Stocks/ARQ

ARQ

Arq, Inc.v3 6.3/10 · 2026-11-05
Industrials·Industrial - Pollution & Treatment Controls
$3.00
$130M market cap
v3 Rating
6.3/104.8–7.5
Setup
7.0/105.5–8.5
Fair Value
$3.00$1.50–$4.80+0%
DCF (10%)
$3.33+11%
Base IRR
+19%-15%–+40%
Visibility
wide±55%
Wall Street
$7.50 target(1 analyst last year)(2 buy, 2 hold)
Rating
Revenue (TTM)
$126.6M
Owner Earnings
$8M
Next-Yr Owner Earnings
$9M
Growth
+12.0% × 4y
P / Next-Yr OE
14.9x
Net Debt
$18M

Operating throughout North America, Arq, Inc. is a specialized manufacturer of activated carbon materials. Their product range encompasses various types of activated carbon, specifically granular, powdered, and colloidal forms. Additionally, they provide Arq Powder Wetcake, which is a finely processed, low-ash particle originating from coal waste, along with additives formulated for managing air pollution. These versatile products find application in numerous sectors, including water purification, remediation of contaminated groundwater, enhancing soil composition, controlling atmospheric discharges, and as components in asphalt mixtures. Established in 1996, the company rebranded as Arq, Inc. in February 2024, having previously been known as Advanced Emissions Solutions, Inc. Its corporate headquarters are located in Greenwood Village, Colorado.

2-Year Price History

$2.40-65.3%
$2.0$3.0$4.0$5.0$6.0$7.0Initial target $3.00 · 2026-11-05volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-05

Rating
6.34.8–7.5
Setup
7.05.5–8.5
Fair value (USD)
3.001.50 – 4.80
Upside vs 3.00
+0%
DCF (10%)
3.331.00 – 6.00+11%
Base IRR
19%-15% – 40%
Visibility
widerange ±55%
Sentiment
4/10
2026-11-05 · claude-opus-5-5 · priced at 2.40

Arq is a single-plant (Red River, Louisiana) maker of lignite-based powdered activated carbon (PAC), used for mercury control at coal plants and for municipal water treatment. Its attempt to get into granular carbon (GAC) failed and led to a $45M write-down. The stock fell from $8 to a $1.64 low, then jumped about 30% to $2.40 (Nov 5 close; it was $1.84 the day before) on a record Q3: revenue $38.2M, gross margin 39.7%, adjusted EBITDA $8.8M. FY26 EBITDA guidance was tightened to $19-20M, up from $13M in 2025. The core PAC business is now clearly profitable, but the honest cash picture is less flattering than the EBITDA. After stock comp (~$4M) and maintenance capex including the biennial turnaround (~$7.5M), with no cash tax thanks to NOLs, unlevered owner earnings are only ~$7-8M (about 40% of EBITDA). On an EV of ~$125M that is ~16x owner earnings, though only 6.4x adjusted EBITDA, and today's year repeated forever is worth only ~$1.30/share. The case rests on 2027. Management's building blocks are a premium-priced PAC-for-PFAS line that needs almost no capex (test volumes already sold, more than a dozen customer trials, EPA keeping the 4 ppt PFOA/PFOS limit), cost cuts, a cheaper refinancing of the 9%+ MidCap revolver, and Corbin monetization (~$2.6M a year of costs plus $8M of debt). Together they target a ~$30M EBITDA exit run-rate without GAC. My base case has FCF of $9M rising to $17M by 2031, valued at 11x. That gives a DCF of ~$3.33 and a ~19% IRR, and I set fair value at $3.00 given the execution record (the GAC fiasco, covenant waivers, CFO churn, thin liquidity). Rating 6.3: a credible turnaround that has just started to show, still near the bottom of its range, with four Buy-rated analysts (average target ~$4). But the stock is not cheap on today's cash, and the move off capitulation lows has already begun. Research rating 7: whether PAC-for-PFAS volumes and pricing are real can be checked by early-2027 guidance and customer and channel checks, and if they are, the stock could re-rate 50%+.

A deep dive would have to establish: Whether PAC-for-PFAS can deliver contracted 2027 volumes at materially higher prices and margins, lifting EBITDA toward ~$25-30M (and owner earnings toward $12M+) without new capex or dilution, while the refinancing removes the liquidity overhang.

Owner earnings, TTM
$8M$5M – $11M
Realistic peak profit
$19M$12M – $30M
Growth rate
12.0%3.0% – 22.0%
Years of growth
42 – 7
Market cap
$107M$104M – $110M
EV
$125M$119M – $131M
Net debt
$18M$14M – $22M
Capital return / cap
0.0%0.0% – 1.0%
P/E
20.0×12.0× – 60.0×
EV/EBITDA
6.4×5.6× – 7.2×
FCF yield
4.5%2.5% – 7.0%
Projected FCF, base case (USD millions)
Y1$9M$4M – $13M
Y2$13M$6M – $19M
Y3$15M$6M – $22M
Y4$16M$6M – $24M
Y5$17M$6M – $26M
Competition: Arq sells partly commoditized lignite-based PAC against larger rivals (Calgon/Kuraray, Norit, Carbon Solutions, Jacobi, coconut-shell importers) in a currently tight, firm-priced market, with captive feedstock and utility relationships as its main edge.
Governance: No fraud history, but there is a record of over-promising and failing on GAC ($45M write-down), heavy CFO/COO turnover, repeated lender amendments and covenant waivers, and an NOL rights plan that deters takeovers.
Research (expand)

What the company does

Arq (formerly Advanced Emissions Solutions) makes activated carbon in North America. Almost all of its value is the Red River plant in Coushatta, Louisiana, one of the larger PAC furnaces on the continent, fed by its own Five Forks lignite mine. PAC goes to two markets: (1) coal-fired power plants and industrial users for mercury emissions control, under the 2012 MATS rule, which still stands; and (2) municipal water utilities for taste, odor and contaminant removal. Customers buy mostly on annual and multi-year contracts, and 96% of 2026 volume was contracted by March. Arq also owns Corbin, Kentucky, a coal-waste purification site meant to feed GAC. Corbin is idled, written down by $45M, and now being marketed as an asphalt additive or other feedstock. A half-built GAC line at Red River was paused in March 2026 because of design flaws (litigation against the former engineering firm is ongoing). Finishing Phase 1 (25M lb a year on purchased bituminous coal) would cost $40-60M, and there is no commitment or funding.

Investment case

  • The PAC base has turned. FY25 adjusted EBITDA was $13.0M. 9M26 is $17.4M, and Q3 alone was $8.8M on record revenue of $38.2M (+9%, volume-driven) with a 39.7% gross margin (vs 28.8%). Gross margin for 9M rose to 37.7% from 32.5%. Most of the improvement is real: pricing, mix, cost work, and no more GAC start-up drag. FY26 guidance is $19-20M EBITDA on $120-125M revenue. The implied Q4 of $1.6-2.6M reflects normal seasonality (Q4 2025 was roughly breakeven).
  • PAC for PFAS. This is a premium PAC grade for utilities just above the 4 ppt PFOA/PFOS limit. It runs on existing PAC dosing equipment, so the customer avoids buying GAC vessels, and it can sit in front of existing GAC to extend change-out intervals. Test lots were sold "materially above" the normal PAC price. There are more than a dozen trials, patents are pending, and management puts the addressable market at ~160M lb a year by 2029, more than Arq's whole ~125M lb of output. Revenue is expected to be weighted to the back of 2027. Arq needs almost no capex for this and can displace low-margin PAC volume if capacity gets tight. The regulatory picture: EPA's May 2026 proposals keep the 4 ppt PFOA/PFOS limits but push compliance to 2031 and rescind the PFHxS/PFNA/GenX limits. Monitoring and reporting still starts April 2027, and utilities are moving early for reputational reasons. That makes demand slower but intact.
  • Self-help. New CFO Shimon Steinmetz (a former activist investor) has found 15+ cost and liquidity opportunities across 8 departments. The MidCap revolver (SOFR+5%, 2.5% floor, four amendments, a $2.5M availability reserve rising to $5M in January 2027) is to be refinanced within 6 months. Selling Corbin would remove ~$8M of CTB debt, release ~$1.9M of escrow, and save ~$2.6M a year of operating and SG&A cost.
  • Management's target is a ~$30M adjusted EBITDA exit run-rate for 2027 without GAC, which would put the current EV at about 4x. GAC remains a cheap call option on a largely built plant.

What it earns today (real FCF)

FY26E adjusted EBITDA is ~$19.5M. Stock comp of ~$4.2M (SBC was $3.1M for 9M; it is added back in adjusted EBITDA and is a real cost) brings that to ~$15.3M. Maintenance capex runs ~$7.5M a year: Red River furnace upkeep, mine development, and the $3.1M biennial turnaround (capitalized in other assets, next one April 2028), averaged. Cash taxes are ~0 because of large NOLs, which are protected by a tax-asset preservation rights plan. That leaves unlevered owner earnings of ~$7.8M (range $5-10.5M), about 40% of EBITDA. Interest runs ~$3M a year, so levered owner FCF is ~$4.8M, a ~4.5% yield on the $106M market cap. Reported 9M operating cash flow was $7.7M after a $5.2M receivables build, and 9M capex was $2.75M plus $0.35M mine development plus the turnaround booked in other assets. The ~$14M of D&A is far above maintenance capex because most of the $136M of PP&E is the non-earning GAC plant. That is why GAAP EPS looks tiny ($0.06 in Q3, $0.01 for 9M).

Mature-company test: today's $7.8M repeated forever, discounted at 10%, is worth $78M of EV, less ~$18M net debt, or ~$1.33/share, below the price. The equity earns ~$4.8M a year (~4.5%) if nothing changes. The stock is only attractive if 2027 growth shows up.

Net debt and share count

Total debt at 9/30/26 is $28.2M: the $19.2M MidCap revolver, ~$9.0M CTB term loan and finance items. Unrestricted cash is $7.8M. Of the $11.3M restricted cash, $9.3M is surety-bond collateral for Five Forks and Corbin reclamation (not available), and ~$2M is CTB escrow (I net it against the CTB loan). That gives net debt of ~$18M (range $14-22M). Operating leases (railcars and equipment) are expensed in COGS and left out of EV. There are 44.17M shares outstanding and I use ~45M diluted for RSUs, so the market cap is ~$107M and EV ~$125M.

Five-year FCF projection (unlevered, after SBC, capex, working capital and cash tax)

| Year | Adj. EBITDA | FCF (low / base / high) |

|---|---|---|

| 2027 | ~$24M | $4 / $9 / $13M |

| 2028 | ~$28M (turnaround year) | $6 / $13 / $19M |

| 2029 | ~$31M | $6 / $15 / $22M |

| 2030 | ~$33M | $6 / $16 / $24M |

| 2031 | ~$35M | $6 / $17 / $26M |

The base case assumes SBC of ~$4.5M, maintenance capex of $8-9M, $1M a year of working-capital build, and cash taxes starting to creep in around 2030. It includes no GAC capex or revenue. Revenue grows from ~$123M to ~$155M through volume (capacity allows another 15-20%), price increases as contracts renew, and a PFAS mix shift. Growth runway: about 3-4 years at double digits, then capacity-bound mid-single digits unless GAC is built.

What the company looks like in 5 years

In the base case it is not a corpse but not a compounder either. It would be a single-plant specialty carbon producer with ~$150M revenue, ~$35M EBITDA, ~$17M FCF and net cash by 2029-30, worth 10-12x FCF as a ~5%-growth business with some cyclicality. Mercury-control demand is a slow-melting part of the base as coal plants retire, though current federal policy is delaying retirements and coal burn is up. Water and PFAS are the growing part. The upside version funds GAC with debt and becomes a two-product PFAS remediation platform, which a strategic buyer would value at 8-10x EBITDA. The downside version: PFAS PAC is a niche, EBITDA stalls near $20M, and FCF stays ~$6-8M. Confidence is moderate-low. The 2026 base is visible, but 2027+ depends on a new product with no disclosed volumes.

Fair value and multiples

  • DCF (10%, 5 years of FCF plus 11x year-5 FCF of $17M = $187M terminal): PV of FCF $52M, PV of terminal $116M, EV $168M, less $18M net debt = $150M, or ~$3.33/share (5-95% range ~$1.0-6.0).
  • Base IRR from $2.40 is ~19%.
  • Multiples at $2.40: EV/FY26 adjusted EBITDA 6.4x; EV/(EBITDA - SBC) 8.2x; EV/owner earnings ~16x; EV/2027E EBITDA ~5.2x. P/E is about 20x my 2027 EPS estimate (~$0.12, inflated by D&A on the idle GAC plant), while consensus 2027 GAAP EPS is $0.04.
  • Buyout check: 8x 2027E EBITDA of $24M less net debt is ~$3.90/share. The NOL rights plan and >20% insider ownership cut both ways.
  • Fair value $3.00 (range $1.50-4.80), set below the DCF because of the execution record and thin liquidity. That is ~25% upside, with ~40% if the DCF base case plays out.
  • No dividend or buyback, so capital return is 0.
  • Options are effectively untraded (no open interest), so there is no covered-call setup.

Chart

The stock went from $8.02 (3-year high) down to $1.64 (1-year low). Month-end closes: $6.64 in October 2025, $1.77 in October 2026. It is now $2.40 after a ~30% earnings-day gap from $1.84, which is 16% of the way up its 1-year range and 12% of its 3-year range. The pattern looks like capitulation, then a first proof point. Orin Hirschman's 7.2% stake was fully sold by April 2026, which is likely part of the 2026 selling pressure and is now done. Daniel Kaufman holds 5.1%. The new CFO bought ~$56K of stock at $2.22-2.34 in September 2026, and the CEO bought in 2025 at $3.79-5.25. Short interest is small (~0.45M shares, about 2 days to cover).

Management, governance, risks

  • Management: CEO Bob Rasmus has now met or beaten guidance for three quarters and talks openly about rebuilding credibility. He also oversaw the GAC fiasco ($45M write-down, design litigation) after earlier promising GAC revenue. There has been heavy turnover: CFO and COO left, the SVP Ops hired in 2025 has already been replaced, and there is a new CAO. Board and management own >20%, and management says equity is the least-preferred way to fund growth. They also talk about borrowing up to 3x EBITDA (~$60M) for GAC, which would re-lever the company.
  • Risks:

- PAC for PFAS adoption is slower or smaller than hoped, now that the compliance deadline has moved to 2031.

- Single-plant concentration (furnace outage, Louisiana hurricanes).

- Coal-fleet retirements erode the mercury segment.

- Liquidity is thin: CTB covenants waived for FY25 and suspended for FY26, MidCap amended four times, and the availability reserve rises to $5M in January 2027.

- A GAC funding decision could bring dilution or leverage.

- Working-capital seasonality.

  • Competition: Calgon Carbon (Kuraray), Norit (One Equity Partners), Carbon Solutions/ADA Carbon, Jacobi (Osaka Gas), Donau, and imported coconut-shell GAC, which tariffs currently restrain. The PAC market is tight and pricing is firm. Arq's edge is a captive lignite feedstock and long utility relationships, but its products are only partly differentiated.
  • Governance: no fraud history. Watch-points are the NOL rights plan (a takeover deterrent), repeated lender amendments and waivers, and past over-promising on GAC.

Sentiment: 3.5/10

The stock was hated into October: down ~75% from its 2025 high, a 26% drop after Q2, write-downs, and a $1.64 low. The finviz/retail tone before the print was cautious, calling the balance sheet the main overhang. Analysts are uniformly constructive but have cut hard. All four (Canaccord $6, Clear Street $6, Roth $3.50, Craig-Hallum $3.50) rate it Buy, with an average target of ~$4.03, down from $10 in 2025. Consensus is 2026 revenue of $124M and 2027 revenue of $139M (+12%). The Q3 pop marks the start of a recovery off capitulation, not elation. Sentiment is still well short of the point where the market believes the $30M EBITDA story.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue127+7%120+10%109+10%99.2-4%103
Gross profit40.6+3%33.5-7%36.1+24%29.1+51%19.3
Operating expenses45.0+11%41.8+10%38.0-10%42.5+35%31.4
▸Adj EBITDA9.13-5%3.52-47%6.63-2.79-5.65
▸Adj OCF4.24-60%4.15-50%8.36-1.63-3.24
CapEx-4.16-6.32-85.2-27.5-9.15
Adj FCF0.08-2.17-76.8-29.1-12.4
Interest expense1.362.453.263.010.34
▸Adj net income-7.20-10.7-3.95-14.7-12.4
▸Owner's earnings-2.00--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-20.412.0100%-38.46.58100%1.46100%-1.96
FCF (OCF−capex)-1374.8841%-9.05-74.6-43.5-15.2
Net income-78.00.938%-52.6-5.11-78%-12.2-838%-8.92
▸Capital returned-60.61.4112%-3.82-40.3-612%-19.92.02
Buybacks-56.60.210.07-41.3-16.00.39
Dividends0.040.000.000.000.000.04
Interest paid9.870.812.453.263.010.34
Debt paid down-13.90.39-6.34-2.26-6.921.25
▸Reinvestment1301.2110%5.6184.228.210.7
Capex (PP&E)1312.886.3285.227.59.15
Intangibles & M&A-2.380.000.00-0.15-2.230.00
Leases signed (net Δ)1.24-1.67-0.71-0.862.961.52
Retained / other-64.74.2836%-2.78-30.9-470%-18.4-16.9

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 12 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)233231284236181
▸Liabilities (total)61.562.667.157.141.2
Net debt (incl. leases)8.8430.820.8-13.6-54.0
Net debt / Adj EBITDA0.978.753.14----
Net debt / Adj FCF112--------
Adj EBITDA / interest6.721.442.04-0.93-16.8
Shares outstanding43.742.742.042.042.0
Dilution (YoY)+2.3%+1.7%+9.4%+71.9%--
Employees200202203----
MarginsTTM2025202420232022
Gross margin32.1%-1.327.9%-5.233.1%+3.729.4%+10.618.8%
Adj EBITDA margin7.2%-0.92.9%-3.26.1%+8.9-2.8%+2.7-5.5%
Adj OCF margin3.4%-5.73.5%-4.27.7%+9.3-1.6%+1.5-3.1%
Adj FCF margin0.1%+31.7-1.8%+68.7-70.5%-41.1-29.4%-17.4-12.0%
Net income margin-38.8%-35.5-43.7%-39.0-4.7%+7.7-12.3%-3.7-8.7%
Adj NI margin-5.7%-3.4-8.9%-5.3-3.6%+11.2-14.8%-2.8-12.0%
ROIC (adj, after-tax)-1.9%-3.2%-0.6%-5.0%-6.3%
Cost of debt5.0%6.5%10.4%9.4%2.6%

Revenue Breakdown

Revenue Segments

By Geography (2026-Q1)
UNITED STATES$26.2M+6%
CANADA$2.9M+9%

Earnings Calls

13 calls

Earnings Call · 2026 Q3

2026-11-05

Arq reported a strong Q3 2026, driven by its foundational powdered activated carbon (PAC) business. Record revenue was $38.2 million, up about 9% from $35.1 million, on higher seasonal PAC volume. Gross margin rose to 39.7% from 28.8%, as revenue grew 9% while costs fell about 8%. Adjusted EBITDA was $8.8 million versus $5.2 million, the tenth straight quarter of positive adjusted EBITDA. Net income was $2.5 million versus a $0.9 million loss. SG&A rose to $7.2 million from $4.6 million on incentive compensation and legal and professional fees, while R&D fell to $0.8 million from $2.6 million because GAC ramp-up costs did not recur. Year-to-date adjusted EBITDA of $17.4 million already exceeds all of 2025 ($13.0 million). Management tightened 2026 adjusted EBITDA guidance to $19-20 million from $17-20 million, and reiterated revenue guidance of $120-125 million and CapEx of $8-10 million. CEO Bob Rasmus stressed rebuilding credibility by meeting or beating targets. The balance sheet strengthened. Total cash was $19.1 million, of which $7.8 million was unrestricted, up nearly $7 million sequentially. Debt fell $2.5 million to $28.2 million, including $19.2 million drawn on the MidCap facility. A cost program has identified over 15 opportunities across 8 departments. PFAS remediation was the main strategic theme. With the April 2027 monitoring and reporting deadline approaching, customers are seeking solutions and industry prices are rising. PAC for PFAS is the immediate priority because it uses existing equipment, needs little or no CapEx, and can deliver cash margins similar to or better than granular activated carbon (GAC). Early tests, which were sold rather than given away, show removal of lower-level PFAS plus taste and odor control. Premium test volumes were priced materially above the average PAC price, and patents are pending. Management estimates the addressable market at about 160 million pounds per year by 2029. More than a dozen customer opportunities are in testing, which takes 1-3 months. Meaningful orders are feasible in 2027, but revenue is expected to be back-end loaded. The GAC strategic review is effectively complete with design, cost and timeline unchanged. GAC remains an option to be exercised later, depending on returns and acceptable funding, and is not tied to PAC for PFAS adoption. For 2027, building blocks include PAC for PFAS, cost and SG&A efficiencies, refinancing the MidCap facility within about six months into a simpler, cheaper facility, operational efficiencies, and monetizing the Corbin site. Corbin carries about $8 million of debt, $1.9 million of escrowed cash, and about $2.6 million of annual operating and SG&A costs, and a sale might occur within 12 months but is not in expectations. Management remains comfortable with exiting 2027 at a roughly $30 million adjusted EBITDA run rate without GAC. Formal 2027 guidance will come early next year. Management believes the stock is undervalued, noting replacement value of assets is a significant multiple of book value.

Analyst Q&A (11)
▸
What are the next steps for PAC for PFAS in terms of testing, certification and sales, and where does the company stand today?
Gerard Sweeney · ROTH Capital
More than a dozen opportunities are identified between existing and scheduled testing, and the number should grow. Testing takes 1-3 months, with contract talks running simultaneously. PAC for PFAS revenue is expected in 2027 and to be back-end loaded.
▸
Do Arq's existing water-system relationships help jumpstart the PAC for PFAS strategy?
Gerard Sweeney · ROTH Capital
Yes. Strong relationships with many municipal authorities and private utilities, combined with technical and R&D capabilities, give Arq a leg up in getting access and building momentum.
▸
Has testing shown the sweet spot for PFAS limits (MCLs, around 4 ppt) where PAC for PFAS works best?
Gerard Sweeney · ROTH Capital
Testing confirms removal of lower-level PFAS plus taste and odor control, either as an alternative to GAC or combined with it to reduce GAC change-outs. The technical sweet spot is still being determined, but it is up to a reasonably high level.
▸
What drove Q3 strength, and does the guidance imply conservatism or pull-forward into Q3 for Q4?
Aaron Spychalla · Craig-Hallum
Growth was predominantly volume-driven, with small PAC for PFAS sales at premium prices. Raising EBITDA but not revenue guidance reflects efficiencies captured from the review and underlying strength. Management is keeping to a meet-or-beat approach to rebuild credibility, and 2027 guidance will come early next year.
▸
Is management still optimistic about gross margin expansion given Q3's seasonal strength?
Aaron Spychalla · Craig-Hallum
Yes. Gross margin rose 1,100 bps to 39.7% as revenue grew 9% and costs fell about 8%. Q3 is seasonally strongest, but cost mitigation, core PAC growth and the PAC for PFAS launch should keep strengthening margins.
▸
Can management explain the disconnect between replacement value and book value of the Red River assets and the undervaluation?
Aaron Spychalla · Craig-Hallum
It is a dual disconnect: asset replacement value is a significant multiple of book value, and the company trades at a severely undervalued enterprise value multiple relative to its performance.
▸
What are the gating factors for proceeding with GAC given the PAC for PFAS ramp is back-half weighted, and do Corbin or PAC evidence factor into the timing?
Jason Tilchen · Canaccord Genuity
Management is confident in PAC for PFAS, but the GAC decision has no set date and does not depend on PAC for PFAS adoption. It depends on timing, return profile and an acceptable funding solution. PAC for PFAS is the immediate priority because it can deliver similar or better cash margins with little to no CapEx.
▸
With 2027 volume upside of 15-20%, capacity near current volumes, and a PAC for PFAS market larger than capacity, what are the puts and takes?
Jason Tilchen · Canaccord Genuity
2027 profitability gains will come gradually from lower costs, higher pricing, efficiencies and volume, with PAC for PFAS back-end weighted. If capacity became constrained, that would be a good problem, and Arq would drop lower-margin volumes in favor of higher-priced PAC for PFAS.
▸
How was the 160 million pound PAC for PFAS market estimated, and what share could Arq capture by 2029?
Peter Gastreich · Water Tower Research
The estimate grew from customer and prospect conversations plus in-depth market research and should keep growing as the 2027 monitoring and 2029-2031 compliance deadlines near. No specific share was given, but even modest share would mean very attractive returns.
▸
What does the new SVP of Operations bring and what are his priorities?
Peter Gastreich · Water Tower Research
Thad Ratliff replaced Eric Robinson, who stabilized operations and built operating leadership ahead of the 2-3 year timeline. Ratliff has activated carbon, carbon black and specialty chemical experience, and the role's scope changed with the near-term focus on PAC for PFAS. Robinson stays on as a consultant, including for any GAC build. The appointment was not announced separately because the role is not C-suite.
▸
As utilities move from monitoring to compliance, how will customer relationships change, for example longer contracts or customized products?
Peter Gastreich · Water Tower Research
It should enhance relationships because Arq solves a significant problem for utilities, and management expects additional contract volumes, including single-year and multi-year contracts.

SEC Filing Findings

SEC Filing — material findings

2026-11-04 · depth 9/10
risk 6Liquidity/Covenants
▸

Secured revolver (MidCap, SOFR+5% with 2.5% floor) has been amended four times since May 2025. The minimum liquidity covenant was replaced with a $2.5M availability reserve that rises to $5.0M in January 2027. Revolver borrowings of $19.2M are secured by first-priority liens on substantially all assets.

“the replacement of the existing minimum liquidity covenant with a $ 2.5 million availability reserve requirement, which will increase to $ 5.0 million beginning in January 2027”
risk 6Going Concern/Covenants
▸

CTB term loan lender waived FY2025 financial covenants and suspended covenant testing for FY2026. The waiver required Arq to increase its cash reserve deposits at CTB.

“the lender waived the Company’s obligation to satisfy certain financial covenants for the fiscal year ending December 31, 2025 and suspended financial covenant testing for the fiscal year ending December 31, 2026. As a condition of the waiver, the Company was required to increase its deposits held in reserve at CTB.”

Options

Chain Snapshot (daily)

Call IV (ATM)--
Put IV (ATM)--
ATM Spread--
Call $OI (near money)$200
Put $OI (near money)$0
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$2.5
Major Expirations2
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$2.50--/$0.75314$0.30/$0.952
$5.00--/$0.05597$2.50/$3.700
$7.50--/$0.750$5.00/$6.200
Snapshot: 2026-11-04

Short Interest

Short % of Float1.5%
Short Shares0.5M
Days to Cover1.7
Change (vs Prior)+7.2%
Short % Float History
1.50%-2.90pp
1.0%2.0%3.0%4.0%5.0%6.0%10-1512-3103-1305-2908-1410-30

Web Traffic

arq.com
Web rank#727,730
Est. visits/mo664K

Executive Compensation (2023.0-2025.0)

Direct Pay$6.4M
Incentive & Other$1.4M
Total Compensation$7.8M
% of Revenue2.2%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$5.4M$5.79+$132K+$524K—$5.69T
ROYCE & ASSOCIATES LP$4.5M$5.69+$742K+$4.5M-0.4%$10.09B
VANGUARD CAPITAL MANAGEMENT LLCPassive$3.7M$2.56+$3.7M+$3.7M—$4.04T
AQR CAPITAL MANAGEMENT LLC$2.8M$2.77+$2.0M+$2.7M+0.0%$218.19B
MARSHALL WACE, LLP$2.1M$3.99+$936K+$1.5M-0.2%$92.71B
GEODE CAPITAL MANAGEMENT, LLCPassive$2.1M$5.40+$59K+$263K-0.1%$1.61T
Peapod Lane Capital LLC$2.0M$2.77+$1.4M+$2.0M—$122M
DIMENSIONAL FUND ADVISORS LPPassive$2.0M$5.58−$403K+$260K-0.3%$480.92B
STATE STREET CORPPassive$1.4M$5.85+$7K+$362K-0.2%$2.89T
RENAISSANCE TECHNOLOGIES LLC$1.1M$3.80−$4K+$388K+0.7%$63.91B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

01.8M3.7M5.5M7.3M$1.78$3.23$4.67$6.12$7.572021-062022-062023-062024-062025-062026-03
hover the chart for per-quarter detailprice (right axis)
AIGH Capital Management LLC—Alta Fundamental Advisers LLC—ROYCE & ASSOCIATES LP1.7MADAGE CAPITAL PARTNERS GP, L.L.C.—Invesco Ltd.38KWELLINGTON MANAGEMENT GROUP LLP—1492 Capital Management LLC—GRATIA CAPITAL, LLC—Alyeska Investment Group, L.P.—FRANKLIN RESOURCES INC31K

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (1 analysts)$7.50+151.7%
Current Price$2.98
Analyst Ratings
2
2
Buy: 2Hold: 2Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q119M—27M$0.64$0.61 – $0.681
2019 Q221M—31M$0.74$0.71 – $0.791
2019 Q322M—34M$0.80$0.76 – $0.851
2019 Q420M—38M$0.90$0.86 – $0.961
2020 Q117M—26M$0.62$0.59 – $0.661
2020 Q219M—27M$0.64$0.61 – $0.681
2020 Q321M—31M$0.74$0.71 – $0.791
2020 Q422M—34M$0.80$0.76 – $0.851
2021 Q120M—38M$0.90$0.86 – $0.961
2021 Q217M—26M$0.62$0.59 – $0.661
2021 Q318M—28M$0.67$0.64 – $0.711
2021 Q420M—37M$0.87$0.83 – $0.931
2022 Q123M—40M$0.94$0.90 – $1.001
2022 Q424M-9M-11M$-0.26$-0.28 – $-0.251
2023 Q123M-2M-4M$-0.10$-0.11 – $-0.101
2023 Q217M-3M-7M$-0.16$-0.17 – $-0.151
2023 Q326M-1M-5M$-0.11$-0.12 – $-0.101
2023 Q427M1M-3M$-0.08$-0.09 – $-0.081
2024 Q123M-0M-3M$-0.07$-0.07 – $-0.071
2024 Q221M0M-2M$-0.05$-0.05 – $-0.051
2024 Q330M5M1M$0.04$0.03 – $0.041
2024 Q429M2M-1M$-0.02$-0.02 – $-0.022
2025 Q126M2M-1M$-0.03$-0.03 – $-0.022
2025 Q226M2M-1M$-0.03$-0.03 – $-0.032
2025 Q335M5M1M$0.02$0.01 – $0.023
2025 Q429M1M-3M$-0.07$-0.08 – $-0.042
2026 Q128M1M-2M$-0.04$-0.06 – $-0.022
2026 Q229M4M-1M$-0.01$-0.03 – $0.011
2026 Q335M7M1M$0.03$0.03 – $0.042
2026 Q428M2M-2M$-0.06$-0.06 – $-0.052
2027 Q131M4M-1M$-0.01$-0.02 – $-0.011
2027 Q234M6M1M$0.01$0.01 – $0.021
2027 Q340M8M3M$0.06$0.06 – $0.061
2027 Q436M7M1M$0.03$0.02 – $0.031
2028 Q150M7M1M$0.02$0.02 – $0.021
2028 Q254M9M2M$0.05$0.05 – $0.051
2028 Q357M10M2M$0.06$0.05 – $0.061
2028 Q457M9M2M$0.04$0.03 – $0.041
2029 Q143M16M7M$0.17$0.16 – $0.181
2029 Q243M17M7M$0.17$0.16 – $0.181
2029 Q344M17M7M$0.17$0.16 – $0.181
2029 Q445M16M6M$0.14$0.14 – $0.151
2030 Q145M21M10M$0.23$0.22 – $0.251
2030 Q246M22M11M$0.25$0.23 – $0.261
2030 Q346M24M12M$0.28$0.26 – $0.301
2030 Q447M23M12M$0.27$0.25 – $0.291

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$562K
8 txns · 5 insiders · 264,500 sh
Sells ($, 12mo)
$38K
1 txn · 1 insider · 16,709 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-09-08BUYSteinmetz Shimonofficer: Chief Financial Officer2,972$2.34$7K$826K
2026-09-04BUYSteinmetz Shimonofficer: Chief Financial Officer5,758$2.28$13K$801K
2026-09-03BUYSteinmetz Shimonofficer: Chief Financial Officer16,270$2.22$36K$779K
2026-05-04SELLVoncannon Jay Loringofficer: Chief Financial Officer16,709$2.27$38K$110K
2026-03-23BUYCampbell-Breeden Richarddirector150,000$2.21$332K$895K
2026-03-17BUYWong Joseph Mofficer: Chief Technology Officer10,000$1.89$19K$757K
2026-03-16BUYSmith Claiborne Bensonofficer: Gen Counsel, Corp Secretary1,000$1.92$2K$197K
2026-03-13BUYEICHER CAROL Sdirector77,500$1.95$151K$339K
2026-03-12BUYSmith Claiborne Bensonofficer: Gen Counsel, Corp Secretary1,000$1.92$2K$195K
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

ARQ has a credible but unproven operating recovery. The core PAC business is showing better pricing, gross margin and utilization, and the Q2 result supports the view that PAC can be a viable cash-generating franchise without GAC. PAC-for-PFAS could be strategically important because it may use existing equipment, avoid customer GAC infrastructure and command better pricing. The investment case is nevertheless highly dependent on execution. The GAC project has already suffered major technical failures and a substantial impairment, while the proposed $40M-$60M Phase 1 investment is large relative to ARQ's balance sheet. Restricted cash, prior covenant waivers, customer concentration and a history of heavy capex make financial flexibility a central risk. The likely two-year outcome is a better PAC business, but not yet a proven high-quality compounder.

Trade Signal

Trade rating
-0.8/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw $2.28+31.6% since

No trade: ARQ's improving PAC economics and PFAS option are real, but at roughly $98M of equity value the stock is near conservative fair value and does not compensate for liquidity, execution and dilution risk.

Temporary mispricing+1.0

The major repricing occurred before the latest quarter: the February-March collapse followed the FY2025 impairment and the announcement that GAC production and development were being paused after thermal-oxidizer capacity proved inadequate. The stock then bounced in late March and May on insider buying, the Q1 update and reaffirmed guidance, before drifting from $2.84 in mid-June to roughly $2.07 by early August without a major new company-specific shock. The stock rose about 10% around the August 11 Q2 print as PAC margins and EBITDA materially improved, then held near $2.28. The earlier decline was largely a durable repricing of execution and financing risk, not a temporary panic; the post-earnings response looks broadly appropriate, with only a small possibility that the market is underappreciating PAC sustainability.

Market view-4.0

The stock remains disliked and largely ignored after falling roughly 70% over the past year from a $7.73 high. Bears focus on the $44.8M Corbin impairment, GAC technical failures, delayed commercialization, negative cash flow and financing risk. Bulls point to the improving PAC franchise, PFAS demand and Corbin optionality. The immediate Q2 result improved sentiment, but analyst coverage is thin and superficially bullish while positioning is not crowded: short interest is only 1.5% and options liquidity is poor. The market is skeptical rather than euphoric, but that skepticism is substantially justified.

Inflectionwindow ~4mo+2.5

The PAC business is improving faster than the recent operating history suggests: Q2 EBITDA rose 59%, gross margin expanded to 38.5%, and management sees substantial additional efficiency potential. PAC-for-PFAS could be a genuine product and margin inflection in 2027. However, the market has already seen the Q2 beat, management's $30M core-PAC EBITDA ambition and the PFAS narrative. The available consensus estimates are sparse and pushed far into 2029-2030, so they are not a reliable near-term benchmark; the stock is not pricing in a full bull case, but neither is the inflection clearly undiscovered.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and full-year guidance update — Seasonally stronger operations, no comparable turnaround burden and continued PAC pricing/cost gains could support EBITDA toward the $17M-$20M guidance range.
  • ▲H2 2026 · PAC-for-PFAS customer testing and initial sales — Commercial validation or recurring utility contracts would demonstrate higher-ASP, higher-margin growth using existing equipment and capacity.
  • •Late 2026 to 2027 · GAC strategic review / Phase 1 investment decision — A disciplined, externally funded project could add option value, while another delay or a balance-sheet-funded $40M-$60M build would increase risk materially.
  • ▲Late 2026 · Corbin asphalt additive field-validation results — Successful durability and paving tests, or monetization of the Corbin asset and technology, could unlock non-dilutive value after the large impairment.
  • •2027-03 · FY 2026 earnings and 2027 outlook — The key test is whether PAC generates sustainable cash after capex and working capital, rather than only adjusted EBITDA.
Flow+1.5

Insider flow is clearly positive, with approximately $0.9M of officer/director purchases over the last year and no meaningful insider selling. Dilution was approximately 2% TTM, but the previously proposed equity offering and likely future financing needs are important supply risks. Short interest has fallen sharply to 1.5% of float, leaving little squeeze fuel; passive ownership is not an active demand catalyst.

Floor / Ceiling-2.0

There is no hard floor at the current price. The PAC business has improving EBITDA potential and the Corbin asset provides optionality, but unrestricted cash is only about $3M against roughly $31M of debt, with substantial restricted cash and negative owner earnings. Covenant, refinancing and potential equity-financing risk could overwhelm asset value in a downside case. There is also no clear hard ceiling, although a financing or GAC-related equity raise could cap upside.

Buyability

Moderately buyable for specialist small-cap industrial investors: PAC is showing real margin improvement, insider buying is supportive, and PFAS-for-PAC offers a differentiated growth angle. However, the $98M market cap, high volatility, negative owner earnings, restricted cash and financing risk limit the natural buyer base.

Fear vs Greedfear 8/10 (-2.0)greed 7/10 (+3.0)

Fear pulls harder than greed at $2.28. The operating recovery is credible, but the valuation is already close to the analyst's conservative $90M target while the company still has negative owner earnings, limited unrestricted liquidity, technical GAC history and a meaningful chance of dilution. I would want either a lower entry price or evidence of sustained cash conversion before buying.

Valuation

Our Target
$90M-31%
Market Should Pay
$68M-48%
target ×0.75 (fear discount)
Current Market Cap
$130MNeutral
What Changed
transcript · 2026-08-11
+8%fair value on this information

The quarter showed stronger PAC economics than the headline revenue growth implied: gross margin reached 38.5%, adjusted EBITDA was approximately $5.8M, and management attributed the improvement to pricing, mix and operating actions rather than only a one-off accounting benefit. The call also introduced a more attractive PAC-for-PFAS commercialization path using existing capacity, while clarifying that GAC Phase 1 would require $40M-$60M and that investors should assume no GAC sales in 2027. Management said unrestricted cash had recovered to approximately $3.1M by July 31, reducing immediate liquidity concern but not eliminating financing risk.

▸ How the cases moved

Versus the day before the Q2 result, the bear case improves modestly from roughly $0M-$2M to $5M equity value and its probability falls from about 0.35 to 0.30 because PAC profitability and liquidity timing were better than feared. The base case rises from roughly $120M to $140M as gross margin, pricing discipline, cost initiatives and the completed turnaround improve confidence in normalized PAC earnings; its probability rises from 0.45 to 0.50. The bull case declines from roughly $300M to $280M because management now guides investors to assume no bituminous GAC production or sales in 2027 and disclosed a $40M-$60M Phase 1 capital requirement; its probability remains approximately 0.20. The shifts are attributable to the Q2 release and call, not previously known historical filings.

2-Year Plausible Outcomes
bear30%
$5M
rev -5%/yrOE $-5M

PAC remains a low-margin, cyclical industrial business; the PFAS-specific product takes longer to qualify, while GAC remains deferred and Corbin produces no meaningful proceeds. EBITDA falls toward $6M, but interest, maintenance capex, working-capital needs and stock compensation leave owner earnings negative. Restricted cash and covenant history force conservative financing and may cause dilution.

▸ Valuation

4x $6M EBITDA = $24M EV − $19M net debt = $5M equity value

base50%
$140M
rev +7%/yrOE $18M

The PAC franchise improves through pricing, higher utilization, cost reductions and initial PAC-for-PFAS contracts, but the $30M EBITDA goal is not fully achieved. No GAC production occurs by 2027 and Corbin remains an option rather than a material contributor. Cash generation improves after the 2026 turnaround, allowing some debt reduction and positive owner earnings.

▸ Valuation

6x $25M EBITDA = $150M EV − $10M net debt = $140M equity value

bull20%
$280M
rev +18%/yrOE $30M

PAC-for-PFAS testing converts into recurring, high-margin municipal contracts, operational initiatives lift core PAC EBITDA toward or above $30M, and Corbin or its technology is monetized for meaningful non-dilutive value. GAC remains a valuable option, with a disciplined project decision or external funding rather than a balance-sheet-damaging build. Strong cash conversion materially reduces net debt and supports a higher-quality industrial growth multiple.

▸ Valuation

8x $35M EBITDA = $280M EV − $0M net debt = $280M equity value

▸ Target Rationale

The probability-weighted scenario value discounts to $102M, but I set the analytical target at $90M. The adjustment reflects weak historical cash conversion, restricted liquidity, covenant risk, probable financing needs, and the possibility that future GAC or growth spending consumes the PAC cash flow before it reaches shareholders. I give substantial credit for the improving PAC economics and PFAS option, but not for uncommitted GAC value or management's full EBITDA target.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now5/10
Trajectory7/10
Risk8/10
Governance5/10
Insolvency prob (2yr)12%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q4 and FY 2025 Earnings (March 10, 2026): Arq reported full-year 2025 revenue of $120.3 million (up 10% YoY) and Adjusted EBITDA of $13.2 million, driven by strong powdered activated carbon (PAC) performance. However, the company recorded a heavy net loss of $52.6 million for the year (including a Q4 net loss of $50.0 million), heavily impacted by a $44.8 million non-cash impairment charge on its Corbin facility.
  • GAC Production Pause: Simultaneously with its FY 2025 earnings, Arq announced a temporary pause on granular activated carbon (GAC) production and development at its Red River facility. Independent engineering reviews revealed that the current thermal oxidizer capacity only supports about 15 million pounds of annual GAC production—well below the original 25 million-pound target—prompting a comprehensive optimization review. No GAC production is expected for the remainder of fiscal 2026.
  • Q1 2026 Earnings (May 6, 2026): Arq reported Q1 2026 revenue of $29.1 million (up 7% YoY from $27.2 million), driven by resilient PAC sales volumes. Adjusted EBITDA fell to $2.7 million (down from $4.1 million in Q1 2025), affected by an $0.8 million non-cash inventory revaluation charge and $0.6 million in GAC-related carryover expenses. Net loss for the quarter was $0.8 million. Management reaffirmed its full-year 2026 guidance of $120–$125 million in revenue and $17–$20 million in Adjusted EBITDA. The biennial plant turnaround at Red River was completed under budget in April 2026.
  • Management Reorganization & CFO Appointment: In early 2026, Arq eliminated the COO role to streamline operations. Subsequently, on May 27, 2026, the company appointed Shimon Steinmetz as Executive Vice President and Chief Financial Officer, succeeding acting principal financial officer Stacia Hansen, who resigned effective June 12, 2026.
  • Proposed Equity Offering & Contract Disclosures: In May 2026, Arq announced a proposed equity offering to the market. In the accompanying prospectus, the company disclosed the termination of its construction contract for the GAC manufacturing plant, indicating near-term GAC project execution delays.
▸ Thesis-test Findings
1. EPA PFAS drinking water regulation compliance deadlines 2027
  • Findings: On May 18, 2026, the EPA proposed a rule under the Safe Drinking Water Act (SDWA) that would allow public water systems to request up to a two-year extension—shifting the compliance deadline to meet Maximum Contaminant Levels (MCLs) for PFOA and PFOS from April 2029 to April 2031. However, the EPA did *not* delay the initial monitoring or reporting requirements; all public water systems are still mandated to complete initial PFAS monitoring by 2027.
  • Bearing on Thesis: This is a mixed signal for Arq's GAC demand thesis. On the bearish side, delaying the enforceable treatment deadline to 2031 may defer large-scale municipal capital expenditures for GAC installation, slowing immediate near-term market inflection. On the bullish side, keeping the 2027 initial monitoring deadline intact guarantees that water utilities will actively identify and report contaminations over the next year, maintaining high pressure on water systems to plan, test, and design remediation solutions early.
2. Granular activated carbon industry capacity additions North America
  • Findings: The North American GAC market has seen significant capacity additions from major incumbent players. Most notably, industry leader Calgon Carbon (Kuraray Group) completed a major expansion at its Pearlington, Mississippi plant, adding a second virgin GAC line that added 50 million pounds (25,000 tons) of annual capacity, pushing its total U.S. virgin capacity past 200 million pounds per year. Calgon also leveraged this scale to secure a massive, 9-year exclusive supply contract with American Water in January 2025.
  • Bearing on Thesis: This is a headwind for the bull case. With Calgon Carbon locking in multi-year utility agreements and expanding its domestic output, competition is intensifying. Because Arq has paused its own GAC commercial ramp-up for technical optimization, competitors are actively capturing early municipal demand. However, the bull case retains its long-term merit because Arq remains one of only three coal-based domestic GAC manufacturers, meaning its vertically integrated, US-sourced supply chain will still have a major structural and tariff-insulated cost advantage once production is successfully optimized.
3. Arq Inc municipal testing asphalt additive Corbin wet cake
  • Findings: Arq's "Corbin wetcake" (a low-ash, coal waste-derived byproduct produced at its idled Corbin facility) has progressed significantly in commercial testing. In its Q1 2026 earnings release, Arq announced that testing of the wetcake for asphalt emulsion blending with a leading U.S. asphalt partner has demonstrated differentiated performance and is now advancing to small-scale, in-field paving tests. Additionally, Arq is in active discussions with multiple third parties regarding the outright monetization of the Corbin Facility and its related technologies.
  • Bearing on Thesis: This is highly positive for the bull case. Following the severe $44.8 million asset impairment of the Corbin facility in late 2025, finding high-margin commercial applications for the Corbin wetcake—or successfully selling the facility/IP—represents a major opportunity to unlock non-dilutive value. Successful commercialization in the asphalt market would build a secondary, high-margin standalone business line that diversifies Arq's revenue beyond pure activated carbon filtration.