ASTE
Astec Industries, Inc.v3 6.5/10 · 2026-11-05Astec Industries, Inc. is a company dedicated to the creation, production, and global distribution of specialized machinery and essential components. These products primarily support road construction and various other heavy building and civil engineering endeavors, serving both domestic and international markets. Its operations are structured into two distinct divisions: Infrastructure Solutions and Materials Solutions. The Infrastructure Solutions division provides an extensive range of equipment vital for asphalt production, concrete handling, and overall construction support. This encompasses asphalt and concrete plants, storage tanks, heating and cooling units, various paving and material transfer vehicles, dust control systems, soil stabilization and remediation machinery, wood processing equipment like chippers and grinders, and advanced control systems. Furthermore, it delivers comprehensive engineering and environmental compliance services. Its clientele spans asphalt manufacturers, heavy civil and road construction contractors, ready-mix concrete suppliers, companies engaged in construction and demolition waste recycling, and government entities. Conversely, the Materials Solutions division specializes in designing and producing robust machinery for material processing. This includes crushing, screening, and vibrating equipment, along with mobile, modular, and portable plant configurations. It also provides bulk material handling and conveying systems, plant automation solutions, and specialized mineral processing equipment. This segment augments its product offerings with expert consulting and engineering support. Astec Industries, Inc. was established in 1972 and maintains its corporate headquarters in Chattanooga, Tennessee.
2-Year Price History
Valuation v3 Opus worker · 2026-11-05
Astec (asphalt plants, pavers, concrete plants, rock crushing and screening, about 35% parts and service) closed at $35.36 on 5 Nov 2026, down about 12% on the day and 45% from April's $64.85 high. Q3 was poor: adjusted EBITDA $18.9M (5.4% margin), adjusted EPS -$0.01. FY26 guidance has now been cut for the third time, from $170-190M to $140-150M. Management blames two things it says are temporary: customers pushed asphalt-plant deliveries into Q4/Q1 because of diesel prices and the federal highway bill, and steel inflation ran about 200bp ahead of fixed-price contracts. Demand still looks healthy. Backlog is a record $671M (+49% YoY), Infrastructure orders rose 43% with book-to-bill at 149%, there have been no cancellations, and parts bookings hit a record in October. At $815M market cap plus about $310M net debt (EV about $1.13B), the stock trades at 8.2x trailing and 7.8x 2026-guided adjusted EBITDA, and about 6.4x a plausible 2027 (around $175M). Underlying owner earnings are about $82M after SBC, the recurring 'transformation' add-back, cash taxes and maintenance capex, so only about 55% of EBITDA reaches owners. That is roughly a 7.3% unlevered yield and 7.6% on the equity after interest. My base case has margins rising only from about 9% to 12%, well short of the 14-17% 2030 target. That gives FCF before interest of about $83M rising to $134M over five years, a 13x year-5 multiple, and a DCF of about $51/share, with a wide range of $24-82 because this is a cyclical company with a long record of missing guidance. Sentiment is washed out but not capitulation: the stock is at a 52-week low after three misses, while short interest is only about 2.7% of shares and the sell side still says Buy. Rating 6.5: cheap on a normal year, with leverage of 2.3x that is manageable, a real installed-base aftermarket and multi-year infrastructure, data-center and aggregates demand. But management credibility is impaired, and the thesis depends on Q4's guided record quarter ($48-58M EBITDA) actually happening. Research rating 7.5: if Q4 and early-2027 margins confirm the 'timing, not structure' story, the stock could re-rate 40-60% in a year, and that question can be answered within one or two quarters.
A deep dive would have to establish: Whether Q3's margin collapse was really timing and price-cost lag, shown by Q4-26 adjusted EBITDA of $48-58M and Q1-27 margins back near 10%+, or whether Astec's long record of structural execution misses is repeating despite a record $671M backlog.
Research (expand)
What the company does
Astec Industries (Chattanooga, TN; about $1.6B sales) makes equipment that turns rock into roads. Infrastructure Solutions (TTM sales $878M; segment adjusted EBITDA margin 13.5% TTM) makes asphalt plants (the US leader alongside Gencor), concrete plants (CWMF was added in early 2026), Roadtec pavers and the Shuttle Buggy material-transfer vehicle, thermal and storage systems, and forestry chippers and grinders. Materials Solutions (TTM $680M, 9.6% margin) makes crushers, screens, washing and material-handling equipment (KPI-JCI, Telsmith, Osborn, the Omagh plant in Northern Ireland, and TerraSource, bought in July 2025 for $245M). Parts and service is about 35% of sales year to date and is the stable, higher-margin core. Customers are asphalt producers, road contractors, aggregates quarries, ready-mix firms, dealers, mining companies and governments.
The investment case
- Demand is real and growing; the problem is margins. Q3 backlog was a record $670.5M (+49% YoY, +11% QoQ). Infrastructure backlog is $382M (+47%), IS orders rose 43% YoY with book-to-bill at 149%, and IS should enter 2027 with about $100M more backlog than it entered 2026. Materials backlog is $289M (+52%), with Q1-27 nearly fully covered. Management says there have been no cancellations of note. Data-center and industrial megaprojects have generated an estimated $75-100M of orders so far.
- Why Q3 broke. (1) Asphalt-plant customers waited about 7 weeks instead of the usual 4 and pushed deliveries into Q4-26 and Q1-27, citing diesel and liquid-AC prices after the Iran conflict and the uncertain highway bill, which hurt mix and absorption. (2) Steel inflation outran fixed-price contracts by about 200bp, roughly $7.7-8M in Q3. Management expects the gap to narrow in Q4 and reach parity by the end of Q1-27. A further $5-10M of EBITDA has slipped from 2026 into 2027.
- The Q4 test. Guidance implies Q4 adjusted EBITDA of $48-58M against $44.8M last year, which would be a record shipment quarter. Delivering it would support the timing story; another miss would show the problem is structural.
- Macro support. IIJA highway money is 86% committed and still being spent. The highway bill was extended to 11 Dec 2026, and the proposed BUILD America 250 Act would raise highway funding. State DOT budgets are healthy, and aggregates producers remain upbeat. On 3 Nov the board added John Keating, who ran CRH's Americas Materials business from 2022 to 2026, a useful customer-side voice.
- Optionality. Management said it 'continues to evaluate our product portfolio'. Forestry and the PSG capital-equipment business inside TerraSource are candidates for sale. The 2030 targets from the May 2026 Investor Day are revenue CAGR above 6%, adjusted EBITDA margin of 14-17%, and ROIC of 13-15%.
What it earns today (real free cash flow)
- TTM adjusted EBITDA is $137M (8.8% margin), and FY26 guidance is $140-150M. Adjusted EBITDA already deducts SBC (about $11M a year; $8.5M YTD). It adds back 'transformation program' costs ($13.2M YTD, about $18M a year), which have recurred every year since the ERP and operating overhaul began. I treat most of that as a real cost and assume it runs off only slowly.
- A normalized base year is about $150M adjusted EBITDA: TTM plus roughly half of the temporary price-cost gap and delivery slippage. Less about $15M of transformation and restructuring costs gives about $135M. Less cash taxes of about $22M (27% on EBIT after about $60M of D&A; about $30M of that D&A is acquired-intangible amortization, which is tax-deductible but not a cash cost). Less maintenance capex of about $28M, against total capex guidance of $30-40M and PP&E depreciation of about $28M. Unlevered owner earnings come to about $82M (range $65-100M), roughly 55% of adjusted EBITDA.
- YTD reported FCF was $48.0M (OCF $70.2M less capex $22.2M), helped by the best working-capital turns in 10 years. Management says some of that holds structurally, but I do not count the inventory release as recurring.
- Balance sheet at 30 Sep 2026: debt $374.8M ($345.2M long-term, $18.4M current, $11.2M short-term), cash $64.4M, so net debt is about $310M, 2.3x TTM adjusted EBITDA, within the 1.5-2.5x target. Operating leases are excluded because rent is already expensed. Interest runs about $7M a quarter, roughly $21M a year after tax.
- Shares outstanding are about 23.05M, giving a market cap of about $815M at $35.36 and an EV of about $1.125B.
Multiples we are paying
- EV/adjusted EBITDA: 8.2x TTM, 7.8x the 2026 guide midpoint, about 6.4x my 2027 estimate of about $175M.
- EV/unlevered owner earnings is about 13.7x, a 7.3% unlevered yield. After-tax interest leaves about $62M for equity, a 7.6% yield on market cap.
- P/E: about 13x 2026 adjusted EPS of about $2.7 (adjusted EPS excludes amortization and transformation costs; GAAP is about breakeven). That falls to about 10-11x on a recovered 2027.
- Steady state (mature-company check): $82M / 10% = $820M, less $310M net debt = $510M, or about $22/share if today's depressed year repeated forever. The equity earns about $62M a year, roughly $2.70/share, if nothing changes. So the current price already assumes some recovery, and the downside on a no-recovery view is real.
Five-year FCF projection (before interest, after SBC, transformation runoff, capex and working capital)
Assumptions: revenue goes from about $1.61B (FY26E) to $1.70B, $1.77B, $1.84B, $1.91B and $1.97B (about 5% a year, below the company's 6%+ target). Adjusted EBITDA margin goes 10.5%, 11%, 11.5%, 12%, 12%, well below the 14-17% target. Transformation costs run off from $12M to $3M. Capex is $40-44M, working capital about 15% of incremental sales, and the tax rate 27%.
| Year | Adj. EBITDA | FCF before interest |
|---|---|---|
| 2027 | ~$178M | ~$83M |
| 2028 | ~$195M | ~$102M |
| 2029 | ~$212M | ~$114M |
| 2030 | ~$229M | ~$129M |
| 2031 | ~$236M | ~$134M |
DCF: these flows discount at 10% to about $417M. A year-5 value of 13x FCF ($1.74B), the multiple for a roughly 5%-growth, cyclical but aftermarket-heavy industrial, discounts to about $1.08B. EV is about $1.50B; less $310M net debt gives equity of about $1.19B, or about $51/share. The bear case ($24) has margins stuck near 9% on flat sales, a 10x multiple and the highway bill slipping. The bull case ($82) has the company hitting its 14-15% margin target on about $2B sales at 15x. A five-year hold in the base case (exit at 13x, debt mostly paid down, $0.52 a year in dividends) returns about 18% a year. A one-year re-rate to about 8x 2027 EBITDA would be worth about $55-58.
What kind of company in 5 years? Neither a corpse nor a compounder. Most likely it is a steadier, more aftermarket-weighted, mid-cycle-margin road and aggregates equipment maker with sales of about $2B and EBITDA of $220-250M. It is tied to multi-year US infrastructure spending, aggregates demand (data centers, reshoring, mining) and a large installed base of asphalt plants and crushers that needs parts. My confidence is moderate to low on margins, which have disappointed for a decade, and moderate to high on demand.
Fair value
The DCF midpoint is about $51, but I haircut it for weak guidance credibility (three FY26 cuts) and the cyclicality. My fair value is about $46 (range $30-65), about 30% above today's $35.36. The stock trades at 20% of its 3-year range and at its 1-year low. This is a good-but-not-screaming deal near the bottom of its range. If Q4 delivers, a 50% one-year return is plausible; if Q4 misses again, $28-30 (the 2024 lows) is the likely floor. Options: ATM IV is 44% (calls) and 58% (puts) at the 52-week low, so selling cash-secured puts or covered calls is attractive. It is not a textbook valuation-floor setup, though, because forward earnings are not yet predictable.
Management, capital allocation, risks and competition
- Management: CEO Jaco van der Merwe (since 2022, a 10-year Astec veteran) and CFO Brian Harris have made real progress on working capital and the aftermarket, and margins are up about 440bp from three years earlier. But they missed Q1, cut guidance in Q2 and cut again in Q3, so credibility is damaged. The company pays a dividend of $0.13 a quarter (about 1.5% yield). Management keeps rejecting buybacks ('float is pretty small... better opportunities elsewhere'), which signals more M&A. They are acquisitive: TerraSource for $245M at about 2x leverage, then CWMF. Insiders sold modestly in early 2026 near $61, and there has been no insider buying. Governance has no red flags; the board is independent, chaired by Mark Gliebe (ex-Regal Beloit).
- Risks: steel and tariff inflation against fixed-price backlog; a delayed or smaller highway reauthorization; diesel and liquid-asphalt prices squeezing contractors; another Q4 slip (lumpy asphalt-plant invoicing); integration of TerraSource's PSG unit (capital sales weak); a lengthy history of operational misses; an international tax drag on EPS; and a cyclical downturn in private construction. Leverage of 2.3x is fine but leaves less room for a cycle.
- Competition: asphalt plants compete with Gencor, Ammann, Wirtgen/Benninghoven (Deere) and Marini (Fayat). Pavers compete with Caterpillar, Wirtgen/Vögele and Volvo/Dynapac. Crushing and screening compete with Metso, Sandvik, Terex (Powerscreen and Finlay) and Kleemann (Deere). Astec's edge is its US installed base, dealer and direct network, and parts business. Its position is durable in US asphalt plants but only mid-tier against much larger crushing rivals.
Sentiment: 3 / 10 (disliked, not capitulated)
The stock is down about 45% from April's peak, fell about 12% on the Q3 print and is at a 52-week low after three straight disappointments. Zacks has had it at Rank #5 (Strong Sell) since August, and estimates keep falling. That is not full capitulation. Short interest is only about 620K shares (about 2.7% of shares, 2.5 days to cover), and there is no forced seller (BlackRock about 16%, Vanguard about 11%, all passive or long-only). The small sell side still likes it: Stifel had Buy/$60 in Sept, and the S&P-polled consensus is 'Strong Buy' with $60-78 targets set before Q3. Those targets will have to come down; I expect cuts toward $45-55. Retail and value investors have not yet shown up. The setup is contrarian-attractive if Q4 shipments hit, but the bottom is not proven.
- /Users/gregwo/stocks2/data/analysisv3/context/ASTE.md (context pack incl. Q3-26 call transcript)
- https://www.sec.gov/Archives/edgar/data/0000792987/000079298726000053/aste-20260930xexx991.htm
- /Users/gregwo/stocks2/data/edgar_filings/ASTE/10-Q_2026-11-05_0000792987-26-000055.html
- /Users/gregwo/stocks2/data/edgar_filings/ASTE/8-K_2026-11-03_0000792987-26-000048_EX99-1.html
- https://stockanalysis.com/stocks/aste/forecast/
- https://www.barchart.com/story/news/1955792/astec-industries-maps-2030-growth-plan-targets-higher-margins-at-investor-day
- https://www.webull.com/news/15367135718695936
- https://www.nasdaq.com/articles/aste-stock-down-104-1-week-near-term-earnings-risks-build
- https://www.insidertrades.com/alerts/nasdaq-aste-insider-buying-and-selling-2026-03-07
- https://www.quantisnow.com/insight/right-lane-industries-announces-sale-of-terrasource-holdings-to-astec-6012665
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 1557+14% | 1410+8% | 1305-2% | 1338+5% | 1275 |
| Gross profit | 398+7% | 379+15% | 328-1% | 331+26% | 262 |
| Operating expenses | 349+18% | 313+3% | 305+8% | 282+18% | 240 |
| ▸Adj EBITDA | 104-5% | 102+104% | 50.0-33% | 74.2+49% | 49.9 |
| ▸Adj OCF | 104-4% | 107+71% | 62.7-9% | 68.6+168% | 25.6 |
| CapEx | -50.9 | -40.7 | -20.5 | -34.1 | -40.7 |
| Adj FCF | 53.0-42% | 66.7+58% | 42.2+22% | 34.5 | -15.1 |
| Interest expense | 28.8 | 18.5 | 10.7 | 8.90 | 2.50 |
| ▸Adj net income | 8.80-81% | 36.3+641% | 4.90-85% | 32.5+103% | 16.0 |
| ▸Owner's earnings | 48.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 387100% | 69.6100% | 115100% | 61.6100% | 88.9100% | 52.2100% |
| FCF (OCF−capex) | -50.2-13% | 48.069% | 20.118% | 2.604% | -6.30-7% | -115-220% |
| Net income | 76.120% | -0.40-1% | 38.834% | 4.307% | 33.538% | -0.100% |
| ▸Capital returned | -242-63% | 4.807% | -199-173% | -13.9-23% | 25.929% | -60.7-116% |
| Buybacks | 10.1 | 0.00 | 0.10 | -0.10 | 0.00 | 10.1 |
| Dividends | 55.7 | 8.90 | 11.9 | 11.9 | 11.8 | 11.2 |
| Interest paid | 62.3 | 21.7 | 18.5 | 10.7 | 8.90 | 2.50 |
| Debt paid down | -371 | -25.8 | -229 | -36.4 | 5.20 | -84.5 |
| ▸Reinvestment | 502130% | 90.4130% | 289252% | 19.832% | 26.229% | 76.3146% |
| Capex (PP&E) | 158 | 22.2 | 40.7 | 20.5 | 34.1 | 40.7 |
| Intangibles & M&A | 343 | 68.2 | 248 | -0.70 | -7.90 | 35.6 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- | -- |
| Retained / other | -88.8-23% | -3.30-5% | -11.0-10% | 27.945% | -15.4-17% | -87.0-167% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 22 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 1417 | 1367 | 1044 | 1059 | 1014 |
| ▸Liabilities (total) | 741 | 686 | 406 | 406 | 388 |
| Net debt (incl. leases) | 299 | 276 | 27.0 | 14.2 | 21.0 |
| Net debt / Adj EBITDA | 2.89 | 2.70 | 0.54 | 0.19 | 0.42 |
| Net debt / Adj FCF | 5.65 | 4.14 | 0.64 | 0.41 | -- |
| Adj EBITDA / interest | 3.60 | 5.52 | 4.67 | 8.34 | 20.0 |
| Shares outstanding | 23.0 | 22.9 | 22.8 | 22.7 | 22.6 |
| Dilution (YoY) | +0.7% | +0.3% | +0.3% | +0.5% | -0.6% |
| Employees | 4148 | 4468 | 4148 | 4322 | 4291 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 25.5%-1.7 | 26.8%+1.7 | 25.1%+0.4 | 24.7%+4.2 | 20.5% |
| Adj EBITDA margin | 6.7%-1.3 | 7.2%+3.4 | 3.8%-1.7 | 5.5%+1.6 | 3.9% |
| Adj OCF margin | 6.7%-1.2 | 7.6%+2.8 | 4.8%-0.3 | 5.1%+3.1 | 2.0% |
| Adj FCF margin | 3.4%-3.3 | 4.7%+1.5 | 3.2%+0.6 | 2.6%+3.8 | -1.2% |
| Net income margin | 0.7%-2.8 | 2.8%+2.4 | 0.3%-2.2 | 2.5%+2.5 | -0.0% |
| Adj NI margin | 0.6%-2.8 | 2.6%+2.2 | 0.4%-2.1 | 2.4%+1.2 | 1.3% |
| ROIC (adj, after-tax) | 3.1% | 4.7% | 2.0% | 5.2% | 2.0% |
| Cost of debt | 7.7% | 8.2% | 8.5% | 9.8% | -- |
Revenue Breakdown
Revenue Segments
| Infrastructure Group | $245.2M | +0% |
| Material Solutions | $160.6M | +68% |
| CANADA | $24.0M | +56% |
| AUSTRALIA | $12.5M | +166% |
| South America (excluding Brazil) | $9.3M | +191% |
| Europe | $8.0M | +8% |
| BRAZIL | $7.3M | +28% |
| Africa | $7.1M | -13% |
| Asia | $5.7M | -16% |
| MEXICO | $2.0M | -38% |
| Others | $0.4M | -33% |
Earnings Calls
Earnings Call · 2026 Q3
Astec Industries reported a weak Q3 2026 that fell short of expectations and the high-level outlook given on the Q2 call. Net sales were $352 million, up 0.7%, while adjusted EBITDA was $18.9 million (5.4% margin) versus $27.1 million a year ago, and adjusted EPS was -$0.01 versus $0.47. Management called it an outlier quarter driven by two factors. First, a prolonged slowdown in asphalt plant orders (about 7 weeks versus a typical 4) created an unfavorable shipment and invoicing mix, with some customers shifting deliveries to Q4 2026 and Q1 2027. Second, steel and broader material inflation outpaced pricing by roughly 200 basis points, about $7-8 million, because long lead times delayed pricing actions. Management expects price-cost parity to return by the end of Q1 2027. Orders rebounded strongly. Total backlog rose 49.2% year over year to $671 million, up 11% sequentially. Infrastructure Solutions backlog was $382 million, up $93 million from Q2 and $122 million from last year, with a book-to-bill of 149%. Material Solutions backlog was $289 million, up 52% year over year but down $23 million sequentially, with a book-to-bill of 86%. Consolidated book-to-bill was 120%. Data center and industrial projects have generated an estimated $75-100 million of orders. Parts and service sales were $126 million (35.7% of sales), and the company saw record parts and service bookings in the first month of Q4. Segment results: Infrastructure Solutions sales were $189 million (down 2.2%) with adjusted EBITDA of $15.3 million (8.1% margin). Material Solutions sales rose 4.1% to $163 million with adjusted EBITDA of $13.9 million (8.5% margin, down 130 bps). The PSG business acquired in July 2025 faced macro headwinds on capital sales. On the balance sheet, cash was $63.2 million, liquidity $267 million, operating cash flow $17.4 million, and net debt to EBITDA about 2.3x, within the 1.5-2.5x target. Full-year 2026 adjusted EBITDA guidance was cut to $140-150 million from $160-175 million, implying Q4 EBITDA of $48-58 million versus $44.8 million last year. Other guidance: quarterly SG&A $70-75 million, interest expense $7 million, tax rate 26-30%, D&A $55-65 million, and capex $30-40 million. On policy, the federal highway bill was extended through December 11, 2026, and states have committed about 86% of IIJA highway and bridge funds. Management expects record Q4 shipments, a full Q1 plant schedule, and Infrastructure Solutions entering 2027 with backlog about $100 million higher than entering 2026. They view the issues as temporary and remain constructive on multiyear demand.
▸How much of the roughly $20 million guidance cut is due to delayed orders versus the inflation headwind?Steven Ramsey · Thompson Research Group
▸Is materials demand broad-based or driven by specific pockets of strength?Steven Ramsey · Thompson Research Group
▸With the infrastructure backlog getting sizable, will production pacing challenge operations or margins?Steven Ramsey · Thompson Research Group
▸How should we interpret the opposite swings in implied orders between the two segments over the last two quarters?Steve Ferazani · Sidoti
▸How much older, lower pricing is in backlog and when will margins normalize?Steve Ferazani · Sidoti
▸What is behind the Infrastructure Solutions delays, and are they delays or cancellations?Steve Ferazani · Sidoti
▸What are the capital allocation priorities, and when would share buybacks be considered?Steve Ferazani · Sidoti
▸How will the price-cost gap evolve through Q4 and when will parity be reached?Joe Nolan (for David MacGregor) · Longbow Research
▸Does the asphalt shipment pushout allow Astec to recover pricing on those volumes?Joe Nolan (for David MacGregor) · Longbow Research
▸What gives confidence in Material Solutions heading into 2027 after the sequential decline?Joe Nolan (for David MacGregor) · Longbow Research
▸How much of the operating cash flow improvement is structural, and will working capital investment rise with production volumes?Dilyara Sailaubayeva · Freedom Broker
▸How has the Infrastructure Solutions revenue mix evolved, which categories are strongest, and what shifts are expected in 2027?Dilyara Sailaubayeva · Freedom Broker
SEC Filing Findings
SEC Filing — material findings
2026-11-05 · depth 9/10Nothing material flagged — a clean filing.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $25.00 | $12.00/$16.80 | 0 | --/$4.90 | 0 |
| $30.00 | $7.00/$11.80 | 0 | --/$2.00 | 2 |
| $35.00 | $3.10/$7.90 | 0 | --/$4.90 | 3 |
| $40.00 | $0.20/$4.90 | 1 | $0.65/$5.50 | 85 |
| $45.00 | --/$4.90 | 253 | $4.30/$8.80 | 0 |
| $50.00 | --/$4.90 | 10 | $9.00/$13.50 | 0 |
| $55.00 | --/$4.90 | 65 | $13.60/$18.50 | 11 |
| $60.00 | --/$4.90 | 743 | $18.60/$23.50 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $213M | $32.15 | +$4.8M | −$15.4M | — | $6.70T |
| DIMENSIONAL FUND ADVISORS LPPassive | $88.6M | $40.06 | +$909K | +$1.2M | — | $551.30B |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $84.0M | $53.93 | +$1.1M | +$84.0M | — | $2.22T |
| GAMCO INVESTORS, INC. ET AL | $66.0M | $33.08 | −$1.5M | −$10.2M | — | $11.14B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $62.3M | $53.99 | +$1.3M | +$62.3M | — | $4.68T |
| STATE STREET CORPPassive | $56.3M | $41.93 | +$2.9M | +$2.5M | — | $3.38T |
| MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd. | $50.4M | $32.81 | +$3.9M | +$939K | — | $83.85B |
| Invesco Ltd. | $48.8M | $44.54 | +$4.5M | +$18.5M | — | $1.26T |
| ACK Asset Management LLC | $42.2M | $47.38 | −$5.9M | +$42.2M | — | $856M |
| Harvey Partners, LLC | $41.2M | $39.21 | +$110K | +$20.6M | — | $1.44B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2003 Q2 | 517M | 2M | -4M | $0.08 | $0.06 – $0.10 | 8 |
| 2003 Q3 | 152M | 3M | -2M | $0.14 | $0.12 – $0.17 | 19 |
| 2004 Q1 | 50M | 9M | 4M | $0.07 | $0.06 – $0.08 | 9 |
| 2004 Q2 | 127M | 18M | 12M | $0.23 | $0.18 – $0.28 | 9 |
| 2004 Q3 | 670M | 4M | 1M | $0.40 | $0.32 – $0.48 | 20 |
| 2005 Q1 | 176M | 13M | 7M | $0.39 | $0.31 – $0.47 | 20 |
| 2005 Q2 | 150M | 15M | 9M | $0.37 | $0.30 – $0.44 | 7 |
| 2005 Q3 | 164M | 18M | 11M | $0.36 | $0.29 – $0.43 | 16 |
| 2005 Q4 | 350M | 5M | 1M | $0.19 | $0.15 – $0.23 | 13 |
| 2006 Q1 | 182M | 17M | 11M | $0.48 | $0.38 – $0.58 | 16 |
| 2006 Q2 | 229M | 22M | 14M | $0.78 | $0.62 – $0.94 | 14 |
| 2006 Q3 | 157M | 15M | 9M | $0.38 | $0.30 – $0.46 | 18 |
| 2006 Q4 | 123M | 9M | 4M | $0.15 | $0.12 – $0.18 | 7 |
| 2007 Q1 | 216M | 23M | 15M | $0.69 | $0.55 – $0.83 | 10 |
| 2007 Q2 | 202M | 24M | 16M | $0.65 | $0.52 – $0.78 | 12 |
| 2007 Q3 | 279M | 23M | 15M | $0.87 | $0.70 – $1.04 | 7 |
| 2007 Q4 | 181M | 15M | 9M | $0.32 | $0.26 – $0.38 | 11 |
| 2008 Q1 | 260M | 26M | 17M | $0.76 | $0.61 – $0.91 | 15 |
| 2008 Q2 | 284M | 32M | 22M | $0.97 | $0.78 – $1.16 | 14 |
| 2008 Q3 | 184M | 19M | 11M | $0.39 | $0.31 – $0.47 | 20 |
| 2008 Q4 | 242M | 17M | 10M | $0.56 | $0.45 – $0.67 | 17 |
| 2009 Q1 | 187M | 13M | 7M | $0.27 | $0.22 – $0.32 | 17 |
| 2009 Q2 | 222M | 16M | 9M | $0.46 | $0.37 – $0.55 | 11 |
| 2009 Q3 | 343M | 10M | 5M | $0.42 | $0.34 – $0.51 | 9 |
| 2009 Q4 | 267M | -32M | -37M | $0.29 | $0.23 – $0.35 | 7 |
| 2010 Q1 | 154M | 13M | 7M | $0.16 | $0.12 – $0.19 | 18 |
| 2010 Q2 | 181M | 16M | 9M | $0.33 | $0.26 – $0.40 | 14 |
| 2010 Q3 | 133M | 11M | 5M | $0.16 | $0.13 – $0.19 | 17 |
| 2010 Q4 | 161M | 11M | 5M | $0.18 | $0.14 – $0.22 | 19 |
| 2011 Q1 | 220M | 17M | 10M | $0.40 | $0.32 – $0.48 | 9 |
| 2011 Q2 | 215M | 20M | 12M | $0.50 | $0.40 – $0.60 | 9 |
| 2011 Q3 | 282M | 17M | 10M | $0.62 | $0.50 – $0.74 | 11 |
| 2011 Q4 | 206M | 15M | 8M | $0.37 | $0.30 – $0.44 | 8 |
| 2012 Q1 | 290M | 23M | 14M | $0.69 | $0.55 – $0.83 | 16 |
| 2012 Q2 | 355M | 23M | 14M | $0.89 | $0.71 – $1.07 | 11 |
| 2012 Q3 | 306M | 17M | 9M | $0.54 | $0.43 – $0.65 | 15 |
| 2012 Q4 | 376M | 25M | 15M | $0.53 | $0.42 – $0.64 | 20 |
| 2013 Q1 | 235M | 21M | 12M | $0.51 | $0.41 – $0.61 | 18 |
| 2013 Q2 | 284M | 21M | 13M | $0.62 | $0.50 – $0.74 | 20 |
| 2013 Q3 | 282M | 16M | 8M | $0.46 | $0.37 – $0.55 | 7 |
| 2013 Q4 | 193M | 14M | 7M | $0.26 | $0.21 – $0.31 | 8 |
| 2014 Q1 | 320M | 21M | 12M | $0.69 | $0.55 – $0.83 | 20 |
| 2014 Q2 | 277M | 25M | 14M | $0.63 | $0.50 – $0.76 | 15 |
| 2014 Q3 | 1.2B | 11M | 3M | $0.68 | $0.55 – $0.82 | 7 |
| 2014 Q4 | 233M | 17M | 8M | $0.35 | $0.28 – $0.42 | 7 |
| 2015 Q1 | 253M | 23M | 13M | $0.49 | $0.39 – $0.59 | 13 |
| 2015 Q2 | 363M | 25M | 15M | $0.87 | $0.70 – $1.04 | 9 |
| 2015 Q3 | 571M | 11M | 3M | $0.40 | $0.32 – $0.48 | 16 |
| 2015 Q4 | 484M | 13M | 5M | $0.50 | $0.40 – $0.60 | 14 |
| 2016 Q1 | 257M | 27M | 16M | $0.65 | $0.52 – $0.78 | 17 |
| 2016 Q2 | 279M | 28M | 17M | $0.71 | $0.57 – $0.85 | 13 |
| 2016 Q3 | 289M | 16M | 8M | $0.40 | $0.32 – $0.48 | 13 |
| 2016 Q4 | 327M | 23M | 12M | $0.53 | $0.42 – $0.64 | 10 |
| 2017 Q1 | 323M | 26M | 15M | $0.67 | $0.54 – $0.80 | 16 |
| 2017 Q2 | 390M | 29M | 18M | $0.98 | $0.78 – $1.18 | 18 |
| 2017 Q3 | 210M | 5M | -2M | $-0.08 | $-0.10 – $-0.06 | 15 |
| 2017 Q4 | 327M | 21M | 11M | $0.46 | $0.37 – $0.55 | 9 |
| 2018 Q1 | 329M | 33M | 20M | $0.89 | $0.71 – $1.07 | 20 |
| 2018 Q2 | 241M | -28M | -35M | $0.79 | $0.63 – $0.95 | 7 |
| 2018 Q3 | 505M | 19M | 9M | $0.79 | $0.63 – $0.95 | 19 |
| 2019 Q1 | 339M | 29M | 18M | $0.82 | $0.81 – $0.83 | 18 |
| 2019 Q2 | 300M | 40M | 26M | $0.41 | $0.41 – $0.42 | 13 |
| 2019 Q3 | 260M | 12M | 4M | $0.24 | $0.24 – $0.25 | 9 |
| 2019 Q4 | 299M | 18M | 9M | $0.38 | $0.38 – $0.38 | 9 |
| 2020 Q1 | 292M | 20M | 11M | $0.39 | $0.38 – $0.39 | 8 |
| 2020 Q2 | 229M | 127M | 95M | $0.05 | $0.05 – $0.05 | 8 |
| 2020 Q3 | 228M | 8M | 1M | $0.11 | $0.11 – $0.11 | 14 |
| 2020 Q4 | 271M | 20M | 10M | $0.42 | $0.41 – $0.42 | 11 |
| 2021 Q1 | 311M | 23M | 12M | $0.83 | $0.82 – $0.84 | 1 |
| 2021 Q2 | 300M | 19M | 9M | $0.49 | $0.49 – $0.50 | 1 |
| 2021 Q3 | 266M | 14M | 5M | $0.31 | $0.31 – $0.32 | 1 |
| 2021 Q4 | 268M | -17M | -25M | $0.03 | $0.02 – $0.03 | 1 |
| 2022 Q1 | 287M | 15M | 6M | $0.11 | $0.11 – $0.11 | 2 |
| 2022 Q2 | 303M | 2M | -6M | $0.53 | $0.52 – $0.53 | 2 |
| 2022 Q3 | 302M | 15M | 5M | $0.30 | $0.30 – $0.31 | 2 |
| 2022 Q4 | 314M | -19M | -27M | $0.38 | $0.37 – $0.38 | 2 |
| 2023 Q1 | 341M | 16M | 6M | $0.52 | $0.51 – $0.52 | 1 |
| 2023 Q2 | 349M | 1M | -7M | $0.68 | $0.67 – $0.68 | 1 |
| 2023 Q3 | 333M | 18M | 7M | $0.62 | $0.46 – $0.74 | 4 |
| 2023 Q4 | 347M | -22M | -30M | $0.67 | $0.40 – $1.00 | 3 |
| 2024 Q1 | 343M | 17M | 7M | $0.81 | $0.77 – $0.84 | 2 |
| 2024 Q2 | 332M | 30M | 16M | $0.69 | $0.69 – $0.70 | 1 |
| 2024 Q3 | 313M | 19M | 7M | $0.31 | $0.30 – $0.32 | 1 |
| 2024 Q4 | 371M | 30M | 17M | $0.73 | $0.67 – $0.79 | 2 |
| 2025 Q1 | 320M | 22M | 11M | $0.46 | $0.43 – $0.49 | 2 |
| 2025 Q2 | 354M | 24M | 13M | $0.56 | $0.51 – $0.60 | 2 |
| 2025 Q3 | 333M | 31M | 9M | $0.40 | $0.39 – $0.42 | 1 |
| 2025 Q4 | 374M | 43M | 19M | $0.83 | $0.80 – $0.86 | 1 |
| 2026 Q1 | 393M | 46M | 19M | $0.84 | $0.80 – $0.87 | 2 |
| 2026 Q2 | 405M | 52M | 24M | $1.04 | $1.00 – $1.08 | 2 |
| 2026 Q3 | 375M | 35M | 11M | $0.47 | $0.45 – $0.49 | 2 |
| 2026 Q4 | 435M | 58M | 29M | $1.25 | $1.20 – $1.30 | 2 |
| 2027 Q1 | 407M | 50M | 23M | $1.00 | $0.96 – $1.04 | 2 |
| 2027 Q2 | 413M | 51M | 24M | $1.04 | $1.00 – $1.08 | 1 |
| 2027 Q3 | 348M | 39M | 14M | $0.62 | $0.60 – $0.64 | 1 |
| 2027 Q4 | 397M | 57M | 29M | $1.26 | $1.21 – $1.31 | 1 |
| 2028 Q1 | 393M | 53M | 26M | $1.12 | $1.08 – $1.16 | 1 |
| 2028 Q2 | 414M | 60M | 31M | $1.36 | $1.31 – $1.41 | 1 |
| 2028 Q3 | 371M | 44M | 19M | $0.82 | $0.79 – $0.85 | 1 |
| 2028 Q4 | 422M | 61M | 32M | $1.40 | $1.35 – $1.46 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-03-03 | SELL | GILBERT EDWARD TERRELL JR | officer: GC & CORPORATE SECRETARY | 975 | $61.07 | $60K | $539K |
v2 analysis (legacy, 2026-08-05) — for comparison onlyclick to expand
Thesis
Astec is emerging from a difficult post-COVID inventory and margin period with strong revenue growth, a record backlog, improving Materials Solutions demand, and a growing parts-and-service mix. The current operating level is much healthier than the 2022-2024 trough, but profitability remains modest: TTM adjusted EBITDA margin is only 6.8%, adjusted FCF margin is 3.7%, and net leverage is approximately 2.7x EBITDA. The business is therefore not yet a high-quality compounder; it is a cyclical capital-goods company attempting to improve mix and consistency through acquisitions, aftermarket expansion and operating initiatives. The Q2 result confirmed strong demand and record backlog, but the reduction in 2026 EBITDA guidance from $170M-$190M to $160M-$175M exposed the timing sensitivity of the asphalt business. The base case assumes the backlog converts with delays, Material Solutions remains the principal growth engine, margins recover gradually and debt declines. The bull case requires both cyclical demand and successful structural margin improvement. The bear case is credible because highway-bill uncertainty, customer delivery deferrals and capital intensity could keep returns below the cost of capital.
Trade Signal
Short ASTE: even after the post-earnings drop, the stock remains materially above the analyst's approximately $700 million fair value while near-term earnings and funding risks limit the chance of a rapid fundamental catch-up.
The stock rose from roughly $43 at year-end 2025 to $64 in early May 2026, then fell to $53 after the Q1 EPS miss and margin pressure. It recovered toward $61 in late June/early July on strong backlog, infrastructure optimism and sector sympathy, drifted down through July as delivery and funding uncertainty persisted, and dropped from $52.25 to $45.04 on the August 5 earnings release. The latest leg was a justified repricing after the EBITDA guidance reduction, despite record Q2 revenue and backlog. The market may have slightly overreacted to the guidance cut, but the remaining valuation premium means this is not a compelling oversold dislocation; it is more likely a durable reset toward fundamental value.
Consensus remains constructive—six buys and six holds with no sells—and the long thesis emphasizes record backlog, Materials Solutions growth, aftermarket expansion, infrastructure spending, data-center construction and synergies. Bears point to the guidance cut, low margins, leverage, delivery delays and the possibility of an IIJA funding cliff. The 14% post-earnings decline, put-heavy options positioning and low retail participation show that sentiment has weakened, but the stock is not hated or heavily shorted. The market narrative is somewhat stale in continuing to emphasize growth without fully discounting the weak earnings conversion and valuation.
There is a genuine operational inflection in Materials Solutions, aftermarket mix and acquisition integration, but it is not clearly unanticipated. Analysts already expect roughly $155 million of 2026 EBITDA and quarterly EBITDA around $34-$41 million, while management itself guided to $160-$175 million after cutting the prior range. Q2's record revenue and backlog are encouraging, yet the near-term evidence points to better demand with only modest profitability and continued delivery/mix risk. The next major upside inflection would require sustained margin expansion toward the bull case, which is not yet visible.
- ▼2026-11 · Q3 2026 earnings and updated full-year guidance — Expected around November 2026; results will test whether delivery delays and the lower EBITDA guide are timing-related or evidence of weaker demand and margins.
- ▼2026-09 to 2026-12 · IIJA expiration / highway funding resolution — September 30 funding uncertainty could delay asphalt-plant commitments and create a Q4/Q1 order-conversion overhang if Congress does not provide clarity.
- ▲2027-02 · Q4 2026 earnings and 2027 outlook — A strong Q4, backlog conversion and evidence of margin recovery could support the bull case; failure would likely expose the valuation gap.
- ▲H2 2026 to 2027 · TerraSource and CWMF synergy / aftermarket progress — Further parts penetration and procurement savings could improve margins, but most of the benefit appears gradual rather than an immediate catalyst.
Neutral-to-slightly negative. TTM dilution is approximately zero and there is no death-spiral financing, but there is no meaningful buyback or insider-buying support. Two modest insider sales occurred over the last year, while short interest is only 2.5% of float and therefore offers little squeeze fuel. Options positioning is notably put-heavy, consistent with downside hedging rather than a strong incremental demand catalyst.
There is no hard floor near the current price. Cash and available liquidity reduce insolvency risk, but the company remains a cyclical capital-goods business with modest FCF margins, meaningful leverage and acquisition/capex needs. The valuation itself provides little support: the analyst's base value is about $39 per share and the fear-adjusted value about $28. A rally toward the mid-$50s would likely encounter fundamental sellers as the market capitalizes only a still-unproven margin recovery.
A real, investable industrial with strong backlog, growing aftermarket revenue and credible infrastructure/data-center exposure, so marginal buyers exist. However, at roughly 22x owner earnings and a 5% FCF yield, the stock is not obviously attractive enough to overcome its cyclicality, modest margins and 2.7x leverage.
Fear pulls harder than greed at $45. The business is improving and Q2 was operationally strong, but the market is still paying a premium for a cyclical company whose guidance was just reduced, whose historical cash conversion is uneven, and whose base-case value is below the current price. The main risk to a short is that backlog, aftermarket growth and infrastructure spending eventually validate the bull case before valuation compresses.
Valuation
The quarter provided new evidence of record revenue, strong Materials Solutions demand, a $601M backlog, 49% higher implied orders and unusually strong June and July bookings. It also newly revealed that management had reduced 2026 adjusted EBITDA guidance to $160M-$175M because asphalt plant deliveries are moving into late 2026 and early 2027. The combination is better demand visibility but lower near-term certainty on conversion and margins.
▸ How the cases moved
Versus the day-before baseline, the bear case rises modestly from $180M to $200M because Q2 backlog, bookings and Materials Solutions demand reduce the probability of a severe demand collapse; its probability falls from 0.28 to 0.25. The base case rises from $850M to $905M because the quarter confirms backlog conversion and parts demand, although the guidance cut limits the increase; its probability rises from 0.52 to 0.55. The bull case moves from $1,700M to $1,770M as strong bookings and aftermarket growth support a higher upside outcome, but its probability is unchanged at 0.20 because management reduced guidance and asphalt timing remains uncertain.
Infrastructure funding remains delayed, asphalt plant deliveries slip into 2027, and mobile-equipment mix and acquisition integration limit margins. Revenue is roughly flat, EBITDA falls toward $90M, and leverage remains elevated as free cash flow is consumed by capex and working capital.
▸ Valuation
5x $90M EBITDA = $450M EV - $250M net debt = $200M equity
The backlog converts over the next two years, Materials Solutions remains strong, and infrastructure demand is delayed rather than destroyed. Parts and service growth plus TerraSource and CWMF synergies lift EBITDA, while debt reduction improves the equity share of enterprise value. The business reaches approximately $75M of sustainable owner earnings.
▸ Valuation
7x $155M EBITDA = $1,085M EV - $180M net debt = $905M equity
A multi-year infrastructure and data-center aggregate cycle accelerates, asphalt deliveries normalize, and aftermarket revenue expands materially. Procurement and operating synergies lift margins toward a more attractive industrial profile, with EBITDA around $210M and strong cash generation enabling substantial debt paydown.
▸ Valuation
9x $210M EBITDA = $1,890M EV - $120M net debt = $1,770M equity
▸ Target Rationale
The probability-weighted discounted value is $721.4M. I set the analytical target modestly lower at $700M because the arithmetic gives meaningful credit to a bull case while not fully capturing Astec's uneven historical cash conversion, acquisition and capex requirements, modest current returns on invested capital, and dependence on infrastructure-cycle timing. The target still recognizes the improved backlog, aftermarket mix and credible deleveraging path.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results (Released May 6, 2026): Astec reported net sales of $396.3 million, up 20.3% year-over-year. Growth was largely propelled by a 70.6% surge in Materials Solutions net sales, driven by organic gains and acquisition contributions. Meanwhile, Infrastructure Solutions net sales remained flat at $237.0 million (up 0.4% YoY) as tuck-in sales offset legacy shortfalls. However, profitability was pressured; adjusted earnings per share (EPS) of $0.54 missed consensus expectations of $0.85–$0.88 by roughly 36.5%. This earnings miss was attributed to legacy mix/timing shortfalls, CONEXPO trade show expenses, and freight/tariff headwinds. On a positive note, total backlog increased 36.4% year-over-year to $549.2 million, and full-year 2026 adjusted EBITDA guidance was maintained at $170 million to $190 million.
- CWMF Acquisition Integration (January 2, 2026): Astec finalized the acquisition of CWMF, LLC, a Minnesota-based manufacturer of asphalt plant equipment, parts, and services. In recent management commentary, Astec indicated that integration of this regional tuck-in has been highly efficient, with cost synergies materializing ahead of schedule.
- Executive Leadership Transition (April 20, 2026): Astec appointed Chad Hartley as Group President of Infrastructure Solutions and a member of the Executive Leadership Team, effective May 11, 2026. Hartley, who previously ran Conveyance Solutions at Regal Rexnord, takes the helm of the legacy road-building division during a critical transition period.
- Investor Day 2026 (May 13, 2026): Management presented its 2030 growth strategy, which is heavily oriented toward driving high-margin recurring parts and services revenue (which grew to 36.9% of total Q1 net sales), scaling digital products, establishing common manufacturing platforms under the "OneASTEC" model, and sustaining disciplined tuck-in M&A.
▸ Thesis-test Findings
TerraSource Global integration synergy updates Astec 2026
Astec’s acquisition of TerraSource Global (completed in July 2025) is tracking positively through the first half of 2026, providing a solid bull case for margin expansion. Management highlighted that synergy realization is coming through the pipeline rapidly, with an annual run-rate cost synergy target of $10 million expected by mid-2027, primarily driven by procurement optimization. Over the longer-term horizon, TerraSource is expected to boost Astec's parts and service mix by 2 to 3 percentage points as the company works to capture and upsell aftermarket solutions to TerraSource's global installed footprint of over 100,000 active legacy assets.
US highway spending IIJA funding rollout status 2026
The federal highway funding environment presents a mixed near-term outlook as the Infrastructure Investment and Jobs Act (IIJA) approaches its September 30, 2026 expiration. In the near term, the spending pipeline remains exceptionally robust: as of March 31, 2026, the Department of Transportation reported that of the $545.7 billion in adjusted enacted budget authority under the IIJA, 69.3% had been obligated and 41.2% outlayed. Consequently, heavy highway market activity is projected to plateau at record highs through late 2026, with the American Road & Transportation Builders Association (ARTBA) forecasting public highway and bridge construction to reach $145.5 billion this year (up 3% from 2025). However, the bear case centers on a potential "funding cliff" starting in Q4 2026. Congress has historically struggled to pass surface transportation reauthorizations on time, and a failure to do so before September 30 could leave state DOTs in planning limbo, stalling long-term project commitments.
Aggregate demand data center construction trends 2026
The unprecedented boom in data center construction is a major demand catalyst for Astec’s Materials Solutions division, particularly for aggregate processing and concrete batch plants. High-intensity AI workloads and hyperscaler demands are driving a historic global infrastructure build cycle. In the U.S., year-to-date data center starts through April 2026 reached $49.5 billion—a massive leap compared to only $13.6 billion during the same period in 2025. From October 2025 to March 2026, $92.1 billion was deployed to construct 140 new data centers, and quarterly spending is projected to average over $70 billion through 2028. This trend supports a multi-year bull case for aggregate and concrete demand, though developers are increasingly facing power and grid constraints in legacy hubs, prompting a geographic shift toward power-advantaged, emerging regions.