BKH
Black Hills Corporationv3 3.5/10 · 2026-11-13Black Hills Corporation operates as an American utility firm, delivering both electric power and natural gas through its subsidiaries. Its business is organized into two primary divisions: Electric Utilities and Gas Utilities. The Electric Utilities segment is responsible for generating, transmitting, and distributing electricity to approximately 218,000 customers spanning Colorado, Montana, South Dakota, and Wyoming. This division manages 1,481.5 megawatts of power generation capacity and maintains 8,892 miles of electric transmission and distribution lines. Electric power generation is diversified, utilizing wind, natural gas, and coal-fired plants, and the company also operates a coal mine near Gillette, Wyoming. Conversely, the Gas Utilities segment provides natural gas to roughly 1,094,000 utility clients across Arkansas, Colorado, Iowa, Kansas, Nebraska, and Wyoming. This operation includes overseeing 4,732 miles of intrastate gas transmission pipelines, 41,644 miles of gas distribution mains and service lines, six natural gas storage facilities, around 50,000 horsepower of compression, and 515 miles of gathering lines. Beyond these core utility offerings, Black Hills Corporation also constructs and maintains gas infrastructure for various gas transportation customers. It provides appliance repair services for residential utility subscribers and offers electrical system construction to large industrial clients. Founded in 1941, the company's headquarters are situated in Rapid City, South Dakota.
2-Year Price History
Valuation v3 Opus worker · 2026-11-13
Black Hills is a regulated gas and electric utility in eight Rocky Mountain and Plains states. It is about to become Bright Horizon Energy (HZN): Montana approved the all-stock NorthWestern merger 3-2 on Nov 10, the last approval needed, and NWE holders get 0.98 BKH share each, so one BKH share will soon be about 1/137 of the combined company. The bull case is real. Signed, contracted Google data center agreements in Cheyenne should add about $150M of net income by 2030 (roughly $1.10 per combined share), with cost pass-through, collateral and stranded-asset protections. A further 600MW is in negotiation and 2.5GW+ is at an exploratory stage. BKH's own EPS is growing in the upper half of 4-6%, and the dividend has risen for 56 straight years. But the market already knows all of this. The stock rose about 25% from $70 to $87.62 (Nov 12 close) after the Google deal and sits at the top of its 3-year range. That is about 21x combined 2026 EPS of roughly $4.10 and about 12x EV/EBITDA, a premium to utility peers. NorthWestern brings a Colstrip drag and is tracking to the low end of its own guidance. Funding $2.5B of Google generation and transmission plus a roughly $1.6B/yr base capex program means years of negative free cash flow and continued ATM equity issuance. At our 10% hurdle, a business that earns 9.5-10% allowed returns is worth little more than its book value plus the Google contract: the DCF comes to about $52 per share, and even on market utility multiples fair value is about $80. Rating 3.5: fairly valued to modestly rich after a news-driven run, with no variant perception. Interest 3: a well-run, predictable utility, but there is nothing here the market is missing.
A deep dive would have to establish: After the post-Google rerating to about 21x, can Bright Horizon grow EPS well above 6% (more large-load contracts beyond Google, without heavy equity dilution or Colstrip/NWE drag), so that it earns a premium utility multiple?
Research (expand)
What it does. Black Hills serves about 1.1M gas customers (AR, CO, IA, KS, NE, WY) and about 218k electric customers (CO, MT, SD, WY). It is a monopoly whose earnings come from rate base times allowed ROE (9.6-9.8% in recent orders). After closing (Montana PSC approved 3-2 on 2026-11-10 with Colstrip conditions; close expected by year-end) it becomes Bright Horizon Energy with NorthWestern (MT, SD, NE) as a subsidiary. That is about 136.8M shares (76.5M BKH plus 0.98 x about 61.5M NWE).
What the market believes. That Cheyenne is a real data-center hub and that the Google contract turns BKH from a 4-6% grower into a 6%+ grower with contracted, non-ratepayer earnings. Since the Q3 call the stock has rerated from about 70 to 87.6. Short interest of 12M shares (about 16% of BKH's float) is mostly merger arbitrage (long NWE, short BKH), not a bearish view. I agree with the story; the problem is the price.
What it earns today. Combined 2026 pro forma: adjusted net income about $560M (BKH about $333M at $4.35; NWE about $228M at about $3.70, lower half of guidance). Unlevered owner earnings (EBIT about $990M after SBC, about 15% cash tax, maintenance capex taken as equal to D&A) are about $840M. Real free cash flow is negative: BKH spent $756M on capex in 9M26 against $543M of operating cash flow and issued $70M of ATM equity.
Unlevered FCF, combined, $M: 2027 -1,000; 2028 -1,150; 2029 -670 (Google $1.8B of generation plus about $700M of transmission on top of base capex); 2030 +160; 2031 +280. In year 5 this is a 'neither' company, growing about 5-6% with durable regulated and contracted cash flows. Terminal value is 11x 2031 EBITDA of about $2.5B (about 20x NOPAT). Discounted at 10%, less about $8.2B of pro forma net debt (BKH $4.45B at Q3 plus NWE about $3.7B; BKH's $399M of refundable Google advances are left out because they fund equipment), that gives about $52 per share. Using the 7-8% cost of equity that utility buyers actually apply, it supports about $80.
Multiples. About 21x 2026 and about 19.5x 2027 combined EPS; about 12.3x EV/EBITDA; about 4.2% owner-earnings yield on EV; 3.1% dividend yield, partly offset by 1-2% annual dilution. Base IRR is about 7%: dividend plus 6-7% EPS growth, less some multiple compression.
Management, risks, competition. CEO Linn Evans executes steadily and the LPCS tariff is a genuine innovation. Risks: the Google exposure is one customer (assets 'may not be readily redeployable'); about $686M of transmission recovery depends on WPSC approval of the LCTCAM; the $400M of 3.15% notes due Jan 2027 will refinance at higher coupons; and the Colstrip plan required by the Montana PSC adds risk. Customer sentiment is poor (BBB about 1.1/5, rising bills, Iowa 'public peril' finding), which raises regulatory lag risk as rate cases continue at 3-4 a year. No competition inside its territory; the risk is how much regulators will allow.
Investor sentiment: 7/10. At all-time highs and loved as an AI-power play, while the merger arbitrage overhang should clear at close. The February 2027 plan (2027-2031 capex and EPS with Google included) is the next catalyst, but it is largely priced in.
- /Users/gregwo/stocks2/data/analysisv3/context/BKH.md (Q3 2026 call transcript, price history, short interest)
- /Users/gregwo/stocks2/data/edgar_filings/BKH/10-Q_2026-11-05_0001193125-26-449130.html
- /Users/gregwo/stocks2/data/edgar_filings/BKH/8-K_2026-11-04_0001193125-26-447656_EX99-1.html
- https://dailymontanan.com/2026/11/10/public-service-commission-approves-northwestern-energy-black-hills-corp-merger/
- https://www.krtv.com/news/montana-psc-approves-nw-energy-black-hills-energy-merger-in-split-vote
- https://www.sec.gov/Archives/edgar/data/0001993004/000199300426000060/ex991pressreleaseq32026.htm
- https://finviz.com/news/417492/northwestern-energy-misses-by-205-as-colstrip-drag-pushes-2026-toward-low-end-shares-near-highs-on-merger-endgame
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 2335+3% | 2310+9% | 2128-9% | 2331-9% | 2552 |
| Gross profit | 1164+33% | 889+6% | 840+6% | 796+3% | 773 |
| Operating expenses | 598+73% | 351+4% | 337+4% | 324+2% | 318 |
| ▸Adj EBITDA | 791-2% | 820+6% | 773+6% | 729+3% | 706 |
| ▸Adj OCF | 684+9% | 641+6% | 602+6% | 566+4% | 543 |
| CapEx | -1026 | -820 | -744 | -556 | -604 |
| Adj FCF | -342 | -179 | -142 | 10.6 | -61.6 |
| Interest expense | 209 | 206 | 195 | 180 | 163 |
| ▸Adj net income | 307+8% | 286+4% | 275+3% | 265+3% | 257 |
| ▸Owner's earnings | 290 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 3611100% | 551100% | 827100% | 785100% | 739100% | 709100% |
| FCF (OCF−capex) | -15.50% | -213-39% | -146-18% | -24.9-3% | 38953% | -19.6-3% |
| Net income | 129636% | 21038% | 29235% | 27335% | 26236% | 25836% |
| ▸Capital returned | 88424% | 19936% | -131-16% | 21227% | 49066% | 11416% |
| Buybacks | -678 | -68.9 | -219 | -181 | -118 | -90.0 |
| Dividends | 865 | 160 | 198 | 182 | 168 | 157 |
| Interest paid | 898 | 154 | 206 | 195 | 180 | 163 |
| Debt paid down | -201 | -46.5 | -316 | 16.2 | 261 | -115 |
| ▸Reinvestment | 348096% | 756137% | 82099% | 74495% | 55675% | 60485% |
| Capex (PP&E) | 3480 | 756 | 820 | 744 | 556 | 604 |
| Intangibles & M&A | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- | -- |
| Retained / other | -1.520% | -258-47% | 19123% | -42.0-5% | 78.411% | 29.24% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 44 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 11144 | 10870 | 10023 | 9620 | 9618 |
| ▸Liabilities (total) | 7111 | 6964 | 6437 | 6315 | 6528 |
| Net debt (incl. leases) | 4847 | 4518 | 4368 | 4315 | 4647 |
| Net debt / Adj EBITDA | 6.13 | 5.51 | 5.65 | 5.91 | 6.58 |
| Net debt / Adj FCF | -- | -- | -- | 408 | -- |
| Adj EBITDA / interest | 3.79 | 3.98 | 3.96 | 4.05 | 4.34 |
| Shares outstanding | 76.3 | 75.5 | 71.7 | 68.3 | 66.1 |
| Dilution (YoY) | +4.7% | +5.3% | +5.0% | +3.2% | +2.0% |
| Employees | 2841 | 2795 | 2795 | 2982 | 2982 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 49.9%+11.3 | 38.5%-1.0 | 39.5%+5.3 | 34.2%+3.9 | 30.3% |
| Adj EBITDA margin | 33.9%-1.6 | 35.5%-0.9 | 36.3%+5.1 | 31.3%+3.6 | 27.7% |
| Adj OCF margin | 29.3%+1.6 | 27.8%-0.5 | 28.3%+4.0 | 24.3%+3.0 | 21.3% |
| Adj FCF margin | -14.6%-8.6 | -7.7%-1.1 | -6.7%-7.1 | 0.5%+2.9 | -2.4% |
| Net income margin | 13.5%+1.0 | 12.6%-0.2 | 12.8%+1.6 | 11.3%+1.1 | 10.1% |
| Adj NI margin | 13.1%+0.6 | 12.4%-0.5 | 12.9%+1.5 | 11.4%+1.3 | 10.1% |
| ROIC (adj, after-tax) | 5.6% | 5.5% | 5.6% | 5.7% | 5.4% |
| Cost of debt | 4.5% | 4.6% | 4.4% | 3.9% | 3.6% |
Earnings Calls
Earnings Call · 2026 Q3
Black Hills Corporation reported strong Q3 2026 results and a major strategic milestone: definitive agreements to serve Google's planned data center in Wyoming. GAAP EPS was $0.54, or $0.57 adjusted for $0.03 of merger costs, versus $0.45 in Q3 2025. Margins rose $0.28 per share on new rates, rider recovery and favorable weather. Year-to-date adjusted EPS was $2.89 versus $2.68 a year earlier. The company reaffirmed 2026 adjusted EPS guidance of $4.25 to $4.45 (6% growth at the midpoint) and expects to deliver in the upper half of its 4% to 6% long-term EPS growth range. Credit targets remain 14% to 15% FFO to debt and net debt to capitalization at or better than 55%. About $70 million of equity was issued via the ATM year-to-date, liquidity was $685 million, and $400 million of 3.15% notes mature in January 2027. The dividend has risen for 56 consecutive years. The Google project uses the Wyoming Large Power Contract Service (LPCS) tariff and a private microgrid. Black Hills will own 564 MW of new gas generation at Cheyenne Prairie through a nonregulated affiliate, a $1.8 billion investment, to deliver up to 590 MW of grid service. It will also manage about 2.1 GW of third-party co-located PPA resources for a microgrid management fee, within a 2.7 GW total resource mix that includes reserve margins. Service starts late 2027 with full ramp in 2030. Cash returns on generation begin during construction in mid-2027, assets enter service 2028–2029, and contracts run through 2048. Combined earnings are expected to reach about $150 million of net income in 2030, net of financing costs, which are passed through. The project should produce about $2.4 billion of unlevered free cash flow through 2048 after netting the $1.8 billion investment. Protections include cost pass-throughs, collateral, stranded asset protection and early termination provisions. About $700 million of transmission investment, including the $606 million Aeolus project and the $80 million South Cheyenne project, is to be recovered from large load customers through a proposed LCTCAM tariff. The current plan includes about 600 MW of data center load, mainly Microsoft and Meta. Google is upside to be added when the 2027–2031 plan is released in February. Another 600 MW is under negotiation, and exploratory opportunities, including Microsoft's land purchase, total at least 2.5 GW. Regulatory progress includes Arkansas gas new revenue of $17.9 million at a 9.8% ROE, South Dakota electric settlement of $27.4 million, Wyoming electric settlement of $4 million at a 9.6% ROE, and a pending Colorado Electric review. The 99 MW Lange II project enters service in Q4. For the NorthWestern merger, 6 of 7 approvals are in hand and the Montana decision is due by November 12.
▸Are the Google deal's terms and economics a fair per-unit proxy for future data center deals?Paul Zimbardo · Jefferies
▸Has the opportunity pipeline effectively stayed unchanged after converting Google, with Microsoft's new opportunity replenishing it?Paul Zimbardo · Jefferies
▸Is the $150 million net income figure net of financing costs?Paul Zimbardo · Jefferies
▸Can the $150 million of 2030 Google net income be split between generation returns and microgrid management fees?Nicolas Woods · Bank of America
▸Is the Related Digital site still in the pipeline as a potential customer?Nicolas Woods · Bank of America
▸How will Google earnings ramp in 2027–2029 before $150 million in 2030, and does it stay flat through 2048?Andrew Weisel · Scotiabank
▸Given the scale of Google, are you ready for more, or might you need a pause, and what would be limiting factors?Andrew Weisel · Scotiabank
▸Would Bright Horizon allow NorthWestern's Colstrip share to go to ratepayers rather than data centers, and might that be a merger condition?Andrew Weisel · Scotiabank
SEC Filing Findings
SEC Filing — material findings
2026-11-05 · depth 9/10risk 7Customer Concentration▸Google data center project creates increased exposure to a single large customer; 10-Q states anticipated benefits depend on one customer's continued demand, and assets may not be readily redeployable if the customer ceases operations or defaults.
Google data center project creates increased exposure to a single large customer; 10-Q states anticipated benefits depend on one customer's continued demand, and assets may not be readily redeployable if the customer ceases operations or defaults.
risk 7Liquidity/Refundable Advances▸$398.8M of customer refundable advances recorded as a current liability, due for repayment by June 30, 2027 (maturity extended and advances increased in Q3 2026), sitting outside covenant debt definitions; repayment must come from other sources if the project does not proceed.
$398.8M of customer refundable advances recorded as a current liability, due for repayment by June 30, 2027 (maturity extended and advances increased in Q3 2026), sitting outside covenant debt definitions; repayment must come from other sources if the project does not proceed.
risk 6Financing / Dilution Plan▸Planned ~$1.8B generation investment to be financed through project cash flow plus debt and equity instruments, with ATM equity issuance continuing; company has issued 4.7% annualized share growth and balance-sheet capacity to absorb the Google capex is not yet specified.
Planned ~$1.8B generation investment to be financed through project cash flow plus debt and equity instruments, with ATM equity issuance continuing; company has issued 4.7% annualized share growth and balance-sheet capacity to absorb the Google capex is not yet specified.
risk 6Regulatory/Recovery▸Approximately $686M of Wyoming transmission CPCNs and LCTCAM tariff are pending WPSC approval, with recovery of ~$700M from large-load customers dependent on that approval.
Approximately $686M of Wyoming transmission CPCNs and LCTCAM tariff are pending WPSC approval, with recovery of ~$700M from large-load customers dependent on that approval.
upsideHidden Upside▸Company disclosed unlevered free cash flow of about $2.4B through 2048 after netting the $1.8B investment, and ~$150M of 2030 net income from the Google project combined, with 2.5 GW+ of further pipeline under negotiation.
Company disclosed unlevered free cash flow of about $2.4B through 2048 after netting the $1.8B investment, and ~$150M of 2030 net income from the Google project combined, with 2.5 GW+ of further pipeline under negotiation.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $65.00 | $17.30/$21.40 | 0 | --/$3.50 | 0 |
| $70.00 | $12.40/$16.50 | 0 | --/$1.20 | 12 |
| $75.00 | $7.70/$11.70 | 4 | --/$3.60 | 5 |
| $80.00 | $3.50/$7.50 | 30 | $0.85/$2.70 | 1 |
| $85.00 | $0.50/$4.20 | 132 | $1.60/$5.90 | 0 |
| $90.00 | $0.50/$1.30 | 2 | $5.10/$9.10 | 0 |
| $95.00 | --/$3.60 | 0 | $9.50/$13.60 | 0 |
| $100.00 | --/$4.90 | 0 | $14.00/$18.80 | 0 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $929M | $58.47 | +$26.2M | +$86.3M | — | $6.70T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $382M | $69.51 | +$7.5M | +$382M | — | $2.22T |
| STATE STREET CORPPassive | $284M | $60.62 | +$14.8M | −$1.6M | — | $3.38T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $255M | $69.50 | +$4.4M | +$255M | — | $4.68T |
| NOMURA ASSET MANAGEMENT INTERNATIONAL INC. | $186M | $68.77 | −$13.6M | +$186M | — | $66.28B |
| AQR CAPITAL MANAGEMENT LLC | $166M | $61.01 | +$47.3M | +$99.2M | — | $286.62B |
| Point72 Asset Management, L.P. | $161M | $69.27 | +$16.2M | +$161M | — | $62.77B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $159M | $59.85 | +$10.2M | +$23.0M | — | $1.87T |
| FRANKLIN RESOURCES INC | $146M | $64.60 | +$28.8M | +$68.3M | — | $457.77B |
| Capital Research Global Investors | $136M | $57.50 | −$33.5M | +$13.8M | — | $716.77B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
| Ticker | Name | Co-holders | Score |
|---|---|---|---|
| GD | General Dynamics Corporation | 3 | 52.64× |
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2006 Q1 | 163M | 49M | 25M | $0.49 | $0.39 – $0.59 | 12 |
| 2006 Q2 | 175M | 37M | 13M | $0.47 | $0.38 – $0.56 | 15 |
| 2006 Q3 | 150M | 48M | 21M | $0.54 | $0.43 – $0.65 | 9 |
| 2006 Q4 | 190M | 53M | 23M | $0.74 | $0.59 – $0.89 | 10 |
| 2007 Q1 | 113M | 45M | 19M | $0.39 | $0.31 – $0.47 | 14 |
| 2007 Q2 | 142M | 49M | 21M | $0.34 | $0.27 – $0.41 | 20 |
| 2007 Q3 | 142M | 27M | 19M | $0.54 | $0.43 – $0.65 | 8 |
| 2007 Q4 | 144M | 50M | 22M | $0.57 | $0.46 – $0.68 | 9 |
| 2008 Q1 | 227M | 51M | 22M | $0.85 | $0.68 – $1.02 | 11 |
| 2008 Q2 | 225M | 58M | 29M | $0.66 | $0.53 – $0.79 | 11 |
| 2008 Q3 | 246M | 185M | 134M | $0.35 | $0.28 – $0.42 | 16 |
| 2008 Q4 | 100M | -506M | -542M | $3.46 | $2.76 – $4.15 | 19 |
| 2009 Q1 | 365M | 76M | 21M | $0.44 | $0.35 – $0.53 | 8 |
| 2009 Q2 | 96M | 72M | 16M | $0.16 | $0.13 – $0.19 | 10 |
| 2009 Q3 | 429M | 46M | -5M | $0.43 | $0.35 – $0.52 | 14 |
| 2009 Q4 | 224M | 69M | 16M | $0.26 | $0.21 – $0.32 | 10 |
| 2010 Q1 | 442M | 87M | 33M | $0.87 | $0.70 – $1.04 | 18 |
| 2010 Q2 | 283M | 46M | -9M | $0.23 | $0.18 – $0.28 | 17 |
| 2010 Q3 | 190M | 66M | 9M | $0.20 | $0.16 – $0.24 | 15 |
| 2010 Q4 | 406M | 112M | 43M | $0.75 | $0.60 – $0.90 | 16 |
| 2011 Q1 | 571M | 99M | 35M | $1.09 | $0.87 – $1.31 | 13 |
| 2011 Q2 | 130M | 65M | 9M | $0.18 | $0.14 – $0.21 | 14 |
| 2011 Q3 | 243M | 46M | -10M | $0.35 | $0.28 – $0.42 | 10 |
| 2011 Q4 | 326M | 89M | 23M | $0.50 | $0.40 – $0.60 | 8 |
| 2012 Q1 | 383M | 103M | 31M | $0.71 | $0.57 – $0.85 | 18 |
| 2012 Q2 | 264M | 54M | -15M | $0.40 | $0.32 – $0.48 | 8 |
| 2012 Q3 | 247M | 107M | 34M | $0.42 | $0.34 – $0.50 | 19 |
| 2012 Q4 | 295M | 97M | 28M | $0.58 | $0.46 – $0.70 | 15 |
| 2013 Q1 | 328M | 100M | 36M | $0.63 | $0.50 – $0.76 | 8 |
| 2013 Q2 | 287M | 94M | 31M | $0.43 | $0.34 – $0.52 | 15 |
| 2013 Q3 | 243M | 84M | 22M | $0.41 | $0.33 – $0.49 | 11 |
| 2013 Q4 | 319M | 96M | 16M | $0.54 | $0.43 – $0.65 | 14 |
| 2014 Q1 | 392M | 98M | 40M | $0.76 | $0.61 – $0.91 | 8 |
| 2014 Q2 | 309M | 78M | 21M | $0.52 | $0.42 – $0.62 | 13 |
| 2014 Q3 | 236M | 80M | 23M | $0.44 | $0.35 – $0.53 | 14 |
| 2014 Q4 | 383M | 96M | 34M | $0.78 | $0.62 – $0.94 | 20 |
| 2015 Q1 | 413M | 110M | 45M | $0.93 | $0.74 – $1.12 | 18 |
| 2015 Q2 | 209M | 30M | -29M | $0.30 | $0.24 – $0.36 | 15 |
| 2015 Q3 | 247M | 50M | -9M | $0.52 | $0.42 – $0.62 | 10 |
| 2015 Q4 | 300M | 49M | -13M | $0.63 | $0.50 – $0.76 | 7 |
| 2016 Q1 | 362M | 110M | 30M | $0.75 | $0.60 – $0.90 | 18 |
| 2016 Q2 | 442M | 82M | 1M | $0.67 | $0.54 – $0.80 | 11 |
| 2016 Q3 | 299M | 99M | 12M | $0.38 | $0.30 – $0.46 | 20 |
| 2016 Q4 | 398M | 102M | 17M | $0.91 | $0.73 – $1.09 | 17 |
| 2017 Q1 | 544M | 168M | 76M | $1.39 | $1.11 – $1.67 | 8 |
| 2017 Q2 | 417M | 111M | 26M | $0.59 | $0.47 – $0.71 | 20 |
| 2017 Q3 | 369M | 116M | 30M | $0.60 | $0.48 – $0.72 | 7 |
| 2017 Q4 | 488M | 139M | 54M | $1.12 | $0.90 – $1.34 | 14 |
| 2018 Q1 | 530M | 223M | 121M | $1.37 | $1.10 – $1.64 | 19 |
| 2018 Q2 | 324M | 106M | 20M | $0.37 | $0.30 – $0.44 | 18 |
| 2018 Q3 | 414M | 108M | 21M | $0.66 | $0.53 – $0.79 | 11 |
| 2018 Q4 | 439M | 171M | 74M | $0.79 | $0.63 – $0.95 | 20 |
| 2019 Q1 | 582M | 192M | 92M | $1.56 | $1.56 – $1.56 | 10 |
| 2019 Q2 | 400M | 108M | 19M | $0.43 | $0.43 – $0.43 | 10 |
| 2019 Q3 | 385M | 100M | 12M | $0.45 | $0.45 – $0.45 | 10 |
| 2019 Q4 | 555M | 167M | 67M | $1.09 | $1.09 – $1.09 | 10 |
| 2020 Q1 | 633M | 201M | 95M | $1.62 | $1.62 – $1.62 | 9 |
| 2020 Q2 | 396M | 116M | 20M | $0.30 | $0.30 – $0.30 | 9 |
| 2020 Q3 | 398M | 130M | 32M | $0.52 | $0.52 – $0.52 | 9 |
| 2020 Q4 | 594M | 174M | 72M | $1.15 | $1.15 – $1.15 | 9 |
| 2021 Q1 | 607M | 214M | 103M | $1.66 | $1.66 – $1.66 | 9 |
| 2021 Q2 | 382M | 130M | 29M | $0.38 | $0.38 – $0.38 | 1 |
| 2021 Q3 | 387M | 147M | 43M | $0.64 | $0.64 – $0.64 | 1 |
| 2021 Q4 | 488M | 182M | 71M | $1.26 | $1.26 – $1.26 | 1 |
| 2022 Q1 | 633M | 220M | 105M | $1.65 | $1.65 – $1.65 | 1 |
| 2022 Q2 | 406M | 132M | 25M | $0.40 | $0.40 – $0.40 | 1 |
| 2022 Q3 | 413M | 159M | 47M | $0.58 | $0.58 – $0.58 | 1 |
| 2022 Q4 | 523M | 196M | 78M | $1.17 | $1.17 – $1.17 | 1 |
| 2023 Q1 | 748M | 239M | 116M | $1.67 | $1.67 – $1.67 | 1 |
| 2023 Q2 | 552M | 144M | 32M | $0.38 | $0.38 – $0.38 | 1 |
| 2023 Q3 | 580M | 169M | 52M | $0.51 | $0.47 – $0.55 | 2 |
| 2023 Q4 | 864M | 212M | 86M | $1.08 | $1.08 – $1.08 | 1 |
| 2024 Q1 | 683M | 258M | 128M | $1.70 | $1.63 – $1.83 | 3 |
| 2024 Q2 | 498M | 140M | 22M | $0.29 | $0.24 – $0.38 | 3 |
| 2024 Q3 | 446M | 163M | 37M | $0.49 | $0.49 – $0.49 | 1 |
| 2024 Q4 | 881M | 236M | 102M | $1.34 | $1.30 – $1.38 | 4 |
| 2025 Q1 | 706M | 291M | 148M | $1.94 | $1.92 – $1.98 | 3 |
| 2025 Q2 | 443M | 151M | 28M | $0.36 | $0.28 – $0.42 | 5 |
| 2025 Q3 | 445M | 156M | 30M | $0.39 | $0.39 – $0.39 | 2 |
| 2025 Q4 | 648M | 250M | 106M | $1.39 | $1.39 – $1.39 | 2 |
| 2026 Q1 | 769M | 288M | 141M | $1.84 | $1.84 – $1.84 | 2 |
| 2026 Q2 | 491M | 162M | 31M | $0.41 | $0.41 – $0.41 | 2 |
| 2026 Q3 | 483M | 167M | 36M | $0.47 | $0.47 – $0.47 | 2 |
| 2026 Q4 | 788M | 273M | 119M | $1.56 | $1.45 – $1.68 | 3 |
| 2027 Q1 | 1.3B | 328M | 154M | $2.02 | $1.99 – $2.05 | 2 |
| 2027 Q2 | 881M | 209M | 43M | $0.56 | $0.56 – $0.56 | 1 |
| 2027 Q3 | 953M | 214M | 39M | $0.51 | $0.51 – $0.51 | 1 |
| 2027 Q4 | 652M | 313M | 122M | $1.59 | $1.59 – $1.59 | 1 |
| 2028 Q1 | 722M | 371M | 168M | $2.21 | $2.21 – $2.21 | 1 |
| 2028 Q2 | 536M | 235M | 48M | $0.63 | $0.63 – $0.63 | 1 |
| 2028 Q3 | 562M | 232M | 44M | $0.57 | $0.57 – $0.57 | 1 |
| 2028 Q4 | 660M | 333M | 129M | $1.69 | $1.69 – $1.69 | 1 |
| 2029 Q1 | 533M | 380M | 169M | $2.21 | $2.21 – $2.21 | 1 |
| 2029 Q2 | 540M | 231M | 37M | $0.48 | $0.48 – $0.48 | 1 |
| 2029 Q3 | 548M | 228M | 33M | $0.43 | $0.43 – $0.43 | 1 |
| 2029 Q4 | 555M | 348M | 136M | $1.78 | $1.78 – $1.78 | 1 |
| 2030 Q1 | 563M | 395M | 176M | $2.30 | $2.30 – $2.30 | 1 |
| 2030 Q2 | 570M | 240M | 39M | $0.51 | $0.51 – $0.51 | 1 |
| 2030 Q3 | 578M | 238M | 36M | $0.48 | $0.48 – $0.48 | 1 |
| 2030 Q4 | 586M | 364M | 145M | $1.89 | $1.89 – $1.89 | 1 |
v2 analysis (legacy, 2026-08-06) — for comparison onlyclick to expand
Thesis
Black Hills is a regulated utility with a long dividend record, improving rate recovery, and unusually attractive potential electricity-load growth from Wyoming data centers. The operating trajectory is favorable: Q2 adjusted EPS exceeded the prior-year quarter, new rates and riders more than offset higher financing and depreciation costs, and management maintained its 2026 outlook despite adverse weather. The NorthWestern merger and large-load pipeline could lift the long-term growth rate above the stand-alone 4%–6% framework. The central problem is that accounting earnings have not translated into distributable cash. TTM capex of $983M exceeded OCF by a wide margin, adjusted FCF was negative $323M, net debt is approximately $4.5B, interest costs are rising, and shares have increased 5% year over year. The 1.8 GW opportunity is promising but remains subject to definitive contracts, regulatory acceptance, customer commitment, and execution. This is a credible improving utility, but not yet a self-funding compounder.
Trade Signal
Lean short/no-trade: BKH is a quality utility with genuine merger and data-center upside, but at $71.72 it is priced above fundamental value and depends on uncontracted, delayed-to-earnings catalysts while dilution and weak free cash conversion persist.
The stock rose from roughly $55 at the start of 2025 to $73 by late 2025, then remained broadly range-bound around $71–$76 through 2026. The major upward leg appears tied to the utility/data-center growth narrative and progress toward the NorthWestern merger; the recent weakness from the $77.33 52-week high to about $71.72 reflects consolidation rather than a specific adverse shock. After the August 6 Q2 beat and guidance reaffirmation, the stock was unchanged, so the market slightly missed favorable near-term operating news. That is a modest positive dislocation, but not a large oversold opportunity because the shares remain well above fundamental fair value; the valuation gap is more durable than temporary.
The market is constructive to bullish: analysts show a consensus Buy with no Sell ratings and an average target of $83.50, while investors appear willing to pay for utility defensiveness plus data-center and merger optionality. However, the 12.5% short interest, rising materially from roughly 2% a year ago, shows a substantial valuation and execution dispute. The unchanged price after a strong Q2 print suggests good results are already largely anticipated, though the lack of a selloff also indicates shorts face squeeze risk.
There is a potentially meaningful long-term inflection from the NorthWestern combination and the 1.8 GW Wyoming hyperscaler opportunity, but neither provides a large, near-term earnings step-up that is clearly absent from expectations. Management already guides to 4%–6% growth, analysts are constructive with an average target of $83.50, and the stock has risen about 25% over the past year. The market appears to recognize the story; the missing evidence is contractual and regulatory confirmation, not discovery of an ignored business improvement.
- ▲2026-10 to 2026-11 · Montana commission decision on NorthWestern merger — Expected around mid-October to mid-November; approval would remove the principal regulatory obstacle, while delay or rejection would pressure the shares.
- ▲2026-10 to 2026-11 · Q3 2026 earnings and guidance update — A clean print and reaffirmation could support the stock, but the shares currently appear to require continued execution rather than merely meeting guidance.
- ▲2026-Q3 to 2026-Q4 · Definitive agreement for the 1.8 GW Wyoming hyperscaler project — A signed contract would validate the largest upside assumption and potentially improve the growth multiple; continued negotiation would leave the catalyst speculative.
- ▲H2 2026 · NorthWestern merger closing — Closing would increase scale and potentially lift long-term EPS growth to 5%–7%, though rate-freeze concessions limit near-term earnings benefit.
- ▼2027-01 · $400 million debt maturity and refinancing — January refinancing occurs in a high-cost capital environment and could highlight leverage, financing expense, and the need for additional equity.
- ▲2027-Q1 · Colorado electric rate-review decision or implementation — The request for $26.7 million of annual revenue could support earnings and rate-base growth, but the outcome is not expected until around Q1 2027.
Net flow is unfavorable. TTM dilution is approximately 5%, including $50 million of ATM issuance in Q2, with no insider buying and two insider sales totaling about $1.3 million. Short interest is elevated at 12.5% of float and 11.9 days to cover, creating squeeze risk if merger or data-center news is positive, while call open interest is much larger than put open interest.
The dividend, regulated assets, and recurring rate recovery provide some downside support, but there is no hard floor at the current price. Free cash flow yield is only about 3%, capital spending is heavy, leverage is meaningful, and ongoing ATM equity issuance dilutes shareholders. The principal ceiling is valuation: the stock is already priced above the analyst's base-case value and needs merger/data-center success to sustain a premium multiple.
A credible, liquid U.S. utility with a 56-year dividend-growth record, regulated rate-base growth, and potential data-center load growth. Income-oriented and utility-growth buyers can own it, but the 4% yield and 4%–6% stand-alone growth do not justify the current valuation without successful merger and hyperscaler execution.
Fear is slightly stronger than greed at $71.72: the business is sound, but the price discounts much of the favorable utility and data-center narrative while cash generation, leverage, dilution, and regulatory execution remain real constraints. I would prefer a short only with defined risk because the merger and hyperscaler catalysts can produce sharp squeezes.
Valuation
Q2 showed a better underlying operating result than the headline TTM cash profile: new rates and riders contributed $0.21 per share in the quarter, O&M discipline contributed $0.04, and adjusted EPS rose to $0.54 from $0.38 despite higher financing and depreciation costs. More importantly, management said Crusoe's departure has not disrupted direct negotiations with the hyperscale end user, extended the 1.8 GW reservation agreement through August 31, and indicated refundable customer advances could reach $377M. However, no definitive 1.8 GW contract was announced, and full-year guidance was merely reaffirmed.
▸ How the cases moved
The new quarter modestly raises the base and bull cases: the base equity value moves from approximately $4,950M to $5,120M as rate recovery and cost control offset financing pressure; the bull case moves from approximately $7,100M to $7,410M because the 1.8 GW reservation process remains active, the agreement was extended, and refundable customer advances can reach $377M. The bear case improves slightly from approximately $3,400M to $3,510M because the customer relationship appears more direct than the departed Crusoe development arrangement suggested. Probabilities shift from bear/base/bull 0.27/0.56/0.17 to 0.25/0.55/0.20. The changes are positive but limited because definitive agreements for the large project were not signed and Montana merger approval remains pending.
Regulatory recovery and rate-base growth continue, but capital costs remain high, the NorthWestern merger is delayed or fails, and the 1.8 GW data-center opportunity does not become a firm earnings contributor. Earnings grow slowly while leverage and dilution constrain the equity multiple.
▸ Valuation
13x $270M owner earnings = $3,510M equity value
The merger closes with modest regulatory concessions, the existing capital plan enters rate base, and the approximately 600 MW of already-planned large-load demand supports management's 4%–6% growth framework. The 1.8 GW project advances but contributes little within two years, leaving earnings quality adequate but free cash flow structurally weak during heavy investment.
▸ Valuation
16x $320M owner earnings = $5,120M equity value
The NorthWestern combination closes on schedule, regulatory execution remains constructive, and definitive agreements are signed for the 1.8 GW hyperscale project along with additional large-load opportunities. Customer-funded infrastructure reduces capital risk, rate-base growth accelerates, and owner earnings rise toward $390M with the market awarding a premium utility-growth multiple.
▸ Valuation
19x $390M owner earnings = $7,410M equity value
▸ Target Rationale
The probability-weighted scenario value discounted at 12% is $4,140M. I set the analytical target modestly lower at $4,050M because the scenario earnings figures still rely partly on regulated accounting earnings rather than fully distributable cash, leverage is high for a utility entering a higher-rate environment, ongoing equity issuance creates per-share dilution, and the most valuable data-center catalyst is not yet contractually secured. The reduction is fundamental rather than an emotional fear discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results: On May 6, 2026, Black Hills Corp. reported GAAP diluted EPS of $1.73 and adjusted EPS of $1.79 for the first quarter of 2026, down from GAAP and adjusted EPS of $1.87 in Q1 2025. The year-over-year decline was heavily driven by exceptionally mild winter weather, which had a negative $0.18 per share impact. First-quarter revenue was $780.7 million compared to $805.2 million in the prior-year period.
- Guidance and Dividends Reaffirmed: Despite the Q1 weather headwinds, management reaffirmed its full-year 2026 adjusted EPS guidance in the range of $4.25 to $4.45 per share. Additionally, the board declared a quarterly dividend of $0.703 per share, extending the company’s history of consecutive annual dividend increases to 56 years.
- Colorado Rate Review Filing: On June 12, 2026, Black Hills' Colorado electric utility submitted a rate review application to the Colorado Public Utilities Commission seeking $26.7 million in new annual revenue. The filing aims to recover approximately $184 million of capital infrastructure and operational investments made since 2024 to enhance grid reliability. The request is based on a capital structure of 51.02% equity and 48.98% debt, with a proposed return on equity (ROE) of 10.5% and a projected implementation date in the first quarter of 2027.
- Infrastructure Progress: Construction continues on the 99-MW ($280 million) Lange II gas-fired generation facility in South Dakota, which is targeted for completion in Q4 2026. The company also began constructing a 50-MW battery storage project in Colorado and executed a power purchase agreement for up to 200 MW of solar energy.
▸ Thesis-test Findings
Black Hills Corp Wyoming 1.8 GW data center contract June 2026
In a June 10, 2026 update, Black Hills Corp. confirmed that its proposed 1.8-gigawatt (GW) data center project in Cheyenne, Wyoming, is moving forward on schedule with initial service planned for early 2028. Although Crusoe is no longer the project’s development partner, the utility is now advancing development directly with the large-load hyperscaler customer. In April 2026, Black Hills' Wyoming electric utility subsidiary executed an agreement to secure long lead-time generation equipment, and the customer has provided over $200 million in refundable contributions in aid of construction to support milestone payments. This setup significantly shifts capital risk off the utility's balance sheet. The project will be served under Wyoming's Large Power Contract Service (LPCS) Tariff, which protects retail ratepayers by ensuring the large customer directly funds 100% of its infrastructure and power procurement needs. This progress supports a robust long-term growth catalyst while mitigating near-term capital and execution risks, though the exit of Crusoe introduces minor near-term developer transition friction.
NorthWestern Energy BKH merger regulatory approvals settlements 2026
The proposed all-stock merger with NorthWestern Energy to form "Bright Horizon Energy Corporation" achieved several major milestones in the first half of 2026. Shareholders of both utilities overwhelmingly approved the transaction on April 2, 2026. The Hart-Scott-Rodino federal antitrust waiting period has also concluded. On May 19, 2026, Nebraska became the first state to formally approve the merger after the utilities reached settlement agreements with the ratepayer Public Advocate and labor unions. In the Nebraska settlement, the companies accepted rate protection commitments, including a general base rate freeze for NorthWestern until May 2027 and for Black Hills until May 2028. Constructive settlement agreements have also been reached with key intervenors in Montana and South Dakota, though final state commission approvals there, along with FERC approval, remain pending. The merger remains on track to close in the second half of 2026. If finalized, the transaction will create an $11 billion rate base and elevate the combined company's long-term EPS growth target to 5%–7% (up from 4%–6% independently). However, the rate freeze concessions required to settle with state regulators will limit near-term pricing flexibility in approved territories.
Cheyenne Wyoming utility industrial electricity load growth forecast
Industrial load growth in Cheyenne is experiencing an unprecedented surge, driven heavily by massive tech sector developments. Wyoming Electric (operating locally as Cheyenne Light, Fuel & Power) reported a record peak load of 393 MW in Q1 2026, an increase of 4% over the 2025 peak and marking 20 consecutive years of demand growth in the Cheyenne region. According to economic development agency Cheyenne LEADS, there are currently 14 data centers either under construction or in definite planning stages in the city, including Meta's "Project Cosmo" and a major 3,200-acre land acquisition by Microsoft in April 2026 to expand its hyperscale footprint. While local anxiety regarding massive electricity and resource consumption prompted the Cheyenne City Council to consider a one-year moratorium on new data center developments, the council voted 8-to-1 against the moratorium on May 26, 2026, maintaining a supportive municipal policy environment. Although the state's consumer advocate has warned that the regional grid is not yet equipped to handle this level of growth without massive grid-level transmission and generation buildouts, the risk of ratepayer backlash is minimized because incoming industrial customers are legally bound under the approved LPCS Tariff to pay 100% of the associated infrastructure and supply costs.