Stocks/BOE.AX

BOE.AX

Boss Energy Limitedv3 5.5/10 · 2026-10-16
Basic Materials·Industrial Materials
1.39 AUD
563M AUD market cap
v3 Rating
5.5/104.0–7.0
Setup
6.5/105.0–8.0
Fair Value
1.55 AUD1.00 AUD–2.50 AUD+12%
DCF (10%)
1.50 AUD+8%
Base IRR
+11%-8%–+30%
Visibility
wide±48%
Rating
Revenue (TTM)
151.1M AUD
Owner Earnings
A$5M
Next-Yr Owner Earnings
A$5M
Growth
+12.0% × 4y
P / Next-Yr OE
115.5x
Net Debt
-A$91M

Boss Energy Limited, an Australian entity, focuses on the discovery, development, and extraction of uranium deposits. The company's primary holding is its entirely-owned Honeymoon uranium project, an expansive property spanning roughly 2,595 square kilometers in South Australia. Established in 2005, with its main office located in Subiaco, Australia, the firm rebranded from Boss Resources Limited to Boss Energy Limited in November 2020.

2-Year Price History

$1.45-54.8%
$1.5$2.0$2.5$3.0$3.5$4.0$4.5Initial target $1.55 · 2026-10-16volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-16

Rating
5.54.0–7.0
Setup
6.55.0–8.0
Fair value (AUD)
1.551.00 – 2.50
Upside vs 1.39
+12%
DCF (10%)
1.500.95 – 2.40+8%
Base IRR
11%-8% – 30%
Visibility
widerange ±48%
Sentiment
3/10
2026-10-16 · claude-opus-5-5 · priced at 1.35

Boss Energy is a small, debt-free uranium producer: its Honeymoon in-situ recovery mine in South Australia made 1.41 Mlbs in FY26, and it owns 30% of the troubled Alta Mesa mine in Texas. After the 2021 feasibility study failed in the field (the stock is down roughly 75% from its 2024 high), management reset the mine plan in August 2026. The new plan is wider-spaced wellfields, 13.8 Mlbs over about 9 years, a peak of 1.9 Mlb/yr from FY30, and life-of-mine AISC of A$79/lb. That is a smaller, shorter and more expensive mine than the market once paid for. FY27 is a transition year: 1.25-1.30 Mlbs at an AISC of A$83-92/lb, so free cash flow is close to zero. At A$1.345 (16 Oct 2026 close; the pack quoted A$1.34) the market cap is about A$559M on roughly 415M shares. Against that sit about A$260M of net liquid assets: A$50M cash, about A$41M of listed stakes, and 1.58 Mlbs of drummed U3O8 worth about A$200M at a spot price near US$90/lb, less A$35M of payables. That leaves about A$300M for a Honeymoon cash-flow stream I put at around A$330M NPV10, plus Alta Mesa and 45 Mlbs of satellite resources at Jasons and Gould's Dam. My DCF gives about A$1.50/share. That makes the stock modestly cheap, not a bargain, with heavy leverage to the uranium price, because Boss is deliberately under-contracted while the long-term contract price is at a record US$96.50. Rating 5.5: cheap against assets but with a broken credibility record and little cash flow until FY29. Research rating 6.5: at US$110/lb, or if the satellite hub (2.5 Mlb/yr at A$65 AISC) proves real, the stock could be worth 40%+ more. The open questions are the A$ cost per pound and whether the new reactive-transport model holds up in EKT1 and the first wide-spaced wellfields over the next 2-3 quarters. Those can be checked.

A deep dive would have to establish: Do the first wide-spaced wellfields (EKT1/EKT2) and the Stage 1 water-treatment debottleneck deliver the NFS flow, recovery and A$ cost-per-pound assumptions, so that the 1.9 Mlb/yr base and a 2.5 Mlb/yr satellite hub are bankable at today's ~US$90 uranium?

Owner earnings, TTM
A$5M-A$10M – A$20M
Realistic peak profit
A$60MA$25M – A$120M
Growth rate
12.0%2.0% – 22.0%
Years of growth
42 – 7
Market cap
A$559MA$500M – A$620M
EV
A$468MA$420M – A$520M
Net debt
-A$91M-A$110M – -A$60M
Capital return / cap
0.0%0.0% – 2.0%
P/E
60.0×25.0× – 200.0×
EV/EBITDA
8.0×5.0× – 14.0×
FCF yield
1.0%-5.0% – 6.0%
Projected FCF, base case (AUD millions)
Y1A$5M-A$30M – A$35M
Y2A$25M-A$20M – A$60M
Y3A$55MA$0M – A$100M
Y4A$75MA$10M – A$130M
Y5A$80MA$10M – A$150M
Competition: Boss is a sub-scale price-taker in a global U3O8 market set by Kazatomprom, Cameco and Orano; its edges are low-capex ISR, a licensed plant with spare capacity in a tier-1 jurisdiction, and an under-contracted book, while Paladin and Heathgate are the closest Australian peers.
Governance: No governance red flags found, but management's credibility is impaired: the 2021 feasibility study was withdrawn after a year of operations (July 2025) and the replacement plan cut the resource by about 35% and lowered the production profile.
Research (expand)

What the company does

Boss Energy (ASX: BOE) owns and operates the Honeymoon in-situ recovery (ISR) uranium mine in South Australia, which it restarted in 2024. It also holds 30% of the Alta Mesa ISR joint venture in South Texas (enCore Energy has 70% and operates it), about 18-20% of Laramide Resources, and two undeveloped satellite deposits next to Honeymoon: Jasons and Gould's Dam, with about 45 Mlbs of resource. Honeymoon has an export licence of 3.3 Mlb/yr and a processing plant with 2.4 Mlb/yr nameplate capacity. Wellfield flow, not the plant, is now the binding constraint.

What happened

  • July 2025: Boss withdrew its 2021 Enhanced Feasibility Study. Drilling found less continuous high-grade mineralisation and more ore in low-permeability clays than the study assumed. The stock fell about 40% in a day and has kept falling, from a May 2024 high of A$5.63 to about A$1.25-1.35 now.
  • December 2025: the Honeymoon Review moved the mine to a wide-spaced wellfield design.
  • 27 August 2026: Boss released the New Feasibility Study (NFS), an updated resource and FY26 results. The stock fell 16.5% to A$1.515 that day.

- The new resource is 20.8 Mlbs at 440 ppm, 34% of it inferred. That is about 35% below the 2019 estimate at the same cut-off.

- The new mine plan is 13.8 Mlbs over about 9 years (to FY34-35). Production ramps 1.3 → 1.5 → 1.7 → 1.9 Mlb/yr by FY30.

- Life-of-mine C1 is about A$50/lb and AISC about A$79/lb, with A$58M of extra processing capital.

- About 15% of the plan sits in Brooks Dam North, which still needs approvals.

  • 18 September 2026 (Market Day): management set an aspiration of 2.5 Mlb/yr at an AISC of A$65/lb by the early 2030s. Jasons would be fed in around early CY30 and Gould's Dam around early CY31, both subject to permits and board decisions.
  • Analysts: Macquarie raised its target to A$2.00 on the stock (A$1.72 at the time). JPMorgan has been building a substantial holding, reaching 7.20% (29.9M shares) on 7 October 2026.
  • Since mid-September the stock has fallen to A$1.25-1.35 even though uranium has strengthened. Nuclear and uranium equities sold off broadly (CCJ, UEC, OKLO), with utilities balking at record term prices.

What it earns today

FY26 (to June 2026, from the company's results release):

  • Revenue A$151.1M from 1.40 Mlbs sold, about 0.4 Mlbs of it the last of the inventory bought in 2021.
  • Realised price A$111/lb (US$74).
  • NPAT A$2.5M; operating cash flow A$73.6M; development capex A$66.8M.
  • Margin on produced uranium sold: A$31.9M on 1.0 Mlbs.
  • C1 cost A$39/lb, AISC A$61/lb. D&A was A$39M.
  • Year-end cash A$49.7M, plus a separate A$16.3M environmental bond. Listed investments A$41.4M. Inventory 1.581 Mlbs at A$116M book value (about A$195M at the 30 June spot price). No debt. Payables and accruals A$35.4M.

FY27 guidance:

  • Production 1.25-1.30 Mlbs; C1 A$51-56/lb; AISC A$83-92/lb; capex A$58-65M.
  • About 0.9 Mlbs of production comes from the legacy wellfields, which are declining.
  • Q1 FY27 realised price is guided at about US$80-82/lb, including roughly 300 klbs delivered to two utilities.
  • A legacy contract of about 250 klb/yr realises only 65-70% of spot.
  • About 73% of Honeymoon production is uncommitted.

At about US$82 realised (about A$117 at AUD/USD 0.70), FY27 gives:

  • EBITDA of roughly A$55-60M
  • NPAT of roughly A$0-15M
  • Free cash flow near zero after processing capex, unless Boss sells inventory.

What it could earn at maturity

Honeymoon alone, FY30-33:

  • About 1.9 Mlb/yr at a steady-state C1 of about A$47/lb and AISC in the low-to-mid A$70s.
  • At spot (US$90, about A$129/lb): roughly A$100M pre-tax AISC margin, about A$70-80M after-tax FCF, and NPAT of about A$50-60M after D&A.
  • At the term price (US$96.5, about A$138/lb): about A$85-90M FCF.

With the satellites: if the hub reaches 2.5 Mlb/yr at an AISC of A$65/lb, after-tax FCF could reach A$120-150M a year in the early 2030s. That would need satellite capex, which is not yet costed (management said to model it on Honeymoon's cost structure), and permitting, which management estimates at 2-3 years.

Fair value and the multiples we are paying

Basis: about 415.4M shares, derived from JPM's notice (29.91M shares = 7.20%). Market cap is about A$559M at A$1.345.

  • EV net of cash and listed stakes is about A$468M. Net of the inventory at spot as well, it is only about A$300M.
  • FY27 multiples: about 8x EV/EBITDA, and P/E is not meaningful (60x or more on a single-digit NPAT).
  • On steady-state FY30+ Honeymoon earnings: about 9-10x P/E, and about 4x EV/FCF after stripping out the inventory.

Base DCF (10% discount rate, A$, spot price around US$90 held flat, AUD/USD 0.70):

  • FCF of A$5M / 25M / 55M / 75M / 80M for FY27-31.
  • Terminal value at FY31 of about A$260M. That covers the Honeymoon tail to FY35 net of rehabilitation (about A$165M) plus about A$95M for a risked satellite-hub extension.
  • Present value of operations: about A$330M.

| Component | Value (A$M) |

|---|---|

| Present value of operations | about 330 |

| Net liquid assets at market (cash 50 + investments 41 + inventory at spot about 200 − payables 35) | about 260 |

| 30% of Alta Mesa (permit-delayed, production down to 45 klbs/qtr at 100%; Boss paid US$60M in 2024) | about 40 |

| Equity value | about 630, or about A$1.50/share |

Uranium price sensitivity:

  • Each US$10/lb adds roughly A$0.25-0.30/share across the remaining NFS pounds plus the inventory.
  • At US$110 flat: about A$2.10.
  • At US$70: about A$0.95, which is roughly liquidation value plus a thin operating stub.

Fair value range: A$1.00 / 1.55 / 2.50. Base IRR from today's price is about 11%.

Risks and competition

  • Credibility and technical risk. The last feasibility study failed within a year of production. The NFS rests on a reactive-transport model calibrated to historical data, with wide spacing (49 m) that is mostly untested at scale. EKT1, at 60 m spacing, has about 180 days of residence time to prove. The plan relies on inferred resources after 2030, and the measured resource category was removed.
  • Water treatment plant bottleneck. Stage 1 is due Q1 FY27 and Stage 2 (to about 300 m³/h) Q3 FY28 on an unoptimised 18-month schedule. Delays push the ramp back directly.
  • Cost risk. Free cash flow is thin through FY29. Fixed-cost dilution and lower legacy grades lift FY27 AISC to A$83-92/lb, and an A$10/lb miss is meaningful against an A$30-50/lb margin.
  • Uranium price and term-market risk. Spot is about US$90 and term US$96.50 (a record), but contracting volumes are thin. A drop in spot hits both cash flow and the inventory. AUD strength is a further headwind.
  • Alta Mesa. It is a cash drag with Texas permitting delays. Wellfield 3 Extension is expected in Q4 2026 and Wellfield 8 permits by the end of Q1 2027.
  • Satellites. These are development and permitting risk, with no costed study yet.
  • Competition. Boss sells U3O8 into a global market priced off Kazatomprom, Cameco and Orano. In Australia, Paladin (Langer Heinrich) and Heathgate (Beverley) are the closest peers. ISR's low capital intensity is a structural advantage, but Honeymoon is small and low-grade.
  • Positives. Boss has no debt, organically funded capex, a tier-1 jurisdiction and an existing export licence. A strategic buyer could value the licensed plant and the 66 Mlb district above the market price.

How investors feel (sentiment 3/10)

The stock is widely distrusted.

  • It is down about 75% from its 2024 peak, fell another 16% on the NFS, and has dropped about 25% from the post-Market Day high of about A$1.72, even with uranium near cycle highs.
  • Retail investors were burned twice, by the July 2025 study withdrawal and the August 2026 downsized plan, and treat management guidance sceptically.

Sell-side and institutional signals are softer than retail sentiment:

  • Macquarie has an A$2.00 target and calls the stock "attractive and not yet priced in".
  • JPMorgan has been accumulating (5.56% to 7.20% in three weeks).

The near-term catalyst is the September-quarter report on 28 October 2026: first wide-spaced wellfield data, Stage 1 water treatment plant timing, and realised price.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue151+100%151+100%75.60.000.00
Gross profit16.916.9-18.3-0.39-0.08
Operating expenses5.35-38%5.35-38%8.65-25%11.6+77%6.53
▸Adj EBITDA41.041.0-8.39-11.6-6.53
▸Adj OCF73.6+336%73.6+336%16.9-4.04-3.54
CapEx-56.0-56.0-37.5-49.8-40.0
Adj FCF17.617.6-20.6-53.8-43.5
Interest expense0.290.290.260.170.13
▸Adj net income14.314.3-24.4-8.76-2.16

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA8.32100%41.0100%-11.2-15.9-5.62
FCF (OCF−capex)-99.917.643%-20.1-53.8-43.5
Net income25.5307%2.546%-34.244.612.5
▸Capital returned0.9411%0.291%0.340.170.13
Buybacks0.000.000.000.000.00
Dividends0.000.000.000.000.00
Interest paid0.850.290.260.170.13
Debt paid down0.080.000.080.000.00
▸Reinvestment18356.0137%37.449.840.0
Capex (PP&E)18356.037.549.840.0
Intangibles & M&A0.000.000.000.000.00
Leases signed (net Δ)-0.08---0.08----
Retained / other-100.017.643%-20.2-53.8-43.5

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 0.5 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)549549528572268
▸Liabilities (total)71.271.244.561.617.0
Net debt (incl. leases)-49.3-49.3-47.1-66.6-89.0
Net debt / Adj EBITDA-1.20-1.20------
Net debt / Adj FCF-2.81-2.81------
Adj EBITDA / interest139139-32.4-67.0-51.8
Shares outstanding415416412410355
Dilution (YoY)+0.9%+0.9%+0.4%+15.7%+10.0%
Employees139--------
MarginsTTM2026202520242023
Gross margin11.2%+35.411.2%+35.4-24.3%----
Adj EBITDA margin27.2%+38.327.2%+38.3-11.1%----
Adj OCF margin48.7%+26.448.7%+26.422.3%----
Adj FCF margin11.6%+39.011.6%+39.0-27.3%----
Net income margin1.7%+46.91.7%+46.9-45.2%----
Adj NI margin9.5%+41.79.5%+41.7-32.3%----
ROIC (adj, after-tax)2.4%2.4%-4.4%-2.2%-2.6%
Cost of debt----------

Earnings Calls

5 calls

Earnings Call · 2027 Q1

2026-10-27

Boss Energy's September quarter 2026 call, led by CEO Matt Dusci with CFO Justin Laird, described a pivotal quarter. The company delivered the New Feasibility Study (NFS) ahead of schedule, confirming the wide space wellfield design at Honeymoon. The NFS forecasts about 13.8 million pounds over 9 years, supporting economic production to at least FY34, and updated the mineral resource. At September's Market Day, Boss set an aspiration to combine Honeymoon, Jason's Deposit and Gould's Dam through one processing plant, targeting 2.5 million pounds a year at an all-in sustaining cost (AISC) of about A$65/lb by the early 2030s, with operating life extending into the 2040s. The three deposits hold 65.9 million pounds of combined resources, including 45.1 million at Jason's and Gould's Dam. Honeymoon produced 359,000 lbs of drummed uranium despite 19 days lost to heavy August rain, with record flow offsetting declining tenor. December quarter production is expected to be broadly consistent, and FY27 guidance is unchanged at 1.25-1.3 million lbs, C1 cost of $51-56/lb and AISC of $83-92/lb. C1 cost was $47/lb and AISC $79/lb, both below the guidance range, though costs are expected to rise as tenor declines. Capex was $13 million against full-year guidance of $58-65 million. Wellfield B6, the first at East Kalkaroo, recovered about half its resource after 12 pore volumes at 102 ppm average tenor. EKT1, the first wide space wellfield (58m spacing versus the NFS's 49m), is in flushing with encouraging early signs, and first leaching results are due in the December quarter. HMT1 will test 70m spacing. Both water treatment plant upgrades are on track, for completion in the June quarter of FY27 and the March quarter of FY28. Boss sold 301,000 lbs at an average A$117/lb (US$81.8), with the December quarter expected at about US$87-89. It ended with $39.2 million cash, $31.4 million of investments and uranium inventory carried at $124 million, totaling $194.9 million with no debt. Inventory rose 60,000 lbs to 1.641 million lbs, and management said holding these pounds could achieve realized prices in the low 90s. Management aims to keep cash at $40-60 million. On approvals, the Honeymoon extension EPBC referral decision is expected in the December quarter. At Jason's, drilling has begun, with a 137-hole delineation program starting in the December quarter. At Alta Mesa (30% owned, operated by enCore), production fell to 10,000 lbs, Boss received none, and the plant has stopped pending permits for new wellfields (PAA3 expected in December quarter, PAA8 in March quarter). Peter Botten became Chair on September 30. Analysts focused on production conservatism, the contract book, Alta Mesa's costs and possible funding calls, EKT1 evidence, recoveries, rain resilience and the 2.5 million lb target.

Analyst Q&A (20)
▸
Q1 Honeymoon production was well above the implied full-year guidance run rate and December is guided flat, implying a second-half step down. How much is conservatism versus grade uncertainty?
Hugo Nicolaci · Goldman Sachs
Guidance of 1.25-1.3 million lbs stands, but management always tries to do better. Grade will decline slightly as the company transitions to wide space wellfields, so getting the transition right matters. Optimization programs could help the back end of FY27.
▸
Is 100% of the legacy contract for FY27 delivered in the second half, so December quarter realization is essentially all spot?
Hugo Nicolaci · Goldman Sachs
Laird confirmed the legacy contract deliveries in the second half represent 100% of calendar 2027 legacy deliveries.
▸
For calendar 2026, have contract deliveries been met by September, so December is all spot?
Hugo Nicolaci · Goldman Sachs
Laird said the calendar 2026 contract book is mostly full, with forward sales already executed for Q4 calendar 2026.
▸
What is the timeline for Alta Mesa after production halted, and does restarting add costs?
Hugo Nicolaci · Goldman Sachs
Final permitting for PAA3 and PAA8 is expected in the December and March quarters respectively, after which production will ramp up. Costs would likely be affected during the non-producing and ramp-up phase.
▸
What has been observed at EKT1 flushing that supports confidence in the NFS design?
Alistair Rankin · RBC
Management sees contact between injector and extractor wells (hydraulic connectivity), pH falling to about 2 and sulfates rising, all over the expected timeframes and pore volumes. More data, including initial leaching, comes next quarter.
▸
How does B6's recovery of about half the resource after 12 pore volumes and low acid consumption compare with the model, and what does it say about East Kalkaroo versus the Honeymoon domain?
Alistair Rankin · RBC
B6 is similar to or slightly better than the model. Uncertainty remains, but management expects East Kalkaroo to perform as well as or better than the Honeymoon domain, which is the highest grade but the most complex to leach.
▸
How do you expect Honeymoon recoveries to trend as lower-grade material comes through the plant?
Branko Skocic · JPMorgan
Recoveries are roughly in line with expectations. Leach circuit trials and added columns caused some front-end variability, but front-end recovery is recirculated. The key loss point, the pre-strip circuit, is holding well.
▸
What is the go-forward strategy for Alta Mesa and would you consider a strategic review?
Branko Skocic · JPMorgan
The focus has been on Honeymoon, but with the feasibility done management will consider Alta Mesa. The company will stay disciplined on capital, and if expected returns are lacking it must make decisions.
▸
What are the quarterly cash contributions to the Alta Mesa JV?
Branko Skocic · JPMorgan
Laird said little cash was contributed. A payable to the JV recorded in the June accounts grew slightly but remains largely consistent.
▸
Cash is under the $50 million minimum target amid wide space capital commitments. How do you buffer liquidity?
Daniel Roden · Jefferies
Capital priorities are unchanged from Market Day. Boss balances sales with cash needs, and holding 60,000 lbs could yield low-90s realized prices versus about $82 had they been sold. Sales will be matched to lumpy capital needs, with the aim of keeping $40-60 million of cash.
▸
What explains the step up in cash operating costs from about $15 million to $22 million?
Daniel Roden · Jefferies
The roughly $5.4 million variance to C1 cash cost comprised $2.2 million of royalties, $1.2 million of consumables (mainly resin), and working capital items of about $1 million in trade payables, $0.7 million in prepayments and $0.2 million in selling costs.
▸
Can Honeymoon build more resilience to recurring rain impacts, e.g. roads or reagent inventory?
Mark Wiseman · Macquarie
August had two events totaling 100 ml. Programs target site access including reagent delivery, on-site reagent storage and wellfield access so wells need not be turned off when wet. Long-life planning enables these programs.
▸
Would those resilience measures materially affect reagent inventories or sustaining capex?
Mark Wiseman · Macquarie
No, they are smaller-ticket items.
▸
Will Boss have to inject more funds into the Alta Mesa JV given no production?
Mark Wiseman · Macquarie
A fair assumption, but too early to comment.
▸
What does the Alta Mesa balance sheet look like, including cash?
Glyn Lawcock · Barrenjoey
Dusci could not comment given the JV structure. Boss will disclose if it has to contribute cash, and enCore is working with regulators to bring new wellfields online.
▸
If Alta Mesa needs funding, must it be cash from the two owners or are there other options?
Glyn Lawcock · Barrenjoey
Too early to comment.
▸
Honeymoon is permitted to 3.3 million lbs; how confident are you in the 2.5 million lb target and could it go higher?
Glyn Lawcock · Barrenjoey
2.5 million lbs is what the back end of the plant can handle with light capital (precip circuit and runtime improvements). Going beyond would need more back-end capital and returns analysis. The export permit is 3.3 million. 2.5 million is a simple first stage requiring the pipeline from Jason's and trucking from Gould's Dam.
▸
What additional work is needed at Jason's to build confidence in committing to the satellite deposit?
Alistair Rankin · RBC
Delineation drilling starts next swing and will take 2-3 months, feeding a new resource model, reactive transport and wellfield simulations, permeability modeling and further leaching characterization, leading to a feasibility study and FID.
▸
B6 used old 30x30 spacing and recovered strongly. Does that suggest the move to wide spacing was premature?
Matt Hope · Ord Minnett
No. It shows good leaching characteristics at East Kalkaroo, which would also apply to wide spacing.
▸
Would tight spacing have achieved the NFS recoveries anyway?
Matt Hope · Ord Minnett
Possibly, but wide spacing is better optimized for hydraulics, permeability and leaching, and remains the route to drive down cost structure.

Institutional Ownership

Change in total shares held by all 13F filers, each quarter, as % of shares outstanding at that quarter. Pale bars = what individual filers bought / sold. Hover a quarter for its biggest buyers and sellers.
0%0%+0%$1.77$2.27$2.77Q4 2021Q3 2022Q2 2023Q1 2024Q4 2024Q3 2025Q2 2026Q3 2026
Q2 20262026-06-30(hover the chart for other quarters)
0.00% of shares out (net)
Bought 0.00% by 0 filers · Sold 0.00% by 0
Net 0 shares on 415M out (current)
0 filers reported
Top buyersΔΔ %holds
none
Top sellersΔΔ %holds
none

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

Not enough holder history to plot.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q448M-8M-9M$-0.02$-0.02 – $-0.021
2025 Q26M-10M-28M$-0.07$-0.07 – $-0.071
2025 Q4103M44M20M$0.05$0.05 – $0.051
2026 Q272M19M6M$0.01$0.01 – $0.011
2026 Q487M34M18M$0.04$0.04 – $0.041
2027 Q291M28M13M$0.03$0.03 – $0.031
2027 Q4107M33M18M$0.04$0.04 – $0.041
2028 Q2111M33M18M$0.04$0.04 – $0.041
2028 Q4121M53M35M$0.08$0.08 – $0.081
2029 Q2135M51M33M$0.08$0.08 – $0.081
2029 Q4151M72M50M$0.12$0.12 – $0.121
2030 Q2169M61M41M$0.10$0.10 – $0.101
v2 analysis (legacy) — for comparison onlyclick to expand

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Honeymoon Project Feasibility Study Overhaul (December 2025): Boss Energy withdrew its 2021 Enhanced Feasibility Study (EFS) for the Honeymoon Project. A detailed review revealed weaker high-grade mineralization continuity, lower leachability, and smaller wellfields than previously modeled. In response, the company pivoted to a "wide-spaced wellfield design" and initiated a New Feasibility Study and updated JORC resource estimate, which is targeted for completion in the September quarter of 2026.
  • Weather-Driven Production Guidance Downgrade (April 2026): Boss Energy revised its full-year FY26 production guidance downward to 1.40M–1.45M lbs of U3O8 drummed (from an initial 1.6M lbs). This adjustment was triggered by heavy March rainfall in South Australia, which degraded access roads, restricted site access, and delayed essential reagent deliveries and wellfield development.
  • Strong Balance Sheet Retention (April 2026): Despite operational setbacks, Boss Energy remained completely debt-free as of March 31, 2026. The company held A$211 million in cash and liquid assets (including cash on hand, liquid investments, receivables, and physical drummed uranium inventory). Unrestricted cash on hand stood at A$38 million.
  • High-Grade Drill Results at Alta Mesa East (June 2026): Joint venture operator enCore Energy reported positive results from its ongoing exploration drilling at the Alta Mesa East project (30% owned by Boss). Drilling confirmed that high-grade uranium mineralization extends more than 3,700 feet east of the current wellfields, providing a strong potential feed source to supply the Central Processing Plant (CPP).
▸ Thesis-test Findings
Boss Energy Honeymoon project AISC and C1 cost performance 2026
  • The Bull Case: For the cumulative nine months ending March 31, 2026, Honeymoon displayed strong underlying cost structures, generating a cumulative C1 cash cost of A$37/lb (US$25/lb) and an All-In Sustaining Cost (AISC) of A$58/lb (US$39/lb). Despite Q3 setbacks, Boss reconfirmed its full-year FY26 cost guidance of A$36–$40/lb (US$24–$26/lb) for C1 cash costs and A$60–$64/lb (US$40–$42/lb) for AISC, though expected to finish at the upper end of those ranges due to transport-related fuel cost increases.
  • The Bear Case: Short-term operational numbers suffered severely in Q3 FY26 (ended March 31, 2026). Drummed production fell 56% quarter-over-quarter to 203,000 lbs due to weather disruptions and declining solution tenor (falling to 53 mg/L from 77 mg/L in the previous quarter). This drop in volume triggered a sharp, temporary spike in quarterly unit cash costs to C1 A$60/lb (US$41/lb) due to fixed-cost fractionalization over lower output.
Uranium spot price forecasts and term contracting volumes 2026 2027
  • The Bull Case: Long-term market fundamentals remain exceptionally tight. Long-term uranium contract prices reached an 18-year high of US$90.00 to US$93.00 per pound in early 2026, widening the premium over spot prices and proving that western utilities are aggressively contracting to secure long-term future supply. This trend is driven by reactor life extensions, small modular reactor (SMR) interest, and surging energy demand from AI data centers. S&P Global reports that global uranium capex is accelerating, heading toward a peak of US$1.6 billion in 2027 to incentivize future mining capacity.
  • The Bear Case: Spot price volatility has increased. While spot U3O8 surged briefly to a peak of US$101.41/lb in late January 2026, it subsequently cooled and stabilized in the US$85.00–$87.00/lb range by mid-2026. Analysts note that some speculative retail capital has exited the market, and some utilities are prioritizing allocations from established long-term contracts over spot-market buying.
enCore Energy Alta Mesa JV production ramp-up updates
  • The Bull Case: The JV is executing on medium-term expansion. enCore Energy successfully doubled Alta Mesa's CPP processing capacity by starting up its second ion exchange (IX) circuit, boosting total flow capacity from 2,500 to 5,000 gallons per minute. Wellfield 7 and the Wellfield 3 extension are currently being actively developed to match this capacity. Additionally, the June 2026 discovery of high-grade roll-front mineralization at Alta Mesa East supports the JV's efforts to expand resource life.
  • The Bear Case: Regulatory and administrative bottlenecks have slowed the near-term ramp-up. During the March 2026 quarter, Alta Mesa’s drummed production was restricted to just 97,000 lbs (100% basis), resulting in Boss receiving only 35,000 lbs of attributable U3O8 (down from 68,000 lbs in the prior quarter). This drop was driven by administrative delays in receiving final wellfield permits in Texas, which pushed back the timeline for bringing newly completed extraction modules online.