Ameresco, Inc.v3 5.0/10 · 2026-11-08Ameresco, Inc. operates as a clean technology integrator, offering a broad spectrum of solutions focused on energy efficiency and sustainable energy generation across the United States, Canada, and global markets. The company serves diverse businesses and organizations by implementing strategies for enhanced energy efficiency, critical infrastructure improvements, bolstered energy security and resilience, improved asset longevity, and the deployment of renewable energy systems. Its operations are structured into distinct segments: U.S. Regions, U.S. Federal, Canada, and Non-Solar Distributed Generation. Ameresco specializes in the conceptualization, development, engineering, and installation of projects specifically designed to lower energy consumption and decrease operational and maintenance (O&M) expenses for client facilities. These projects typically involve tailored interventions aimed at optimizing the performance of critical building infrastructure, including heating, ventilation, cooling, and lighting systems. Additionally, Ameresco delivers comprehensive renewable energy services. This encompasses building small-scale power generation facilities, either owned directly by the company or constructed for clients, to produce electricity, gas, heat, or cooling from sustainable sources. They also provide ongoing operations and maintenance for these plants and market the generated renewable electricity, processed gas fuel, or thermal energy. Beyond this, the company distributes photovoltaic (PV) solar products and integrated systems, offers specialized consulting, and provides enterprise-level energy management solutions. Notably, Ameresco also owns and manages a wind power facility situated in Ireland. Its broad client base includes federal, state, and local governmental bodies, healthcare organizations, educational establishments, airports, public housing entities, universities, and a wide spectrum of commercial and industrial clients. By the close of 2021, spec
2-Year Price History
Valuation v3 Opus worker · 2026-11-08
Ameresco is a founder-run energy-infrastructure contractor and asset owner that has landed in the hottest story in the market: behind-the-meter power for data centres. Q2 2026 brought a record $1.8B of awards ($1.2B data-centre), total backlog +32% to $6.73B, five data-centre projects representing over a gigawatt, and management says five more look similar. The stock has still halved from $39.52 (Oct 2025) to $21.61, printing an $18.09 low on 2026-11-05, because underneath the bookings the cash goes the other way: FY25 operating cash flow -$80M on $256M of capex, and Q2 2026 alone burned -$107M of operating cash (-$65M on the company's own adjusted definition). Debt is ~$1.96B against $138M unrestricted cash and a $1.15B market cap, roughly 7x net debt/EBITDA consolidated and 3.2x at the corporate level against a 3.5x covenant with only $42.8M of revolver left; the Q2 'beat and raise' was cosmetic, since GAAP EPS fell to $0.18 from $0.24 and the EPS guide rose only on a mid-year accounting-policy change for transferable tax credits. On my numbers, both a 10% DCF and a sum-of-parts (energy assets at ~11x EBITDA less $1.55B project debt, plus projects/O&M at 9-11x owner earnings less corporate debt) land at roughly $21/share, i.e. the price: EV/unlevered owner earnings ~16x, EV/EBITDA ~11x, a 6% unlevered yield and no cash coming out the end. Rating 5.0 - a levered, cash-hungry, terminal-value-heavy compounder at fair value is not how we want to own the data-centre theme, and it is not shortable either (EBITDA-profitable essential infrastructure, ~14% of the Class A float already short at ~10 days to cover, insiders bought ~$1.9M at ~$22, and Q3 prints after the close on 2026-11-09). Research 6.5, because the question is resolvable and the prize is large: HASI paid $400M for 30% of the biofuels unit at an implied $1.8B EV, marking roughly $0.7-0.8B of value in one of four businesses against a $1.15B market cap, so if that mark is clean common value and the $4.4B awarded backlog converts, the sum of parts is $32-40 and this is a double; the reason it is not a 9 is that the answer requires a 2028-2030 ramp funded by a balance sheet with no slack.
A deep dive would have to establish: Separate the recourse corporate entity from the non-recourse asset vehicles to establish corporate-only free cash flow and funding need through 2028 (is an equity raise required?), and pressure-test whether HASI's $1.8B biofuels mark is clean common value or a preference-protected structure - if corporate FCF self-funds and the mark holds, the sum of parts is $32-40.
Research (expand)
What the company does
Ameresco (founded 2000 by George Sakellaris, who still runs it) is three businesses stapled together:
1. Projects (EPC), ~$1.55B of 2026E revenue. Design-build energy efficiency, resiliency and on-site generation, historically for US federal agencies (ESPC contracts where the savings pay for the work), states, municipalities, universities, schools and hospitals, plus Canada and now Continental Europe (Enerqos in Italy, a SUNEL JV in Greece/Romania; a 560 MW Greek solar project energised in Q2). Gross margin mid-to-high teens. This is the segment the data-centre awards flow through: management confirmed on the Q2 call that data-centre work is "straight EPC revenue," percent-complete, at "high teens" gross margin - no asset sale, no different balance-sheet treatment.
2. Energy assets, ~$320M of 2026E revenue. 822 MW operating (Ameresco's 70% share of the Neogenyx JV included) plus 513 MW in development/construction: solar, renewable natural gas, battery storage, fuel cells. ~55% adjusted-EBITDA margin ($116.8M in FY25). Financed with $1,547M of project debt plus tax equity and ITC sales.
3. O&M, ~$130M of revenue, +29% in Q2. Long-term service on its own and third-party assets (now 2.5 GW of third-party solar and storage), $1.5B+ of O&M backlog. The best business in the company: recurring, high margin, no capital.
In May 2026 the biofuels/RNG business was carved into Neogenyx Fuels: HASI invested $400M for 30% ($300M into the JV, $100M cash to Ameresco), implying an $1.8B enterprise value for the segment. Ameresco keeps 70% and control; 30% of that EBITDA now goes to NCI, which is why FY26 adjusted-EBITDA guidance was cut from ~$283M to $250-270M with revenue unchanged.
The investment case (and the counter-case)
Bull. Hyperscalers and neoclouds cannot wait 4-7 years for utility interconnection, so they are buying their own power. Ameresco has spent two decades building exactly this - microgrids, reciprocating engines, gas turbines, fuel cells, batteries - on federal bases, where community and zoning risk is lowest. It added three data-centre projects in Q2 (Texas and Arizona joining the existing footprint), bringing it to five plus the CyrusOne/NAS Lemoore project (up to 350 MW) in the asset portfolio; Sakellaris said the $1.2B booked "will probably increase... I wouldn't be surprised that we will get up to $2 billion," and that there are at least five more, plus five federal enhanced-use-lease sites including Pearl Harbor. Awarded backlog is up 65% to $4.4B. Each project drags a multi-year O&M stream behind it. Consensus 2027 EPS is $1.74, so the stock is on 12.4x next year against a $41.89 average target (Canaccord $62, Cantor $36 Overweight, Baird cut to Neutral $32, UBS $32 Neutral). Insiders bought ~$1.9M in late August at ~$22, Sakellaris adding 8,000 shares himself. ~5.0M shares short (~14% of the 35.1M Class A float, 9.7 days to cover) with 76-95% ATM implied vol.
Bear. The bookings are awards, not contracts. Management's own cadence: 6-24 months award-to-contract, then 12 months-to-3 years to build, so "most likely we will not see a big impact coming from the data centers till '28 and beyond. Between '28 to '30." Meanwhile the company consumes cash. FY25: CFO -$80M, capex -$256M, $326M invested in new energy assets plus $29M of major maintenance. Q2 2026: CFO -$107.2M; adjusted CFO -$65.3M even after adding back $20.4M of ITC sales and $21.5M of federal ESPC proceeds; the 8-quarter rolling average adjusted CFO has fallen from $54.3M to $29.6M. Total debt and financing leases $1,958.8M ($164.3M current + $1,794.5M long-term) against $138.3M unrestricted and $87.1M restricted cash. Corporate leverage 3.2x vs a 3.5x covenant and $42.8M of revolver availability at 30 June - the forensic scan flagged exactly this. Growth you must fund plus a covenant you must respect plus a revolver you have already used is how an equity gets diluted. Add: the Q2 EPS raise came from switching the accounting policy for transferable tax credits with prior periods to be recast (a quality-of-earnings flag, not operating progress); a disclosed SCE battery-storage dispute where liquidated damages of up to $89M are "at least reasonably possible"; and OBBBA ending solar/wind ITCs for assets placed in service after 2027 unless construction began by July 2026, which shrinks the cash subsidy that funds the build.
Second-order: the backlog number is not the profit number. $1.2B of data-centre EPC at high-teens gross margin is ~$200-220M of gross profit over three-plus years - real, but perhaps $100M of present value against a $1.15B market cap. The story is bigger than the arithmetic unless the pipeline compounds.
What it earns today (real, unlevered owner earnings)
FY2026 guidance (reaffirmed at Q2): revenue $2.0-2.2B, adjusted EBITDA $250-270M (already net of HASI's 30% of biofuels), non-GAAP EPS $1.15-1.35. H1 actuals: revenue $917M, adjusted EBITDA $103.3M - so H2 must deliver ~$150-165M, ~10% above H2 2025. No slack.
From $260M of adjusted EBITDA: less $16M of stock comp (a real cost, added back in "adjusted"); less ~$10M of cash taxes (small, given the depreciation and ITC shield); less ~$55M of maintenance capex (energy-asset major maintenance was $29M in FY25, plus PP&E, capitalised software and an honest allowance for battery augmentation and RNG well/compressor replacement) = ~$180M of unlevered owner earnings.
So 69% of EBITDA reaches owners before interest - decent conversion for an asset owner, and far better than reported FCF suggests, because the gap is new-build growth capex, not maintenance. But then:
- Net debt ~ $1,958.8M debt less $138.3M unrestricted less ~$40M usable restricted = ~$1,780M.
- EV ~ $1,147M market cap (53.07M shares: 35.07M Class A + 18.0M Class B at $21.61) + $1,780M = ~$2,930M, with HASI's ~$400M NCI stake ranking above the common on top of that.
- EV / unlevered owner earnings ~16.3x (6.1% unlevered yield). EV/EBITDA ~11.3x.
- After-tax interest of ~$100-110M leaves ~$75M to equity, a 6.5% yield on the market cap - and that $75M never arrives as cash, because it is consumed in the build and in working capital (Q2: "significant work performed ahead of contractual billing milestones"). Reported free cash flow is about -$400M a year.
That is the whole story: an 11x EV/EBITDA energy-infrastructure business with a 6% unlevered yield, 7x consolidated leverage, and no cash coming out the end.
Projected free cash flow (unlevered, after stock comp and all reinvestment)
Assumptions: revenue +9-11% a year; EBITDA growing a touch faster on O&M and asset mix; the energy-asset build moderating after 2028 (solar ITCs gone, Neogenyx growth funded by HASI's $300M for several years); data-centre EPC revenue ramping in 2029-2031.
| $M | 2027 | 2028 | 2029 | 2030 | 2031 |
|---|---|---|---|---|---|
| Adjusted EBITDA (post-NCI) | 285 | 320 | 375 | 430 | 480 |
| Unlevered owner earnings | 195 | 225 | 270 | 315 | 355 |
| Growth capex net of ITC/tax equity, and working capital | (255) | (205) | (150) | (105) | (75) |
| Unlevered FCF | (60) | 20 | 120 | 210 | 280 |
The company in five years. If the data centres land, 2031 Ameresco is a ~$3.5-4B revenue energy-infrastructure group: ~1.5 GW of contracted owned assets, $2.5B+ of O&M backlog, and an EPC book where on-site power for hyperscalers rivals the federal franchise. Growing ~10%, capital-intensive, structurally levered - not a 20-30x FCF business. I use 13-16x year-5 unlevered FCF (~8-9x EBITDA), in line with listed renewable asset owners and levered infrastructure contractors. Confidence: low-to-moderate. The 2027-28 flows are nearly knowable; 2030-31 depends on whether the AI build-out holds through a cycle and on Ameresco never having to issue equity. Almost all of the DCF value is terminal.
DCF at 10%. PV of 2027-31 flows ~$370M. Terminal $280M x ~14.5x = $4.06B, discounted five years = ~$2.52B. EV ~$2.89B less $1,780M net debt = ~$1.11B of equity, ~$21/share. Flexing the exit multiple 13x-16x and the delivery of the ramp gives roughly $11 to $33, mid $21.
Sum-of-parts cross-check (same answer). Energy assets: ~$145M of Ameresco-share EBITDA going to ~$200M as the 513 MW energises; at 11x = $2.2B less $1,547M project debt = ~$650M. Projects + O&M + corporate: ~$80M of unlevered owner earnings at 9-11x = $750-880M less ~$250M net corporate debt = $500-630M. Total $1.15-1.28B, ~$22-24/share. The HASI mark argues higher: $1.8B EV for biofuels less perhaps $600M of segment debt, 70% to Ameresco = ~$0.8B, nearly three-quarters of the market cap from one of four businesses - but a structured strategic investment with likely preferences is not a clean common-equity mark. The bull arithmetic: if the data-centre ramp takes projects+O&M owner earnings to $180-200M by 2030, that piece alone is worth $1.6-2.0B and the stock is $32-40.
Fair value $21 (range $13-30), essentially the price. I do not mark it above the DCF for a buyout, because the dual-class structure makes an unsolicited bid impossible.
Management, competition, risks
Management. Sakellaris founded the business, holds ~1.01M Class A shares directly and 39.5% economically, and has been buying in the open market at ~$22 - the most encouraging datapoint here. Neogenyx was good capital allocation: he sold 30% of his most richly valued segment at ~20x EBITDA to a partner that then funds its growth, and kept control. He is in his late seventies; promoting Nicole Bulgarino and Lou Maltezos to Co-Presidents and Peter Grisakas to COO reads as orderly succession. Against that: Class B supervoting shares give him ~80%+ of votes on ~40% of the economics, there is no dividend, the buyback has $5.7M left (i.e. none), and the mid-year tax-credit accounting change that lifted EPS guidance while GAAP EPS fell is the kind of thing that erodes trust. He has never shrunk the balance sheet; twelve years of history say the cash goes back into the ground.
Competition. Efficiency/ESCO work against Johnson Controls, Honeywell, Schneider, Trane and Carrier/NORESCO; on-site power EPC against Bechtel, Burns & McDonnell, Primoris, MYR and the turbine OEMs' packagers. The edge is decades of federal relationships, an integrated develop-own-operate model and speed - not proprietary technology - and in a boom the competition arrives.
Risks, ranked. (1) Financing: $42.8M of revolver, 3.2x vs a 3.5x covenant, ~$400M of annual cash consumption - an equity raise near $20 is a live possibility and the worst outcome for holders. (2) Timing: no material data-centre revenue before 2028, and the AI capex cycle may be tested first (the market is already discounting that). (3) Policy: OBBBA ends the solar/wind ITC for assets placed in service after 2027. (4) Execution/legal: the SCE dispute (up to $89M) and liquidated damages on gigawatt-scale projects whose equipment has not yet been ordered. (5) Earnings quality: non-GAAP EPS leaning on negative tax rates and a freshly changed accounting policy.
How investors feel: 4 / 10
Disliked, but not capitulated - and that distinction is why I am not buying. The stock is down ~50% from October 2025, printed a 52-week low of $18.09 on 2026-11-05, sits 4% off the bottom of its one-year range, and the cash-flow bears have the microphone ("lit $28 of cash for every $100 of revenue"). Shorts are ~14% of the Class A float. Big holders have churned: Millennium in at 5.2% in July 2026 and out by October, First Trust 5.4% to 0.8%, GMO 9.2% to 6.7%, Wellington 13.6% to 10.2%, Vanguard reported to zero in March 2026 - real distribution over twelve months. But the sell side has not given up: average target $41.89 (roughly double the price), six buys, one strong buy, five holds, two sells, Canaccord at $62. That is not blood on the ground in the Edenred sense; it is a story stock mid-derating with the believers still holding their targets. Capitulation would look like targets in the twenties, a dilutive raise already done, and the data-centre narrative stripped out of the price. At $12-14, with the financing question answered, this is interesting. At $21.61, 24 hours before a print that has to show ~10% H2 EBITDA growth and a cash-conversion turn, it is a coin flip on fair value.
*Price note: $21.61 is the close on Friday 2026-11-06 (+12.85% that day). The context pack's price series ends at 19.15 on 2026-11-05, so the pack's history is one session stale; the pack header quote matches the latest close. Q3 2026 results are released after the close on Monday 2026-11-09.*
- /Users/gregwo/stocks2/data/analysisv3/context/AMRC.md (context pack: Q2 2026 full transcript, 8-K summaries, forensic findings, 13D/G history, short interest, options)
- https://www.businesswire.com/news/home/20260803954891/en/Ameresco-Reports-Second-Quarter-2026-Financial-Results
- https://www.sec.gov/Archives/edgar/data/0001488139/000162828026052190/amrc-20260630.htm
- https://www.sec.gov/Archives/edgar/data/1488139/000162828026013574/amrc_20251231x10-k.htm
- https://ir.ameresco.com/news-events/press-releases/detail/740/ameresco-reports-fourth-quarter-and-full-year-2025
- https://ir.ameresco.com/news-events/press-releases/detail/755/ameresco-reports-first-quarter-2026-financial-results
- https://www.fool.com/earnings/call-transcripts/2026/08/10/ameresco-amrc-q2-2026-earnings-call-transcript/
- https://finance.yahoo.com/energy/articles/ameresco-amrc-data-center-boom-093716882.html
- https://stockstory.org/us/stocks/nyse/amrc/news/buy-or-sell/3-reasons-amrc-is-risky-and-1-stock-to-buy-instead
- https://www.marketbeat.com/instant-alerts/price-ameresco-nyse-amrc-hits-new-12-month-low-should-you-sell-2026-11-05/
- https://www.marketbeat.com/instant-alerts/consensus-ameresco-inc-nyse-amrc-stock-has-average-price-target-of-4189-2026-10-22/
- https://stockstory.org/us/stocks/nyse/amrc/news/earnings/earnings-to-watch-ameresco-amrc-reports-q3-results-tomorrow
- https://www.fool.com/coverage/filings/2026/08/29/ameresco-ceo-sakellaris-buys-5-000-shares-for-usd113-300-is-this-a-sign-renewable-energy-projects-are-taking-off/
- https://www.insidermonkey.com/blog/ameresco-insiders-bought-about-1-9-million-after-the-stock-fell-are-they-signaling-an-ai-power-rebound-1826618/
- https://stockanalysis.com/stocks/amrc/forecast/
- https://www.arnoldporter.com/en/perspectives/advisories/2025/07/from-ira-to-obbba-a-new-era-for-clean-energy-tax-credits
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 2078+10% | 1932+9% | 1770+29% | 1375-25% | 1824 |
| Gross profit | 351+27% | 304+19% | 256+4% | 246-15% | 291 |
| Operating expenses | 189+26% | 175+19% | 147-10% | 164+4% | 158 |
| ▸Adj EBITDA | 275+20% | 233+18% | 198+34% | 148-21% | 187 |
| ▸Adj OCF | 164+45% | 124+28% | 96.8-14% | 113-30% | 161 |
| CapEx | -510 | -252 | -438 | -552 | -328 |
| Adj FCF | -346 | -127 | -341 | -439 | -167 |
| ▸Interest expense | 102 | 87.9 | 70.8 | 42.9 | 30.6 |
| ▸Adj net income | 45.5-24% | 39.9-34% | 60.8-4% | 63.5-31% | 91.6 |
| ▸Owner's earnings | 30.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 966100% | 197100% | 237100% | 194100% | 147100% | 191100% |
| FCF (OCF−capex) | -2440-253% | -499-253% | -332-140% | -321-165% | -622-423% | -666-349% |
| Net income | 28229% | 23.312% | 44.319% | 56.829% | 62.542% | 94.950% |
| ▸Capital returned | -1207-125% | -151-77% | -139-59% | -54.5-28% | -449-305% | -414-217% |
| Buybacks | -7.28 | -1.99 | -2.48 | 0.00 | -2.81 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 310 | 77.5 | 87.9 | 70.8 | 42.9 | 30.6 |
| Debt paid down | -1510 | -226 | -224 | -125 | -489 | -445 |
| ▸Reinvestment | 2005208% | 461234% | 245103% | 383197% | 595404% | 321168% |
| Capex (PP&E) | 2024 | 454 | 252 | 438 | 552 | 328 |
| Intangibles & M&A | -29.0 | 0.00 | -0.30 | -55.6 | 26.9 | 0.00 |
| Leases signed (net Δ) | 10.4 | 7.12 | -6.12 | 0.26 | 16.2 | -7.04 |
| Retained / other | -894-93% | -271-137% | -105-44% | -140-72% | -157-107% | -222-116% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 61 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 5254 | 4537 | 4159 | 3714 | 2877 |
| ▸Liabilities (total) | 3604 | 3413 | 3111 | 2741 | 1957 |
| Net debt (incl. leases) | 1941 | 1874 | 1595 | 2009 | 1306 |
| Net debt / Adj EBITDA | 7.06 | 8.05 | 8.06 | 13.6 | 6.97 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 2.69 | 2.65 | 2.80 | 3.45 | 6.11 |
| Shares outstanding | 53.1 | 18.0 | 18.0 | 34.3 | 18.0 |
| Dilution (YoY) | +0.7% | +0.0% | -47.5% | +90.4% | +0.6% |
| Employees | 1500 | 1601 | 1509 | 1500 | 1363 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 16.9%+2.2 | 15.7%+1.3 | 14.5%-3.5 | 17.9%+2.0 | 15.9% |
| Adj EBITDA margin | 13.2%+1.0 | 12.1%+0.9 | 11.2%+0.4 | 10.8%+0.5 | 10.3% |
| Adj OCF margin | 7.9%+1.9 | 6.4%+1.0 | 5.5%-2.8 | 8.2%-0.6 | 8.8% |
| Adj FCF margin | -16.6%-8.0 | -6.6%+12.7 | -19.3%+12.6 | -31.9%-22.8 | -9.1% |
| Net income margin | 2.0%-1.3 | 2.3%-0.9 | 3.2%-1.3 | 4.5%-0.7 | 5.2% |
| Adj NI margin | 2.2%-1.0 | 2.1%-1.4 | 3.4%-1.2 | 4.6%-0.4 | 5.0% |
| ROIC (adj, after-tax) | 4.9% | 4.3% | 4.0% | 2.8% | 5.5% |
| Cost of debt | 5.1% | 4.7% | 4.2% | 2.8% | 3.2% |
Revenue Breakdown
Revenue Segments
| Project Revenue | $290.5M | +16% |
| Energy Assets Revenue | $60.7M | +7% |
| Operations And Maintenance Revenue | $30.2M | +22% |
| Other Revenue | $20.0M | +1% |
| UNITED STATES | $240.4M | +3% |
| Europe | $127.4M | +32% |
| CANADA | $33.7M | +43% |
Earnings Calls
Earnings Call · 2026 Q2
Ameresco characterized the second quarter of 2026 as a transformational period, combining record commercial wins, improving operating performance, expanded capital access, and a sharper strategic identity. The company recorded $1.8 billion of new awards, consisting of $1.2 billion from data-center opportunities and $600 million from other core markets. Awarded project backlog increased 65% to a record $4.4 billion, while total project backlog rose 32% to $6.7 billion. Management stressed that backlog conversion remains dependent on commercial, permitting, procurement, financing, and execution milestones, but expects the existing backlog to convert over approximately three to four years. Data-center power infrastructure was the central growth theme. Ameresco added three projects during the quarter, bringing its awarded data-center project count to five, in addition to the Lemoore data-center project held in its energy-assets portfolio. The projects collectively represent more than one gigawatt of generation capacity and span Texas, Arizona, and other active markets. Solutions may combine reciprocating engines, gas turbines, fuel cells, battery storage, and microgrids to deliver reliable, on-site power. The company is working with a broad ecosystem that includes data-center operators, hyperscalers, neoclouds, commercial real-estate developers, landowners, and federal-government customers. Management said Ameresco’s decades of experience developing and operating resilient power infrastructure, particularly for federal customers, provides a competitive advantage. The current $1.2 billion of data-center awards represents only part of the potential opportunity. Management indicated that the awards could ultimately expand toward $2 billion, while at least five additional opportunities are being actively evaluated. Ameresco is maintaining a selective approach, focusing on experienced partners, strong local relationships, customer readiness, and sites with manageable permitting and community risks. Awards are expected to convert into contracts in roughly six to 24 months. Construction may then take one to three years, depending on the complexity and number of phases. The company expects only a limited contribution in 2027, with the most meaningful data-center revenue impact likely occurring from 2028 through 2030. Projects are expected to generate standard EPC revenue recognized on a percentage-of-completion basis, rather than gain-on-sale proceeds or a different balance-sheet treatment. Battery systems are generally expected to have approximately two-hour durations and support both resilience and load shifting. Future O&M revenue is another important benefit. Financial results were strong. Revenue rose 9% to $515 million, including 6% growth in project revenue to $381 million. Energy-asset revenue increased 21% to $76 million after 32 additional megawatts entered operation. The operating energy-asset base reached 822 megawatts, with another 513 megawatts in development or construction, reflecting Ameresco’s 70% ownership in the Neogenyx joint venture with HASI. O&M revenue grew 29%, and the company now services more than 2.5 gigawatts of third-party solar and storage assets. Long-term O&M backlog exceeded $1.5 billion. Gross margin improved to 17.7%, adjusted EBITDA rose 12% to $62.8 million, and non-GAAP EPS was $0.20. Unrestricted cash ended at $138 million, corporate debt at $385 million, and corporate leverage at 3.2x, below the 3.5x covenant. Ameresco secured $471 million of new financing commitments, including $400 million associated with Neogenyx. Management acknowledged that project timing and work performed ahead of billing milestones absorbed cash in working capital, making cash conversion a key second-half priority. The company reaffirmed full-year guidance across all metrics and increased non-GAAP EPS guidance to $1.15–$1.35, based on an expected 25%–40% tax benefit rate and a planned accounting-policy change for transferable tax credits. Second-half activity is expected to follow normal seasonality, with greater weighting toward the fourth quarter.
▸How are the new data-center project delivery obligations structured for risk sharing, including Ameresco’s exposure to liquidated damages from supply-chain, interconnection, or permitting delays?George Gianarikas · Canaccord Genuity
▸What is the latest update on the Neogenyx joint venture and its project pipeline?George Gianarikas · Canaccord Genuity
▸How should investors think about converting the large data-center awards into revenue, and is the timing different from Ameresco’s historical backlog conversion?Stephen Gengaro · Stifel
▸Is it reasonable to assume the new data-center projects have margins similar to Ameresco’s legacy activity?Stephen Gengaro · Stifel
▸How large is the broader data-center pipeline relative to the $1.2 billion already awarded, and where are those opportunities in their development lifecycle?Eric Stine · Craig-Hallum
▸Could Ameresco use a Neogenyx-like structure to finance and accelerate its ability to execute the sizable data-center opportunity?Eric Stine · Craig-Hallum
▸How did Ameresco win the data-center awards, who are the customers or counterparties, and how could these relationships generate future opportunities?Noah Kaye · Oppenheimer & Co.
▸Do the data-center projects include hyperscaler and neocloud customers?Noah Kaye · Oppenheimer & Co.
▸Where does Ameresco stand on securing long-lead equipment, including reciprocating engines and other major components?Noah Kaye · Oppenheimer & Co.
▸What revenue cadence should investors expect from a project that comes online in 2028, 2029, or 2030?Ryan Pfingst · B. Riley Securities
▸Where does the CyrusOne/Lemoore project sit in awarded versus contracted backlog, and how is it progressing at Naval Air Station Lemoore?Ryan Pfingst · B. Riley Securities
▸How should investors view the six-project pipeline from a monetization perspective, and will it be recognized as gain-on-sale revenue or partly capitalized on Ameresco’s balance sheet?Joseph Osha · Guggenheim Partners
▸Are the battery deployments primarily short-duration power-quality systems or longer-duration resilience projects?Joseph Osha · Guggenheim Partners
▸What is the typical duration of the battery-storage systems Ameresco is seeing?Joseph Osha · Guggenheim Partners
▸Are the additional data-center opportunities roughly the same size as the awarded projects, or are project sizes increasing over time?Craig Shere · Tuohy Brothers
▸When should the awarded projects become firm contracts and be completed, particularly for large multi-phase projects?Craig Shere · Tuohy Brothers
▸Once the projects reach construction in 2028 and beyond, should revenue and margin be expected to be evenly distributed across the project years?Craig Shere · Tuohy Brothers
▸Are the three new wins affiliated with the two previously booked projects, and what types of customers are involved—hyperscalers, colocation operators, or other users?Swetha Rakhecha · Cantor Fitzgerald
▸How is Ameresco assessing and mitigating risks from data-center delays, local bans, zoning restrictions, and other permitting or community issues?Swetha Rakhecha · Cantor Fitzgerald
▸Given the robust pipeline, what would need to happen for Ameresco to raise its 2026 guidance?Swetha Rakhecha · Cantor Fitzgerald
SEC Filing Findings
SEC Filing — material findings
2026-08-04 · depth 9/10risk 6Litigation / Customer Dispute▸SCE battery-storage contract dispute: final payments and liquidated damages remain disputed; company says loss of up to $89M is at least reasonably possible and force majeure costs may not be recovered.
SCE battery-storage contract dispute: final payments and liquidated damages remain disputed; company says loss of up to $89M is at least reasonably possible and force majeure costs may not be recovered.
risk 6Covenants / Liquidity▸Corporate credit agreement imposes a total funded debt to EBITDA maximum; the revolver had only $42.8M available at June 30, 2026, leaving limited headroom.
Corporate credit agreement imposes a total funded debt to EBITDA maximum; the revolver had only $42.8M available at June 30, 2026, leaving limited headroom.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $12.50 | $8.00/$9.80 | 0 | --/$0.50 | 0 |
| $15.00 | $6.50/$7.40 | 0 | $0.05/$0.60 | 14 |
| $17.50 | $4.50/$5.50 | 0 | $0.55/$1.15 | 0 |
| $20.00 | $3.00/$3.90 | 0 | $1.35/$1.95 | 0 |
| $22.50 | $1.80/$2.80 | 0 | $2.55/$3.40 | 0 |
| $25.00 | $1.00/$2.20 | 34 | $4.30/$5.20 | 0 |
| $30.00 | $0.25/$1.10 | 19 | $8.50/$9.40 | 10 |
| $35.00 | $0.05/$0.50 | 0 | $12.90/$14.10 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| WELLINGTON MANAGEMENT GROUP LLP | $93.1M | $36.24 | −$4.6M | +$44.7M | — | $578.54B |
| BlackRock, Inc.Passive | $73.2M | $37.06 | +$5.4M | +$5.9M | — | $6.70T |
| Grantham, Mayo, Van Otterloo & Co. LLC | $56.1M | $56.24 | −$5.5M | −$50.1M | — | $44.35B |
| DIMENSIONAL FUND ADVISORS LPPassive | $44.2M | $27.32 | +$4.5M | +$10.2M | — | $551.30B |
| STATE STREET CORPPassive | $44.2M | $29.63 | +$7.5M | +$3.6M | — | $3.38T |
| MILLENNIUM MANAGEMENT LLC | $41.0M | $32.79 | +$34.1M | +$41.0M | — | $142.62B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $39.5M | $25.61 | +$2.0M | +$39.5M | — | $4.68T |
| D. E. Shaw & Co., Inc. | $34.7M | $20.81 | −$378K | +$9.9M | — | $153.37B |
| DnB Asset Management AS | $28.3M | $19.87 | +$3.4M | −$4.5M | — | $35.69B |
| ROYCE & ASSOCIATES LP | $27.5M | $27.80 | −$6.9M | +$18.6M | — | $12.37B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2010 Q3 | 158M | 18M | 9M | $0.18 | $0.14 – $0.22 | 11 |
| 2010 Q4 | 158M | 12M | 7M | $0.13 | $0.10 – $0.16 | 7 |
| 2011 Q1 | 122M | 9M | 4M | $0.08 | $0.06 – $0.10 | 14 |
| 2011 Q2 | 166M | 15M | 9M | $0.19 | $0.15 – $0.23 | 14 |
| 2011 Q3 | 219M | 20M | 12M | $0.25 | $0.20 – $0.30 | 18 |
| 2011 Q4 | 199M | 15M | 9M | $0.20 | $0.16 – $0.24 | 8 |
| 2012 Q1 | 440M | 9M | 2M | $0.14 | $0.11 – $0.16 | 9 |
| 2012 Q2 | 134M | 11M | 4M | $0.07 | $0.06 – $0.08 | 12 |
| 2012 Q3 | 240M | 17M | 9M | $0.29 | $0.23 – $0.35 | 9 |
| 2013 Q1 | 83M | -0M | -6M | $0.09 | $0.07 – $0.11 | 17 |
| 2013 Q2 | 682M | -5M | -10M | $0.05 | $0.04 – $0.06 | 18 |
| 2013 Q3 | 291M | 14M | 6M | $0.23 | $0.19 – $0.28 | 19 |
| 2014 Q1 | 73M | 0M | -5M | $-0.08 | $-0.10 – $-0.06 | 18 |
| 2014 Q2 | 71M | 18M | 10M | $-0.11 | $-0.13 – $-0.09 | 13 |
| 2014 Q3 | 137M | 13M | 6M | $0.10 | $0.08 – $0.12 | 17 |
| 2015 Q1 | 180M | 0M | -6M | $-0.19 | $-0.23 – $-0.15 | 17 |
| 2015 Q2 | 38M | 10M | 4M | $0.02 | $0.01 – $0.02 | 14 |
| 2015 Q3 | 231M | 12M | 5M | $0.13 | $0.10 – $0.16 | 8 |
| 2016 Q1 | 535M | 9M | 2M | $-0.16 | $-0.19 – $-0.13 | 18 |
| 2016 Q2 | 163M | 9M | 2M | $0.04 | $0.03 – $0.05 | 15 |
| 2016 Q3 | 135M | 11M | 4M | $0.06 | $0.05 – $0.07 | 14 |
| 2017 Q1 | 135M | 4M | -2M | $0.03 | $0.02 – $0.03 | 9 |
| 2017 Q2 | 155M | 13M | 5M | $0.06 | $0.04 – $0.07 | 16 |
| 2017 Q3 | 171M | 15M | 7M | $0.12 | $0.10 – $0.14 | 17 |
| 2018 Q1 | 22M | — | 35M | $0.10 | $0.08 – $0.12 | 17 |
| 2018 Q2 | 165M | 16M | 7M | $0.08 | $0.06 – $0.10 | 12 |
| 2018 Q3 | 143M | 16M | 7M | $0.10 | $0.08 – $0.12 | 8 |
| 2019 Q1 | 149M | 22M | 10M | $-0.03 | $-0.03 – $-0.03 | 4 |
| 2019 Q2 | 197M | 19M | 7M | $0.15 | $0.14 – $0.16 | 5 |
| 2019 Q3 | 235M | 25M | 12M | $0.26 | $0.25 – $0.27 | 4 |
| 2019 Q4 | 291M | 37M | 21M | $0.39 | $0.37 – $0.42 | 6 |
| 2020 Q1 | 176M | 16M | 5M | $0.07 | $0.07 – $0.08 | 3 |
| 2020 Q2 | 195M | 15M | 3M | $0.08 | $0.07 – $0.08 | 4 |
| 2020 Q3 | 247M | 28M | 11M | $0.25 | $0.24 – $0.27 | 3 |
| 2020 Q4 | 266M | 30M | 16M | $0.29 | $0.28 – $0.31 | 5 |
| 2021 Q1 | 205M | 22M | 6M | $0.09 | $0.09 – $0.10 | 7 |
| 2021 Q2 | 259M | 27M | 9M | $0.26 | $0.25 – $0.28 | 9 |
| 2021 Q3 | 304M | 34M | 14M | $0.34 | $0.32 – $0.36 | 4 |
| 2021 Q4 | 413M | 47M | 24M | $0.43 | $0.41 – $0.46 | 5 |
| 2022 Q1 | 412M | 35M | 13M | $0.27 | $0.26 – $0.29 | 9 |
| 2022 Q2 | 511M | 46M | 20M | $0.45 | $0.43 – $0.48 | 5 |
| 2022 Q3 | 419M | 44M | 18M | $0.46 | $0.44 – $0.49 | 5 |
| 2022 Q4 | 368M | 56M | 26M | $0.38 | $0.37 – $0.41 | 7 |
| 2023 Q1 | 242M | 41M | 15M | $0.07 | $0.07 – $0.07 | 9 |
| 2023 Q2 | 291M | 53M | 22M | $0.17 | $0.16 – $0.18 | 4 |
| 2023 Q3 | 385M | 55M | 22M | $0.46 | $0.40 – $0.63 | 11 |
| 2023 Q4 | 400M | 71M | 29M | $0.59 | $0.45 – $0.81 | 9 |
| 2024 Q1 | 255M | 54M | 16M | $-0.12 | $-0.25 – $-0.03 | 8 |
| 2024 Q2 | 390M | 50M | 11M | $0.20 | $0.12 – $0.26 | 7 |
| 2024 Q3 | 486M | 79M | 28M | $0.52 | $0.49 – $0.55 | 3 |
| 2024 Q4 | 522M | 100M | 43M | $0.79 | $0.58 – $1.01 | 9 |
| 2025 Q1 | 307M | 30M | -14M | $-0.25 | $-1.06 – $0.61 | 7 |
| 2025 Q2 | 414M | 52M | 4M | $0.08 | $-0.09 – $0.20 | 10 |
| 2025 Q3 | 518M | 67M | 14M | $0.25 | $0.20 – $0.29 | 6 |
| 2025 Q4 | 556M | 75M | 18M | $0.33 | $0.31 – $0.36 | 7 |
| 2026 Q1 | 363M | 39M | -16M | $-0.29 | $-0.32 – $-0.23 | 6 |
| 2026 Q2 | 465M | 70M | 11M | $0.20 | $0.18 – $0.22 | 6 |
| 2026 Q3 | 573M | 91M | 31M | $0.57 | $0.53 – $0.63 | 7 |
| 2026 Q4 | 646M | 117M | 47M | $0.87 | $0.86 – $0.89 | 3 |
| 2027 Q1 | 438M | 54M | -8M | $-0.14 | $-0.29 – $0.01 | 3 |
| 2027 Q2 | 549M | 91M | 19M | $0.36 | $0.35 – $0.37 | 1 |
| 2027 Q3 | 612M | 123M | 41M | $0.76 | $0.74 – $0.78 | 1 |
| 2027 Q4 | 709M | 132M | 43M | $0.81 | $0.78 – $0.82 | 1 |
| 2028 Q1 | 502M | 77M | -3M | $-0.06 | $-0.06 – $-0.06 | 2 |
| 2028 Q2 | 644M | 128M | 34M | $0.63 | $0.62 – $0.65 | 2 |
| 2028 Q3 | 701M | 163M | 57M | $1.06 | $1.04 – $1.09 | 2 |
| 2028 Q4 | 835M | 184M | 68M | $1.27 | $1.24 – $1.30 | 2 |
| 2029 Q1 | 569M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q2 | 670M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q3 | 747M | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q4 | 1.0B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-15 | SELL | Chiplock Mark | officer: EVP, CFO & CAO | 476 | $22.46 | $11K | $63K |
| 2026-09-15 | SELL | Maltezos Louis P | officer: Co-President | 592 | $22.46 | $13K | $755K |
| 2026-08-28 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 3,000 | $22.13 | $66K | $22.43M |
| 2026-08-27 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 4,000 | $22.84 | $91K | $23.08M |
| 2026-08-26 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 1,000 | $21.92 | $22K | $22.06M |
| 2026-08-25 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 5,000 | $21.95 | $110K | $22.07M |
| 2026-08-24 | BUY | Miller Jennifer L | director | 2,000 | $20.96 | $42K | $724K |
| 2026-08-24 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 5,000 | $20.91 | $105K | $20.92M |
| 2026-08-24 | BUY | Sutton Joseph W. | director | 9,700 | $20.87 | $202K | $1.67M |
| 2026-08-21 | BUY | Cox Brian C | director | 4,625 | $21.64 | $100K | $959K |
| 2026-08-11 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 1,000 | $25.90 | $26K | $25.79M |
| 2026-08-10 | BUY | Cox Brian C | director | 39,700 | $25.07 | $995K | $995K |
| 2026-08-10 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 1,000 | $25.27 | $25K | $25.13M |
| 2026-08-07 | BUY | Sakellaris George P | director, 10 percent owner, officer: Chief Executive Officer | 5,000 | $25.95 | $130K | $25.78M |
| 2026-05-29 | SELL | WISNESKI FRANCIS V JR | director | 5,000 | $36.12 | $181K | $911K |
| 2026-05-19 | SELL | WISNESKI FRANCIS V JR | director | 10,000 | $30.29 | $303K | $764K |
| 2026-05-18 | SELL | Miller Jennifer L | director | 10,000 | $32.27 | $323K | $714K |
| 2026-05-15 | SELL | STAVROPOULOS NICKOLAS | director | 1,355 | $34.00 | $46K | $480K |
| 2026-03-12 | SELL | Chiplock Mark | officer: EVP, CFO & CAO | 273 | $25.31 | $7K | $42K |
| 2026-03-12 | SELL | Corrsin David J | director, officer: EVP and General Counsel | 19 | $25.31 | $481 | $11K |
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand
Thesis
Ameresco has a potentially valuable position at the intersection of energy resilience, federal infrastructure, battery storage, RNG, and data-center power demand. The Q2 result strengthened the strategic story: awards rose sharply, data-center exposure expanded, gross margin improved, and management raised non-GAAP EPS guidance. However, the financial profile remains much weaker than the headline backlog suggests. Cash conversion is poor, capex has been persistently heavy, net debt is high relative to EBITDA, interest coverage is thin, and several large data-center projects remain awarded rather than contracted. The largest opportunity is explicitly back-end loaded into 2028-2030, so it should not be fully capitalized today. The base case is gradual improvement, not an immediate transformation into a high-quality compounder.
Trade Signal
Short AMRC: the data-center backlog is real, but the market capitalization is more than twice the study's fair value while leverage, cash burn and execution risk remain unresolved.
The stock declined from roughly $36 in late May to $18.51 on July 29, following the broader reassessment of leverage, project execution, working-capital consumption and the BESS sale-leaseback issue; this was more than simple market drift. It then rebounded to $22.92 after Q2 earnings on record awards, a 65% increase in awarded backlog, improved gross margin and reaffirmed guidance with higher EPS guidance. The initial decline was partly justified, but the earnings-day rebound appears to have overshot the improvement in near-term fundamentals: GAAP earnings fell year over year, free cash flow remains deeply negative and the data-center payoff is mostly 2028-2030. This is a potentially temporary upward dislocation rather than a fully justified durable repricing, though a clean financing/covenant resolution could prolong it.
The sell-side view is highly constructive, with 18 buys, no sells and an average one-year target of $39.54, while the stock has nevertheless fallen sharply from its 2025 highs and recently traded below $20. Short interest has risen steadily to 8.7%, indicating a meaningful skeptical constituency focused on leverage, execution and cash burn. The August earnings rally reflects enthusiasm over record awards and data-center exposure, but the market appears to be valuing future backlog optionality more generously than current cash economics warrant. The consensus narrative is constructive but likely stale or incomplete on balance-sheet risk.
There is a potentially important long-term inflection in data-center power infrastructure, but it is not near-term enough to justify the current valuation on the supplied evidence. Ameresco's Q2 awards and backlog improved materially, yet management expects only limited data-center contribution in 2027 and the main revenue impact in 2028-2030. Current consensus already reflects a growth recovery, while the study's own base case assumes only modest deleveraging and near-breakeven free cash flow. The next genuinely important inflection is evidence of cash conversion and margin improvement, not another award announcement.
- ▼2026-08 to 2026-09 · Sale-leaseback waiver/default resolution update — The supplied materials do not confirm a clean resolution of the BESS-related lien default and waiver risk; an adverse outcome could accelerate debt or constrain financing.
- ▼2026-11 · Q3 2026 earnings and cash-flow update — The key watch items are working-capital absorption, free cash flow, covenant headroom, project margins and whether full-year guidance remains credible after the earnings-day rally.
- ▲H2 2026 to 2027 · Additional data-center project contracts and backlog conversion — Awards must convert into executable contracts, with permitting, financing and procurement milestones determining whether the headline $1.2B data-center opportunity has economic value.
- ▲2027 · CyrusOne/Navy Lemoore project progress — The first phase is expected online in 2027; credible construction progress would support the data-center power-platform thesis, although material revenue impact is later dated.
- ▲H2 2026 to 2027 · Neogenyx Fuels JV deleveraging and operating updates — The $400M HASI commitment and $100M cash receipt help, but further evidence of cash generation and debt reduction is needed to change the leverage risk assessment.
Net flow is modestly negative. There are no reported buybacks or insider purchases, while officers and directors made 22 sales totaling approximately $3.3M over the last year. TTM dilution is only about 1%, so this is not currently a death-spiral situation, but persistent capital needs and possible future equity issuance remain risks. Short interest of 8.7% of float and 9.2 days to cover provide some squeeze fuel, particularly after positive backlog news, but the insider pattern is unfavorable.
There is no hard equity floor at the current price. The business has real assets, backlog and a strategic JV partner, but those supports are offset by approximately 8x net leverage on the broader business, negative free cash flow, interest burden and potential covenant/default complications. Below the current price, asset values and backlog may attract strategic interest, but the equity cushion is thin and could be diluted or impaired if project execution worsens. There is also no obvious hard ceiling, though analyst disappointment and insider selling can create substantial overhead supply.
There is a credible business and a compelling data-center/microgrid narrative, so growth-oriented investors can own it. However, negative free cash flow, high leverage, working-capital demands and uncertain conversion of backlog make it difficult to underwrite as a durable compounder. The next buyer is likely a momentum or infrastructure-growth investor, not a cash-flow-focused fundamental investor.
Fear is stronger than greed at this price. The backlog and data-center opportunity are genuine, but the stock price capitalizes a favorable long-term narrative while the current business remains capital-intensive, cash-flow negative and highly levered. The recent earnings pop increases the asymmetry for a short, although the position must be sized for volatility and squeeze risk.
Valuation
The genuinely new information is the scale and composition of Q2 awards: $1.2B of data-center opportunities within $1.8B of total awards, awarded backlog up 65%, total project backlog at $6.7B, and management's expectation that the data-center opportunity could expand toward $2B. The quarter also showed 17.7% gross margin and a raised 2026 non-GAAP EPS outlook. Offsetting new information was the explicit disclosure that projects remain in awarded backlog, equipment orders have not yet been placed, and substantial revenue is unlikely before 2028. Working-capital usage and the limited answers on liquidated-damages exposure temper the headline.
▸ How the cases moved
Before the Q2 release, I would have weighted bear/base/bull at roughly 0.35/0.50/0.15, with terminal equity values of approximately $150M/$1,250M/$3,500M. The new $1.8B of awards, record $6.7B total backlog, improved gross margin, and raised EPS guidance increase the bull value to $4,200M and its probability to 0.20; the base value rises to $1,350M and probability remains 0.50. Bear probability falls to 0.30, but the bear value remains $200M because management disclosed that awards still require contracting, financing, procurement, permitting, and execution milestones. The probability-weighted discounted value therefore rises from approximately $1,010M to $1,260M before the qualitative target haircut.
Backlog conversion is slower than expected, data-center awards remain uncontracted, and project execution, working-capital absorption, or equipment costs pressure margins. Ameresco remains viable but continues to consume substantial capital, while leverage stays elevated and the sale-leaseback/covenant issues constrain financing flexibility. The business settles near $350M of EBITDA with only modest owner earnings.
▸ Valuation
5x $350M EBITDA = $1,750M EV - $1,550M net debt = $200M equity value
Existing backlog converts gradually, with data-center projects contributing only modestly within two years and the larger revenue benefit deferred to 2028-2030. Gross margins remain in the high teens, the Neogenyx capital helps fund growth and deleveraging, and EBITDA improves without a full recovery in cash conversion. Capital intensity moderates but remains meaningful, producing roughly $70M of sustainable owner earnings.
▸ Valuation
7x $400M EBITDA = $2,800M EV - $1,450M net debt = $1,350M equity value
Ameresco converts the awarded data-center backlog faster than expected, wins additional phases, and establishes itself as a credible behind-the-meter power and microgrid platform for hyperscalers and federal customers. High-teens project margins, growing O&M revenue, Neogenyx funding, and project-level financing allow EBITDA to scale while corporate capital requirements fall. Owner earnings reach approximately $220M as construction intensity normalizes and recurring asset/O&M cash flow grows.
▸ Valuation
9x $600M EBITDA = $5,400M EV - $1,200M net debt = $4,200M equity value
▸ Target Rationale
The probability-weighted discounted scenario value is $1,260M, but I set the analytical target at $1,050M. The haircut reflects the poor cumulative cash conversion, approximately 8x net debt/adjusted EBITDA, thin interest coverage, covenant and sale-leaseback history, and the fact that much of the data-center opportunity is still conditional backlog rather than contracted revenue. The scenario math also gives meaningful credit to future deleveraging and margin improvement; I do not believe that credit should be fully awarded until working capital and capital intensity demonstrate sustained improvement.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results: On May 4, 2026, Ameresco reported its Q1 2026 results. Consolidated revenue reached $401.5 million, up 13.78% year-over-year, which beat consensus estimates of $365.2 million due to $20 million to $30 million of pull-forward revenue. However, the company posted a wider-than-expected Non-GAAP EPS loss of -$0.35 (against a consensus expected loss of approximately -$0.27 to -$0.30). This earnings miss was driven by operational headwinds, higher project-related upfront expenses, and the typical lumpiness of revenue recognition on large-scale infrastructure projects. Despite the bottom-line miss, management reaffirmed its full-year fiscal 2026 guidance.
- Credit Facility Refinancing: Effective March 30, 2026, Ameresco amended its senior secured credit agreement to increase its Term Loan A by $45 million to a total of $140 million. The proceeds of the new loan were primarily used to pay down the outstanding balance of its $225 million revolving credit facility, improving short-term liquidity. The facility matures on December 28, 2028.
- Operational Leadership Restructuring: On April 1, 2026, Ameresco implemented a formalized management structure. The company appointed Nicole Bulgarino and Lou Maltezos as Co-Presidents and named Peter Christakis as Chief Operating Officer. George Sakellaris continues his role as Chief Executive Officer and Chairman. The structure is designed to divide operational focus across data centers, large energy infrastructure, non-federal projects, smart buildings, and international markets.
- Technology Innovation Recognition: On June 15, 2026, Ameresco was recognized by Frost & Sullivan with the 2026 North America Technology Innovation Leadership Award, highlighting the company's industry-leading work in advancing resilient microgrid infrastructure.
▸ Thesis-test Findings
Ameresco Master Sale-leaseback agreement default waiver June 2026
In its May 2026 Form 10-Q filing, Ameresco disclosed that it was in default of certain lien provisions under its August 2018 Master Sale-leaseback agreement. This default originated from a defect discovered in a Battery Energy Storage System (BESS) installed for a customer under a long-term power purchase agreement, which required the asset to be entirely removed. While the financing partner temporarily waived the defaults and refrained from pursuing remedies, the current waiver is only valid until June 30, 2026. As of late June 2026, no further public announcements or SEC filings have confirmed an extension of this waiver. This presents a near-term compliance risk for the bear case, as failure to extend the waiver or resolve the lien defaults by the June 30 deadline could trigger acceleration clauses or restrict future asset sale-leaseback transactions.
CyrusOne Ameresco 350MW project execution progress
The partnership between Ameresco, CyrusOne, and the U.S. Navy to develop a co-located microgrid and AI-optimized data center at Naval Air Station (NAS) Lemoore is proceeding as planned. Although originally announced as a 100 MW project, management confirmed in recent quarters that the facility has the capacity to scale up to 350 MW over time. The deployment will combine solar, battery storage, and fuel cells with local utility grid power, and Ameresco expects to retain an ownership stake in a portion of the energy assets. The first phase of the project is scheduled to come online in 2027. No material delays, disruptions, or budget issues have been reported over the last six months, and the project remains a cornerstone of the bull thesis regarding Ameresco's ability to capture high-growth AI data center power demand.
HASI Neogenix Fuels joint venture closing details
On May 12, 2026, Ameresco successfully closed its previously announced transaction with HA Sustainable Infrastructure Capital (HASI) to spin off its biofuels business into a joint venture named Neogenyx Fuels. Neogenyx Fuels is owned 70% by Ameresco and 30% by HASI. The joint venture carries a post-money enterprise value of $1.8 billion. As part of the closing, HASI committed $400 million to fund future growth, of which $100 million was paid directly to Ameresco at closing. From an accounting perspective, Ameresco will continue to consolidate Neogenyx’s financials on its balance sheet, but 30% of its net income will be classified below-the-line as non-controlling interest. This closing strongly supports the bull case, providing Ameresco with $100 million in immediate cash to pay down its substantial corporate debt burden while maintaining 70% exposure to a fast-expanding renewable natural gas (RNG) pipeline.