Alamos Gold is a Canadian mid-tier gold producer (about 535koz in 2026) whose long-term story is still one of the best in the sector: Island Gold is becoming a 500koz+/yr low-cost Ontario mine with roughly 8Moz of reserves, Lynn Lake adds about 186koz/yr from 2029, and management targets about 1Moz/yr by 2030, all self-funded from a net-cash balance sheet (about $0.68B including the Turkish sale proceeds). The near term is weak. 2026 guidance was cut from 570-650koz at $1,500-1,600 AISC to 510-560koz at $1,775-1,875. Young-Davidson is running at about 60% of plan after a June seismic event. Q3 AISC hit $1,956, the Island Gold shaft slipped a quarter to mid-2027, PDA ramp-up is slower, and gold has fallen from about $4,800 in Q1 to about $4,050. The stock closed at $28.83 on Oct 29 (down 9% on the print), 48% below its February peak and near the bottom of its 1-year range. At flat $4,000 gold, with costs above management's guidance, I get free cash flow (after stock comp and all growth capex) of about $0.46B in 2027, rising to about $1.75B by 2031. Using an 11x year-5 multiple, the DCF gives about $41/share and a base-case IRR of about 19%. That is attractive, but it depends on the gold price and on a management team that has missed guidance two years running. My fair value is $37, rating 6.5: a good asset at a fair-to-cheap price, but not a clear 50% setup unless gold recovers or 2027 execution resets expectations. Research rating 6.5. The open questions are 2027-28 costs and Young-Davidson's recovery (answered by the early-2027 three-year guidance) and the gold price, which more work cannot resolve. With call IV around 50% near the range low, covered calls are a reasonable way to hold it.
A deep dive would have to establish: Whether the early-2027 three-year guidance can credibly reset 2027-28 AISC near $1,400-1,600 with Young-Davidson recovering toward 7,000 tpd, so that roughly $1B+ of 2028 FCF at $4,000 gold is bankable rather than another moving target.
Research (expand)
What the company does
Alamos Gold (TSX/NYSE: AGI, Toronto) mines gold in three districts. (1) The Island Gold District in Ontario combines the high-grade Island Gold underground mine with the Magino open pit and mill acquired with Argonaut in 2024. It has about 8Moz of reserves, record Q3 production of 68.7koz, underground rates of about 1,790 tpd heading to 2,000 by year-end, and the Magino mill at about 10,300 tpd. (2) Young-Davidson in Ontario is a deep underground mine, now constrained to about 5,100 tpd after a June 2026 seismic event and producing about 23koz/quarter. (3) The Mulatos District in Sonora, Mexico: La Yaqui Grande finishes open-pit mining in H1 2027, and the higher-grade PDA underground and mill ($165M) starts in 2027. Lynn Lake in Manitoba ($937M, 36% spent) is under construction for first production in H1 2029, averaging 186koz/yr for 10 years. Total reserves are about 16Moz.
The investment case
- Growth that is mostly funded. Production should go from about 535koz (2026) to about 750koz (2028) and about 1Moz (2030), with AISC falling as Island Gold grows to 500koz+/yr at about $1,000-1,100/oz (study basis) and Lynn Lake's first-quartile costs come in. The Phase 3+ shaft is about 100% committed (about $877M, 5% over budget), the Island Gold mill expansion is 45% committed, and Lynn Lake is on budget.
- Clean balance sheet. At Sept 30: $597M cash and $200M debt, so $397M net cash. Since then $160M of Turkish sale proceeds arrived in October, with $150M more due October 2027. That makes about $0.68B of effective net cash. 96% of the Argonaut legacy hedges ($228M YTD) are now retired, so the company is fully exposed to the spot price.
- Jurisdiction. About 85% of future production is Canadian, which earns a premium multiple and makes the company a strategic target. Island Gold is one of the best underground deposits in Canada.
- The setup. The stock is down 48% from the February high ($55) to $28.83, 12% of the way up its 1-year range, after a guidance cut, the Young-Davidson seismic event, a shaft delay and a falling gold price (about $4,050, which broke below $4,000 last week as Fed hike talk returned).
What it earns today (real free cash flow)
Reported free cash flow (after all growth capex and hedge buybacks) was $321M for the first nine months of 2026, $76M in Q3, and about $350M in 2025. That understates the earning power, because about $650-700M/yr is growth capital (Island Gold expansion, Lynn Lake, PDA).
Owner earnings at today's $4,050 spot price:
- At the 2026 run-rate of about 535koz and $1,825 AISC (AISC already includes sustaining capex, G&A and stock comp), the margin is about $2,225/oz, or about $1.19B pre-tax.
- Cash taxes are about $0.2B.
- That leaves about $0.9-1.0B of owner earnings.
- On the weaker Q3 run-rate (476koz annualised at $1,956 AISC) it is closer to $0.82B.
I use about $0.9B as current real free cash flow, which is a 7.5% yield on the $12.05B market cap.
Treadmill caveat: mining depletes. Some of the 'growth' capex (PDA replacing La Yaqui Grande, much of the Young-Davidson ground-support work, and exploration to keep reserves at 15+ years) is effectively maintenance. Stock comp is small (about $25M/yr).
Projected free cash flow
Assumptions: flat $4,000/oz gold, after stock comp, taxes and all growth capex, with my own production and cost estimates set below and above guidance respectively.
| Year | Production | AISC | FCF |
|---|---|---|---|
| 2027 | about 600koz (guide 650-730 is stale; shaft delay, YD and PDA slower) | about $1,600 | growth capex about $690M (Lynn Lake about $400M); FCF about $460M |
| 2028 | about 750koz (mill expansion Q1 2028) | about $1,400 | growth capex about $500M; FCF about $950M |
| 2029 | about 850koz (Lynn Lake partial year) | about $1,350 | FCF about $1.45B |
| 2030 | about 950koz | about $1,400 | FCF about $1.65B |
| 2031 | about 1.0Moz | about $1,400 | growth capex about $250M; FCF about $1.75B |
Sensitivity: each $500/oz move in gold shifts annual FCF by about $0.3-0.35B after tax. At $3,500 gold, year-5 FCF is about $1.4B; at $4,500 it is about $2.1B.
The company in 5 years
In five years this is a growing income stream rather than a declining one: a roughly 1Moz/yr producer, mostly Canadian, with AISC near $1,400 in today's dollars. It would have 15+ years of reserve life and exploration upside (Upper West at Island Gold, Cline Pick, Edwards, PDA regional targets), and could generate $1.5-2B/yr of free cash flow at $4,000 gold. After 2030 production is flat-ish, so it moves from the 'growing' category into the '0-5% growth, commodity-exposed' category. I use 11x year-5 FCF (range 9-14x). I am fairly confident in the operating projection (ranges of about ±15% on ounces and costs) and not confident in the gold price, which dominates the outcome.
Fair value and multiples
- DCF (10% discount rate, 11x terminal multiple). The PV of 2027-31 FCF is about $4.6B and the PV of the terminal value (11 × $1.75B = $19.3B) is about $12.0B. That gives an EV of about $16.5B; adding about $0.68B of net cash gives equity of about $17.2B. Divided by about 418M shares, that is about $41/share. The range is $24 at $3,500 gold or 9x to $60 at $4,500 gold or 13x.
- Base IRR from $28.83: about 19%.
- Multiples paid today.
- EV is about $11.4B.
- EV/EBITDA is about 7x on 2026 and 2027.
- Forward P/E is about 13x 2027 at $4,000 gold. The TTM P/E is 11x, but it is flattered by gains.
- The owner-earnings yield is 7.5% today and the 2031 FCF yield on today's price is about 15%.
- Fair value: $37. That is about 10% below the DCF because the company has cut guidance two years in a row, cost inflation (labour, contractors, a structural retention program) keeps landing above plan, and the DCF depends on gold holding $4,000. Sell-side targets average about US$41 (C$53-80; CIBC cut to C$69 and BMO to C$70 today).
- Upside. About 28% to fair value. It would take about $4,500 gold or a clean 2027 to reach 50%.
Management, risks and competition
- Management. CEO John McCluskey, a co-founder, has run Alamos for two decades with a value-accretive record: Island Gold via Richmont (2017), Argonaut/Magino (2024), and the Turkish assets monetised for about $470M after a permit dispute. Capital allocation is disciplined (no active M&A, self-funded growth) and there are no governance red flags. Capital return is modest: a $0.04/quarter dividend (raised 60% in Feb) plus an opportunistic NCIB of up to 18.6M shares, about $140M returned in 2026 so far, about 1.2% of market cap. Operational execution is the weak spot: 2025 production missed, 2026 guidance was cut sharply, AISC of about $1,825 compares with $1,500-1,600 guided, and Young-Davidson, PDA and the shaft have all slipped.
- Risks.
- The gold price: the Fed is split, with two members voting for a hike.
- Labour and contractor inflation in Ontario.
- Young-Davidson seismicity and an unknown pace of recovery; the new mine plan is due early 2027.
- Lynn Lake capex overrun risk on a $937M build.
- Island Gold grade and dilution: Q3 came in at 8.69 g/t against the 9-11.5 g/t guide.
- Mexico: mining taxes and permits.
- Competition and peers. Gold is a price-taker market. Relevant comps are Canadian intermediates and seniors such as Agnico Eagle (premium multiple and a natural Ontario acquirer), Kinross, Equinox and Lundin Gold. Alamos's moat is its asset quality (grade and depth at Island Gold), its jurisdiction and its growth pipeline, not pricing power.
- Takeover angle. As a $12B net-cash Canadian producer with a tier-one asset, Alamos is a credible strategic target if it stays depressed. That is speculative.
How investors feel (sentiment 4.5/10)
- Sell side. Still uniformly positive: about 12-13 Buy/Outperform ratings, no Sells, an average target of about US$41, and targets being trimmed (C$82 to C$75 consensus earlier; CIBC and BMO cuts today).
- The tape. Negative: the shares are down 48% from the February peak, fell 9% on today's cost miss (adjusted EPS of $0.44 vs $0.45 expected, revenue of $510M vs $529M), and short interest is low (about 7M shares, 1.7 days to cover).
- Generalists. Have rotated out of gold miners as bullion fell from its highs.
- Options. IV is high (calls about 50%), and the stock is near the bottom of its range. Writing covered calls against a position is attractive, though forward earnings are tied to gold rather than truly predictable, so this is not a textbook valuation-floor setup.
- Catalysts. Q4 production of 140-160koz (a 26% increase) at lower costs; the three-year guidance in early 2027 (the key reset); shaft commissioning in mid-2027; and the PDA start.
- https://www.sec.gov/Archives/edgar/data/0001178819/000117881926000094/ex991alamosgoldq32026earni.htm
- https://www.sec.gov/Archives/edgar/data/0001178819/000117881926000094/ex99209302026mda.htm
- https://www.sec.gov/Archives/edgar/data/1178819/000117881926000024/ex991alamosgoldprovidesthr.htm
- https://stockanalysis.com/stocks/AGI/
- https://www.marketbeat.com/instant-alerts/price-alamos-gold-nyse-agi-shares-gap-down-time-to-sell-2026-10-29/
- https://247wallst.com/cards/alamos-gold-q3-2026-earnings-agi-01m64czykgmh59r4jjrzymve69
- https://www.stocktitan.net/news/AGI/alamos-gold-reports-third-quarter-2026-m3mxjdcxv5uc.html
- https://www.riotimesonline.com/gold-silver-precious-metals-wednesday-october-28-2026
- https://www.usagold.com/daily-precious-metals-market-report-october-27-2026/
- https://www.barchart.com/story/news/36743545/alamos-gold-announces-renewal-of-normal-course-issuer-bid
- https://simplywall.st/sv/stocks/ca/materials/tsx-agi/alamos-gold-shares/management
- /Users/gregwo/stocks2/data/analysisv3/context/AGI.md (2026Q3 call transcript, prior call summaries, options, short interest)
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 2253+40% | 1813+35% | 1347+32% | 1023+25% | 821 |
| Gross profit | 1347+67% | 984+65% | 596+55% | 386+82% | 212 |
| Operating expenses | 68.2-61% | 177+347% | 39.7-41% | 67.5-33% | 101 |
| ▸Adj EBITDA | 1478+74% | 1022+32% | 775+52% | 508+80% | 283 |
| ▸Adj OCF | 958+48% | 787+62% | 487+0% | 489+43% | 342 |
| CapEx | -742 | -519 | -425 | -349 | -314 |
| Adj FCF | 216+49% | 268+332% | 61.9-56% | 140+395% | 28.3 |
| Interest expense | 2.16 | 0.40 | 6.30 | 2.70 | 5.70 |
| ▸Adj net income | 871+97% | 612+83% | 335+45% | 232+473% | 40.5 |
| ▸Owner's earnings | 425 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 3941100% | 1062100% | 1378100% | 735100% | 486100% | 280100% |
| FCF (OCF−capex) | 70218% | 87.58% | 27020% | 23632% | 12425% | -15.2-5% |
| Net income | 203652% | 61558% | 88965% | 28439% | 21043% | 37.113% |
| ▸Capital returned | 40910% | 10310% | 13610% | 96.713% | 34.97% | 38.614% |
| Buybacks | 71.4 | 53.5 | 36.7 | -13.6 | -3.07 | -2.20 |
| Dividends | 193 | 47.7 | 39.5 | 35.1 | 35.3 | 35.1 |
| Interest paid | 17.3 | 2.16 | 0.40 | 6.30 | 2.70 | 5.70 |
| Debt paid down | 128 | 0.00 | 59.2 | 68.9 | 0.00 | 0.00 |
| ▸Reinvestment | 206352% | 58655% | 33124% | 48966% | 34972% | 309110% |
| Capex (PP&E) | 2187 | 580 | 519 | 425 | 349 | 314 |
| Intangibles & M&A | -138 | 0.00 | -163 | 30.2 | 0.00 | -5.00 |
| Leases signed (net Δ) | 13.8 | 5.97 | -25.4 | 33.2 | -- | -- |
| Retained / other | 44811% | -13.7-1% | 29722% | 11616% | 91.619% | -43.1-15% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 107 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 6888 | 6373 | 5336 | 4001 | 3674 |
| ▸Liabilities (total) | 1951 | 1935 | 1752 | 1078 | 953 |
| Net debt (incl. leases) | -414 | -447 | -64.6 | -237 | -148 |
| Net debt / Adj EBITDA | -0.28 | -0.44 | -0.08 | -0.47 | -0.52 |
| Net debt / Adj FCF | -1.91 | -1.67 | -1.04 | -1.70 | -5.23 |
| Adj EBITDA / interest | 684 | 2577 | 123 | 188 | 49.6 |
| Shares outstanding | 419 | 423 | 420 | 397 | 394 |
| Dilution (YoY) | -0.1% | +0.6% | +5.8% | +0.8% | -0.5% |
| Employees | 2400 | 2.00 | 2.00 | 2.00 | 2.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 59.8%+9.4 | 54.3%+10.1 | 44.2%+6.5 | 37.7%+11.8 | 25.9% |
| Adj EBITDA margin | 65.6%+12.7 | 56.4%-1.1 | 57.5%+7.8 | 49.7%+15.2 | 34.5% |
| Adj OCF margin | 42.5%+2.1 | 43.4%+7.2 | 36.2%-11.6 | 47.8%+6.1 | 41.6% |
| Adj FCF margin | 9.6%+0.6 | 14.8%+10.2 | 4.6%-9.1 | 13.7%+10.2 | 3.5% |
| Net income margin | 46.9%+13.5 | 49.1%+28.0 | 21.1%+0.6 | 20.5%+16.0 | 4.5% |
| Adj NI margin | 38.6%+11.1 | 33.8%+8.9 | 24.9%+2.2 | 22.7%+17.7 | 4.9% |
| ROIC (adj, after-tax) | 17.6% | 14.1% | 9.3% | 7.8% | 2.7% |
| Cost of debt | -- | 0.1% | -- | -- | -- |
Earnings Calls
Earnings Call · 2026 Q3
Alamos reported third quarter 2026 gold production of 119,000 ounces, in line with quarterly guidance. Record output at the Island Gold District offset lower planned production at Young-Davidson. Island Gold set new quarterly records for underground mining rates, which averaged nearly 1,800 tons per day, and the Magino Mill averaged over 10,000 tons per day. Management expects consolidated production to rise 26% in the fourth quarter, putting the company on track to meet its revised annual guidance. All-in sustaining costs increased from the second quarter due to lower production and the timing of sustaining capital spending. Management expects costs to fall in the fourth quarter as Island Gold ramps up. The company sold 118,400 ounces at an average realized price of $4,258 per ounce, generating revenue of $510 million. Total cash costs were $1,375 per ounce and all-in sustaining costs were $1,956 per ounce. Operating cash flow before working capital changes was $235 million, or $0.56 per share. Reported net earnings were $166 million ($0.40 per share) and adjusted net earnings were $184 million ($0.44 per share). Free cash flow was $76 million in the quarter after reinvestment in growth and exploration, and $321 million year to date, with management expecting another record year. Capital spending totaled $227 million, including $164 million of growth capital, $50 million of sustaining capital, and $13 million of capitalized exploration. Shareholder returns were $22 million in the quarter through dividends and buybacks. Year-to-date returns reached $123 million, and a further $17 million of shares was repurchased in October. The company has bought back 96% of the legacy Argonaut gold hedges acquired in 2024, using $86 million in the quarter to eliminate 33,000 ounces. About 3,000 more ounces were eliminated in October, with the remaining 14,000 ounces to be eliminated before their 2027 maturity. The company ended the quarter with net cash of $397 million. It received a $160 million anniversary payment from the sale of its Turkish development assets in October, and a final $150 million payment is due in October 2027. On growth projects, the Island Gold shaft commissioning has been delayed by about one quarter, to mid-2027. During excavation of the ore and waste handling bins, crews encountered a dike that required additional ground support. The sequence of civil work was changed to make the work safer, but management said this does not affect other work. The Phase 3+ shaft expansion capital cost is now expected to be 5% above the $835 million budget because of added work and inflation. Underground mining rates are expected to exceed 2,000 tons per day in the first half of 2027, with the ramp to 2,400 tons per day now expected in the second half. The Island Gold District expansion was 45% spent or committed at quarter end. The Magino mill expansion to 20,000 tons per day is expected to finish in the first quarter of 2028. Once the shaft and process plant expansions are complete, Island Gold is expected to produce over 500,000 ounces annually. Management reiterated its goal of nearly doubling production to about one million ounces annually by 2030. At Young-Davidson, production was 22,700 ounces, down from the second quarter following a June seismic event. Mining averaged 5,135 tons per day, and milling averaged nearly 7,100 tons per day, supplemented by low-grade stockpiles of roughly 300,000 tons. Mine site free cash flow was $30 million. Rehabilitation work on the 9410 level, enhanced ground support, and an updated mine plan are expected to support a gradual increase in mining rates through 2027 and 2028. Updated mining rate and cost guidance will come with three-year guidance in early 2027. Mulatos produced 27,600 ounces, 8% below the prior quarter, due to lower grades, rainy-season impacts, and a constrained pit bottom at La Yaqui Grande. Mine site free cash flow was $39 million. Open pit mining at La Yaqui Grande is expected to end in the first half of 2027, with residual leaching continuing through 2027. At the PDA project, $25 million of development capital was spent. Initial capital remains at $165 million, and mill completion is targeted for mid-2027. Underground development has been slower than planned because of a known fault system, additional ground support, and contractor performance. This is expected to reduce PDA production in the second half of 2027, although management says conditions are improving. At Lynn Lake, $40 million of development capital was spent, and the permanent camp was commissioned. The project remains on budget and on schedule for completion in the first half of 2029. It is expected to average 186,000 ounces per year over its first 10 years at first quartile costs. In the Q&A, analysts focused on the Island Gold guidance shortfall, which management estimated at about 400 tons per day in the first half of 2027. They also asked about capital inflation, mainly labor pressure that is more pronounced on capital projects. Other topics included Young-Davidson grades and stockpile feed, confidence in the $165 million budget, ground conditions at PDA, the Island Gold dike, dilution in higher-grade stopes, and progress toward fourth quarter guidance.
▸With shaft commissioning delayed a quarter, should next year's Island Gold production guidance be lowered, and is the previous range no longer appropriate?Fahad Tariq · Jefferies
▸Given about 45% of growth capital is already spent, is capital cost inflation being seen on the mill expansion?Fahad Tariq · Jefferies
▸How should Young-Davidson mined versus blended grades be viewed in Q4, and will stockpiles keep supplementing mill feed into 2027? How much stockpile is there and at what grade?Sathish Kasinathan · Bank of America
▸The Island Gold Phase 3 capital cost rose 5%, but the $165 million MD&A budget was maintained despite added ground support and slow development. What supports that estimate, and is there contingency to absorb pressure?Sathish Kasinathan · Bank of America
▸What are the ground conditions causing slow underground development at PDA? Is it a structure or rock quality, and is the extra support mesh and bolts or improved material?Cosmos Chiu · CIBC
▸Is the dike at Island Gold a known structure, how extensive is it, and could it affect other work as the shaft is finished?Cosmos Chiu · CIBC
▸Island Gold Q3 grade of 8.69 grams per ton was below expectations due to dilution in August. Is that unusual, and has it happened elsewhere?Cosmos Chiu · CIBC
▸With a month of Q4 gone, how is the company tracking against Q4 guidance, what milestones remain, and is Island Gold mining 11+ gram material yet?Carey MacRury · Canaccord Genuity
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $24.00 | $5.00/$7.40 | 11 | --/$0.75 | 51 |
| $25.00 | $4.20/$5.60 | 491 | $0.25/$0.45 | 2,015 |
| $26.00 | $3.50/$4.80 | 3 | $0.25/$0.55 | 64 |
| $27.00 | $3.50/$4.00 | 9 | $0.40/$0.75 | 184 |
| $28.00 | $2.95/$3.20 | 426 | $0.80/$1.05 | 493 |
| $29.00 | $2.35/$2.55 | 55 | $1.30/$1.45 | 609 |
| $30.00 | $1.70/$2.05 | 322 | $1.75/$1.90 | 794 |
| $31.00 | $1.40/$1.60 | 440 | $2.05/$2.50 | 324 |
Short Interest
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| VAN ECK ASSOCIATES CORP | $1.08B | $20.87 | −$52.2M | +$55.6M | — | $164.08B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $355M | $44.21 | +$5.6M | +$355M | — | $4.68T |
| MACKENZIE FINANCIAL CORP | $272M | $18.76 | −$433K | −$114M | — | $99.88B |
| FRANKLIN RESOURCES INC | $224M | $40.81 | +$7.4M | +$117M | — | $457.77B |
| First Eagle Investment Management, LLC | $187M | $7.18 | +$0 | −$2.2M | — | $60.68B |
| ROYAL BANK OF CANADA | $171M | $15.95 | −$54.6M | −$74.5M | — | $589.47B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $168M | $29.22 | +$17.3M | +$58.9M | — | $1.87T |
| NORGES BANK | $164M | $17.74 | −$8.4M | −$993K | — | $1.00T |
| CIBC Asset Management Inc | $152M | $21.47 | −$38.3M | −$186M | — | $45.61B |
| RENAISSANCE TECHNOLOGIES LLC | $145M | $12.21 | −$10.5M | −$68.3M | — | $72.56B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2003 Q2 | 0M | -0M | -0M | $-0.02 | $-0.03 – $-0.02 | 7 |
| 2003 Q3 | 0M | -1M | -1M | $-0.01 | $-0.01 – $-0.01 | 11 |
| 2003 Q4 | 0M | -1M | -1M | $-0.02 | $-0.02 – $-0.02 | 19 |
| 2004 Q1 | 0M | -0M | -0M | $-0.01 | $-0.01 – $-0.01 | 8 |
| 2004 Q2 | 0M | -1M | -1M | $-0.01 | $-0.01 – $-0.01 | 9 |
| 2005 Q1 | 0M | -1M | -1M | $-0.01 | $-0.01 – $-0.01 | 18 |
| 2005 Q3 | 2M | -9M | -9M | $0.05 | $0.04 – $0.06 | 17 |
| 2006 Q1 | 3M | -5M | -7M | $0.05 | $0.04 – $0.06 | 20 |
| 2006 Q2 | 25M | -3M | -5M | $0.15 | $0.12 – $0.18 | 8 |
| 2006 Q3 | 25M | -21M | -23M | $0.05 | $0.04 – $0.06 | 10 |
| 2007 Q1 | 131M | -13M | -15M | $0.05 | $0.04 – $0.06 | 20 |
| 2007 Q2 | 52M | -31M | -34M | $0.05 | $0.04 – $0.06 | 10 |
| 2007 Q3 | 403M | -591M | -594M | $0.40 | $0.32 – $0.48 | 18 |
| 2008 Q1 | 64M | 16M | 9M | $0.10 | $0.08 – $0.12 | 12 |
| 2008 Q2 | 81M | 13M | 6M | $0.10 | $0.08 – $0.12 | 16 |
| 2008 Q3 | 42M | 2M | -3M | $0.07 | $0.06 – $0.08 | 20 |
| 2009 Q1 | 47M | 8M | 3M | $0.09 | $0.07 – $0.11 | 9 |
| 2009 Q2 | 39M | -0M | -6M | $0.10 | $0.08 – $0.12 | 13 |
| 2009 Q3 | 44M | 4M | -1M | $0.11 | $0.09 – $0.13 | 20 |
| 2010 Q1 | 66M | 8M | 1M | $0.18 | $0.14 – $0.22 | 11 |
| 2010 Q2 | 43M | -125M | -131M | $0.09 | $0.07 – $0.11 | 11 |
| 2010 Q3 | 56M | 16M | 9M | $0.10 | $0.08 – $0.12 | 17 |
| 2011 Q1 | 70M | 21M | 12M | $0.16 | $0.13 – $0.19 | 17 |
| 2011 Q3 | 27M | — | 39M | $0.05 | $0.04 – $0.06 | 8 |
| 2011 Q4 | 27M | — | 70M | $0.18 | $0.14 – $0.22 | 20 |
| 2012 Q1 | 29M | 9M | 1M | $0.10 | $0.08 – $0.12 | 14 |
| 2012 Q2 | 32M | 44M | 25M | $0.31 | $0.25 – $0.37 | 17 |
| 2012 Q3 | 45M | 61M | 39M | $0.27 | $0.22 – $0.32 | 10 |
| 2012 Q4 | 55M | -4M | -22M | $0.24 | $0.19 – $0.29 | 12 |
| 2013 Q1 | 52M | 31M | 14M | $0.16 | $0.13 – $0.19 | 20 |
| 2013 Q2 | 48M | -65M | -81M | $0.11 | $0.09 – $0.13 | 12 |
| 2013 Q3 | 48M | 32M | 13M | $0.06 | $0.05 – $0.07 | 19 |
| 2013 Q4 | 51M | -95M | -106M | $0.05 | $0.04 – $0.06 | 13 |
| 2014 Q2 | 74M | 24M | -17M | $0.01 | $0.01 – $0.01 | 15 |
| 2014 Q3 | 952M | -170M | -205M | $0.13 | $0.10 – $0.16 | 20 |
| 2014 Q4 | 1.7B | -2.6B | -2.6B | $-0.72 | $-0.86 – $-0.57 | 18 |
| 2015 Q1 | 131M | -20M | -48M | $-0.02 | $-0.03 – $-0.02 | 11 |
| 2015 Q2 | 54M | -216M | -248M | $-0.04 | $-0.04 – $-0.03 | 8 |
| 2015 Q3 | 77M | 16M | -22M | $-0.04 | $-0.04 – $-0.03 | 15 |
| 2016 Q1 | 104M | 47M | 10M | $-0.03 | $-0.04 – $-0.02 | 19 |
| 2016 Q3 | 126M | 39M | 5M | $0.03 | $0.02 – $0.04 | 12 |
| 2017 Q1 | 121M | 33M | 0M | $-0.01 | $-0.01 – $-0.01 | 17 |
| 2017 Q2 | 33M | 34M | 4M | $0.02 | $0.01 – $0.02 | 12 |
| 2017 Q3 | 64M | 69M | 32M | $0.03 | $0.03 – $0.04 | 10 |
| 2017 Q4 | 243M | 36M | -6M | $0.08 | $0.06 – $0.10 | 15 |
| 2018 Q1 | 173M | 44M | 1M | $0.03 | $0.02 – $0.04 | 16 |
| 2018 Q2 | 507M | 30M | -13M | $0.05 | $0.04 – $0.06 | 8 |
| 2018 Q3 | 143M | 50M | 7M | $0.01 | $0.01 – $0.01 | 8 |
| 2018 Q4 | 163M | -29M | -72M | $0.01 | $0.01 – $0.01 | 8 |
| 2019 Q1 | 163M | 66M | 21M | $0.03 | $0.03 – $0.04 | 4 |
| 2019 Q2 | 169M | 64M | 18M | $0.04 | $0.03 – $0.04 | 6 |
| 2019 Q3 | 182M | 67M | 20M | $0.07 | $0.06 – $0.08 | 4 |
| 2019 Q4 | 183M | 86M | 33M | $0.07 | $0.06 – $0.08 | 7 |
| 2020 Q1 | 168M | 31M | -5M | $0.06 | $0.05 – $0.07 | 3 |
| 2020 Q2 | 113M | 44M | 12M | $0.03 | $0.03 – $0.03 | 5 |
| 2020 Q3 | 213M | 109M | 51M | $0.12 | $0.10 – $0.14 | 3 |
| 2020 Q4 | 220M | 130M | 65M | $0.13 | $0.11 – $0.15 | 6 |
| 2021 Q1 | 222M | 104M | 47M | $0.13 | $0.11 – $0.14 | 3 |
| 2021 Q2 | 214M | -145M | -188M | $0.11 | $0.10 – $0.13 | 2 |
| 2021 Q3 | 221M | 78M | 27M | $0.11 | $0.10 – $0.13 | 2 |
| 2021 Q4 | 203M | 89M | 35M | $0.09 | $0.08 – $0.10 | 2 |
| 2022 Q1 | 189M | 29M | -10M | $0.06 | $0.05 – $0.07 | 3 |
| 2022 Q2 | 197M | -167M | -207M | $0.06 | $0.05 – $0.07 | 3 |
| 2022 Q3 | 219M | 89M | 30M | $0.07 | $0.06 – $0.08 | 3 |
| 2022 Q4 | 233M | 96M | 38M | $0.08 | $0.07 – $0.09 | 3 |
| 2023 Q1 | 232M | 37M | -11M | $0.10 | $0.08 – $0.11 | 4 |
| 2023 Q2 | 251M | -181M | -228M | $0.12 | $0.11 – $0.14 | 3 |
| 2023 Q3 | 251M | 90M | 33M | $0.11 | $0.10 – $0.13 | 6 |
| 2023 Q4 | 257M | 104M | 42M | $0.11 | $0.10 – $0.12 | 4 |
| 2024 Q1 | 271M | 38M | -12M | $0.12 | $0.11 – $0.13 | 4 |
| 2024 Q2 | 283M | 153M | 79M | $0.19 | $0.18 – $0.21 | 5 |
| 2024 Q3 | 348M | 176M | 89M | $0.21 | $0.21 – $0.21 | 2 |
| 2024 Q4 | 329M | 186M | 101M | $0.24 | $0.20 – $0.28 | 6 |
| 2025 Q1 | 363M | 150M | 78M | $0.19 | $0.16 – $0.22 | 4 |
| 2025 Q2 | 448M | 227M | 138M | $0.33 | $0.29 – $0.37 | 9 |
| 2025 Q3 | 487M | 246M | 152M | $0.36 | $0.33 – $0.40 | 6 |
| 2025 Q4 | 568M | 331M | 216M | $0.51 | $0.49 – $0.54 | 6 |
| 2026 Q1 | 612M | 340M | 232M | $0.55 | $0.54 – $0.56 | 7 |
| 2026 Q2 | 594M | 332M | 222M | $0.53 | $0.50 – $0.57 | 7 |
| 2026 Q3 | 551M | 285M | 188M | $0.45 | $0.42 – $0.47 | 7 |
| 2026 Q4 | 594M | 351M | 234M | $0.56 | $0.54 – $0.60 | 4 |
| 2027 Q1 | 629M | 403M | 269M | $0.64 | $0.62 – $0.65 | 2 |
| 2027 Q2 | 649M | 448M | 297M | $0.71 | $0.60 – $0.83 | 1 |
| 2027 Q3 | 753M | 559M | 377M | $0.90 | $0.76 – $1.06 | 1 |
| 2027 Q4 | 794M | 597M | 400M | $0.95 | $0.81 – $1.12 | 1 |
| 2028 Q1 | 942M | 567M | 367M | $0.87 | $0.74 – $1.02 | 1 |
| 2028 Q2 | 943M | 588M | 373M | $0.89 | $0.75 – $1.04 | 1 |
| 2028 Q3 | 954M | 627M | 395M | $0.94 | $0.80 – $1.11 | 1 |
| 2028 Q4 | 955M | 638M | 396M | $0.94 | $0.80 – $1.11 | 1 |
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand
Thesis
Alamos is transitioning from a smaller producer into a larger, internally funded gold platform. The recent operating trajectory is strong: revenue, margins, cash generation and reserves have expanded sharply, while the company has reduced debt and accumulated approximately $676M of cash and short-term investments. Island Gold is the central growth engine, with the shaft and mill expansion offering a credible path to higher production and lower costs. PDA, Mulatos and Lynn Lake provide additional medium-term optionality. The main analytical caution is that the recent earnings surge is not all structural. Gold prices have done much of the work, while the cash-flow statement shows that roughly half of cumulative EBITDA has been reinvested in capex. Young-Davidson seismicity, higher contractor and labor costs, and the additional $10M-$15M of annual ground-support capital create execution and cost risks. The company is financially strong enough to absorb setbacks, but the equity remains exposed to gold prices and the capital intensity of mine expansion.
Trade Signal
No trade: Alamos has attractive assets and a credible 2027–28 improvement path, but at roughly fair value and only a 3% FCF yield, the upside does not sufficiently compensate for genuine execution and gold-price risk.
The major move was a rally from roughly $24 in July 2025 to $55 in February 2026, driven by strong gold-equity momentum and expectations for high margins and growth. It then reversed to about $30 by late June and drifted to $28.6 as the June 18 operational update disclosed Young-Davidson seismic damage, power-outage downtime, lower production guidance and higher AISC; the decline also reflected a broader retreat in gold-mining equities. The stock was fairly flat on the July 30 earnings release, suggesting the bad news was largely priced in. The fall looks partly like an overshoot of near-term operational fear, but not a pure temporary dislocation because the cost increases and execution issues are genuine. The gap is therefore modestly favorable, not a strong mean-reversion trade.
The stock is disliked relative to its earlier 2025–early-2026 enthusiasm: it is down roughly 48% from its 52-week high after Young-Davidson seismic events, power outages, production guidance cuts and AISC inflation. Analysts remain bullish, with a consensus Buy and a very high average target, but that optimism appears partly stale or dependent on elevated gold prices and successful project execution. Short interest is low, options positioning is broadly balanced, and retail participation is modest, suggesting disappointment rather than a crowded panic or a heavily shorted setup.
There is a credible operational inflection from the Island Gold shaft, Magino grid connection and eventual PDA development. However, the market already expects a substantial production and margin improvement: consensus is constructive, the average analyst target is far above the current price, and the bull case relies on both elevated gold prices and successful execution. The next evidence should be visible in late-2026 completion milestones and 2027 operating results, so the inflection is positive but not clearly underappreciated.
- ▲late 2026 · Q3 2026 earnings and updated operating guidance — A clean Young-Davidson recovery and sustained Island Gold/Magino throughput could rebuild confidence; further cost or production cuts would hurt.
- ▲Q4 2026 · Island Gold Phase 3+ shaft completion — Completion of the shaft and transition toward higher underground throughput should validate the production and cost step-up thesis.
- ▲late 2026 · Magino grid-power connection — Replacing CNG with grid power is expected to lower mining and processing costs, with benefits beginning in 2027.
- •late 2026 · Young-Davidson rehabilitation and updated mine plan — Recovery above 7,000 tonnes per day would be positive, but additional seismic disruption or higher sustaining capital remains a material risk.
- ▲Q1 2027 · Q4 2026 / FY2026 results and 2027 guidance — The key test is whether cost inflation and Young-Davidson issues are contained while Island Gold and Magino remain on plan.
- ▲mid-2027 · PDA first production at Mulatos — The project could extend Mulatos mine life and add high-grade production, although the principal contribution is not expected until 2027.
No meaningful dilution is evident, and the company has increased its dividend while eliminating the remaining legacy hedges, improving spot-gold participation. There is no clear large buyback or imminent tender offer, insider-flow evidence is limited, and short interest is low at about 1.8% of float, providing little squeeze fuel.
The modest net cash position of roughly $450–490 million, producing assets and continued gold exposure provide some support, but this is not a hard asset floor: mine disruption, gold-price declines and sustaining-capital inflation can materially reduce cash generation. There is no obvious hard ceiling, although the stock's prior high and broad analyst optimism could create selling pressure on a recovery.
Reasonably buyable for gold and materials investors: Alamos has net cash, operating mines, a growing dividend and visible organic growth. The likely next buyers are gold-equity funds seeking leveraged spot exposure and investors looking for production growth, but the recent guidance resets and high volatility limit broad sponsorship.
Slight greed, but not enough for an aggressive position. The operational pipeline, net cash and full spot-gold exposure are attractive, yet the stock is already valued at about 38x reported FCF and recent guidance resets show that execution risk is real.
Valuation
The call clarified that the roughly $90/oz cost increase is not purely temporary: the employee-retention program and parts of the additional ground-support and labor burden will persist into 2027 and beyond. It also provided more detail that Young-Davidson's recovery timing and extraction sequence remain uncertain. Conversely, Island Gold's 1,550 tonnes-per-day rate, the expected ramp toward 2,000 tonnes per day, improving Magino throughput and the continued strategic focus on organic growth were reassuring. The key new information was therefore a more durable cost burden and a less certain Young-Davidson recovery, not a change to the long-term Island Gold thesis.
▸ How the cases moved
Relative to the day before the Q2 call, the bear case becomes modestly more valuable in absolute terms because the company reaffirmed liquidity and the broader growth plan, but its probability rises from approximately 0.22 to 0.25 because the $90/oz cost increase, structural retention costs and Young-Davidson rehabilitation are more persistent than previously assumed. The base case value is broadly unchanged at about $3,850M, while its probability falls from approximately 0.58 to 0.55. The bull case remains intact but its probability slips from approximately 0.20 to 0.20 as the cost outlook becomes less favorable; the bull value is unchanged because Island Gold's ramp and future infrastructure remain on track.
Gold prices retreat, Young-Davidson takes longer to rehabilitate, and Island Gold and Lynn Lake spending remain elevated. Production growth is delayed and sustaining capital absorbs most of the operating cash flow. Alamos remains solvent and asset-rich, but the market values it as a higher-cost, execution-challenged mid-tier producer.
▸ Valuation
7x $225M owner earnings = $1,575M EV + $450M net cash = $2,025M equity value
Gold remains supportive but does not continue rising at the recent pace. Young-Davidson gradually returns above 7,000 tonnes per day, Island Gold reaches its planned ramp milestones, and Magino benefits from grid power. Higher labor, contractor and ground-support costs persist, but production growth and the organic project pipeline support a solid owner-earnings profile.
▸ Valuation
8x $425M owner earnings = $3,400M EV + $450M net cash = $3,850M equity value
Gold remains near cycle highs, Young-Davidson recovers quickly, and Island Gold ramps toward 2,400 tonnes per day while Magino and the grid connection materially reduce unit costs. PDA progresses toward production and investor confidence rises in the path toward approximately one million ounces of annual production. Strong margins and visible organic growth justify a premium valuation.
▸ Valuation
9x $700M owner earnings = $6,300M EV + $450M net cash = $6,750M equity value
▸ Target Rationale
The probability-weighted scenario value is $3,179M, but I set the analytical target at $3,150M. The small discount reflects commodity-price dependence, the gap between adjusted earnings and cumulative cash conversion, and the still-unproven recovery profile at Young-Davidson. The strong net-cash position, reserve growth and credible Island Gold expansion prevent a larger discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Operational Update and Guidance Revision (June 2026): On June 18, 2026, Alamos Gold provided a major operational update. Due to two seismic events at the Young-Davidson mine in Ontario that damaged underground infrastructure (blocking access to two planned high-grade stopes) and storm-triggered regional power outages that caused three days of downtime, the company revised its second-quarter gold production guidance downward to between 130,000 and 135,000 ounces. Alamos Gold also warned that full-year 2026 consolidated production will fall below its initial guidance range of 570,000 to 650,000 ounces, with all-in sustaining costs (AISC) expected to exceed previous forecasts. A fully updated annual guidance outlook will be released in late July.
- Legacy Hedge Book Elimination (May 2026): Alamos Gold capitalized on strong market conditions by purchasing and eliminating all remaining 2026 legacy forward gold sale contracts inherited from the Argonaut Gold acquisition. The buyback of these 35,000 ounces for $92.3 million gives the company full spot gold price exposure for the remainder of the year.
- Q1 2026 Financial Results (April 2026): Alamos reported Q1 2026 revenues of $596.7 million, a 79.2% increase year-over-year. Gold production for the quarter was 123,900 ounces. While rising gold prices significantly expanded the company's AISC margins (up 160% year-over-year), operational disruptions and elevated inflation pressures at Young-Davidson caused Q1 earnings to slightly miss consensus analyst expectations.
---
▸ Thesis-test Findings
Island Gold Phase 3 Shaft Expansion Status
The Phase 3+ Expansion at the Island Gold District remains on track for completion in the fourth quarter of 2026. According to the company's updated District Expansion Study, the project is largely de-risked. Capital spending for the remainder of 2026 is focused on executing the final 29 meters of the shaft sink to its ultimate depth of 1,379 meters, as well as finishing the 1350-level loading pocket and paste plant. Crucially, during the June 2026 operational update, the company reported that underground mining at Island Gold is performing ahead of plan, reaching record rates above 1,500 tonnes per day (tpd) with improving grades. This success supports the transition from trucking ore via ramps to skipping ore to the surface through the new shaft, which is designed to eventually support mining rates of 3,000 tpd and significantly reduce cash costs post-2026.
Magino Mill Grid Power Connection Completion
The high-voltage power line project to connect the Magino mill to lower-cost electric utility grid power is on track for completion in late 2026. The construction of the 115 kV transmission line will allow the centralized Magino processing facility (which is currently absorbing all processed ore from both the Magino and Island Gold deposits) to eliminate its costly reliance on compressed natural gas (CNG). This grid connection is expected to be a primary driver of cost synergies starting in 2027, contributing to an estimated 35% reduction in mining costs and a 31% reduction in processing costs, while simultaneously decreasing greenhouse gas emissions by approximately 29% per ounce.
PDA Project Mulatos First Production Timeline
The Puerto Del Aire (PDA) underground development project in the Mulatos District of Mexico remains on schedule to achieve first production in mid-2027. Construction and development activities are actively progressing, aided by the receipt of the Environmental Permit Amendment in January 2025. Exploratory drilling results from January 2026 continue to expand high-grade gold mineralization beyond current mineral reserves. The company views PDA as a high-return project (boasting a 46% after-tax IRR at a base gold price of $1,950/oz) that will nearly triple the active mine life of the Mulatos District, extending its operational runway to at least 2035.