Stocks/AGL.AX

AGL.AX

AGL Energy Limitedv3 5.5/10 · 2026-10-16
Utilities·Independent Power Producers
9.05 AUD
6.1B AUD market cap
2.7% div yield
v3 Rating
5.5/104.0–7.0
Setup
5.0/103.5–6.5
Fair Value
9.00 AUD6.50 AUD–12.00 AUD-1%
DCF (10%)
7.00 AUD-23%
Base IRR
+8%+0%–+15%
Visibility
moderate±31%
Rating
Revenue (TTM)
13.6B AUD
Owner Earnings
A$600M
Next-Yr Owner Earnings
-A$250M
Growth
+2.0% × 5y
P / Next-Yr OE
--
Net Debt
A$3.0B

AGL Energy Limited, an Australian enterprise, delivers energy and related services to a broad customer base, encompassing households, small and large businesses, and wholesale clients. The company operates through three principal divisions: Customer Markets, Integrated Energy, and Investments. It is involved in generating electricity from a diverse mix of sources, including coal and gas-fired plants, thermal, hydroelectric, wind, battery storage, and solar power facilities. Additionally, AGL manages gas storage activities and offers retail sales of electricity, natural gas, broadband, mobile, and voice services, alongside solar and energy efficiency solutions. The firm's electricity generation portfolio boasts a capacity of 10,330 megawatts. Its operational assets include the Newcastle gas storage facility in New South Wales, the Silver Springs underground gas storage facility in Queensland, natural gas production assets at Camden in New South Wales, and gas assets in North Queensland. Founded in 1837 and based in Sydney, Australia, AGL Energy Limited currently caters to 4.2 million customer accounts.

2-Year Price History

$9.02-8.4%
$8.5$9.0$9.5$10$11Initial target $9.00 · 2026-10-16volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-16

Rating
5.54.0–7.0
Setup
5.03.5–6.5
Fair value (AUD)
9.006.50 – 12.00
Upside vs 9.05
-1%
DCF (10%)
7.004.00 – 11.00-23%
Base IRR
8%0% – 15%
Visibility
moderaterange ±31%
Sentiment
4/10
2026-10-16 · claude-opus-5-5 · priced at 8.82

AGL Energy is Australia's largest private generator and an integrated gentailer (4.6m customer services, ~10 GW of capacity anchored by the Bayswater and Loy Yang A coal plants, 8.7 GW of flexible capacity including a growing battery fleet). FY26 was solid (underlying EBITDA $2,100m, underlying NPAT $631m, 50c fully franked dividend, net debt flat at $2.86bn thanks to $739m of Tilt proceeds). FY27 guidance points down, though: NPAT of $470-670m (mid ~$570m) as 2027 NEM futures have fallen 20%+ and cheap legacy gas rolls off, and Morningstar cut medium-term EPS by 37%. At A$8.82 (15 Oct 2026 close; the pack's 8.74 is slightly stale) the stock trades on ~10x FY27 earnings, ~4.4x EV/EBITDA, with a ~5.6% fully franked yield. The trade-off is that the cheap multiple is matched by about A$1.5bn a year of capex. Sustaining capex is ~$700m, and growth capex of ~$800m is going into batteries and peakers at a ~10% IRR. That leaves equity free cash flow after all capex negative in FY27, and net debt likely rising toward ~A$3.5bn. The coal earnings base also winds down between 2030 and 2035. My 10%-rate DCF gives ~A$7 a share, and my fair value, which counts franking and a utility-like cost of capital, is ~A$9.0. Rating 5.5: fairly priced income stock, modest upside, and the wholesale-price cycle can cut either way. Research 5.0: the upside case is real but not 40%. It needs volatility to return when Yallourn closes in mid-2028, Tomago smelter volume to be recontracted at higher prices in FY28, and batteries to keep a ~20% EBITDA/capex yield. Those can be checked against forward curves, but the payoff looks like +20-30% plus dividends, not a doubler.

A deep dive would have to establish: Whether FY28-30 NEM forward curves (post-Yallourn closure, Tomago smelter recontracting) plus the battery fleet can hold Integrated Energy EBITDA near $2bn while growth capex rolls off, turning equity FCF after all capex durably positive (~$500m+) before the coal base runs off.

Owner earnings, TTM
A$600MA$470M – A$670M
Realistic peak profit
A$700MA$450M – A$950M
Growth rate
2.0%-3.0% – 6.0%
Years of growth
53 – 8
Market cap
A$5.9BA$5.8B – A$6.0B
EV
A$8.9BA$8.7B – A$9.4B
Net debt
A$3.0BA$2.8B – A$3.5B
Capital return / cap
5.6%4.5% – 6.5%
P/E
10.4×8.9× – 12.6×
EV/EBITDA
4.4×4.0× – 4.9×
FCF yield
10.0%7.0% – 13.0%
Projected FCF, base case (AUD millions)
Y1-A$250M-A$600M – A$50M
Y2A$150M-A$300M – A$450M
Y3A$350M-A$100M – A$650M
Y4A$450MA$0M – A$750M
Y5A$500MA$0M – A$800M
Competition: Origin, EnergyAustralia and Alinta plus a long tail of discount retailers compete for customers, while merchant battery and renewable entrants erode the wholesale volatility that AGL's firming fleet monetises.
Governance: No accounting red flags; Grok Ventures (~11%, Cannon-Brookes) shapes strategy toward transition capex at ~10% hurdles, and the retail transformation has overrun by $100-150m and 12 months.
Research (expand)

What the company does

AGL Energy (ASX: AGL) is a vertically integrated "gentailer" in Australia's National Electricity Market (NEM). It has three businesses:

  • Customer Markets (FY26 EBITDA $392m, up 32%): 4.6m electricity, gas and other services. The telco arm was sold to Aussie Broadband for ~$115m in ABB shares. Ampol Energy's customers were integrated. Churn is 4.9pp better than the market.
  • Integrated Energy (FY26 EBITDA $2,032m, down 2%): wholesale trading plus the generation fleet. Main assets are the Bayswater black-coal plant (NSW, closing 2030-33) and the Loy Yang A brown-coal plant and mine (Vic, closing ~2035). It also owns gas peakers, hydro, gas storage (Newcastle, Silver Springs) and 300 MW of operating batteries. The 500 MW Liddell battery started in July 2026, the 500 MW Tomago battery is under construction (~$800m, LTESA-backed), and the K2 battery is being built in WA (~$490m). A 220 MW Kwinana Swift gas peaker is also being built in WA.
  • Investments: Kaluza (retail billing platform, now with ENGIE as a customer and 25m+ contracted meters) and the ABB stake. The 19.9% Tilt Renewables stake was sold for $750m (post-tax gain $268m).

The investment case

1. Cheap headline multiple and a franked yield. At A$8.82 the market cap is ~A$5.9bn (~672.7m shares). That is ~10x FY27 consensus EPS of 87c and ~4.4x FY27 EBITDA. The FY27 dividend at a 55-60% payout is ~49-50c, a ~5.6% yield and ~8% grossed-up for franking.

2. The value of firming is cyclical, not gone (management's argument). FY26 was unusually mild and volatility was low, yet EBITDA still grew 2%. Yallourn (1.48 GW, ~20% of Victoria's power) closes in mid-2028. The Tomago smelter contract ends in FY28, which frees volume AGL can recontract at higher prices. Data-centre and electrification demand is building, and batteries already earn a ~20% EBITDA/capex yield ($57m on the 300 MW fleet).

3. Self-help. $50m of net opex cuts by FY27 ($30m already delivered). The retail transformation is worth $70-90m a year pre-tax from FY30 ($25m already realised). Finance costs fall ~$30m in FY27.

4. The balance sheet is fine. Baa2 stable, FFO/net debt 38%, gearing 33.6%, $1.55bn of liquidity, and no major maturities until FY29.

What it earns today and at maturity

  • Today: FY26 underlying NPAT was $631m (~94c/share). FY27 guidance is $470-670m (mid ~$570m, ~85c). The wide range shows how much hinges on wholesale prices.
  • Cash: FY26 operating cash flow was $1,151m (after $243m of interest, $126m of unusually low tax, and $173m of significant items, mostly the retail transformation). Sustaining capex was $683m and growth capex $674m. Reported operating FCF (after sustaining capex) was $850m. Before growth capex, normalised owner FCF is roughly $550-750m a year, a ~10-12% yield. After the ~$800m FY27 growth program, equity FCF is negative (~-$250m). Dividends (~$335m) are funded with debt, so net debt likely rises toward ~$3.4-3.6bn by June 2027 unless the >2 GW renewables capital partnership brings in cash.
  • At maturity (FY29-31): Tomago, K2 and Liddell batteries running for a full year; the Tomago smelter volume repriced; transformation savings landed. NPAT could plausibly reach ~$650-800m in a normal-volatility market. In a low-price world (Morningstar's case: retail prices down ~20% to ~$100/MWh by 2029) it would be ~$450m. Beyond 2030 the coal earnings base (most of Integrated Energy EBITDA) runs off as Bayswater and then Loy Yang close. That base has to be replaced with new capex at roughly 10% IRRs, and rehabilitation costs rise. So "maturity" is a treadmill, not a harvest.

Fair value and the multiples we pay

  • Market cap ~A$5.93bn; net debt ~A$2.9-3.0bn now (reported $2.86bn at 30 June 2026); EV ~A$8.9bn.
  • P/E ~10.4x FY27 guidance midpoint; EV/EBITDA ~4.4x; dividend yield ~5.6% franked; FCF yield ~10% before growth capex and slightly negative after it.
  • DCF (10%, 5 years + terminal): equity FCF after all capex of -$250m / $150m / $350m / $450m / $500m for FY27-31. Terminal growth 2% on $500m. That gives ~A$4.7bn, or ~A$7.0 per share. The 10% hurdle is harsh for a Baa2 utility-like cash stream, which is why brokers (who use ~7-8% WACCs and SOTP EV/EBITDA) sit at A$9.7-11.8.
  • Fair value ~A$9.0 (range A$6.5-12). This blends the DCF with a franking-adjusted, utility-cost-of-capital view and Morningstar's A$10.30 (cut 14% in August). Consensus target ~A$9.7 (FNArena); Ord Minnett A$11.25 Accumulate; Citi A$11.80 Buy; UBS A$10.70 Buy; Macquarie A$10.40 Hold.
  • Base-case return ~7-8% a year, mostly the dividend. That is below a 14% hurdle.

Risks and competition

  • Wholesale prices: NSW and Victoria 2027 futures are down 20%+ since March 2026 because of renewable supply, rooftop solar, good coal availability and battery growth. AGL's cost base is mostly fixed, so price falls hit profit hard. Hedging delays the hit; it doesn't prevent it.
  • Gas: legacy cheap contracts roll off. ~65 PJ has been contracted, some of it linked to JKM or international prices, while the government's gas reservation policy is unresolved. If domestic prices then fall, AGL could be over-contracted at high prices.
  • Execution: the retail transformation (Kaluza/Salesforce) is now $400-450m, running 12 months late, with benefits pushed to FY30. Thermal sustaining capex stays at $400-500m a year. There were $227m of post-tax impairments in FY26.
  • Coal end-of-life: rehabilitation cash costs ($87m in FY26) rise into the 2030s. There is closure-date and policy risk (state intervention, DMO/VDO price resets, tougher retail rules).
  • Competition: Origin (Eraring extended), EnergyAustralia, Alinta and an aggressive tail of smaller retailers are fighting for customers. In wholesale, a growing fleet of independent merchant batteries is eroding the volatility AGL's firming assets earn from.
  • Governance: Mike Cannon-Brookes' Grok Ventures (~11%) blocked the 2022 demerger and pushes for faster decarbonisation, so capital allocation is tilted toward transition capex at ~10% hurdles. No accounting red flags.

How investors feel right now: 4/10

The stock is down ~20% over 12 months and ~6% year to date, and it underperformed the ASX 200. Sentiment is soured by falling futures, a downbeat FY27 guide (NPAT mid -10%), the transformation overrun, and dividends being debt-funded while growth capex peaks. Sell-side consensus is still mildly positive (average Buy/Accumulate, ~10-25% target upside), and income investors like the franked yield. Nobody is excited, though. The stock is treated as a value trap until volatility comes back.

Sources
  • AGL FY26 Results Announcement, 12 Aug 2026: https://announcements.asx.com.au/asxpdf/20260812/pdf/072nn3jjhrk93g.pdf
  • AGL FY26 results presentation/transcript, 12 Aug 2026: https://announcements.asx.com.au/asxpdf/20260812/pdf/072nntbkqgk4kf.pdf
  • AGL FY26 earnings call summary (context pack, 2026Q4 transcript)
  • FNArena consensus (price $8.82 at 15 Oct 2026, target $9.706, FY27 EPS 87c): https://www.fnarena.com/index.php/analysis-data/consensus-forecasts/stock-analysis/?code=AGL
  • Morningstar, ASX utility share downgraded as electricity prices fall (6 Aug 2026, FV $10.30): https://www.morningstar.com.au/stocks/asx-utility-share-downgraded-electricity-prices-fall
  • Motley Fool AU FY26 result coverage: https://www.fool.com.au/2026/08/12/agl-energy-posts-solid-fy26-result-lifts-dividend-eyes-growth-in-renewables/
  • InvestSMART AGL quote: https://www.investsmart.com.au/security/asx/agl/agl-energy-limited/share-price
  • Kalkine, AGL stock falls on energy market concerns: https://kalkine.com.au/news/utilities/agl-energy-asxagl-stock-falls-555-on-energy-market-concerns-cost-cuts-and-dividend-in-focus
  • Utility Magazine, Yallourn to close in 2028: https://utilitymagazine.com.au/vic-gov-confirms-yallourn-power-station-to-close-in-2028/
  • Energy Magazine, Loy Yang A and Bayswater closures expedited: https://www.energymagazine.com.au/loy-yang-a-and-bayswater-power-station-closures-expedited/

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue13590-6%13590-6%14393+6%13583-4%14157
Gross profit1877-33%1877-33%2796-10%3105+170%1149
Operating expenses447-62%447-62%1192+12%1063+132%458
▸Adj EBITDA2410+2%2410+2%2367-14%2741+82%1505
▸Adj OCF1148-41%1148-41%1935-17%2344-37.0
CapEx-1438-1438-1125-838-624
Adj FCF-290-136%-290-136%810-46%1506-661
Interest expense240240341251276
▸Adj net income931-29%931-29%1318-43%2318+78%1304
▸Owner's earnings700--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA5437100%2410100%1096100%2410100%-479
FCF (OCF−capex)111621%-290-12%-284-26%140258%288
Net income1052%75631%-98.0-9%71130%-1264
▸Capital returned169031%53722%25523%101842%-120
Buybacks20.010.05.003.002.00
Dividends1170329390330121
Interest paid1108240341251276
Debt paid down-608-42.0-481434-519
▸Reinvestment510194%211988%1368125%91438%700
Capex (PP&E)402514381125838624
Intangibles & M&A2770.0022260.0-5.00
Leases signed (net Δ)79968121.016.081.0
Retained / other2575%-587-24%-420-38%57524%689

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 5.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)1598315983162041566115238
▸Liabilities (total)1070710707113461023010119
Net debt (incl. leases)33243324297517572507
Net debt / Adj EBITDA1.381.381.260.641.67
Net debt / Adj FCF----3.671.17--
Adj EBITDA / interest10.010.06.9410.95.45
Shares outstanding673673673675673
Dilution (YoY)+0.1%+0.1%-0.3%+0.3%-1.0%
Employees3735--------
MarginsTTM2026202520242023
Gross margin13.8%-5.613.8%-5.619.4%-3.422.9%+14.78.1%
Adj EBITDA margin17.7%+1.317.7%+1.316.4%-3.720.2%+9.510.6%
Adj OCF margin8.4%-5.08.4%-5.013.4%-3.817.3%+17.5-0.3%
Adj FCF margin-2.1%-7.8-2.1%-7.85.6%-5.511.1%+15.8-4.7%
Net income margin5.6%+6.25.6%+6.2-0.7%-5.95.2%+14.2-8.9%
Adj NI margin6.8%-2.36.8%-2.39.2%-7.917.1%+7.99.2%
ROIC (adj, after-tax)11.3%11.3%15.5%17.6%6.8%
Cost of debt5.0%5.0%11.2%9.2%9.0%

Earnings Calls

5 calls

Earnings Call · 2026 Q4

2026-08-11

AGL Energy delivered a strong and resilient FY26 result, demonstrating the benefits of its integrated customer, generation and development businesses during a period of unusually mild weather and low wholesale-market volatility. Underlying EBITDA increased 2% to $2.1 billion, while underlying net profit was $631 million, marginally lower because higher depreciation and finance costs offset operating improvements. Net debt was broadly flat despite substantial growth, sustaining and acquisition spending, as well as $330 million of dividends, supported by stronger operating cash flow and $739 million of proceeds from the Tilt Renewables divestment. The company maintained its Baa2 investment-grade rating, reported a 97% cash-conversion rate excluding specified timing and market effects, and ended with approximately $1.6 billion of liquidity. Customer Markets performed particularly well. Customer services grew by 92,000, including the successful integration of Ampol Energy customers and organic electricity growth. Consumer margin improved 11% as pricing and portfolio optimization returned margins to more sustainable levels. Customer satisfaction rose to 84.1%, strategic NPS reached a record plus 10, and AGL's churn advantage versus the market improved to 4.9 percentage points. The company is narrowing its focus to core energy, supported by its strategic investment in Kaluza, its OVO Australia subsidiary and the partnership with Aussie Broadband following the telecommunications divestment. However, the retail transformation program has become more expensive and will extend by up to 12 months. AGL expects to invest an additional $100 million-$150 million beyond the original approximately $300 million program cost, reflecting implementation complexity, compliance, regulatory requirements and further investment in data, credit, collections and platform capabilities. The targeted annual pretax cash benefits remain $70 million-$90 million from FY30, with approximately $25 million already realized. Integrated Energy earnings held up despite lower volatility and 3.4% lower generation volumes. Stronger thermal availability, a lower unplanned outage factor and 3.3 GW of thermal flexibility allowed AGL to operate when conditions were most favorable. Total flexible capacity increased by roughly 400 MW to 8.7 GW, while the portfolio achieved an 118% realized pricing premium to the time-weighted NEM price. The operating 300 MW battery portfolio contributed $57 million of EBITDA, up $10 million year on year and equivalent to a 20% CapEx yield. Liddell's 500 MW battery commenced operations in July, Tomago's 500 MW battery is under construction with LTESA support, and K2 construction is progressing in Western Australia. Management views FY26's low volatility as cyclical rather than structural. It expects future coal retirements, rising peaks, electrification, electric vehicles and data-center demand to increase the value of firming, flexibility and orchestration. AGL is targeting approximately $800 million of growth CapEx and $700 million of sustaining CapEx in FY27, while maintaining a disciplined 10% post-tax ungeared project-level IRR target. It is also exploring capital partnerships for more than 2 GW of renewable projects to preserve balance-sheet capacity for higher-returning firming assets. The FY26 dividend increased to $0.50 per share, and management is targeting a 55%-60% payout ratio for FY27. FY27 guidance assumes stable consumer margins, Liddell's full-year contribution and cost reductions, partly offset by higher gas costs, lower wholesale prices and approximately $50 million of additional depreciation, with finance costs expected to decline by about $30 million.

Analyst Q&A (21)
▸
How should investors think about cyclical versus structural drivers of lower near-term prices and volatility, the effect of Yallourn and Torrens retirements on forward curves, and the implications of continued Tomago smelter operations?
Tom Allen · UBS
Management said Tomago's FY28 contract ending provides AGL with additional market length and potentially higher-value contracting opportunities. Management would not forecast forward prices, but said FY26 was unusually mild and the market is balanced with limited margin for error. Coal retirements will eventually require replacement flexible capacity, while data centers could create significant new demand. AGL is investing in batteries, peakers and renewables while maintaining capital discipline.
▸
How resilient are AGL's battery earnings if low volatility persists, and how does an integrated battery portfolio differ from a standalone merchant battery?
Tom Allen · UBS
AGL's batteries are integrated into its generation, retail and hedging portfolio rather than operated as standalone merchant assets. They reduce cap purchases, support hedging and contribute to portfolio premiums even in low-volatility periods. The Liddell battery will add earnings from FY27, and management expects the value of portfolio flexibility to grow over time.
▸
Does the end of the Tomago electricity contract create an EBIT uplift by allowing AGL to place the capacity into higher-value contracts or markets?
Tom Allen · UBS
Management agreed that the end of the Tomago contract would allow AGL to redirect that electricity volume into higher-value customer, data-center or other market contracts, creating potential portfolio EBIT upside.
▸
How should the medium-term returns of AGL's grid-scale batteries be assessed against the previously discussed 7%-11% IRR range, and what market conditions would support returns near the top of that range?
Tom Wallington · Citi
Battery projects have generated approximately a 20% EBITDA-to-CapEx yield to date. Although returns will move with market cycles, the projects benefit from four revenue streams: FCAS, arbitrage, portfolio benefits and caps or avoided caps. Management remains confident in achieving returns toward the upper end of the previously discussed 8%-11% range over 20 years, with evolving markets potentially adding revenue streams.
▸
What competitive dynamics is AGL seeing in retail, particularly as reports emerge that smaller retailers are struggling?
Uwan Minogue · Barrenjoey
Management did not comment on individual retailers but said the year was highly competitive. AGL's churn increased by nearly 1%, but its spread-to-market churn advantage improved, and customer services grew by nearly 90,000 including Ampol customers. Strong hedging, risk management, brand and product breadth leave AGL well positioned.
▸
What supports the decision to increase the FY27 payout target, and how should investors think about the key dividend drivers beyond FY27?
Uwan Minogue · Barrenjoey
The higher payout target reflects strong FY26 results, cash flow and balance-sheet strength despite mild conditions. These factors enabled AGL to increase the FY26 dividend and target a 55%-60% payout ratio for FY27 while retaining flexibility within the 50%-75% policy range.
▸
Is the expected increase in wholesale volatility primarily a longer-term view dependent on Yallourn's FY28 closure and structural market changes, given that near-term volatility appears to be declining?
Gordon Ramsay · RBC
Management expects volatility to remain a feature of the market, although it will vary by year depending on weather, network constraints and thermal generation. FY26 was exceptionally mild, especially in May and June, while strong thermal performance across the NEM reduced volatility. AGL's strong result despite those conditions demonstrated the value of asset flexibility.
▸
What is driving the 12-month extension and increased cost of the Kaluza and Salesforce retail transformation?
Gordon Ramsay · RBC
The retail transformation is a broad replacement of the customer-market technology ecosystem, designed to support electrification, new products and services. The additional 12 months reflects program complexity, regulatory and policy requirements and the desire to improve customer implementation quality. Management emphasized that the delay is not a Kaluza or Salesforce problem specifically.
▸
What are AGL's FY27 plans for improving NPS and equivalent or commercial availability, and is achieving the targeted availability increase mainly an economic decision?
Robert Koh · Morgan Stanley
Management expects continued improvement in commercial asset availability and flexibility, but emphasized that the target is commercial availability when the system needs the assets, not simply equivalent availability. Further gains will be balanced against the economics of additional investment. Customer NPS reached a record plus 10, with a target of moving toward plus 20 viewed as a challenging objective.
▸
Have the battery earnings columns in the FY30 strategic-target chart changed from the prior disclosure, or do they still reflect the same CapEx, timing and return assumptions?
Robert Koh · Morgan Stanley
The FY30 battery earnings columns are directionally similar to prior disclosures and remain intentionally translucent because outcomes depend on future market curves and project timing. The chart shows FY26's strong performance and the staged commissioning of additional batteries; it excludes K2, which could contribute roughly half a year from around December 2027. Management said battery earnings are still expected to offset changes in coal and gas earnings.
▸
Why are midday WEM prices currently higher than evening peak prices, and could a similar intraday pattern develop in the NEM?
Robert Koh · Morgan Stanley
Capacity payments are primarily an insurance product that compensates the battery for being available when the market needs it, while AGL can also operate K2 commercially within its portfolio. The WEM has experienced rapid battery deployment and strong competition to charge during midday because batteries must discharge during the evening peak. Similar conditions would require substantially greater battery penetration in the NEM.
▸
How far through the repricing of gas contracts is AGL, should gas costs rise further in FY28, and what could be the financial impact?
Cameron Needham · Bank of America
The FY26 results include only an initial effect from low-cost gas contracts rolling off, while FY27 reflects the first full-year impact. AGL has contracted approximately 65 PJ during FY26 and is well covered for FY27. Beyond FY28, it is waiting for the gas reservation policy to become clearer; lower gas prices would be directionally beneficial. Although gas costs may rise, portfolio revenues are also increasing and the combined customer and integrated gas impact is not material.
▸
What is driving the extra $100 million-$150 million investment in the retail transformation, what are total and remaining costs, and how do the revised payback and returns change?
Cameron Needham · Bank of America
The transformation's original cost was approximately $300 million, with an additional $100 million-$150 million now required. The increase reflects the program's scale, complexity, compliance and regulatory requirements, and additional investment in data, credit and collections capabilities. Expected benefits of $70 million-$90 million annually remain unchanged but are delayed by one year. Approximately $25 million of benefits has already been delivered, with the remaining benefits expected toward the back end of the program.
▸
Why does a 12-month extension to the retail transformation require such a large additional investment, and what other spending is included?
Ian Myles · Macquarie
The additional cost is principally the run-rate cost of extending a large program by 12 months, together with extra capability investment during the next two years. The program replaces the entire technology ecosystem and requires further investment in data platforms, credit and collections, and compliance capabilities.
▸
How exposed is AGL to government gas-reservation changes if existing contracts are linked to JKM or international prices and domestic supply increases?
Ian Myles · Macquarie
AGL viewed the 65 PJ of gas contracting as a necessary balance between securing supply and managing reservation-policy risk. It is comfortable with the contracted levels and could blend lower future gas prices into the portfolio if the market declines. Management said remaining unhedged would present a greater risk.
▸
Why has AGL not taken more FID decisions on NEM firming assets or its renewable acquisition pipeline during the last 12-24 months despite its positive outlook?
Ian Myles · Macquarie
AGL's most recent FIDs were K2 approximately six months ago and Tomago around 12 months ago. Nearly $2 billion is under construction, while the development pipeline continues progressing through planning and commercial stages. AGL is prioritizing capital discipline, waiting to bring projects to FID when market conditions, government schemes and risk-adjusted returns are appropriate.
▸
Is the lack of recent FIDs partly a deferral caused by current market conditions and policy, given that AGL may not need to be early in bringing new plants online?
Ian Myles · Macquarie
Management said the market urgently needs more wind, but projects should proceed only when the economics support appropriate shareholder returns. AGL bids into government arrangements on the basis that it intends to build, so it must ensure returns are adequate. Current spot and forward prices are insufficient investment signals because conditions will change during development and construction; projects must have a clear portfolio purpose and be built in the right place and at the right time.
▸
Why was FY26 depreciation materially below the approximately $900 million expectation, and what are the implications for future periods?
Adrian Atkins · Morningstar
FY26 depreciation was below the initial expectation because of the timing and phasing of capital deployment. Management expects depreciation and amortization to increase by approximately $50 million in FY27 as further capital is deployed, including a full year of Liddell battery depreciation.
▸
Have the battery earnings assumptions in Slide 37 materially declined from last year's disclosure, despite the apparent lower forward earnings profile?
Anthony Moulder · Jefferies
The battery earnings chart has not changed materially from the prior disclosure. The columns may move modestly each year as curves and project timing change, but management remains confident that battery returns will trend toward the upper end of the 8%-11% range.
▸
How much interest was capitalized for Liddell in FY26, and what amount should contribute in FY27?
Anthony Moulder · Jefferies
Management did not provide the precise capitalized-interest figure for Liddell immediately. It indicated that Liddell was delivered under budget and suggested a broad calculation using approximately $800 million at 5%-6%, with the exact detail to be confirmed.
▸
Of the planned $70 million-$90 million of annual transformation benefits, has AGL delivered $25 million so far, with only $20 million-$40 million remaining to be realized by completion?
Robert Koh · Morgan Stanley
Approximately $25 million of the transformation benefits has already been delivered, mainly from completing about three-quarters of the operating-model changes in Customer Markets. The remaining benefits will be delivered toward the back end of the extended program, while AI-native capabilities could create additional benefits over time.

Web Traffic

agl.com.au
Web rank#301,153
Est. visits/mo2.1M
Traffic YoY▲ 218.8%
Traffic QoQ (12w)▼ 28.5%
Web Rank History
#301,153-551,439
rankest. visits/mo
200k400k600k800k1.0m260K1.3M2.3M3.3M4.3M05-1908-2512-0103-0906-1509-2111-16

Cash Runway

29.4months
WATCH

Institutional Ownership

note: probably the least-tested part of this site, take with a grain of salt
Holder behavior (holder profile)
On big dips (−10%+)
—
how holders react when this stock falls
On quiet Qs
-2.6%
−10% to +10% baseline
On rallies (+10%+)
+67.5%
how they react when this stock rises
Holders' portfolio flow this Q
+5.9%
inflows — adds are organic
Sellers' portfolio flow this Q
+0.0%
Sellers' overall flow ~ flat.

Ownership Over Time

Ownership composition

Active
0.0%
1 filers
hedge / family / endowment
Retail funds
—
Fidelity, Schwab, 401(k)
Passive
0.0%
0 filers
Vanguard, iShares, SPDR
Market makers
0.0%
0 filers
Citadel, Susquehanna
Insiders
—
Form 4 — latest per insider
Not enough quarterly ownership history to chart yet.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2012 Q44.5B857M350M$0.52$0.47 – $0.583
2013 Q24.8B674M387M$0.59$0.58 – $0.622
2013 Q45.1B780M407M$0.53$0.44 – $0.614
2014 Q25.1B711M408M$0.61$0.59 – $0.632
2014 Q44.9B720M394M$0.43$0.41 – $0.463
2015 Q25.1B749M411M$0.48$0.46 – $0.515
2015 Q45.4B825M435M$0.51$0.47 – $0.544
2016 Q25.6B856M453M$0.55$0.49 – $0.623
2016 Q45.8B874M468M$0.56$0.52 – $0.613
2017 Q25.5B839M438M$0.60$0.57 – $0.643
2017 Q46.7B993M533M$0.63$0.61 – $0.652
2018 Q27.2B1.1B605M$0.90$0.87 – $0.932
2018 Q46.5B1.3B710M$1.05$1.02 – $1.092
2019 Q29.1B1.1B508M$0.75$0.73 – $0.782
2019 Q49.2B1.1B488M$0.72$0.70 – $0.752
2020 Q25.7B983M397M$0.59$0.57 – $0.612
2020 Q46.0B914M320M$0.47$0.46 – $0.492
2021 Q26.1B964M343M$0.51$0.49 – $0.532
2021 Q46.4B863M333M$0.49$0.48 – $0.512
2022 Q26.2B936M272M$0.40$0.39 – $0.422
2024 Q47.2B905M321M$0.48$0.48 – $0.481
2025 Q26.7B1.1B248M$0.37$0.37 – $0.371
2025 Q37.4B—0M$0.00$0.00 – $0.000
2025 Q47.2B1.0B342M$0.51$0.51 – $0.511
2026 Q17.0B—0M$0.00$0.00 – $0.000
2026 Q27.4B1.0B292M$0.43$0.43 – $0.431
2026 Q47.2B1.1B316M$0.47$0.47 – $0.471
2027 Q26.7B1.0B260M$0.39$0.39 – $0.391
2027 Q46.5B1.0B243M$0.36$0.36 – $0.361
2028 Q26.5B982M230M$0.34$0.34 – $0.341
2028 Q46.5B1.0B258M$0.38$0.38 – $0.381
2029 Q26.5B999M246M$0.36$0.36 – $0.361
2029 Q46.5B1.1B309M$0.46$0.46 – $0.461
2030 Q26.5B1.1B311M$0.46$0.46 – $0.461
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

AGL is a large, investment-grade gentailer with a valuable combination of retail customers, dispatchable thermal generation, batteries and development capability. Its transition strategy is credible: battery EBITDA is rising even during a period of weak volatility, Liddell is operating, Tomago is under construction, and the customer franchise is improving. The business can therefore earn attractive returns from flexibility and portfolio integration rather than relying solely on merchant battery arbitrage. The principal issue is cash intensity. Over the reported period, reinvestment absorbed more than claimed EBITDA, lease obligations expanded materially and net debt rose to AUD 5.2 billion. Statutory earnings remain poor and depreciation and finance costs are rising. The newly disclosed retail-transformation overrun and 12-month delay are tangible execution blemishes. I expect a stable-to-improving business over two years, but not a clean high-growth compounder: outcomes remain unusually dependent on wholesale volatility, gas costs, project returns and the timing of coal retirement.

Trade Signal

Trade rating
+4.2/10
No trade
Horizon
~6mo
gpt-5.6-luna2026-08-13 · saw 8.45 AUD+7.1% since

Modest buy: AGL trades at a material discount to a reasonably supported transition valuation, but negative free cash flow and high capital intensity argue for a measured position rather than an aggressive purchase.

Temporary mispricing+2.0

The shares rose from A$8.19 immediately before the 11 August earnings release to A$8.71, a roughly 6% reaction, after a broader decline from approximately A$9.66 at the end of February to A$8.19 before earnings. The preceding weakness appears to reflect concerns over lower wholesale-price volatility, battery-spread compression, high investment requirements and the retail-transformation overrun rather than a single capitulation event. The earnings move suggests the market had undershot AGL's operational resilience, but the stock has not been dramatically oversold: it is only modestly above its 52-week low and remains exposed to genuine cash-flow and leverage risks. This is a small temporary dislocation likely to close if subsequent cash-flow and battery evidence improves, not a wholesale market error.

Market view-2.0

The market appears mixed to mildly skeptical rather than euphoric. The shares remain 16% below their 52-week high and are down 12% over six months, consistent with concern about subdued NEM volatility, coal-asset runoff, rising capex, debt and the retail-transformation overrun. The recent 6% post-earnings rise shows that the result was better than feared, particularly on customer performance and operational resilience. Bulls see an integrated gentailer with valuable firming capacity and data-center/electrification exposure; bears focus on negative free cash flow, uncertain project returns and the lack of a near-term earnings surge. Positioning data are not provided, so there is no basis to claim a heavily shorted or crowded setup.

Inflectionwindow ~6mo+3.0

There is a positive but not exceptional earnings inflection. Liddell should contribute for a full year, customer-market performance is improving, and batteries have grown EBITDA even during a severe volatility slump. These facts support the analyst's thesis that AGL's integrated portfolio is more resilient than a pure merchant-storage operator. However, FY27 guidance already incorporates much of this improvement, and management expects lower wholesale prices, higher gas costs, additional depreciation and only gradual benefits from the retail transformation. The market is likely underappreciating the quality and duration of the transition, but a large surprise step-up is not yet evident.

Catalysts
  • ▲February 2027 · FY27 first-half earnings and cash-flow update — The market will test whether Liddell's full-year contribution, customer-margin stability and lower finance costs offset weaker wholesale prices, higher gas costs and transformation spending.
  • ▲H2 2026 · Liddell Battery full commercial ramp and operating data — A full-year contribution from the 500 MW battery could validate AGL's integrated gentailer model, provided earnings hold up despite compressed merchant spreads.
  • •H2 2026–FY27 · Tomago Battery construction and funding milestones — Progress and any capital-partnership announcement could reduce balance-sheet concerns; delays or cost overruns would reinforce the bear case.
  • ▲Late 2026–early 2027 · FY27 operating guidance updates — Evidence that customer margins remain stable and the retail transformation can achieve its A$70m–A$90m target would support a rerating; further cost escalation would hurt.
  • ▲February 2027 · Dividend declaration and payout update — The targeted 55%–60% payout ratio provides a tangible shareholder-return catalyst, although it competes with substantial growth and sustaining capex.
Flow+1.0

Dilution is currently negligible and the dividend is supportive, but there is no meaningful buyback or tender catalyst. AGL is spending roughly A$1.5bn on FY27 growth and sustaining capex while considering capital partnerships; this may limit cash available for repurchases and could preserve investor concern about leverage. Dividend demand is a modest positive, with no clear insider or squeeze-driven flow.

Floor / Ceiling+1.0

There is no hard net-cash or committed-bid floor. The dividend yield, investment-grade rating, recurring retail cash flows and strategic value of dispatchable generation provide some support, but net debt is substantial and free cash flow is currently negative after investment. Below the current price, the main support is valuation and income rather than readily realizable assets. Above it, sustained capex, debt discipline and the extended retail-transformation program create a ceiling on multiple expansion.

Buyability

Moderately good. AGL is a liquid, investment-grade Australian utility with a substantial customer franchise, a 6% dividend yield and credible exposure to firming, batteries and rising electricity demand. The next buyers are likely income-oriented investors and investors seeking a less speculative energy-transition vehicle. However, negative free cash flow, high capital intensity and uncertain returns on new projects limit enthusiasm.

Fear vs Greedfear 5/10 (+1.0)greed 6/10 (+1.0)

Greed is modestly stronger than fear. The valuation gap is meaningful and the business has real strategic assets, improving customer metrics and demonstrable battery earnings. Fear remains substantial because the valuation depends on a capital-intensive transition, while current owner earnings and free cash flow do not yet support the headline EBITDA-based value.

Valuation

Our Target
7.9B AUD+30%
Market Should Pay
7.5B AUD+24%
target ×0.95 (fear discount)
Current Market Cap
6.1B AUDSlightly bearish
What Changed
transcript · 2026-08-11
+4%fair value on this information

The FY26 full-year release confirms that EBITDA grew despite unusually mild weather and low wholesale volatility, with customer margins, customer additions and battery EBITDA all improving. It also newly quantifies the retail-transformation setback: a 12-month extension, AUD 100M–150M of additional spending and delayed realization of the previously targeted benefits. FY27 guidance points to stable margins and Liddell growth but higher gas costs, depreciation and continued substantial capex.

▸ How the cases moved

The strong FY26 result and resilient cash conversion lift the base case terminal equity value from AUD 10,500M to AUD 11,100M and its probability from 0.48 to 0.50. The bull case rises from AUD 17,500M to AUD 18,100M as Liddell, portfolio flexibility and the higher payout become more credible, with probability broadly unchanged at 0.20. The bear case falls from AUD 3,600M to AUD 3,400M because net debt remains high and the transformation now needs another AUD 100M–150M, though its probability declines from 0.32 to 0.30 because operations held up in unusually mild conditions.

2-Year Plausible Outcomes
bear30%
3.4B AUD
rev -2%/yrOE $400M

Wholesale prices and volatility remain subdued, gas costs rise, and coal-asset earnings decline faster than batteries and retail can replace them. The retail transformation consumes additional capital without delivering its promised benefits on schedule, while sustaining and growth capex keep net debt elevated. AGL remains solvent but earns only modest returns on a capital-intensive portfolio.

▸ Valuation

5x AUD 1,800M EBITDA = AUD 9,000M EV − AUD 5,600M net debt = AUD 3,400M equity

base50%
11.1B AUD
rev +2%/yrOE $800M

Customer margins remain broadly stable, Ampol integration adds volume, thermal availability improves, and Liddell contributes for a full year. Battery and flexible-generation earnings grow, but lower wholesale prices, higher gas costs, depreciation and the extended retail-transformation program limit profit conversion. AGL gradually replaces legacy coal earnings rather than producing a rapid earnings inflection.

▸ Valuation

7x AUD 2,300M EBITDA = AUD 16,100M EV − AUD 5,000M net debt = AUD 11,100M equity

bull20%
18.1B AUD
rev +5%/yrOE $1100M

Volatility and peak demand recover as coal retirements, electrification and data centers tighten the NEM. Liddell, Tomago, K2 and the broader battery pipeline earn attractive integrated-portfolio returns, while retail margins and the transformation program deliver their targeted benefits. Capital partnerships limit balance-sheet strain and AGL sustains higher cash generation with improving returns on invested capital.

▸ Valuation

8x AUD 2,800M EBITDA = AUD 22,400M EV − AUD 4,300M net debt = AUD 18,100M equity

▸ Target Rationale

The probability-weighted terminal values discounted at 12% produce AUD 8,152M. I set the analytical target modestly below that figure at AUD 7,900M because the arithmetic relies on EBITDA multiples while owner earnings are materially lower after capex, interest and lease commitments. The discount also reflects rising net debt, recurring adjustment items and the newly disclosed transformation overrun; it is not a fear-and-greed adjustment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory7/10
Risk5/10
Governance6/10
Insolvency prob (2yr)3%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Upward Guidance Revision (May 2026): AGL narrowed its FY26 guidance range upward, now expecting Underlying EBITDA of $2,060 million to $2,180 million (previously $2,020 million to $2,180 million) and Underlying NPAT of $610 million to $680 million (previously $580 million to $680 million). The revision reflects strong operational performance across its thermal and renewable fleet, which achieved a high equivalent availability factor of 83.2% for the nine months ending March 31, 2026.
  • Capital Recyclings & Western Australia Expansion (May 2026): AGL announced it expects to receive approximately A$750 million in proceeds from the sale of its stake in Tilt Renewables. Concurrently, the company made a Final Investment Decision (FID) on the 220 MW K2 gas peaker project in Western Australia, aiming to grow and diversify its flexible generation portfolio beyond the eastern states.
  • 1H26 Financial Results (February 2026): AGL reported flat underlying EBITDA of $1.09 billion for the six months ended December 31, 2025 (1H26). However, operating free cash flow surged by $240 million to $314 million. Notably, EBITDA from AGL's growing battery portfolio (300 MW) rose by 40% to $35 million, demonstrating that its flexible assets can successfully capture earnings despite lower volatility.
  • Data Center Demand Tailwind (May 2026): Management noted structural tailwinds from data centre-driven electricity demand in the National Electricity Market (NEM), which is forecast to surge from ~5 TWh currently to up to 34 TWh once all planned projects are online, positioning AGL to benefit from a structurally tighter grid.
▸ Thesis-test Findings
  • NEM Spot Price Volatility & Battery Arbitrage Spreads:

Recent data confirms a structural squeeze on pure merchant battery arbitrage. In Q1 2026, daily two-hour intraday price spreads in the mainland NEM compressed by over 70% year-on-year, with autumn peak prices dropping to ~$70/MWh and midday troughs hovering around $12/MWh. This compression is driven by massive rooftop and utility solar generation during the day coupled with expanding battery fleets (such as the 2.5 GWh added in Q1 2026 alone) smoothing evening peaks. As a result, NEM grid-scale battery revenues hit a two-year low of $54k/MW/year in February 2026. While extreme weather events (such as the Adelaide heatwave on January 26, 2026, which spiked prices to $19,000/MWh) still occur, pure merchant battery earnings face strong downward pressure. Conversely, this reinforces the bull case for AGL’s diversified "gentailer" model; its physical generation and retail integration allowed it to grow battery EBITDA by 40% in 1H26 despite the volatility slump.

  • AGL Liddell Battery Construction Progress and Commissioning:

Construction of AGL’s 500 MW / 1,000 MWh (2-hour duration) grid-scale Liddell Battery is fully complete, representing a successful project execution milestone. On March 20, 2026, AGL officially commenced commissioning the first 250 MW stage of the $750 million facility, which is situated at the site of the former Liddell Power Station. Progressive testing and grid integration are on track to bring the entire battery into full commercial operations by June 2026. This timely execution validates AGL's transition pathway, adding crucial firming capacity as its next major battery asset (the 500 MW Tomago battery) continues construction.

  • AEMO ISP Coal Retirement Schedules and Capacity Requirements:

The Draft 2026 Integrated System Plan (ISP) released by AEMO in December 2025 slows down projected coal retirements compared to prior roadmaps. While the 2024 ISP projected a full coal exit by FY38, the Draft 2026 ISP Step Change scenario projects retaining coal capacity until FY49 to ensure system security. Roughly two-thirds of the remaining coal fleet is still expected to retire by 2035. This slower trajectory softens the near-term urgency for long-duration storage replacement and extends fossil fuel market competition. For AGL, this acts as a regulatory cushion, allowing its legacy thermal assets (Bayswater and Loy Yang A) a more gradual, less disruptive exit path, even as the NEM's broader target of adding 27 GW of utility storage by 2030 confirms long-term demand for AGL's pipeline.