Arq, Inc.v3 6.3/10 · 2026-11-05Operating throughout North America, Arq, Inc. is a specialized manufacturer of activated carbon materials. Their product range encompasses various types of activated carbon, specifically granular, powdered, and colloidal forms. Additionally, they provide Arq Powder Wetcake, which is a finely processed, low-ash particle originating from coal waste, along with additives formulated for managing air pollution. These versatile products find application in numerous sectors, including water purification, remediation of contaminated groundwater, enhancing soil composition, controlling atmospheric discharges, and as components in asphalt mixtures. Established in 1996, the company rebranded as Arq, Inc. in February 2024, having previously been known as Advanced Emissions Solutions, Inc. Its corporate headquarters are located in Greenwood Village, Colorado.
2-Year Price History
Valuation v3 Opus worker · 2026-11-05
Arq is a single-plant (Red River, Louisiana) maker of lignite-based powdered activated carbon (PAC), used for mercury control at coal plants and for municipal water treatment. Its attempt to get into granular carbon (GAC) failed and led to a $45M write-down. The stock fell from $8 to a $1.64 low, then jumped about 30% to $2.40 (Nov 5 close; it was $1.84 the day before) on a record Q3: revenue $38.2M, gross margin 39.7%, adjusted EBITDA $8.8M. FY26 EBITDA guidance was tightened to $19-20M, up from $13M in 2025. The core PAC business is now clearly profitable, but the honest cash picture is less flattering than the EBITDA. After stock comp (~$4M) and maintenance capex including the biennial turnaround (~$7.5M), with no cash tax thanks to NOLs, unlevered owner earnings are only ~$7-8M (about 40% of EBITDA). On an EV of ~$125M that is ~16x owner earnings, though only 6.4x adjusted EBITDA, and today's year repeated forever is worth only ~$1.30/share. The case rests on 2027. Management's building blocks are a premium-priced PAC-for-PFAS line that needs almost no capex (test volumes already sold, more than a dozen customer trials, EPA keeping the 4 ppt PFOA/PFOS limit), cost cuts, a cheaper refinancing of the 9%+ MidCap revolver, and Corbin monetization (~$2.6M a year of costs plus $8M of debt). Together they target a ~$30M EBITDA exit run-rate without GAC. My base case has FCF of $9M rising to $17M by 2031, valued at 11x. That gives a DCF of ~$3.33 and a ~19% IRR, and I set fair value at $3.00 given the execution record (the GAC fiasco, covenant waivers, CFO churn, thin liquidity). Rating 6.3: a credible turnaround that has just started to show, still near the bottom of its range, with four Buy-rated analysts (average target ~$4). But the stock is not cheap on today's cash, and the move off capitulation lows has already begun. Research rating 7: whether PAC-for-PFAS volumes and pricing are real can be checked by early-2027 guidance and customer and channel checks, and if they are, the stock could re-rate 50%+.
A deep dive would have to establish: Whether PAC-for-PFAS can deliver contracted 2027 volumes at materially higher prices and margins, lifting EBITDA toward ~$25-30M (and owner earnings toward $12M+) without new capex or dilution, while the refinancing removes the liquidity overhang.
Research (expand)
What the company does
Arq (formerly Advanced Emissions Solutions) makes activated carbon in North America. Almost all of its value is the Red River plant in Coushatta, Louisiana, one of the larger PAC furnaces on the continent, fed by its own Five Forks lignite mine. PAC goes to two markets: (1) coal-fired power plants and industrial users for mercury emissions control, under the 2012 MATS rule, which still stands; and (2) municipal water utilities for taste, odor and contaminant removal. Customers buy mostly on annual and multi-year contracts, and 96% of 2026 volume was contracted by March. Arq also owns Corbin, Kentucky, a coal-waste purification site meant to feed GAC. Corbin is idled, written down by $45M, and now being marketed as an asphalt additive or other feedstock. A half-built GAC line at Red River was paused in March 2026 because of design flaws (litigation against the former engineering firm is ongoing). Finishing Phase 1 (25M lb a year on purchased bituminous coal) would cost $40-60M, and there is no commitment or funding.
Investment case
- The PAC base has turned. FY25 adjusted EBITDA was $13.0M. 9M26 is $17.4M, and Q3 alone was $8.8M on record revenue of $38.2M (+9%, volume-driven) with a 39.7% gross margin (vs 28.8%). Gross margin for 9M rose to 37.7% from 32.5%. Most of the improvement is real: pricing, mix, cost work, and no more GAC start-up drag. FY26 guidance is $19-20M EBITDA on $120-125M revenue. The implied Q4 of $1.6-2.6M reflects normal seasonality (Q4 2025 was roughly breakeven).
- PAC for PFAS. This is a premium PAC grade for utilities just above the 4 ppt PFOA/PFOS limit. It runs on existing PAC dosing equipment, so the customer avoids buying GAC vessels, and it can sit in front of existing GAC to extend change-out intervals. Test lots were sold "materially above" the normal PAC price. There are more than a dozen trials, patents are pending, and management puts the addressable market at ~160M lb a year by 2029, more than Arq's whole ~125M lb of output. Revenue is expected to be weighted to the back of 2027. Arq needs almost no capex for this and can displace low-margin PAC volume if capacity gets tight. The regulatory picture: EPA's May 2026 proposals keep the 4 ppt PFOA/PFOS limits but push compliance to 2031 and rescind the PFHxS/PFNA/GenX limits. Monitoring and reporting still starts April 2027, and utilities are moving early for reputational reasons. That makes demand slower but intact.
- Self-help. New CFO Shimon Steinmetz (a former activist investor) has found 15+ cost and liquidity opportunities across 8 departments. The MidCap revolver (SOFR+5%, 2.5% floor, four amendments, a $2.5M availability reserve rising to $5M in January 2027) is to be refinanced within 6 months. Selling Corbin would remove ~$8M of CTB debt, release ~$1.9M of escrow, and save ~$2.6M a year of operating and SG&A cost.
- Management's target is a ~$30M adjusted EBITDA exit run-rate for 2027 without GAC, which would put the current EV at about 4x. GAC remains a cheap call option on a largely built plant.
What it earns today (real FCF)
FY26E adjusted EBITDA is ~$19.5M. Stock comp of ~$4.2M (SBC was $3.1M for 9M; it is added back in adjusted EBITDA and is a real cost) brings that to ~$15.3M. Maintenance capex runs ~$7.5M a year: Red River furnace upkeep, mine development, and the $3.1M biennial turnaround (capitalized in other assets, next one April 2028), averaged. Cash taxes are ~0 because of large NOLs, which are protected by a tax-asset preservation rights plan. That leaves unlevered owner earnings of ~$7.8M (range $5-10.5M), about 40% of EBITDA. Interest runs ~$3M a year, so levered owner FCF is ~$4.8M, a ~4.5% yield on the $106M market cap. Reported 9M operating cash flow was $7.7M after a $5.2M receivables build, and 9M capex was $2.75M plus $0.35M mine development plus the turnaround booked in other assets. The ~$14M of D&A is far above maintenance capex because most of the $136M of PP&E is the non-earning GAC plant. That is why GAAP EPS looks tiny ($0.06 in Q3, $0.01 for 9M).
Mature-company test: today's $7.8M repeated forever, discounted at 10%, is worth $78M of EV, less ~$18M net debt, or ~$1.33/share, below the price. The equity earns ~$4.8M a year (~4.5%) if nothing changes. The stock is only attractive if 2027 growth shows up.
Net debt and share count
Total debt at 9/30/26 is $28.2M: the $19.2M MidCap revolver, ~$9.0M CTB term loan and finance items. Unrestricted cash is $7.8M. Of the $11.3M restricted cash, $9.3M is surety-bond collateral for Five Forks and Corbin reclamation (not available), and ~$2M is CTB escrow (I net it against the CTB loan). That gives net debt of ~$18M (range $14-22M). Operating leases (railcars and equipment) are expensed in COGS and left out of EV. There are 44.17M shares outstanding and I use ~45M diluted for RSUs, so the market cap is ~$107M and EV ~$125M.
Five-year FCF projection (unlevered, after SBC, capex, working capital and cash tax)
| Year | Adj. EBITDA | FCF (low / base / high) |
|---|---|---|
| 2027 | ~$24M | $4 / $9 / $13M |
| 2028 | ~$28M (turnaround year) | $6 / $13 / $19M |
| 2029 | ~$31M | $6 / $15 / $22M |
| 2030 | ~$33M | $6 / $16 / $24M |
| 2031 | ~$35M | $6 / $17 / $26M |
The base case assumes SBC of ~$4.5M, maintenance capex of $8-9M, $1M a year of working-capital build, and cash taxes starting to creep in around 2030. It includes no GAC capex or revenue. Revenue grows from ~$123M to ~$155M through volume (capacity allows another 15-20%), price increases as contracts renew, and a PFAS mix shift. Growth runway: about 3-4 years at double digits, then capacity-bound mid-single digits unless GAC is built.
What the company looks like in 5 years
In the base case it is not a corpse but not a compounder either. It would be a single-plant specialty carbon producer with ~$150M revenue, ~$35M EBITDA, ~$17M FCF and net cash by 2029-30, worth 10-12x FCF as a ~5%-growth business with some cyclicality. Mercury-control demand is a slow-melting part of the base as coal plants retire, though current federal policy is delaying retirements and coal burn is up. Water and PFAS are the growing part. The upside version funds GAC with debt and becomes a two-product PFAS remediation platform, which a strategic buyer would value at 8-10x EBITDA. The downside version: PFAS PAC is a niche, EBITDA stalls near $20M, and FCF stays ~$6-8M. Confidence is moderate-low. The 2026 base is visible, but 2027+ depends on a new product with no disclosed volumes.
Fair value and multiples
- DCF (10%, 5 years of FCF plus 11x year-5 FCF of $17M = $187M terminal): PV of FCF $52M, PV of terminal $116M, EV $168M, less $18M net debt = $150M, or ~$3.33/share (5-95% range ~$1.0-6.0).
- Base IRR from $2.40 is ~19%.
- Multiples at $2.40: EV/FY26 adjusted EBITDA 6.4x; EV/(EBITDA - SBC) 8.2x; EV/owner earnings ~16x; EV/2027E EBITDA ~5.2x. P/E is about 20x my 2027 EPS estimate (~$0.12, inflated by D&A on the idle GAC plant), while consensus 2027 GAAP EPS is $0.04.
- Buyout check: 8x 2027E EBITDA of $24M less net debt is ~$3.90/share. The NOL rights plan and >20% insider ownership cut both ways.
- Fair value $3.00 (range $1.50-4.80), set below the DCF because of the execution record and thin liquidity. That is ~25% upside, with ~40% if the DCF base case plays out.
- No dividend or buyback, so capital return is 0.
- Options are effectively untraded (no open interest), so there is no covered-call setup.
Chart
The stock went from $8.02 (3-year high) down to $1.64 (1-year low). Month-end closes: $6.64 in October 2025, $1.77 in October 2026. It is now $2.40 after a ~30% earnings-day gap from $1.84, which is 16% of the way up its 1-year range and 12% of its 3-year range. The pattern looks like capitulation, then a first proof point. Orin Hirschman's 7.2% stake was fully sold by April 2026, which is likely part of the 2026 selling pressure and is now done. Daniel Kaufman holds 5.1%. The new CFO bought ~$56K of stock at $2.22-2.34 in September 2026, and the CEO bought in 2025 at $3.79-5.25. Short interest is small (~0.45M shares, about 2 days to cover).
Management, governance, risks
- Management: CEO Bob Rasmus has now met or beaten guidance for three quarters and talks openly about rebuilding credibility. He also oversaw the GAC fiasco ($45M write-down, design litigation) after earlier promising GAC revenue. There has been heavy turnover: CFO and COO left, the SVP Ops hired in 2025 has already been replaced, and there is a new CAO. Board and management own >20%, and management says equity is the least-preferred way to fund growth. They also talk about borrowing up to 3x EBITDA (~$60M) for GAC, which would re-lever the company.
- Risks:
- PAC for PFAS adoption is slower or smaller than hoped, now that the compliance deadline has moved to 2031.
- Single-plant concentration (furnace outage, Louisiana hurricanes).
- Coal-fleet retirements erode the mercury segment.
- Liquidity is thin: CTB covenants waived for FY25 and suspended for FY26, MidCap amended four times, and the availability reserve rises to $5M in January 2027.
- A GAC funding decision could bring dilution or leverage.
- Working-capital seasonality.
- Competition: Calgon Carbon (Kuraray), Norit (One Equity Partners), Carbon Solutions/ADA Carbon, Jacobi (Osaka Gas), Donau, and imported coconut-shell GAC, which tariffs currently restrain. The PAC market is tight and pricing is firm. Arq's edge is a captive lignite feedstock and long utility relationships, but its products are only partly differentiated.
- Governance: no fraud history. Watch-points are the NOL rights plan (a takeover deterrent), repeated lender amendments and waivers, and past over-promising on GAC.
Sentiment: 3.5/10
The stock was hated into October: down ~75% from its 2025 high, a 26% drop after Q2, write-downs, and a $1.64 low. The finviz/retail tone before the print was cautious, calling the balance sheet the main overhang. Analysts are uniformly constructive but have cut hard. All four (Canaccord $6, Clear Street $6, Roth $3.50, Craig-Hallum $3.50) rate it Buy, with an average target of ~$4.03, down from $10 in 2025. Consensus is 2026 revenue of $124M and 2027 revenue of $139M (+12%). The Q3 pop marks the start of a recovery off capitulation, not elation. Sentiment is still well short of the point where the market believes the $30M EBITDA story.
- /Users/gregwo/stocks2/data/analysisv3/context/ARQ.md (context pack incl. Q3 2026 call transcript, 13D/G, short interest, forensic 10-Q flags)
- https://www.sec.gov/Archives/edgar/data/1515156/000151515626000137/a991pressreleaseq32026_114.htm
- /Users/gregwo/stocks2/data/edgar_filings/ARQ/10-Q_2026-11-04_0001515156-26-000136.html
- /Users/gregwo/stocks2/data/edgar_filings/ARQ/8-K_2026-11-04_0001515156-26-000137_EX99-1.html
- https://stockanalysis.com/stocks/arq/forecast/
- https://finviz.com/news/409216/arqs-margin-turnaround-meets-its-first-peak-season-test-as-shares-sit-near-lows
- https://www.quantisnow.com/insiders/ARQ
- https://quantisnow.com/insight/chief-executive-officer-rasmus-robert-e-bought-189590-worth-of-6273147
- https://www.marketbeat.com/instant-alerts/canaccord-genuity-group-raises-arq-nasdaqarq-price-target-to-1000-2025-08-07
- https://esemag.com/water/epa-proposes-pfas-rule-rollback-extending-compliance-timeline-pfoa-pfos/
- https://pfas.foxrothschild.com/2026/05/epa-is-one-step-closer-to-scaling-back-pfas-mcls/
- https://www.barchart.com/story/news/3764027/arq-reports-second-quarter-2026-results
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 127+7% | 120+10% | 109+10% | 99.2-4% | 103 |
| Gross profit | 40.6+3% | 33.5-7% | 36.1+24% | 29.1+51% | 19.3 |
| Operating expenses | 45.0+11% | 41.8+10% | 38.0-10% | 42.5+35% | 31.4 |
| ▸Adj EBITDA | 9.13-5% | 3.52-47% | 6.63 | -2.79 | -5.65 |
| ▸Adj OCF | 4.24-60% | 4.15-50% | 8.36 | -1.63 | -3.24 |
| CapEx | -4.16 | -6.32 | -85.2 | -27.5 | -9.15 |
| Adj FCF | 0.08 | -2.17 | -76.8 | -29.1 | -12.4 |
| Interest expense | 1.36 | 2.45 | 3.26 | 3.01 | 0.34 |
| ▸Adj net income | -7.20 | -10.7 | -3.95 | -14.7 | -12.4 |
| ▸Owner's earnings | -2.00 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -20.4 | 12.0100% | -38.4 | 6.58100% | 1.46100% | -1.96 |
| FCF (OCF−capex) | -137 | 4.8841% | -9.05 | -74.6 | -43.5 | -15.2 |
| Net income | -78.0 | 0.938% | -52.6 | -5.11-78% | -12.2-838% | -8.92 |
| ▸Capital returned | -60.6 | 1.4112% | -3.82 | -40.3-612% | -19.9 | 2.02 |
| Buybacks | -56.6 | 0.21 | 0.07 | -41.3 | -16.0 | 0.39 |
| Dividends | 0.04 | 0.00 | 0.00 | 0.00 | 0.00 | 0.04 |
| Interest paid | 9.87 | 0.81 | 2.45 | 3.26 | 3.01 | 0.34 |
| Debt paid down | -13.9 | 0.39 | -6.34 | -2.26 | -6.92 | 1.25 |
| ▸Reinvestment | 130 | 1.2110% | 5.61 | 84.2 | 28.2 | 10.7 |
| Capex (PP&E) | 131 | 2.88 | 6.32 | 85.2 | 27.5 | 9.15 |
| Intangibles & M&A | -2.38 | 0.00 | 0.00 | -0.15 | -2.23 | 0.00 |
| Leases signed (net Δ) | 1.24 | -1.67 | -0.71 | -0.86 | 2.96 | 1.52 |
| Retained / other | -64.7 | 4.2836% | -2.78 | -30.9-470% | -18.4 | -16.9 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 12 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 233 | 231 | 284 | 236 | 181 |
| ▸Liabilities (total) | 61.5 | 62.6 | 67.1 | 57.1 | 41.2 |
| Net debt (incl. leases) | 8.84 | 30.8 | 20.8 | -13.6 | -54.0 |
| Net debt / Adj EBITDA | 0.97 | 8.75 | 3.14 | -- | -- |
| Net debt / Adj FCF | 112 | -- | -- | -- | -- |
| Adj EBITDA / interest | 6.72 | 1.44 | 2.04 | -0.93 | -16.8 |
| Shares outstanding | 43.7 | 42.7 | 42.0 | 42.0 | 42.0 |
| Dilution (YoY) | +2.3% | +1.7% | +9.4% | +71.9% | -- |
| Employees | 200 | 202 | 203 | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 32.1%-1.3 | 27.9%-5.2 | 33.1%+3.7 | 29.4%+10.6 | 18.8% |
| Adj EBITDA margin | 7.2%-0.9 | 2.9%-3.2 | 6.1%+8.9 | -2.8%+2.7 | -5.5% |
| Adj OCF margin | 3.4%-5.7 | 3.5%-4.2 | 7.7%+9.3 | -1.6%+1.5 | -3.1% |
| Adj FCF margin | 0.1%+31.7 | -1.8%+68.7 | -70.5%-41.1 | -29.4%-17.4 | -12.0% |
| Net income margin | -38.8%-35.5 | -43.7%-39.0 | -4.7%+7.7 | -12.3%-3.7 | -8.7% |
| Adj NI margin | -5.7%-3.4 | -8.9%-5.3 | -3.6%+11.2 | -14.8%-2.8 | -12.0% |
| ROIC (adj, after-tax) | -1.9% | -3.2% | -0.6% | -5.0% | -6.3% |
| Cost of debt | 5.0% | 6.5% | 10.4% | 9.4% | 2.6% |
Revenue Breakdown
Revenue Segments
| UNITED STATES | $26.2M | +6% |
| CANADA | $2.9M | +9% |
Earnings Calls
Earnings Call · 2026 Q3
Arq reported a strong Q3 2026, driven by its foundational powdered activated carbon (PAC) business. Record revenue was $38.2 million, up about 9% from $35.1 million, on higher seasonal PAC volume. Gross margin rose to 39.7% from 28.8%, as revenue grew 9% while costs fell about 8%. Adjusted EBITDA was $8.8 million versus $5.2 million, the tenth straight quarter of positive adjusted EBITDA. Net income was $2.5 million versus a $0.9 million loss. SG&A rose to $7.2 million from $4.6 million on incentive compensation and legal and professional fees, while R&D fell to $0.8 million from $2.6 million because GAC ramp-up costs did not recur. Year-to-date adjusted EBITDA of $17.4 million already exceeds all of 2025 ($13.0 million). Management tightened 2026 adjusted EBITDA guidance to $19-20 million from $17-20 million, and reiterated revenue guidance of $120-125 million and CapEx of $8-10 million. CEO Bob Rasmus stressed rebuilding credibility by meeting or beating targets. The balance sheet strengthened. Total cash was $19.1 million, of which $7.8 million was unrestricted, up nearly $7 million sequentially. Debt fell $2.5 million to $28.2 million, including $19.2 million drawn on the MidCap facility. A cost program has identified over 15 opportunities across 8 departments. PFAS remediation was the main strategic theme. With the April 2027 monitoring and reporting deadline approaching, customers are seeking solutions and industry prices are rising. PAC for PFAS is the immediate priority because it uses existing equipment, needs little or no CapEx, and can deliver cash margins similar to or better than granular activated carbon (GAC). Early tests, which were sold rather than given away, show removal of lower-level PFAS plus taste and odor control. Premium test volumes were priced materially above the average PAC price, and patents are pending. Management estimates the addressable market at about 160 million pounds per year by 2029. More than a dozen customer opportunities are in testing, which takes 1-3 months. Meaningful orders are feasible in 2027, but revenue is expected to be back-end loaded. The GAC strategic review is effectively complete with design, cost and timeline unchanged. GAC remains an option to be exercised later, depending on returns and acceptable funding, and is not tied to PAC for PFAS adoption. For 2027, building blocks include PAC for PFAS, cost and SG&A efficiencies, refinancing the MidCap facility within about six months into a simpler, cheaper facility, operational efficiencies, and monetizing the Corbin site. Corbin carries about $8 million of debt, $1.9 million of escrowed cash, and about $2.6 million of annual operating and SG&A costs, and a sale might occur within 12 months but is not in expectations. Management remains comfortable with exiting 2027 at a roughly $30 million adjusted EBITDA run rate without GAC. Formal 2027 guidance will come early next year. Management believes the stock is undervalued, noting replacement value of assets is a significant multiple of book value.
▸What are the next steps for PAC for PFAS in terms of testing, certification and sales, and where does the company stand today?Gerard Sweeney · ROTH Capital
▸Do Arq's existing water-system relationships help jumpstart the PAC for PFAS strategy?Gerard Sweeney · ROTH Capital
▸Has testing shown the sweet spot for PFAS limits (MCLs, around 4 ppt) where PAC for PFAS works best?Gerard Sweeney · ROTH Capital
▸What drove Q3 strength, and does the guidance imply conservatism or pull-forward into Q3 for Q4?Aaron Spychalla · Craig-Hallum
▸Is management still optimistic about gross margin expansion given Q3's seasonal strength?Aaron Spychalla · Craig-Hallum
▸Can management explain the disconnect between replacement value and book value of the Red River assets and the undervaluation?Aaron Spychalla · Craig-Hallum
▸What are the gating factors for proceeding with GAC given the PAC for PFAS ramp is back-half weighted, and do Corbin or PAC evidence factor into the timing?Jason Tilchen · Canaccord Genuity
▸With 2027 volume upside of 15-20%, capacity near current volumes, and a PAC for PFAS market larger than capacity, what are the puts and takes?Jason Tilchen · Canaccord Genuity
▸How was the 160 million pound PAC for PFAS market estimated, and what share could Arq capture by 2029?Peter Gastreich · Water Tower Research
▸What does the new SVP of Operations bring and what are his priorities?Peter Gastreich · Water Tower Research
▸As utilities move from monitoring to compliance, how will customer relationships change, for example longer contracts or customized products?Peter Gastreich · Water Tower Research
SEC Filing Findings
SEC Filing — material findings
2026-11-04 · depth 9/10risk 6Liquidity/Covenants▸Secured revolver (MidCap, SOFR+5% with 2.5% floor) has been amended four times since May 2025. The minimum liquidity covenant was replaced with a $2.5M availability reserve that rises to $5.0M in January 2027. Revolver borrowings of $19.2M are secured by first-priority liens on substantially all assets.
Secured revolver (MidCap, SOFR+5% with 2.5% floor) has been amended four times since May 2025. The minimum liquidity covenant was replaced with a $2.5M availability reserve that rises to $5.0M in January 2027. Revolver borrowings of $19.2M are secured by first-priority liens on substantially all assets.
risk 6Going Concern/Covenants▸CTB term loan lender waived FY2025 financial covenants and suspended covenant testing for FY2026. The waiver required Arq to increase its cash reserve deposits at CTB.
CTB term loan lender waived FY2025 financial covenants and suspended covenant testing for FY2026. The waiver required Arq to increase its cash reserve deposits at CTB.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $2.50 | --/$0.75 | 314 | $0.30/$0.95 | 2 |
| $5.00 | --/$0.05 | 597 | $2.50/$3.70 | 0 |
| $7.50 | --/$0.75 | 0 | $5.00/$6.20 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $5.4M | $5.79 | +$132K | +$524K | — | $5.69T |
| ROYCE & ASSOCIATES LP | $4.5M | $5.69 | +$742K | +$4.5M | -0.4% | $10.09B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $3.7M | $2.56 | +$3.7M | +$3.7M | — | $4.04T |
| AQR CAPITAL MANAGEMENT LLC | $2.8M | $2.77 | +$2.0M | +$2.7M | +0.0% | $218.19B |
| MARSHALL WACE, LLP | $2.1M | $3.99 | +$936K | +$1.5M | -0.2% | $92.71B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $2.1M | $5.40 | +$59K | +$263K | -0.1% | $1.61T |
| Peapod Lane Capital LLC | $2.0M | $2.77 | +$1.4M | +$2.0M | — | $122M |
| DIMENSIONAL FUND ADVISORS LPPassive | $2.0M | $5.58 | −$403K | +$260K | -0.3% | $480.92B |
| STATE STREET CORPPassive | $1.4M | $5.85 | +$7K | +$362K | -0.2% | $2.89T |
| RENAISSANCE TECHNOLOGIES LLC | $1.1M | $3.80 | −$4K | +$388K | +0.7% | $63.91B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2019 Q1 | 19M | — | 27M | $0.64 | $0.61 – $0.68 | 1 |
| 2019 Q2 | 21M | — | 31M | $0.74 | $0.71 – $0.79 | 1 |
| 2019 Q3 | 22M | — | 34M | $0.80 | $0.76 – $0.85 | 1 |
| 2019 Q4 | 20M | — | 38M | $0.90 | $0.86 – $0.96 | 1 |
| 2020 Q1 | 17M | — | 26M | $0.62 | $0.59 – $0.66 | 1 |
| 2020 Q2 | 19M | — | 27M | $0.64 | $0.61 – $0.68 | 1 |
| 2020 Q3 | 21M | — | 31M | $0.74 | $0.71 – $0.79 | 1 |
| 2020 Q4 | 22M | — | 34M | $0.80 | $0.76 – $0.85 | 1 |
| 2021 Q1 | 20M | — | 38M | $0.90 | $0.86 – $0.96 | 1 |
| 2021 Q2 | 17M | — | 26M | $0.62 | $0.59 – $0.66 | 1 |
| 2021 Q3 | 18M | — | 28M | $0.67 | $0.64 – $0.71 | 1 |
| 2021 Q4 | 20M | — | 37M | $0.87 | $0.83 – $0.93 | 1 |
| 2022 Q1 | 23M | — | 40M | $0.94 | $0.90 – $1.00 | 1 |
| 2022 Q4 | 24M | -9M | -11M | $-0.26 | $-0.28 – $-0.25 | 1 |
| 2023 Q1 | 23M | -2M | -4M | $-0.10 | $-0.11 – $-0.10 | 1 |
| 2023 Q2 | 17M | -3M | -7M | $-0.16 | $-0.17 – $-0.15 | 1 |
| 2023 Q3 | 26M | -1M | -5M | $-0.11 | $-0.12 – $-0.10 | 1 |
| 2023 Q4 | 27M | 1M | -3M | $-0.08 | $-0.09 – $-0.08 | 1 |
| 2024 Q1 | 23M | -0M | -3M | $-0.07 | $-0.07 – $-0.07 | 1 |
| 2024 Q2 | 21M | 0M | -2M | $-0.05 | $-0.05 – $-0.05 | 1 |
| 2024 Q3 | 30M | 5M | 1M | $0.04 | $0.03 – $0.04 | 1 |
| 2024 Q4 | 29M | 2M | -1M | $-0.02 | $-0.02 – $-0.02 | 2 |
| 2025 Q1 | 26M | 2M | -1M | $-0.03 | $-0.03 – $-0.02 | 2 |
| 2025 Q2 | 26M | 2M | -1M | $-0.03 | $-0.03 – $-0.03 | 2 |
| 2025 Q3 | 35M | 5M | 1M | $0.02 | $0.01 – $0.02 | 3 |
| 2025 Q4 | 29M | 1M | -3M | $-0.07 | $-0.08 – $-0.04 | 2 |
| 2026 Q1 | 28M | 1M | -2M | $-0.04 | $-0.06 – $-0.02 | 2 |
| 2026 Q2 | 29M | 4M | -1M | $-0.01 | $-0.03 – $0.01 | 1 |
| 2026 Q3 | 35M | 7M | 1M | $0.03 | $0.03 – $0.04 | 2 |
| 2026 Q4 | 28M | 2M | -2M | $-0.06 | $-0.06 – $-0.05 | 2 |
| 2027 Q1 | 31M | 4M | -1M | $-0.01 | $-0.02 – $-0.01 | 1 |
| 2027 Q2 | 34M | 6M | 1M | $0.01 | $0.01 – $0.02 | 1 |
| 2027 Q3 | 40M | 8M | 3M | $0.06 | $0.06 – $0.06 | 1 |
| 2027 Q4 | 36M | 7M | 1M | $0.03 | $0.02 – $0.03 | 1 |
| 2028 Q1 | 50M | 7M | 1M | $0.02 | $0.02 – $0.02 | 1 |
| 2028 Q2 | 54M | 9M | 2M | $0.05 | $0.05 – $0.05 | 1 |
| 2028 Q3 | 57M | 10M | 2M | $0.06 | $0.05 – $0.06 | 1 |
| 2028 Q4 | 57M | 9M | 2M | $0.04 | $0.03 – $0.04 | 1 |
| 2029 Q1 | 43M | 16M | 7M | $0.17 | $0.16 – $0.18 | 1 |
| 2029 Q2 | 43M | 17M | 7M | $0.17 | $0.16 – $0.18 | 1 |
| 2029 Q3 | 44M | 17M | 7M | $0.17 | $0.16 – $0.18 | 1 |
| 2029 Q4 | 45M | 16M | 6M | $0.14 | $0.14 – $0.15 | 1 |
| 2030 Q1 | 45M | 21M | 10M | $0.23 | $0.22 – $0.25 | 1 |
| 2030 Q2 | 46M | 22M | 11M | $0.25 | $0.23 – $0.26 | 1 |
| 2030 Q3 | 46M | 24M | 12M | $0.28 | $0.26 – $0.30 | 1 |
| 2030 Q4 | 47M | 23M | 12M | $0.27 | $0.25 – $0.29 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-09-08 | BUY | Steinmetz Shimon | officer: Chief Financial Officer | 2,972 | $2.34 | $7K | $826K |
| 2026-09-04 | BUY | Steinmetz Shimon | officer: Chief Financial Officer | 5,758 | $2.28 | $13K | $801K |
| 2026-09-03 | BUY | Steinmetz Shimon | officer: Chief Financial Officer | 16,270 | $2.22 | $36K | $779K |
| 2026-05-04 | SELL | Voncannon Jay Loring | officer: Chief Financial Officer | 16,709 | $2.27 | $38K | $110K |
| 2026-03-23 | BUY | Campbell-Breeden Richard | director | 150,000 | $2.21 | $332K | $895K |
| 2026-03-17 | BUY | Wong Joseph M | officer: Chief Technology Officer | 10,000 | $1.89 | $19K | $757K |
| 2026-03-16 | BUY | Smith Claiborne Benson | officer: Gen Counsel, Corp Secretary | 1,000 | $1.92 | $2K | $197K |
| 2026-03-13 | BUY | EICHER CAROL S | director | 77,500 | $1.95 | $151K | $339K |
| 2026-03-12 | BUY | Smith Claiborne Benson | officer: Gen Counsel, Corp Secretary | 1,000 | $1.92 | $2K | $195K |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
ARQ has a credible but unproven operating recovery. The core PAC business is showing better pricing, gross margin and utilization, and the Q2 result supports the view that PAC can be a viable cash-generating franchise without GAC. PAC-for-PFAS could be strategically important because it may use existing equipment, avoid customer GAC infrastructure and command better pricing. The investment case is nevertheless highly dependent on execution. The GAC project has already suffered major technical failures and a substantial impairment, while the proposed $40M-$60M Phase 1 investment is large relative to ARQ's balance sheet. Restricted cash, prior covenant waivers, customer concentration and a history of heavy capex make financial flexibility a central risk. The likely two-year outcome is a better PAC business, but not yet a proven high-quality compounder.
Trade Signal
No trade: ARQ's improving PAC economics and PFAS option are real, but at roughly $98M of equity value the stock is near conservative fair value and does not compensate for liquidity, execution and dilution risk.
The major repricing occurred before the latest quarter: the February-March collapse followed the FY2025 impairment and the announcement that GAC production and development were being paused after thermal-oxidizer capacity proved inadequate. The stock then bounced in late March and May on insider buying, the Q1 update and reaffirmed guidance, before drifting from $2.84 in mid-June to roughly $2.07 by early August without a major new company-specific shock. The stock rose about 10% around the August 11 Q2 print as PAC margins and EBITDA materially improved, then held near $2.28. The earlier decline was largely a durable repricing of execution and financing risk, not a temporary panic; the post-earnings response looks broadly appropriate, with only a small possibility that the market is underappreciating PAC sustainability.
The stock remains disliked and largely ignored after falling roughly 70% over the past year from a $7.73 high. Bears focus on the $44.8M Corbin impairment, GAC technical failures, delayed commercialization, negative cash flow and financing risk. Bulls point to the improving PAC franchise, PFAS demand and Corbin optionality. The immediate Q2 result improved sentiment, but analyst coverage is thin and superficially bullish while positioning is not crowded: short interest is only 1.5% and options liquidity is poor. The market is skeptical rather than euphoric, but that skepticism is substantially justified.
The PAC business is improving faster than the recent operating history suggests: Q2 EBITDA rose 59%, gross margin expanded to 38.5%, and management sees substantial additional efficiency potential. PAC-for-PFAS could be a genuine product and margin inflection in 2027. However, the market has already seen the Q2 beat, management's $30M core-PAC EBITDA ambition and the PFAS narrative. The available consensus estimates are sparse and pushed far into 2029-2030, so they are not a reliable near-term benchmark; the stock is not pricing in a full bull case, but neither is the inflection clearly undiscovered.
- ▲2026-11 · Q3 2026 earnings and full-year guidance update — Seasonally stronger operations, no comparable turnaround burden and continued PAC pricing/cost gains could support EBITDA toward the $17M-$20M guidance range.
- ▲H2 2026 · PAC-for-PFAS customer testing and initial sales — Commercial validation or recurring utility contracts would demonstrate higher-ASP, higher-margin growth using existing equipment and capacity.
- •Late 2026 to 2027 · GAC strategic review / Phase 1 investment decision — A disciplined, externally funded project could add option value, while another delay or a balance-sheet-funded $40M-$60M build would increase risk materially.
- ▲Late 2026 · Corbin asphalt additive field-validation results — Successful durability and paving tests, or monetization of the Corbin asset and technology, could unlock non-dilutive value after the large impairment.
- •2027-03 · FY 2026 earnings and 2027 outlook — The key test is whether PAC generates sustainable cash after capex and working capital, rather than only adjusted EBITDA.
Insider flow is clearly positive, with approximately $0.9M of officer/director purchases over the last year and no meaningful insider selling. Dilution was approximately 2% TTM, but the previously proposed equity offering and likely future financing needs are important supply risks. Short interest has fallen sharply to 1.5% of float, leaving little squeeze fuel; passive ownership is not an active demand catalyst.
There is no hard floor at the current price. The PAC business has improving EBITDA potential and the Corbin asset provides optionality, but unrestricted cash is only about $3M against roughly $31M of debt, with substantial restricted cash and negative owner earnings. Covenant, refinancing and potential equity-financing risk could overwhelm asset value in a downside case. There is also no clear hard ceiling, although a financing or GAC-related equity raise could cap upside.
Moderately buyable for specialist small-cap industrial investors: PAC is showing real margin improvement, insider buying is supportive, and PFAS-for-PAC offers a differentiated growth angle. However, the $98M market cap, high volatility, negative owner earnings, restricted cash and financing risk limit the natural buyer base.
Fear pulls harder than greed at $2.28. The operating recovery is credible, but the valuation is already close to the analyst's conservative $90M target while the company still has negative owner earnings, limited unrestricted liquidity, technical GAC history and a meaningful chance of dilution. I would want either a lower entry price or evidence of sustained cash conversion before buying.
Valuation
The quarter showed stronger PAC economics than the headline revenue growth implied: gross margin reached 38.5%, adjusted EBITDA was approximately $5.8M, and management attributed the improvement to pricing, mix and operating actions rather than only a one-off accounting benefit. The call also introduced a more attractive PAC-for-PFAS commercialization path using existing capacity, while clarifying that GAC Phase 1 would require $40M-$60M and that investors should assume no GAC sales in 2027. Management said unrestricted cash had recovered to approximately $3.1M by July 31, reducing immediate liquidity concern but not eliminating financing risk.
▸ How the cases moved
Versus the day before the Q2 result, the bear case improves modestly from roughly $0M-$2M to $5M equity value and its probability falls from about 0.35 to 0.30 because PAC profitability and liquidity timing were better than feared. The base case rises from roughly $120M to $140M as gross margin, pricing discipline, cost initiatives and the completed turnaround improve confidence in normalized PAC earnings; its probability rises from 0.45 to 0.50. The bull case declines from roughly $300M to $280M because management now guides investors to assume no bituminous GAC production or sales in 2027 and disclosed a $40M-$60M Phase 1 capital requirement; its probability remains approximately 0.20. The shifts are attributable to the Q2 release and call, not previously known historical filings.
PAC remains a low-margin, cyclical industrial business; the PFAS-specific product takes longer to qualify, while GAC remains deferred and Corbin produces no meaningful proceeds. EBITDA falls toward $6M, but interest, maintenance capex, working-capital needs and stock compensation leave owner earnings negative. Restricted cash and covenant history force conservative financing and may cause dilution.
▸ Valuation
4x $6M EBITDA = $24M EV − $19M net debt = $5M equity value
The PAC franchise improves through pricing, higher utilization, cost reductions and initial PAC-for-PFAS contracts, but the $30M EBITDA goal is not fully achieved. No GAC production occurs by 2027 and Corbin remains an option rather than a material contributor. Cash generation improves after the 2026 turnaround, allowing some debt reduction and positive owner earnings.
▸ Valuation
6x $25M EBITDA = $150M EV − $10M net debt = $140M equity value
PAC-for-PFAS testing converts into recurring, high-margin municipal contracts, operational initiatives lift core PAC EBITDA toward or above $30M, and Corbin or its technology is monetized for meaningful non-dilutive value. GAC remains a valuable option, with a disciplined project decision or external funding rather than a balance-sheet-damaging build. Strong cash conversion materially reduces net debt and supports a higher-quality industrial growth multiple.
▸ Valuation
8x $35M EBITDA = $280M EV − $0M net debt = $280M equity value
▸ Target Rationale
The probability-weighted scenario value discounts to $102M, but I set the analytical target at $90M. The adjustment reflects weak historical cash conversion, restricted liquidity, covenant risk, probable financing needs, and the possibility that future GAC or growth spending consumes the PAC cash flow before it reaches shareholders. I give substantial credit for the improving PAC economics and PFAS option, but not for uncommitted GAC value or management's full EBITDA target.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q4 and FY 2025 Earnings (March 10, 2026): Arq reported full-year 2025 revenue of $120.3 million (up 10% YoY) and Adjusted EBITDA of $13.2 million, driven by strong powdered activated carbon (PAC) performance. However, the company recorded a heavy net loss of $52.6 million for the year (including a Q4 net loss of $50.0 million), heavily impacted by a $44.8 million non-cash impairment charge on its Corbin facility.
- GAC Production Pause: Simultaneously with its FY 2025 earnings, Arq announced a temporary pause on granular activated carbon (GAC) production and development at its Red River facility. Independent engineering reviews revealed that the current thermal oxidizer capacity only supports about 15 million pounds of annual GAC production—well below the original 25 million-pound target—prompting a comprehensive optimization review. No GAC production is expected for the remainder of fiscal 2026.
- Q1 2026 Earnings (May 6, 2026): Arq reported Q1 2026 revenue of $29.1 million (up 7% YoY from $27.2 million), driven by resilient PAC sales volumes. Adjusted EBITDA fell to $2.7 million (down from $4.1 million in Q1 2025), affected by an $0.8 million non-cash inventory revaluation charge and $0.6 million in GAC-related carryover expenses. Net loss for the quarter was $0.8 million. Management reaffirmed its full-year 2026 guidance of $120–$125 million in revenue and $17–$20 million in Adjusted EBITDA. The biennial plant turnaround at Red River was completed under budget in April 2026.
- Management Reorganization & CFO Appointment: In early 2026, Arq eliminated the COO role to streamline operations. Subsequently, on May 27, 2026, the company appointed Shimon Steinmetz as Executive Vice President and Chief Financial Officer, succeeding acting principal financial officer Stacia Hansen, who resigned effective June 12, 2026.
- Proposed Equity Offering & Contract Disclosures: In May 2026, Arq announced a proposed equity offering to the market. In the accompanying prospectus, the company disclosed the termination of its construction contract for the GAC manufacturing plant, indicating near-term GAC project execution delays.
▸ Thesis-test Findings
1. EPA PFAS drinking water regulation compliance deadlines 2027
- Findings: On May 18, 2026, the EPA proposed a rule under the Safe Drinking Water Act (SDWA) that would allow public water systems to request up to a two-year extension—shifting the compliance deadline to meet Maximum Contaminant Levels (MCLs) for PFOA and PFOS from April 2029 to April 2031. However, the EPA did *not* delay the initial monitoring or reporting requirements; all public water systems are still mandated to complete initial PFAS monitoring by 2027.
- Bearing on Thesis: This is a mixed signal for Arq's GAC demand thesis. On the bearish side, delaying the enforceable treatment deadline to 2031 may defer large-scale municipal capital expenditures for GAC installation, slowing immediate near-term market inflection. On the bullish side, keeping the 2027 initial monitoring deadline intact guarantees that water utilities will actively identify and report contaminations over the next year, maintaining high pressure on water systems to plan, test, and design remediation solutions early.
2. Granular activated carbon industry capacity additions North America
- Findings: The North American GAC market has seen significant capacity additions from major incumbent players. Most notably, industry leader Calgon Carbon (Kuraray Group) completed a major expansion at its Pearlington, Mississippi plant, adding a second virgin GAC line that added 50 million pounds (25,000 tons) of annual capacity, pushing its total U.S. virgin capacity past 200 million pounds per year. Calgon also leveraged this scale to secure a massive, 9-year exclusive supply contract with American Water in January 2025.
- Bearing on Thesis: This is a headwind for the bull case. With Calgon Carbon locking in multi-year utility agreements and expanding its domestic output, competition is intensifying. Because Arq has paused its own GAC commercial ramp-up for technical optimization, competitors are actively capturing early municipal demand. However, the bull case retains its long-term merit because Arq remains one of only three coal-based domestic GAC manufacturers, meaning its vertically integrated, US-sourced supply chain will still have a major structural and tariff-insulated cost advantage once production is successfully optimized.
3. Arq Inc municipal testing asphalt additive Corbin wet cake
- Findings: Arq's "Corbin wetcake" (a low-ash, coal waste-derived byproduct produced at its idled Corbin facility) has progressed significantly in commercial testing. In its Q1 2026 earnings release, Arq announced that testing of the wetcake for asphalt emulsion blending with a leading U.S. asphalt partner has demonstrated differentiated performance and is now advancing to small-scale, in-field paving tests. Additionally, Arq is in active discussions with multiple third parties regarding the outright monetization of the Corbin Facility and its related technologies.
- Bearing on Thesis: This is highly positive for the bull case. Following the severe $44.8 million asset impairment of the Corbin facility in late 2025, finding high-margin commercial applications for the Corbin wetcake—or successfully selling the facility/IP—represents a major opportunity to unlock non-dilutive value. Successful commercialization in the asphalt market would build a secondary, high-margin standalone business line that diversifies Arq's revenue beyond pure activated carbon filtration.