Stocks/AMI.AX

AMI.AX

Aurelia Metals Limitedv3 6.0/10 · 2026-10-20
Basic Materials·Industrial Materials
0.41 AUD
680M AUD market cap
v3 Rating
6.0/104.5–7.5
Setup
6.0/104.5–7.5
Fair Value
0.50 AUD0.25 AUD–0.78 AUD+23%
DCF (10%)
0.48 AUD+19%
Base IRR
+14%-10%–+35%
Visibility
wide±53%
Rating
Revenue (TTM)
480.2M AUD
Owner Earnings
A$70M
Next-Yr Owner Earnings
A$5M
Growth
+15.0% × 4y
P / Next-Yr OE
139.4x
Net Debt
-A$120M

Aurelia Metals Limited is an Australian enterprise dedicated to the exploration and development of mineral resources across the nation. The company primarily seeks out deposits rich in gold, silver, lead, zinc, and copper. It holds full ownership of several key mining operations in New South Wales: the Hera mine, located southeast of Cobar; the Peak mine, situated within the northern Cobar Basin; and the Dargues mine, found in the state's southeastern region. Established in 2004, the firm was initially known as YTC Resources Limited before officially adopting the name Aurelia Metals Limited in June 2014. Its corporate headquarters are based in Brisbane, Australia.

2-Year Price History

$0.40+122.2%
$0.20$0.25$0.30$0.35$0.40$0.45$0.50Initial target $0.50 · 2026-10-20volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-20

Rating
6.04.5–7.5
Setup
6.04.5–7.5
Fair value (AUD)
0.500.25 – 0.78
Upside vs 0.41
+23%
DCF (10%)
0.480.18 – 0.75+19%
Base IRR
14%-10% – 35%
Visibility
widerange ±53%
Sentiment
6/10
2026-10-20 · claude-opus-5-5 · priced at 0.42

Aurelia is a A$720M Cobar Basin (NSW) polymetallic miner. Gold is about 55% of revenue, with zinc, lead and copper making up the rest. Several years of repair are done: it owns one mill (Peak), now being lifted from 0.8 to 1.1-1.2Mtpa; Federation, a new high-grade zinc-lead-gold mine, reached commercial production in FY26; and Great Cobar, a 3.2% copper deposit due for first ore in FY28, is funded from cash flow. FY26 revenue was A$480M, EBITDA A$189M and NPAT A$83M. There is about A$120M of net cash after the first dividend since 2020, the Trafigura debt has been refinanced, and director Frank Brazil owns 23.8% and has kept buying on market. At A$0.42 (19 Oct close) the EV is about A$600M, roughly 3x FY27 EBITDA and 8-10x earnings. Real free cash flow today is only about A$70M a year (a ~10% yield on owner earnings) because sustaining capex, exploration and tax are heavy. Free cash flow after growth capex is close to zero in FY27, and it is the Great Cobar copper ramp (FY28-30) that could double it to about A$140M. On a price deck 10-15% below today's very strong spot prices (copper is US$14.6k/t), my DCF gives about A$0.48 a share. That is a ~14% base IRR and ~15-20% upside, in line with broker targets of A$0.53-0.55. At spot prices it is worth about A$0.70. In a gold and copper pullback it is worth about A$0.20. This is a cheap, well-run, insider-backed commodity price-taker with a short reserve life (~5 years), not a durable compounder. The stock has already doubled and has fallen 20% from its September high as gold eased. Rating 6.0: attractive if you want copper and gold exposure, but the 50% case rests on commodity prices rather than mispricing. Research 6.0: the 28 Oct quarterly (ball-mill ramp), Great Cobar timing, the new CEO's capital-return framework and takeover optionality (about 3x EBITDA for a strategic mill) are worth tracking, but the main swing factor, metal prices, cannot be researched away.

A deep dive would have to establish: Can the expanded Peak plant run at 1.1-1.2Mtpa and Great Cobar reach 500ktpa on schedule, so that FCF approaches A$140M by FY30 at mid-cycle copper and gold, and will the new CEO return that cash (or will the 24% holder entertain a bid) rather than spend it on reserve replacement?

Owner earnings, TTM
A$70MA$40M – A$115M
Realistic peak profit
A$150MA$90M – A$240M
Growth rate
15.0%0.0% – 28.0%
Years of growth
42 – 6
Market cap
A$723MA$700M – A$785M
EV
A$603MA$560M – A$670M
Net debt
-A$120M-A$150M – -A$85M
Capital return / cap
2.5%1.0% – 5.0%
P/E
9.0×6.5× – 13.0×
EV/EBITDA
3.1×2.5× – 4.2×
FCF yield
10.0%5.0% – 16.0%
Projected FCF, base case (AUD millions)
Y1A$5M-A$25M – A$35M
Y2A$25M-A$30M – A$75M
Y3A$85MA$10M – A$150M
Y4A$140MA$30M – A$220M
Y5A$135MA$20M – A$215M
Competition: A commodity price-taker with no pricing power; its only edges are high-grade Federation and Great Cobar ore and ownership of the strategic Peak mill in the northern Cobar Basin, where neighbours include MAC's CSA copper mine.
Governance: No fraud or governance red flags; watch the July 2026 CEO turnover (new CEO started 6 Oct 2026), past capital destruction (Dargues purchase and closure, dilutive 2023 recapitalisation with Trafigura warrants) and a 23.8% director holding that controls any takeover outcome.
Research (expand)
What the company does

Aurelia Metals (ASX: AMI) runs an integrated hub in the Cobar Basin of western NSW:

  • Peak Operation: the Peak South and New Cobar underground mines, which supply copper-gold and lead-zinc-gold ore, plus the Peak Processing Plant. The plant processed 806kt in FY26 and is being expanded to 1.1-1.2Mtpa: the tailings thickener was commissioned in June 2026, the tertiary ball mill was due in Q1 FY27, and council approval for 1.2Mtpa came in August 2026.
  • Federation: high-grade zinc-lead-gold mine (reserve 8.3% Zn, 4.9% Pb, 1.4g/t Au). It mined 360kt in FY26 and reached commercial production during the year.
  • Great Cobar: consented copper-gold project, in development since July 2025. The feasibility study inventory is 3.6Mt at 3.2% Cu and 0.9g/t Au (77kt Cu, 84koz Au over 8 years). First ore is due in FY28, ramping to 500ktpa from FY30. It is on schedule and on budget, and is funded from cash flow.
  • New Occidental tailings: about 32koz of gold, capex A$3.3M, NPV(8%) A$42M; feasibility study runs through H1 FY27. Dargues is in closure (A$10-12.5M rehab in FY27).

FY26 production was 50.4koz Au, 2.5kt Cu, 28.3kt Zn and 17.8kt Pb. FY27 guidance is 1.05-1.15Mt processed, 50-60koz Au, 2.5-3.5kt Cu, 26-34kt Zn and 17-25kt Pb, weighted to H2. Unit costs are guided down 11-19% to A$300-330/t, a figure that includes royalties and TC/RCs.

Investment case

1. Volume growth already paid for: throughput up ~36% in FY27, and Great Cobar adds ~12-15ktpa of copper by FY30 (vs 2.5kt today).

2. Clean balance sheet: A$143.9M cash at 30 June against A$7.3M of loans and leases. A new A$150M Citi/Credeq/HSBC package. No hedges (the FY26 hedge book cost A$35M), so it is fully exposed to spot.

3. Insider owner buying: director Frank Brazil (Brazil Farming) went from 349M shares (March 2025) to 409M (23.8%) by September 2026.

4. Capital-return pivot: first dividend since 2020 (1c fully franked, A$17.2M, paid 8 October), A$40.5M franking balance, and a new-CEO capital framework pending. No buyback yet.

5. Strategic mill in the northern Cobar Basin at ~3x EBITDA gives takeover optionality (5x would be ~A$0.60+). The 24% holder controls any outcome. No evidence of a process.

Real free cash flow today

FY26: operating cash flow A$142.8M (after A$35.4M of hedge settlements and only A$19.8M of cash tax against A$38.2M expensed). Sustaining capex A$58.8M, growth capex A$49.9M, exploration A$12.9M, SBC A$2.8M (already in P&L). FCF after everything was ~A$21M. Owner earnings (adding back Great Cobar and plant growth capex, counting exploration and Federation decline as maintenance because reserve life is ~5 years) are ~A$70M. Management's FY27 bridge at 26 August spot (gold US$4,660) showed A$120-215M of pre-tax operating cash flow before growth capex. At today's gold (~US$4,180, AUD ~0.70) that is ~A$140M pre-tax. After ~A$40M tax and A$11M Dargues rehab, about A$89M remains; after exploration and Federation decline, owner earnings are ~A$65-75M. FCF after A$60M of growth capex is only ~A$0-20M in FY27.

5-year FCF (after all capex incl. growth; base deck gold A$5,400, Cu A$18,500, Zn A$4,700, Pb A$2,750, ~10-15% below spot)

| FY | Driver | EBITDA | FCF |

|---|---|---|---|

| FY27 | ball mill ramp, Great Cobar capex | ~187 | 5 |

| FY28 | Great Cobar first ore, ~5kt Cu | ~180 | 25 |

| FY29 | ~10kt Cu | ~235 | 85 |

| FY30 | Great Cobar 500ktpa, ~15kt Cu | ~305 | 140 |

| FY31 | steady, Federation aging | ~295 | 135 |

In five years: a ~1.15Mtpa copper-gold-zinc producer making A$130-150M of FCF at mid-cycle prices, with Great Cobar at mid-life (to ~FY35). It depends on Federation reserve replacement (1.8Mt reserve vs 3.2Mt resource) and conversion of the 19.6Mt at 1.8% Cu Peak copper resource. It is a mid-life miner, neither a corpse nor a compounder. Confidence in volumes is moderate to good; confidence in dollars is low, because gold plus copper is more than 70% of revenue.

Fair value and multiples

DCF at 10%: PV of FY27-31 FCF ≈ A$268M. Terminal value of 6x FY31 FCF = A$810M (A$503M PV). EV ≈ A$771M. Add ~A$120M net cash and A$30M of warrant cash, and deduct ~A$30M of closure liabilities: equity ≈ A$891M. On 1,868M fully diluted shares (1,720.5M ordinary + 120M Trafigura warrants at A$0.25 to Aug 2027 + 28M performance rights) that is ≈ A$0.48/share. At spot prices and 7x: ~A$0.70-0.75. Bear case (gold US$3,200, Cu US$10k): ~A$0.18-0.20. Base IRR ≈ 14%; fair value ≈ A$0.50. Today: market cap A$723M basic, EV ~A$600M, ~3.1x FY27E EBITDA, P/E 8.6x trailing and 7.5x on consensus FY27 (5.6c), 10x on Macquarie (4.1c). Owner-earnings yield ~10%, dividend yield 2.4%. No listed options, so covered calls do not apply.

Management, risks, competition

CEO turnover: Bryan Quinn (who led the turnaround) left in July 2026. Steve Badenhorst (ex-Rio Tinto asset management head, ex-Glencore Kidd) started on 6 October 2026. Cummings is back as CFO and Graeme Hunt has chaired since February 2026. The team has delivered on guidance for two years. Earlier history includes value destruction (Dargues purchase, then closure and impairments) and a dilutive 2023 recapitalisation that came with Trafigura warrants. No fraud red flags. Risks: metal prices near records (copper US$14.6k, gold ~US$4.2k; gold already off ~10% since August, and Macquarie downgraded on copper risk); short reserve life and replacement capex (a treadmill); execution on the plant ramp and Great Cobar ventilation and raise-bore; diesel and labour inflation; one concentrate customer taking 56% of revenue; TRIFR ~7.5. Competition: a price-taker with no moat beyond grade and owning the regional mill. Neighbours include MAC's CSA copper mine.

Sentiment 6/10

The stock doubled over 12 months (A$0.21 to a A$0.525 high on 25 Sept) and has since fallen to A$0.42 as gold eased. Shaw and Partners: Buy, A$0.55 (EPS 7.1c/9.1c). Macquarie: downgraded to Neutral on 2 Oct, A$0.53 (EPS 4.1c/3.8c). Ord Minnett: Buy, A$0.50 (April). FNArena consensus target A$0.54. The register is concentrated (top 20 hold 71%). Next catalyst: the September-quarter report on 28 Oct, the new CEO's first call.

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue480+40%480+40%343+11%310-16%369
Gross profit143+67%143+67%85.7+187%29.9-34.2
Operating expenses12.7+5%12.7+5%12.1-17%14.6-7%15.6
▸Adj EBITDA193+76%193+76%110+35%81.2+52%53.6
▸Adj OCF143+15%143+15%124+12%111+337%25.3
CapEx-108-108-116-82.9-46.5
Adj FCF34.8+314%34.8+314%8.42-70%27.7-21.1
Interest expense9.149.1416.915.16.86
▸Adj net income86.9+126%86.9+126%38.40.40-32.9

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA411100%189100%106100%79.4100%36.4100%
FCF (OCF−capex)65.716%34.818%13.713%17.722%-0.59-2%
Net income73.618%82.744%48.946%-5.73-7%-52.2-144%
▸Capital returned34.58%11.86%15.615%2.783%4.2512%
Buybacks-38.00.000.00-15.6-22.4
Dividends0.000.000.000.000.00
Interest paid48.09.1416.915.16.86
Debt paid down24.42.66-1.303.2619.7
▸Reinvestment33982%10757%115108%79.9101%36.8101%
Capex (PP&E)35310811682.946.5
Intangibles & M&A3.90-0.930.000.004.83
Leases signed (net Δ)-18.30.27-1.10-3.02-14.5
Retained / other75.418%33.118%15.014%30.138%-2.81-8%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 4.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)647647548473444
▸Liabilities (total)189189185156135
Net debt (incl. leases)-137-137-102-109-26.3
Net debt / Adj EBITDA-0.71-0.71-0.92-1.34-0.49
Net debt / Adj FCF-3.92-3.92-12.1-3.91--
Adj EBITDA / interest21.121.16.495.377.81
Shares outstanding17201934169316801276
Dilution (YoY)+14.2%+14.2%+0.7%+31.7%-1.6%
Employees57.0--------
MarginsTTM2026202520242023
Gross margin29.8%+4.929.8%+4.924.9%+15.39.7%+18.9-9.3%
Adj EBITDA margin40.2%+8.340.2%+8.232.0%+5.826.2%+11.714.5%
Adj OCF margin29.7%-6.529.7%-6.536.2%+0.535.7%+28.86.9%
Adj FCF margin7.3%+4.87.3%+4.82.5%-6.58.9%+14.7-5.7%
Net income margin17.2%+3.017.2%+3.014.2%+16.1-1.9%+12.3-14.1%
Adj NI margin18.1%+6.918.1%+6.911.2%+11.00.1%+9.0-8.9%
ROIC (adj, after-tax)19.2%19.2%13.5%3.7%-12.2%
Cost of debt--------29.8%

Earnings Calls

3 calls

Earnings Call · 2027 Q1

2026-10-27

Aurelia Metals reported a strong September 2026 quarter, the first of FY27 and the first call for new CEO Steve Badenhorst (ex-Rio Tinto). Higher copper, gold and zinc output drove Cobar Regional operating cash flow after sustaining capital to $65.3 million, the highest quarterly result since 2018. Net cash rose to $160.7 million from $143.9 million, and liquidity including the undrawn revolver exceeded $200 million. A $0.01 fully franked dividend ($17.2 million) was paid on 8 October. Production, cost and capital guidance was reaffirmed. Production: gold 16,200 oz (close to 30% of guidance midpoint), supported by high-grade Peak South ore; copper 1,300 t (43% of midpoint, flattered by a heavier copper-ore mix that will not repeat); zinc 8,300 t (best since FY22); lead 5,200 t, on track. Group operating costs were just under $90 million, helped by more Federation development being capitalized and lower corporate costs. Sustaining capital was $13.2 million and growth capital $11.7 million; sustaining spend should rise in Q2 with fleet investment. Exploration spend rose $4 million. Working capital outflowed $23 million due to higher concentrate receivables, lower trade payables and the annual incentive payment. No diesel supply issues were reported. Operations: Peak ore mined was 148,000 t with development above 1,500 m; drill stocks rose from 25,000 t to over 70,000 t and extra drilling contractors have demobilized. Federation mined 97,000 t after July drilling, loader and labor issues, with rates back to plan in August and September. Water management at Federation and the Hera TSF forced slower dewatering and development of 1,147 m; evaporator fans and a second reverse osmosis plant are reducing dam levels, with normal development expected from Q3 and no change to FY27 metal guidance. The plant processed 226,000 t, near the 230,000 t record, and ROM stocks reached 123,000 t. Projects: the tailings and process water project is complete; the tertiary ball mill and cyclone cluster are installed after a 5-day shutdown, commissioning is under way, and full expanded capacity is expected from Q3 (regulatory approval received). Great Cobar development reached 506 m (2,380 m of about 4 km), the raisebore collar is poured, the rig mobilizes in November, and first ore remains on track for FY28 on budget. Exploration: Peak South results included 1 m at 1,120 g/t gold within 10 m at 113.3 g/t gold and 1.3% copper in the Peak-Kairos gap, suggesting the lenses join. Kairos Eastern Copper extended 100 m north and 80 m down dip, and Perseverance Zone A returned 2.8 m at almost 4% copper within 11 m at 1.4%. A surface parent hole will be wedged. Federation and New Cobar updates are due before Christmas. Badenhorst's priorities are safe predictable operations, productivity and cost reduction, completing growth projects, asset management fundamentals, ore body knowledge, and workforce attraction, including Cobar accommodation. Exploration head Andrew Graham is leaving in the coming weeks.

Analyst Q&A (11)
▸
Is there any change in strategy versus the prior management team, or is the business on an even keel?
Adam Baker · Macquarie
Badenhorst said the business is performing well and he sees no strategy change, just a minor course correction toward more sustainable operating improvement, especially asset management fundamentals. Lower costs could improve access to Cobar Basin resources.
▸
Is the extra water at Federation from a new aquifer or surface storage capacity constraints?
Adam Baker · Macquarie
Angus Wyllie said the increased flows are from underground, and surface infrastructure capacity needed expanding. New evaporators and additional RO plants are letting the site manage the volume and get on top of it.
▸
Will the Peak plant expansion tie-ins (tertiary ball mill, cyclone cluster) cause downtime this quarter?
Adam Baker · Macquarie
Wyllie said a 5-day shutdown was just completed for the tie-ins. The new cyclone cluster is running and the ball mill is loaded with balls and being commissioned this week.
▸
With liquidity over $200 million and a self-funded business, what are the priorities across Great Cobar, New Occidental or further Peak South exploration?
Peter Kormendy · Shaw and Partners
Badenhorst said about $100 million of liquidity is needed for working capital swings. No deviation from planned exploration or plant expansion is expected, and growth projects are locked in. He will work with the Board and expects to be positioned to decide on any direction change around end Q2 to early Q3.
▸
How sustainable is the gold-heavy mix from September quarter, which annualizes well above guidance?
Peter Kormendy · Shaw and Partners
Wyllie said next quarter's plan has lower gold after very high-grade stopes, but the company remains on track for the upper end of guidance. Badenhorst added Federation ore on the ROM has lower gold grade and as plant capacity grows, lead and zinc will top up.
▸
Do the Peak and Kairos exploration results change the mine plan over the next 3 years?
Paul Kaner · Ord Minnett
Andrew Graham said the plan does not change but adds inventory close to development, extending Peak South's life and providing optionality as Great Cobar comes on. Badenhorst added deeper infill drilling from established platforms should improve understanding and expansion at depth.
▸
Was the quarter better than planned, or should metals retrace to guidance midpoints, particularly copper and lead?
Paul Kaner · Ord Minnett
Martin Cummings said the company is happy with performance and comfortable with guidance but will wait another quarter before considering changes. Lead is about 25% and zinc 28-29% of midpoint; copper is high due to more copper ore processed (including gold-only stopes classed as copper ore), with more lead-zinc Federation ore later in the year.
▸
With Andrew Graham leaving, who will take over his role?
Paul Kaner · Ord Minnett
Badenhorst said it is too early to say whether there will be a direct replacement or a reorganization; all options are open and a decision will come in the next few weeks, with the team beneath Graham performing well.
▸
Why are Peak mining costs about $161/t, among the highest on record, how much is due to chasing higher-grade stopes, and what strategies will address it?
Daniel Roden · Jefferies
Cummings cited deliberately carried production drilling operators and equipment across June and September quarters, diesel inflation, and much smaller average stopes needing the same development. Wyllie said stopes average 6,000-7,000 t versus 20,000 t, and the focus is on productivity and efficiency. Larger stopes at Great Cobar should lower unit costs.
▸
Will Peak South stope sizes increase to support a full mill after expansion?
Daniel Roden · Jefferies
Wyllie said no increase in stope size is expected. The focus is on areas around Peak and Kairos near the crusher and hoisting infrastructure, improving productivity and keeping drilled stocks ahead to ensure material availability.
▸
How should we think about capital allocation and shareholder returns beyond projects, given franking credits and a healthy balance sheet?
Daniel Roden · Jefferies
Cummings said Badenhorst's arrival allows a revisit of strategy and the capital management framework outlined in August, including shareholder returns versus exploration and inorganic growth. Discussions are happening but the company is not ready to give detail.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2014 Q21M-16M-17M$-0.01$-0.01 – $-0.012
2015 Q240M-169M-176M$-0.04$-0.05 – $-0.042
2023 Q2308M—0M$0.00$0.00 – $0.000
2024 Q4162M34M4M$0.00$0.00 – $0.001
2025 Q2181M41M12M$0.01$0.01 – $0.011
2025 Q3179M—0M$0.00$0.00 – $0.000
2025 Q4193M26M-6M$0.00$0.00 – $0.001
2026 Q1205M—0M$0.00$0.00 – $0.000
2026 Q2273M101M46M$0.02$0.02 – $0.021
2026 Q4316M162M87M$0.04$0.04 – $0.041
2027 Q2318M149M75M$0.04$0.04 – $0.041
2027 Q4317M129M59M$0.03$0.03 – $0.031
2028 Q2323M129M58M$0.03$0.03 – $0.031
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • A$150 Million Refinancing Package (April 2026): Aurelia secured a A$150 million senior secured financing package with a tier-one international bank syndicate. The package comprises a A$110 million Rehabilitation Bonding Facility (RBF) and a A$40 million Revolving Credit Facility (RCF). Crucially, this replaces existing Trafigura arrangements and releases approximately A$38 million in previously restricted cash, bolstering the company's total proforma liquidity.
  • Upgraded Gold Production Guidance (April 2026): On the back of the March 2026 quarterly results, Aurelia upgraded its FY26 gold production guidance to 45,000–50,000 ounces (up from 35,000–45,000 ounces). Conversely, copper production guidance was adjusted down to 2.5–3.0kt (from 3.0–4.0kt) to prioritize higher-value gold ore. The company's cash balance (excluding restricted cash) reached A$94.7 million for the quarter, driven by A$36.2 million in operating cash flow from the Cobar region.
  • New Occidental Tailings PFS (June 2026): Aurelia announced the completion of a Pre-Feasibility Study (PFS) for the New Occidental Tailings Retreatment Project near its Peak operation. The study declared a maiden Mineral Resource of 2.6Mt at 0.65g/t gold and a maiden Ore Reserve of 2.3Mt at 0.64g/t gold. Boasting a post-tax NPV8 of A$42 million, an IRR of 258%, and a low capital requirement of A$3.3 million, the project aims to produce 32,000 ounces of gold over 10 years starting in FY28 by processing tailings alongside standard campaigns.
  • Cobar Basin Footprint Expansion (June 2026): Aurelia completed an farm-in/earn-in agreement with Legacy Minerals, securing a pathway to earn up to a 90% interest in EL9511 and EL9858 tenements adjacent to its Peak operation. Concurrently, the company was granted two new exploration licences (EL9898 and EL9899) in the Nymagee District, significantly expanding its strategic footprint along prospective structural corridors.
  • Board Directorate Changes (April 2026): Experienced investor Franklyn (Lyn) Brazil rejoined the Board of Directors as a Non-Executive Director to strengthen governance and capital allocation depth during the company's current expansion phase.
▸ Thesis-test Findings
Aurelia Metals Federation mine ramp up progress 2026

The ramp-up at the Federation Mine continues to support the bull case, tracking ahead of the company's FY26 targets. In the March 2026 quarter, ore mined increased to 108kt (up from 76kt in the prior quarter), driven by 1,449 metres of completed mine development. This pushed Federation’s annualized mining rate past 400kt. Mined gold grade also rose to 1.37g/t. As of May 31, 2026, Aurelia had built a robust stock buffer of approximately 75,000 tonnes of combined run-of-mine (ROM) ore stockpiles across Peak and Federation, ensuring immediate feed availability. Underground exploration drilling has also added immediate mining upside, extending high-grade mineralization at Federation West down-dip by approximately 70m and identifying a new polymetallic structure called the Harley Lens.

Peak mill expansion schedule Aurelia Metals

The Peak processing plant expansion remains on schedule, further validating the bull thesis of scaling capacity from 0.8Mtpa to 1.1–1.2Mtpa to handle incoming Federation ore. In early June 2026, Aurelia achieved a major milestone by successfully constructing and commissioning the new 22-metre tailings thickener, which is now operational and expected to enhance metal recoveries while reducing operating costs. Meanwhile, construction of the Tertiary Ball Mill Project remains on track, with commissioning expected in Q1 FY27 (the latter half of calendar year 2026). This timing lines up with the build-up of ROM stockpiles, positioning Peak to process higher volumes immediately upon the mill's final commissioning.

Cobar basin base metal exploration results Nymagee

Exploration updates support a strong growth narrative for the broader Nymagee District. Drilling campaigns at the historic Nymagee Mine confirmed massive up-dip extensions of 100 metres at Nymagee North and up to 250 metres down-dip at Nymagee Main, bolstering confidence in the scale of the district. Additionally, recent drilling programs delivered standout intercepts, including the highest zinc assays (37.9%) and some of the highest copper (13.4%) and silver (254g/t) results recorded at Nymagee since exploration began in 1905. To build upon this geological potential, Aurelia expanded its land footprint in June 2026, adding the Legacy Minerals earn-in tenements and the newly granted Glenwood and Barton licences to secure a dominant position along the highly prospective structural corridor hosting Nymagee.