Stocks/ANTO.L

ANTO.L

Antofagasta plcv3 3.5/10 · 2026-11-03
Basic Materials·Copper
2,707.00 GBp
$27.3B market cap
1.3% div yield
v3 Rating
3.5/102.5–5.0
Setup
3.0/102.0–4.5
Fair Value
2,450.00 GBp1,650.00 GBp–3,400.00 GBp-9%
DCF (10%)
2,250.00 GBp-17%
Base IRR
+3%-8%–+12%
Visibility
moderate±36%
Wall Street
(2 sell)
Rating
Revenue (TTM)
$9.3B
Owner Earnings
p1.3B
Next-Yr Owner Earnings
p1.0B
Growth
+7.0% × 4y
P / Next-Yr OE
25.8x
Net Debt
p1.5B

Antofagasta plc operates as a mining company. It operates through Los Pelambres, Centinela, Antucoya, Zaldívar, Exploration and Evaluation, and Transport Division segments. The company produces copper cathodes and copper concentrates; molybdenum concentrates; and gold and silver by-products. It also provides rail and road cargo services to mining customers in northern Chile. In addition, the company has exploration projects in various countries. It has operations in the United Kingdom, Switzerland, Spain, Germany, rest of Europe, Chile, rest of Latin America, the United States, Japan, China, Singapore, South Korea, Hong Kong, and rest of Asia. The company was incorporated in 1888 and is headquartered in London, the United Kingdom. Antofagasta plc is a subsidiary of Metalinvest Anstalt.

2-Year Price History

$3138.00+89.0%
$1.5k$2.0k$2.5k$3.0k$3.5k$4.0kInitial target $2450.00 · 2026-11-03volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-03

Rating
3.52.5–5.0
Setup
3.02.0–4.5
Fair value (GBp)
2,450.001,650.00 – 3,400.00
Upside vs 2,707.00
-9%
DCF (10%)
2,250.001,450.00 – 3,300.00-17%
Base IRR
3%-8% – 12%
Visibility
moderaterange ±36%
Sentiment
6/10
2026-11-03 · claude-opus-5-5 · priced at 3,138.00

Antofagasta is the Luksic-controlled, Chile-only copper pure play: Los Pelambres (60%), Centinela (70%), Antucoya (70%), Zaldivar (50% JV), plus a 19% stake in Buenaventura. The business is high quality: a 63% EBITDA margin in H1 2026, net cash costs of about $1.22/lb thanks to gold and moly credits, and a funded brownfield program meant to lift copper output about 30% (from roughly 650kt to roughly 850kt) once the Centinela second concentrator ramps in 2028. The shares closed at 3,138p on 3 Nov 2026, the same figure as the pack and MarketBeat. That is 30% below the February high of 4,455p, after a run of misses. July snowstorms at Pelambres cut 2026 guidance to 625-655kt. Q3 output came in 2% short of consensus, the 2027 guide of 630-690kt sits below the 692kt consensus, gross cash-cost guidance went up on diesel and acid, and Centinela had a 12-day strike that is now settled. Copper itself is still near records, at about $6.2-6.4/lb. The stock is not cheap. You pay about 22x 2026-27 EPS and about 11x attributable EBITDA at near-record copper prices. Only about 43% of group EBITDA becomes owner earnings after the 36% Chilean tax take and $1.8bn of stay-in-business capex, and about a third of what remains belongs to the Japanese minority partners. My 10% DCF (attributable FCF, copper easing from $6.00 in 2027 to $5.50, production to 850kt, 16x year-5 FCF) gives about 2,250p. Flat spot copper at 18x is needed to justify today's price. The base IRR is only about 2-3%. Sentiment is middling, not capitulation: the stock is down 30% but copper bulls are everywhere, and analysts are split (3 Buy / 3 Hold / 2 Sell, average target about 3,840p). Rating 3.5/10: a great asset priced for spot copper forever, a mild avoid or short candidate rather than a buy. Research rating 3/10: the answer depends mostly on the copper price, which more work cannot resolve.

A deep dive would have to establish: Whether 2028-30 copper prices of $6.25+/lb and an on-budget 2027-28 Centinela second-concentrator ramp to about 850kt are realistic enough to justify paying about 22x earnings and about 11x attributable EBITDA at near-record copper.

Owner earnings, TTM
p1.3Bp1.0B – p1.6B
Realistic peak profit
p2.1Bp1.4B – p2.8B
Growth rate
7.0%3.0% – 10.0%
Years of growth
42 – 6
Market cap
p31Bp30B – p32B
EV
p32Bp31B – p34B
Net debt
p1.5Bp1.1B – p2.1B
Capital return / cap
2.2%1.5% – 3.0%
P/E
22.5×18.0× – 27.0×
EV/EBITDA
10.8×9.0× – 12.5×
FCF yield
3.3%1.8% – 5.0%
Projected FCF, base case (GBp millions)
Y1p1.0Bp600M – p1.5B
Y2p1.4Bp800M – p2.1B
Y3p1.6Bp850M – p2.5B
Y4p1.7Bp900M – p2.6B
Y5p1.7Bp900M – p2.6B
Competition: A commodity producer whose edge is first-to-second-quartile by-product-credited costs and long-life Chilean brownfield growth, competing with Codelco, BHP, Freeport, Southern Copper, Anglo/Teck and Glencore for the same price-taking market.
Governance: The Luksic family controls about 65% through Metalinvest, so no takeover premium is likely; there are no fraud or integrity concerns, and minorities receive the same 50% payout.
Research (expand)

What the company does

Antofagasta plc is a London-listed, Chile-operating copper miner controlled about 65% by the Luksic family through Metalinvest. In 2025 it produced 653.7kt of copper, along with gold (about 190koz) and molybdenum (about 13kt) by-products, and it runs a rail and road transport division in northern Chile. The assets:

  • Los Pelambres (60%; the Japanese consortium led by JX/Mitsubishi Materials holds 40%): a large concentrator in central Chile with a desalination plant and a life-extension EIA to 2051.
  • Centinela (70%; Marubeni 30%): cathodes plus a concentrator. A second concentrator (about $4.4bn, about 144ktpa Cu plus gold and moly, about 170kt CuEq in early years) commissions in 2027 and ramps in 2028. The permit allows expansion to 150ktpd.
  • Antucoya (70%) cathodes, and Zaldivar (50% JV with Barrick) cathodes. Zaldivar's permit now runs to 2051, and a $900m water pipeline is due by mid-2028.
  • Options: a 19% stake in Buenaventura (Peru; about $1.4bn at roughly $28/ADS), Twin Metals in Minnesota (the mineral withdrawal has been reversed and lease recovery is under way), Cuprochlor-T sulphide leaching (FID around 2028), and exploration prospects (Cachorro, Encierro).

The investment case and what just happened

The bull case is simple. Antofagasta is a scarce, Tier-1, first-to-second-quartile copper pure play in a stable jurisdiction, with roughly 30% volume growth fully funded and peak capex behind it. Capex falls from $3.7bn in 2025 and $3.4bn in 2026 to about sustaining-plus-tail levels (under $2.5bn) by 2028. That should turn group FCF from roughly break-even after growth capex into $2.5-3.5bn a year, in a market where management cites about 8Mt of demand growth to 2035 against about 4Mt of supply growth. Chile's proposed cut in the corporate tax rate from 27% to 23% is a small help, partly offset by withholding tax.

The last four months have been a run of disappointments:

  • Pelambres storms (July). About 5m m3 of snow had to be cleared. Full-year 2026 guidance was cut to 625-655kt (it was previously about 650-680kt) and higher-grade ore was deferred.
  • Q3 production (15 Oct). Output was 151.9kt, 2% below the 155kt consensus, and gold missed (44koz against 53koz). 2026 cash costs before by-products were raised to $2.60-2.70/lb on diesel; net cash cost was held at $1.15-1.35/lb. The shares fell 6.5%.
  • 2027 guidance of 630-690kt (660kt at the midpoint) came in below the 692kt consensus: Pelambres grades rise but Centinela concentrate grades fall.
  • The Centinela strike. Two unions (709 workers) struck from 7-19 October before settling.
  • Input costs. The 2027 sulphuric acid contracts reset partly toward a much higher spot price, and the company does not hedge inputs.
  • Wording on the second concentrator. At the half-year, the 'on budget and on schedule' sentence for the Centinela project disappeared and extra flotation-area ground work was disclosed. Management insists the schedule (commissioning 2027, ramp-up 2028) and the budget are unchanged.

The stock fell from 4,016p (end-August) to 3,138p, and is down 3.5% today alongside a tech/AI risk-off move that also hit copper.

What it earns today (real owner earnings)

H1 2026: revenue $4.48bn, EBITDA $2.84bn (63% margin), operating profit $1.90bn, PBT $2.00bn, tax $719m (36% effective, including royalties and withholding), and profit after tax about $1.28bn, of which $847m (66%) went to Antofagasta shareholders and about $430m (34%) to minorities. EPS was 85.9c, the realised copper price $6.19/lb, net cash cost $1.22/lb and capex $1.67bn (sustaining $579m, mine development $296m, growth $779m). Group net debt is $3.97bn including about $1bn of leases (0.68x EBITDA). Cash tax of $927m was inflated by the April settlement of 2025 tax.

For 2026 at about $6+/lb copper I estimate group EBITDA of about $6.1bn and D&A of about $1.9bn. Deduct tax on EBIT at 36% (about $1.5bn), stay-in-business capex (sustaining about $1.2bn plus mine development about $0.6bn; stripping and pit development are needed every year just to hold output) and about $0.15bn of lease and JV cash. That leaves group unlevered owner earnings of about $2.6bn, or about $1.74bn (£1.3bn) attributable. Only about 43% of EBITDA reaches owners before minorities, and about 28% reaches Antofagasta shareholders. That conversion is the key reason the optical EV/EBITDA understates what we are paying. After all capex, including growth, 2026 attributable FCF is only about $0.3-0.5bn.

Five-year projection (attributable unlevered FCF, after all capex)

Assumptions:

  • Copper: $6.00/lb in 2027, $5.75 in 2028, $5.50 in 2029-31. Spot is about $6.2-6.4.
  • Production: 660kt in 2027, 740kt in 2028 (Centinela ramp), 820kt in 2029, 850kt in 2030-31.
  • Margins and costs: EBITDA per lb is price less about $1.45 (net cash cost plus corporate and exploration, with acid and diesel inflation offset by the scale of the second concentrator). Tax is 36% of EBIT.
  • Capex: $2.7bn in 2027 (Centinela tail, Pelambres, Encuentro, Zaldivar water), $2.2bn in 2028, then about $2.1bn a year.
  • Minorities: 66% attributable.

| Year | Group EBITDA | Attrib. FCF ($bn) | Attrib. FCF (£m @1.3415) |

|---|---|---|---|

| 2027 | ~6.7 | 1.39 | ~1,036 |

| 2028 | ~7.2 | 1.93 | ~1,439 |

| 2029 | ~7.7 | 2.18 | ~1,625 |

| 2030 | ~7.9 | 2.31 | ~1,722 |

| 2031 | ~7.9 | 2.31 | ~1,722 |

Sensitivity: each $0.25/lb on copper moves attributable FCF by about $0.2bn a year at 850kt, or about 200p per share of DCF value.

In five years Antofagasta will be a larger (about 850kt), lower-capex, long-life copper producer (Pelambres and Zaldivar to 2051, Centinela phase 2 optional) throwing off $2-3bn of attributable FCF at mid-$5 copper. It is clearly a growing income stream, not a corpse. But volume growth stops at around 2029 unless phase 2, Cuprochlor-T or Twin Metals are sanctioned, and every dollar is levered to a cyclical metal price. Category: low-growth, long-duration and cyclical, so about 14-18x FCF; I use 16x for the scarcity premium copper pure plays enjoy. My confidence in volumes is moderate-to-high and in price low.

Fair value and the multiples we are paying

  • Price and size. The price is 3,138p (3 Nov 2026 close), $42.10 at 1.3415. There are 985.86m shares, so market cap is £30.9bn ($41.5bn).
  • Attributable EV. Add attributable net debt excluding leases (about $2.0bn, £1.5bn) to get about £32.4bn. The Buenaventura stake (about £1.0bn) is extra and is added back in the DCF. On a consolidated basis, with market-value minorities, the EV is about $66bn.
  • Multiples. P/E is about 22-23x 2026E (EPS about $1.86) and about 22x 2027E at $6 copper. Attributable EV/EBITDA is about 10.8x 2026 and about 9.9x 2027. Attributable owner-earnings yield is about 4%, falling to about 3.3% after all capex (2027). The dividend yield is about 2.2% (50% payout; interim 30.1c).
  • DCF (10%, attributable). The PV of 2027-31 FCF is $7.5bn. Add the terminal value (16x $2.31bn, discounted, about $23.0bn) to get $30.5bn. Less $2.0bn of net debt plus the $1.4bn Buenaventura stake gives $29.9bn, about $30.3 a share, or about 2,250p (range about 1,450p at $4.75 copper and 13x up to about 3,300p at $6.75 copper and 18x). The base IRR from 3,138p is about 2.5% a year.
  • Fair value is about 2,450p. I sit slightly above the DCF because the market durably pays a scarcity premium for Tier-1 copper and the growth is funded. Even so, the stock looks about 20-25% overvalued against a realistic copper deck. Today's price needs roughly $6.25-6.75/lb copper forever and an 18-20x exit multiple.
  • Chart. The stock sits 30% of the way up its one-year range (2,577-4,455p) but 59% up its three-year range (1,256-4,455p), and is still about 2.5x its late-2023 level. It is not at a valuation floor, so this is not a covered-call setup.

Management, governance and capital allocation

CEO Ivan Arriagada and CFO Mauricio Ortiz have a credible record: five years without a fatality, a competitiveness programme ($248m of savings in 2024), project finance that ring-fences Centinela, and a disciplined policy of a minimum 35% interim payout and about 50% for the full year. Their communication is guarded. The quiet removal of 'on budget and on schedule' and the evasive answers on acid exposure and TC/RCs are worth watching. Luksic control (about 65%) means no takeover premium is plausible, but there is also no history of abuse; minority holders get the same dividend. Leverage is low (0.68x).

Risks

1. The copper price retraces from about $6.3 toward the $4.50-5.00 incentive price. This is the dominant risk, and the AI/data-centre narrative is crowded.

2. The Centinela second concentrator slips or overruns. The H1 language change and the flotation-cell soil work are early warnings.

3. Cost inflation: the acid reset in 2027, diesel, Chilean labour (the strike), and falling Centinela concentrate grades.

4. Weather and water (drought versus El Nino extremes at Pelambres).

5. Chilean royalty and tax policy. This is currently moving favourably under the new government.

6. Minorities and project-level debt dilute the headline group numbers.

Competition

Copper is a commodity, so the 'moat' is position on the cost curve and reserve life. Antofagasta's by-product-credited net costs (about $0.7-0.8/lb at Centinela and Pelambres) are first-to-second quartile against Codelco, BHP (Escondida), Freeport, Southern Copper, Anglo/Teck and Glencore. Peers have larger scale and diversification; Antofagasta has purity of copper exposure and visible brownfield growth.

How investors and analysts feel: 5.5/10

It is neither hated nor euphoric. The stock has derated 30% from its February peak on operational misses, but copper is near record highs, the 'electrification plus AI' story is consensus, and the shares are still up about 2.5x in three years. Analysts are split. MarketBeat's sample shows 3 Buy, 3 Hold and 2 Sell with an average target of about 3,840p: Berenberg Buy at 4,500p (trimmed 16 Oct), JPMorgan Overweight at 4,300p, Citi Buy at 4,300p, Jefferies Hold at 4,500p, Canaccord Hold at 4,100p, Deutsche upgraded to Hold at 3,300p (27 Oct), Morgan Stanley Underweight at 3,050p and RBC Underperform at 2,700p. Broader polls show about 21 analysts at Neutral. Most bulls' targets assume $5.50-6.00+ long-term copper. There is no forced seller, buyback or insider buying of note. The next catalysts are the Q4 production report (January 2027, with 2027 cost and capex guidance) and Centinela commissioning milestones.

Financials — Adjusted

Adjusted · TTM 2026-Q2 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue9323+68%6744+2%6613+5%6325+8%5862
Gross profit4973+120%3416+36%2504-6%2658+9%2429
Operating expenses731+255%581+39%420-53%896+10%812
▸Adj EBITDA5833+80%4121+18%3490+21%2890+8%2665
▸Adj OCF4030+114%3062+40%2195-9%2424+19%2044
CapEx-3693-2831-2415-2129-1879
Adj FCF338231-220-175%295+79%165
Interest expense16521269.40.000.00
▸Adj net income1801+100%1217+47%831+25%664-3%686
▸Owner's earnings2400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA15295100%2615100%4098100%3023100%2895100%2665100%
FCF (OCF−capex)-132-1%43.62%-248-6%-130-4%2047%-2.300%
Net income511733%84732%107226%82927%83529%153358%
▸Capital returned9466%64925%-259-6%-1295-43%75926%109241%
Buybacks0.000.000.000.000.000.00
Dividends29404732733186131263
Interest paid2810.0021269.40.000.00
Debt paid down-2275175-743-1682146-171
▸Reinvestment1123673%223585%257763%235078%222277%185169%
Capex (PP&E)1092616722831241521291879
Intangibles & M&A-2560.00-2560.000.000.00
Leases signed (net Δ)5655632.33-65.093.0-28.1
Retained / other-541-4%-605-23%47912%123541%-555-19%-1094-41%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 41 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)2740426428226351964718238
▸Liabilities (total)1232011992968175996594
Net debt (incl. leases)396628091033703886
Net debt / Adj EBITDA0.680.680.300.240.33
Net debt / Adj FCF11.812.1--2.385.38
Adj EBITDA / interest35.419.550.3----
Shares outstanding986986986986986
Dilution (YoY)+0.0%+0.0%+0.0%+0.0%+0.0%
Employees8457--------
MarginsTTM2025202420232022
Gross margin53.4%+12.850.7%+12.837.9%-4.242.0%+0.641.4%
Adj EBITDA margin62.6%+4.361.1%+8.452.8%+7.145.7%+0.245.5%
Adj OCF margin43.2%+9.345.4%+12.233.2%-5.138.3%+3.534.9%
Adj FCF margin3.6%+8.63.4%+6.8-3.3%-8.04.7%+1.92.8%
Net income margin17.8%+2.815.9%+3.412.5%-0.713.2%-12.926.1%
Adj NI margin19.3%+3.118.1%+5.512.6%+2.110.5%-1.211.7%
ROIC (adj, after-tax)14.6%10.2%9.2%8.8%9.8%
Cost of debt2.1%2.9%1.2%0.0%0.0%

Earnings Calls

5 calls

Earnings Call · 2026 Q2

2026-08-13

Antofagasta delivered a strong first half of 2026, combining operational discipline with favorable copper and by-product pricing. EBITDA increased 27% to $2.84 billion, producing a 63% margin, described as one of the highest in the company’s history. Cash flow from operations rose 53%, supporting an interim dividend of $0.301 per share, approximately 80% higher than the prior-year payment and consistent with the company’s policy of distributing at least 35% of earnings. Despite inflationary pressure in diesel, sulfuric acid, and other inputs, net cash cost decreased 8%, or $0.10 per pound, due to productivity gains, cost controls, the competitiveness program, and substantial by-product credits from the Centinela and Pelambres districts. Full-year net cash-cost guidance remains $1.15–$1.35 per pound. The main operational issue was an exceptionally severe winter storm at Los Pelambres. The event, associated with a strong El Niño, affected central Chile but did not materially affect Antucoya, Zaldívar, or Centinela. Pelambres was temporarily halted in a safe and orderly manner, and operations are being progressively restarted. Approximately 5 million cubic meters of snow must be removed, including from higher areas of the mine. Although the mine has returned to its main operating phases, some areas remain to be cleared. As a result, higher grades expected later in 2026 will be deferred toward year-end or early 2027. Revised full-year copper production guidance is 625,000–655,000 tonnes, with the range also incorporating the risk of additional adverse weather during the remaining winter period. Management stressed that the storm was highly unusual against a longer-term backdrop of drought, rather than evidence of sustained worsening winter conditions. Antofagasta’s organic growth program remains fully funded and is expected to increase production by approximately 30% once complete in 2027. The Centinela second concentrator remains on budget and on schedule for completion of commissioning in 2027, with ramp-up expected in 2028. Additional sealing work in the flotation area, prompted by soil conditions, is already being undertaken within the existing schedule and budget. Capital spending has passed its peak: 2026 development CapEx is guided at $3.4 billion compared with $3.7 billion in 2025, with some Centinela tail spending in 2027 and spending broadly approaching sustaining levels from 2028. Sustaining CapEx is expected to remain around $1.0–$1.5 billion for the next few years. The company intends to draw the full $2.5 billion Centinela project-finance facility, although timing of drawdowns may vary. The company has secured sulfuric acid volumes for 2027 through term contracts, limiting exposure to spot markets, though some recent price increases will flow through. Antofagasta generally does not hedge input commodities. Management continues to advance Twin Metals as a long-term U.S. development option and views its Buenaventura stake as a strategic entry into Peru rather than a near-term monetization. Proposed Chilean tax reform could reduce the corporate rate from 27% to 23%, benefiting corporate and deferred taxes, although withholding taxes may limit the effect on total taxation.

Analyst Q&A (19)
▸
Asked whether the Centinela second concentrator’s ramp-up had been delayed to 2028 or later, whether costs would be affected, and which operations were impacted by the storms.
Jason Fairclough · Bank of America
Management said the Centinela second concentrator remains on track for commissioning and the start of ramp-up in 2027, with no change to the project schedule or expected cost. The storms mainly affected central Chile and had no meaningful impact on Antucoya, Zaldívar, or Centinela; Pelambres was the principal operationally affected asset.
▸
Asked whether further industry or operational impacts from the storms might emerge and whether the revised production guidance was conservative.
Jason Fairclough · Bank of America
Management said the company is only halfway through winter and has incorporated contingency for additional severe weather into the revised production guidance. The event was unusually severe and linked to El Niño, so the guidance range includes potential further downside from adverse weather during the rest of winter.
▸
Asked why the release omitted the explicit “on budget and on schedule” wording, whether the flotation work indicated cost or schedule pressure, whether the storm-related downgrade reflected other operational issues, and whether 2027 production growth remained achievable.
Ian Rossouw · Barclays
Pelambres’ recovery is taking longer because approximately 5 million cubic meters of snow must be removed safely. Some higher-grade mining areas will therefore be deferred into late 2026 or early 2027, which is reflected in guidance. Centinela remains on budget and on schedule for commissioning in 2027 and ramp-up in 2028. Additional flotation-area sealing work caused by soil conditions is already underway within the existing schedule and budget.
▸
Asked for building blocks behind the expected 2027 CapEx reduction, including how much of Centinela’s budget would be spent by year-end, normalized sustaining CapEx, and the likely scale of the step-down.
Daniel Major · UBS
Management said peak development capital spending has passed. Total CapEx is guided at $3.4 billion in 2026 versus $3.7 billion in 2025, with some Centinela tail spending in 2027. Sustaining CapEx is expected to remain around $1.0–$1.5 billion for the next few years, and from 2028 spending should be broadly sustaining CapEx plus any new growth projects. More precise 2027 guidance will be provided with third-quarter results.
▸
Asked about the additional $630 million lease liability, whether it would rise as the Centinela water project progressed, the difference between cash taxes and P&L tax, and the absence of Marubeni CapEx contributions during the period.
Daniel Major · UBS
The $630 million lease liability reflects the completed third-party-financed water subsystem serving the Centinela expansion; it should not increase further because the full invested amount has been recognized. Higher cash taxes reflected settlement of 2025 tax liabilities in April after stronger copper prices. Marubeni contributions and debt drawdowns are being managed alongside operating cash flow to optimize financing costs, with liquidity sources used in a value-accretive manner.
▸
Asked whether second-half tax accruals would create a positive differential between cash tax and reported tax expense.
Daniel Major · UBS
Management confirmed that cash tax should be below P&L tax in the second half as tax liabilities accrue and are paid during the first half of 2027.
▸
Asked about sulfuric acid consumption and efficiency by mine, exposure to higher prices, and whether 2027 leaching production might be shifted toward concentrator output at Centinela.
Maxime Kogge · ODDO BHF
Sulfuric acid volumes are distributed among Antucoya, Zaldívar, and Centinela, with no current supply-security issue. Antofagasta uses mostly term contracts rather than spot purchases, limiting exposure to spot prices, although 2027 contracts reflect some of the recent price increase. Volumes required for 2027 have been secured, and management expects market conditions to gradually improve. Detailed 2027 leaching production guidance will come in the third quarter.
▸
Asked whether indexed pricing had become predominant in concentrate sales, what to expect for the 2027 TC/RC benchmark, and whether sulfuric acid purchases from smelters could be linked to concentrate sales to mitigate cost increases.
Maxime Kogge · ODDO BHF
Management said TC/RC terms are negotiated annually through term contracts with smelting customers. The pricing basis can evolve with market conditions, but management would not disclose the precise indexed-versus-benchmark mix or 2027 terms because they are commercially sensitive. Long-standing customer relationships provide supply security and competitive long-term pricing.
▸
Asked whether the company would continue hedging most exposure in 2027 if commodity prices stayed high, and whether its approach to diesel hedging had changed.
Ioannis Masvoulas · Morgan Stanley
Antofagasta generally does not hedge commodity input costs such as diesel or sulfuric acid. It prefers to remain exposed to input prices while protecting margins through competitive term contracts and supply relationships. This approach is not expected to change for 2027 even if prices remain elevated.
▸
Asked how much sulfuric acid spot-price exposure would be reflected in 2027 costs under the company’s term-contract structure.
Ioannis Masvoulas · Morgan Stanley
The extent to which higher spot sulfuric acid prices flow into 2027 costs depends on the specific contract and operation. Management expects a significant portion of the spot-price trend to be reflected, but could not quantify it publicly.
▸
Asked about the outlook for Twin Metals over the next several years and whether worsening winter weather, El Niño, or other factors explained the exceptional Pelambres storm.
Benjamin Davis · RBC
Twin Metals remains an attractive long-term option under the current U.S. policy environment. The withdrawal that restricted mining in the area has been reversed, and the company is working to recover its leases and establish the terms for their return, after which it can advance permitting. The Pelambres storm was historically exceptional and associated with El Niño, following a prolonged drought; infrastructure was not materially damaged, but snow removal and a cautious restart reduced near-term grades and production.
▸
Asked whether Twin Metals work was continuing beyond the legal proceedings, including studies or exploration.
Benjamin Davis · RBC
The company is updating Twin Metals’ pre-feasibility work and continuing exploration drilling on other properties within the broader complex where it holds valid exploration licenses.
▸
Asked where inflationary pressure was affecting CapEx, particularly across earthwork-intensive projects, and whether higher diesel and input costs threatened unchanged 2026 CapEx guidance.
Matthew Greene · Goldman Sachs
Most of the major Centinela and Pelambres development costs are locked in through EPC contracts, limiting exposure to diesel inflation. Remaining exposure is concentrated in mine development, where operating teams are optimizing haulage routes and diesel consumption. Management currently sees no risk to the 2026 CapEx guidance.
▸
Asked how much of the year-on-year increase in controllable unit costs was temporary versus structural.
Matthew Greene · Goldman Sachs
Despite inflationary pressures and higher controllable costs, net cash cost fell 8%, or $0.10 per pound, year over year because of stronger by-product credits and the competitiveness program. Improved production in the second half should support delivery of full-year net cash-cost guidance; management characterized the pressures as manageable rather than a threat to the structural cost position.
▸
Asked how Chile’s proposed corporate tax-rate reduction would affect Antofagasta’s effective tax rate.
Patrick Jones · JPMorgan
Proposed legislation would reduce Chile’s corporate income tax rate from 27% to 23% over several years if approved. Antofagasta would benefit at the corporate tax level and through deferred-tax calculations, although withholding tax on dividends would largely offset the benefit to the overall tax burden. Management viewed the measure as positive for investment competitiveness.
▸
Asked whether Antofagasta planned to take profits from its Buenaventura stake or distribute the shares to shareholders.
David Radcliff · Global Mining Research
Antofagasta continues to view its 19% Buenaventura stake as a strategic foothold in Peru rather than a near-term monetization opportunity. The company is represented on Buenaventura’s board, is working with its management on existing and potential copper projects, and continues separate exploration in Peru. No change to the strategic rationale or indication of a planned sale or share distribution was provided.
▸
Asked whether the 63% EBITDA margin could persist or was primarily attributable to unusually strong by-product pricing.
Management expects cost competitiveness to remain the main support for margins through the cycle, combining disciplined cost control, by-product credits, and the competitiveness program. Centinela’s second concentrator should add scale and reduce unit costs, supporting a move toward first-quartile costs. However, margins will also remain sensitive to commodity prices.
▸
Asked whether Antofagasta still intended to fully utilize the $2.5 billion Centinela project-finance facility or might fund the expansion from operating cash flow.
Ian Rossouw · Barclays
Management said the company has a financial plan for Centinela and is executing it; any timing differences in funding are only timing differences. It confirmed that the plan remains to draw down the full $2.5 billion project-finance facility, despite strong operating cash flow and no drawdown in the first half.
▸
Asked what permitting would be required for a future, multi-phase Centinela expansion and whether water infrastructure could support throughput of up to 150,000 tonnes per day.
Daniel Major · UBS
The existing permit covers both the current Centinela second-concentrator phase and a potential future increase in capacity to 150,000 tonnes per day. Management also confirmed that the water infrastructure has sufficient additional capacity to support higher throughput in both concentrators.

Web Traffic

antofagasta.co.uk
Web rank#911,204
Est. visits/mo603K

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
CONFLUENCE INVESTMENT MANAGEMENT LLC$1.5M$2091.22−$479K+$285K-1.1%$6.44B
Accent Capital Management, LLC$22K$1640.16+$0+$0+0.8%$281M
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

09K17K26K35K$1388$1873$2357$2842$33272021-062023-032023-122024-092025-062026-03
hover the chart for per-quarter detailprice (right axis)
CONFLUENCE INVESTMENT MANAGEMENT LLC34KAccent Capital Management, LLC499

Analyst Coverage

Analyst Coverage
Analyst Ratings
2
Sell: 2Consensus: Sell
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2007 Q21.8B965M690M$0.70$0.63 – $0.783
2007 Q41.9B481M308M$0.71$0.69 – $0.742
2008 Q22.3B533M347M$0.84$0.69 – $0.965
2008 Q41.4B328M180M$0.23$-0.11 – $0.797
2009 Q21.1B409M231M$0.19$0.12 – $0.297
2009 Q41.5B616M388M$0.45$0.40 – $0.485
2010 Q21.8B573M344M$0.47$0.35 – $0.566
2010 Q42.9B750M464M$0.77$0.72 – $0.885
2011 Q23.2B669M322M$0.81$0.65 – $1.136
2011 Q43.1B615M278M$0.53$0.49 – $0.594
2012 Q23.3B693M313M$0.65$0.58 – $0.737
2012 Q43.6B702M321M$0.68$0.66 – $0.713
2013 Q22.8B543M225M$0.46$0.40 – $0.575
2013 Q43.2B715M334M$0.48$0.37 – $0.576
2014 Q22.8B561M248M$0.37$0.27 – $0.456
2014 Q42.6B754M279M$0.42$0.37 – $0.485
2015 Q21.9B522M211M$0.11$0.07 – $0.174
2015 Q41.8B656M265M$-0.02$-0.04 – $0.013
2016 Q21.5B555M243M$0.04$0.03 – $0.044
2016 Q42.0B820M386M$0.26$0.19 – $0.343
2017 Q22.0B577M227M$0.24$0.19 – $0.274
2017 Q42.6B897M478M$0.49$0.43 – $0.544
2018 Q22.2B743M331M$0.27$0.22 – $0.375
2018 Q42.7B854M330M$0.33$0.30 – $0.374
2019 Q22.6B843M320M$0.32$0.26 – $0.396
2019 Q42.4B645M197M$0.19$0.17 – $0.235
2020 Q22.2B904M323M$0.16$0.13 – $0.196
2020 Q43.9B1.4B579M$0.20$0.19 – $0.224
2021 Q44.7B1.5B697M$0.24$0.19 – $0.344
2022 Q44.9B1.5B707M$0.52$0.01 – $0.9917
2023 Q471M—0M$0.00$0.00 – $0.007
2024 Q43.7B1.5B400M$0.41$0.41 – $0.411
2025 Q23.8B1.0B430M$0.44$0.44 – $0.441
2025 Q44.7B2.1B819M$0.83$0.83 – $0.831
2026 Q24.5B1.6B721M$0.73$0.73 – $0.731
2026 Q46.2B2.4B1.2B$1.25$1.25 – $1.251
2027 Q25.4B2.1B950M$0.96$0.96 – $0.961
2027 Q45.7B2.3B1.0B$1.02$1.02 – $1.021
2028 Q25.9B2.6B1.2B$1.25$1.25 – $1.251
2028 Q45.2B2.9B1.4B$1.46$1.46 – $1.461
v2 analysis (legacy, 2026-08-16) — for comparison onlyclick to expand

Thesis

Antofagasta is a high-margin, long-life copper producer with unusually strong current EBITDA margins, a funded brownfield growth pipeline and relatively low financial leverage at about 0.7x adjusted EBITDA net debt. The strategic case is attractive: Centinela and Los Pelambres should lift production materially, and the company has demonstrated strong cost competitiveness and meaningful by-product credits. The principal limitation is that current accounting earnings overstate near-term distributable cash because development capex is still close to $3.4B annually. The latest half also demonstrates operational and climate exposure: the Los Pelambres storm caused a production-guidance reduction and deferred higher grades. Over a two-year horizon, value depends heavily on copper prices, project execution and the pace at which capital intensity falls. The business is financially sound, but it is not a predictable compounder.

Trade Signal

Trade rating
-6.5/10
Short
Horizon
~6mo
gpt-5.6-luna2026-08-16 · saw 3,564.26 GBp-24.1% since

Short: Antofagasta is an excellent copper asset, but the market price heavily discounts successful growth and elevated copper while current free cash flow is negligible and the study's fair value is dramatically lower.

Temporary mispricing-1.0

The stock rose sharply through late 2025 and early 2026, likely driven by copper strength, improving margins, and enthusiasm around Centinela, reaching 4,455p before declining about 20% from the high. It then fell 11% across the August 13 earnings release and August 14, as the Los Pelambres winter storm deferred higher grades and reduced production guidance. The earnings reaction was directionally justified rather than a panic overshoot: the stock remains up 72% year on year and trades far above the study's fair value. The market may still be underreacting to the combination of weak near-term owner earnings, heavy capex and valuation risk, but the gap looks more like a durable repricing risk than a temporary dislocation.

Market view+2.0

The market appears constructive on copper and Antofagasta's strong margins, reflected in a 72% one-year share-price gain and a rally from roughly 1,400p in 2023 to above 4,000p in 2026. The recent 11% post-earnings decline shows investors are sensitive to the Los Pelambres disruption and guidance cut. Analyst coverage is overtly negative, with two Sell recommendations and no Buys or Holds, but that bearish consensus has not prevented substantial momentum and may already capture some operational concerns. The stock is therefore not hated or ignored; it is a high-attention, commodity-sensitive name with bullish long-term expectations embedded in the price.

Inflectionwindow ~6mo-2.5

The business has a credible positive operational trajectory: Los Pelambres should recover from the storm, development capex should decline after 2027, and Centinela could lift production by roughly 30% by 2028. However, the market is already assigning a high valuation to that future path, while the latest earnings showed a production-guidance reduction and deferred grades. The study's fair value assumes a successful capex roll-off and project execution; those are plausible but not clearly underappreciated. Near-term evidence is more likely to be mixed than an unexpected step-up in profitability.

Catalysts
  • ▼2026-10 · Q3 2026 production report — Expected around October 2026; should show whether Los Pelambres has fully recovered from the winter storm and whether production guidance remains achievable.
  • ▲2027-02 · FY 2026 production and results — Expected early 2027; a recovery in grades, lower costs and confirmation that capex is rolling over could support the bull case, while another guidance cut would reinforce downside.
  • ▲2027-H1 to 2027-H2 · Centinela Second Concentrator commissioning milestones — Progress through 2027 is the main long-term earnings catalyst, but the current valuation already discounts a successful project and smooth ramp-up.
  • ▲H2 2026 to 2027 · Chile tax and permitting reform votes/implementation — A reduction in the corporate tax rate and faster permitting would modestly improve project economics, though timing and final legislation remain uncertain.
  • ▼2026-08 to 2026-09 · Remaining Chilean winter/weather and Los Pelambres operating updates — Additional weather disruption or delayed snow clearance could push higher grades further into 2027 and pressure near-term estimates.
Flow-1.0

No meaningful buyback or tender support is identified. TTM dilution is approximately zero, but the company is drawing project finance for Centinela and remains a heavy capex issuer rather than a material net repurchaser. The low dividend limits income-oriented demand; there is no clear squeeze or forced-buying catalyst.

Floor / Ceiling-2.0

There is a real asset and solvency floor from long-life copper mines, strong margins and moderate leverage, but no hard floor close to the current price: owner earnings are obscured by heavy development capex, free cash flow is currently negligible, and copper equities can de-rate sharply with the commodity cycle. Above the current price, the principal ceiling is valuation—8.9x TTM EV/EBITDA and an equity value more than three times the study's fair value—rather than a formal lockup or dilution trigger.

Buyability

Poor for a long at this price: the stock trades at roughly 8.9x TTM EV/EBITDA, has negligible/negative reported free cash flow while development capex is $3.4B, and pays only about a 1% dividend. A marginal buyer would need to believe copper remains structurally elevated and Centinela creates a major 2028 earnings step-up. The more natural next buyer is a commodity momentum investor, but that support is vulnerable if copper or execution disappoints.

Fear vs Greedfear 5/10 (+2.0)greed 7/10 (-1.0)

Fear pulls stronger than greed. This is a high-quality copper producer, but the price appears to capitalize much of the favorable copper, margin and Centinela story while current distributable cash remains weak. The attractive operating assets reduce insolvency risk but do not justify paying a premium multiple for cyclical earnings.

Valuation

Our Target
$10.8B-70%
Market Should Pay
$10.3B-71%
target ×0.95 (fear discount)
Current Market Cap
$35.6BExtremely bullish
What Changed
transcript · 2026-08-13
-5%fair value on this information

The genuinely new information is the severity and operational duration of the Los Pelambres winter-storm disruption: approximately 5 million cubic meters of snow must be removed, some higher-grade areas are deferred, and 2026 copper-production guidance is reduced to 625,000-655,000 tonnes with additional weather contingency. The quarter also newly confirms that Centinela remains on schedule and on budget, that peak development capex has passed, and that the $2.5B project-finance facility is still intended to be fully drawn. Much of the strong copper pricing, high margins and broader project strategy was already known before the event.

▸ How the cases moved

The storm-related production guidance reduction shifts value modestly toward the bear case: bear probability approximately 0.15 -> 0.20 and base probability 0.55 -> 0.55, while bull probability approximately 0.30 -> 0.25. The bear terminal value rises in relative importance because Los Pelambres recovery is taking longer and further winter disruption remains possible. The base and bull values are broadly unchanged because Centinela remains on budget and on schedule, but the probability of achieving the most optimistic near-term production path falls.

2-Year Plausible Outcomes
bear20%
$3.5B
rev -8%/yrOE $1200M

Copper prices normalize or weaken, Los Pelambres suffers further weather and grade disruption, and the Centinela expansion experiences ramp-up friction or cost leakage. Development capex remains elevated longer than expected, leaving owner earnings well below EBITDA. The company remains solvent, but the market applies a low-cycle mining multiple.

▸ Valuation

4.0x $2,200M EBITDA = $8,800M EV - $5,300M net debt = $3,500M equity

base55%
$13.0B
rev +5%/yrOE $2800M

The Los Pelambres storm is a temporary disruption, with production recovering toward the lower-to-middle end of guidance and higher grades shifting into late 2026 or 2027. Copper remains supportive but not exceptional. Centinela is commissioned on schedule, while development capex declines toward sustaining levels by 2028. Owner earnings improve as growth capex rolls off, although the business remains commodity-exposed.

▸ Valuation

4.5x $4,000M EBITDA = $18,000M EV - $5,000M net debt = $13,000M equity

bull25%
$25.0B
rev +15%/yrOE $4200M

Copper prices stay structurally strong, Los Pelambres recovers rapidly, and Centinela's second concentrator is delivered on budget with a smooth ramp. The approximately 30% production increase is achieved with first-quartile costs, while development capex falls sharply after 2027. Higher production, strong by-product credits and lower unit costs convert a much larger portion of EBITDA into owner earnings, supporting a premium-quality copper growth multiple.

▸ Valuation

5.45x $5,500M EBITDA = $29,975M EV - $4,975M net debt = $25,000M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% produces $11,280M. I set the analytical target modestly below that at $10,800M because the arithmetic gives substantial credit to a successful capex roll-off and Centinela execution while underweighting the possibility that sustaining requirements, lease-related commitments or commodity normalization keep owner earnings below the modeled levels. The target still reflects Antofagasta's strong balance sheet, long-lived assets and high operating margins, but avoids treating current peak EBITDA as permanent.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now8/10
Trajectory8/10
Risk5/10
Governance7/10
Insolvency prob (2yr)1%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Production & Cost Performance: On April 15, 2026, Antofagasta released its Q1 2026 quarterly production report. The company produced 143,000 tonnes of copper, down 8% year-on-year and 19% quarter-on-quarter, reflecting scheduled lower processing rates and weaker grades at its concentrators. Despite the slow start, Antofagasta maintained its full-year 2026 copper production guidance of 650,000 to 700,000 tonnes, anticipating quarter-on-quarter output increases driven by rising grades and throughput at Los Pelambres. Group net cash costs for the quarter were a highly competitive $1.08/lb (supported by exceptionally low cash costs of $0.72/lb at Los Pelambres and $0.34/lb at Centinela due to strong gold and molybdenum by-product credits), allowing the company to reiterate its full-year cost targets.
  • Move to Spot-Linked Concentrate Contracts: In mid-June 2026, reports emerged that Antofagasta has approached several Chinese copper smelters with proposals to price its long-term contract shipments using spot-market indexes rather than the traditional annual fixed-price benchmark system. Spot treatment and refining charges (TC/RCs) dropped to historic lows of -$147.30 per ton in June 2026 due to extreme global concentrate shortages. Transitioning contract pricing to spot-market indices represents a significant commercial shift that would allow Antofagasta to capture much higher margins than if it remained bound to the fixed-benchmark system.
▸ Thesis-test Findings
  • Centinela Second Concentrator construction progress 2026: Construction on the $4.4 billion Centinela Second Concentrator expansion is progressing successfully, strongly supporting the long-term bull case. In February 2026, the company achieved key commissioning milestones by initiating operations with its first fleet of six autonomous Komatsu trucks at the Encuentro Sulfuros open pit and energizing the DMC electrical substation. In April 2026, management confirmed that pre-commissioning activities are officially underway at the site. The expansion project remains on track and on budget to increase the company's annual output by 170,000 copper-equivalent tonnes, moving Antofagasta toward its medium-term goal of boosting total copper production by 30%.
  • Chile mining permit reforms corporate tax rate 2026: A highly constructive regulatory shift is unfolding in Chile under the administration of President José Antonio Kast. On April 22, 2026, the government submitted the "National Reconstruction and Economic and Social Development Bill" to Congress. The bill proposes a phased reduction of the corporate income tax rate from 27% to 23% by 2029, returns Chile to a fully integrated tax system by 2030, and reinstates a 25-year tax stability regime for major projects. Furthermore, the legislation targets the reduction of permitting times for large industrial developments and establishes statutory deadlines to help clear Chile's multi-billion dollar backlog of stalled mining approvals, significantly mitigating political and fiscal risks for Antofagasta.
  • Zaldivar mine water permit dispute 2026 Antofagasta: Antofagasta has successfully mitigated its most pressing environmental and operational risk at the Zaldívar mine (a 50:50 joint venture with Barrick Gold). In June 2026, local authorities granted environmental approval for Zaldívar to continue using its existing continental water source through 2028, avoiding a potential shutdown. Concurrently, the company announced a $900 million investment to extend the mine's operating life to 2051. This long-term extension hinges on a complete water transition project starting in 2028, which will entirely replace continental water with treated wastewater supplied by sanitation company Econssa. This dual resolution clears a major regulatory hurdle and bypasses long-standing indigenous disputes over local aquifer depletion.