CAML.L
Central Asia Metals plcv3 4.5/10 · 2026-11-18Central Asia Metals plc, along with its associated companies, is primarily engaged in the extraction and processing of base metals. Its output includes a range of valuable metals such as copper, zinc, silver, and lead. The company holds full ownership of two key operations: the Kounrad solvent extraction-electrowinning (SX-EW) facility, situated near Balkhash in central Kazakhstan, and the Sasa mine, located in northeastern Macedonia. Established in 2005, Central Asia Metals maintains its global headquarters in London, United Kingdom.
2-Year Price History
Valuation v3 Opus worker · 2026-11-18
Central Asia Metals owns two mines. Kounrad is a very low-cost copper SX-EW operation in Kazakhstan (84% EBITDA margin in H1-26). Sasa is a lead-zinc mine in North Macedonia whose turnaround is working (Q3-26 zinc +18%). On 27 Oct 2026 the company also closed the all-share Cygnus deal, which brought in the Chibougamau copper-gold project in Quebec and took the share count to 256.2m. At 117.6p (18 Nov close) the market cap is about GBP301m, with about GBP87m of net cash and no debt. EV is about 2x EBITDA. That looks absurdly cheap until you read the company's own reserve report. Kounrad's maiden JORC plan schedules only 74.5kt of copper for 2026-34, so after a roughly 13kt 2026 output falls toward 6-8kt a year. Sasa's 6.9Mt reserve also runs to about 2034. The producing business is an eight-year run-off, not a steady earner. Its cash is also spoken for. BMO models about C$630m to build Chibougamau, more than the market cap, and the CEO has said the dividend will 'flex' to fund it. I re-ran the DCF on a Kounrad profile 9% above the reserve plan, because Kounrad has always beaten its recovery curves, with copper easing from $12.5k to $11k, real Chibougamau study spend and a run-off terminal value. It gives about 116p, about today's price. Rating 4.5. The market has this right: it is a cheap-looking run-off with a dilutive build ahead, and it is fairly priced. Setup 4.0. The only mispricing is mechanical: a Sale Agent is dumping some ex-Cygnus holders' shares on AIM. That ends within weeks and is worth a few pence, not a re-rating. Upside needs copper to hold above $13k, a Kounrad licence extension, or a strong Chibougamau PEA (mid-2027). Downside at $9k copper is about 75p. Pass.
Flow: About 78m new shares (30% of the enlarged 256.2m) were issued to Cygnus holders on 27 Oct 2026. A scheme Sale Agent is selling the ineligible-foreign, electing and FRCGW holders' portion on AIM 'as soon as reasonably practicable', so that slice is running now and should end within weeks. Other ex-Cygnus holders may keep trimming via AIM or the new TSX line. The $10m buyback ended in March 2026 and no new one has been announced.
A deep dive would have to establish: Can Kounrad keep beating its 74.5kt 2026-34 reserve plan, and can Chibougamau's mid-2027 PEA justify roughly C$630m of capex without a dilutive raise, given that the producing base otherwise halves by 2031?
Research (expand)
What it does. CAML owns three assets.
- Kounrad (100%). It leaches old dumps in Kazakhstan into LME-grade copper cathode at a C1 cost of about $0.95/lb. The licence runs to 2034, and the August 2026 JORC reserve schedules 74.5kt of cathode for 2026-34.
- Sasa (100%). An underground lead-zinc mine in North Macedonia with a 6.9Mt probable reserve, about eight years.
- Chibougamau (via Cygnus, closed 27 Oct 2026). A high-grade copper-gold district in Quebec: 6.4Mt M&I at 2.3% Cu plus 8.5Mt inferred. It needs a new or rebuilt plant. The PEA is due mid-2027, and up to 70km of drilling is planned through 2027.
What the market believes. It sees a melting ice cube run by builders. Shareholders asked for a wind-down. Management instead gave away 30% of the company for a pre-PEA project. The shares fell from 217p in February to 117.6p even as copper hit records, and copper itself slid to a four-month low in mid-November.
What it earns today. H1-26 EBITDA was $75.5m and adjusted FCF $46.8m. At spot prices, owner earnings are about $100m (about GBP72-76m) after cash tax and $16m of sustaining capex. Kounrad pays about 32% all-in, including the 15% withholding tax. Part of 2026's margin comes from a MET cut of about 85% under the new Kazakh tax code's dump-recovery coefficient, which may not last.
Projected unlevered FCF (US$m; GBP in the JSON). Copper eases from $12.5k to $11k, Kounrad runs 12.5, 11.5, 10.5, 9.5 and 8.5kt, and $35m a year goes to Chibougamau study work and Kazakh exploration in 2027-28:
| Year | FCF (US$m) |
|---|---|
| 2027 | 57 |
| 2028 | 42 |
| 2029 | 46 |
| 2030 | 40 |
| 2031 | 36 |
Chibougamau construction capex is excluded; I treat the project as an option.
Year 5. This is a corpse. By 2031 both mines have about three years of reserve left. I put the 2032-34 tail at about $75m net of closure, roughly 2x year-5 FCF.
DCF at 10%.
- Producing assets: about $217m.
- Net cash: plus about $115m.
- Chibougamau: about $60m. It was bought for about $150m in shares, but needs about C$630m of capex (BMO) for first copper in late 2031 or 2032.
- Total: about $392m, or about GBP297m. That is about 116p a share.
Spot copper held gives about 155p, Kounrad beating plan by a further 25% adds about 15p, and $9k copper with no value for Chibougamau gives about 75p.
Multiples. About 1.9x EV/2027 EBITDA, about 5x P/E and a 14% equity FCF yield. These are cheap only because the base halves by 2031.
Fair value: 112p. I hold it slightly below the DCF because cash will be recycled into Chibougamau, with risk of equity issuance at depressed prices.
Management, risks and competition. Ferrar and Wrathall are candid. They walked away from NWR, took the $117.5m Sasa impairment and have returned $437m since IPO. But they have chosen growth over a wind-down. The risks are:
- Kazakh fiscal changes: the MET relief could be reversed, the withholding tax has already risen, and a royalty regime is due for new licences from 2029.
- Copper mean reversion: LME stocks are up to about 320kt.
- Chibougamau's capex and the dilution that could come with it.
- Sasa geology.
- Tenge and denar inflation.
On competition, both mines are price-takers, and Kounrad sits deep in the first quartile of the cost curve.
Sentiment: 3/10. The stock is near its three-year low, holders are irritated by the dilution, ex-Cygnus holders are selling via the scheme's sale facility, and broker coverage is thin.
Thesis test
- Kounrad reserve run-off (challenge right, slightly overstated). The reserve plan (74.5kt for 2026-34) matches management's own '75,500t remaining' on the H1 call. The pitch's 55kt for 2027-31 plus a $170m terminal value was too rich. I keep about 9% outperformance, for Kounrad's record of beating its recovery curves, which gives 52kt for 2027-31 and a $75m tail. This costs about 30p.
- Chibougamau as a cash sink (challenge right). Capex is about C$630m (BMO) against a GBP301m market cap. 2027 study and drilling spend is about $35m, and the CEO has said the dividend will flex to fund it. Option value cut to $60m, with a range that goes negative, and capital return cut to about 7%. Costs about 7p.
- Fall partly copper, not flowback (challenge mostly right). Copper hit a four-month low on 16 Nov and LME stocks are rising. The Sale Agent selling on AIM is real, but it is small and short-lived, so it is not a thesis.
- Kazakh MET windfall (challenge right, small). The H1 MET fell from $5.0m to $0.8m. That is a tail risk of about 5p, already reflected in a lower FCF mid-case.
- Peak-flattered multiples (challenge right). The 2x EBITDA multiple is real but describes a halving business, and consensus H2 EBITDA is well below H1.
- Conclusion. The pitch's upside came from a terminal value the company's own reserve report does not support. The base DCF is about 116p against 117.6p, which is fair value. There is no variant perception beyond a short-lived seller. Pass, rating 4.5.
- /Users/gregwo/stocks2/data/analysisv3/context/CAML.L.md (H1-2026 results call, 26 Aug 2026)
- https://stockanalysis.com/quote/aim/CAML/history
- https://www.investegate.co.uk/announcement/rns/central-asia-metals--caml/total-voting-rights/9451922
- https://kalkinemedia.com/uk/news/announcements/central-asia-metals-caml-releases-updated-jorc-mineral-resource-and-ore-reserve-estimates-for-kounrad-and-sasa-mines
- https://www.geomechanics.io/news/article/chibougamau-copper-growth-for-central-asia-metals-capex-schedule-and-mine-plan-lens
- https://www.bnnbloomberg.ca/press-releases/2026/10/27/cygnus-metals-limited-implementation-of-the-scheme/
- https://capital.com/en-sg/news/tsx-opening-and-chibougamau-project-update
- https://tradingeconomics.com/commodity/copper/news/601397
| date | price | rating | research | fair value | DCF | base IRR | sentiment |
|---|---|---|---|---|---|---|---|
| 2026-11-03 | 125.80 | 6.5 | 7.0 | 150.00 | 155.00 | 20% | 3 |
| 2026-11-18 | 117.60 | 4.5 | 4.0 | 112.00 | 116.00 | 10% | 3 |
Financials — Adjusted
Adjusted · TTM 2025-Q4 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 230+7% | 230+7% | 214+10% | 195-12% | 221 |
| Gross profit | 104+0% | 104+0% | 103+3% | 100-24% | 132 |
| Operating expenses | 33.0+44% | 33.0+44% | 22.9-30% | 32.5+14% | 28.5 |
| ▸Adj EBITDA | 104-4% | 104-4% | 108+11% | 97.0-26% | 132 |
| ▸Adj OCF | 65.6-16% | 65.6-16% | 77.8+12% | 69.6-36% | 108 |
| CapEx | -18.8 | -18.8 | -21.2 | -27.8 | -17.4 |
| Adj FCF | 46.8-17% | 46.8-17% | 56.6+36% | 41.7-54% | 91.0 |
| Interest expense | 1.62 | 1.62 | 2.19 | 0.00 | 0.00 |
| ▸Adj net income | 54.3-3% | 54.3-3% | 55.8+35% | 41.3+11% | 37.3 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025
| Where the Cash Went | Total | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 433100% | 99.7100% | 106100% | 96.2100% | 132100% |
| FCF (OCF−capex) | 21951% | 45.145% | 53.050% | 38.640% | 82.463% |
| Net income | 46.511% | -75.5-76% | 50.948% | 37.139% | 34.026% |
| ▸Capital returned | 18142% | 32.432% | 43.141% | 41.543% | 64.249% |
| Buybacks | 0.02 | 0.00 | 0.02 | 0.00 | 0.00 |
| Dividends | 161 | 30.8 | 40.9 | 41.5 | 48.2 |
| Interest paid | 3.81 | 1.62 | 2.19 | 0.00 | 0.00 |
| Debt paid down | 16.1 | 0.00 | 0.06 | 0.00 | 16.0 |
| ▸Reinvestment | 89.721% | 18.619% | 25.124% | 28.730% | 17.413% |
| Capex (PP&E) | 85.3 | 18.8 | 21.2 | 27.8 | 17.4 |
| Intangibles & M&A | 3.83 | -0.02 | 3.85 | 0.00 | 0.00 |
| Leases signed (net Δ) | 0.59 | -0.24 | -0.03 | 0.86 | -- |
| Retained / other | 37.99% | 14.414% | 8.228% | -2.93-3% | 18.214% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 14 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 385 | 385 | 440 | 462 | 443 |
| ▸Liabilities (total) | 101 | 101 | 88.6 | 82.1 | 74.9 |
| Net debt (incl. leases) | -77.9 | -77.9 | -65.6 | -55.0 | -58.6 |
| Net debt / Adj EBITDA | -0.75 | -0.75 | -0.61 | -0.57 | -0.45 |
| Net debt / Adj FCF | -1.67 | -1.67 | -1.16 | -1.32 | -0.64 |
| Adj EBITDA / interest | 64.1 | 64.1 | 49.1 | -- | -- |
| Shares outstanding | 170 | 173 | 186 | 191 | 187 |
| Dilution (YoY) | -6.8% | -6.8% | -2.6% | +2.2% | +2.0% |
| Employees | 1000 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 45.1%-3.2 | 45.1%-3.2 | 48.3%-3.0 | 51.2%-8.4 | 59.7% |
| Adj EBITDA margin | 45.0%-5.2 | 45.0%-5.2 | 50.2%+0.5 | 49.7%-9.9 | 59.5% |
| Adj OCF margin | 28.5%-7.8 | 28.5%-7.8 | 36.3%+0.7 | 35.6%-13.5 | 49.1% |
| Adj FCF margin | 20.3%-6.1 | 20.3%-6.1 | 26.4%+5.0 | 21.4%-19.8 | 41.2% |
| Net income margin | -32.7%-56.5 | -32.7%-56.5 | 23.7%+4.7 | 19.0%+3.6 | 15.4% |
| Adj NI margin | 23.6%-2.5 | 23.6%-2.5 | 26.0%+4.9 | 21.1%+4.3 | 16.9% |
| ROIC (adj, after-tax) | 19.5% | 19.5% | 15.0% | 11.8% | 18.1% |
| Cost of debt | -- | -- | -- | -- | -- |
Earnings Calls
Earnings Call · 2026 Q2
Central Asia Metals plc (CAML) reported its H1 2026 results, a strong half driven by higher commodity prices, improved operating performance at Sasa, and strong cash generation. CAML owns 100% of the Kounrad copper cathode project in Kazakhstan, which has produced copper profitably since 2012 and is licensed to 2034. It also owns the Sasa underground lead-zinc mine in North Macedonia, held since 2017, with a life of mine to 2034. The group holds exploration projects in Kazakhstan (CAML X, CAML XD and Shaindy), a minority stake in privately held Aberdeen Minerals in Scotland, and has agreed an all-share transaction to acquire Cygnus Metals, which holds the Chibougamau copper-gold assets in Quebec, Canada. Financial highlights: revenue rose 46% to $145.5 million from $99.5 million, EBITDA rose 89% to about $75.5 million from $39.9 million at a 52% margin, and adjusted free cash flow was $46.8 million versus $16.2 million a year earlier. Cash at 30 June was $97.2 million, with only a $0.9 million overdraft as borrowings. The board declared an 8p dividend, equal to about 40% of adjusted free cash flow and in the middle of the 30% to 50% policy range. Copper prices averaged 39% higher and zinc 26% higher year on year, while silver spiked to $115 per ounce. Silver affects revenue and costs but not profitability, and it drove an $8.8 million purchase cost under the OR Royalties contract. Treatment charges fell $2.2 million to $2.7 million, helped by negative lead treatment charges locked in through April 2027. Headwinds included a weaker US dollar, with the denar 7% weaker and the tenge 5% weaker, which raised local costs. Inflation was 11% in Kazakhstan and 4% in North Macedonia. Hedging produced a loss of about $1.4 million on 50% of 2026 Sasa zinc production, hedged at $3,011 per tonne, and a small FX hedge loss of about $0.1 million. Depreciation at Sasa rose to $15.9 million, reflecting a shorter mathematical life to 2034. Tax rose $10.8 million, driven by higher Kounrad profits taxed at 20% and by Kazakh withholding tax rising from 10% to 15% from January 2026. A roughly $9 million swing in the share-based payment liability reflected the weaker share price, since the LTIPs are cash-settled. Adjusted EPS excludes a $1.5 million unrealized hedge loss. The company reported H1 EPS up about 330%. At Kounrad, production rose 1% to cathode output, despite weather disruption in Q1. Costs rose about $0.12 per pound largely due to tenge strength, but remained below inflation for the rest of the cost base. Kounrad achieved an EBITDA margin of 84%, and EBITDA rose 78%. A power tariff increase from $0.06 to $0.07 per kWh starts in June and will add cost in H2. Management reaffirmed 2026 guidance of 12,000 to 13,000 tonnes of copper cathode. Cumulative production since 2012 exceeds 185,000 tonnes. Updated JORC and NI 43-101 compliant reserves show about 75,400 tonnes of recoverable copper remaining, which management views as a minimum to 2034, with potential extension if the licence is renewed. A solar plant supplied 18% of Kounrad's electricity in H1. At Sasa, zinc output rose 5% and lead output rose 6%, aided by higher ore tonnages, grades and reduced dilution. Site operating costs were roughly flat, with mining costs down $0.7 million from productivity gains and headcount reductions, offset partly by higher fuel costs and higher tailings disposal costs. The C1 cost fell from $32.1 million to $30.8 million, and Sasa EBITDA rose 62% to $19.3 million, with the margin back near 30%. Inventory fell about $3 million in H1 as part of a programme that has reduced it by nearly $5 million over the year. Guidance remains at 18,000 to 20,000 tonnes of zinc and 26,000 to 28,000 tonnes of lead. Group capex was $9.5 million in H1, including $8 million at Sasa for underground development and the raise boring project, and full-year guidance of $14.5 million to $17.5 million was reiterated. Exploration spend was $1.6 million in H1, with about $3 million to $3.5 million planned for Kazakhstan in 2026. Maiden drilling at Otyar and Yuzhnoe returned 4,300 metres across 15 diamond holes and intersected polymetallic and copper-molybdenum mineralization, with assays expected in Q3. A geophysical survey at Shaindy is being interpreted for drill targets, and a 4,600-metre programme is planned at CAML XD. Aberdeen Minerals stake will rise to about 38.9% after a final GBP 1.15 million investment to fund Phase 4 drilling. The Cygnus transaction is a share-based deal valuing Cygnus equity at about AUD 232 million. The scheme booklet and UK circular were published in mid-August, with CAML shareholder voting on 4 September, proxies due by 2 September, and the Cygnus scheme meeting on 18 September. Completion is targeted for October 2026. Both boards recommend the deal, and Glass Lewis, ISS and PIRC support it. A TSX listing application is underway, with conditional approval expected within weeks. Chibougamau comprises five copper-gold deposits with a 6.4 million tonne measured and indicated resource, located mostly within 30 km of an existing processing facility, which requires refurbishment. The district has historically produced over 1 million tonnes of copper and 3.5 million ounces of gold. A preliminary economic assessment is expected in early 2027, with further drilling planned. The company intends to retain the Canadian management team and expects development capex to ramp up in late 2027 and 2028. In the Q&A, management said the 8p dividend was set at the midpoint of policy and could move toward the upper end if commodity prices stay strong, while dilution from the Cygnus shares will reduce per-share payouts. Management advised keeping Sasa unit costs flat through the year. In strategy, management said the next 12 months will focus on integrating Cygnus, with no other significant acquisition expected, though opportunities remain under review. Working capital priorities include further inventory reduction at Sasa and timing of Kazakh CIT payments in equal instalments from August to December.
▸How should investors think about the H2 payout ratio given the H1 dividend at the midpoint of policy, the pending transaction and Chibougamau development spend? Does the capital allocation framework change structurally after close, and how should group capex be expected to trend over the next 12 to 24 months?Laura Chan · RBC
▸Is there more cost cutting to come at Sasa under the operational improvement programme, or is H1 the normalized level for mining costs per tonne in H2?Nicholas Chalmers · Cavendish
▸Assuming the Cygnus transaction closes on time, what is the expected timing of the Chibougamau PEA and the budget to get there?Nicholas Chalmers · Cavendish
▸Given Chibougamau's longer-dated volumes, is there potential for additional near-producing transactions, or is that less likely than more speculative exploration upside, including from improvements at existing operations?Richard Hatch · Berenberg
▸Should we expect working capital movements in H2, given the well-controlled working capital in H1?Richard Hatch · Berenberg
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2014 Q4 | 120M | 78M | 52M | $0.30 | $0.21 – $0.37 | 7 |
| 2015 Q2 | 45.6B | 10.5B | 7.6B | $0.07 | $0.07 – $0.07 | 2 |
| 2015 Q4 | 105M | 29M | 17M | $0.20 | $0.10 – $0.54 | 8 |
| 2016 Q2 | 42M | 13M | 8M | $0.06 | $0.06 – $0.06 | 2 |
| 2016 Q4 | 83M | 23M | 14M | $0.22 | $0.19 – $0.25 | 6 |
| 2017 Q4 | 133M | 40M | 23M | $0.25 | $0.18 – $0.34 | 4 |
| 2018 Q4 | 271M | 96M | 47M | $0.16 | $0.16 – $0.17 | 2 |
| 2019 Q4 | 226M | 69M | 39M | $0.13 | $0.13 – $0.14 | 2 |
| 2020 Q2 | 92M | 37M | 16M | $0.10 | $0.09 – $0.12 | 3 |
| 2020 Q4 | 203M | 63M | 35M | $0.09 | $0.09 – $0.09 | 2 |
| 2023 Q4 | 255M | — | 0M | $0.00 | $0.00 – $0.00 | 4 |
| 2024 Q4 | 111M | 62M | 33M | $0.18 | $0.18 – $0.18 | 1 |
| 2025 Q2 | 96M | 43M | 20M | $0.11 | $0.11 – $0.11 | 1 |
| 2025 Q4 | 123M | 66M | 33M | $0.18 | $0.18 – $0.18 | 1 |
| 2026 Q2 | 144M | 77M | 43M | $0.23 | $0.23 – $0.23 | 1 |
| 2026 Q4 | 145M | 51M | 24M | $0.13 | $0.13 – $0.13 | 1 |
| 2027 Q2 | 147M | 48M | 22M | $0.12 | $0.12 – $0.12 | 1 |
| 2027 Q4 | 148M | 50M | 24M | $0.13 | $0.13 – $0.13 | 1 |
| 2028 Q2 | 149M | 48M | 23M | $0.12 | $0.12 – $0.12 | 1 |
| 2028 Q4 | 150M | 51M | 25M | $0.13 | $0.13 – $0.13 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- FY 2025 Financial Results & Sasa Impairment (March 2026): Central Asia Metals PLC (CAML) reported robust underlying operational results for 2025, generating Group EBITDA of $101.8 million with a 44% EBITDA margin (down from 48% in 2024), on revenues of $229.9 million (up 7% YoY, driven by higher copper prices). However, the company recorded a net statutory loss of $75.2 million due to a major $117.8 million non-cash impairment charge on the Sasa lead-zinc mine in North Macedonia. Stripping out this impairment, the company achieved an underlying attributable profit of $32.6 million. Adjusted free cash flow came in at $56.0 million, and the board declared a final dividend of 7.5 pence per share, bringing the full-year 2025 dividend to 12 pence.
- Capital Allocation & Share Buyback (Jan-Mar 2026): Following its decision to walk away from a competitive bidding war in mid-2025 for New World Resources (the Antler copper project) to maintain strict capital discipline, the company completed a post-period $10.0 million share buyback program. It entered 2026 with a robust balance sheet, holding $80.1 million in cash against minimal debt ($0.9 million overdraft).
- Proposed Acquisition of Cygnus Metals (June 2, 2026): CAML announced a proposed A$232 million (~$166 million equivalent) all-scrip acquisition of Cygnus Metals, an ASX/TSXV-listed developer. Upon closing (expected in September 2026), legacy CAML shareholders will own approximately 70% of the combined group. The transaction adds the high-grade Chibougamau copper-gold project in Quebec, Canada, to CAML’s portfolio, addressing a long-standing gap in its pipeline by securing a near-term development-stage asset. The company also plans to list its ordinary shares on the TSX or TSXV to broaden its North American investor base.
- 5-Month Trading and Production Update (June 10, 2026): Production in the first five months of 2026 outpaced 5M 2025 across all three of the company's core metals. Copper production reached 5,141 tonnes (vs. 4,953t in 5M 2025), zinc-in-concentrate reached 7,566 tonnes (vs. 7,397t), and lead-in-concentrate was 11,142 tonnes (vs. 10,792t). Stronger metals prices significantly boosted average received prices (copper averaged $13,076/t vs $9,377/t YoY; zinc averaged $3,299/t vs $2,765/t YoY).
▸ Thesis-test Findings
Sasa mine North Macedonia production updates and grade profiles 2025 2026
The bear-case at Sasa materialized in early March 2026 when a comprehensive operational review resulted in a revised Life-of-Mine (LoM) plan, cutting five years off Sasa's mine life (now estimated to 2034) by restricting the mine schedule strictly to the Svinja Reka deposit and excluding Golema Reka. Ore Reserves were revised downwards to 6.9Mt (averaging 2.5% Zn and 3.5% Pb) due to higher operating cost assumptions, updated treatment charges (TCs), and updated mine designs. This structural down-sizing drove the $117.8 million impairment charge. However, the bull-case is supported by a strong operational turnaround in early 2026. For the first five months of 2026, both zinc (7,566t vs. 7,397t) and lead (11,142t vs. 10,792t) production outpaced 5M 2025. Net revenues have been further boosted by historically low TCs for lead concentrates, which actually turned negative. Turnaround efforts are currently in the implementation phase, including cost controls, an 11% reduction in headcount, and transitioning to paste backfill to improve mining efficiency.
Kounrad copper leach curve maturity and recovery rates Kazakhstan
Kounrad continues to act as CAML's "cash engine," generating a phenomenal 75% EBITDA margin in 2025 with industry-leading C1 cash costs of $0.82/lb. However, the bear-case concern of dump-leach maturity is real: after 14 years of operations since 2012, Kounrad's leach curves are naturally starting to mature and tail off. This gradual curve decline has prompted lower production guidance for FY2026 of 12,000 to 13,000 tonnes of copper, compared to 13,311 tonnes produced in 2025 and 13,439 tonnes in 2024. Despite this finite runway, near-term recovery rates and production remain robust: copper production for the first five months of 2026 reached 5,141 tonnes, outpacing 4,953 tonnes in 5M 2025, with stronger output expected in H2 due to warmer weather seasonal effects on leaching. Furthermore, Kounrad will benefit from a massive regulatory margin boost starting January 1, 2026, as Kazakhstan's Mineral Extraction Tax (MET) on man-made mineral formations was slashed from 8.55% to 0.855%.
Central Asia Metals M&A pipeline and exploration targets
To mitigate the finite reserve lives of Sasa and Kounrad, CAML is aggressively building out its growth pipeline. The proposed acquisition of Cygnus Metals in June 2026 secures the Chibougamau copper-gold project in Quebec, Canada, providing CAML with a high-grade 6.4Mt M&I resource at ~3% CuEq (plus 8Mt Inferred) and an existing 900,000 tpa processing plant. This fills a critical gap in the company’s portfolio by providing a clear, near-term development-stage asset to bridge the gap between early-stage exploration and active cash-generating production. For early-stage exploration, CAML's 80%-owned CAML Exploration (CAML X) completed maiden drilling (~2,000m each) on schedule at the Yuzhnoe and Otyar projects in Kazakhstan, with results expected in Q3 2026. CAML also signed an option agreement over a new prospective license in Kazakhstan’s Tengiz Basin and is funding a Phase 3 drilling program at the Arthrath base-metals project in Scotland with Aberdeen Minerals (results also expected in Q3 2026).