AYA.TO
Aya Gold & Silver Inc.v3 5.0/10 · 2026-11-03Montreal, Canada-based Aya Gold & Silver Inc., operating alongside its subsidiaries, focuses on the acquisition, exploration, appraisal, and development of valuable mineral properties across Morocco. The firm's exploration efforts are primarily directed towards deposits of gold, silver, zinc, lead, tungsten, molybdenum, uranium, and copper. Central to its portfolio is the Zgounder property, located about 265 kilometers east of Agadir in the Proterozoic Siroua Massif of Morocco's Anti-Atlas Range. Aya Gold & Silver Inc. was founded in 2007.
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
Aya Gold & Silver (TSX/Nasdaq: AYA, C$32.28 at the 2026-11-03 close, about US$23; market cap about C$4.65B) is a one-country Moroccan silver producer. It owns 85% of Zgounder, which runs at about 6 Moz of silver a year at a cash cost of about $17-19/oz, after a mill ramp to 4,100 tpd against a 2,700 tpd design, plus a small Boumadine pyrite-tailings reclaim. The value case rests on its 85% of Boumadine. The September 2026 updated PEA puts its after-tax NPV5 at $3.5B, with a 93% IRR, $463M capex and about 348 koz AuEq a year in years 1-5. The feasibility study is due H2 2027 and first production is likely in 2029. Operations are excellent: record Q3 production of 2.03 Moz AgEq, net cash of about US$150M, and $119M of H1 operating cash flow on a mine that cost about $140M to build. But silver has dropped from about $67 at the PEA to about $50-52 at the end of October. At spot, today's business earns only about C$105M of attributable unlevered owner earnings a year after the 15% ONHYM minority, 35-40% Moroccan tax, sustaining capex and stock comp. That is about 42x EV and about 16x forward EBITDA. The stock is priced almost entirely on Boumadine being built on time. My DCF holds metals at spot, takes a 15% haircut to the PEA, assumes Aya funds all the capex and uses a 9x year-5 multiple for a depleting miner. It gives about C$30 a share, roughly the current price, for a base IRR of about 8%. Nine sell-side analysts, all Buy, put the average target near C$50 using higher metal decks and 5% NAV math. Sentiment is middling: the stock is down 24% from its C$42.68 high in a silver correction, but this is not capitulation. Rating 5.0: a well-run, good-jurisdiction growth miner that is fairly priced at spot metals. A 50% return in a year needs silver to get back to $65+. It is not mispriced on fundamentals. Research rating 5.5: worth a look mainly as a silver-beta vehicle, or if a further sell-off takes it toward C$22-25.
A deep dive would have to establish: Whether Boumadine's feasibility study (H2 2027) can convert the largely inferred PEA resource at about 85% payability and about $463M capex on a 2029 start, because at spot silver and gold that, not Zgounder, is what supports the C$4.65B market cap.
Research (expand)
What the company does
Aya Gold & Silver is a Montreal-headquartered miner that operates only in Morocco. Its assets:
- Zgounder (85% Aya, 15% ONHYM, the state agency): a high-grade silver mine with an open pit and underground workings. The plant was expanded in 2024-25. Design capacity is 2,700 tpd and Q3-2026 throughput was a record 4,096 tpd at 146 g/t and 92% recovery. It produces about 1.5 Moz of silver a quarter, about 6 Moz a year. The December 2025 mine plan calls for 6 Moz a year for 11 years at a life-of-mine cash cost of $16.26/oz.
- Boumadine pyrite reclaim: a low-capex reprocessing of historic tailings, sold as concentrate at about 50% payability. Q3 production was 0.54 Moz AgEq, with cash cost around $10-11/oz.
- Boumadine main project (85% Aya): a polymetallic gold-silver-zinc-lead deposit. The Sept-2026 updated PEA shows an after-tax NPV5 of $3.54B and a 93% IRR at $3,500 gold and $50 silver, rising to $5.5B at the then-spot $4,472/$66.85. Capex is $463M including $99M contingency. Mine life is 14 years. Years 1-5 average 348 koz AuEq at AISC $1,105/oz; life of mine averages 271 koz AuEq at AISC $1,300. The feasibility study is due H2 2027 and early works start late 2026. Management talks of about 43 Moz AgEq a year combined by about 2029.
- A large exploration land package of over 1,000 km² around Boumadine plus 259 km² of new ground. The exploration budget is $60M/yr.
Investment case
- For:
- Operations have been executed very well since the 2025 ramp. Throughput rose every quarter and Q2 cash cost fell to $17.69/oz.
- The jurisdiction is good: grid power from renewables, a supportive state and an EBRD lender.
- The balance sheet is clean: June-30 cash of $183M plus $16M restricted, against $84M of debt; about US$150M net cash estimated at Sept-30.
- Boumadine is a genuinely tier-1-looking asset on paper, and its resource keeps growing: the strike length is now 5.4 km and a new parallel zone hit 51 m at 890 g/t AgEq.
- The Nasdaq listing in April 2026 and GDX inclusion widened the shareholder base.
- Against:
- At today's metal prices the producing business is small relative to the market cap.
- Boumadine is a PEA on a largely inferred resource. It will be the company's second build in Morocco, and the first (Zgounder) ran late and ended in an EPC arbitration with Duro Felguera.
- The price is effectively a call option on silver and gold plus Boumadine execution.
What it earns today (real free cash flow)
USD first, at spot silver of about $52 and gold of about $4,000, with realized silver about $51 (Aya realizes 3-6% under LBMA in falling markets).
Zgounder:
- 6.0 Moz × $51 = about $306M revenue.
- Less cash cost at about $19/oz, which lets the strip ratio rise to about 13 from YTD 10: $114M.
- Cash margin: about $192M.
- Less sustaining capex of about $18M and tax at 35% (the 5% solidarity surcharge drops in 2027) on about $164M after D&A: about $57M.
- After-tax cash: about $117M, of which 85% is Aya's: about $100M.
Pyrite reclaim: about 1.8 Moz AgEq at a roughly $15/oz net margin, about $15M attributable after tax.
Corporate: G&A of about $22M (higher after the Nasdaq listing) plus stock comp of about $10M (H1 SBC was $5.1M), so about $32M. Zgounder near-mine drilling of about $8M is treated as maintenance.
Owner earnings:
- Unlevered attributable owner earnings come to about US$75M a year, about C$105M.
- At $65 silver this would be about US$120M (C$170M); at $45 silver, about US$45M.
- Consolidated EBITDA at spot is about US$197M (C$276M), so only about 38% of EBITDA reaches Aya's owners. The rest goes to the ONHYM minority, Moroccan tax of 35-40% (H1 effective rate 37%), sustaining capex and stock comp.
- Interest is trivial and the company is net cash, so the equity yield is about the same: about 2.3% of market cap.
Trailing numbers look much better because H1-2026 silver realized $68-82: H1 revenue $214M, net income $84M, OCF $119M. Those figures are not repeatable at today's spot.
Five-year FCF projection (unlevered, attributable, after SBC and growth capex)
Assumptions:
- Flat spot metals.
- Boumadine at 85% of PEA economics with a 15% haircut for PEA-to-FS risk. That is about US$460M a year attributable at full run-rate, against about $540M PEA-as-is at spot.
- Aya funds 100% of about $520M build capex: 2027 $170M, 2028 $280M, 2029 $70M.
- Exploration of $45M a year, falling to $35M.
- First Boumadine production in H2 2029 at 35% of a full year, 90% in 2030, 100% in 2031.
| Year | Zgounder | Reclaim | Corporate | Exploration | Boumadine capex | Boumadine FCF | FCF US$M | FCF C$M |
|---|---|---|---|---|---|---|---|---|
| 2027 | 100 | 15 | -32 | -45 | -170 | 0 | -132 | -185 |
| 2028 | 100 | 15 | -34 | -45 | -280 | 0 | -244 | -340 |
| 2029 | 100 | 0 | -36 | -35 | -70 | 161 | 120 | 170 |
| 2030 | 100 | 0 | -40 | -35 | 0 | 414 (less 20 WC) | 419 | 585 |
| 2031 | 100 | 0 | -40 | -35 | 0 | 460 | 485 | 680 |
Net cash bottoms around -US$150 to -200M in 2028. That is easily financed: the PEA contemplates some external debt, and management says no equity is needed.
What kind of company in 5 years: a two-mine, roughly 40 Moz AgEq a year, gold-heavy polymetallic producer. Boumadine will be in its peak-grade years 1-3 and Zgounder at about mid-life. It will be a cash machine but a depleting one: Boumadine's later years run about 25% lower, unless exploration keeps extending life, which it has so far (11 to 14 years in one PEA cycle). That is not a corpse and not a compounder. It is a mid-tier producer that the market prices at about 7-11x FCF, so I use 9x.
Fair value and multiples
DCF (10% discount, US$M):
- PV of 2027-31 FCF: about 356.
- PV of terminal value (485 × 9 = 4,365): about 2,710.
- Plus about 150 net cash and about 50 of option proceeds.
- Equity of about US$3.27B over 154M fully diluted shares: about US$21.2, or C$29.7 a share.
Sensitivities:
- PEA-as-is at spot with a 10x exit: about C$38.
- 25% haircut with an 8x exit: about C$24.
- $65 silver / $4,500 gold: about C$40-45.
- $42 silver / $3,500 gold with a one-year delay: about C$17-19.
Base IRR from C$32.28: about 8%. Year-5 value (terminal plus about US$850M accumulated cash) is about C$47 a share.
Multiples paid (EV about C$4.44B):
- About 42x attributable owner earnings and about 16x forward EBITDA at spot.
- About 9x trailing EBITDA at H1 prices.
- Forward P/E about 40x at spot; trailing about 23x.
No buyback, no dividend. Fair value C$31 (range 18-48). It is fairly priced at spot metals, and the outcome is dominated by the silver and gold price rather than by anything mispriced about the business. Not a covered-call floor setup: IV is high, but forward earnings are commodity-driven and unpredictable.
Management, risks and competition
Management: CEO Benoit La Salle and his team turned a junior into a 6 Moz producer in about six years, and the Zgounder expansion now pays back about every 6 months at current prices. Capital allocation is growth-first: $60M a year of exploration, Boumadine and land acquisitions. There is no capital return. Dilution is modest (141M to 144M shares) and SBC is about $10M a year.
Blue Orca: in Sept-2025 Blue Orca alleged roughly 100% resource inflation and falling grades at Zgounder. Since then, head grades of 141-146 g/t and record output have largely answered that. Note, though, that the Dec-2025 mine plan pivoted to bulk mining of lower grades at higher prices.
Duro Felguera: the EPC arbitration is ongoing. DF claims about $13.5M; Aya counterclaims, and about $5M of legal and listing costs hit Q2.
Risks:
- Silver price; the stock behaves like 1.5-2x silver beta.
- Single-country (Morocco) and ONHYM partner risk.
- Moroccan tax rose to 35% plus a 5% surcharge.
- Strip ratio rising toward 13-16 in the open pit.
- Zgounder's tailings capacity is being consumed faster at 4,000 tpd.
- Boumadine resource conversion, payability and capex inflation; the first build ran late.
- Seasonal Q1 weather.
- Concentrated revenue from one mine until 2029.
Competition: silver is a price-taker market. Peers such as Pan American, First Majestic, Hecla, Endeavour Silver and MAG/SSR compete for capital, not customers. Aya's edge is low cost, high grade and a first-mover land position in Morocco, alongside Managem, the incumbent with Imiter.
How investors feel (6/10)
The stock ran from about C$10 (Apr-2025) to C$42.68 (Aug-Sep 2026), then fell 24% to C$32 as silver slid from about $67 to about $50-52 (Oct-30 close $52.40, intraday below $50, the lowest since Nov-2025). It now sits 65% up its 1-year range.
The sell side is uniformly bullish: 9 analysts, all Buy. MarketScreener shows an average target of about US$36 (about C$50) and a range of about C$42-56. BMO is at C$41 (Aug), Stifel at C$39 and Desjardins at C$37 (Apr), and Scotiabank rates it Strong Buy. Those targets lean on higher metal decks and NAV-at-5%. Q3 results come on Nov 12 and will look strong on Q3's higher realized prices.
This is neither capitulation nor euphoria. Momentum and silver-ETF holders are trimming, while new Nasdaq and GDX holders are anchored. The setup to watch is a capitulation in silver: below about C$24 the stock would trade at a 20%+ discount to my spot DCF for an asset base that is improving.
- /Users/gregwo/stocks2/data/analysisv3/context/AYA.TO.md (context pack incl. 2026Q2 call transcript)
- https://www.sec.gov/Archives/edgar/data/0001826836/000162828026056782/q22026earningsresults21.htm
- https://www.sec.gov/Archives/edgar/data/0001826836/000162828026056782/q22026ayagoldsilverinc-mda.htm
- https://www.sec.gov/Archives/edgar/data/0001826836/000162828026066240/q3productionresults.htm
- https://finviz.com/news/382068/aya-gold-silver-reports-q2-2026-results-and-delivers-record-operational-performance
- https://finviz.com/news/390043/aya-gold-silver-announces-updated-pea-for-boumadine-after-tax-npv-doubles-to-35b-with-93-irr
- https://finviz.com/news/402251/aya-gold-silver-reports-record-q3-2026-production-of-203-million-ageq-ounces
- https://www.canadianminingreport.com/blog/silver-stocks-heading-into-november-2026-five-canadian-miners-with-catalysts-to-track
- https://www.isabullion.com/?p=9022
- https://ca.marketscreener.com/quote/stock/AYA-GOLD-SILVER-INC-3719807/consensus/
- https://www.marketbeat.com/instant-alerts/scotiabank-boosts-earnings-estimates-for-aya-gold-silver-2026-07-20/
- https://www.marketbeat.com/instant-alerts/aya-gold-silver-tseaya-given-a-c3700-price-target-by-desjardins-analysts-2026-04-23/
- https://thedeepdive.ca/aya-gold-targeted-by-shorts
- https://www.barchart.com/story/news/35046749/aya-gold-silver-categorically-rejects-the-erroneous-and-misleading-allegations-made-against-the-company
- https://kalkinemedia.com/ca/companies/tsxv-aya
- https://www.exchange-rates.org/exchange-rate-history/cad-usd-2026-10-02
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 389+186% | 202+417% | 39.1-9% | 42.8+12% | 38.2 |
| Gross profit | 255+558% | 83.2 | 5.38-66% | 15.8+51% | 10.5 |
| Operating expenses | 36.5+84% | 26.5+60% | 16.5+52% | 10.9+26% | 8.65 |
| ▸Adj EBITDA | 248+615% | 77.2 | -7.74-178% | 9.94+21% | 8.18 |
| ▸Adj OCF | 190 | 51.5 | -5.58-187% | 6.43-27% | 8.82 |
| CapEx | -42.9 | -76.2 | -96.5 | -128 | -43.3 |
| Adj FCF | 148 | -24.6 | -102 | -121 | -34.5 |
| Interest expense | 16.4 | 15.4 | 0.15 | 0.07 | 0.25 |
| ▸Adj net income | 128+971% | 25.5 | -4.21-216% | 3.64 | -1.69 |
| ▸Owner's earnings | 105 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 318100% | 211100% | 101100% | -21.3 | 15.7100% | 11.6100% |
| FCF (OCF−capex) | -103-32% | 14770% | -4.24-4% | -105 | -107-682% | -33.7-290% |
| Net income | 14546% | 11554% | 45.645% | -21.6 | 5.5035% | 0.474% |
| ▸Capital returned | -274-86% | 55.326% | -104-103% | -96.8 | -128-820% | 0.494% |
| Buybacks | -234 | -2.95 | -105 | -57.3 | -68.8 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 22.0 | 6.08 | 15.4 | 0.15 | 0.07 | 0.25 |
| Debt paid down | -61.5 | 52.2 | -14.6 | -39.7 | -59.7 | 0.24 |
| ▸Reinvestment | 367115% | 19.19% | 76.275% | 96.8 | 127810% | 48.5417% |
| Capex (PP&E) | 362 | 18.0 | 76.2 | 96.5 | 128 | 43.3 |
| Intangibles & M&A | 5.17 | 0.00 | 0.00 | 0.00 | 0.00 | 5.17 |
| Leases signed (net Δ) | 0.32 | 1.12 | -0.04 | 0.28 | -1.05 | -- |
| Retained / other | 18859% | 97.746% | 116114% | -8.19 | 21.7139% | -39.1-336% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 33 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 727 | 632 | 400 | 333 | 157 |
| ▸Liabilities (total) | 198 | 208 | 154 | 108 | 26.5 |
| Net debt (incl. leases) | -110 | -22.8 | 70.4 | 8.96 | -39.1 |
| Net debt / Adj EBITDA | -0.45 | -0.29 | -- | 0.90 | -4.77 |
| Net debt / Adj FCF | -0.75 | -- | -- | -- | -- |
| Adj EBITDA / interest | 15.1 | 5.01 | -51.2 | 136 | 32.6 |
| Shares outstanding | 144 | 142 | 130 | 128 | 113 |
| Dilution (YoY) | +4.1% | +9.2% | +2.1% | +13.0% | +7.7% |
| Employees | 405 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 65.6%+37.1 | 41.1%+27.4 | 13.8%-23.1 | 36.9%+9.5 | 27.4% |
| Adj EBITDA margin | 63.8%+38.2 | 38.2%+58.0 | -19.8%-43.0 | 23.2%+1.8 | 21.4% |
| Adj OCF margin | 49.0%+37.1 | 25.5%+39.8 | -14.3%-29.3 | 15.0%-8.0 | 23.1% |
| Adj FCF margin | 37.9%+78.9 | -12.2%+248.9 | -261.1%+22.4 | -283.5%-193.3 | -90.2% |
| Net income margin | 34.0%+32.2 | 22.5%+77.8 | -55.3%-68.1 | 12.8%+11.6 | 1.2% |
| Adj NI margin | 33.0%+24.2 | 12.6%+23.4 | -10.8%-19.2 | 8.5%+12.9 | -4.4% |
| ROIC (adj, after-tax) | 24.1% | 7.1% | -2.5% | 1.1% | 0.9% |
| Cost of debt | 17.6% | 15.7% | 0.2% | 0.3% | -- |
Earnings Calls
Earnings Call · 2026 Q2
Aya Gold & Silver delivered a very strong second quarter of 2026, benefiting from higher production, strong silver prices despite a sharp June correction, and continued operating improvements at its Zgounder mine. Silver-equivalent production reached 1.7 million ounces, up 61% year over year and 12% from the prior quarter. Revenue increased 151% year over year to $97 million, net income rose to $35 million, and operating cash flow reached $48 million, a 522% increase from Q2 2025. Seasonality remains favorable, with management expecting Q3 to be stronger than Q2 and Q4 historically the strongest quarter. Zgounder’s operating performance exceeded the original feasibility-study design. Mining averaged approximately 4,900 tonnes per day, compared with the plant’s initial 2,700-tonne-per-day design, while mill throughput averaged 3,900 tonnes per day versus 3,600 tonnes in Q1 and 3,000 tonnes in the prior-year quarter. Plant recovery and availability both exceeded 90%. The mine also built a 374,000-tonne ore stockpile, providing flexibility to temporarily reduce underground mining while crews develop lower levels and additional sublevels. Underground production is currently around 1,200–1,500 tonnes per day, and any moderation is intended to strengthen infrastructure and future access rather than reflect an operational problem. Zgounder’s cash cost improved to $17.69 per ounce from $18.64 in Q1 and approximately $20 in Q4 2025. Open-pit stripping is expected to increase to roughly 16 over the next six months, with the full-year ratio near 13, consistent with the long-term plan. Management rejected a modeled 20:1 ratio for 2027. A temporary crushing contractor is helping sustain elevated throughput, while a permanent tertiary-crushing section is expected to be commissioned in late 2026 and ready in early 2027. The addition is intended to make current throughput independent of the contractor and potentially enable averages above 4,000 tonnes per day. Boumadine, an add-on tailings-reclamation operation, produced roughly 187,000 silver-equivalent ounces at a $10.58-per-ounce cash cost and generated approximately $3.6 million of free cash flow. Rain made Q1 and Q2 operations more difficult, but management expects a meaningful production catch-up during the warmer, drier second half. Sales also lagged production because of inventory timing and June’s rapid silver-price decline; Zgounder inventory was sold in July and Boumadine volumes are expected to catch up in Q3 and Q4. Aya generated $119 million of operating cash flow during the first half and ended Q2 with $183 million of cash, alongside $16 million of restricted cash. It spent $38 million on exploration and sustaining capital, repaid $33 million of EBRD debt and retired $15 million of short-term debt. Full-year guidance remains intact: Zgounder production of 5.2–5.8 million ounces, Boumadine production of approximately 1 million ounces, Zgounder cash cost of $21.50 per ounce, Boumadine cash cost near $10.10, $36 million of sustaining and growth capital, and about $60 million of exploration expenditure. Boumadine is now Aya’s main growth project. An updated PEA, incorporating a new resource model and revised payability assumptions, is expected in early September, while feasibility-study work is underway for the first half of 2027. Independent consultants are working on metallurgy, energy, water, logistics, tailings storage and other feasibility streams. Initial infrastructure activities, including electricity, water and camp-related work, are expected to begin toward year-end. Exploration continues with a 200,000-metre Boumadine program and 30,000 metres at Zgounder. Boumadine drilling has reached 93,000 metres, and a new parallel-zone intercept of 51 metres grading 890 grams per tonne silver equivalent was identified outside the current resource model. The Boumadine mineralized structure has expanded to 5.4 kilometres. Aya also acquired 259 square kilometres of Moroccan exploration ground covering copper, silver, gold, lead, zinc and potentially rare earth opportunities for approximately $1 million, with an initial exploration budget of about $800,000. Management emphasized Morocco’s favorable jurisdiction, underexplored geology and Aya’s growing first-mover position. The company also described its new U.S. listing as a major success that broadened trading volume and attracted new institutional shareholders, despite a temporary increase in G&A.
▸What strip ratio should investors expect at Zgounder in Q3 and Q4, and how should the 2027 stripping campaign affect the outlook?Bryce Adams · Desjardins
▸What are the expectations for underground mining rates over the next few quarters?Bryce Adams · Desjardins
▸Is a modeled 20:1 open-pit strip ratio for 2027 too conservative?Bryce Adams · Desjardins
▸Why did silver sales lag production in Q2, has the gap been recovered in July, and should it benefit the next financial results?Bryce Adams · Desjardins
▸What long-term throughput will the additional Zgounder crusher enable, and is it mainly intended to maintain throughput in the upper-3,000-to-4,000-tonne-per-day range?Justin Chan · SCP Resource Finance
▸Will the Boumadine updated PEA materially change project scope, throughput or the open-pit/underground split, or mainly update CapEx and payabilities?Justin Chan · SCP Resource Finance
▸Does the strong wet season in Morocco provide a favorable water-supply position for Boumadine and the second half of the year?Justin Chan · SCP Resource Finance
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2022 Q4 | 14M | 7M | 4M | $0.02 | $0.02 – $0.02 | 1 |
| 2023 Q1 | 8M | 0M | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2023 Q2 | 8M | 2M | -0M | $0.00 | $0.00 – $0.00 | 1 |
| 2023 Q3 | 8M | -0M | -1M | $0.00 | $0.00 – $0.00 | 3 |
| 2023 Q4 | 8M | -0M | -0M | $0.00 | $0.00 – $0.00 | 4 |
| 2024 Q2 | 11M | 1M | 1M | $0.00 | $0.00 – $0.00 | 6 |
| 2024 Q3 | 15M | 1M | 0M | $0.00 | $-0.01 – $0.01 | 5 |
| 2024 Q4 | 15M | 2M | -0M | $0.00 | $-0.03 – $0.02 | 6 |
| 2025 Q1 | 33M | 9M | 2M | $0.01 | $0.00 – $0.03 | 6 |
| 2025 Q2 | 36M | 19M | 9M | $0.06 | $0.06 – $0.06 | 7 |
| 2025 Q3 | 53M | 22M | 14M | $0.09 | $0.05 – $0.12 | 8 |
| 2025 Q4 | 75M | 49M | 25M | $0.17 | $0.14 – $0.20 | 5 |
| 2026 Q1 | 136M | 80M | 56M | $0.38 | $0.29 – $0.45 | 7 |
| 2026 Q2 | 121M | 73M | 50M | $0.33 | $0.29 – $0.44 | 7 |
| 2026 Q3 | 117M | 68M | 46M | $0.31 | $0.23 – $0.37 | 7 |
| 2026 Q4 | 112M | 68M | 43M | $0.29 | $0.25 – $0.33 | 5 |
| 2027 Q1 | 118M | 84M | 52M | $0.35 | $0.28 – $0.42 | 2 |
| 2027 Q2 | 121M | 90M | 54M | $0.36 | $0.36 – $0.36 | 1 |
| 2027 Q3 | 124M | 96M | 55M | $0.37 | $0.37 – $0.37 | 1 |
| 2027 Q4 | 120M | 99M | 55M | $0.36 | $0.36 – $0.36 | 1 |
| 2028 Q1 | 102M | 68M | 28M | $0.19 | $0.19 – $0.19 | 1 |
| 2028 Q2 | 101M | 67M | 25M | $0.17 | $0.17 – $0.17 | 1 |
| 2028 Q3 | 99M | 67M | 24M | $0.16 | $0.16 – $0.16 | 1 |
| 2028 Q4 | 98M | 69M | 24M | $0.16 | $0.16 – $0.16 | 1 |
v2 analysis (legacy, 2026-08-16) — for comparison onlyclick to expand
Thesis
Aya has moved from a speculative development story to a cash-generating silver producer. Zgounder's expansion is producing at well above its original design rate, margins and cash flow have inflected sharply, and the company has accumulated substantial net cash while repaying debt. The immediate business trajectory is favorable, supported by higher throughput, improving unit costs, inventory sales expected in the second half, and a favorable Moroccan operating jurisdiction. The principal value driver beyond the current mine is Boumadine. Its resource potential and prior PEA economics create substantial upside, but the project is still pre-feasibility and must pass metallurgy, infrastructure, permitting, capital-cost and financing tests. The current valuation therefore gives Aya meaningful credit for operating cash flow and project option value without treating the PEA NPV as realized equity value. Silver-price volatility, open-pit stripping, grade control, contractor dependence and continued share dilution remain material risks.
Trade Signal
Short: Aya's operating inflection is real, but the stock price already discounts a near-bull-case outcome and stands at roughly three times the analyst's fair value, with dilution and commodity/project risk limiting support.
The stock rose from roughly $20 at the end of 2025 to $29.53 in late February 2026, then suffered a sharp March correction to $17.31 amid a broad pullback and silver weakness. It recovered through April–June as production, earnings and cash-flow evidence improved, benefited from the May Nasdaq listing, June GDX inclusion and strong silver-sector sentiment, then accelerated from $27.73 at the end of July to $39.09 on August 12 before easing to $35.95 after the August 14 earnings release. The recent move is not a panic overshoot: it largely tracks genuine operational improvement and sector momentum, but the final rerating appears to have overshot normalized fundamentals. The muted-to-negative reaction to very strong earnings indicates expectations were already stretched. This is more likely a durable valuation repricing that can partially unwind than a clean temporary dislocation.
The stock has shifted from speculative developer to favored growth silver producer. Bulls point to strong Zgounder execution, improving costs, cash generation, Moroccan jurisdiction, silver deficits and exceptional Boumadine drill results. Bears can point to the sharp commodity and valuation sensitivity, a single-mine concentration, future stripping and capital intensity, dilution, and Boumadine's long timeline. Nasdaq listing and GDX inclusion broadened demand and attention, while the 202% one-year gain indicates the narrative is well recognized rather than ignored. The post-earnings decline despite excellent results suggests a crowded or expectation-heavy setup.
Operational profitability has clearly inflected: Q2 production rose 61% year over year, revenue 151%, operating cash flow 522%, and throughput and recoveries exceeded design assumptions. However, the market has already seen and rewarded that improvement: the stock is up 202% over one year, 54% over six months and trades near its 52-week high. Boumadine could become a major future inflection, but the next hard evidence is an updated PEA and resource estimate, not near-term production. Relative to the analyst's normalized base case, the market appears to be pricing something closer to the bull case already.
- ▼2026-08 · Q2 2026 earnings digestion and analyst estimate revisions — The strong print was followed by a 4% decline, suggesting expectations were already elevated; any normalization in grades, costs or cash conversion could drive downgrades.
- ▲2026-09 · Boumadine updated PEA / resource update — Expected resource growth and strong drill results could add value, but the project is still years from production and much of its upside is already embedded.
- ▲2026-11 · Q3 2026 production and financial results — Management expects stronger seasonal production, inventory sales and Boumadine volume catch-up; confirmation could support the bull case.
- ▲late 2026–early 2027 · Tertiary crusher commissioning — Late-2026 commissioning, with full readiness in early 2027, could validate sustained throughput above the original design rate and reduce contractor dependence.
- ▲2027-02 · Q4 2026 / full-year 2026 results and 2027 guidance — The key test is whether elevated production and margins persist after normalization, stripping increases and sustaining capital are included.
- ▲H1–H2 2027 · Boumadine feasibility-study milestones — Metallurgy, resource conversion and infrastructure work can improve confidence, but full feasibility is not expected until 2027 and first production is targeted for 2029.
Net flow is unfavorable. TTM dilution is approximately 8%, reflecting financing, equity compensation or other share issuance, while the company is reinvesting heavily in exploration and growth rather than returning capital through buybacks or a meaningful dividend. Nasdaq and GDX inclusion created incremental demand, but that passive and institutional support may already be reflected in the recent rerating.
There is some fundamental support from a producing mine, approximately $183 million of cash plus restricted cash, positive operating cash flow and debt repayment. But the cash balance is small relative to the $5.2 billion equity value, FCF is only about 3% of market capitalization, and the valuation depends heavily on volatile silver prices and future project execution. There is no hard asset or takeover floor near today's price. The ceiling is more concrete: the stock already prices in an unusually strong operating and commodity outcome, while dilution and future Boumadine capital needs can limit upside.
Aya is now a credible cash-generating silver producer with institutional access, strong Zgounder execution and real Boumadine optionality, so it is buyable in principle. However, at roughly 33x FCF and over 3x the analyst's fair value, the next buyer must underwrite sustained exceptional silver prices, above-design throughput and a successful Boumadine development; that is a demanding setup rather than an attractive entry point.
Fear is stronger than greed at this price. The operating report is genuinely good, but the market is paying a premium multiple for a single producing asset, a volatile metal, and a development project whose cash flows are several years away. The asymmetry is unfavorable unless silver remains exceptionally strong and every execution assumption holds.
Valuation
The quarter provides fresh confirmation that elevated Zgounder throughput is translating into strong cash generation: Q2 production rose to about 1.7 million silver-equivalent ounces, cash cost improved to $17.69 per ounce, and the company ended with $183M of cash after debt repayment. Management also disclosed a meaningful ore stockpile, expected recovery of delayed sales in Q3 and Q4, and a tertiary crusher intended to make current high throughput independent of a temporary contractor. The call did not materially raise full-year guidance, and the main Boumadine project scope remains broadly unchanged pending the updated PEA.
▸ How the cases moved
Versus the day before the Q2 document, the bull equity value rises from roughly $3,300M to $3,570M as sustained throughput above design, the planned tertiary crusher, strong exploration and a clearer Boumadine update timetable improve confidence; bull probability rises from 0.23 to 0.25. Base value rises from roughly $1,850M to $1,920M and base probability from 0.53 to 0.55 because operating execution and liquidity are confirmed. Bear value declines from roughly $670M to $650M, while bear probability falls from 0.24 to 0.20, reflecting lower near-term operating and liquidity risk despite continued commodity and development uncertainty.
Silver prices retreat, Zgounder grades and throughput normalize below recent peaks, and higher stripping and sustaining capital absorb much of the cash generation. Boumadine remains a delayed or heavily redesigned development project rather than a near-term value contributor.
▸ Valuation
5x $120M EBITDA = $600M EV - (-$50M net debt) = $650M equity value
Zgounder sustains strong production but moderates toward a normalized run rate, with costs near guidance and silver prices remaining supportive but volatile. Boumadine advances through the feasibility process and exploration adds option value, but construction and financing risk prevent the market from fully capitalizing its PEA economics.
▸ Valuation
7x $260M EBITDA = $1,820M EV - (-$100M net debt) = $1,920M equity value
Silver remains in a tight physical market, Zgounder operates consistently above design throughput with improving grades and costs, and the tertiary crusher enables sustained production above 4,000 tonnes per day. Boumadine's updated resource and PEA materially improve confidence in a large, high-margin polymetallic mine, making Aya a credible multi-asset growth producer.
▸ Valuation
9x $380M EBITDA = $3,420M EV - (-$150M net debt) = $3,570M equity value
▸ Target Rationale
The probability-weighted discounted value is approximately $1,659M. I set the analytical target at $1,600M because the scenario arithmetic still gives substantial credit to Boumadine and assumes healthy terminal net cash, while execution, commodity-price volatility, mine-plan normalization, project capital intensity and the company's history of dilution and heavy reinvestment warrant a modest haircut. This is not a sentiment discount; sentiment is handled separately in the fear-greed modifier.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Nasdaq Listing: On May 4, 2026, Aya commenced trading on the Nasdaq Stock Market under the ticker "AYA". The company maintains its primary listing on the Toronto Stock Exchange (TSX), with the dual listing designed to broaden global investor exposure and access to capital.
- Record Q1 2026 Financial Results: In mid-May 2026, Aya reported record quarterly revenue of $117 million and net income of $49 million. Strong production at its flagship Zgounder silver mine drove expanded margins and significant cash flow generation, bolstering the balance sheet to fund district-scale exploration.
- GDX ETF Inclusion: On June 16, 2026, Aya was officially added to the VanEck Gold Miners ETF (GDX), increasing its profile among institutional investors.
- Board of Directors Transition: During the Annual General Meeting on June 12, 2026, shareholders approved the appointment of Ghislane Guedira as the new Chair of the Board. Guedira’s financial expertise in the Moroccan business landscape will guide Aya's next growth phases, and her appointment brings female representation on the company's board to 50%.
- Operational Guidance: For the full year 2026, Aya projected total production of 6.2 to 6.8 million silver-equivalent (AgEq) ounces. This includes 5.2 to 5.8 million silver ounces from Zgounder at an average cash cost of $21.50 per ounce, as well as approximately 1.0 million AgEq ounces from reclaiming the Boumadine pyrite stockpile.
- Exploration Success: Aya has continued to report exceptional drill results. At Zgounder, near-pit drilling continues to hit high grades, while exploration at the Boumadine project in May 2026 returned its strongest intercept to date, featuring hole BOU-DD25-745 which cut 52 meters grading 535 grams per tonne (g/t) silver and 2.05 g/t gold.
▸ Thesis-test Findings
Aya Gold & Silver Boumadine Feasibility Study Updates
Aya officially initiated its comprehensive feasibility study for the Boumadine polymetallic project in March 2026, advancing on the heels of a positive Preliminary Economic Assessment (PEA) released in late 2025. The company has retained SRK to deliver an updated Mineral Resource Estimate (MRE) in the second half of 2026, and SGS is actively managing the metallurgical testwork program. The timeline targets completion of the full feasibility study by the second half of 2027, followed by detailed engineering, with construction slated for late 2027 and first production expected by 2029. To build geological confidence and convert resources to reserves, Aya is executing a massive 360,000-meter drilling program across 2026 and 2027 (targeting 180,000 meters in 2026). These developments represent a strong bull-case driver, as recent exploration continues to intercept wide, high-grade mineralization (such as 52 meters of 535 g/t silver and 2.05 g/t gold) that highlights massive resource growth potential relative to the project's current mineral resource estimate.
Morocco Mining Code and Tax Regulations 2026
Morocco is actively updating its regulatory and fiscal framework to become more competitive, presenting a generally favorable, stable backdrop for operations:
- Mining Code Reform: Under the guidance of the Ministry of Energy Transition and Sustainable Development, Morocco is advancing Draft Law No. 72-24, which is expected to undergo a final Parliamentary vote during 2026. This draft law will replace the previous Law No. 33-13, modernizing mining governance, streamlining investor processes, and integrating strict ESG standards in line with the newly-adopted Marrakech Declaration (which positions Morocco as a continental leader in ESG mining governance).
- Tax Reform: The Morocco Finance Law 2026 (Law No. 50-25) has restructured the corporate tax landscape. It refines Corporate Income Tax (CIT) bands as rates continue to transition toward a standard 20% rate, while tightening filing deadlines and broadening withholding taxes on services. This structured transition provides fiscal transparency and aligns Morocco with international standards, supporting its rank as the second-most attractive mining jurisdiction in Africa in the latest Fraser Institute survey.
Global Industrial Silver Demand and Deficit Forecasts 2026
The global silver market fundamentals remain exceptionally tight, establishing a highly supportive macro environment for silver producers:
- Persistent Supply Deficits: Industry groups like the Silver Institute and Metals Focus forecast that the silver market will record its sixth consecutive annual supply deficit in 2026. The 2026 physical shortfall is estimated to reach 46.3 million ounces (up 15% from 2025), with some trading forecasts suggesting deficits could widen up to 67 million ounces.
- Rigid Mine Supply: More than 70% of global silver is produced as a byproduct of other industrial mining operations (such as lead, zinc, and copper). Because supply is structurally inelastic and slow to react to silver price movements, global production is expected to remain constrained at approximately 1.0 to 1.05 billion ounces.
- Robust Industrial Demand: Demand continues to be structurally driven by green technologies. Despite minor thrifting in solar panel design, global solar PV capacity additions are forecast to reach 665 GW in 2026, consuming 120 to 125 million ounces of silver. EV manufacturing is expected to add another 70 to 75 million ounces of demand, and ongoing grid and data center expansions provide a firm structural demand floor.