BRVO.V
Bravo Mining Corp.v3 5.5/10 · 2026-11-26Bravo Mining Corp. operates as an intermediate-stage mineral exploration company, primarily concentrating on identifying and advancing mining properties throughout Brazil. The company holds a complete 100% interest in its flagship initiative, the Luanga project. This extensive 7,810-hectare mining exploration concession, situated in Brazil's Carajás Mineral Province, Pará State, is being explored for its potential in platinum group elements, gold, and nickel. Founded in 2022, the entity was previously known as BPG Metals Corp. before officially adopting the name Bravo Mining Corp. in May 2022. Its corporate headquarters are located in Vancouver, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
Bravo Mining is a one-asset, pre-revenue developer: the 100%-owned Luanga palladium-platinum-rhodium-gold-nickel open pit in Carajas, Brazil. The September 2026 PFS shows an after-tax NPV8 of US$1.45bn and a 35% IRR on US$785m of pre-production capex (up ~58% from the 2025 PEA because Bravo added its own smelter in the Barcarena export zone), a 9.6-year mine at ~394koz 4E PGM a year, and an AISC of US$706/oz. The stock has fallen from C$4.81 (Dec 2025) to C$1.83 (last close 2026-11-25, 2% above its 1-year low) even though it raised C$86m at C$4.40 in January with Orion. At ~C$251m market cap and an estimated ~C$115m of cash, the market pays roughly C$135m (US$100m) EV for a project worth perhaps US$800m after tax at today's spot deck (palladium ~$918 vs the PFS $1,245, platinum ~$1,378 vs $1,700; rhodium and gold above deck), i.e. ~0.12-0.2x NAV. That looks cheap, but it is cheap for the reasons developers are always cheap: US$785m of unfunded capex against a US$180m equity value means heavy dilution, the Installation Licence is not yet even filed (target end Q4 2026), an in-house PGM smelter is novel execution risk, Brazil, and palladium is at a ten-year low with the EV shift as a structural headwind. My DCF (production 2031, spot-ish prices, 10%) gives ~C$4.5/share before any discount for financing and permitting risk; risked at a normal PFS-stage P/NAV I get fair value ~C$2.7. Rating 5.5: it is optically very cheap with ~45% of the market cap in cash, but I cannot name what the market is getting wrong beyond PGM sentiment, and the next five years are cash out, dilution and permits, not owner cash. Trade setup 4.5: the variant view is that platinum and rhodium (not palladium) carry most of the basket and the cash floor bounds the downside; catalysts are the LI filing (Q4 2026), the resource update (Q1 2027) and the financing package with Orion, but the financing is as likely to hurt as help the shares.
Flow: No buyback; the next flow is a large construction financing after the DFS and LI (2027-28): US$785m capex against a ~US$180m market cap means equity issuance likely of 50-150% of today's shares, partly offset by Orion's up-to-US$300m participation agreement; January 2026 buyers at C$4.40 are deep underwater and insiders have been net sellers.
A deep dive would have to establish: Can Bravo get the Installation Licence and fund a US$785m mine-plus-smelter without diluting existing holders below today's price, with PGM prices near spot?
Research (expand)
What it is. Bravo owns Luanga (7,810 ha, Para, Brazil), bought from Vale (Vale + BNDES + landowner royalties, ~5% total). PFS (Sep 22 2026): reserve 86.7Mt at 2.77 g/t PdEq; 10Mtpa open pit + concentrator, plus a smelter 600km away in the Barcarena ZPE that turns a ~100 g/t PGM+Au / 7% Ni bulk concentrate into a saleable alloy (20 years of tax/customs benefits, authorised Aug 25 2026). Average output 209koz Pd, 151koz Pt, 16koz Rh, 18koz Au, 9.8kt Ni; C1 US$478/oz, AISC US$706/oz 4E; NPV8 US$1.45bn, IRR 35%, payback 2 yrs, capex US$785m + US$98m sustaining. A new copper-gold division (Feb 2026) explores IOCG targets.
What the market believes. That this is a palladium developer in a palladium bear market (spot ~$918, lowest since 2016) with an unfunded US$785m build that will be paid for by heavy dilution, years away from cash flow. It sold off ~60% from the Dec 2025 high, through a strong PFS.
What it may be missing. At spot, revenue is only ~14% below the PFS deck because rhodium and gold are above deck and platinum is now the bigger earner; the PFS sensitivity puts NPV near US$800m at -14%. EV is ~US$100m. Cash (~US$85m est. at Sep 30, after US$94.1m at Jun 30) funds the resource update, DFS and LI. Orion's participation agreement contemplates up to US$300m of project funding.
What it earns today. Nothing: burn ~C$50m/yr (drilling, studies, G&A). Owner earnings negative.
Projected unlevered FCF (C$m). 2027 -55 (DFS, LI); 2028 -250; 2029 -450; 2030 -500 (build, assuming FID late 2027/2028); 2031 +50 to +250 (ramp). At steady state ~C$400m/yr after tax at spot prices (~C$530m at the PFS deck).
Year 5. A depleting single-mine producer, valued as ~9 years of remaining cash flow (annuity ~C$2.3bn at year 5), not a multiple. Confidence low: timing, capex, permits and PGM prices each move the answer by 30%+.
Value. Unrisked DCF at 10% with a one-year slip: ~C$720m equity incl. cash, ~C$5.2/share on ~138m shares (share count estimated from the C$251m cap; Jan issue of 19.6m at C$4.40 plus Orion's placement). Haircut for dilution at today's price gives ~C$4.5. Risked at 0.3-0.4x NAV (normal at PFS stage): fair value ~C$2.7. Floor: cash ~C$0.85/share. No P/E, EV/EBITDA or FCF yield applies.
Management, risks, competition. Brazilian-led team that has moved quickly (PEA 2025, LP licence Mar 2025, PFS Sep 2026). Risks: LI permitting in Para, smelter execution (few juniors build their own PGM smelters), capex creep (already +58%), funding/dilution, Brazilian tax and royalty changes, palladium's structural decline with BEVs. Competes for capital with South African and North American PGM projects; few PGM producers outside SA/Russia, which makes Luanga strategically interesting (possible buyer).
Sentiment: 3/10. Near 52-week lows, juniors out of favour, palladium hated; insiders have sold per Simply Wall St.
- https://www.cantechletter.com/newswires/bravo-reports-results-of-pre-feasibility-study-for-its-luanga-project/
- https://reporteminero.cl/noticia/noticias/2026/09/bravo-mining-luanga-pfs-1450-millones-usd-integacion-vertical-brasil
- https://www.reporteminero.cl/noticia/exploraciones/2026/01/bravo-mining-c86m-orion-luanga-nickel-pgm-brasil
- https://www.northernminer.com/news/value-rises-to-1-45b-for-bravos-pgm-project-in-brazil/1003895039/
- https://www.placera.se/pressmeddelanden/bravo-mining-bravo-metals-authorized-to-establish-industrial-project-in-barcarena-export-processing-zone-20260903
- https://www.kitco.com/charts/palladium
- https://www.kitco.com/charts/rhodium
- /Users/gregwo/stocks2/data/analysisv3/context/BRVO.V.md
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Gross profit | -0.02 | -0.02 | -0.02 | -0.01 | -0.01 |
| Operating expenses | 4.24+10% | 3.78+10% | 3.45-20% | 4.31+47% | 2.93 |
| ▸Adj EBITDA | -4.24 | -3.78 | -3.45 | -4.31 | -2.93 |
| ▸Adj OCF | -0.42 | -2.45 | -2.28 | -2.81 | -3.28 |
| CapEx | -0.24 | -3.11 | -8.13 | -13.4 | -6.52 |
| Adj FCF | -0.65 | -5.57 | -10.4 | -16.2 | -9.79 |
| Interest expense | 0.07 | 0.01 | 0.00 | 0.00 | 0.00 |
| ▸Adj net income | -2.07 | -2.92 | -2.06 | -2.26 | -2.70 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -18.2 | -3.41 | -3.78 | -3.58 | -4.30 | -3.15 |
| FCF (OCF−capex) | -37.2 | -0.59 | -4.13 | -8.96 | -15.2 | -8.35 |
| Net income | -12.3 | -1.53 | -2.85 | -2.31 | -2.48 | -3.13 |
| ▸Capital returned | -130 | -77.5 | -1.14 | 0.06 | -17.8 | -33.5 |
| Buybacks | -130 | -77.6 | -1.23 | 0.00 | -17.8 | -33.5 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 0.07 | 0.06 | 0.01 | 0.00 | 0.00 | 0.00 |
| Debt paid down | 0.23 | 0.04 | 0.08 | 0.06 | 0.05 | 0.00 |
| ▸Reinvestment | 31.4 | 0.22 | 3.11 | 8.13 | 13.4 | 6.52 |
| Capex (PP&E) | 31.4 | 0.22 | 3.11 | 8.13 | 13.4 | 6.52 |
| Intangibles & M&A | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- | -- |
| Retained / other | 92.6 | 77.0 | -2.98 | -9.02 | 2.58 | 25.1 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 5.2 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 139 | 56.9 | 57.4 | 56.8 | 38.9 |
| ▸Liabilities (total) | 2.50 | 0.89 | 1.15 | 1.65 | 2.24 |
| Net debt (incl. leases) | -90.3 | -19.6 | -23.5 | -32.2 | -29.4 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -60.2 | -- | -- | -- | -- |
| Shares outstanding | 137 | 110 | 109 | 109 | 77.5 |
| Dilution (YoY) | +25.6% | +1.2% | +0.4% | +40.1% | -- |
| Employees | 16.0 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -- | -- | -- | -- | -- |
| Adj EBITDA margin | -- | -- | -- | -- | -- |
| Adj OCF margin | -- | -- | -- | -- | -- |
| Adj FCF margin | -- | -- | -- | -- | -- |
| Net income margin | -- | -- | -- | -- | -- |
| Adj NI margin | -- | -- | -- | -- | -- |
| ROIC (adj, after-tax) | -2.5% | -5.3% | -4.8% | -6.2% | -6.3% |
| Cost of debt | -- | -- | -- | -- | -- |
Institutional Ownership
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2026 Q1 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2026 Q2 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2026 Q3 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2026 Q4 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q1 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q2 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q3 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q4 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q1 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q2 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q3 | 0M | — | -1M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2028 Q4 | 0M | — | -3M | $-0.02 | $-0.02 – $-0.02 | 1 |