BOL.ST
Boliden ABv3 4.5/10 · 2026-10-29Boliden AB (publ) engages in the extracting, producing, and recycling of base metals in Sweden, Finland, other Nordic region, Germany, the United Kingdom, Europe, North America, and internationally. The company operates through Business Area Mines and Business Area Smelters segments. It explores copper, zinc, nickel, lead, gold, silver, cobalt, sulphuric acid, tellurium, platinum, palladium, rhodium, iridium, ruthenium, and osmium deposits. The company operates the Aitik, the Boliden Area, and Garpenberg mines in Sweden; the Tara mine in Ireland; the Kevitsa mines in Finland; the Somincor mine in Portugal; Kokkola smelters in Finland; Odda zinc smelters in Norway; the Rönnskär smelter in Sweden; Harjavalta copper smelters in Finland; and the Bergsöe lead smelter in Sweden. It sells its metals primarily to industrial customers. The company was founded in 1924 and is headquartered in Stockholm, Sweden.
2-Year Price History
Valuation v3 Opus worker · 2026-10-29
Boliden is a well-run Nordic copper/zinc miner and smelter that just printed its best quarter ever (Q3 2026 EBIT ex-PIR SEK 4.9bn, LTM SEK 16.3bn vs 10.7bn in FY2025). Copper is about $14,100/t, zinc about $3,800/t and sulphuric acid prices are high. Odda and the Rönnskär tankhouse add roughly SEK 4bn of EBITDA once they are fully ramped. Garpenberg is recovering from the March seismic event (1.5 Mt in 2026, 2.3 Mt in 2027, against 3.7 Mt before). The pending all-share purchase of 64.7% of Nexa Resources is cheap (about 3.5x LTM EBITDA, more than 8% EPS-accretive), but it takes Boliden out of its 'pure-European' premium niche and into Peru/Brazil. It also lifts pro-forma net debt to about SEK 40bn. At SEK 508.80 (close 29 Oct 2026, +2% on the report) the stock looks optically cheap, at about 5x pro-forma 2027 EBITDA and 8-9x 2027 EPS. That cheapness rests on near-record metal prices. My DCF on pro-forma unlevered free cash flow, with prices fading only about 10% from spot and a 11x year-5 multiple for a flattish, cyclical miner, gives about SEK 430 per share. Holding spot prices flat gives about SEK 560, which is roughly where the 15-analyst Hold consensus (average target about SEK 566) sits. The base-case IRR is only about 7%. This is a good company at a fair-to-full price at the top of the commodity cycle, not a 50% one-year setup, not a valuation-floor covered-call candidate, and not a fear-driven bargain. Rating 4.5/10. Research rating 4/10: the 8 December 2027 guidance and the Lappberget decision could move the numbers, but neither is likely to make the stock 40% undervalued unless copper keeps rising.
A deep dive would have to establish: Whether the December 2026 guidance (2027 capex, Aitik grades, a Lappberget restart that would get Garpenberg back toward 3.7 Mt) plus fully ramped Odda/Rönnskär and Nexa can sustain about SEK 16bn+ of pro-forma unlevered FCF even if copper and zinc fall 15-20% from today's record levels.
Research (expand)
What the company does
Boliden (founded 1924, Stockholm) mines and smelts base and precious metals, almost entirely in the Nordics, Ireland and Portugal. Mines: Aitik (one of Europe's largest open-pit copper mines, about 42 Mt milled per year at 0.16-0.18% Cu plus gold), the Boliden Area (gold/zinc), Garpenberg (zinc/silver; until March 2026 the group's cash engine), Kevitsa (copper/nickel, Finland), Tara (zinc, Ireland), and Somincor (Neves-Corvo, Portugal) plus Zinkgruvan (Sweden), both bought from Lundin Mining in April 2025. Smelters: Rönnskär and Harjavalta (copper/nickel/precious metals), Kokkola and Odda (zinc), and Bergsöe (lead recycling). It is a price taker. Profit is driven by copper, zinc, gold, silver, nickel, treatment charges, sulphuric acid and USD/SEK.
What happened in Q3 2026 (primary source: interim report, 29 Oct 2026)
- Revenue SEK 30.4bn (22.0bn). EBIT ex process-inventory revaluation SEK 4,894m (2,752m), a record. Mines 3,938m, Smelters 1,482m. Net profit 3,888m, EPS 13.69. Nine-month EPS 34.94, LTM EPS 50.25.
- Free cash flow SEK 1,121m after a SEK 1.0bn working-capital build (higher metal prices) and a SEK 219m earn-out paid to Lundin. Capex SEK 3.4bn. Net debt SEK 18.3bn (21% of equity). Net reclamation liability SEK 6.2bn sits outside net debt.
- Average prices in Q3: Cu $14,104/t (+44% YoY), Zn $3,825/t (+35%), Au $4,255/oz, Ag $62.6/oz (down from a $121 peak in January), USD/SEK 9.65. The Boliden metal-price index is about 194 vs 140 a year ago.
- 2026 capex guidance unchanged at SEK 15.5bn. Mine-sustaining capex raised to SEK 7.0bn (from 6.5bn). Aitik grade cut to 0.16% (from 0.18%) on waste-rock dilution, but throughput raised to 42 Mt.
- Odda roaster availability averaged 50% (17% in Q2) and reached 70% in September. Management calls 70% 'the new floor', with about 90% targeted 'pretty soon' and silver-rich feed in H1 2027. The Rönnskär tankhouse started its first section on 29 October and should be at full pace in Q1 2027. On the call management sized the combined uplift at about EUR 250m (Odda) plus SEK 1.5bn (Rönnskär), so roughly SEK 4bn+ of EBITDA at March prices. Almost none of it is in the numbers yet.
- Q4 headwinds: a SEK 2bn+ working-capital fill at the Rönnskär tankhouse, about SEK 150m per quarter of extra D&A each from Odda and Rönnskär, higher smelter maintenance (SEK 500m for the full year), and oil-driven cost inflation (about SEK 400m per quarter spent on diesel, plus a similar amount on chemicals and transport).
- There was a fatality at the Boliden Area tailings facility in October.
The Nexa deal
On 27 August 2026 Boliden agreed to buy Votorantim's 64.68% of Nexa Resources (zinc/silver/copper; five mines and three smelters in Peru and Brazil). It pays 0.250 new Boliden shares per Nexa share, which is 21.4m new shares, 7% dilution, taking the share count from 284.2m to 305.6m. That valued Nexa at an equity value of about $2.0bn and an EV of $3.67bn (net debt $1.34bn): about 3.5x LTM EBITDA, about 4.5x EV/EBIT and about 5.5x P/E. A voluntary cash tender for the remaining 35% follows closing at the same implied value. Peruvian mandatory tender offers for listed subsidiaries also follow. A $2.0bn bridge loan is committed. Boliden guides to more than 8% EPS accretion. The EGM is on 23 November (simple majority). About 15 regulatory approvals are needed (Swedish FDI received 27 October). Closing is targeted for Q1 2027. Nexa's Q2 2026 adjusted EBITDA was $286m, which annualises to about $1.1-1.2bn (SEK 11bn) at current zinc. Its 2026 capex is about $381m. One agency cut Nexa to junk this week, and further downgrades could trigger bond puts that the bridge would refinance.
Analyst reaction was split. Handelsbanken cut to Hold (target 614) and dropped Boliden from its sector favourites, citing a changed risk profile. Ålandsbanken called it a '180-degree turn' that could compress the multiple. Arctic and SB1 questioned asset quality, short mine lives and ESG fit, though SB1 kept Buy with a 700 target and thinks the market is 'too negative'. DNB Carnegie was cautiously positive. My take: it is cheap at the cycle peak because it is short-lived, carries Peru political and tax risk, and comes without synergies. It adds earnings per share now but probably lowers the quality and multiple of the whole.
What it earns today (real free cash flow)
Stock-based compensation is negligible; there is a cash profit-sharing scheme already in costs. LTM operating cash flow before working capital is SEK 21.1bn after tax and interest, or about 22.7bn before interest. Maintenance is the real question for a miner. Mine-sustaining capex (stripping, dam raises, processing) is SEK 7bn. Add about SEK 2-2.5bn for smelter sustaining and about SEK 1-1.5bn of 'other mines' spend that is really sustaining (tailings, reserve replacement), and true maintenance is about SEK 10-11bn per year. That leaves about SEK 12-13bn of owner free cash flow before interest at LTM prices, with Garpenberg depressed and Odda/Rönnskär contributing nothing. At the Q3 run-rate it is about SEK 14bn. Reported FCF is far lower (LTM SEK 3.4bn; FY2025 was -9.3bn including the SEK 14.4bn Lundin purchase) because of the Odda/Rönnskär/Garpenberg-hoist growth capex and working capital. On the standalone EV of about SEK 163bn (144.6bn market cap + 18.3bn net debt), today's owner FCF is an 8% yield at near-record prices.
Five-year projection (pro forma for Nexa, unlevered, after ALL capex, SEK m)
Assumptions:
- Nexa closes at end-Q1 2027 (nine months in 2027).
- Metal prices fade 5% from spot in 2027 and settle about 10% below spot from 2028.
- Odda and Rönnskär fully ramped by 2028. Garpenberg climbs from 2.3 Mt toward about 3 Mt.
- Combined D&A about SEK 14bn and a blended 24% tax rate.
- Capex about SEK 15bn for Boliden (7bn mine sustaining, about 2.5bn smelter sustaining, the Garpenberg hoist, SCMentum, Boliden Area sand recycling) plus about SEK 3.5bn for Nexa.
- Laver and Nautanen are excluded, both their capex and their value.
| Year | EBITDA | Tax | Capex | FCF |
|---|---|---|---|---|
| 2027 | 39.2bn | 6.2bn | 17.8bn (+0.5bn earn-out) | ~14.7bn |
| 2028 | 41.9bn | 6.6bn | 18.7bn | ~16.6bn |
| 2029 | 42.4bn | 6.7bn | 18.5bn | ~17.2bn |
| 2030 | 41.0bn | 6.4bn | 18.0bn | ~16.6bn (Nexa/Tara/Kevitsa depletion begins) |
| 2031 | 40.5bn | 6.3bn | 18.0bn | ~16.2bn |
If prices simply stay at spot, each year is about SEK 3-4bn higher (about 18-20bn). If prices return to 2025 averages (Cu about $9.5k, Zn about $2.8k, Ag about $35), combined FCF falls to about SEK 6-8bn.
What kind of company in 5 years? Neither a compounder nor a corpse. It will be a larger (about SEK 140bn revenue), roughly flat-volume, cyclical miner-smelter. It has long-life core assets: Aitik into the 2040s, Garpenberg with 25 years of reserves and a 4.5 Mt hoist targeted for 2032, and the Boliden Area at 10 years. Against that sit shorter-lived Nexa, Tara and Kevitsa assets that need reinvestment, and optional big copper growth (Laver, about 10% of European copper supply, FID 'in a few years'; Nautanen) that would need new equity-like capital. Category: durable but cyclical, about 0-3% volume growth, so 10-12x FCF. I use 11x. My confidence in the five-year cash flows is low because the price deck is the dominant variable. Confidence in the asset base itself is high.
Fair value and multiples
- DCF (10%, 5 years plus 11x year-5 FCF): PV of FCF about SEK 61bn plus PV of terminal value about SEK 111bn gives an EV of about SEK 172bn. Less pro-forma net debt of about SEK 40bn (18.3bn now, Q4 Rönnskär working-capital fill roughly offset by seasonal release, plus Nexa's SEK 12.9bn net debt, plus about SEK 8-10bn of cash tender offers) leaves about SEK 132bn of equity. That is about SEK 430 per share on 305.6m shares. Using 12x gives about SEK 465. Holding spot prices gives about SEK 560. A 2025-price bear case gives about SEK 250-280, which is where the shares traded through mid-2025. Reclamation liabilities (SEK 6.2bn at Boliden alone) are excluded and would reduce all of these slightly.
- IRR from SEK 508.80 in the base case is about 7% per year. You need spot-or-higher metal prices to earn 10%.
- Multiples (pro forma): about 11.5x 2026E EPS (about 44) and about 8.5-9x 2027E EPS (consensus about 55 standalone plus 8-14% accretion). EV/EBITDA is about 5.9x 2026E standalone and about 4.5-5x 2027E pro forma, but about 6.5-7x at mid-cycle prices. FCF yield after all capex is about 8% on 2027-28 at a fading price deck. Dividend SEK 11 (2.2%), likely rising to SEK 15+ (about 3%).
- Fair value about SEK 460 (90% range 320-640). That sits slightly above the fade-case DCF because consensus and the forward curve argue for copper staying elevated (structural concentrate deficit, spot copper TCs at -$297/t, AI/grid demand). It sits below the spot case because I won't capitalise record prices at a 10% rate.
Price chart
The close of SEK 508.80 is up 2% on the day of the report (the pack's 499 was the 28 October close). The 1-year range is 403-728: the stock is about 30% below the February 2026 peak (silver at $121, before Garpenberg) and about 28% of the way up its 1-year range, but up 70% from mid-2025. It is not at a bottom, and it is not a fear-driven trough on depressed earnings. It is a cyclical sitting on record earnings.
Management, capital allocation, governance
CEO Mikael Staffas (since 2019) and CFO Håkan Gabrielsson are credible, conservative communicators who guide for whole years and refuse to over-promise. Staffas admitted his 'self-confidence in promising things in Odda is a little bit low' after repeated slips. The owner base is Swedish institutions (Swedbank Robur, Alecta, Handelsbanken funds on the nomination committee). Gearing policy is about 20-30% net debt/equity. The dividend policy pays about a third of net profit, with no buybacks. Capital allocation is acquisitive: Lundin assets at about SEK 14.4bn and now Nexa. That is disciplined on price but is turning a unique European pure-play into a global commodity conglomerate. There are no governance red flags. Votorantim will become a 7% holder with a board seat, a potential future seller (overhang) once any lock-up expires.
Risks
1. Metal prices: copper at about $14k and zinc at about $3.8k are records or near-records. A 25-30% reversion would cut EBITDA by roughly SEK 10-12bn.
2. Garpenberg/Lappberget: the December update on whether the Lappberget orebody (70-75% of working areas) can be mined again. Garpenberg was guided at 3.7 Mt before March. Getting back there is upside; abandoning it permanently is downside.
3. Execution: the Odda ramp (lagging for nine months), the Rönnskär tankhouse start-up and its working-capital fill, Aitik grade dilution, and Tara ground conditions.
4. Nexa: Peru political, tax and social risk; short mine lives; junk rating and bond puts; tender-offer cost; a possible multiple de-rating; integration across continents.
5. Smelter terms: copper benchmark TCs at zero and possibly negative in 2027, with 80% of feed locked to benchmark. Sulphuric acid and free metals offset this for now.
6. Costs and taxes: diesel, energy, chemicals; the Finnish mining tax hitting Kevitsa (EUR 20-30m per year); Swedish permitting (Garpenberg waste rock, Laver and Nautanen judicial reviews).
7. Safety: an October fatality and a rising LTIF.
Competition
Boliden is a price taker against Glencore, Teck, Antofagasta, Lundin Mining, Korea Zinc and Nyrstar/Trafigura. Its edge is cost and ESG: Aitik's productivity on very low grade, its integrated mine-to-smelter European value chain, recycling/e-waste feed at Rönnskär, and 'green' low-carbon metal premia. That edge is durable but generates no pricing power.
Sentiment: 5/10
The sell-side is neutral. Fifteen analysts sit at a Hold consensus with an average target of about SEK 566 (about 11% upside). Handelsbanken downgraded to Hold (614) on the Nexa deal, while SB1 is at Buy (700). Q3 beat consensus EBIT (SEK 4,894m vs about 4,498m FactSet), and the stock rose 2%. Investors are torn between record earnings and copper-bull enthusiasm on one side and, on the other, the Nexa strategy shift, Garpenberg uncertainty and a sense of peak-cycle earnings. The stock is not hated, there are no forced sellers today, and it is not crowded. There is no covered-call 'valuation floor' setup here, because forward earnings are not predictable at a cyclical peak.
- Boliden Interim Report Q3 2026 (PDF): https://investors.boliden.com/sites/boliden-ir/files/pr/202610291842-1.pdf
- Boliden Q3 2026 press release: https://investors.boliden.com/en/press/boliden-q3-2026-solid-performance-across-mines-and-smelters-2493523
- Boliden Interim Report Q1 2026 (PDF): https://investors.boliden.com/sites/boliden-ir/files/pr/202604274497-1.pdf
- Boliden Q3 2026 earnings call transcript (context pack /Users/gregwo/stocks2/data/analysisv3/context/BOL.ST.md)
- Boliden to acquire controlling stake in Nexa Resources: https://investors.boliden.com/sv/node/6047
- Pulse2 on Nexa deal terms: https://pulse2.com/boliden-to-acquire-64-68-of-nexa-resources-in-1-31-billion-deal-valuing-company-at-3-67-billion/
- Aktiespararna, analysts split on Nexa deal: https://www.aktiespararna.se/nyheter/bolidens-nexa-affar-splittrar-analytikerna-shb-slopar-kop
- Aktiespararna, analysts warn on Nexa deal: https://www.aktiespararna.se/nyheter/analytiker-varnar-for-bolidens-nexa-affar-trots-lag-vardering
- Placera, FactSet Q3 consensus: https://www.placera.se/telegram/boliden-boliden-vantas-redovisa-4-498-miljoner-kronor-i-rorelseresultat-factset-20261027
- StockAnalysis quote, consensus and targets: https://stockanalysis.com/quote/sto/bol/
- MarketScreener financial estimates: https://www.marketscreener.com/quote/stock/BOLIDEN-58808448/finances/
- Quartr Boliden Q2 2026 summary: https://quartr.com/events/boliden-bol-q2-2026_33jpqRXs
- Nexa Q2 2026 summary (Quartr): https://quartr.com/events/nexa-resources-s-a-nexa-q2-2026_FL4lol9M
- Westmetall LME prices: https://www.westmetall.com/en/markdaten.php?action=showtable
Financials — Adjusted
Adjusted · TTM 2026-Q3 · SEK
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 112128+23% | 93508+5% | 89209+14% | 78554-9% | 86437 |
| Gross profit | 21762+67% | 15786+22% | 12904+20% | 10736-41% | 18147 |
| Operating expenses | 2740+59% | 3009+63% | 1844-34% | 2779+23% | 2252 |
| ▸Adj EBITDA | 28922+47% | 21557+21% | 17865+26% | 14204-36% | 22067 |
| ▸Adj OCF | 21082+33% | 16693+6% | 15736+37% | 11462-40% | 19147 |
| CapEx | -15624 | -15457 | -15003 | -15532 | -10027 |
| Adj FCF | 5458 | 1236+69% | 733 | -4070-145% | 9120 |
| Interest expense | 1701 | 1468 | 1357 | 894 | 327 |
| ▸Adj net income | 13637+73% | 8989-10% | 10023+65% | 6071-51% | 12426 |
| ▸Owner's earnings | 10500 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 100736100% | 21139100% | 22164100% | 20660100% | 14681100% | 22092100% |
| FCF (OCF−capex) | 1194712% | 10405% | 522924% | 265513% | -3348-23% | 637129% |
| Net income | 4783147% | 992247% | 940442% | 1002249% | 607341% | 1241056% |
| ▸Capital returned | 1844218% | 545926% | -9973-45% | 19479% | 978167% | 1122851% |
| Buybacks | -3584 | 0.00 | -3584 | 0.00 | 0.00 | 0.00 |
| Dividends | 33072 | 3123 | 0.00 | 2051 | 12309 | 15589 |
| Interest paid | 5392 | 1346 | 1468 | 1357 | 894 | 327 |
| Debt paid down | -16438 | 990 | -7857 | -1461 | -3422 | -4688 |
| ▸Reinvestment | 8166081% | 1121353% | 29604134% | 1529574% | 15487105% | 1006146% |
| Capex (PP&E) | 67038 | 11019 | 15457 | 15003 | 15532 | 10027 |
| Intangibles & M&A | 14658 | 267 | 14391 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | -36.0 | -73.0 | -244 | 292 | -45.0 | 34.0 |
| Retained / other | -15761-16% | -3340-16% | 227910% | 206510% | -12235-83% | -4530-21% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 155238 | 143396 | 116192 | 102405 | 96376 |
| ▸Liabilities (total) | 69638 | 66858 | 51181 | 45986 | 38051 |
| Net debt (incl. leases) | 17766 | 14764 | 9455 | 9604 | -967 |
| Net debt / Adj EBITDA | 0.61 | 0.68 | 0.53 | 0.68 | -0.04 |
| Net debt / Adj FCF | 3.25 | 11.9 | 12.9 | -- | -0.11 |
| Adj EBITDA / interest | 17.0 | 14.7 | 13.2 | 15.9 | 67.5 |
| Shares outstanding | 284 | 284 | 273 | 273 | 274 |
| Dilution (YoY) | -0.0% | +3.8% | +0.0% | -0.0% | +0.0% |
| Employees | 8154 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 19.4%+5.1 | 16.9%+2.4 | 14.5%+0.8 | 13.7%-7.3 | 21.0% |
| Adj EBITDA margin | 25.8%+4.2 | 23.1%+3.0 | 20.0%+2.0 | 18.1%-7.5 | 25.5% |
| Adj OCF margin | 18.8%+1.4 | 17.9%+0.2 | 17.6%+3.1 | 14.6%-7.6 | 22.1% |
| Adj FCF margin | 4.9%+4.4 | 1.3%+0.5 | 0.8%+6.0 | -5.2%-15.7 | 10.6% |
| Net income margin | 12.7%+3.9 | 10.1%-1.2 | 11.2%+3.5 | 7.7%-6.6 | 14.4% |
| Adj NI margin | 12.2%+3.5 | 9.6%-1.6 | 11.2%+3.5 | 7.7%-6.7 | 14.4% |
| ROIC (adj, after-tax) | 13.7% | 10.1% | 10.8% | 9.0% | 18.2% |
| Cost of debt | 7.3% | 6.4% | 7.9% | 6.3% | 3.5% |
Earnings Calls
Earnings Call · 2026 Q3
Boliden reported its Q3 2026 results, which management described as the best quarter in company history, with operating profit of about SEK 4.9 billion, positive free cash flow of SEK 1.1 billion, CapEx of SEK 3.4 billion in line with guidance, and gearing (debt-to-equity) of about 20-21%. CEO Mikael Staffas attributed the strong result to high metal prices and terms, the Boliden index being up about 75% since 2021, and solid production across the mining and smelting portfolio. CFO Håkan Gabrielsson walked through the financials: a SEK 219 million contingent consideration payout tied to Somincor and Zinkgruvan, a year-on-year EBIT bridge with roughly SEK 3.2 billion from prices (mainly copper, zinc and gold, plus about SEK 200 million from provisional pricing and sulfuric acid), costs up about SEK 600 million on oil-driven inflation and ramp-up costs in Odda and higher profit-sharing provisions, and about SEK 259 million from other items, largely sales of excess electricity from Odda. Net payment capacity was stated at SEK 19 billion. Operationally, mines delivered a strong quarter with Somincor, Kevitsa (a record volume) and Aitik performing well. Aitik's milled volume was 10.3 million tons, but the copper grade came in below guidance, so management is lowering the full-year Aitik grade guidance (to about 0.16 per the analyst question) while raising the throughput guidance. Garpenberg is ramping up according to plan despite the loss of the Lappberget area after the seismic event, and volumes improved sequentially by about SEK 300 million, lifting the mine from a slight loss in Q2 to around SEK 300 million EBIT. Smelters were led by Harjavalta, which had near-exceptional equipment availability and a quarterly record in nickel feed. Kokkola and Bergsöe also ran strongly. Rönnskär had a maintenance stop and a silver furnace outage that has since been fixed. At Odda, roaster availability rose to about 50% on average in the quarter, from 17% in Q2, and reached about 70% in September. Management views 70% as the new floor and about 90% as the target availability for the equipment, with the silver-rich concentrate ramp-up expected in the first half of 2027. Planned smelter maintenance guidance was raised from SEK 450 million to SEK 500 million due to additional work on the old Odda roaster and acid plant. Project updates: the Rönnskär tankhouse was energized in its first of three sections earlier on the day of the presentation and is already producing on that section, with the other two sections to be powered later in the quarter and full-pace production expected in Q1. Rönnskär will tie roughly SEK 2 billion or more of working capital in Q4 as the tankhouse fills with metals. The Boliden Area sand recycling project is on plan, the Rönnskär SCMentum project is early stage with ramp-up targeted for the first half of 2029, and the Garpenberg new shaft project has begun excavation, with Garpenberg targeting 1.5 million tons for 2026 and 2.3 million tons in 2027. Depreciation is rising, with Odda expected to add about SEK 150 million in Q4 and Rönnskär about SEK 150 million per quarter once operating in 2027. Safety and ESG: there was a lost-time injury rate that management described as not good, and a fatality occurred in early October just after the quarter, with the cause still being investigated. Sick leave fell to 4.0%, roughly pre-pandemic levels. Greenhouse gas emissions are tracking plan. Corporate: Boliden announced it will acquire Votorantim's stake in Nexa and subsequently make a broader offer for the minority shares. Management said about 15 regulatory approvals are needed (Swedish FDI approval already received, Brazilian natural resource permits, and anti-competition approvals from roughly 10 countries, not including China), that a simple majority is needed at the November 23 EGM, and that closing is expected in Q1 2027 though the company does not control the process. Management declined to update the previously cited roughly $3 billion estimate for the Peruvian minority buyout, citing legal advice. Nexa's recent credit downgrade to junk was described as having a limited impact on Boliden, with bondholders potentially requesting prepayment. Outlook: guidance is largely unchanged, apart from the Aitik grade and throughput revisions and the smelter maintenance increase. A Capital Markets Day is planned for March, with a guidance update in early December. On the Q&A, management indicated that sulfuric acid profits will continue to increase, with a positive number expected in Q4, and that Rönnskär and Odda EBITDA uplift is still largely ahead, with management citing a combined SEK 2-3 billion improvement once fully ramped. Around 80% of smelter volumes remain on benchmark terms even if treatment charges turn negative. Management also said Somincor has potential low-capital debottlenecking options and was included on the EU list of strategic projects. Power sales from Odda were just over SEK 150 million in Q3. Fuel and diesel costs were about SEK 400 million in the quarter, with energy costs of about SEK 700 million, and cost effects from diesel are expected to largely flow through within about a month. Laver and Nautanen investments will be considered as those projects mature, with the balance sheet prioritized in the meantime.
▸How should we think about 2027 Aitik, given the lowered grade guidance of 0.16, and is the expected second-half uplift being pushed out?Johannes Grunselius · SB1 Markets
▸Do you expect more incremental profit from sulfuric acid going forward, given current prices?Johannes Grunselius · SB1 Markets
▸What is the EBITDA contribution from Norzink and Rönnskär at current metal prices, and when will the Rönnskär tankhouse and Odda improve EBIT?Johan Sjöberg · Nordea Securities
▸What share of sulfuric acid volumes is exposed to the price increase, and how much is renegotiated next year?Johan Sjöberg · Nordea Securities
▸Is roaster availability of about 70% in September a fair run rate for Q4, and what must be resolved for full production at Odda?Kaleb Solomon · SEB
▸Is the Aitik volume improvement a lasting step-up that should carry into next year?Kaleb Solomon · SEB
▸Will the Odda ramp-up to 100% be linear or a hockey stick, and over what period?Alain Gabriel · Morgan Stanley
▸Are there updates on the MTO process for Peruvian listed subsidiaries, and does the roughly $3 billion minority buyout estimate still hold?Alain Gabriel · Morgan Stanley
▸Garpenberg is above the 30% utilization rate previously discussed; is this normal fluctuation or upside to the ramp-up timeline?Adrian Gilani · ABG Sundal Collier
▸Will Boliden keep its policy of locking in about 80% of smelter volume on benchmark terms if copper and zinc TCs go negative?Adrian Gilani · ABG Sundal Collier
▸How much excess power sales were there at Odda in Q3? Was any of the SEK 2 billion working capital build in Q3, and will Q4 seasonal working capital release still occur? What would negative 100 in TCs mean for 2026 EBIT?Liam Fitzpatrick · DB
▸How are the smelters under-earning relative to their capitalization and recent investments, and is there low-capital debottlenecking optionality at Somincor?Jason · [Inaudible]
▸What EBITDA uplift potential remains at Odda and Rönnskär?Jason · [Inaudible]
▸What are the implications of Nexa's credit rating downgrade to junk, and whether further downgrades could trigger bond prepayment?Amos Fletcher · Barclays
▸Has all the Odda concentrate inventory been built for the full ramp-up, or is more build due in Q4?Amos Fletcher · Barclays
▸What is the timeframe for getting Odda recoveries right and running more silver-rich concentrate?Amos Fletcher · Barclays
▸What is the quantum of D&A uplift from Rönnskär ramp-up in 2027?Amos Fletcher · Barclays
▸How much of the quarter-on-quarter volume improvement in mines came from Garpenberg?Daniel Major · UBS
▸What is the fuel sensitivity and cost delta if European diesel prices stay constant into Q4 and next year?Daniel Major · UBS
▸What was the provisional pricing impact in the quarter?Daniel Major · UBS
▸What development meter rates are needed to support 2.3 million tons at Garpenberg next year, given development meters fell quarter-on-quarter?Matt Greene · Goldman Sachs
▸What other major regulatory approvals are pending for the Nexa transaction, and is the November 23 vote a simple or super majority?Krishan Agarwal · Citigroup
▸Does the list of about 10 anti-competition countries include China?Krishan Agarwal · Citigroup
▸Is there upside to Q4 volume and grade guidance across mines, or is management being cautious?Christian Kopfer · Arctic Securities
▸What is driving the negative metal premiums and the large negative TC/RC number?Christian Kopfer · Arctic Securities
▸What supports the implied Tara acceleration to roughly 500 kilotons milled in Q4 under unchanged full-year guidance?Erik Rougier · Fearnley Securities
▸Following the Nexa acquisition, will balance sheet and deleveraging take priority over growth investments such as Laver?Erik Rougier · Fearnley Securities
▸How confident is Boliden that permits for additional waste rock storage at Garpenberg will be secured in time for the 2.3 million ton guidance, which assumes the new shaft is operational in H1 2027?Erik Rougier · Fearnley Securities
▸Is the SEK 300 million Garpenberg sequential improvement an EBIT figure, and what is the related depreciation?Boris Bourdet · Kepler Cheuvreux
▸Is annual depreciation of about SEK 650 million from last year divided by four a fair quarterly base?Boris Bourdet · Kepler Cheuvreux
Web Traffic
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2019 Q1 | 13.4B | 3.3B | 1.6B | $5.53 | $5.08 – $6.75 | 4 |
| 2019 Q2 | 13.1B | 2.9B | 1.3B | $4.63 | $4.26 – $5.66 | 6 |
| 2019 Q3 | 12.7B | 2.8B | 1.1B | $4.00 | $3.67 – $4.88 | 4 |
| 2019 Q4 | 13.1B | 3.1B | 1.4B | $4.88 | $4.48 – $5.96 | 6 |
| 2020 Q1 | 12.9B | 2.6B | 1.1B | $3.71 | $3.40 – $4.53 | 3 |
| 2020 Q2 | 12.7B | 2.8B | 1.0B | $3.63 | $3.34 – $4.44 | 5 |
| 2020 Q3 | 13.1B | 3.4B | 1.6B | $5.53 | $5.08 – $6.75 | 3 |
| 2020 Q4 | 14.4B | 4.0B | 1.9B | $6.53 | $6.00 – $7.98 | 5 |
| 2021 Q1 | 16.0B | 3.8B | 1.9B | $6.69 | $6.15 – $8.17 | 3 |
| 2021 Q2 | 17.2B | 4.4B | 2.3B | $8.14 | $7.48 – $9.94 | 5 |
| 2021 Q3 | 17.5B | 4.1B | 2.1B | $7.35 | $6.75 – $8.98 | 3 |
| 2021 Q4 | 18.2B | 4.4B | 2.2B | $7.89 | $7.25 – $9.64 | 5 |
| 2022 Q1 | 22.0B | 5.3B | 3.0B | $10.73 | $9.86 – $13.11 | 4 |
| 2022 Q2 | 22.6B | 6.0B | 3.4B | $12.11 | $11.13 – $14.80 | 6 |
| 2022 Q3 | 20.4B | 5.0B | 2.7B | $9.42 | $8.66 – $11.51 | 4 |
| 2022 Q4 | 21.3B | 5.2B | 2.7B | $9.38 | $8.61 – $11.46 | 6 |
| 2023 Q1 | 22.5B | 5.4B | 3.0B | $10.47 | $9.62 – $12.80 | 3 |
| 2023 Q2 | 19.4B | 4.0B | 1.7B | $6.06 | $5.56 – $7.40 | 5 |
| 2023 Q3 | 18.1B | 3.7B | 1.5B | $5.44 | $4.99 – $6.64 | 3 |
| 2023 Q4 | 19.0B | 3.6B | 1.4B | $4.84 | $3.52 – $5.59 | 8 |
| 2024 Q1 | 19.1B | 3.3B | 1.1B | $3.90 | $3.58 – $4.24 | 6 |
| 2024 Q2 | 22.5B | 5.9B | 3.1B | $11.09 | $8.34 – $16.63 | 3 |
| 2024 Q3 | 21.5B | 4.2B | 1.7B | $6.10 | $4.17 – $7.17 | 7 |
| 2024 Q4 | 23.6B | 5.8B | 2.8B | $9.89 | $9.23 – $10.31 | 3 |
| 2025 Q1 | 23.7B | 4.5B | 1.9B | $6.64 | $5.89 – $7.28 | 4 |
| 2025 Q2 | 21.7B | 3.7B | 829M | $2.92 | $2.56 – $3.28 | 2 |
| 2025 Q3 | 23.6B | 5.0B | 1.8B | $6.38 | $5.54 – $8.64 | 7 |
| 2025 Q4 | 26.5B | 6.5B | 3.0B | $10.59 | $8.77 – $12.47 | 5 |
| 2026 Q1 | 28.0B | 8.1B | 3.8B | $13.25 | $11.80 – $15.26 | 5 |
| 2026 Q2 | 29.1B | 5.5B | 2.2B | $7.76 | $5.51 – $9.05 | 7 |
| 2026 Q3 | 29.9B | 6.9B | 3.2B | $11.37 | $10.14 – $13.19 | 6 |
| 2026 Q4 | 31.2B | 7.4B | 3.6B | $12.55 | $7.95 – $14.53 | 5 |
| 2027 Q1 | 37.0B | 7.8B | 3.8B | $13.41 | $11.82 – $14.94 | 3 |
| 2027 Q2 | 42.3B | 8.5B | 4.2B | $14.67 | $13.08 – $18.66 | 1 |
| 2027 Q3 | 43.4B | 8.7B | 4.2B | $14.74 | $13.14 – $18.75 | 1 |
| 2027 Q4 | 44.6B | 9.3B | 4.5B | $15.94 | $14.20 – $20.27 | 1 |
| 2028 Q1 | 48.5B | 9.7B | 4.7B | $16.70 | $14.89 – $21.25 | 2 |
| 2028 Q2 | 48.7B | 9.8B | 4.6B | $16.30 | $14.53 – $20.74 | 2 |
| 2028 Q3 | 48.8B | 10.0B | 4.7B | $16.55 | $14.75 – $21.06 | 2 |
| 2028 Q4 | 48.8B | 10.1B | 4.6B | $16.10 | $14.35 – $20.48 | 2 |
v2 analysis (legacy, 2026-07-22) — for comparison onlyclick to expand
Thesis
Boliden is a well-run Nordic base-metals miner/smelter with genuine mine-life and byproduct optionality (gold/silver exposure inside a zinc/copper/nickel book) that has recently been buffeted by two operational shocks — the March 2026 Garpenberg seismic/rockfall event that knocked out its highest-margin ore body for much of 2026, and a bumpy Odda zinc-smelter expansion ramp (roaster automation/mechanical issues, not design flaws) that is running a couple of quarters behind schedule. Underneath the noise, underlying profitability is strong and improving: TTM adj EBITDA margin 26% vs 20% two years ago, driven by record gold/silver prices offsetting collapsed smelter TC/RCs. The Somincor/Zinkgruvan 2024/25 acquisitions have integrated ahead of plan and are performing well, Aitik just secured a long-dated environmental permit renewal (45Mt/yr) with a Nautanen satellite optionality, and the balance sheet remains conservatively levered (net debt/EBITDA 0.7x). The near-term story is a capex/ramp-and-recovery story: Odda (~EUR150m annual EBITDA target) reaching full production in Q3 2026, Rönnskär tank-house expansion ramping Q4 2026, and Garpenberg restarting per guidance (1.5Mt 2026 → 2.3Mt 2027) but with real uncertainty about long-run access to the Lappberget ore body beyond 2027 (update due December). Tara's slower-than-expected restart (guidance cut to 1.6Mt from 2.2Mt) is a fresh negative data point. Reported M&A dialogue with Nexa Resources adds a growth optionality overlay but is unconfirmed and could dilute capital discipline if pursued aggressively. Overall this is a quality, cash-generative cyclical business going through a rough operational patch with credible signs of recovery, not a structural impairment of the franchise.
Trade Signal
Even after the post-earnings drop to 476.8, Boliden trades ~24% above the analyst's blended fair value and ~19% above the probability-weighted base case, with unresolved Garpenberg/Lappberget risk not clarifying until December — a modest short/avoid-long stance rather than a bottom-fishing buy.
Stock ran from ~300 in mid-2025 to a 722 high in late Feb 2026 on the metals-price boom (gold/silver/copper strength boosting byproduct economics), then round-tripped down to ~477 through March-July 2026 as Garpenberg's seismic event (Mar 14-15), the Odda ramp delays, and now the Q2 print (Tara guidance cut, negative FCF, -6% on the print itself) hit sentiment. The latest leg (-16% 1m, -12% 3m) looks like a continuation of derating operational-risk news rather than a fresh overreaction — the market has been digesting real, repeated execution misses (Garpenberg, Odda, Tara) that genuinely impair 2026-27 earnings power. This is closer to a justified repricing than a dislocation, though the magnitude may have overshot near-term given underlying EBITDA margins are still expanding (26% TTM vs 20% two years ago) on precious-metals byproduct strength.
Consensus narrative is 'high-quality Nordic miner-smelter with metal-price tailwinds, but currently accident-prone' — three operational disappointments in a row (Garpenberg, Odda, Tara) have eroded confidence in execution even as headline profitability stays strong. Bulls point to gold/silver leverage and byproduct economics offsetting TC/RC collapse; bears flag that Lappberget access may be impaired for years, structurally lowering Garpenberg's contribution and that this pattern of misses suggests underappreciated geotechnical/project risk. Stock is a widely-covered, liquid large-cap Nordic industrial — not ignored, but currently out of favor after the pullback from highs; positioning likely long-biased institutional Nordic natural-resources money still holding through the correction rather than a crowded short.
No positive inflection is visible near-term; if anything the risk is the opposite — December will bring the Lappberget geotechnical update that could confirm structurally lower long-run Garpenberg throughput (already flagged by institutional research as understated in consensus). Odda and Rönnskär ramp-ups (Q3/Q4 2026) are potential positive catalysts but are 'catching up to already-known guidance' rather than surprising upside. The market is not underestimating near-term earnings weakness; if anything the bear case (structural Lappberget impairment) may not be fully priced given base case still assumes eventual recovery.
- ▲Q3 2026 · Odda full production ramp — Expected to hit full run-rate EBITDA (~EUR150m annualized) if issues resolved as guided
- ▲Q4 2026 · Rönnskär tank house ramp-up — On schedule per management; incremental capacity
- •December 2026 · Lappberget geotechnical study update — Key swing factor — could confirm structurally lower long-term Garpenberg output (bear case) or better-than-feared access (bull case)
- •Oct 2026 · Q3 2026 earnings — Watch working capital reversal, Tara recovery pace, byproduct metal price contribution
- ▼H2 2026 · Potential Nexa Resources M&A — Could add scale accretively but also execution/leverage risk; market wary given recent operational misses
No significant dilution (TTM flat), management pays dividends and maintains a strong balance sheet (24% gearing) even through negative quarterly FCF; no active large buyback flagged. Net flow roughly neutral — steady dividend payer, no major insider buying/selling signals disclosed, no lockup/overhang issues.
Balance sheet is solid (net debt ~SEK18-20bn vs EBITDA ~24bn, gearing 24%) providing some downside support, but there's no hard net-cash floor and no active buyback to defend the price. Analyst's own bear case (88,000M, -38% from current) sits well below today's price, meaning downside is not structurally capped near current levels. No obvious ceiling either — this is a liquid large-cap without controlling-holder overhang, so price is driven by fundamentals/multiple, not float mechanics.
Highly buyable — large, liquid Nordic large-cap (OMX-listed), $600m/day dollar volume, real institutional ownership base, dividend payer with strong balance sheet. Not a story stock; the debate is purely about near/medium-term earnings power and multiple, which is exactly the kind of name real long-only and L/S funds can act on in size either direction.
Fear leans slightly stronger here — the stock already fell hard post-earnings and the analyst's own fair value (~114-120bn, i.e., ~401-424/share) sits meaningfully below the current ~477 price even after the drop, with base case (149.5bn) above but weighted only 50% against a real 25% bear tail (88bn) tied to unresolved Lappberget risk that won't clarify until December. The pattern of three consecutive operational misses makes me want to fade strength rather than buy the dip.
Valuation
The market learns that underlying EBIT (ex inventory revaluation) rose sharply YoY on high metal prices, that FCF was negative this quarter mainly due to seasonal/planned inventory builds (with an explicit near-term reversal flagged plus a further planned SEK1.5-2bn Rönnskär-related build), that Odda's roaster issues are mechanical/automation (not design) and expected resolved with full production in Q3, and that Tara's throughput guidance for 2026 is cut to 1.6Mt from a prior 2.2Mt target due to slower-than-expected recovery. Nexa M&A dialogue is confirmed as real but framed as routine, not imminent.
▸ How the cases moved
Base case largely unchanged (168,000 EV multiple math holds) but owner-earnings trajectory pushed slightly later given the Odda delay and Tara cut; bear case probability nudged up modestly (0.20→0.25) on the Tara miss and repeated project hiccups; bull case equity value modestly trimmed (from an implicit prior ~225,000 to 215,000) reflecting Tara underperformance, though M&A optionality is a mild offset. Probabilities essentially hold given this is largely confirmation of known thematic risks rather than a major surprise.
Garpenberg's Lappberget recovery stalls well below 2027 guidance, metal prices (gold/silver/copper) mean-revert down 15-20% from current elevated levels, TC/RC pressure on smelters persists, Tara never gets back to full capacity, and Odda's ramp issues recur or the EBITDA uplift disappoints. Multiple compresses to reflect a cyclical trough.
▸ Valuation
6.0x mid-cycle EBITDA SEK18,000M = SEK108,000M EV − net debt SEK20,000M = SEK88,000M equity
Odda reaches full production in Q3 2026 as guided, Rönnskär ramps Q4, Garpenberg restarts along the 1.5Mt/2.3Mt path with partial long-term Lappberget access, Tara stabilizes below prior peak capacity, metal prices ease modestly from cycle highs but stay supportive of byproduct economics. Steady, modestly growing cash generation.
▸ Valuation
7.0x normalized EBITDA SEK24,000M = SEK168,000M EV − net debt SEK18,500M = SEK149,500M equity
Metal prices (especially gold/silver) stay elevated, Odda and Rönnskär both hit full run-rate EBITDA targets ahead of expectations, Garpenberg fully recovers access to Lappberget by 2027, Tara returns to 2.2Mt, and Nexa or similar M&A adds accretive scale without over-leveraging the balance sheet.
▸ Valuation
8.0x EBITDA SEK30,000M = SEK240,000M EV − net debt SEK25,000M (incl. M&A) = SEK215,000M equity
▸ Target Rationale
Slightly below the model figure to reflect execution risk: two consecutive operational surprises (Garpenberg seismic event, Odda roaster issues, now Tara guidance cut) suggest a pattern of project/geotechnical risk that the scenario math doesn't fully price, plus genuine uncertainty on long-run Lappberget access that won't be resolved until December. The core business quality and balance sheet strength argue against a larger discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Abnormal Seismic Activity at Garpenberg Mine (March 2026): On March 14–15, 2026, the Garpenberg mine (Boliden's highest-margin zinc and silver operation) experienced severe seismic activity that damaged upper areas of the dominant Lappberget ore body, which historically supplied 70–75% of mined ore. While key infrastructure like crushers and hoists remained intact, auxiliary media (ventilation, water, electrical) were heavily damaged. Mining in the most affected sections is suspended for the remainder of 2026, restricting Garpenberg's production to roughly 30% of its previously guided 3.7 Mtonnes/year capacity. This disruption triggered a SEK 700 million asset impairment and impacted Q1 2026 EBITDA by SEK 400 million.
- Q1 2026 Financial Results: On April 28, 2026, Boliden reported strong financial results that showed notable resilience despite the Garpenberg setback. Revenue rose to SEK 27,822 million (vs. SEK 21,121 million in Q1 2025), and operating profit reached SEK 5,247 million (up from SEK 3,062 million in Q1 2025). Free cash flow improved dramatically to SEK 1,673 million (compared to negative SEK 1,869 million in Q1 2025). Performance was bolstered by exceptionally high metal prices (specifically precious metals) and robust performance across open-pit mines.
- Aitik Environmental Permit Renewal (June 2026): On June 15, 2026, the Swedish Land and Environment Court granted the Aitik copper mine a renewed environmental permit. The permit approves continued production of up to 45 million tonnes of ore annually alongside updated water and dam-raising guidelines. Boliden is also seeking a strategic project designation from the European Commission for the nearby Nautanen copper deposit, which could act as a satellite underground mine feeding Aitik's existing infrastructure.
- Operational Recovery Debates: In June 2026, major institutional research highlighted significant ongoing risks. Analysts warned that consensus forecasts may be underestimating the recovery timeframe at Garpenberg, projecting that annual throughput will stay below 3 million tonnes for the rest of the decade (down from pre-event expectations of 3.7 million tonnes), posing a long-term earnings drag.
▸ Thesis-test Findings
- Boliden Odda Expansion Commissioning Updates 2026:
The hot commissioning of Boliden's major Odda zinc smelter expansion was delayed by two months in late 2025, pushing first feed to Q1 2026. In its Q1 2026 interim report, the company confirmed that it successfully achieved this milestone. The expansion is designed to increase annual zinc capacity by 150 ktonnes (to a total of 350 ktonnes) and add 45 ktonnes of a new lead-silver-gold leach product. Once fully optimized and producing at capacity, the project is guided to add approximately EUR 150 million in annual EBITDA.
- Somincor Neves-Corvo Production Grades 2026:
Boliden's 2026 guidance for the newly acquired Somincor (Neves-Corvo) mine in Portugal projects stable overall milling volumes of roughly 4.5 Mtonnes. Head grades are projected at 1.7% Cu for the copper ore (on 2.3 Mtonnes of throughput) and 6.7% Zn for the zinc ore (on 2.2 Mtonnes of throughput), with recoveries expected to remain flat year-over-year. Operations are undergoing significant development, including shift-schedule adjustments, expanded near-mine exploration drilling, and automation upgrades utilizing automated loader fleets to support production.
- European Zinc and Copper Smelter Treatment Charges 2026:
Smelters are experiencing severe structural margin compression as global treatment and refining charges (TC/RCs) have collapsed. In zinc, treatment charges have fallen to record, loss-making lows in 2026 due to extreme shortages in concentrate supply relative to global smelting capacity. In copper, spot treatment charges remained severely depressed or even negative throughout late 2025 and early 2026, forcing many smelters to restrict output. While some Japanese smelters expect to secure positive double-digit charges for 2026, they are substantially below historical averages. To offset these depressed fees, Western smelters are relying heavily on byproduct revenues (from high precious metal and sulphuric acid prices) to maintain operational viability.