Stocks/BVN

BVN

Compañía de Minas Buenaventura S.A.A.v3 5.0/10 · 2026-10-30
Basic Materials·Other Precious Metals
$21.79
$5.2B market cap
4.8% div yield
v3 Rating
5.0/103.5–6.5
Setup
5.0/103.5–7.0
Fair Value
$28.00$18.00–$40.00+28%
DCF (10%)
$28.90+33%
Base IRR
+12%-15%–+40%
Visibility
moderate±39%
Wall Street
$39.00 target(1 analyst last quarter)(5 buy, 3 hold)
Rating
Revenue (TTM)
$2.3B
Owner Earnings
$680M
Next-Yr Owner Earnings
$600M
Growth
+2.0% × 3y
P / Next-Yr OE
9.2x
Net Debt
-$307M

Compañía de Minas Buenaventura S.A.A. is a prominent Peruvian mining company focused on the exploration, development, processing, and commercialization of both precious and base metals. Its primary targets for extraction include gold, silver, lead, zinc, and copper. The company operates several key mining units within Peru, such as Tambomayo (Caylloma province), Orcopampa (Castilla province), Uchucchacua (Oyón province), and Julcani (Angaraes province). It also manages the San Gabriel project in the General Sánchez Cerro province, Moquegua region. Furthermore, Buenaventura holds significant interests in other notable mines, including Colquijirca, La Zanja, Yanacocha, Cerro Verde, El Brocal, Coimolache, Yumpaq, San Gregorio, and the Trapiche mining unit. Diversifying its operations, the company also produces manganese sulphate monohydrate and other mineral by-products, in addition to operating hydroelectric power plants. Established in 1953, Compañía de Minas Buenaventura S.A.A. is headquartered in Lima, Peru.

2-Year Price History

$26.76+125.4%
$15$20$25$30$35$40Initial target $28.00 · 2026-10-30volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-30

Rating
5.03.5–6.5
Setup
5.03.5–7.0
Fair value (USD)
28.0018.00 – 40.00
Upside vs 21.79
+28%
DCF (10%)
28.9017.00 – 42.00+33%
Base IRR
12%-15% – 40%
Visibility
moderaterange ±39%
Sentiment
4/10
2026-10-30 · claude-opus-5-5 · priced at 26.42

Buenaventura is Peru's largest listed precious-metals miner, controlled by the Benavides family. It runs silver (Uchucchacua/Yumpag), copper (El Brocal, 61% owned) and gold (Orcopampa, Tambomayo, Julcani, and the new San Gabriel) mines, and owns 19.58% of Freeport's Cerro Verde copper mine, which now pays it roughly $250-340M a year in dividends. The ADS closed at $26.42 on 2026-10-30 (latest close, down 4.2% on Q3 day). That is 40% below the February peak of $43.67 and 24% of the way up its one-year range, after gold fell from above $5,400 to about $4,000 and silver from above $80 to about $54. Q3 was good on paper: revenue of $545M, direct EBITDA of $261M, net income of $268M, $242M of free cash flow and $1.0B of cash. Net cash is $307M and the interim dividend is $0.55. But San Gabriel keeps slipping. 2026 gold guidance there went from 48-55koz to 15-20koz, nameplate moved to end-2028, and recovery will be about 70% against an 85% design. Tambomayo is near the end of its life and Orcopampa has 2-3 years left. Marked to spot metals, I get about $680M of real free cash flow before interest attributable to BVN (no meaningful stock comp), so roughly a 10% yield, about 8.5x forward earnings and about 3.8x look-through EV/EBITDA. That is cheap, but it is the right price for a miner whose production is flat and whose cash flow is driven by metal prices. My DCF (10%, 10.5x terminal FCF) gives about $29 a share, so the base case returns about 11-12% a year plus upside to metal prices, not the 50% we want. Rating 5.0/10, research 5.0/10. It is a fairly priced, well-capitalized, family-run commodity call with no mispricing edge beyond a metals view. The Investor Day in mid-November (2027 guidance, Cerro Verde payout, a Trapiche partner) is the next check. Implied volatility is 60%, but the listed options are too illiquid (12% ATM spread, near-zero open interest) for a practical covered-call trade.

A deep dive would have to establish: Whether San Gabriel can really reach about 1Mtpa at 85% recovery (about 115koz) by 2028, and whether Cerro Verde dividends plus direct operations can hold about $650M+ of free cash flow at mid-cycle gold, silver and copper prices without Trapiche absorbing the cash.

Owner earnings, TTM
$680M$480M – $880M
Realistic peak profit
$800M$600M – $1.1B
Growth rate
2.0%-5.0% – 7.0%
Years of growth
31 – 5
Market cap
$6.7B$6.5B – $6.8B
EV
$6.4B$6.2B – $6.6B
Net debt
-$307M-$450M – -$150M
Capital return / cap
4.5%3.0% – 6.0%
P/E
8.5×6.0× – 12.0×
EV/EBITDA
3.8×3.2× – 5.0×
FCF yield
10.0%7.0% – 13.0%
Projected FCF, base case (USD millions)
Y1$600M$380M – $820M
Y2$660M$400M – $920M
Y3$720M$420M – $1.0B
Y4$700M$380M – $1.0B
Y5$690M$350M – $1.1B
Competition: BVN is a price-taking Peruvian multi-metal miner with no moat beyond asset quality and its 19.58% Cerro Verde stake; it competes for capital with Hochschild, Fortuna, Pan American and Southern Copper.
Governance: Family-controlled (Benavides), with a weak project-execution record (Uchucchacua restart, repeated San Gabriel delays and overruns) and political exposure from a past campaign contribution, but no fraud history.
Research (expand)
What the company does

Buenaventura (founded 1953, Lima) mines precious and base metals in Peru. It has three kinds of assets:

  • Direct operations (consolidated):

- Uchucchacua/Yumpag silver, about 14-16Moz a year. Yumpag is a high-grade deposit, and its throughput is being raised from 1,000 to 1,200 tpd.

- El Brocal copper, about 50kt a year, 61.4% owned so there is a minority leak. It is expanding from 13 to 17ktpd, but copper output will stay roughly flat.

- Gold: Orcopampa (2-3 years of life), Tambomayo (a hold decision in Q2'27), Julcani, and San Gabriel, the new underground gold mine in Moquegua that is in a troubled ramp-up.

  • Affiliates (equity-accounted):

- 19.58% of Cerro Verde (Freeport-operated copper and molybdenum, decades of life). This is the crown jewel and paid about $320-340M in 2026.

- 40% of Coimolache (gold).

- 43.65% of Yanacocha (Newmont-operated). Little cash and large closure liabilities.

  • Options: Trapiche (copper; the EIA is approved, but acid consumption, access and power are open questions, and management is open to a partner) and the near-mine exploration districts.
The investment case
  • Bull case:

- Net cash of $307M and a $1.0B cash pile.

- A Cerro Verde dividend stream worth about $2.5-3.5B on its own, roughly 40-50% of the market cap.

- Direct EBITDA of about $0.9B a year at spot.

- San Gabriel can add about 110-120koz a year at roughly $180/t cost by 2028-29, which is about $250M+ of EBITDA at $4,000 gold.

- The dividend policy is now 40% of net income (2026 payouts: $0.99 final for FY25 plus a $0.55 interim, about a 4-5% yield).

- Peru's new president, Keiko Fujimori (sworn in July 2026), is pro-mining, which lowers fiscal-regime risk.

- The stock has already fallen 40% as metals corrected.

  • Bear case:

- Earnings are mostly a function of gold, silver and copper prices, all still far above their 5-10 year averages.

- San Gabriel has missed every schedule since 2023: the ventilation accident, montmorillonite clay, press-filter foundations moving, preg-robbing carbon, and tailings dry-stack area limits.

- Two gold mines are depleting.

- Yumpag silver grades are falling (Q3 silver -21% YoY).

- Peruvian cash taxes lag, so 2027 will absorb the catch-up on 2026's peak profits.

- Trapiche could become a $1.5B+ capital sink if it is built without a partner.

What it earns today (real free cash flow)

Reported figures: 9M26 revenue was $1,699M, direct EBITDA $882M, EBITDA including affiliates $1,535M and net income $825M ($3.25/share). In Q3, realized prices were $4,216 gold, $57.82 silver and $15,190/t copper. The 9M average was much higher ($4,475 gold, $82 silver). Q3 direct EBITDA was $261M. Repriced to spot (about $4,000 gold, $54 silver, $6.5/lb copper), the run rate is about $230M a quarter, or about $920M a year.

Owner FCF at spot, before interest, attributable to BVN:

| Item | $M / year |

|---|---|

| Direct EBITDA at spot | ~920 |

| Cash taxes (Peru 29.5% plus mining taxes and royalties) | -(230-280) |

| Maintenance capex (incl. the exploration/development treadmill at depleting mines and owner-fleet replacement) | -~250 |

| El Brocal minority share | -~70 |

| Cerro Verde dividends (normalized; 2026 actual ~330, management 'conservatively' ~250 for 2027) | +~280 |

| Coimolache / other | +~30 |

| Owner FCF | ~$650-700M, mid ~$680M |

That is about $2.7/share and a 10% yield on the $6.71B market cap (253.99M shares). Stock comp is immaterial. Q3's reported $242M FCF ($126M of it Cerro Verde dividends) was flattered by higher prices and by lagged tax payments.

Five-year FCF projection (spot-flat metals, after all capex including growth, before interest)

| Year | FCF $M (5%-mid-95%) | Drivers |

|---|---|---|

| 2027 | 380 / 600 / 820 | San Gabriel ~600kt at 70% recovery (~50koz); Tambomayo winding down; tax catch-up; SG flotation and tailings capex; owner fleet $25-30M; Cerro Verde dividend ~$250-280M |

| 2028 | 400 / 660 / 920 | SG ~800kt, ~75koz; El Brocal 17ktpd; Yumpag grid connection cuts costs 15-17% |

| 2029 | 420 / 720 / 1,020 | SG at nameplate ~1Mt, 85% recovery, ~110-120koz; growth capex fades |

| 2030 | 380 / 700 / 1,040 | Orcopampa likely done; Trapiche pre-development spend |

| 2031 | 350 / 690 / 1,050 | Flat portfolio; Yumpag depletion vs. near-mine replacements |

Growth is roughly 0-3% a year for about 3 years, with San Gabriel offsetting depletion. Then it is flat.

What it looks like in 5 years: not a corpse and not a compounder. It will be a steady, mid-tier, multi-metal Peruvian producer: about 150-170koz of gold equivalent from San Gabriel, Julcani and Coimolache, about 13-15Moz of silver, about 50kt of El Brocal copper, plus the Cerro Verde annuity and a Trapiche option. It belongs in the 'about flat, durable but commodity-cyclical' category, worth about 9-12x FCF. My confidence in the operating projection is moderate, but my confidence in the dollar figures is low, because a +/-25% move in metals swings FCF by about +/-40%.

Fair value and multiples
  • DCF: PV of 2027-31 FCF is about $2.54B. Terminal value is 10.5x x $690M = about $7.25B, which discounts to $4.50B. Add net cash of $0.31B to get about $7.34B, or $28.9/share (range about $17-42 across metal decks).
  • At $26.42 we pay:

- about 8.5x forward EPS at spot (about $3.1);

- about 5.9x trailing EPS;

- about 7x EV / direct EBITDA, which includes the Cerro Verde stake for free;

- about 3.8x EV / look-through EBITDA including affiliates (about $1.7B run rate at spot);

- about 10% FCF yield.

  • Sum of the parts: Cerro Verde at about 10x its $280M dividend = about $2.8B. That leaves the direct operations at about $3.6B EV, about 4x their EBITDA. This is cheap for a miner but normal, given short-lived Tambomayo and Orcopampa and a troubled San Gabriel.
  • Base IRR from today: about 11-12% (DCF value plus a 4-5% dividend yield). A 50% one-year return needs gold back near $4,800 and silver near $70, or a San Gabriel turnaround the market believes.
  • Fair value: $28 (range $18-40). That is slightly under the DCF because of San Gabriel's credibility gap, the 2027 tax catch-up and the Trapiche capital-allocation risk.
  • Covered calls: IV of about 60% near the bottom of the range looks like a covered-call setup on paper, but the listed options are illiquid (12% ATM spread, near-zero open interest).
Management, governance, risks, competition
  • Control and track record: The Benavides family controls the company (Roque Benavides is chairman, Raul Benavides a director) and CEO Leandro Garcia runs operations. They are conservative (unhedged, deleveraged from about 2x to net cash) and have restored a meaningful payout. But the project execution record is poor: Uchucchacua's 2022-23 restart, and San Gabriel's repeated guidance cuts and capex overruns.
  • Governance: No fraud history. In the Fujimori campaign-finance probe, Roque Benavides acknowledged a $200k 2011 contribution to a pro-private-enterprise campaign, not a party. That is political-exposure noise, not a governance red flag.
  • Risks: metal prices (silver above all); Peruvian social conflict and informal mining; El Nino (already $12M of mitigation capex); San Gabriel tailings capacity; Yumpag grade decline; taxes; Trapiche.
  • Competition: BVN is a price-taker. It competes for capital with Peruvian and Latin American peers (Hochschild, Southern Copper, Fortuna, Pan American, and Newmont's Yanacocha). There is no moat beyond its asset quality and the Cerro Verde stake.
Sentiment: 4/10
  • Price action and positioning: The stock is down 40% from its February high and fell 4.2% on Q3 results after the San Gabriel guidance cut. Short interest is low and stable (about 4.4M shares, 3-5 days to cover).
  • Analysts are lukewarm:

- Morgan Stanley: Overweight, $34.50 (cut from $42.50 in July).

- Scotiabank: Sector Perform, $40 (cut from $44).

- Zacks: upgraded to Hold.

- Consensus about $37-38.5 (2 Buy, 2-4 Hold). Those targets were set at higher metal prices and are probably due for cuts.

  • Retail view: a gold/silver beta play that has rolled over. Nobody hates it, but momentum buyers have left and value buyers want San Gabriel proof.
  • Catalysts: Investor Day in New York in mid-November 2026 (2027 guidance, San Gabriel recovery plan, Cerro Verde dividend outlook, Trapiche partner) and the annual dividend proposal.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue2320+65%1732+50%1155+40%824+0%825
Gross profit1213+80%863+98%436+378%91.2-56%209
Operating expenses231-19%313-9.44-113%70.1-72%248
▸Adj EBITDA1101+111%685+16%590+229%179+29%139
▸Adj OCF1500+140%676+5%645+80%358+133%154
CapEx-514-476-338-239-152
Adj FCF986+397%200-35%307+157%1191.69
Interest expense46.453.165.439.654.1
▸Adj net income595+202%358+51%237-86.8-122%399
▸Owner's earnings525--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA2878100%865100%991100%712100%190100%120100%
FCF (OCF−capex)88431%77289%10511%14821%-11.6-6%-129-108%
Net income262491%81794%78279%40357%19.910%603501%
▸Capital returned102135%31637%87.09%16423%89.147%366304%
Buybacks0.000.000.000.000.000.00
Dividends41925211218.518.518.5
Interest paid25946.453.165.439.654.1
Debt paid down34417.9-78.179.631.0293
▸Reinvestment74726%41348%47148%32446%91.548%-553-460%
Capex (PP&E)1567363476338239152
Intangibles & M&A-756-0.46-2.26-12.2-36.7-705
Leases signed (net Δ)-63.650.4-2.29-1.23-110--
Retained / other87730%50358%73.47%62.49%-24.5-13%263219%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)65366023504845344503
▸Liabilities (total)17251755148813651340
Net debt (incl. leases)-307180150-220485
Net debt / Adj EBITDA-0.280.260.25-1.223.48
Net debt / Adj FCF-0.310.900.49-1.84286
Adj EBITDA / interest23.712.99.024.542.57
Shares outstanding254254254254254
Dilution (YoY)+0.0%+0.0%+0.0%+0.0%+0.0%
Employees831032952958137592783
MarginsTTM2025202420232022
Gross margin52.3%+4.449.9%+12.137.8%+26.711.1%-14.325.4%
Adj EBITDA margin47.5%+10.439.6%-11.551.1%+29.321.8%+4.916.9%
Adj OCF margin64.7%+20.339.1%-16.855.8%+12.443.5%+24.818.6%
Adj FCF margin42.5%+28.411.6%-15.026.6%+12.114.5%+14.30.2%
Net income margin51.7%+21.045.2%+10.334.9%+32.52.4%-70.673.0%
Adj NI margin25.6%+11.620.7%+0.220.5%+31.0-10.5%-59.048.4%
ROIC (adj, after-tax)15.1%9.9%8.0%0.5%-1.0%
Cost of debt6.6%6.8%13.0%7.3%7.2%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-10-30

Compañía de Minas Buenaventura reported third quarter 2026 results, showing strong financial performance driven by higher realized prices and copper volumes, while operations faced mixed results and ongoing ramp-up challenges at the San Gabriel project. Consolidated gold production was about 29 thousand ounces, down 60% year over year. Silver production fell 21% to 3.4 million ounces, mainly due to lower planned silver grades at Yumpag. Copper production rose 7% to 13.6 thousand tonnes, supported by higher ore grade throughput at El Brocal. Financially, total revenues rose 27% to $545 million, driven by higher realized prices and copper sales volumes from El Brocal. EBITDA from direct operations increased 34% to $261 million, with an EBITDA margin of 48%. Net income grew 50% to $268 million. The company ended September with about $1 billion in cash and a net cash position of $307 million, improving its leverage ratio to negative 0.25 times. Free cash flow was $242 million in the quarter, supported by $126 million in dividends received. The board approved an interim dividend of $0.5508 per share or ADS, equivalent to 20% of net income for the first nine months of 2026. The annual dividend will be proposed at the next board meeting. Cost performance was mixed. Silver cash cost at Uchucchacua and Yumpag reached $11 per ounce, up year over year due to more selective OCF mining at Yumpag, additional ground support needs, the transition to an owner-operated fleet, and lower plant silver grades, partly offset by a stronger byproduct credit and lower commercial deductions. At El Brocal, copper cash cost increased, reflecting higher cement consumption for tailings management, schedule maintenance, and the transition to owner-operated equipment. El Brocal reached a processing rate of 13.5 thousand tonnes per day by quarter end. Coimolache cash cost declined to $11.03 per ounce on higher payable gold production and stronger byproduct credits. At San Gabriel, the mining rate stabilized at about 1.7 thousand tons per day, with an ore stockpile of roughly 100 thousand metric tons. Undercut mining below cemented fill commenced, and management said the ramp-up remains ahead of plan. The first phase of filtration system reinforcement was completed. The processing plant averaged about 1.4 thousand tons per day in October, with a target of 1.7 thousand tons per day in November and December. Gold recovery is expected to rise from roughly 60% in October to near 70% by December, which becomes the entry point for 2027. Management now expects recovery to reach about 85% in 2028 after additional circuit work. The main bottleneck is downstream tailings drying and compaction rather than the processing plant. Current facilities support about 1.5 thousand tons per day, with additional drying areas expected by the second quarter of 2027. Two of the three press filters are under repair, with all three expected ready around April or May 2027, after the rainy season. Production is projected at about 600 thousand tons in 2027 and 800 thousand tons in 2028, with full nameplate capacity targeted by the end of 2028. Steady-state operations are expected at around 1 million tons per year, or about 3 thousand tons per day, with gold output of roughly 110 to 120 thousand ounces per year. Strategically, the company is transitioning to owner-operated mining fleets at Uchucchacua-Yumpag, El Brocal, and San Gabriel. Buenaventura expects to produce 100% of El Brocal's underground ore by the second quarter of 2027. Remaining equipment capex is modest, roughly $25 to $30 million. The exploration budget was increased to extend mine life and grow reserves and resources. El Brocal's throughput expansion from 13 to 17 thousand tons per day is planned, though copper output is expected to be largely flat. For Trapiche, drilling is underway, bioleaching tests aim to reduce acid consumption, and engineering and permits for the access road and power line are advancing. The company is open to a partner to de-risk the investment. Orcopampa has roughly two to three years of remaining mine life, while Tambomayo is nearing end of life, with a review of partial continuation scheduled for the second quarter of 2027. Cerro Verde has already paid $270 million in dividends in 2026, with another $50 to $70 million expected by year-end. Management plans conservatively around $250 million per year going forward. El Niño preparedness and worker safety were highlighted as priorities, and more detail is expected at the investor day in New York in about two weeks.

Analyst Q&A (9)
▸
How has San Gabriel performed in October, including mining rate, processing rate, and whether improvement in production and cost is visible in the fourth quarter or only in 2027?
Carlos De Alba · Morgan Stanley
Processing averaged about 1.4 thousand tons per day, with a target of 1.7 thousand tons per day in November and December, which is the expected 2027 run rate. The plant itself is not the constraint; tailings drying and compaction are the bottleneck. Gold recovery was about 60% in October, rising toward 70% by December, and that is the entry point for 2027. More detail will be given at the investor day.
▸
What is the latest update on the Trapiche project, and would the company consider a partner to de-risk financially and add open-pit high-altitude copper expertise?
Carlos De Alba · Morgan Stanley
Drilling of about 20 thousand meters has started, half for primary exploration and half for fresh samples for bioleaching tests to reduce acid consumption. Engineering and permits for the access road and power line are advancing. Management is open to a partner to de-risk the investment and is evaluating that possibility.
▸
With about 100 thousand tons of ore stockpiled and mining stabilized near 1.7 thousand tons per day, what processing throughput should be expected by mid-2027, and when will nameplate capacity be reached?
Cesar Perez-Novoa · BTG Pactual
The average production target is about 600 thousand tons in 2027 and about 800 thousand tons in 2028. Full nameplate capacity is expected by the end of 2028. The constraint is drying and dry-stacking area at the bottom of a V-shaped valley, which expands step by step as compaction progresses.
▸
At El Brocal, with throughput at 13.5 thousand tons per day but declining grades and recoveries, how much growth will come from throughput versus grade, and will the higher cement consumption for tailings persist into 2027?
Cesar Perez-Novoa · BTG Pactual
El Brocal is planning to expand throughput from 13 to 17 thousand tons per day, but refined copper output will be roughly the same. Cement consumption is linked to tailings management and the owner-operated fleet transition. Management did not clearly say whether the cost increase is temporary, but it is connected to the operational changes under way.
▸
What is the ultimate gold recovery expected at San Gabriel, given that 70% seems low, and what is the status of the tailings facility structure repairs?
Tanya Jakusconek · Scotiabank
The expected ultimate recovery is about 85%, requiring reagent additions now and possibly new circuits, with the target reached in 2028. Two of three press filters are under preliminary repair since late September, with all three expected ready with steel and concrete supports by April or May 2027, after the rainy season.
▸
What are the steady-state expectations for San Gabriel, including throughput, mining cost per ton, and annual gold production?
Tanya Jakusconek · Scotiabank
Steady state is expected at about 1 million tons per year, roughly 3 thousand tons per day, with operating cost around $180 per ton. Annual gold production is expected to be about 110 to 120 thousand ounces, depending on recovery and grade.
▸
Which operations are moving to owner mining, and how much capital is needed for equipment, given that it may exceed $50 million?
Tanya Jakusconek · Scotiabank
Uchucchacua-Yumpag is already fully mined and developed by Buenaventura, with most capex already spent and about $6 million in equipment deliveries in the first quarter of 2027. El Brocal will be 100% underground production by Buenaventura by the second quarter of 2027, with about 50% of development. San Gabriel has 100% of production and about 75% of development in-house. Capex for next year is about $25 million, with underground fleet deliveries in the first and second quarters adding about $25 to $30 million, so total capital needs are below $50 million.
▸
What dividends are expected from Cerro Verde in 2026 and 2027?
Tanya Jakusconek · Scotiabank
Cerro Verde has already disbursed $270 million in 2026, with an additional $50 to $70 million expected by year-end. For 2027, the planning assumption is conservatively around $250 million, not necessarily $300 million, with more information expected at the investor day.
▸
What is the remaining life of mine for Orcopampa and Tambomayo, and has any consideration been given to extending their lives?
Arturo Rocha · Profuturo AFP
Orcopampa has about two to three years of remaining life, with underground exploration and nearby exploration ongoing. Tambomayo is close to the end of its life of mine; by the second quarter of 2027, management will decide whether to continue or partially halt mining and focus on district exploration, where recent results have been good.

Options

Chain Snapshot (daily)

Call IV (ATM)70%
Put IV (ATM)40%
ATM Spread10.1%
Call $OI (near money)$85K
Put $OI (near money)$14K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$27.0
Major Expirations2
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$23.00$4.40/$6.90120--/$0.750
$24.00$3.50/$5.701--/$0.850
$25.00$2.70/$4.9073--/$2.0564
$26.00$2.00/$4.206--/$1.751
$27.00$1.20/$3.904$0.10/$2.950
$28.00$1.10/$2.4015$0.75/$1.8511
$29.00$0.35/$1.951$1.65/$2.4060
$30.00$0.65/$2.2046$2.10/$4.2023
Snapshot: 2026-11-04

Short Interest

Short % of Float2.6%
Short Shares4.5M
Days to Cover5.7
Change (vs Prior)+2.4%
Short % Float History
2.60%-0.40pp
2.5%3.0%3.5%10-1512-3103-1305-2908-1410-30

Web Traffic

buenaventura.com
Web rank#879,523
Est. visits/mo612K
Traffic YoY▼ 5.7%
Web Rank History
#879,523-83,263
rankest. visits/mo
600k700k800k900k1.0m575K617K659K701K742K08-2509-0110-2708-03

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
VAN ECK ASSOCIATES CORP$349M$14.00−$131M−$157M—$164.08B
Westwood Global Investments, LLC$334M$8.94+$8.8M−$22.1M—$2.85B
BlackRock, Inc.Passive$303M$15.71+$23.4M−$42.6M—$6.70T
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$213M$19.27−$13.4M+$60.5M—$83.85B
FIL Ltd$195M$16.52−$104M−$135M—$139.12B
Tidal Investments LLC$158M$19.43+$28.3M+$74.4M—$41.21B
CENTRICA WEALTH MANAGEMENT, LLC$132M$29.29+$127M+$132M—$133M
Robeco Institutional Asset Management B.V.$125M$28.65−$2.7M+$115M—$81.42B
ACADIAN ASSET MANAGEMENT LLC$110M$24.32−$35.0M+$69.6M—$84.18B
JPMORGAN CHASE & CO$97.4M$17.29+$14.9M+$31.9M—$1.71T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

017.8M35.6M53.3M71.1M$6.34$14$21$29$362021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
VAN ECK ASSOCIATES CORP11.9MWestwood Global Investments, LLC11.4MFIL Ltd6.7MCITIGROUP INC471KMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.7.3MPRICE T ROWE ASSOCIATES INC /MD/7KACADIAN ASSET MANAGEMENT LLC3.8MBANK OF NOVA SCOTIA3.2MTidal Investments LLC5.4MRobeco Institutional Asset Management B.V.4.3M

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$39.00+88.7%
Last Year (5 analysts)$40.10+94.0%
Current Price$20.67
Analyst Ratings
5
3
Buy: 5Hold: 3Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
1998 Q415M42M8M$0.02$0.02 – $0.0212
1999 Q322M17M8M$0.02$0.02 – $0.0313
2001 Q337M25M17M$0.06$0.05 – $0.0717
2001 Q459M22M17M$0.12$0.09 – $0.148
2002 Q346M44M31M$0.11$0.09 – $0.1315
2002 Q436M34M23M$0.05$0.04 – $0.0710
2003 Q358M267M-45M$0.19$0.15 – $0.237
2003 Q470M330M17M$0.22$0.18 – $0.2616
2004 Q397M60M40M$0.35$0.28 – $0.4219
2005 Q395M69M48M$0.26$0.21 – $0.3110
2006 Q3166M129M93M$0.43$0.34 – $0.5213
2006 Q4217M127M87M$0.39$0.31 – $0.4710
2007 Q3218M153M111M$0.50$0.40 – $0.6011
2007 Q4248M387M129M$0.53$0.42 – $0.647
2008 Q3238M179M116M$0.54$0.43 – $0.6520
2008 Q4311M125M83M$0.40$0.32 – $0.4816
2009 Q3218M200M141M$0.53$0.42 – $0.6414
2009 Q4229M256M185M$0.65$0.52 – $0.7813
2010 Q3267M233M166M$0.62$0.50 – $0.7413
2010 Q4410M315M230M$0.94$0.75 – $1.1315
2011 Q3537M350M257M$1.32$1.06 – $1.5812
2011 Q4389M337M221M$0.85$0.68 – $1.0211
2012 Q3394M259M178M$0.67$0.54 – $0.8013
2012 Q4494M272M162M$0.78$0.62 – $0.9412
2013 Q3392M136M74M$0.34$0.27 – $0.417
2013 Q41.9B-1.5B-1.9B$1.62$1.30 – $1.947
2014 Q3312M179M77M$0.17$0.13 – $0.2015
2014 Q4226M235M-130M$0.12$0.10 – $0.149
2015 Q31.9B-187M-209M$0.09$0.07 – $0.1117
2015 Q41.3B-1.5B-1.6B$-0.16$-0.19 – $-0.1311
2016 Q3686M-7M-63M$0.31$0.24 – $0.3715
2017 Q3715M46M-23M$0.50$0.40 – $0.6018
2017 Q4572M60M13M$0.43$0.35 – $0.5216
2018 Q3555M52M-21M$0.31$0.24 – $0.3713
2018 Q41.7B-418M-472M$0.32$0.26 – $0.3915
2019 Q1216M86M20M$0.08$0.08 – $0.087
2019 Q2234M86M13M$0.05$0.05 – $0.057
2019 Q3222M81M7M$0.09$0.09 – $0.097
2019 Q4254M-135M-175M$0.13$0.13 – $0.137
2020 Q1192M21M-19M$-0.07$-0.07 – $-0.0710
2020 Q285M-0M-47M$-0.18$-0.18 – $-0.189
2020 Q3252M96M24M$0.12$0.12 – $0.129
2020 Q4236M118M51M$0.20$0.20 – $0.2010
2021 Q1191M98M32M$0.12$0.12 – $0.126
2021 Q2228M148M70M$0.28$0.28 – $0.281
2021 Q3241M-148M-219M$0.23$0.23 – $0.231
2021 Q4175M-946M-1.0B$0.28$0.28 – $0.281
2022 Q1206M172M86M$0.34$0.34 – $0.341
2022 Q2213M122M51M$0.20$0.20 – $0.201
2022 Q3186M48M-6M$-0.03$-0.03 – $-0.031
2022 Q4210M122M50M$0.20$0.20 – $0.201
2023 Q1192M105M47M$0.18$0.18 – $0.181
2023 Q2181M91M28M$0.11$0.11 – $0.111
2023 Q3180M113M38M$0.15$0.15 – $0.151
2023 Q4201M78M33M$0.13$0.13 – $0.131
2024 Q1230M86M24M$0.10$0.10 – $0.102
2024 Q2322M159M86M$0.34$0.34 – $0.341
2024 Q3275M127M70M$0.28$0.28 – $0.281
2024 Q4297M172M70M$0.28$0.28 – $0.281
2025 Q1297M131M67M$0.26$0.26 – $0.261
2025 Q2336M166M90M$0.35$0.31 – $0.402
2025 Q3384M180M101M$0.40$0.40 – $0.401
2025 Q4522M262M171M$0.67$0.67 – $0.671
2026 Q1666M397M277M$1.09$1.09 – $1.091
2026 Q2610M392M269M$1.06$1.02 – $1.101
2026 Q3440M332M218M$0.86$0.86 – $0.861
2026 Q4613M395M264M$1.04$1.04 – $1.041
2027 Q1683M423M282M$1.11$1.11 – $1.111
2027 Q2625M424M279M$1.10$1.10 – $1.101
2027 Q3654M419M272M$1.07$1.07 – $1.071
2027 Q4685M421M269M$1.06$1.06 – $1.061
v2 analysis (legacy, 2026-07-31) — for comparison onlyclick to expand

Thesis

Buenaventura has moved from a leveraged, inconsistent cash generator into a much stronger operating and financial position. The recent improvement is supported by real factors: higher metal prices, rising production, San Gabriel entering commercial sales, Yumpag expansion, and substantial Cerro Verde dividends. Cash of approximately $760M against relatively modest debt gives the company meaningful resilience and project-financing flexibility. The central investment question is whether San Gabriel becomes the high-return growth asset management expects. Q2 showed encouraging mining progress, but processing constraints, filter-foundation issues and recovery below the approximately 85% budgeted level remain unresolved. The potential flotation circuit is inexpensive relative to the asset, but it pushes the full recovery opportunity into 2027. The company also remains exposed to metal-price normalization, Peru operating and permitting risk, contractor cost escalators and a structurally high capex burden. The likely trajectory is still positive over the next year, but the current earnings peak should not be capitalized as a steady-state annuity. A normalized owner-earnings framework produces substantial value, with upside if San Gabriel reaches design recovery and commodity prices remain supportive.

Trade Signal

Trade rating
-5.8/10
Short
Horizon
~6mo
gpt-5.6-luna2026-07-31 · saw $30.28-28.0% since

Short: despite a genuine operating turnaround and a solid balance sheet, BVN trades near twice the study's probability-weighted fair value while consensus already prices in strong commodities and a successful San Gabriel ramp.

Temporary mispricing+1.0

The stock rose from $16.91 at the end of July 2025 to $43.67 in late February 2026, coinciding with the precious-metals rally, improving Buenaventura operating results, San Gabriel's ramp and strong Cerro Verde dividend expectations. It then fell sharply through March and June, reaching roughly $28.58–$29.29, before stabilizing around $30–$32 in July. The latest earnings reaction was another 5% decline despite very strong reported Q2 results, suggesting the market is already looking through the headline growth toward valuation, recovery constraints and commodity normalization. The recent move is not a panic overshoot; it is a partial but incomplete correction of an earlier re-rating. The stock remains materially above the study's fair value, so the mispricing is more durable than temporary, though short-term commodity moves can delay convergence.

Market view+5.0

The stock is liked and somewhat crowded on fundamentals: analysts are unanimously constructive among the published ratings, with a $34.36 average target, and investors appear to favor the combination of precious-metals exposure, improving operations, Cerro Verde dividends and net cash. The 79% one-year return and very large call open interest indicate bullish positioning, although the stock is 30% below its February high and has recently drifted lower. Bears focus on commodity-cycle normalization, San Gabriel's filtration/recovery issues, Peru risk and the capital intensity of Trapiche. The prevailing bullish view appears stale on valuation: the market is treating the recent earnings surge as durable while the analyst's fair value is only about $16.68 per share.

Inflectionwindow ~2mo+1.0

The business has already delivered a major earnings inflection: Q1/Q2 revenue, EBITDA and net income surged, San Gabriel entered commercial sales, Yumpag is expanding and the balance sheet improved. However, analyst consensus is already constructive, with a Buy rating and a 1-year target above the current price, while the current valuation also reflects strong metal prices and further San Gabriel improvement. The next inflection is therefore execution proof rather than an unrecognized step-change; recovery improvement and successful ramp could support upside, but they are not sufficiently unexpected to offset the valuation gap.

Catalysts
  • ▲2026-08 · San Gabriel industrial-scale reagent tests — August 2026 tests should indicate whether recovery can move toward the approximately 70% year-end target; success supports the growth narrative, while failure challenges the bull case.
  • ▲2026-Q3 · Yumpag throughput expansion and grid connection — The move toward 1,200 tpd in Q3 could lift production and reduce operating costs by an estimated 15%–17%.
  • •2026-Q3/2026-Q4 · Q3 2026 earnings and San Gabriel ramp update — The print should show whether commercial production is scaling despite filtration and clay-related constraints; strong results may be largely priced in.
  • ▲2026-12 · San Gabriel interim ramp target — Reaching approximately 2,000 tpd by December would validate progress, but failure would reinforce concerns that the 3,000 tpd design rate is deferred to 2027.
  • ▲H2 2026 · Cerro Verde dividend distributions — Additional 2026 distributions of roughly $50M–$100M provide liquidity and support the dividend and balance sheet, though a lower copper-price environment could reduce them.
  • •H2 2026–2027 · Trapiche financing and partner process — A strategic partner could reduce Buenaventura's funding burden, but the $3.4B project remains a long-dated capital commitment with permitting and execution risk.
Flow+1.0

No meaningful dilution is reported and the company is generating cash while paying a dividend. There is no stated large buyback or imminent corporate action, insider buying is not evident, and short interest is only 2.4% of float, limiting squeeze fuel. Overall flow is mildly supportive but not a major price driver.

Floor / Ceiling+2.0

The balance sheet, reported cash, Cerro Verde dividend stream and positive free cash flow provide a meaningful but not hard floor. The estimated net cash is modest relative to a $7.7B equity value, and mining cash flows are highly exposed to gold, silver and copper prices. There is no clear hard ceiling, but the valuation itself creates substantial overhead if commodity prices normalize or San Gabriel disappoints.

Buyability

Highly buyable for precious-metals and Latin American mining investors: strong gold/copper exposure, improving production, net cash, a 4% dividend and Cerro Verde cash distributions. The main marginal buyers are commodity-bull funds and momentum-oriented mining investors, although the valuation and Peru/project risks limit fundamental appeal.

Fear vs Greedfear 5/10 (-2.0)greed 7/10 (+2.0)

Fear is stronger than greed at $30: the operating turnaround is real, but the market is capitalizing unusually strong commodity prices and a still-incomplete San Gabriel ramp as if they are durable. The balance sheet reduces downside risk, but it does not justify paying nearly twice the analyst's probability-weighted value.

Valuation

Our Target
$4.0B-24%
Market Should Pay
$3.7B-30%
target ×0.92 (fear discount)
Current Market Cap
$5.2BNeutral
What Changed
transcript · 2026-07-31
+8%fair value on this information

The quarter newly demonstrated that San Gabriel had begun commercial sales and was contributing to production, while also quantifying the remaining processing and recovery obstacles. Yumpag's throughput approval, the expected 15%–17% power-cost reduction from grid connection, and Cerro Verde distributions tracking toward $350M–$380M for 2026 were incremental positives. The market also learned that San Gabriel's recovery is currently below budget and that filter reinforcement and a possible flotation circuit are needed, limiting the immediacy of the full ramp-up.

▸ How the cases moved

The Q2 result raises the near-term base case: base equity value moves from approximately $5,200M to $5,400M as San Gabriel commercial sales, stronger Yumpag economics and higher Cerro Verde distributions improve confidence, while base probability rises from 0.50 to 0.55. The bull value moves from approximately $8,300M to $8,700M, but bull probability rises only from 0.18 to 0.20 because recovery and filtration constraints remain unresolved. The bear value falls from approximately $2,900M to $2,800M, but bear probability declines from 0.32 to 0.25 as the balance sheet and operating execution provide more evidence of resilience.

2-Year Plausible Outcomes
bear25%
$2.8B
rev -10%/yrOE $350M

Commodity prices normalize, San Gabriel remains below design throughput and recovery, and higher contractor costs and El Niño-related spending pressure cash generation. Cerro Verde dividends decline toward the lower end of management's range. Buenaventura remains solvent and net-cash-positive, but owner earnings fall materially as the current commodity-cycle benefit fades.

▸ Valuation

8x $350M owner earnings = $2,800M equity

base55%
$5.4B
rev +8%/yrOE $600M

San Gabriel ramps gradually, reaching useful but not fully optimized production during the next two years. Recovery improves toward approximately 70%, while the higher-recovery flotation circuit remains a 2027 option. Yumpag benefits from higher throughput and grid power, Cerro Verde continues distributing substantial cash, and consolidated owner earnings settle near $600M despite some normalization in gold, silver and copper prices.

▸ Valuation

9x $600M owner earnings = $5,400M equity

bull20%
$8.7B
rev +15%/yrOE $850M

Strong gold and copper prices persist, San Gabriel resolves its filtration and recovery issues and approaches its budgeted recovery profile, while Yumpag and other assets deliver operating leverage. Cerro Verde dividends remain near the upper end of guidance and the company converts its project pipeline into credible long-duration growth without excessive dilution or leverage. Owner earnings reach approximately $850M and the company earns a premium mining multiple for diversified, low-leverage growth.

▸ Valuation

10.2353x $850M owner earnings = $8,700M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $4,236M. I set the analytical target below that result at $4,000M because the arithmetic still gives meaningful credit to exceptionally strong commodity prices, unusually high Cerro Verde distributions and an incomplete San Gabriel ramp. The discount also reflects the company's history of consuming much of claimed EBITDA through capex and working through operational surprises. The balance sheet and improving execution prevent a deeper discount.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now8/10
Trajectory7/10
Risk5/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial and Operating Results: Buenaventura reported exceptionally strong financial and operating performance for the first quarter of 2026. Revenue reached $624.6 million, more than doubling year-over-year. EBITDA from direct operations surged to $386.3 million (up from $126.3 million in Q1 2025), expanding the EBITDA margin to 62%. Net income rose 142% year-over-year to $355.2 million. This momentum was driven by an 8% increase in gold production (boosted by the San Gabriel ramp-up), a 6% increase in silver production, and increases of 20% and 27% in lead and zinc production.
  • Balance Sheet Deleveraging: The company achieved a positive net cash position for the first time in years. It closed Q1 2026 with $759.9 million in cash and cash equivalents against $708 million in total debt, yielding negative net debt of $51.9 million and a leverage ratio of -0.05x.
  • Asset Extensions & Regulatory Wins: In May 2026, Buenaventura announced it is evaluating a significant life-of-mine extension of up to 16 years for its flagship San Gabriel gold mine by potentially adding a surface open-pit operation to the current underground plan. Additionally, the company is progressing with other assets; Tantahuatay is on track to reach full capacity in 2026, and Yumpag is working toward expanding its extraction capacity to 1,200 tonnes per day (tpd) by Q3 2026.
▸ Thesis-test Findings
  • Buenaventura San Gabriel gold mine clay processing issues: During the Q1 2026 earnings call, management disclosed that the San Gabriel orebody contains expansive, sticky montmorillonite clays (ranging from 1% to 8% of the ore). This clay causes mechanical processing challenges in the crushing circuit, particularly during high-moisture periods. Due to these bottlenecks, reaching the nominal design capacity of 3,000 tpd has been pushed to 2027, with a revised interim target of 2,000 tpd by December 2026. To mitigate the issue, Buenaventura is implementing an ore-blending distribution model and investing approximately $1 million in additional CapEx for clay-washing and screening upgrades (such as Banana screens). Operating costs are expected to increase by a negligible $0.10 per ton, and gold recoveries remain unaffected. This indicates that while the clay is a minor operational headwind delaying full ramp-up, the financial impact is minimal and well-managed.
  • Cerro Verde copper mine 2026 cash dividend distributions: Cerro Verde (where Buenaventura holds a 19.58% stake) continues to act as a significant source of cash inflow. Buenaventura received $98 million in dividends from Cerro Verde in late January 2026, followed by an additional $58.7 million on April 24, 2026. This brings the total dividends received year-to-date from Cerro Verde to $156.6 million. This strong distribution stream is supported by robust underlying cash generation; Cerro Verde is projected to generate between $1.2 billion and $1.3 billion in free cash flow and over $2.5 billion in EBITDA for the full year 2026 at current copper prices. This provides Buenaventura with reliable liquidity to fund its organic project pipeline.
  • Peru ministry of energy and mines trapiche project approvals: In March 2026, Peru’s environmental certification authority, SENACE, officially approved the detailed Environmental Impact Study (EISd) for Buenaventura's $3.4 billion Trapiche copper project in Apurímac. The estimated development cost has risen to $3.4 billion (from an initial $2 billion estimate) due to refined engineering design, higher environmental and social standards, and inflation in mining construction. While this is a major regulatory victory, it does not immediately authorize construction or extraction; Buenaventura must still secure subsequent standard permits, including water use and construction licenses. The company targets a starting operational date around 2030 and has indicated it will likely seek a strategic partner to help finance the capital-intensive sulfide stage of the project.