Stocks/ASTL

ASTL

Algoma Steel Group Inc.v3 4.5/10 · 2026-11-05
Basic Materials·Steel
$5.23
461M CAD market cap
v3 Rating
4.5/103.0–6.0
Setup
6.0/104.5–7.5
Fair Value
$4.50$1.00–$10.00-14%
DCF (10%)
$4.30-18%
Base IRR
+8%-40%–+45%
Visibility
wide±100%
Wall Street
(1 buy)
Rating
Revenue (TTM)
1.4B CAD
Owner Earnings
-$110M
Next-Yr Owner Earnings
-$70M
Growth
+15.0% × 3y
P / Next-Yr OE
--
Net Debt
$730M

Algoma Steel Group Inc. operates as a key North American producer and distributor of steel products. The company's offerings include a diverse range of flat and sheet steels, such as temper-rolled, cold-rolled, hot-rolled pickled and oiled items, floor plates, and custom-cut lengths. These flat products serve critical sectors like the automotive industry, manufacturers of hollow structural products, and various light manufacturing and transportation businesses. Additionally, Algoma Steel supplies plate steel—in rolled, hot-rolled, and heat-treated forms—which is integral to the construction of railcars, buildings, bridges, heavy off-highway equipment, storage tanks, ships, and military defense applications. Established in 1901, Algoma Steel Group Inc. is headquartered in Sault Ste. Marie, Canada.

2-Year Price History

$4.99-56.1%
$4.0$6.0$8.0$10Initial target $4.50 · 2026-11-05volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-05

Rating
4.53.0–6.0
Setup
6.04.5–7.5
Fair value (USD)
4.501.00 – 10.00
Upside vs 5.23
-14%
DCF (10%)
4.300.50 – 11.00-18%
Base IRR
8%-40% – 45%
Visibility
very widerange ±100%
Sentiment
3/10
2026-11-05 · claude-opus-5-5 · priced at 4.99

Algoma Steel is a 125-year-old Sault Ste. Marie mill. It shut its blast furnace in January 2026 and now runs two electric arc furnaces, the second of which made its first commercial heat on October 9. The 50% US Section 232 tariff has shut it out of what used to be half its market, so it has pivoted to a Canada-first, plate-first mix: it is Canada's only discrete-plate producer, and plate made up 73% of Q3 shipments. Q3 2026 (reported October 28-29; our pack labels it '2027Q2', but it is calendar Q3 FY2026) was the trough. Shipments were 145kt, adjusted EBITDA was -C$13.9M, and underlying EBITDA was about -C$67M once you strip out a C$53M 'capacity utilization' add-back that is really a cash cost of excess fixed costs. Management cut 2026 volume to about 0.75Mt, guided 2027 to an average of about 1.2Mt exiting at 1.5-1.6Mt, and said costs will not reach the scrap + C$225/t target until new power arrives in early 2028. The balance sheet is the problem. At face value net debt is about US$730M: US$350M of 9.125% 2029 second-lien notes, C$456M of government tariff loans (LETL) that come with 6.8M warrants struck at C$11.08, and other government loans. On top of that sit about US$190M of pension and retiree-benefit obligations, against equity worth only about US$527M (105.7M shares at a US$4.99 close on Nov 5). That makes EV about US$1.26B, or about 5.9x a ramped 2028 EBITDA of roughly C$300M, while today's owner earnings are still negative. My DCF gives about US$4.30 a share: 2027 burns cash, 2028-31 brings US$100-170M a year of unlevered FCF, and I put an 8x FCF terminal multiple on a cyclical, protected-but-commodity steelmaker. So the stock looks roughly fairly priced on base-case execution. The bull case of US$9-11 needs a US-Canada tariff deal (a 25% quota is under negotiation), Buy Canadian demand and C$450M+ EBITDA. Leverage and the transition make the bear case close to a wipeout or a dilutive recapitalization. Sentiment is gloomy but not capitulating, about 3/10: short interest doubled to 4.5M shares (7.6 days to cover), analyst targets have been cut (RBC C$5, consensus about C$7.9), and Maple Rock (15%) and MMCAP (10%) are holding. Rating 4.5: too levered and too dependent on execution and tariffs to buy at fair value. Research rating 6: a tariff deal plus a clean ramp could double the equity, and per-ton economics can be tested against Q4 and Q1 results.

A deep dive would have to establish: Can a fully ramped, Canada-centric 1.6-1.9Mt EAF platform earn C$300M+ EBITDA (C$190+/t) against Canadian sheet oversupply and possible plate price reversion, and will a US-Canada tariff-rate quota or the 2029 refinancing help or hurt the equity?

Owner earnings, TTM
-$110M-$200M – -$30M
Realistic peak profit
$300M$150M – $500M
Growth rate
15.0%5.0% – 30.0%
Years of growth
32 – 5
Market cap
$527M$470M – $580M
EV
$1.3B$1.2B – $1.4B
Net debt
$730M$680M – $800M
Capital return / cap
0.0%0.0% – 2.0%
P/E
5.5×3.5× – 25.0×
EV/EBITDA
5.9×3.5× – 15.0×
FCF yield
9.0%-5.0% – 25.0%
Projected FCF, base case (USD millions)
Y1-$70M-$170M – $20M
Y2$100M-$40M – $220M
Y3$170M$20M – $300M
Y4$170M$10M – $300M
Y5$165M$0M – $300M
Competition: Algoma is Canada's only discrete-plate mill and is protected by new Canadian import quotas and Buy Canadian rules, but in sheet it fights Stelco/Cliffs and ArcelorMittal Dofasco in an oversupplied home market while the US is effectively closed by 50% tariffs.
Governance: None serious, but government lenders (LETL warrants, rate step-ups) and the open supply-contract litigation add creditor and legal overhang.
Research (expand)

What the company does

Algoma Steel (Sault Ste. Marie, Ontario; NASDAQ/TSX: ASTL) makes hot-rolled sheet and coil, cold-rolled sheet and discrete plate. Customers are steel service centres, automakers, makers of hollow structural sections, railcar builders, bridge and infrastructure contractors, heavy equipment and defence. It is Canada's only producer of discrete plate. On January 18, 2026 it permanently shut its blast furnaces and became an all-EAF (electric arc furnace) mill. EAF Unit 1 has carried production since early 2026, and EAF Unit 2 made its first commercial heat on October 9, 2026. Power comes from its own Lake Superior Power (LSP) gas plant plus the Ontario grid. Larger grid supply arrives in early 2028, and that is what lets costs fall to the target and capacity go higher.

Note on the pack: the transcript labelled '2027Q2' is the Q3 FY2026 call held 2026-10-29. Algoma now reports on a calendar year. This is confirmed by the company's 6-K for the quarter ended Sept 30, 2026. The transcript's adjusted EBITDA figure of '-$0.9M' is a transcription error; the release says -C$13.9M.

The investment case (and the counter-case)

Bull:

1. The transition is over. Q3 was the trough (145kt shipped), Q4 shipments are guided +25-35%, the capacity-utilization add-back ends in Q4, 2027 averages about 1.2Mt and exits at 1.5-1.6Mt, and the system can reach 1.8-1.9Mt.

2. The plate franchise is protected and growing. Canadian quotas on non-FTA imports, Buy Canadian/Buy Ontario procurement, defence (the Roshel Algoma Defence ballistic-steel JV) and infrastructure demand all help. Net sales realization (NSR) was C$1,510/t in Q3, up 34% year on year.

3. Once fully powered, an EAF cost base of scrap + about C$225/t is structurally lower than the old blast furnace.

4. There is policy optionality. The US and Canada are negotiating a steel tariff-rate quota (25% within a quota, 50% above it). Ottawa and Ontario created a joint steel action fund that could pay for the beam mill.

5. Holders are concentrated and patient: Maple Rock 15.1% and still adding, MMCAP 10.4%.

Bear:

1. Leverage. Face net debt is about US$730M plus about US$190M of pension and retiree-benefit obligations, against negative EBITDA today.

2. The US-facing coil business is gone. Canadian sheet is oversupplied: Stelco/Cliffs and ArcelorMittal Dofasco are also redirecting tonnes home. More Algoma coil could push prices down, and BMO asked exactly that on the call.

3. The ramp keeps slipping. 2026 volume was cut from 1.0-1.2Mt to about 0.75Mt, the Q4 breakeven-EBITDA target was dropped, and the LSP turbine failed in August.

4. Legal overhang from the supply contracts it abandoned. The Haverhill/SunCoke settlement is confidential and cash goes out in Q4; other supply-agreement claims are still open.

5. LETL interest steps up by 200bp a year from late 2028, and the 2029 notes must be refinanced.

What it earns today (real free cash flow)

  • Today: negative. Nine-month 2026 adjusted EBITDA was -C$28.9M, but that adds back C$198M of capacity-utilization costs and includes C$45M of insurance. Underlying EBITDA was about -C$270M over 9 months, and about -C$67M in Q3 alone.
  • Q3 operating cash flow of +C$78.6M came entirely from one-offs: C$164M of tax refunds, an inventory release and insurance. Strip those and the business burned more than C$100M in the quarter. Capex was C$67.7M.
  • An annualized Q4-style run rate (EBITDA of perhaps -C$80M to -C$140M) less about C$70M of maintenance capex and pension cash gives current unlevered owner earnings of roughly -US$110M (range -US$200M to -US$30M).
  • Cash taxes will be near zero for years thanks to large tax losses. Stock-based compensation is small (about C$5-10M).
  • EBITDA-to-owner conversion in steady state: with about C$90M a year of sustaining capex and C$15M of pension/retiree-benefit cash, roughly 65-70% of EBITDA reaches owners before interest. Cash interest is about C$70M a year (9.125% notes US$32M; LETL at CORRA+200bp on C$456M; other government loans are low-coupon), so at C$300M EBITDA only about 45% reaches equity.

Projected free cash flow before interest (US$M, at 1.40 CAD/USD)

| Year | Shipments | EBITDA (C$M) | Unlevered FCF (US$M) | Notes |

|---|---|---|---|---|

| 2027 | ~1.2Mt | ~80 | -70 (range -170 to +20) | ramp losses early in the year, working-capital build, turbine/EAF capex |

| 2028 | ~1.6Mt | ~300 | 100 (-40 to 220) | new power, cost toward scrap + C$225 |

| 2029 | ~1.8Mt | ~360 | 170 (20 to 300) | |

| 2030 | ~1.8Mt | ~360 | 170 (10 to 300) | some cash tax starts |

| 2031 | ~1.8Mt | ~360 | 165 (0 to 300) | |

About three years of real growth remain (volume going from 0.75Mt to about 1.8Mt). After that this is a flat-volume, cyclical commodity mill. More capacity (beyond 2Mt, or the beam mill) would need new growth capex that is largely government-funded.

What kind of company in 5 years?

Not a corpse and not a compounder. If execution is clean, it becomes a 1.8-2.0Mt Canadian EAF mill with a protected plate niche, about C$300-450M of mid-cycle EBITDA and lumpy, cycle-driven cash flow. If the US border reopens to some degree, upside comes from a 25% quota channel. If Canadian sheet oversupply persists and plate prices revert, EBITDA could sit at C$100-200M, and the 2029 refinancing becomes a recapitalization, possibly with the government converting loans into equity or extracting more warrants. My confidence in the projection is low: the 90% range on 2029 FCF runs from about zero to US$300M. The market will value it as a cyclical, mature steel company at 5-7x EBITDA, or 7-9x FCF.

Fair value and multiples

  • Market cap: 105.66M shares x US$4.99 = US$527M. This was the Nov 5 close, -5.3% on the day; it was US$5.32 on Nov 4. The 1-year range is US$3.16-5.90, and the stock sits about 21% of the way up its 3-year range (US$3.19-11.76).
  • Net debt, face value (Sept 30 plus known items): notes US$350M; LETL C$456.5M drawn (carried at C$267M plus a C$201M deferred 'loan benefit', so face is about US$326M); other government loans (AMF, MENDM, two SIF loans) carried at C$164M; revolver about zero; cash C$152M (US$109M); turbine financing about US$26M; less the C$35M tax refund received after quarter end; plus the Haverhill settlement outflow and the Q4 working-capital build. That comes to about US$730M (range US$680-800M). Pension and retiree-benefit obligations of C$268M (about US$190M) come on top; I count them through the cash flow rather than in EV.
  • EV ~US$1.26B. That is about 5.9x 2028E EBITDA (C$300M, about US$214M) and about 4.9x 2029E. On 2028 unlevered FCF of US$100M it is 12.6x, falling to about 7.4x on 2029.
  • Forward P/E: 2028E net income of about C$135M (EBITDA 300, D&A about 90, interest about 75, no tax) is about US$0.91 a share, or about 5.5x. 2027 is a loss.
  • Levered FCF yield 2028: about 9% (US$48M on the market cap). Deeply negative in 2027.
  • DCF (10% discount, 8x terminal FCF on year 5, minus US$730M net debt): EV ≈ US$1.19B, equity ≈ US$455M, about US$4.30 a share (range about US$0.50-11). Mature-company check: today's year repeated forever is worth less than zero, because owner earnings are negative.
  • 3-year exit view: if 2029 EBITDA reaches C$360M and the stock trades at 6x, EV ≈ US$1.54B against roughly US$680M of net debt. That gives equity of about US$8.10 a share, about 17% a year. The 10%-discount DCF lands at about 8% a year from here because 2027 burns cash.
  • My fair value: about US$4.50 (range US$1-10). That is roughly the current price: a fair price for a levered, binary bet on execution and policy, with no margin of safety. The setup does not fit our 50%-in-a-year screen unless a tariff deal lands. Implied volatility of about 72% is high, but forward earnings are not predictable and this is no valuation floor, so it is not a covered-call setup.

Management, capital allocation, governance

CEO Rajat Marwah (formerly CFO) replaced Michael Garcia in 2025, and Mike Moraca is CFO. Execution on the EAF has been slow (years of delay and overruns) but is now delivering: Unit 2 ramped much faster than Unit 1. The dividend was suspended in 2025 and there are no buybacks, which is appropriate. Government money comes with strings: LETL warrants (6.8M at C$11.08, about 6% dilution), plus interest that steps up by 200bp a year from year 4 of the seven-year term. I see no fraud or self-dealing. The main governance risk is that a creditor-government's priorities (jobs in the Sault) do not line up with shareholders'.

Competition

  • Plate: Algoma is the only Canadian discrete-plate maker. It competes with US mills (Nucor, SSAB Americas, Cleveland-Cliffs) and imports, all now hampered by Canadian quotas, surtaxes and Buy Canadian rules.
  • Sheet: it competes with Stelco (Cleveland-Cliffs) and ArcelorMittal Dofasco, which are also cut off from the US, in a Canadian market that is oversupplied.
  • Costs: an EAF on Ontario scrap should be cost-competitive once power arrives in 2028. Scrap supply has not been a problem so far.

Sentiment: 3/10 (gloomy, not capitulation)

  • The stock is down about 55% from its 2024 highs but up about 50% from its September 2025 low.
  • Short interest doubled from 2.2M to 4.5M shares between July and October 2026 (about 4% of shares, 7.6 days to cover).
  • Q3 missed consensus: an EPS loss of US$0.84 against US$0.56 expected. Guidance was cut and the breakeven target dropped, and the stock fell about 5%.
  • Analysts are lukewarm: RBC Sector Perform C$5 (cut from C$6); BMO downgraded to Market Perform; Stifel Buy C$11.50; consensus about C$7.9 (about US$5.6). Retail treats it as a tariff headline trade: it rallied on Carney's steel package and on reports of a US-Canada quota deal, and fades when deal timing slips.
  • Donald Smith has trimmed its stake from 7.8% to 5%. Maple Rock (15.1%) and MMCAP (10.4%) are large and patient holders. There is no sign of forced selling or insider buying.

What a deep dive must establish

1. Realistic 2028 margin per ton: Canadian HRC and plate prices against scrap + C$225 plus the cost of rolling plate.

2. Whether a US-Canada tariff-rate quota reopens a coil export channel.

3. The size of the Haverhill and other supply-contract liabilities.

4. The refinancing path for the 2029 notes, and the LETL interest step-ups.

Sources

Financials — Adjusted

Adjusted · TTM 2027-Q2 · CAD

TTM & Fiscal-Year P&LTTM2024202320222014
Revenue1427-22%2796+1%2779-27%3806+112%1792
Gross profit-952279-28%390-74%1514-137
Operating expenses84.3+10%115+6%108+5%103-6%109
▸Adj EBITDA-517282-20%355-76%1498-138
▸Adj OCF-324260-25%347-73%1264-163
CapEx-148-478-343-168-29.7
Adj FCF-471-2183.70-100%1096-193
Interest expense96.842.914.547.30.00
▸Adj net income-91797.9-53%209-80%1065-69.8
▸Owner's earnings-400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2014→FY2024 +2027YTD

Where the Cash WentTotal2027YTD2024202320222014
▸Claimed: EBITDA-1879-3805263100%498100%1303100%-138
FCF (OCF−capex)-504-1291-183-70%-166-33%109584%40.6
Net income-5856-680310540%29860%85866%-314
▸Capital returned-953-17087.673%564113%20716%-24.8
Buybacks1600.000.00553-3940.00
Dividends10436.327.930.79.300.00
Interest paid59749342.914.547.30.00
Debt paid down-1815-2237-63.1-34.3544-24.8
▸Reinvestment1993973479182%34369%16813%29.7
Capex (PP&E)199397447834316829.7
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)-0.30-1.501.30---0.10--
Retained / other965908-148-56%-730-147%89969%65.4

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2024202320222014
▸Assets (total)20002676245626941804
▸Liabilities (total)1802117499311112335
Net debt (incl. leases)79454.7-125-8191292
Net debt / Adj EBITDA--0.19-0.35-0.55--
Net debt / Adj FCF-----33.7-0.75--
Adj EBITDA / interest-5.346.5824.431.7--
Shares outstanding106104148148148
Dilution (YoY)+0.1%+0.5%-38.2%----
Employees2818240024002734--
MarginsTTM2024202320222014
Gross margin-66.7%+17.810.0%-4.014.0%-25.839.8%+47.4-7.7%
Adj EBITDA margin-36.3%-0.110.1%-2.712.8%-26.639.4%+47.0-7.7%
Adj OCF margin-22.7%-9.09.3%-3.212.5%-20.733.2%+42.3-9.1%
Adj FCF margin-33.0%-13.3-7.8%-7.90.1%-28.728.8%+39.6-10.8%
Net income margin-66.9%+13.23.8%-7.010.7%-11.822.5%+40.0-17.5%
Adj NI margin-64.3%+6.03.5%-4.07.5%-20.428.0%+31.9-3.9%
ROIC (adj, after-tax)-71.5%7.2%14.1%62.3%-15.0%
Cost of debt10.0%29.8%13.2%14.9%0.0%

Revenue Breakdown

Revenue Segments

By Product (2026-Q3)
Steel Sheet and Strip$1.3B-3%
Steel Plate$565.8M+75%
Freight$175.3M+23%
Non Steel$32.0M+22%
Slab$0.8M-39%
By Geography (2026-Q3)
UNITED STATES$1.1B-1%
CANADA$930.4M+38%
Rest of The World$23.1M+16%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-10-29

Algoma Steel reported fiscal Q3 2026 results in line with its early-October guidance, in what management called the low point of its transition to electric arc furnace (EAF) steelmaking. Shipments were about 144,500 tons versus 419,000 a year ago and 181,000 in Q2, reflecting the accelerated move to EAF-only production, the impact of U.S. Section 232 tariffs, and an unplanned outage at Lake Superior Power (LSP) from August 17 to 29 after one of two turbines tripped. Plate shipments were 105,000 tons, about 73% of the total. Net sales realization rose to $1,510 per ton, up 11% from Q2 and 33.7% year over year. Cost per ton was $1,492, excluding $53.1 million of capacity utilization costs. Revenue was $249.4 million. Adjusted EBITDA was a loss of $13.9 million, within guidance. Excluding the capacity utilization adjustment and Q2's $45 million insurance settlement, underlying EBITDA improved about $19 million sequentially on roughly 20% lower volume, the second consecutive quarter of improvement. Direct tariff costs fell to $18.1 million from $89.7 million as U.S. shipments dropped 83%. Operating cash flow was $78.6 million, helped by $163.9 million of tax refunds and lower inventories. After quarter end, Algoma received another $35 million of tax refunds and the $45 million insurance proceeds that closed the 2024 utility corridor claim. Capex was $67.7 million, including a down payment on a replacement turbine costing about US$35 million, with the balance to be financed over four years. Liquidity was about $428 million, including $152.4 million of cash, and the revolver was essentially undrawn. Algoma also settled the Haverhill Coke dispute on confidential terms. Operationally, LSP's full generating capability was restored September 30 with the new turbine. A leased turbine will be installed in Q4 while the damaged one is repaired, leaving the new turbine as a spare. EAF Unit Two reached first arc and first commercial production on October 9. For Q4, management expects shipments up 25-35% from Q3, weighted to November and December, with a substantial improvement in underlying EBITDA and no capacity utilization add-back. In Q&A, management said 2027 production should exit the year at a 1.5-1.6 million ton annualized rate, averaging about 1.2 million tons for the year, with a potential 1.8-1.9 million ton run rate later. Cost per ton should stay above the scrap-plus-$225 target until more power arrives in early 2028. Management welcomed new federal and Ontario steel support measures and said Buy Canadian policies are already bringing new orders, and that the beam mill rationale is unchanged.

Analyst Q&A (12)
▸
How is the company thinking about ramping both furnaces and total volume next year, beyond the 25-35% Q4 increase?
Katja Jancic · BMO Capital Markets
The ramp is going well, though learning to alternate arcing between the two furnaces takes time. Production should exit 2027 at an average rate of 1.5-1.6 million tons, with the full-year average around 1.2 million tons.
▸
With Canadian sheet prices improved partly because Algoma shipped less, could its ramp-up hurt pricing, or is the market strong enough?
Katja Jancic · BMO Capital Markets
Pricing reflects many factors, including mill utilization, U.S.-Canada trade, Buy Canadian policies and TRQ import restrictions. Most past sheet shipments went to the U.S. and have fallen sharply. Algoma will be disciplined, serving long-standing customers, and expects the market to balance.
▸
Which projects might fit the new government funding and how would it fit in the capital stack?
Ian Gillies · Stifel
The latest announcement focuses on diversification into products Canada needs. The beam mill's economics and rationale are unchanged, and Algoma is working actively with government to find the right program; discussions are ongoing.
▸
Has the company seen tangible contracts or bids from nation-building and Buy Canadian demand?
Ian Gillies · Stifel
The policies are newer and slow to flow through, but orders are coming in across infrastructure and defense plate projects. New customers are buying and existing ones are buying more, and activity should grow as procurement contracts are awarded.
▸
Is the EAF ramp only a learning curve, or have there been issues such as scrap procurement?
Ian Gillies · Stifel
Scrap procurement has been fine and equipment has performed well. The ramp is a learning curve, worsened by the power outage. Unit Two is ramping much faster thanks to lessons from Unit One.
▸
If demand requires more than 1.2-1.3 million tons next year, is there enough flexibility to produce more?
Ian Gillies · Stifel
If the learning curve quickens, higher output is possible. With available power and alternate arcing, run rate could reach 1.8-1.9 million tons, probably by end of next year, though timing is uncertain. More color will come on the next call.
▸
Is the 1.5-1.6 million tons the exit rate for Q4 2027, versus 1.2 million?
James McGarragle · RBC Capital Markets
Yes, 1.5-1.6 million tons is the exit rate for next year.
▸
How should the cost base look at 1.5-1.6 million tons versus the scrap-plus-$225 target?
James McGarragle · RBC Capital Markets
Scrap plus $225 applies when capacity is greater, expected in early 2028 with additional power. Next year's ramp-up costs should be directionally higher than that; volume is the biggest driver and costs will improve as volume rises.
▸
How will the capacity utilization charge evolve over the next couple of quarters?
James McGarragle · RBC Capital Markets
Q3's charge was higher than expected because of the outage. Management still expects no EBITDA add-back in Q4 and is driving the charge down, though current costs support much higher volumes, so cost structure improves as the ramp progresses.
▸
What is the turbine capex, and does the outage point to structural issues, undercapitalization or further outage risk?
James McGarragle · RBC Capital Markets
The outage was an unplanned, premature failure, and insurance recovery may be possible. A third turbine adds redundancy and future power-generation options. The down payment (about 25%) hit Q3 capex, total cost is about US$35 million, and the balance will be financed over four years.
▸
Was planned maintenance fully pulled forward into the outage, or deferred into Q4 or Q1 2027?
Albert Realini · Jefferies
Much of the tie-in work was done during the August 17-29 outage. Inventory supported extra shipments in Q3, and Q4 production will be slightly higher to support inventory.
▸
What are the Q4 working capital expectations, including tax refunds, insurance proceeds and the confidential coke settlement's timing?
Albert Realini · Jefferies
No comment on the settlement amount. Remaining tax refunds arrived post-quarter and the settlement will affect Q4 cash flow. Some raw material working capital will be built toward year-end to support the EAF ramp.

Options

Chain Snapshot (daily)

Call IV (ATM)72%
Put IV (ATM)71%
ATM Spread5.6%
Call $OI (near money)$385K
Put $OI (near money)$47K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$5.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$1.00$4.00/$4.900--/$0.050
$2.00$2.90/$3.900--/$0.750
$3.00$2.00/$2.950--/$0.750
$4.00$1.05/$2.000--/$0.750
$5.00$0.55/$0.8523$0.30/$0.402
$6.00$0.20/$0.30105$0.60/$1.150
$7.00--/$0.350$1.30/$2.250
$8.00--/$0.25100$2.15/$3.100
Snapshot: 2026-11-04

Short Interest

Short % of Float4.7%
Short Shares4.6M
Days to Cover3.3
Change (vs Prior)+3.7%
Short % Float History
4.70%-0.30pp
2.0%3.0%4.0%5.0%6.0%10-1512-3103-1305-2908-1410-30

Cash Runway

11.2months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Maple Rock Capital Partners Inc.$68.3M$5.42+$3.8M+$34.3M—$5.10B
MMCAP International Inc. SPC$44.4M$6.78−$7.7M+$15.1M—$1.18B
DONALD SMITH & CO., INC.$21.4M$6.90−$3.0M−$3.1M—$5.65B
BlackRock, Inc.Passive$16.8M$8.12+$113K−$9.1M—$6.70T
Scheer, Rowlett & Associates Investment Management Ltd.$15.7M$6.39+$2.6M−$211K—$1.39B
MORGAN STANLEY$12.0M$5.60+$6.0M+$10.3M—$1.88T
AEGIS FINANCIAL CORP$7.2M$6.79+$0+$0—$633M
CDC Financial, Inc.$7.1M$4.10+$534K+$7.1M—$130M
BRIGHTLINE CAPITAL MANAGEMENT, LLC$6.7M$4.05+$6.7M+$6.7M—$462M
LITTLEJOHN & CO LLC$6.2M$6.92−$7.8M+$6.2M—$78.6M
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

014.5M28.9M43.4M57.9M$3.56$5.28$6.99$8.71$102021-122022-122023-122024-122025-122026-06
hover the chart for per-quarter detailprice (right axis)
Bain Capital Credit, LP826KBARCLAYS PLC309KMSD Partners, L.P.—DONALD SMITH & CO., INC.5.3MCONTRARIAN CAPITAL MANAGEMENT, L.L.C.—MMCAP International Inc. SPC11.0MMaple Rock Capital Partners Inc.16.9MGOLDENTREE ASSET MANAGEMENT LP—Weiss Multi-Strategy Advisers LLC—THOMIST CAPITAL MANAGEMENT, LP—

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Buy: 1Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2021 Q41.0B317M216M$1.67$1.62 – $1.721
2022 Q1960M189M124M$1.13$1.10 – $1.171
2022 Q2970M191M125M$1.14$1.11 – $1.181
2022 Q31.1B267M182M$1.67$1.63 – $1.711
2022 Q41.0B191M124M$1.13$1.10 – $1.171
2023 Q11.0B199M125M$1.14$1.11 – $1.181
2023 Q2615M78M34M$0.31$0.30 – $0.321
2023 Q3487M-1M-36M$-0.33$-0.34 – $-0.321
2023 Q4655M43M1M$0.01$0.00 – $0.012
2024 Q1577M45M-2M$-0.02$-0.02 – $-0.021
2024 Q2605M52M-3M$-0.02$-0.02 – $-0.021
2024 Q3564M28M-23M$-0.21$-0.21 – $-0.201
2024 Q4506M-26M-79M$-0.72$-0.74 – $-0.701
2025 Q1469M-24M-80M$-0.73$-0.75 – $-0.711
2025 Q2571M9M-43M$-0.39$-0.44 – $-0.373
2025 Q3482M-21M-77M$-0.70$-0.72 – $-0.682
2025 Q4473M213M-49M$-0.45$-0.46 – $-0.431
2026 Q1302M-25M-82M$-0.75$-0.77 – $-0.722
2026 Q2292M-21M-65M$-0.60$-0.62 – $-0.582
2026 Q3230M-6M-54M$-0.49$-0.50 – $-0.482
2026 Q4341M18M-26M$-0.24$-0.25 – $-0.231
2027 Q1405M39M-7M$-0.06$-0.06 – $-0.061
2027 Q2444M42M-5M$-0.05$-0.05 – $-0.041
2027 Q3457M41M-8M$-0.07$-0.07 – $-0.071
2027 Q4476M46M-5M$-0.04$-0.05 – $-0.041
2028 Q1484M59M5M$0.05$0.04 – $0.051
2028 Q2484M60M5M$0.04$0.04 – $0.041
2028 Q3484M62M5M$0.05$0.04 – $0.051
2028 Q4484M66M7M$0.07$0.06 – $0.071
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand

Thesis

Algoma is in the middle of a genuine industrial transformation rather than a normal earnings cycle. The old blast-furnace model has been shut down, the first EAF operated through the quarter, and the second unit is nearing commissioning. That should eventually lower the cost and carbon intensity of production, but the transition has produced severe volume losses, large capacity-utilization charges, negative free cash flow and substantially higher leverage. The 50% U.S. tariff has also forced a rapid commercial pivot into Canada's smaller market. The second-quarter headline was better than the underlying result: adjusted EBITDA was positive C$13.8M, but C$45M came from an insurance settlement and C$54.7M from a capacity-utilization adjustment. Underlying EBITDA was approximately negative C$31M, although management indicated meaningful sequential improvement after normalizing comparable items. Record plate shipments and a 20.2% increase in average realization are encouraging, but Q3 is expected to be another volume trough because maintenance and EAF tie-ins are deliberately concentrated there. The central question is financing. Management has liquidity support, expected tax refunds and an insurance receivable, but quarter-end liquidity was only about C$437M while net debt was approximately C$784M and TTM adjusted FCF was deeply negative. The base case assumes the EAF ramp works and avoids a restructuring, but the distribution of outcomes is unusually wide and the equity remains highly sensitive to tariffs, power costs, Canadian demand and execution.

Trade Signal

Trade rating
-1.8/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-07-30 · saw $3.84+36.2% since

No trade, with a bearish bias: the stock is modestly above the headline fair value and its upside depends on several contingent catalysts, while cash burn, tariffs, and refinancing risk make the downside insufficiently compensated for a long.

Temporary mispricing+0.5

The stock declined from C$5.85 in May to roughly C$4.16 by late June as investors absorbed the tariff regime, weak domestic pricing, the credit downgrade, and transition-related cash losses. It then rebounded to C$4.39 in late July, likely on improving EAF/plate-readthrough and anticipation of the Q2 print, before settling around C$4.27. Q2 earnings produced essentially no one-day reaction—C$4.27 to C$4.27—because the headline EBITDA was supported by insurance and capacity-utilization items while management reiterated the difficult Q3 trough. The move has broadly reflected the facts rather than materially overshooting them. If anything, the July rebound slightly undershot the continued financing risk, but the dislocation is too small and uncertain to qualify as a strong temporary mispricing.

Market view+1.0

The visible analyst view is constructive—one Buy rating and low short interest—but the equity has fallen 27% over the last year and trades well below its 2024 levels, indicating that investors remain skeptical of the transformation. Bulls focus on the second EAF, record plate volumes, domestic strategic importance, and defense optionality. Bears focus on the 50% U.S. tariff, weak Canadian pricing, Ontario power costs, cash burn, the Fitch downgrade, and possible dilution. The July rebound appears more like a positioning or sympathy move than a broad consensus re-rating. The market is mildly constructive on the long-term story but appropriately cautious on near-term solvency and execution.

Inflectionwindow ~3mo+1.5

There is a genuine operational inflection underway as the second EAF comes online and fixed-cost absorption improves, but the market already knows and broadly expects a recovery toward breakeven in late 2026 and stronger volumes in 2027–28. The latest quarter showed underlying sequential improvement, yet reported EBITDA relied on a C$45M insurance settlement and a C$54.7M capacity-utilization adjustment. Consensus estimates remain modest through 2027, so clean execution could help, but the evidence is not yet exceptional or clearly underestimated. The inflection is positive but highly execution-sensitive.

Catalysts
  • ▼Q3 2026 · Second EAF first steel and commissioning update — Expected in Q3 2026; delays, quality problems, or weaker-than-guided ramp would increase cash-burn and refinancing risk.
  • ▼Late 2026 · Q3 2026 earnings and transition trough — Shipments are expected to decline another 10%–20% sequentially because of tie-ins and maintenance; the key question is whether underlying EBITDA improves despite the volume trough.
  • ▲Q4 2026 · Capacity-utilization drag and transition costs approach zero — Management targets elimination of transition costs by Q4 2026 and EBITDA breakeven as EAF volumes recover; confirmation would reduce the distressed-equity discount.
  • ▼H2 2026 · Liquidity and refinancing update — The B- rating with negative outlook, current cash losses, and LETL borrowing make refinancing terms and government support important equity-risk events.
  • ▲Late 2026 to H1 2027 · Canadian defense or infrastructure contract awards — Roshel and potential Hanwha-related opportunities could create higher-margin demand, but the submarine-linked upside remains contingent and uncontracted.
  • •Late 2026 to 2027 · CUSMA/Section 232 trade developments — Tariff relief would be materially positive, while continued exclusion from the U.S. market preserves the current domestic-only constraint; timing and outcome are highly uncertain.
Flow-2.5

Reported TTM dilution is 0% and short interest is only about 2% of float, so there is little squeeze fuel and no current death-spiral evidence. However, the company drew C$124.5M under LETL during the quarter, remains cash-flow negative, and could issue equity or debt if the EAF ramp slips. Buybacks and insider buying are not evident. Net flow is modestly negative because future financing supply is a more credible risk than shareholder-return demand.

Floor / Ceiling-1.5

There is no hard equity floor at today's price. Strategic importance and potential government support may prevent disorderly liquidation, while C$437M of stated liquidity provides some time, but the company is consuming cash, has elevated leverage, and could require additional borrowing or dilutive capital. The strategic-asset value is a soft backstop rather than a committed bid. There is also no clear ceiling, although financing or dilution risk can cap upside if the stock rallies before profitability is demonstrated.

Buyability

Weak-to-moderate. The company has strategic relevance as Canada's only domestic discrete-plate producer and could attract government, defense, or infrastructure buyers, but current losses, elevated leverage, tariff exposure, and dependence on a successful EAF ramp make it difficult for fundamental buyers to underwrite today. The next buyer likely needs evidence of sustained positive EBITDA or a concrete defense contract.

Fear vs Greedfear 9/10 (-1.0)greed 7/10 (+2.0)

Fear pulls stronger than greed. The stock is not expensive on sales, but sales multiples are misleading while owner earnings are deeply negative; the near-term trough, tariff wall, power-cost inflation, credit downgrade, and refinancing risk are real. The upside case depends on several contingent events—clean EAF execution, tariff relief, and defense awards—rather than already visible earnings power.

Valuation

Our Target
500M CAD-24%
Market Should Pay
350M CAD-47%
target ×0.7 (fear discount)
Current Market Cap
662M CADNeutral
What Changed
transcript · 2026-07-30
+8%fair value on this information

The genuinely new information was that the first EAF operated as the sole liquid-steel source for the full quarter, plate shipments reached another record, normalized sequential performance improved materially, and the second EAF was nearing first steel. The quarter also clarified that Q3 will be a planned maintenance trough and that management still expects a 1.5-2.0 million-ton entry run rate in 2027. The positive headline EBITDA was not wholly new value creation because it included the C$45M insurance settlement and a C$54.7M capacity-utilization adjustment.

▸ How the cases moved

The quarter modestly improved the base and bull cases: the base case terminal equity value rises from approximately C$550M to C$650M as normalized sequential performance improved and the first EAF demonstrated broader product capability; the bull case rises from approximately C$2,100M to C$2,300M because the second EAF is close to commissioning and plate volumes remain strong. The bear case remains at C$0M, with probability largely unchanged at 0.30 because liquidity, tariff and refinancing risks remain substantial. Base probability increases from 0.48 to 0.50, bull from 0.19 to 0.20, and bear declines from 0.33 to 0.30.

2-Year Plausible Outcomes
bear30%
0M CAD
rev -5%/yrOE $-150M

The EAF transition remains operationally and financially disruptive, Canadian sheet demand cannot absorb the ramping capacity, electricity costs rise, and the 50% U.S. tariff persists. Algoma requires additional financing or restructuring before achieving sustainable cash generation. Plate demand provides some operating value, but leverage and funding needs consume the equity.

▸ Valuation

3x C$300M EBITDA = C$900M EV − C$900M net debt = C$0M equity

base50%
650M CAD
rev +8%/yrOE $100M

The second EAF ramps substantially during 2027, transition charges disappear, plate volumes approach 600,000 tons, and fixed-cost absorption improves. The U.S. market remains constrained, so Algoma operates primarily in Canada with moderate margins and remains leveraged but solvent. Cash taxes, insurance proceeds and improved working capital help fund the transition without a full restructuring.

▸ Valuation

5x C$250M EBITDA = C$1,250M EV − C$600M net debt = C$650M equity

bull20%
2.3B CAD
rev +15%/yrOE $250M

Both EAFs reach efficient utilization, Canadian infrastructure and defense demand absorb much of the output, pricing improves, and Algoma develops export outlets for lower-carbon steel. Plate mix and cost reductions produce a durable margin recovery, while cash generation materially reduces debt. The business is again valued as a competitive, lower-carbon specialty and plate producer rather than a distressed integrated mill.

▸ Valuation

6x C$450M EBITDA = C$2,700M EV − C$400M net debt = C$2,300M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is C$628M, but I set the analytical target at C$500M because the arithmetic does not fully capture refinancing risk, the company's weak current cash conversion, questionable data quality, tariff exposure and the possibility that higher electricity costs impair the EAF economics. The target still assigns substantial value to a successful ramp and is not a liquidation value; it is deliberately below the model output to reflect the capital structure and execution risk.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now2/10
Trajectory6/10
Risk9/10
Governance5/10
Insolvency prob (2yr)20%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Transition to EAF-Only Steelmaking: On January 18, 2026, Algoma permanently shut down its legacy blast furnace and coke batteries, ending 125 years of coal-based integrated steelmaking. The company has fully transitioned to its new electric arc furnace (EAF) platform, running its first EAF unit on a 24-hour schedule. A second EAF unit is under construction and expected to begin steel production in Q3 2026.
  • Severe Financial Losses in Q1 2026: In its Q1 2026 financial report (released May 2026), Algoma reported a consolidated net loss of C$159.4 million, compared to a net loss of C$24.5 million in Q1 2025. Revenue dropped 42.4% year-over-year to C$296.9 million. Operating losses were heavily impacted by the EAF ramp-up, lower production, and direct tariff expenses.
  • U.S. Tariff Impact and Domestic Pivot: Direct tariff costs for Q1 2026 rose to C$27.4 million (up from C$10.5 million in Q1 2025). Because the 50% U.S. Section 232 tariff has virtually closed off the American market, Algoma has pivoted its commercial strategy entirely toward the Canadian market. It is focusing on discrete plate steel—where it is Canada's only domestic producer—shipping a record 116,000 net tons in Q1 2026.
  • Fitch Credit Downgrade: On May 8, 2026, Fitch Ratings downgraded Algoma Steel Group's Long-Term Issuer Default Rating (IDR) to 'B-' from 'B' and revised the outlook to Negative. Fitch cited pressured earnings, weak Canadian pricing, elevated leverage, and refinancing needs.
  • Layoffs and Rehiring Commitments: Following the accelerated shutdown of its blast furnace, Algoma laid off approximately 1,000 employees in March 2026. In May 2026, federal Industry Minister Mélanie Joly stated that the government is working with Algoma to "bring back" these workers, secure reskilling programs, and add 500 new jobs over the next year to support future domestic plate and beam operations.
▸ Thesis-test Findings
Canada US steel trade negotiations Section 232 exemption 2026

The bear case is heavily reinforced by ongoing tariff friction. The U.S. continues to impose a punitive 50% Section 232 tariff on Canadian steel imports, causing Canadian steel production to drop 15% year-over-year as of May 2026. While a June 1, 2026, proclamation by U.S. President Trump temporarily eased tariff rates on downstream *finished* products containing at least 85% U.S. metal weight, raw and semi-finished Canadian steel remains locked out of the U.S. market. Trade attorneys and analysts indicate that because the U.S. holds immense leverage heading into the scheduled USMCA (CUSMA) trade reviews, it is highly unlikely that Canada or Mexico will successfully secure a Section 232 tariff exemption or rollbacks anytime soon.

Roshel Algoma Defence joint venture contract updates

This highlights a strong, but highly contingent, long-term bull case. In April 2026, Algoma formed a joint venture with armored vehicle manufacturer Roshel Inc., named Roshel Algoma Defence (RAD), to establish a Canadian Centre of Excellence for Ballistic Steel Production in Sault Ste. Marie. RAD aims to supply Canadian-made ballistic steel for federal defense procurements, such as Light Utility Vehicles and the Domestic Arctic Mobility Enhancement program. In June 2026, South Korean defense giant Hanwha also partnered with Algoma to supply Canadian steel for land vehicles. However, these opportunities—including a binding MOU with Hanwha Ocean valued at up to USD $250 million (which includes USD $200 million toward a new structural steel beam mill)—are strictly contingent on Hanwha winning the multi-billion-dollar Canadian Patrol Submarine Project (CPSP) contract to supply up to 12 submarines.

Ontario electricity industrial rate changes EAF steelmakers 2026

The bear case is reinforced by severe provincial energy headwinds. Algoma’s complete transition to an EAF-only platform makes it highly dependent on the Ontario electricity grid. However, 2026 has brought unprecedented increases in industrial electricity costs. The Ontario Energy Board (OEB) projected wholesale energy costs to spike by 71.47% over the course of 2026 (from $55.13/MWh in January to $94.53/MWh by December), driven by massive grid modernization and nuclear reactor refurbishments. Furthermore, a May 2026 report by Clean Prosperity warned that Ontario’s current carbon market rules continue to impose high compliance costs on EAF steelmakers despite their massive low-carbon capital transitions, adding domestic regulatory strain to Algoma's existing tariff pressures.