Stocks/BLLG.CN

BLLG.CN

Blue Lagoon Resources Inc.v3 3.5/10 · 2026-11-26
Basic Materials·Gold
0.46 CAD
84M CAD market cap
v3 Rating
3.5/102.5–5.0
Setup
2.5/101.5–4.0
Fair Value
0.28 CAD0.15 CAD–0.55 CAD-38%
DCF (10%)
0.24 CAD-47%
Base IRR
-10%-25%–+6%
Visibility
wide±71%
Rating
Revenue (TTM)
8.5M CAD
Owner Earnings
C$1M
Next-Yr Owner Earnings
C$3M
Growth
+15.0% × 2y
P / Next-Yr OE
26.5x
Net Debt
-C$3M

Blue Lagoon Resources Inc. is a Canadian enterprise focused on acquiring, exploring, and assessing mineral properties within the nation. The company primarily seeks out deposits rich in gold, silver, and copper. Its most significant asset is the Dome Mountain gold project, situated in British Columbia. Established in 2017, the firm was formerly known as Blue Lagoon Capital Inc. before adopting its current name in December 2018, and it is headquartered in Vancouver, Canada.

2-Year Price History

$0.48+242.9%
$0.00$0.20$0.40$0.60$0.80$1.0Initial target $0.28 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
3.52.5–5.0
Setup
2.51.5–4.0
Fair value (CAD)
0.280.15 – 0.55
Upside vs 0.46
-38%
DCF (10%)
0.240.10 – 0.45-47%
Base IRR
-10%-25% – 6%
Visibility
very widerange ±71%
Sentiment
4/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 0.48

Blue Lagoon is a one-asset junior that has just become a tiny gold producer: the Dome Mountain underground mine near Smithers, BC, permitted for 55,000 t/yr (150 t/d), declared commercial production on May 19, 2026 and now runs at roughly 125 t/d. Its ore is trucked about 900 km to a toll mill (Nicola Mining, Merritt) and its concentrate is sold to Ocean Partners, both of which bought stock (C$10M at C$0.60 in August 2026). The pitch would be a newly cash-flowing gold mine with ~218k oz of measured and indicated resource and exploration upside, at a time when the stock has halved from C$0.95 because gold has fallen to a 14-month low (~US$3,750). The numbers don't support it. The first audited year (FY Mar-2026) shows revenue of C$3.7M on 5,577 t, a 13% gross margin and C$4.6M of stock comp, and the filing was late enough to draw a BCSC cease-trade order. At full permit rate and today's gold price, my estimate is about C$12-15M of mine-level margin per year, which leaves roughly C$6-8M of owner earnings after G&A, stock comp, royalty and sustaining development. Against that, the mine has no reserves and no feasibility study, and the resource supports maybe 10 years of mining. The CAD84M market cap (about 174M shares at C$0.48; the pack's close of 11-25, with no later quote found) is already paying 11-14x steady-state earnings for a depleting, high-cost, trucked-ore mine. The DCF gives about C$0.24 per share. Rating 3.5: expensive against the cash it can make, but it is gold-levered and an illiquid CSE name, so not a clean short. Pass.

Flow: The company is a steady net issuer: about 5% a year from options, warrants, RSUs, CEO fee and loan shares, plus placements; 16.7M shares (about 10%) were issued to Nicola and Ocean Partners at C$0.60 on 2026-08-10. Their hold period runs out around mid-December 2026, but those strategic holders are unlikely sellers. There is no buyback.

A deep dive would have to establish: Can Dome Mountain at its 150 t/d permit cap, trucking ore 900 km to a toll mill, earn enough per tonne at today's gold price, and convert enough resource to reserves, to justify a C$84M market cap?

Owner earnings, TTM
C$1M-C$3M – C$4M
Realistic peak profit
C$8MC$3M – C$16M
Growth rate
15.0%0.0% – 50.0%
Years of growth
21 – 3
Market cap
C$84MC$80M – C$88M
EV
C$81MC$74M – C$90M
Net debt
-C$3M-C$6M – C$3M
Capital return / cap
-4.0%-10.0% – 0.0%
P/E
20.0×10.0× – 80.0×
EV/EBITDA
8.0×5.0× – 25.0×
FCF yield
4.0%-3.0% – 10.0%
Projected FCF, base case (CAD millions)
Y1C$3M-C$3M – C$7M
Y2C$6MC$1M – C$12M
Y3C$7MC$1M – C$14M
Y4C$7MC$0M – C$14M
Y5C$7M-C$1M – C$14M
Competition: Gold is a price-taker commodity. Dome Mountain's edge is its grade (8-10 g/t). Its handicaps are its small scale, contract mining, a 900 km truck haul and dependence on a third-party toll mill, which put it high on the cost curve.
Governance: The CEO is paid through his holding company with heavy option grants, makes interest-free loans compensated in shares, and leases the office from his spouse. Prior years were restated, and the late FY2026 filing drew a BCSC cease-trade order in August 2026.
Research (expand)

What it is. Dome Mountain is a narrow-vein (Boulder vein) gold-silver underground mine near Smithers, BC. It is 100% owned and run by contractor miners. The full mine permit came in February 2025, with a cap of 55,000 t/yr. Ore goes by truck to Nicola Mining's 150 t/d mill at Merritt under a 10-year toll agreement, and the concentrate goes to Ocean Partners. From mid-Nov 2025 to Sep 30, 2026 the company trucked 21,400 t and milled about 17,400 t. Provisional payments were about C$16.5M, which is 85% of provisional value, or roughly C$1,100 per tonne gross. The first finalized lot (5,002 t of feed) returned 992 oz Au against about 1,200 oz estimated in the feed. Recent feed is said to grade 8-10 g/t with 92% recovery.

What the market thinks / what it misses. The stock went from C$0.14 to C$0.95 on the producer re-rating and the gold rally. It is now C$0.48 as gold slid to about US$3,750. The bull says production cash flow plus a 1Moz exploration story. My view is that the market still prices it on ounces in the ground, not on cash. Revenue is booked as the company's *share* of proceeds after the toll arrangement (C$667/t in FY26). Q4 FY26 cost of revenue was C$755/t against C$868/t of revenue.

Earnings today. FY Mar-2026: revenue C$3.72M, gross profit C$0.48M, operating cash flow -C$0.9M, mine capex C$6.5M, SBC C$4.6M, net loss C$6.8M. Cash was C$0.85M against a working-capital deficit of C$1.7M, so it was funded by CEO loans and then by the C$10M August raise. Current owner earnings are around zero to C$3M a year.

Projection (C$M FCF after SBC and sustaining development): 3 / 6 / 7 / 7 / 7. At full rate, 55kt × ~8 g/t diluted × 92% gives about 13koz Au plus silver. At C$5,150/oz, net of toll and freight, that is roughly C$850-950/t against all-in mine costs of C$600-700/t. Year 5 is a shrinking business: M&I of 798kt at about 8.5 g/t covers maybe 8-10 years once dilution and mining losses are counted. There are no reserves and no feasibility study, and the company says this itself. So the terminal value is about 4x, or the run-off of the remaining years. The DCF at 10% comes to about C$40M of equity, or C$0.24 per share on about 180M diluted shares. Exploration (Boulder West, Forks, Flat Chance) and gold upside are the option value: each US$500/oz of gold is worth about C$9M a year.

Multiples. EV is about C$81M, roughly 7x steady-state mine EBITDA and 11-14x steady-state owner earnings, for an asset with a finite life. The stock is not cheap.

Management and risks. CEO Rana Vig is paid C$300k through his holding company, received C$2.8M of SBC, makes interest-free loans that are compensated in shares, and leases the Smithers office from his spouse. There was a prior-period restatement and a late annual filing that triggered a BCSC cease-trade order in August 2026. Dilution is steady: options, warrants, RSUs and private placements. The model depends on a single mill and a single offtaker, and both are equity holders. Other risks are a 900 km truck haul, permit-capped throughput, gold price, and grade reconciliation (the first lot came in about 17% below the estimated contained gold).

Sentiment: 4/10. Retail enthusiasm faded as gold fell and the stock halved from its January high. The strategic holders are supportive.

Financials — Adjusted

Adjusted · TTM 2027-Q1 · CAD

TTM & Fiscal-Year P&LTTM2026202320222021
Revenue8.533.720.000.000.00
Gross profit3.231.620.000.000.00
Operating expenses7.96+88%8.49+6%8.00+49%5.38-44%9.53
▸Adj EBITDA-4.48-6.67-7.79-5.15-9.29
▸Adj OCF-0.83-3.47-8.64-10.5-7.77
CapEx-8.95-6.50-0.36-0.04-0.06
Adj FCF-9.78-9.97-9.00-10.6-7.83
Interest expense0.110.070.030.040.00
▸Adj net income-4.82-6.90-8.61-10.4-8.48

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2021→FY2026 +2027YTD

Where the Cash WentTotal2027YTD2026202320222021
▸Claimed: EBITDA-26.10.86100%-6.67-5.34-5.38-9.53
FCF (OCF−capex)-36.4-2.85-331%-7.40-9.23-9.32-7.63
Net income-38.11.22142%-6.81-12.2-15.3-4.98
▸Capital returned-10.5-3.55-413%-6.980.030.040.00
Buybacks-9.64-3.59-6.050.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid0.180.040.070.030.040.00
Debt paid down-1.000.00-1.000.000.000.00
▸Reinvestment10.03.04354%6.500.360.040.06
Capex (PP&E)9.983.026.500.360.040.06
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)0.020.02--------
Retained / other-25.80.7486%-0.35-9.23-9.32-7.63

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 3.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202320222021
▸Assets (total)38.633.223.434.333.2
▸Liabilities (total)14.814.44.524.943.07
Net debt (incl. leases)0.340.64-2.01-8.66-3.49
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-41.0-97.1------
Shares outstanding17615210186.866.5
Dilution (YoY)+11.5%--+16.7%+30.5%--
MarginsTTM2026202320222021
Gross margin37.9%43.5%------
Adj EBITDA margin-52.5%-179.3%------
Adj OCF margin-9.7%-93.3%------
Adj FCF margin-114.6%-268.2%------
Net income margin-49.2%-183.1%------
Adj NI margin-56.5%-185.4%------
ROIC (adj, after-tax)-14.7%-26.7%-33.5%-14.4%-26.2%
Cost of debt----------

Institutional Ownership

Change in total shares held by all 13F filers, each quarter, in shares (no share count available for this name). Pale bars = what individual filers bought / sold. Hover a quarter for its biggest buyers and sellers.
−50K0+50K$0.11$0.22$0.33Q4 2021Q3 2022Q2 2023Q1 2024Q4 2024Q3 2025Q2 2026Q3 2026
Q2 20262026-06-30(hover the chart for other quarters)
0 shares (net)
Bought 0 by 0 filers · Sold 0 by 0
Net 0 shares
0 filers reported
No share count for this quarter — flow shown in shares, not %.
Top buyersΔΔ %holds
none
Top sellersΔΔ %holds
none

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

015K31K46K61K$0.11$0.17$0.22$0.28$0.332022-032022-092023-032023-092024-032024-092024-12
hover the chart for per-quarter detailprice (right axis)
tru Independence LLC—TUCKER ASSET MANAGEMENT LLC2KINVESTORS ASSET MANAGEMENT OF GEORGIA INC /GA/ /ADV—
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-07-12

Company news

In May 2026, Blue Lagoon Resources officially declared commercial production at its 100%-owned Dome Mountain gold project in British Columbia. This milestone followed 30 consecutive days of underground mining exceeding 100 tonnes per day (tpd), with the company now targeting a ramp-up to its fully permitted capacity of 150 tpd. Financially, the company secured a $3 million investment from Ocean Partners Holdings in May 2026 and previously received multiple seven-figure advance payments from its milling partner, Nicola Mining, for stockpiled mineralized material. Operationally, the company commissioned a water treatment plant and transitioned to a double-shift mining schedule. Additionally, Blue Lagoon received the 2026 PDAC Sustainability Award for its collaborative efforts with the Lake Babine First Nation. (Sources: Northern Miner, Stockwatch, Simply Wall St)

Thesis findings

The bull case rests on Blue Lagoon’s successful transition from a pure explorer to a cash-flowing producer. The Dome Mountain project features high-grade mineralization (averaging ~9 g/t gold) and a permitted 10-year toll-milling agreement that bypasses the need for the company to build its own mill. Geologists suggest the current resource covers only a fraction of the 18-kilometer mineralized corridor, offering significant "bootstrap" expansion potential from production revenue. Conversely, the bear case highlights the small scale of current operations and the absence of a formal Preliminary Economic Assessment (PEA), which increases technical uncertainty. Furthermore, significant shareholder dilution occurred over the past year through private placements and debt-related share issuances needed to fund the final push to production. (Sources: Fundamental Research Corp, Mining.com, MiningIR)

Market opinion (price-aware)

Market sentiment toward BLLG is currently characterized as "cautiously optimistic" but undervalued by technical analysts. While the stock has traded down approximately 6-9% over the last 12 months to roughly $0.70 CAD, analysts maintain a strong consensus "Buy" rating. Fundamental Research Corp (FRC) and other trackers set price targets between $1.74 and $1.83 CAD, suggesting over 150% upside as production scales. Retail sentiment on CEO.ca and StockTwits has improved significantly following the commercial production announcement, shifting from skepticism regarding the "cannabis-background" management to respect for operational execution. However, some bears note the $100M+ market cap is rich for a 150 tpd operation until the company proves it can consistently generate the estimated $30M+ in annual EBITDA. (Sources: Investing.com, ValueInvesting.io, Stockopedia)