Stocks/BYN.V

BYN.V

Banyan Gold Corp.v3 4.5/10 · 2026-11-26
Basic Materials·Gold
1.49 CAD
648M CAD market cap
v3 Rating
4.5/103.5–5.5
Setup
4.5/103.5–5.5
Fair Value
1.30 CAD0.70 CAD–2.40 CAD-13%
DCF (10%)
1.30 CAD-13%
Base IRR
+8%-15%–+25%
Visibility
wide±65%
Rating
Revenue (TTM)
0.0M CAD
Owner Earnings
-C$30M
Next-Yr Owner Earnings
-C$35M
Growth
+0.0% × 0y
P / Next-Yr OE
--
Net Debt
-C$95M

Banyan Gold Corp. is dedicated to the exploration and development of valuable metallic resources, primarily focusing its efforts on uncovering gold and silver deposits. Its flagship property, the AurMac Project, represents a significant land package within the Mayo Mining District of the Yukon Territory. This project consists of 506 quartz mineral claims and spans approximately 9,230 hectares. The company, which was incorporated in 2010, maintains its corporate headquarters in Whitehorse, Canada.

2-Year Price History

$1.31+495.5%
$0.50$1.0$1.5$2.0Initial target $1.30 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.53.5–5.5
Setup
4.53.5–5.5
Fair value (CAD)
1.300.70 – 2.40
Upside vs 1.49
-13%
DCF (10%)
1.300.60 – 2.60-13%
Base IRR
8%-15% – 25%
Visibility
very widerange ±65%
Sentiment
6/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 1.31

Banyan Gold is a pre-revenue Yukon explorer whose only real asset is AurMac, a bulk-tonnage, low-grade gold deposit (May 2026 resource: 3.64 Moz indicated at 0.68 g/t plus 4.98 Moz inferred at 0.58 g/t, ~8.6 Moz) carrying a 6% NSR royalty to Franco-Nevada, which also bought 10M shares. After raising about C$100M in 2026 (the last C$54M at ~C$2.00 in September, no warrants) it is funded through 2028, and the maiden PEA is due around year-end 2026 or early 2027, with a resource update toward 10 Moz in mid-2027 and a PFS in 2028. At C$1.31 (the 2026-11-25 close in our pack; I found no reliable newer quote) the market cap is about C$620M and EV about C$520M, roughly C$60 (US$43) per resource ounce. That is a normal price for a large, low-grade Yukon resource with no power, no mine plan and a heavy royalty, at a gold price that has already come down from ~US$5,600 to ~US$4,000. The stock has fallen ~30% from its September peak alongside gold. My DCF has five years of cash burn and a year-5 value as a PFS-stage project (or a takeout). It gives about C$1.30 a share, essentially the price, and the range is very wide. Rating 4.5: a fairly priced option on gold and the PEA, not a mispricing. Setup 4.5: there is a dated catalyst (the PEA), but I see no variant perception, and low-grade PEAs often disappoint on capex.

Flow: C$100.8M raised in 2026 (about 6% of shares in September at ~C$2.00, no warrants; Franco-Nevada took 10M shares) funds work through 2028, so no near-term raise is needed. Expect another equity raise in 2028-29 for the PFS and permitting; I found no insider buying or selling disclosed.

A deep dive would have to establish: Does the maiden PEA show that a ~0.6 g/t Yukon deposit, carrying a 6% NSR, makes an attractive mine at US$3,000-3,500/oz gold with buildable capex and power?

Owner earnings, TTM
-C$30M-C$45M – -C$18M
Realistic peak profit
C$250MC$0M – C$600M
Growth rate
0.0%0.0% – 0.0%
Years of growth
00 – 0
Market cap
C$622MC$600M – C$640M
EV
C$525MC$500M – C$560M
Net debt
-C$95M-C$110M – -C$80M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-35.0×-60.0× – -20.0×
EV/EBITDA
-25.0×-40.0× – -15.0×
FCF yield
-5.0%-8.0% – -3.0%
Projected FCF, base case (CAD millions)
Y1-C$35M-C$50M – -C$25M
Y2-C$45M-C$60M – -C$30M
Y3-C$60M-C$90M – -C$35M
Y4-C$80M-C$130M – -C$35M
Y5-C$100M-C$200M – -C$30M
Competition: It competes for capital and acquirers with other large Yukon and Canadian gold developers such as Snowline's higher-grade Valley project, and most of them are higher grade than AurMac.
Governance: none flagged
Research (expand)

What it is. Banyan Gold explores AurMac in the Mayo district of the Yukon, next to Victoria Gold's failed Eagle mine. AurMac is a near-surface, bulk-tonnage deposit grading about 0.6-0.7 g/t. Its May 2026 resource was 3.64 Moz indicated plus 4.98 Moz inferred, with a higher-grade core of about 5.2 Moz at roughly 1 g/t. Franco-Nevada owns a 6% NSR, bought in February 2026, and 10M shares. CEO Tara Christie is a Yukon mining veteran.

What the market believes. The market sees a big resource whose economics depend on the gold price. At about C$60/oz EV it pays a normal developer-stage price for an unstudied low-grade deposit. The bull case: the PEA shows a 25+ year mine, the resource passes 10 Moz, and a major (management says larger companies asked for a 50,000 tpd scenario) buys it once it is de-risked. The bear case: 0.6 g/t ore in the Yukon needs a mill, grid power (a 160 MW addition can't be assumed) and multi-billion capex. The Eagle heap-leach failure in 2024 hangs over regional permitting and over heap leach itself. And the 6% NSR takes a big slice of the revenue. I can't see a reason the market is wrong. Retail chased it from C$0.25 to C$2.12 with gold, and it is falling back with gold.

What it earns. Nothing. It burns roughly C$25-40M a year on drilling and studies, and the analyst consensus is a net loss of C$16M rising to C$36M a year. Cash is about C$90-100M after the September raise, which funds the plan through 2028.

Projected FCF (C$M), 2027-31: -35, -45, -60, -80, -100. Studies and permitting get more expensive each year, and after 2028 the money has to come from new equity, so dilution is likely. Construction capex, if a mine is built, would come after year 5 or be paid by an acquirer.

Year 5. I don't know whether AurMac will be a PFS- or feasibility-stage project worth 0.3-0.5x NAV (perhaps C$1.0-1.6B), a takeout, or a shelved low-grade resource worth US$20-30/oz. I ran it each way. The base year-5 equity value is C$1.1B, about C$2.0/share on ~550M diluted shares. Discounted at 10%, with the burn and the cash, that gives C$1.30/share (range 0.6-2.6).

Multiples. About C$620M market cap, about C$520M EV, about US$43 per resource ounce. There are no earnings multiples. The comparable is Snowline (1.6 g/t, much higher US$/oz), and AurMac's grade earns a discount to it.

Management and risks. Management is credible and honest about delays: the PEA may slip into 2027. The risks are gold price (the stock behaves as a levered gold call), capex and power, Yukon permitting after Eagle, First Nations consent, and the heavy 6% royalty. Dilution is the business model, though the latest raise came without warrants.

Sentiment: 6/10. It is a retail and gold-fund favourite with a Franco-Nevada endorsement, but it is down 38% from its September high as gold cooled.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit-0.16-0.12-0.14-0.14-0.09
Operating expenses7.95+132%4.35-6%4.64+71%2.71+10%2.46
▸Adj EBITDA-7.95-4.35-4.64-2.71-2.46
▸Adj OCF-5.88-3.41-1.66-1.63-2.14
CapEx-12.1-9.48-8.86-2.85-0.32
Adj FCF-18.0-12.9-10.5-4.48-2.46
Interest expense0.000.000.000.000.00
▸Adj net income-8.75-5.38-5.94-0.35-1.66

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-20.4-6.26-4.35-4.64-2.72-2.44
FCF (OCF−capex)-45.9-20.3-11.2-8.29-4.63-1.41
Net income-12.5-5.56-1.51-4.280.34-1.46
▸Capital returned-137-78.6-14.8-14.3-12.2-17.0
Buybacks-137-78.6-14.8-14.3-12.2-17.0
Dividends0.000.000.000.000.000.00
Interest paid0.000.000.000.000.000.00
Debt paid down0.000.000.000.000.000.00
▸Reinvestment33.612.19.488.862.850.32
Capex (PP&E)33.612.19.488.862.850.32
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)------------
Retained / other91.158.33.606.007.5515.6

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 5.5 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)16688.172.858.548.4
▸Liabilities (total)33.019.015.39.5410.6
Net debt (incl. leases)-57.4-9.79-13.8-8.15-11.6
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest----------
Shares outstanding473377329285259
Dilution (YoY)+15.2%+14.7%+15.5%+9.9%+37.6%
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-4.8%-5.1%-6.6%-4.6%-5.3%
Cost of debt----------

Institutional Ownership

Change in total shares held by all 13F filers, each quarter, in shares (no share count available for this name). Pale bars = what individual filers bought / sold. Hover a quarter for its biggest buyers and sellers.
−20K0+20K$0.23$0.46$0.70Q4 2021Q3 2022Q2 2023Q1 2024Q4 2024Q3 2025Q2 2026Q3 2026
Q2 20262026-06-30(hover the chart for other quarters)
0 shares (net)
Bought 0 by 0 filers · Sold 0 by 0
Net 0 shares
0 filers reported
No share count for this quarter — flow shown in shares, not %.
Top buyersΔΔ %holds
none
Top sellersΔΔ %holds
none

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

09K18K28K37K$0.23$0.35$0.46$0.58$0.702022-062022-122023-062023-122024-062025-09
hover the chart for per-quarter detailprice (right axis)
GREENUP STREET WEALTH MANAGEMENT LLC—Hurley Capital, LLC10KCARRET ASSET MANAGEMENT, LLC—

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2025 Q30M—0M$0.00$0.00 – $0.000
2025 Q40M—0M$0.00$0.00 – $0.000
2026 Q10M—0M$0.00$0.00 – $0.000
2026 Q20M—0M$0.00$0.00 – $0.000
2026 Q30M—-2M$-0.01$-0.01 – $-0.011
2026 Q40M—-4M$-0.01$-0.01 – $-0.011
2027 Q10M—-4M$-0.01$-0.01 – $-0.011
2027 Q20M—-4M$-0.01$-0.01 – $-0.011
2027 Q30M—-4M$-0.01$-0.01 – $-0.011
2027 Q40M—-9M$-0.02$-0.02 – $-0.021
2028 Q10M—-9M$-0.02$-0.02 – $-0.021
2028 Q20M—-9M$-0.02$-0.02 – $-0.021
2028 Q30M—-9M$-0.02$-0.02 – $-0.021