Ares Strategic Mining Inc.v3 3.5/10 · 2026-11-26
Basic Materials·Industrial Materials
$0.12
31M CAD market cap
v3 Rating
3.5/102.5–5.0
Setup
2.5/101.5–4.0
Fair Value
$0.09$0.02–$0.25-25%
DCF (10%)
$0.06-50%
Base IRR
-12%-60%–+25%
Visibility
wide±128%
Rating
Revenue (TTM)
0.0M CAD
Owner Earnings
-$5M
Next-Yr Owner Earnings
-$15M
Growth
+30.0% × 4y
P / Next-Yr OE
--
Net Debt
$25M

Ares Strategic Mining Inc. functions as a junior entity within the natural resource sector, primarily focusing on identifying and acquiring fluorspar deposits. Its core operations encompass the development, extraction, and distribution of fluorspar types such as metspar and acidspar. The company commands a varied portfolio of mineral assets. This includes complete ownership of the Lost Sheep Fluoride Mine, an asset consisting of 67 claims spread across approximately 1,447 acres in western Utah, USA. Ares also holds the Liard Fluorspar property, which features 14 claims located in British Columbia. Furthermore, it possesses a stake in Nevada's Jackpot Lake property, an area of 2,800 acres covered by 140 mineral claims in Clark County. The firm's holdings also feature a 20% share in the Vanadium Ridge property, comprising 20 mining claims over roughly 5,200 acres near Kamloops, British Columbia. Additionally, Ares maintains an interest in the Campbell-Croster fluorspar venture situated in Kentucky. Formed in 2009, Ares Strategic Mining Inc. is headquartered in Vancouver, Canada.

2-Year Price History

$0.12+0.0%
$0.10$0.20$0.30$0.40$0.50$0.60Initial target $0.09 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
3.52.5–5.0
Setup
2.51.5–4.0
Fair value (USD)
0.090.02 – 0.25
Upside vs 0.12
-25%
DCF (10%)
0.060.00 – 0.25-50%
Base IRR
-12%-60% – 25%
Visibility
very widerange ±128%
Sentiment
2/10
Flow
3/10
2026-11-26 · claude-opus-5-5 · priced at 0.12

Ares Strategic Mining is a single-asset junior restarting the Lost Sheep fluorspar mine in Utah: a lumps (metspar) plant at Delta opened in October 2026 and says it made saleable 80-85% lumps in November, after a longer-than-planned ramp, with first sales 'expected in November'; the acidspar flotation plant that the US$168.9M (ceiling, US$2M guaranteed) Defense Logistics Agency stockpile IDIQ depends on is still not producing. The stock (US$0.115 OTC, C$0.165 on the CSE, latest close 2026-11-25) is down ~73% from January's peak and sits at the bottom of its 3-year range, because every milestone has slipped, the mine contractor is being replaced (handover to an interim GM mid-December), shares went from 212M to ~287M in a year, and there is C$34.8M (~US$25M) of debt against C$3.9M cash at June 30 while capex ran C$9-10M a quarter. Market cap ~US$33M, EV ~US$58M. If Lost Sheep reaches ~50kt/yr of acidspar at US$450-550/t it could earn roughly US$7-10M of free cash a year, worth perhaps US$55-90M as a small single-mine business on 6-8x; that roughly equals today's EV before the cash still to be burned and raised to get there, so my DCF on today's share count is about US$0.06 (range 0-0.25). The market is not obviously wrong: it is pricing a likely further dilutive raise and a real chance of failure, against a real asset and a real government buyer. Rating 3.5: overpriced on the base case but too uncertain, too illiquid (~US$60k/day OTC) and too much a real operating mine with a government contract to short. Trade setup 2.5: no variant perception either way; the dated test is first sales and the December handover, then the flotation plant.

Flow: Steady issuance is running: shares rose from ~212M (Sep 2025) to ~287M (Nov 2026), about +36%, via placements, an equity-swap facility, debt-for-shares (5.55M shares in Oct 2026) and options; with ~C$4M cash at June against C$9-10M quarterly capex and an F-10 shelf on file, another raise of perhaps 10-25% of shares looks likely in the next 6 months.

A deep dive would have to establish: Can Ares get the acidspar flotation plant producing and fill DLA orders before it has to sell another large slug of stock below today's price?

Owner earnings, TTM
-$5M-$8M – -$3M
Realistic peak profit
$9M$3M – $18M
Growth rate
30.0%0.0% – 100.0%
Years of growth
42 – 6
Market cap
$33M$31M – $36M
EV
$58M$52M – $66M
Net debt
$25M$20M – $30M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-7.0×-9.0× – -5.0×
EV/EBITDA
-12.0×-15.0× – -8.0×
FCF yield
-50.0%-80.0% – -25.0%
Projected FCF, base case (USD millions)
Y1-$15M-$25M – -$6M
Y2-$5M-$15M – $3M
Y3$3M-$6M – $9M
Y4$6M-$2M – $13M
Y5$7M-$1M – $15M
Competition: A price-taker against Chinese, Mexican and Mongolian acidspar at ~US$400-550/t; its edge is being a domestic US supplier to the DLA stockpile.
Governance: Promotional junior with repeated schedule slips, a contractor replaced mid-ramp, heavy dilution and debt settled in shares.
Research (expand)

What it does. Ares owns the Lost Sheep fluorspar mine (67 claims, Spor Mountain district, Utah, now expanded to 371 claims), plus minor BC, Nevada and Kentucky interests. Underground mining restarted Feb 2026; ore reached the Delta lumps plant in Aug 2026; the plant was formally opened 13 Oct 2026; on 13 Nov 2026 it said it was producing saleable 80-85% CaF2 metspar lumps, with first commercial shipments expected in November, and that director Bob Li is interim GM while operations move from contractor Provo Mining & Construction to Ares (done mid-December). A flotation plant to make 97% acidspar (design ~50kt/yr) has had its steel up since Sept 2024 but is not producing. Customers: metspar offtakes for the first five years (company claim) and a DLA strategic-stockpile IDIQ awarded Dec 2025/Jan 2026, US$168.9M award, US$250M ceiling, US$2M guaranteed, sole-source. Side stories: gallium/germanium MOU with Found Industries, a Nasdaq uplist via an ADS program and an F-10 shelf filed with the SEC.

What the market believes. That this is another junior whose schedule keeps slipping and which will keep selling stock: the price fell from US$0.43 (Jan) to US$0.115 as the ramp dragged and the contractor was replaced.

What it earns today. Nothing. No revenue; net loss ~C$6.4M TTM; operating cash flow roughly break-even to -C$2M a quarter, capex C$6-10.5M a quarter. Cash C$3.9M at 30 Jun 2026 against C$34.8M of debt (includes a US$11M Utah Community Impact Board loan); a US$1M development debt was settled in shares at C$0.255 in Oct. Owner earnings today about -US$5M a year before capex. Funding has been placements (C$0.45 Oct 2025, C$0.60 Jan 2026), an equity-swap facility with Sorbie Bornholm, debt-for-shares and options: shares +36% in a year.

Five years out (US$M FCF): -15, -5, 3, 6, 7 in the base case: another raise funds the flotation plant, acidspar ramps in 2028, ~40-50kt/yr at ~US$500/t, EBITDA ~US$10M. Year 5 it is a small single-mine commodity producer with a government buyer and unclear mine life: 6-8x FCF at best. Bull: flotation works in 2027, DLA orders + metspar at full rate, US$10-15M FCF, ~US$0.25/share. Bear: ramp fails again, the debt holders and a deep-discount raise take the equity, ~0.

Fair value. DCF at 10%: PV of base FCF ~-7, terminal (7x US$7M) ~30, less ~US$25M net debt = ~US$0-20M equity, ~US$0.06/share on today's count (range 0-0.25). Fair value US$0.09 crediting the real government contract and optionality. Multiples are meaningless (no earnings); EV ~8x the base-case year-5 FCF.

Management, risks, competition. Promotional style (Nasdaq uplist, gallium, 'only US fluorspar mine'), repeated slippage, contractor replaced mid-ramp, related settlements in shares. Competition is Chinese, Mexican (Orbia) and Mongolian acidspar at ~US$400-550/t; the US-domestic angle is the moat, and depends on government will. Sentiment 2/10: down 73% from peak, no analysts, small OTC/CSE retail base.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit-0.54-0.28-0.04-0.04-0.04
Operating expenses6.11+165%3.02+164%1.14-59%2.79-33%4.19
▸Adj EBITDA-6.11-3.02-1.14-2.79-4.19
▸Adj OCF-4.88-3.29-0.99-3.06-4.20
CapEx-27.9-15.9-23.3-3.41-0.92
Adj FCF-32.7-19.2-24.3-6.47-5.12
Interest expense1.532.661.660.610.08
▸Adj net income-8.13-5.89-2.62-3.08-4.30

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-17.6-4.89-1.76-0.63-5.39-4.91
FCF (OCF−capex)-73.6-25.0-17.8-22.9-5.14-2.74
Net income-21.0-4.49-4.67-2.41-4.46-4.98
▸Capital returned-58.8-22.8-14.1-15.1-5.16-1.60
Buybacks-28.9-24.3-0.87-2.710.47-1.44
Dividends0.000.000.000.000.000.00
Interest paid5.310.312.661.660.610.08
Debt paid down-35.31.19-15.9-14.1-6.24-0.24
▸Reinvestment68.224.715.923.33.370.92
Capex (PP&E)68.224.715.923.33.410.92
Intangibles & M&A-0.040.000.000.00-0.040.00
Leases signed (net Δ)------------
Retained / other-9.37-1.83-1.03-6.110.66-1.06

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 3.3 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)76.853.936.517.516.1
▸Liabilities (total)38.537.923.97.261.06
Net debt (incl. leases)29.627.920.05.96-0.13
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-3.99-1.13-0.69-4.57-53.7
Shares outstanding271212151139138
Dilution (YoY)+34.9%+40.3%+8.4%+0.9%+29.0%
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-7.1%-4.9%-2.8%-12.4%-20.1%
Cost of debt4.4%9.1%8.8%12.0%--

Short Interest

Short % of Float0.0%
Short Shares0.0M
Days to Cover1.0
Change (vs Prior)-70.7%

Cash Runway

2.0months
CRITICAL