AKSO.OL
Aker Solutions ASAv3 6.0/10 · 2026-10-29Aker Solutions ASA, established in 1841 and headquartered in Fornebu, Norway, operates internationally, supplying a wide array of solutions, products, and services to the oil and gas sector. Their offerings span early-stage activities like field planning, feasibility assessments, and concept studies, progressing to specialist engineering, project management, and procurement. They are adept at designing, delivering, and constructing crucial infrastructure, including deepwater risers, floater designs, and facilities for hydrocarbon production, reception, and processing. Furthermore, the company is expanding into renewable and environmental solutions, offering expertise in offshore wind, offshore fish farming, hydrogen technologies, and carbon capture, utilization, and storage (CCUS). They also undertake the design and construction of jackets for various services and provide electrification solutions. Aker Solutions is also a key player in subsea technology, providing sophisticated production, compression, pump, power distribution, and processing systems, alongside comprehensive subsea lifecycle services. Their support extends to maintenance, modifications, decommissioning, asset integrity management, hook-up, and completion solutions.
2-Year Price History
Valuation v3 Opus worker · 2026-10-29
Aker Solutions is a Norwegian offshore engineering and EPC contractor (topsides, modifications, brownfield Life Cycle frame agreements, hydropower, CCS, offshore-wind HVDC substructures, with an SMR option via Rolls-Royce) that also owns 20% of SLB OneSubsea. It sits near the end of a project super-cycle driven by Norway's 2020 temporary tax package. Revenue peaked above NOK 63bn in 2025 and is guided to NOK 53-55bn in 2026. On 28 Oct 2026 management guided 2027 down to NOK 35-40bn at a 7-8% EBITDA margin (excluding OneSubsea), reported a weak 0.4x book-to-bill, and the shares fell about 5-6% to NOK 36.54 (28 Oct close, the latest I found). That is about 24% below the March high and midway in the 1-year range of 27.90-47.76. The core business is a scalable, asset-light cyclical: margins have held at 7-8% so far, but after 2027 the order book is thin. The value case is a sum of parts. Net cash is NOK 5.8bn, though roughly NOK 2-4bn of it is customer prepayments that will unwind as working capital normalises. The 20% OneSubsea stake is worth roughly NOK 9-13bn, growing and paying about NOK 0.75-0.85bn a year in dividends. That leaves the core contractor priced at under 2x its trough-year 2027 EBITDA. Underlying EPS should be about NOK 5.3 in 2026 and about 4.5 in 2027 (P/E 7-8x). A 60% payout gives an ordinary dividend yield of 7-9%, and extraordinary dividends are possible. My DCF (10% discount, 9.5x year-5 FCF for a flat cyclical) gives about NOK 51 per share and a base IRR of about 16%. Analysts are split: DNB Carnegie Sell at 33, SB1 Hold at 36, Arctic and Nordea Hold at 38, JPM Neutral at 43, and Pareto upgraded to Buy at 44 the morning after the print. Rating 6.0: it is cheap with a fat yield and a hidden-asset stake, but the 2028+ revenue floor is unknown, the legacy lump-sum offshore-wind projects are still costing money, and growth is not visible, so it looks more like a value and yield name than a 50%-in-a-year winner. It is reasonable for covered calls after the post-guidance drop. Research rating 6.5: whether this is worth 45-55 depends on the 2028 revenue floor and how much working capital unwinds, and both can be researched.
A deep dive would have to establish: Establish the realistic 2028-29 revenue and margin floor (Life Cycle frame call-offs, NCS tieback modifications, international FPSO/engineering wins, HVDC and SMR timing), the true excess cash after working capital normalises, and a defensible value and monetisation path for the 20% OneSubsea stake.
Research (expand)
What the company does
Aker Solutions (Oslo: AKSO, Aker ASA owns roughly 38%) is a 185-year-old Norwegian offshore engineering, procurement and construction contractor. It has two reported segments:
- Renewables & Field Development (R&FD): big EPC and alliance projects such as topsides, jackets and substructures (Verdal yard), FPSO topsides with partners, offshore-wind HVDC platforms (Norfolk, with Drydocks World), CCS (Northern Lights expansion, Hafslund Celsio) and hydropower (Rainpower). Q3 2026: revenue NOK 9.2bn, 8.4% EBITDA margin, backlog NOK 27.1bn, 2026 revenue guide NOK 36-38bn.
- Life Cycle: brownfield modifications, maintenance and tieback hook-ups under long-term frame agreements with Aker BP, Equinor, ConocoPhillips, Cenovus, bp UK and BSP Brunei. All Norwegian and Canadian frames were renewed in the past year. Q3 2026: revenue NOK 3.6bn, 7.6% margin, backlog NOK 40bn (about NOK 80bn including options).
- 20% of SLB OneSubsea (SLB 70%, Subsea7 10%), the subsea production-systems leader. 2025: revenue $3.8bn, 19.4% EBITDA margin. Q3 2026: revenue $1.1bn (+12% y/y), EBITDA $197m (18.5%), backlog $5.3bn, net cash $482m. Aker Solutions takes its share of net profit into EBITDA and received NOK 841m in dividends in 2025, with a similar amount guided for 2026 (about $80m).
The investment case
The stock trades as if the end of Norway's tax-package project wave makes this a shrinking contractor. Aker BP's Yggdrasil/Hugin and Valhall PWP topsides are sailing away now, and revenue falls from more than NOK 63bn (2025) to NOK 53-55bn (2026) and NOK 35-40bn (2027E). Three things are worth more than the price implies:
1. Cash and a capital-light model. Net cash is NOK 5.8bn after paying NOK 4.2bn of dividends in Q2 2026 (NOK 3.60 ordinary plus NOK 5.00 extraordinary). Capex is only about 0.5% of revenue, and more than half of EPC contract value is procurement and subcontracting that scales down with volume. Caveat: working capital is NOK -7.8bn, and management guides it to normalise to NOK -4 to -6bn over time. So about NOK 2-4bn of that cash is customer prepayments that will flow out as the big projects finish. I put this outflow into the 2027-28 FCF rather than ignoring it.
2. The OneSubsea stake. A 20% minority in a growing, roughly 19%-margin subsea leader, with a $9bn+ two-year order target that points to growth from 2027. At 8-10x EBITDA (about $750m) plus net cash, the stake is worth $1.2-1.5bn, or NOK 9-13bn (USD/NOK about 9.3). Midpoint NOK 11bn, about NOK 23 per share, which is 60%+ of the share price.
3. What the market implies for the core. Market cap NOK 17.7bn, minus about NOK 2.8bn of 'true' excess cash, minus NOK 11bn for the stake, leaves about NOK 4bn for a contractor guided to roughly NOK 2.6-3.2bn of EBITDA in its trough year 2027 (IFRS 16, before about NOK 0.6bn of lease payments).
What it earns today (real free cash flow)
Shares: 492.17m issued less 6.91m treasury = 485.3m. Market cap at NOK 36.54 = NOK 17.7bn.
- 2026E: revenue about NOK 54bn x 7.75% = core EBITDA of about NOK 4.2bn. Subtract lease payments (about 0.6bn; lease liabilities about NOK 2.8bn, which sit outside net cash), capex (about 0.27bn), cash tax (about 0.65bn) and employee share programmes (about 0.1bn, treated as stock comp). Add the OneSubsea dividend (about 0.75-0.8bn). That gives about NOK 3.2bn of run-rate owner FCF before working capital, an 18% yield. But this is the peak year and is not repeatable.
- Underlying EPS: 9M 2026 NOK 4.12 (2.67 in H1 plus 1.45 in Q3), so full-year 2026 is about NOK 5.3, a P/E of 6.9x.
- There is no growth capex to add back. The business is asset-light, and the low D&A-to-capex coverage reflects peak volume.
FCF for the next 5 years (NOK m, before interest, after leases, tax, stock comp and working capital)
| Year | Revenue | Core EBITDA | Core FCF | OSS dividend | WC | FCF |
|---|---|---|---|---|---|---|
| 2027 | 35-40bn | ~2.8bn (7.5%) | ~1.1bn (after ~0.3bn restructuring) | ~0.8bn | ~-1.7bn | ~200 |
| 2028 | ~33bn | ~2.3bn | ~1.0bn | ~0.9bn | ~-1.0bn | ~900 |
| 2029 | ~35bn | ~2.5bn | ~1.15bn | ~0.95bn | 0 | ~2,100 |
| 2030 | ~36bn | ~2.6bn | ~1.2bn | ~1.0bn | 0 | ~2,200 |
| 2031 | ~37bn | ~2.7bn | ~1.25bn | ~1.05bn | 0 | ~2,300 |
What kind of company is this in 5 years? Neither a compounder nor a corpse. It will be a smaller, cyclical, cash-generative contractor: Life Cycle frames, subsea-tieback modifications, international FPSO and engineering work from its Mumbai and KL hubs, HVDC substructures, CCS and hydropower, with an SMR construction option from about 2029-2030. Attached to it is a growing stake in a subsea leader. Norwegian petroleum investment is expected to fall about 5% a year in 2026-28 (Norges Bank), and SSB says new developments are unlikely to prevent a 2027 decline. My confidence in the 2027 number is moderate because of the guidance. It is low for 2028-29: backlog for 2028+ is NOK 33bn, mostly Life Cycle, the tender pipeline has shrunk from NOK 77bn to 72bn, and Wisting was lost.
Fair value and multiples
- DCF: PV of 2027-31 FCF is about NOK 5.4bn. Terminal value is 2.3bn x 9.5 = NOK 21.9bn, with PV NOK 13.6bn. Adding net cash of NOK 5.8bn gives about NOK 24.8bn, or about NOK 51 per share. Bear case (revenue falls to about NOK 28bn at 6% margin, terminal 7x): about NOK 33. Bull case (tiebacks, FPSOs and HVDC take revenue back to NOK 45bn, OneSubsea grows, terminal 11x): about NOK 70.
- Base IRR from NOK 36.54: about 16% a year.
- Multiples: EV (net cash basis) about NOK 11.9bn. Including leases, EV/EBITDA is about 2.8x 2026E and about 3.5-4x 2027E. P/E is 6.9x 2026E and about 8x 2027E (EPS about 4.5). The ordinary yield at a 60% payout is about 7.5-9%.
- Fair value NOK 46. I discount the DCF because order visibility after 2027 is poor, legacy lump-sum wind exposure is unresolved, and contractors rarely get re-rated while revenue is falling 30%. Still, the sum of parts (stake NOK 23 per share, true excess cash about NOK 6 per share, core at 3-4x EBITDA about NOK 17-25 per share) supports the mid-40s.
Management, risks and competition
- Management: new CEO Paal Eikeseth (since September 2026, an insider) and CFO Idar Eikrem. The message is 'deliver and transform': lean execution, standardisation, AI and data-driven engineering, and cutting capacity ahead of 2027, with restructuring booked as special items (Verdal already cut 200-300 jobs). The Aker group (Røkke) has a record of paying out cash. The 60% payout policy plus NOK 5 extraordinary dividends shows they return capital rather than empire-build. The related-party concentration with Aker BP (also Aker-controlled) is the main governance consideration. Alliance contracts have been executed well (Skarv satellites came on stream 10 months early).
- Risks: (1) Revenue cliff and order drought: Q3 book-to-bill was 0.4x, Life Cycle orders fell to NOK 1.2bn from 2.6bn, and backlog fell to NOK 69bn from 77bn. (2) Legacy lump-sum offshore-wind projects have zero margin, extra offshore-phase costs were booked in Q3, and commercial disputes are open. (3) Working-capital unwind of NOK 2-4bn. (4) Margin pressure as fixed costs deleverage. (5) OneSubsea is a minority stake with no control over its dividend. (6) Exposure to the oil price and NOK.
- Competition: Aibel (its main Norwegian rival), Wood, Saipem, Technip Energies, and Asian yards (Drydocks World, SembCorp, Chinese yards) on fabrication. Aker Solutions' moat is long-term frame and alliance relationships on the NCS and its engineering depth. That moat is durable for maintenance and modifications but competitive for greenfield EPC.
Sentiment: 4/10
The stock fell about 6% on the 2027 guide and is down about 24% from its March 2026 high of NOK 47.7, though still up about 30% over 12 months. Analysts are split and lean neutral: DNB Carnegie Sell, target cut to 33 from 37 (20 Oct); SpareBank 1 Markets Hold, 36; Arctic Hold, 38; Nordea Hold, 38 (from 40); JPMorgan Neutral, 43 (from 47); Pareto upgraded to Buy, 44 (from 45), on 29 Oct. Average targets are about NOK 44-45. Retail watches the 9% trailing yield but fears the 2027 cliff. The best bull argument, which Pareto makes, is that the post-guidance drop overshoots a capital-light business carrying net cash and a valuable OneSubsea stake. Covered-call note: after the reset the stock is at a multiple floor (about 7-8x earnings, about 3-4x EBITDA, an 8%+ yield). 2027 earnings are now guided, and implied volatility should be elevated after the 6% drop, so selling calls around the mid-40s is a reasonable way to harvest premium.
- /Users/gregwo/stocks2/data/analysisv3/context/AKSO.OL.md (context pack incl. Q3 2026 call transcript)
- https://www.akersolutions.com/news/news-archive/2026/aker-solutions-asathird-quarter-results-2026/
- https://www.prnewswire.co.uk/news-releases/aker-solutions-asa-third-quarter-results-2026-302921762.html
- https://prod.akersolutions.com/news/news-archive/2026/aker-solutions-asasecond-quarter-and-half-year-results-2026/
- https://www.inderes.fi/releases/aker-solutions-asa-fourth-quarter-and-full-year-2025-results-1
- https://prod.akersolutions.com/news/news-archive/2026/aker-solutions-asa-aker-solutions-proposes-nok-3.60-ordinary-dividend/
- https://www.bolsamania.com/nota-de-prensa/mercados/aker-solutions-asa-aker-solutions-proposes-nok-500-extraordinary-dividend--22089568.html
- https://www.investing.com/news/earnings/aker-solutions-shares-slip-as-q3-orders-drop-2027-revenue-guided-lower-4977887
- https://www.investing.com/news/company-news/aker-solutions-q3-2026-slides-solid-quarter-challenging-2027-ahead-93CH-4977807
- https://www.marketscreener.com/news/pareto-securities-upgrades-aker-solutions-to-buy-hold-price-target-nok-44-45-ce785cd3dd8df427
- https://www.ad-hoc-news.de/boerse/news/nebenwerte/aker-solutions-aktie-dnb-carnegie-senkt-ziel-fuer-die-aker-solutions-aktie-auf-33-00-nok/70389028
- https://tradedesk.dk/stock/akso.ol
- https://www.nordnet.no/aksjer/kurser/aker-solutions-akso-xosl
- https://www.marketscreener.com/news/norway-oil-companies-raise-2026-2027-investment-outlook-survey-shows-ce7f5ad3d18cf324
- https://stockanalysis.com/quote/osl/AKSO/financials/balance-sheet/
- https://www.mainsights.io/ma-news/aker-solutions-slb-and-subsea7-announce-the-closing-of-the-onesubsea-joint-venture-valuation-of-nok-3500m
Financials — Adjusted
Adjusted · TTM 2026-Q3 · NOK
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 55955-9% | 62367+19% | 52317+3% | 50873+23% | 41417 |
| Gross profit | 2483-86% | 3475-80% | 17308+504% | 2864+59% | 1796 |
| Operating expenses | 0.00-100% | -760-105% | 13837 | 195 | -34.0 |
| ▸Adj EBITDA | 4019-25% | 5383+20% | 4490+19% | 3765+28% | 2930 |
| ▸Adj OCF | 5667-16% | 6012+3% | 5835+45% | 4031+56% | 2576 |
| CapEx | -256 | -432 | -1420 | -2202 | -620 |
| Adj FCF | 5411-13% | 5580+26% | 4415+141% | 1829-6% | 1956 |
| Interest expense | 25.0 | 84.0 | 9.00 | 0.00 | 167 |
| ▸Adj net income | 1652-54% | 3496+10% | 3168-74% | 12150+978% | 1127 |
| ▸Owner's earnings | 4600 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 16618100% | 3005100% | 3981100% | 3147100% | 3591100% | 2894100% |
| FCF (OCF−capex) | 17179103% | 4554152% | 280370% | 195762% | 4116115% | 3749130% |
| Net income | 20381123% | 236479% | 254664% | 265584% | 11637324% | 117941% |
| ▸Capital returned | 22284134% | 4137138% | 204851% | 12198388% | 184951% | 205271% |
| Buybacks | 449 | -52.0 | 0.00 | 501 | 0.00 | 0.00 |
| Dividends | 17372 | 4177 | 1591 | 11018 | 489 | 97.0 |
| Interest paid | 272 | 12.0 | 84.0 | 9.00 | 0.00 | 167 |
| Debt paid down | 4191 | 0.00 | 373 | 670 | 1360 | 1788 |
| ▸Reinvestment | 11377% | -208-7% | 2486% | -55.0-2% | 72120% | 43115% |
| Capex (PP&E) | 4794 | 120 | 432 | 1420 | 2202 | 620 |
| Intangibles & M&A | -1592 | 124 | 26.0 | -1280 | -608 | 146 |
| Leases signed (net Δ) | -2065 | -452 | -210 | -195 | -873 | -335 |
| Retained / other | -3241-20% | 30510% | 81320% | -8952-284% | 287580% | 171859% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 11 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 33959 | 38351 | 36203 | 41253 | 33088 |
| ▸Liabilities (total) | 24847 | 27105 | 25077 | 22301 | 23848 |
| Net debt (incl. leases) | -3086 | -1918 | -1004 | -7557 | -734 |
| Net debt / Adj EBITDA | -0.77 | -0.36 | -0.22 | -2.01 | -0.25 |
| Net debt / Adj FCF | -0.57 | -0.34 | -0.23 | -4.13 | -0.38 |
| Adj EBITDA / interest | 161 | 64.1 | 499 | -- | 17.5 |
| Shares outstanding | 486 | 482 | 482 | 489 | 487 |
| Dilution (YoY) | +0.8% | -0.0% | -1.4% | +0.4% | -0.3% |
| Employees | 11825 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 4.4%-25.0 | 5.6%-27.5 | 33.1%+27.4 | 5.6%+1.3 | 4.3% |
| Adj EBITDA margin | 7.2%-1.6 | 8.6%+0.1 | 8.6%+1.2 | 7.4%+0.3 | 7.1% |
| Adj OCF margin | 10.1%-0.8 | 9.6%-1.5 | 11.2%+3.2 | 7.9%+1.7 | 6.2% |
| Adj FCF margin | 9.7%-0.5 | 8.9%+0.5 | 8.4%+4.8 | 3.6%-1.1 | 4.7% |
| Net income margin | 5.5%+1.4 | 4.1%-1.0 | 5.1%-17.8 | 22.9%+20.0 | 2.9% |
| Adj NI margin | 3.0%-2.9 | 5.6%-0.4 | 6.1%-17.8 | 23.9%+21.2 | 2.7% |
| ROIC (adj, after-tax) | 16.3% | 22.1% | 18.0% | 10.9% | 8.5% |
| Cost of debt | 0.8% | 2.0% | 0.2% | 0.0% | 2.8% |
Earnings Calls
Earnings Call · 2026 Q3
Aker Solutions presented its third-quarter results, with CEO Paal Eikeseth (in the role since September) and CFO Idar Eikrem presenting. Eikeseth set out two priorities: deliver projects safely, on time, at the right quality and cost, and transform how the company works, using a lean agile setup, standardization, simplification, and a shift from documents to data. Group revenue for Q3 was NOK 13.5 billion, in line with expectations after peak activity in 2025. Underlying EBITDA was NOK 1.3 billion, a 9.6% margin, or 7.7% excluding the net profit from SLB OneSubsea. Underlying EBIT was NOK 891 million (6.6% margin), and underlying net profit was NOK 704 million, equal to EPS of NOK 1.45. Operationally, the Hugin B and Valhall PWP topsides for Aker BP left the yards during the quarter, and Hugin A is expected to sail away in the winter months, with staff supporting offshore commissioning ahead of 2027 start-up. The Skarv Satellite tieback, where Aker Solutions did the topside modifications and SLB OneSubsea supplied subsea equipment, produced first oil more than 10 months ahead of schedule. In offshore wind, the first-generation legacy lump sum projects are in the final offshore commissioning stages but remain commercially and operationally challenging, with commercial discussions ongoing. Management pointed to progress on two second-generation HVDC platforms for the Norfolk project in the U.K., executed in a joint venture with Drydocks World, and to substructure assembly at the Verdal yard for European offshore wind. In carbon capture and storage, work continues on the Northern Lights capacity expansion and the Hafslund Celsio waste-to-energy project in Oslo, and a collaboration agreement was signed with Microsoft to help customers mature projects toward final investment decision. The Rainpower hydropower business, acquired earlier, has become a profitable growth business. In small modular reactors, Aker Solutions is supporting Rolls-Royce SMR under an MOU, with the ambition to sign detailed engineering contracts in 2027 and first energy by 2035. In Life Cycle, all long-term frame agreements in Norway and Canada were renewed over the past year, and a strategically important frame agreement with BP for U.K. assets was won in Q3. Brunei's BSP frame renewal is being tendered. The tender pipeline stands at around NOK 72 billion after removing the Wisting FPSO project, which was lost. Activity centers on hubs in Europe, Asia and Australia, with strong topside modification demand in Europe driven by subsea tiebacks, plus offshore wind and carbon capture. Outside Europe, Aker is positioning for several FPSO opportunities with partners, and management said its Malaysia and India hubs are used both for local bids and for larger global engineering work, including the Middle East. Segment results: Renewable and Field Development revenue was NOK 9.2 billion with an 8.4% underlying EBITDA margin, held back by the legacy lump sum projects. Order intake was NOK 3.7 billion and backlog NOK 27.1 billion. Life Cycle revenue was NOK 3.6 billion, down on lower electrification activity, with EBITDA of NOK 274 million (7.6% margin). Order intake was NOK 1.2 billion (0.3x book-to-bill) and backlog stood at NOK 40 billion, or about NOK 80 billion including option periods. SLB OneSubsea, in which Aker holds 20%, reported revenue of $1.1 billion (up about 12% year on year), EBITDA of $197 million (18.5% margin), and net profit of $152 million, helped by a one-off tax provision release of about $20 million. Order intake was about $1.2 billion, backlog reached $5.3 billion, and net cash rose to $482 million. Aker's quarterly dividend from the stake was NOK 137 million. Dividends from OneSubsea in 2026 are expected to be broadly in line with 2025, when Aker received roughly NOK 841 million (about $80 million). Cash flow was solid: operating cash flow was NOK 1.6 billion, including a working capital improvement of about NOK 700 million. Capex was NOK 67 million, or 0.5% of revenue. Net cash stood at NOK 5.8 billion including liquid funds. Guidance: for 2026 the company raised its outlook to revenue of NOK 53 to 55 billion and an EBITDA margin of 7.5% to 8%, excluding SLB OneSubsea net profit. Renewable and Field Development is guided to NOK 36 to 38 billion and Life Cycle to NOK 14 to 15 billion. For 2027, management expects revenue of NOK 35 to 40 billion and a 7% to 8% margin, excluding SLB OneSubsea, as the NCS activity package projects wind down by the end of 2027. Capex in 2026 should be about 0.5% of revenue, and working capital should normalize to negative NOK 4 to 6 billion over time. In the Q&A, management said the pipeline decline reflected the Wisting and an earlier HVDC project being removed, and that legacy lump sum projects carry extra offshore costs from a longer offshore phase. On headcount, Aker will reshape its capacity and cost base and return with details before year-end; similar to the 200 to 300 Verdal reduction in Q4 2025, restructuring costs are treated as special items and excluded from margin guidance. Management said 2027 revenue guidance is its best current estimate, that incentive and risk-money mechanisms in contracts could support margins, and that large EPC projects are highly procured and subcontracted, giving the business flexibility as volumes change.
▸What are the biggest moving parts in the tender pipeline year-to-date that caused it to shrink since Q1, and are you concerned?Victoria McCulloch · RBC
▸Can you remind us of the size of the legacy lump sum contracts, how much remains, and how much they will drag on 2027 margins under the updated guidance?
▸How do you expect headcount to move in 2027 to reflect lower activity levels?
▸Does the 2027 margin guidance include contingency release related to the Aker BP portfolio, and can you quantify it?Kim Uggedal
▸Have you underestimated 2026 volumes, will the same happen in 2027, and can you give more color on the 2027 margin guidance?Lukas Daul · Arctic
▸Follow-up on the tender pipeline shifting toward Asia Pacific: what are the competitive dynamics there, and why is the region important?
▸What is your view on OneSubsea's financial performance and expected dividend levels for 2026 and beyond?
Web Traffic
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2014 Q3 | 8.0B | 1.1B | 568M | $1.17 | $0.84 – $1.58 | 12 |
| 2014 Q4 | 8.2B | 766M | 273M | $1.15 | $0.92 – $1.37 | 17 |
| 2015 Q1 | 8.2B | 821M | 350M | $1.04 | $0.86 – $1.23 | 13 |
| 2015 Q2 | 7.9B | 583M | 208M | $0.97 | $0.75 – $1.13 | 14 |
| 2015 Q3 | 7.8B | 586M | 199M | $0.91 | $0.73 – $1.16 | 19 |
| 2015 Q4 | 7.5B | 756M | 196M | $0.78 | $0.62 – $0.92 | 16 |
| 2016 Q1 | 7.2B | 71M | -215M | $0.52 | $0.30 – $0.71 | 13 |
| 2016 Q2 | 6.7B | 574M | 134M | $0.45 | $0.29 – $0.68 | 14 |
| 2016 Q3 | 6.5B | 474M | 97M | $0.40 | $0.18 – $0.65 | 15 |
| 2016 Q4 | 6.2B | 901M | 98M | $0.46 | $0.15 – $0.95 | 15 |
| 2017 Q1 | 5.9B | 4M | -275M | $0.24 | $0.16 – $0.40 | 11 |
| 2017 Q2 | 5.5B | 365M | 59M | $0.16 | $0.07 – $0.24 | 13 |
| 2017 Q3 | 5.6B | 267M | 24M | $0.18 | $0.12 – $0.26 | 12 |
| 2017 Q4 | 6.1B | 364M | 118M | $0.34 | $-0.03 – $0.72 | 13 |
| 2018 Q1 | 5.7B | 294M | 24M | $0.34 | $0.28 – $0.41 | 12 |
| 2018 Q2 | 6.1B | 426M | 110M | $0.47 | $0.39 – $0.53 | 10 |
| 2018 Q3 | 6.4B | 420M | 120M | $0.44 | $0.16 – $0.56 | 9 |
| 2018 Q4 | 6.8B | 375M | 147M | $0.50 | $0.46 – $0.54 | 9 |
| 2019 Q1 | 6.4B | 856M | 273M | $0.18 | $0.16 – $0.19 | 4 |
| 2019 Q2 | 7.2B | 691M | 169M | $0.16 | $0.15 – $0.18 | 4 |
| 2019 Q3 | 6.9B | 612M | 115M | $0.14 | $0.13 – $0.15 | 6 |
| 2019 Q4 | 6.4B | 288M | 75M | $0.07 | $0.06 – $0.08 | 4 |
| 2020 Q1 | 5.6B | 356M | -68M | $-0.04 | $-0.04 – $-0.04 | 3 |
| 2020 Q2 | 4.8B | -154M | -612M | $-0.28 | $-0.30 – $-0.26 | 3 |
| 2020 Q3 | 5.0B | -596M | -974M | $-0.29 | $-0.32 – $-0.27 | 6 |
| 2020 Q4 | 6.2B | -758M | -941M | $-0.02 | $-0.03 – $-0.02 | 3 |
| 2021 Q1 | 6.7B | -868M | -1.1B | $-0.06 | $-0.06 – $-0.05 | 3 |
| 2021 Q2 | 6.6B | -766M | -1.1B | $-0.02 | $-0.02 – $-0.02 | 1 |
| 2021 Q3 | 7.2B | -647M | -996M | $0.03 | $0.03 – $0.03 | 1 |
| 2021 Q4 | 8.3B | -587M | -937M | $0.12 | $0.11 – $0.13 | 1 |
| 2022 Q1 | 8.8B | -1.0B | -1.3B | $0.16 | $0.15 – $0.17 | 2 |
| 2022 Q2 | 8.7B | 474M | 89M | $0.18 | $0.17 – $0.20 | 2 |
| 2022 Q3 | 9.6B | 489M | 116M | $0.24 | $0.22 – $0.26 | 2 |
| 2022 Q4 | 11.8B | 597M | 181M | $0.37 | $0.34 – $0.40 | 2 |
| 2023 Q1 | 11.7B | 580M | 182M | $0.38 | $0.35 – $0.41 | 1 |
| 2023 Q2 | 12.4B | 659M | 221M | $0.45 | $0.42 – $0.49 | 1 |
| 2023 Q3 | 14.2B | 745M | 280M | $0.58 | $0.49 – $0.68 | 5 |
| 2023 Q4 | 9.5B | 454M | 143M | $0.29 | $0.24 – $0.34 | 3 |
| 2024 Q1 | 10.1B | 654M | 240M | $0.49 | $0.37 – $0.57 | 7 |
| 2024 Q2 | 11.7B | 586M | 288M | $0.59 | $0.35 – $0.79 | 5 |
| 2024 Q3 | 13.2B | 896M | 365M | $0.75 | $0.68 – $0.81 | 1 |
| 2024 Q4 | 14.3B | 1.0B | 423M | $0.87 | $0.83 – $0.91 | 4 |
| 2025 Q1 | 13.9B | 1.3B | 593M | $1.22 | $1.10 – $1.34 | 2 |
| 2025 Q2 | 14.3B | 1.4B | 637M | $1.31 | $1.27 – $1.36 | 2 |
| 2025 Q3 | 14.2B | 1.5B | 651M | $1.34 | $1.31 – $1.37 | 1 |
| 2025 Q4 | 15.8B | 1.6B | 768M | $1.58 | $1.37 – $1.74 | 3 |
| 2026 Q1 | 13.6B | 1.8B | 899M | $1.85 | $1.13 – $2.85 | 3 |
| 2026 Q2 | 13.5B | 1.4B | 643M | $1.32 | $1.25 – $1.42 | 4 |
| 2026 Q3 | 14.0B | 1.6B | 724M | $1.49 | $1.42 – $1.59 | 4 |
| 2026 Q4 | 13.8B | 1.4B | 621M | $1.28 | $1.20 – $1.41 | 3 |
| 2027 Q1 | 10.6B | 1.1B | 450M | $0.93 | $0.91 – $0.95 | 1 |
| 2027 Q2 | 9.8B | 1.2B | 476M | $0.98 | $0.96 – $1.00 | 1 |
| 2027 Q3 | 9.0B | 1.2B | 478M | $0.98 | $0.96 – $1.01 | 1 |
| 2027 Q4 | 8.8B | 1.1B | 470M | $0.97 | $0.95 – $0.99 | 1 |
v2 analysis (legacy, 2026-07-14) — for comparison onlyclick to expand
Thesis
Aker Solutions is riding out the tail of an exceptional 2024-2026 execution cycle (Yggdrasil, Valhall PWP-Fenris, Hugin) for Aker BP, generating record revenue and cash while transitioning from onshore yard assembly to offshore installation. The 20% OneSubsea JV stake is a genuine cash annuity (NOK 841M dividends in FY25) and gives optional upside via a $9bn two-year booking target. Balance sheet is pristine — net cash ex-leases, no meaningful gross debt, ROIC 18-22%. The core EPC/fabrication business, however, is thin-margin (7-9% adj EBITDA), historically prone to lump-sum legacy losses (2024's huge one-time swing) and highly backlog-dependent; 2027-2028 revenue visibility is thin as management themselves declined to give 2027 guidance. Growth options in CCS, hydropower and SMR (Rolls-Royce MoU) are real but pre-revenue optionality, not near-term earnings. The FY26 revenue guide was raised again this quarter (to NOK50-55bn) on frame-agreement renewals and accelerated milestones, but the structural story is a business normalizing down from peak activity with a backlog refill question mark two years out.
Trade Signal
Buy: AKSO trades at ~22bn mktcap against a fair value near 27.5-29bn, backed by a net-cash balance sheet, 22% FCF yield, and improving 2027 backlog-refill signals that the market hasn't yet fully credited, with the key catalyst (2027 guidance) about 6-8 months out.
Stock has drifted steadily up +42% over 1y and +20% since last earnings on a stream of positive but incremental confirmations: raised FY26 revenue guidance, extraordinary NOK5/sh dividend from SLB divestment, back-to-back Lifecycle frame renewals, Rolls-Royce SMR MoU, and no new provisions on legacy wind/oil projects. This is not a single dislocation but cumulative re-rating as execution risk kept resolving positively while the market stayed skeptical about the post-2026 cliff. The move looks justified by realized fundamentals rather than euphoria, but consensus is still anchored on 'peak now, cliff next' and hasn't priced the durability of Lifecycle/OneSubsea cash flows that reduce the cliff risk — a genuine gap, not pure momentum.
Market treats AKSO as a cyclical oilfield-services beneficiary riding the Aker BP capex supercycle, priced for a hard falloff after 2026/2027 project completions (Yggdrasil, Valhall PWP-Fenris) with no confirmed replacement backlog — hence a still-modest P/FCF of 4.5x and EV/FCF 3.3x despite strong results. Bulls point to the pristine balance sheet (net cash), 22% FCF yield, OneSubsea JV optionality, and NOK77-80bn tender pipeline; bears focus on 2027 guidance being explicitly withheld and cost inflation risk being passed through from Aker BP. Sentiment is constructive but not euphoric — steady buyer base, not a crowded consensus long; limited retail hype, mostly generalist/energy-services investors watching backlog refill data.
The real inflection isn't a dramatic near-term profit jump — Q2 was strong but guidance is largely already known (NOK50-55bn revenue, ~7.5% margin) — it's whether 2027 backlog refill materializes to avoid the bear-case falloff. Order intake of NOK28.8bn in Q1 (book-to-bill 2.2x) and a NOK80bn backlog are early positive signals the market may be underweighting given management deferred formal 2027 guidance. If Q3/Q4 order intake continues at this pace, the 'cliff' narrative should erode, which is a genuine, under-priced positive catalyst rather than an already-discounted one.
- ▲2026-10 · Q3 2026 earnings + order intake update — Further book-to-bill above 1x would confirm backlog refill thesis, easing 2027 cliff fears.
- ▲2027-02 · Q4 2026 earnings + initial 2027 guidance — First formal 2027 guidance is the key re-rating catalyst if backlog holds up.
- ▲H2 2026 · OneSubsea JV new contract awards — Progress toward $9bn 2-yr booking target reinforces JV annuity value.
- ▼H2 2026 · Aker BP cost inflation pass-through disputes — If Aker Solutions absorbs Aker BP's cost overruns via provisions, margins compress.
- •2027+ · Rolls-Royce SMR scope progression — Long-dated optionality, unlikely to move the stock materially within 12 months.
Net cash balance sheet, ROIC 18-22%, minimal dilution (1% TTM). Company just paid an outsized total dividend of NOK8.60/share (ordinary + extraordinary from SLB stake sale), signaling shareholder-friendly capital return rather than hoarding cash for capex. No major insider selling flagged; no lockups. This is a mild net-positive flow picture, though not an aggressive buyback story.
Net cash position (EV 16.1bn vs mktcap 22bn) plus a 22% FCF yield gives a hard-ish floor — the balance sheet alone plus cash generation broadly supports the current price even in the bear case (19,650M vs 21,950M mktcap, i.e. bear case is only ~10% below current price). No obvious overhang, controlling-holder selling, or dilution risk capping upside; Aker family/Aker ASA ownership is stable and strategic. Ceiling is soft — multiple could re-rate higher if backlog refill proves out, but re-rating requires evidence, not sentiment alone.
Highly buyable — large Nordic industrial name with strong liquidity ($24.5M/day), consistent dividend payer with an active extraordinary distribution track record, net cash balance sheet, and real ROIC. This is exactly the type of profitable, cash-returning, well-governed non-US name that institutional and generalist energy investors can own without the 'value trap' problem of no capital returns.
Greed edges out fear here — the stock has already run but the valuation gap to fair value (+25%) is backed by real cash generation, a net cash balance sheet, and credible backlog momentum, not story/multiple expansion; the risk is a 2027 guidance disappointment, which is knowable within 6-8 months.
Valuation
The market already knew from Q1 (April 30) that FY2026 revenue would land around NOK50bn; this call raises that guide further to NOK50-55bn on the back of successful renewal of all five targeted Lifecycle frame agreements in 12 months and accelerated execution (Verdal yard completing all four substructures, no new provisions taken in Q2 following Q1 estimate adjustments). The SMR MoU and SLB share divestment/extraordinary dividend were already disclosed prior to this call. Net new information is modestly positive: incremental guide raise plus a clean quarter with no fresh legacy write-downs.
▸ How the cases moved
Bear probability trimmed slightly (0.30->0.25) as no new provisions were booked and legacy projects are progressing into completion without incident; base case equity value nudges up (~32,500->33,750) on the guidance raise and confirmed Lifecycle run-rate; bull case largely unchanged since 2027/2028 award visibility remains unconfirmed (management explicitly declined to give 2027 guidance).
Post-2026 peak, Aker BP-driven volumes fall faster than guided as no comparable mega-project replaces Yggdrasil/Valhall; renewables legacy lump-sum risk resurfaces or Aker BP cost inflation gets partially absorbed by Aker Solutions via provisions; 2027 backlog refill disappoints. Margins compress toward 6%.
▸ Valuation
5.5x EBITDA ~2,900 = 15,950 EV + net cash ~3,700 = 19,650 equity value
Revenue normalizes to the guided NOK50-55bn band and stabilizes near there in 2027 as Lifecycle frame renewals (NOK15bn/yr sustainable) and OneSubsea dividends offset the Aker BP peak roll-off; no major new provisions; CCS/hydropower/SMR remain pipeline, not P&L, contributors.
▸ Valuation
6.5x EBITDA ~4,300 = 27,950 EV + net cash ~5,800 = 33,750 equity value
Strong tender pipeline (NOK77-80bn, book-to-bill 2.2x in Q1) converts into major new 2027/2028 awards; OneSubsea JV bookings scale toward the $9bn 2-year target lifting distributions; CCS second-generation and early SMR engineering scopes start contributing meaningfully; margins hold near 8.5-9%.
▸ Valuation
8x EBITDA ~5,500 = 44,000 EV + net cash ~7,000 = 51,000 equity value
▸ Target Rationale
Slightly above raw model output: the quarter's guidance raise, absence of new provisions, and back-to-back Lifecycle frame renewals reduce near-term execution risk versus what the base case already assumes, but I discount modestly for the unresolved 2027/2028 backlog-refill question (management explicitly deferred 2027 guidance) and for the gap between headline EBITDA (inflated by OneSubsea equity income) and true owned cash generation.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results: On April 30, 2026, Aker Solutions reported its first-quarter results, showing normalized revenue of NOK 13.4 billion, down from NOK 14.4 billion in Q1 2025 as peak activity levels from 2025 subsided. Underlying EBITDA stood at NOK 1.2 billion, achieving an 8.6% margin (or 7.6% excluding net income from its joint venture, SLB OneSubsea). The company recorded a massive order intake of NOK 28.8 billion (a book-to-bill ratio of 2.2x), which lifted the secured backlog to NOK 80.2 billion at quarter-end. For the full year 2026, revenue is guided at approximately NOK 50 billion, with guided EBITDA margins (excluding OneSubsea) expected to land between 7.0% and 7.5%. Capital expenditures are expected to stabilize at 1% of revenue going forward.
- Asset Divestment & Extraordinary Dividend: In February 2026, Aker Solutions divested its remaining shareholding in SLB N.V. (over 5 million shares at an average of USD 50.43 per share), raising NOK 2.4 billion in cash. Following approval at the Annual General Meeting on April 16, 2026, the entire proceeds were returned to shareholders via an extraordinary dividend of NOK 5.00 per share. Combined with an ordinary dividend of NOK 3.60 per share, a total distribution of NOK 8.60 per share was paid out to shareholders on April 27, 2026.
- Rolls-Royce SMR MoU: On April 29, 2026, Aker Solutions announced a Memorandum of Understanding (MoU) with Rolls-Royce SMR Ltd to collaborate on small modular reactors (SMRs). Aker Solutions will leverage its complex modularization and energy project execution expertise to develop non-nuclear components for Rolls-Royce SMR's portfolio, initially focusing on UK and Czech Republic opportunities.
▸ Thesis-test Findings
SLB OneSubsea dividend distributions backlog 2026
Aker Solutions’ 20% stake in the SLB OneSubsea joint venture continues to act as a robust cash and margin generator, supporting the bull case. During Q1 2026, Aker Solutions received NOK 137 million in cash dividends from the venture, which contributed NOK 143 million in net income to Aker Solutions' consolidated earnings. (In the full year 2025, OneSubsea distributed NOK 841 million to Aker Solutions). Backlog visibility is very strong, with the venture targeting cumulative bookings exceeding USD 9 billion over the next two years. OneSubsea secured several high-profile contracts in early 2026, including the 20-well Kaiping deepwater project in China, the Kikeh deepwater project in Malaysia, a strategic field development collaboration with PETRONAS in Suriname, and a major subsea boosting system contract for bp's Thunder Horse project in the Gulf of America.
Aker BP alliance offshore project timeline capital expenditure 2026 2027
Projects within the strategic alliances with Aker BP are progressing on or ahead of schedule, though they present mixed bull and bear dynamics. Aker BP confirmed that both major developments—Yggdrasil and Valhall PWP-Fenris—remain on track for first production in 2027. Key execution milestones were hit in Q1 2026, including the successful sail-away and installation of the Fenris topside from Aker Solutions' Verdal yard, alongside the installation of the Hugin B jacket. Furthermore, the Skarv Satellites tieback start-up has been accelerated to Q3 2026. On the bear side, inflationary pressures are rising: in February 2026, Aker BP hiked its 2026 capital expenditure guidance to USD 6.2–6.7 billion (roughly 20% higher than expected) to fund Valhall scope expansion, counter unfavorable exchange rates, and protect project schedules. This follows cost overruns reported in late 2025, when nominal project budgets rose 32% for Yggdrasil and 25% for Valhall-Fenris due to supply chain tightness and currency fluctuations. While higher spending by Aker BP secures huge, long-term work for Aker Solutions (such as a new 5-year MMO frame agreement in Q1 2026), the underlying cost inflation poses execution margin risks if Aker Solutions cannot successfully manage pass-through provisions.
Aker Solutions wind power EPC contract provisions disputes
No new material active contract disputes or loss provisions were reported for Aker Solutions’ wind power EPC projects in the last six months. A historical dispute on the German Nordsee Ost offshore wind farm (completed in 2013) was legally resolved in 2021 with an award of EUR 67 million in Aker Solutions' favor. This lack of recent disputes supports the bull case that Aker Solutions is managing commercial risk more effectively than its peers by remaining highly selective, utilizing multi-party consortia, and applying a "design one, build several" standardization strategy. For example, the massive Norfolk Vanguard West and East HVDC converter platform projects (executed in partnership with Siemens Energy and Drydocks World) are progressing smoothly after receiving full notice to proceed from RWE in January 2025. Aker Solutions also secured a significant contract in mid-2025 to fabricate steel substructures for the BalWin2 offshore wind project. However, industry-wide reports from 2025/2026 continue to highlight that fragmented contract structures, interest rate-driven increases in weighted average cost of capital (WACC), and marine bottlenecks expose the offshore wind sector to persistent delay and cost overrun risks.