior)+7.8%
Short % Float History
5.70%+0.80pp
3.5%4.0%4.5%5.0%5.5%10-1512-3103-1305-2908-1410-30

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
VAN ECK ASSOCIATES CORP$605M$8.97−$39.8M+$49.4M—$164.08B
Tidal Investments LLC$334M$8.11−$23.4M+$21.1M—$41.21B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$278M$8.43−$36.1M+$45.8M—$83.85B
VANGUARD CAPITAL MANAGEMENT LLCPassive$229M$21.40+$4.2M+$229M—$4.68T
JUPITER ASSET MANAGEMENT LTD$174M$9.09+$25.6M+$20.6M—$20.15B
ALPS ADVISORS INC$156M$12.54−$18.8M+$97.6M—$21.31B
CITADEL ADVISORS LLC$135M$10.83+$71.4M+$39.8M—$171.38B
MORGAN STANLEY$120M$12.37+$42.9M+$82.3M—$1.88T
Lingotto Investment Management LLP$90.5M$6.77−$79.4M−$78.5M—$4.65B
VANGUARD FIDUCIARY TRUST COPassive$73.1M$21.40+$1.3M+$73.1M—$454.10B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

034.0M67.9M101.9M135.8M$5.10$9.20$13$17$212021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
VAN ECK ASSOCIATES CORP35.7MTidal Investments LLC19.7MMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.16.4MARROWSTREET CAPITAL, LIMITED PARTNERSHIP—ALPS ADVISORS INC9.2MLingotto Investment Management LLP5.3MJUPITER ASSET MANAGEMENT LTD10.2MCITADEL ADVISORS LLC8.0METF MANAGERS GROUP, LLC—BANK OF AMERICA CORP /DE/3.7M

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$25.50+126.5%
Last Year (8 analysts)$26.16+132.3%
Current Price$11.26
Analyst Ratings
4
6
1
Buy: 4Hold: 6Sell: 1Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2007 Q211M1M-1M$-0.01$-0.01 – $-0.017
2008 Q317M0M-1M$-0.08$-0.10 – $-0.0612
2009 Q215M4M1M$0.03$0.02 – $0.0313
2009 Q314M5M2M$0.01$0.01 – $0.019
2010 Q124M3M1M$0.08$0.06 – $0.1017
2010 Q223M18M9M$0.08$0.06 – $0.1020
2010 Q327M15M8M$0.07$0.06 – $0.0820
2010 Q463M33M19M$0.30$0.24 – $0.3620
2011 Q148M36M20M$0.18$0.14 – $0.227
2011 Q266M51M30M$0.27$0.22 – $0.3220
2011 Q357M45M25M$0.22$0.18 – $0.2614
2012 Q169M55M31M$0.36$0.29 – $0.4312
2012 Q284M39M21M$0.39$0.31 – $0.4715
2012 Q373M52M28M$0.27$0.22 – $0.3216
2012 Q4108M58M30M$0.39$0.31 – $0.4715
2013 Q1134M67M36M$0.35$0.28 – $0.4217
2013 Q2161M11M0M$0.15$0.12 – $0.187
2013 Q352M28M10M$0.09$0.07 – $0.1115
2013 Q482M-99M-113M$0.15$0.12 – $0.187
2014 Q1109M27M8M$0.13$0.10 – $0.1519
2014 Q2234M36M12M$0.11$0.09 – $0.1311
2014 Q331M-14M-31M$0.09$0.07 – $0.1118
2014 Q472M-24M-43M$0.02$0.02 – $0.027
2015 Q236M17M-1M$-0.01$-0.01 – $-0.0116
2015 Q322M17M-2M$-0.03$-0.04 – $-0.0310
2015 Q499M-113M-137M$-0.04$-0.05 – $-0.0313
2016 Q266M31M6M$0.03$0.02 – $0.047
2016 Q379M35M8M$0.07$0.06 – $0.0817
2016 Q466M28M5M$0.03$0.02 – $0.0316
2017 Q169M25M3M$0.02$0.02 – $0.0218
2017 Q260M26M4M$0.05$0.04 – $0.067
2017 Q3156M16M-3M$0.03$0.02 – $0.0315
2017 Q415M-36M-101M$-0.02$-0.02 – $-0.0111
2018 Q120M16M-6M$-0.02$-0.02 – $-0.028
2018 Q267M-5M-32M$-0.02$-0.03 – $-0.0214
2018 Q3118M40M7M$-0.05$-0.06 – $-0.0413
2018 Q474M-135M-164M$-0.05$-0.06 – $-0.0411
2019 Q195M25M3M$-0.02$-0.02 – $-0.027
2019 Q287M8M-13M$-0.01$-0.01 – $-0.019
2019 Q397M29M7M$0.05$0.05 – $0.055
2019 Q499M-168M-211M$0.05$0.05 – $0.055
2020 Q194M-18M-36M$0.02$0.02 – $0.027
2020 Q293M-2M-13M$-0.03$-0.03 – $-0.039
2020 Q3138M79M35M$0.14$0.14 – $0.144
2020 Q4119M72M35M$0.10$0.10 – $0.105
2021 Q1105M24M3M$0.07$0.07 – $0.078
2021 Q2155M66M20M$0.08$0.08 – $0.081
2021 Q3184M-49M-83M$0.00$0.00 – $0.001
2021 Q4199M106M37M$0.07$0.07 – $0.071
2022 Q1172M59M15M$0.02$0.02 – $0.021
2022 Q2186M80M26M$0.00$0.00 – $0.001
2022 Q3156M-37M-77M$-0.02$-0.02 – $-0.021
2022 Q4156M85M32M$-0.03$-0.03 – $-0.031
2023 Q1146M61M14M$-0.02$-0.02 – $-0.021
2023 Q2133M83M28M$-0.02$-0.02 – $-0.021
2023 Q3130M-39M-72M$0.02$0.02 – $0.023
2023 Q4133M84M30M$-0.01$-0.02 – $0.003
2024 Q1112M52M13M$-0.05$-0.13 – $0.053
2024 Q2130M24M-13M$-0.03$-0.12 – $0.073
2024 Q3147M53M10M$0.02$0.02 – $0.021
2024 Q4159M71M20M$0.04$0.04 – $0.043
2025 Q1241M119M33M$0.07$0.07 – $0.072
2025 Q2283M100M13M$0.03$0.02 – $0.032
2025 Q3308M142M51M$0.10$0.10 – $0.102
2025 Q4404M259M111M$0.22$0.22 – $0.222
2026 Q1522M310M152M$0.31$0.31 – $0.312
2026 Q2496M250M123M$0.25$0.25 – $0.252
2026 Q3390M203M86M$0.17$0.17 – $0.172
2026 Q4348M187M76M$0.15$0.15 – $0.151
2027 Q1426M240M108M$0.22$0.22 – $0.221
2027 Q2438M229M99M$0.20$0.20 – $0.201
2027 Q3450M285M133M$0.27$0.27 – $0.271
2027 Q4484M283M129M$0.26$0.26 – $0.261
2028 Q1489M317M149M$0.30$0.30 – $0.301
2028 Q2485M312M144M$0.29$0.29 – $0.291
2028 Q3484M314M144M$0.29$0.29 – $0.291
2028 Q4482M317M144M$0.29$0.29 – $0.291
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand

Thesis

First Majestic has undergone a dramatic operating and balance-sheet improvement, but the improvement is occurring during an unusually favorable precious-metals environment. TTM revenue is nearly $1.5B, adjusted EBITDA is $829M and adjusted FCF is $482M, while cash and short-term investments have reached roughly $1.1B against relatively modest debt. Los Gatos integration, La Encantada’s recovery and planned throughput expansions provide genuine operating catalysts rather than a purely metal-price story. The central risk is normalization. Recent realized silver prices are far above the prior-year level, and the company is retaining metal inventory while committing substantial capital to mine expansion, exploration and a Jerritt Canyon restart. The Mexican tax dispute also creates a potentially material cash liability and governance overhang. Share dilution, aggressive exploration and management’s reluctance to address the tax issue directly make the earnings quality less predictable than the headline margins suggest. I therefore underwrite a base case of approximately $450M annual owner earnings, with a wide range around it. The balance sheet provides meaningful downside protection, but the equity remains highly exposed to commodity prices, mine execution and capital allocation.

Trade Signal

Trade rating
-4.7/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-07-30 · saw $15.68-21.4% since

Short, with caution: even after the 36% post-earnings decline, the stock remains roughly 100% above the analyst’s fair value and prices exceptional precious-metals economics that are unlikely to persist indefinitely.

Temporary mispricing+1.5

The stock rose from roughly $6-$9 during mid-2025 to $16.65 at year-end and then surged to $32.01 in February 2026, consistent with a precious-metals and operating-leverage re-rating. It subsequently fell through March-April and declined from $23.58 before the May 12 earnings release to $15.22 by late July, a 36% post-earnings drop despite exceptional Q1 results. The move likely reflects profit-taking, silver-price/commodity-beta reversal and skepticism that Q1 margins are sustainable; the study provides no specific company event explaining each post-earnings leg. The decline may have overshot the deterioration in the operating business, but it has not created a compelling temporary long dislocation because the shares remain about twice the analyst’s fair value. This is primarily a durable de-rating from peak expectations, with only a modest oversold component.

Market view+1.0

The market is mixed but not truly bearish. Analysts show a Hold consensus despite a $22.28 average target, while the stock has fallen 52% from its 52-week high after a powerful 2025-early 2026 rally. Bulls see a transformed operator, strong precious-metals exposure, cash generation and production expansion; bears see a cyclical earnings peak, commodity-price risk, Mexican tax uncertainty, capex and dilution. Short interest is low at 3.5%, options positioning is broadly balanced, and unusually high retail trading indicates continued attention and speculative ownership. The recent decline has made sentiment less euphoric, but the market still appears to underweight normalization risk rather than hate the stock.

Inflectionwindow ~3mo-2.0

The major profitability inflection already appeared in Q1: revenue rose 95%, adjusted earnings turned sharply higher, cash reached roughly $1.1B and margins expanded dramatically. Future throughput growth at Los Gatos and Santa Elena is real, but the analyst’s normalized base case already assumes those projects broadly work. Consensus quarterly EBITDA estimates around $98M-$108M through 2028 do not imply a large unrecognized step-up versus the company’s current earnings power; rather, they imply substantial normalization from the Q1 run rate. Jerritt Canyon is a distant, capital-consuming optionality rather than a near-term earnings inflection.

Catalysts
  • ▲2026-08 · Q2 2026 earnings — Strong silver/gold prices, production and cash generation could support the shares, but the market will focus on realized prices, sustaining costs and whether Q1 margins were exceptional.
  • ▲H2 2026 · Santa Elena and Los Gatos throughput updates — Progress toward the 3,500 tpd Santa Elena expansion and 4,000 tpd Los Gatos target could validate the operating-growth case.
  • •2026- Q4 · Jerritt Canyon pre-feasibility study — The Q4 PFS may add resource value but could also expose substantial capital needs and weak project economics; production is not expected until H2 2027.
  • ▼H2 2026 · Mexican SAT tax dispute / arbitration developments — The approximately $200M reassessment remains an unresolved liability and adverse procedural or arbitration news would reinforce the valuation discount.
  • ▼Next 6-12 months · Commodity-price normalization or guidance reset — The valuation depends heavily on extraordinary silver and gold prices; any retreat in realized prices or margins could expose the earnings peak.
Flow-3.0

Near-term operating cash generation is positive and the dividend policy returns some cash, but there is no meaningful buyback. The reported 63% trailing dilution is a major warning, even if much of it reflects acquisition-related issuance rather than an imminent financing need. High retail participation can provide momentum support, while only 3.5% short interest and 1.7 days to cover offer little squeeze fuel. Net flow is modestly negative because future capital needs and dilution risk outweigh the dividend.

Floor / Ceiling+2.0

The approximately $1.1B cash and short-term investment balance, modest debt and positive free cash flow provide a meaningful but not hard floor. That support is weakened by the roughly $200M Mexican tax exposure, $75M of 2026 Jerritt Canyon spending, exploration and expansion capex, dividends, and the company’s history of dilution. There is no committed bid or active buyback to create a firm downside backstop. There is also no hard ceiling, but the stock’s prior speculative run, high retail participation and potential future equity funding create supply on strength.

Buyability

Highly buyable as a liquid, high-beta silver exposure: precious-metals funds, retail silver bulls and momentum investors can readily own it. However, the 48% retail order share, low short interest and prior 2025-26 surge suggest the marginal buyer is already speculative rather than a neglected fundamental investor. The large historical dilution and commodity dependence reduce institutional conviction.

Fear vs Greedfear 6/10 (+1.0)greed 8/10 (+3.0)

Fear pulls harder than greed at this price. The business is materially better and the balance sheet is strong, but the price still capitalizes unusually favorable precious-metals economics and gives insufficient credit to mean reversion, tax, capex and dilution risks.

Valuation

Our Target
$3.7B-33%
Market Should Pay
$3.1B-43%
target ×0.85 (fear discount)
Current Market Cap
$5.6BSlightly bullish
What Changed
financials release · 2026-05-12
+12%fair value on this information

The quarter showed that the exceptional silver-price environment is converting into unusually high cash generation: Q1 realized silver price was about $86 per ounce, operating cash flow was roughly $300M, and the treasury exceeded $1.1B. The decision to hold back substantial metal inventory also gives investors more direct exposure to further price upside. Operationally, the quarter reduced concern about La Encantada and Los Gatos execution. The unresolved Mexican tax dispute and management’s refusal to take questions on it remain a fear factor, but they were not entirely new to the market.

▸ How the cases moved

The strong Q1 result raises the base case from roughly $4,200M to $4,600M as cash generation, margins and operating execution exceeded expectations; base probability rises from 0.48 to 0.50. The bull case rises from approximately $7,200M to $8,000M because the quarter demonstrated unusually strong operating leverage and a $1.1B treasury; bull probability rises from 0.22 to 0.25. The bear case moves from $2,000M to $2,100M because the cash balance improves downside protection, but bear probability remains meaningful at 0.25 given commodity dependence, the tax dispute and capital commitments.

2-Year Plausible Outcomes
bear25%
$2.1B
rev -10%/yrOE $250M

Silver prices normalize materially, margins contract toward a more normal mining-cycle level, and the company’s high recent cash generation proves heavily price-driven. Expansion spending, Jerritt Canyon rehabilitation, the Mexican tax dispute and continued dilution consume cash. The business remains solvent because of its cash surplus, but investors apply a low cyclical-miner multiple.

▸ Valuation

4x $400M EBITDA = $1,600M EV - ($500M net cash) debt = $2,100M equity

base50%
$4.6B
rev +5%/yrOE $450M

Silver remains well above historical averages but retreats from the extraordinary Q1 realized price. Los Gatos and Santa Elena expansions broadly work, La Encantada remains profitable, and Jerritt Canyon is still an investment rather than a material earnings contributor. Cash generation remains strong, though sustaining and expansion capital, dividends and exploration absorb much of it. The company earns a solid but cyclical mining multiple.

▸ Valuation

6x $650M EBITDA = $3,900M EV - ($700M net cash) debt = $4,600M equity

bull25%
$8.0B
rev +20%/yrOE $800M

Silver and gold prices remain exceptionally strong, while throughput expansions and operational improvements increase production without a proportional cost increase. Jerritt Canyon advances credibly toward its 2027 restart and exploration extends mine lives. Free cash flow compounds, the balance sheet becomes substantially more cash-rich, and First Majestic earns a premium precious-metals growth multiple.

▸ Valuation

7x $1,000M EBITDA = $7,000M EV - ($1,000M net cash) debt = $8,000M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $3,860M. I set the analytical target at $3,700M, modestly below the model, because the scenario arithmetic does not fully capture commodity-price mean reversion, the unresolved approximately $200M Mexican tax exposure, recurring dilution and the company’s history of consuming substantial claimed EBITDA through capex and acquisitions. The large net-cash balance and improving operations prevent a much larger discount.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now8/10
Trajectory8/10
Risk6/10
Governance5/10
Insolvency prob (2yr)2%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Turnaround: On May 12, 2026, First Majestic announced outstanding financial results for Q1 2026. Driven by strong production and metal prices, the company posted record quarterly revenues of $476.7 million, representing a 95% increase compared to $243.9 million in Q1 2025. GAAP net income reached $128.1 million ($0.26 GAAP EPS, $0.31 adjusted EPS), a profound turnaround from the $2.3 million net income recorded in the prior year's first quarter. Operating cash flows stood at $311 million, with free cash flow reaching $223.5 million.
  • High Metal Price Realization & Inventory Hold: Operational performance was propelled by exceptionally high realized prices. The average realized silver price per ounce was $86.35, a 161% increase from $33.10 in Q1 2025. Realized gold prices rose 81% to $5,018 per ounce. Taking advantage of this strong pricing environment, the company chose to withhold 676,000 ounces of silver and 2,700 ounces of gold from immediate sale, building a bullion inventory valued at $63.6 million for future leverage. At the close of Q1 2026, First Majestic's cash and cash equivalents treasury hit a historic high of $1.13 billion.
  • Dividend Growth: Due to surging free cash flows, the board declared a record quarterly dividend of $0.0171 per share (a 280% increase YoY). This aligns with its revised dividend policy implemented on January 1, 2026, which ties payouts to roughly 2% of quarterly net revenues.
  • Executive Reorganization: On May 4, 2026, David Howe (former VP of Operations at Pan American Silver) took over as Chief Operating Officer following the retirement of Steve Holmes. To direct the revitalization of its primary US gold asset, the company also appointed Alex Thompson as Managing Director of Jerritt Canyon Gold, effective April 20, 2026.
  • Annual General Meeting: On June 10, 2026, the company held its 2026 Annual General Meeting of shareholders in Vancouver, reporting that all proposed ballot measures were approved.
▸ Thesis-test Findings
First Majestic SAT Mexico tax dispute court ruling 2026

In a setback for First Majestic’s Mexican operations, the Supreme Court of Mexico (SCJN) ruled on October 30, 2025, to dismiss an appeal by First Majestic’s subsidiary, Primero Empresa Minera (PEM). This decision effectively upheld a Collegiate Court ruling validating the Servicio de Administración Tributaria's (SAT) 2012 tax reassessment against PEM for 2.87 billion pesos (approximately $209.2 million USD, inclusive of surcharges and penalties). First Majestic has responded with an escalation in diplomatic pressure: in late May 2026, the company’s CEO, Keith Neumeyer, called on the Canadian ambassador to Mexico to intervene in the standoff with the Mexican government. Meanwhile, international arbitration proceedings under NAFTA/ICSID remain ongoing. In January 2026, the ICSID tribunal issued a procedural decision regarding First Majestic's second request for provisional measures as the parties continue to dispute the validity of the 2012 Advance Pricing Agreement.

Jerritt Canyon restart progress Alex Thompson H2 2027

On April 2, 2026, First Majestic officially initiated a comprehensive restart plan for the Jerritt Canyon Gold Mine in Nevada, targeting a production resumption in the second half of 2027. The company has committed $75 million in capital for 2026 to support underground rehabilitation, exploration drilling, and plant winterization. To spearhead this effort, the company hired industry veteran Alex Thompson as Managing Director of Jerritt Canyon Gold, effective April 20, 2026. Stantec Consulting Services has been engaged to deliver a pre-feasibility study (PFS) by Q4 2026. The project is supported by a significant resource expansion; as of December 31, 2025, Jerritt Canyon hosts 4.1 million gold ounces in the Measured and Indicated categories, plus an additional 3.7 million ounces classified as Inferred.

Cerro Los Gatos mine throughput expansion 4000 tpd

First Majestic, which acquired 100% of Gatos Silver in January 2025 (holding a 70% interest in the underlying Cerro Los Gatos Joint Venture), has prioritized a near-term capacity expansion. In early 2026, the company reiterated a target to sustainably increase ore throughput at the Cerro Los Gatos mine to 4,000 tonnes per day (tpd) by the second half of 2026. To reach this goal, First Majestic selected and mobilized a new mine development contractor in early 2026 to accelerate development rates and support normalized, high-volume mill feed. This represents a notable step up from historical steady-state operations, which were engineered for 3,500 tpd.