Stocks/CDLR

CDLR

Cadeler A/Sv3 5.0/10 · 2026-11-26
Industrials·Marine Shipping
$5.59
490M EUR market cap
v3 Rating
5.0/103.5–6.5
Setup
4.0/103.0–5.5
Fair Value
$5.90$3.00–$9.00+6%
DCF (10%)
$6.00+7%
Base IRR
+12%+0%–+25%
Visibility
wide±51%
Wall Street
(1 buy)
Rating
Revenue (TTM)
695.6M EUR
Owner Earnings
$300M
Next-Yr Owner Earnings
$200M
Growth
+8.0% × 5y
P / Next-Yr OE
9.9x
Net Debt
$2.7B

Cadeler A/S, founded in 2008 and headquartered in Copenhagen, Denmark, operates as a specialized contractor within the offshore wind sector. The company primarily focuses on the transportation and installation of wind farm components. In addition to these core services, Cadeler provides comprehensive solutions for wind farm maintenance, construction, and decommissioning, alongside broader marine and engineering services for the offshore industry. A key asset in its operations is its fleet of four specialized offshore jack-up vessels, dedicated to wind farm installation projects.

2-Year Price History

$5.52-77.4%
$10$15$20$25Initial target $5.90 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.03.5–6.5
Setup
4.03.0–5.5
Fair value (USD)
5.903.00 – 9.00
Upside vs 5.59
+6%
DCF (10%)
6.002.50 – 10.00+7%
Base IRR
12%0% – 25%
Visibility
widerange ±51%
Sentiment
4/10
Reputation
7/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 5.52

Cadeler owns the largest fleet of high-end jack-up vessels that install offshore wind turbines and foundations (10 vessels, 12 after Wind Apex arrives in Q2 2027, 14 with two T-class ships due 2030-31), plus Menck, the dominant maker of pile-driving hammers, bought in August 2026 for about EUR 500m EV. A data warning first: the pack's chart is broken. Its 28.76 to 5.52 drop is not a crash. On 4-5 November each Cadeler A/S ADS was exchanged for 4 shares of the new UK company, Cadeler plc, now listed directly on the NYSE and in Oslo. The 5.52 USD close on 25 Nov matches NOK 55.10 in Oslo, about 17% below the late-September level and a little under the NOK 58.42 cash squeeze-out price. About 355m plc shares are outstanding: 92.06% of 386.05m, with the other 7.94% being squeezed out for roughly EUR 173m of bridge debt. That puts market cap near USD 1.96bn and EV near USD 4.7bn, with net debt of about EUR 2.35bn after the squeeze-out. The bull case: 2027 is fully booked, backlog is EUR 2.4bn, consensus 2027 EBITDA is about EUR 700m (roughly 5.8x EV), taxes are near zero under tonnage tax, a structural shortage of capable vessels for 15MW+ turbines is coming, and the 2030+ UK award adds visibility. On that view, owner earnings before growth capex are about EUR 480m in 2027 against a EUR 1.7bn market cap. The market's doubts are real, though. 2028 is openly a 'transitional' year. Q3 gross margin fell to 38% from 62% as lower-margin T&I work, crane-wire failures and Menck costs came in. Leverage is about 5x 2026 EBITDA. Growth capex (Apex, two T-class ships, a scour vessel) eats most of the cash through 2030. The company has raised equity twice since 2024, has paid no dividend, and has flagged a possible placement to repay the squeeze-out facility. My DCF (10%, five years, then 8x year-5 owner FCF) gives about USD 6.0 per share. That is only 9% above the price, with a very wide range. Rating 5.0: a levered, capital-intensive, cyclical fleet owner, fairly priced, with no clear variant view. Pass.

Flow: The compulsory cash acquisition of the 7.94% of Cadeler A/S shares that were not exchanged (NOK 58.42 per share, notice around 9 Nov 2026, four-week window, about EUR 173m on a DNB bridge) is in effect a one-off buyback ending in December 2026. The company has said the bridge could be repaid with a private placement, which would be a new issue of about 7-8% of shares, possibly in 1H27. Former ADS holders now own Oslo/NYSE ordinary shares, which may cause some churn. US short interest is small (about 0.8m ADS, roughly 1% of shares) and falling.

A deep dive would have to establish: Will 2028-2032 day rates and utilisation for Tier-1 jack-ups hold up (EBITDA about EUR 850m+ by 2031) despite offshore wind project cancellations and competitor newbuilds, so that Cadeler can carry EUR 2.3bn+ of net debt and fund its T-class ships without another equity raise?

Owner earnings, TTM
$300M$230M – $370M
Realistic peak profit
$700M$450M – $950M
Growth rate
8.0%0.0% – 15.0%
Years of growth
52 – 7
Market cap
$2.0B$1.9B – $2.1B
EV
$4.7B$4.5B – $5.0B
Net debt
$2.7B$2.5B – $3.0B
Capital return / cap
2.0%0.0% – 8.0%
P/E
8.0×6.0× – 11.0×
EV/EBITDA
7.0×5.5× – 9.0×
FCF yield
8.0%2.0% – 17.0%
Projected FCF, base case (USD millions)
Y1$200M$50M – $320M
Y2$330M$120M – $480M
Y3$370M$150M – $560M
Y4$420M$150M – $650M
Y5$560M$280M – $820M
Competition: Fragmented but consolidating among European marine contractors (DEME, Van Oord, Jan De Nul, Havfram), with Chinese-built WTIVs and future newbuilds threatening 2029+ rates; Cadeler's edge is fleet size and redundancy plus control of Menck hammers.
Governance: A serial equity issuer with no dividend history; the UK redomicile squeezed out minorities at a fixed VWAP price; owning Menck, which supplies hammers to rivals, invites conflicts; management is promotional (AI, data-point claims).
Research (expand)

What it does. Cadeler charters and operates the largest Tier-1 fleet of wind turbine and foundation installation jack-ups. It is moving from bareboat-style day rates to full transport-and-installation (T&I) contracts, starting with Hornsea 3 monopiles, which are past halfway. Nexra, its maintenance (O&M) arm, brought in about 20% of 2025 revenue. Menck (hammers, about 33% EBITDA margin) was added on 11 Aug 2026.

What the market believes. Offshore wind is out of favour. Orsted cancellations, a dead US market and 2028 contract gaps weigh on the sector. Investors also fear a vessel newbuild wave and the margin dilution of T&I work, and they dislike the leverage and serial equity raises. Q3 2026 showed revenue +65% to EUR 255m, but adjusted EBITDA of only EUR 120m, versus 109m a year earlier on far fewer vessels. FY26 guidance was kept at EUR 910-1,000m revenue and EUR 435-525m adjusted EBITDA. Getting there needs a strong Q4, including an undisclosed December hammer sale, even though Wind Peak and Wind Zaratan are idle. Expect the low end.

What it earns today. The 2026 run-rate is about EUR 450m adjusted EBITDA. Taking off about EUR 180m of maintenance capex (dry docks, crane and wire fixes, about economic depreciation on EUR 3.4bn of PP&E), about EUR 10m of tax and a little stock comp leaves owner earnings of about EUR 255m (USD 300m) before interest. Interest on EUR 2.3bn of debt costs about EUR 140m.

Projection (unlevered FCF after all capex, USD m). 2027: 200 (EBITDA about EUR 680m, Apex final payment EUR 263m). 2028: 330 (the transitional year). 2029: 370. 2030: 420 (T-class payments are back-ended). 2031: 560. By year 5 the business is 'neither' a category leader nor a corpse. It becomes a 14-vessel cyclical fleet owner with a hammer franchise, with about EUR 850m EBITDA and about EUR 600m owner FCF in the base case. Confidence is low, because day rates in 2029-32 depend on auctions (UK AR8, France, Korea) and on competitor newbuilds.

Valuation. Owner FCF of USD 700m in year 5 at 8x gives a terminal value of USD 5.6bn. Adding discounted flows of USD 1.37bn and subtracting net debt of USD 2.72bn leaves equity of about USD 2.14bn, or USD 6.0 per share. Bear case: EBITDA stays near EUR 650m and the multiple is 6x, which gives about USD 2.5. Bull case: EBITDA reaches EUR 1bn on a vessel shortage, which gives USD 10+. At the price we pay about 9x 2026 EBITDA, about 5.8x 2027 consensus, and about 8x 2026 earnings. The equity is a thin, levered slice of the EV, so each 1x of EBITDA multiple moves the share price about 40%.

Management, risks, competition. CEO Gleerup is promotional: 'AI', '50 million data points'. Execution has been decent (newbuilds on time, Hornsea on schedule), but Q3 showed cost overruns, an incident at the Port of Tyne, and fleet-wide crane-wire degradation that will cost downtime in Q1 2027. Competitors are DEME, Van Oord, Jan De Nul, Havfram and Chinese yards and owners. Owning Menck creates conflicts with those same competitors, who buy its hammers. Customer concentration is high (Orsted, Vestas, Equinor/SSE, RWE). The company has never paid a dividend, and has issued equity in 2024 and 2026.

Sentiment: 4/10. The shares are down about 17% since September and the sector is unloved. Sell-side targets are still around NOK 68-71, so investors are not capitulating either.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · EUR

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue696+50%619+149%249+129%109+2%106
Gross profit307+4%383+215%121+131%52.6-6%56.1
Operating expenses94.8+69%69.9+34%52.0+36%38.2+156%14.9
▸Adj EBITDA366+16%420+236%125+239%36.9-41%62.9
▸Adj OCF243-10%324+217%102+630%14.0-71%48.0
CapEx-963-1231-616-87.1-334
Adj FCF-720-906-514-73.1-286
Interest expense73.437.73.882.884.64
▸Adj net income155-33%275+336%63.1+386%13.0-66%38.6

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA839100%168100%432100%127100%49.7100%61.9100%
FCF (OCF−capex)-1997-238%-295-176%-861-199%-523-412%-23.7-48%-294-475%
Net income43952%47.028%28065%65.151%11.523%35.557%
▸Capital returned-2349-280%-784-468%-984-228%-504-397%-81.5-164%4.647%
Buybacks-327-1751.79-1540.000.00
Dividends0.000.000.000.000.000.00
Interest paid86.937.837.73.882.884.64
Debt paid down-2109-647-1024-353-84.40.00
▸Reinvestment2679319%410245%1233285%626493%74.9151%334540%
Capex (PP&E)2674406123161687.1334
Intangibles & M&A-13.5-0.910.000.00-12.60.00
Leases signed (net Δ)18.25.172.569.980.49--
Retained / other36644%494295%12329%-19.0-15%70.4142%-299-482%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 5.9 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)4535341519371253670
▸Liabilities (total)26601912703294129
Net debt (incl. leases)2199147352411096.3
Net debt / Adj EBITDA6.013.514.182.981.53
Net debt / Adj FCF----------
Adj EBITDA / interest4.9811.232.312.813.6
Shares outstanding96.5351351311311
Dilution (YoY)+0.0%+0.0%+12.7%+17.3%+23.7%
Employees659--------
MarginsTTM2025202420232022
Gross margin44.2%-19.261.9%+13.048.8%+0.448.5%-4.252.7%
Adj EBITDA margin52.6%-15.467.9%+17.650.3%+16.334.0%-25.159.1%
Adj OCF margin35.0%-23.152.4%+11.341.1%+28.212.9%-32.245.1%
Adj FCF margin-103.5%+51.9-146.5%+60.0-206.5%-139.2-67.3%+201.7-269.0%
Net income margin22.9%-27.245.2%+19.126.2%+15.610.6%-22.833.4%
Adj NI margin22.3%-27.244.5%+19.125.4%+13.412.0%-24.336.3%
ROIC (adj, after-tax)5.0%9.7%3.7%1.2%6.3%
Cost of debt4.2%2.8%0.9%3.1%4.8%

Earnings Calls

8 calls

Earnings Call · 2026 Q3

2026-11-23

Cadeler reported Q3 2026 revenue of EUR 255.1 million, up 65% from EUR 154.3 million a year earlier, driven by a larger fleet and more contracted days, plus EUR 24 million from Menck, which has been consolidated since the 11 August acquisition. Adjusted EBITDA was EUR 120.4 million (excluding EUR 7 million of Menck transaction costs) versus EUR 109.1 million. Net profit was EUR 55 million versus EUR 64.6 million, hit by transaction costs, higher depreciation and financing costs that were previously capitalized. Adjusted utilization was 90.9% (92.2% last year), and reported fleet utilization was 78% versus 92%. Cost of sales rose EUR 99 million to EUR 157 million, reflecting Hornsea 3 foundation transport and installation scope, EUR 14 million from Menck, and extra costs from technical issues on Wind Orca and Wind Maker. Margins fell because foundation work carries lower percentage margins, Menck is consolidated (about 33% EBITDA margin), and there were non-recurring items. Vessel OpEx was EUR 37,000 per day versus EUR 38,000. The backlog is about EUR 2.4 billion, flat year on year. Management expects vessel reservation and preferred supplier agreements to convert to contracts. New awards include a firm 2027-28 contract for Wind Apex on Dogger Bank (Equinor and SSE) and an exclusivity agreement for foundation and turbine installation at a large UK wind farm from 2030. Hornsea 3 passed the halfway mark on monopile installation, turbine installation has started, and more than 150 monopiles are in the marshalling port with three heavy transport vessels on charter. Wind Ace was delivered early and is in transit to Europe. Wind Apex is 87% complete and on track for Q2 2027 delivery. Operational issues: a Port of Tyne incident sidelined Wind Orca, which is back at work and expected to recover the lost time before the project ends. Rapid wire degradation on new crane types, an industry-wide issue, caused downtime on Wind Maker. Permanent fixes are planned, with Maker in Q1 2027 and Wind Peak idle until Q1 for maintenance. Spare parts are now positioned regionally. Balance sheet: total assets rose EUR 1 billion to EUR 4.5 billion, including EUR 163 million of goodwill. Equity is EUR 1.9 billion, with a 41% equity ratio. Net liquidity is EUR 257 million, and a takeout refinancing is progressing with banks. The 2026 outlook is unchanged: revenue of EUR 910 million to EUR 1 billion and adjusted EBITDA of EUR 435-525 million. The market outlook is for building momentum, with 16 GW awarded year to date and upcoming auctions in the UK (round 8), France and South Korea. Management highlighted its largest-in-industry fleet and data, plus coming AI initiatives. In Q&A, management declined to size the expected December hammer sale, said no Menck synergies are yet visible, and said Menck will be run at arm's length. Menck segment reporting will begin with the annual report.

Analyst Q&A (8)
▸
Could Q4 utilization be better than Q3's 78% given seasonality and the Maker and Orca impact, and are there vessels with expected Q4 downtime?
Jamie Franklin · Jefferies
Orca's Q3 downtime cannot be recovered in Q4 since she was already scheduled all year, so utilization will be slightly lower; the time is expected to be recovered before the project ends next year. Maker has a catch-up effect in Q4 because of a different rotation. Wind Peak will not work more this year while wire maintenance is done and will restart in Q1. Zaratan is in transit to Europe and will not be working.
▸
Guidance is wide; how large is the anticipated December hammer sale, and is it the bulk of Menck's EBITDA contribution this year?
Jamie Franklin · Jefferies
The hammer sale is on plan for December, but the size cannot be disclosed for commercial reasons.
▸
What is the length of downtime for the permanent wire rope fix on Maker in Q1, and will it be needed across the fleet or only select vessels?
Jamie Franklin · Jefferies
Maker, Mover, Keeper and other vessels with this crane type will likely need the same fix, with Maker planned for Q1 next year. Spare parts are now available, so the impact of any new degradation should be smaller. A new wire for Asia is expected in mid-December from Malaysia. P- and A-class vessels are less urgent because the wire can be cropped. Fixes will be scheduled when convenient.
▸
Why did gross margin fall from about 62% to 38%, what do the vessel downtime costs relate to, and how has revenue mix and margin by segment changed?
Audrey Zhong · China Securities
Cadeler does not guide on margins by segment. The foundation business has a lower percentage margin but better absolute earnings. Last year there was no foundation project, which explains much of the percentage drop. Management remains confident in the foundations business.
▸
Have there been tangible operational improvements or synergies from the Menck acquisition, when will they appear, and how can Menck's data and AI contribute?
Audrey Zhong · China Securities
It is too early, with no synergies harvested yet beyond the client using a Menck hammer on the current project. Future synergies should come from package offerings of hammer plus vessel. Menck will run at arm's length so it can keep serving peers, and the team has had good client discussions. Menck's soil and pile-driving data combined with Cadeler's jacking data, plus AI, should drive industry efficiency, with more updates to follow.
▸
Is Hornsea 3 on budget and on schedule?
Anders Rosenlund · SEB
The project is on the schedule everyone now agrees on, which changed early for reasons partly outside Cadeler's control. More has been spent on transportation, including three transport vessels, using part of the risk contingency to speed up transport, which is where management wants the project to be.
▸
Will Cadeler introduce segment reporting for Menck, and will it be quarterly?
Anders Rosenlund · SEB
Menck will be reported as a segment in the annual report in March. Quarterly segment reporting is not planned, though historical segment reporting might be introduced in 2027, and there will be no specific Menck guidance.
▸
Comment: it would be helpful to break down the order backlog by year of execution.
Anders Rosenlund · SEB
No response was given; this was a comment rather than a question.

Short Interest

Short % of Float--
Short Shares5.8M
Days to Cover19.2
Change (vs Prior)+100.0%

Cash Runway

2.8months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Condire Management, LP$11.8M$18.40−$1.8M−$1.8M—$942M
VALUEWORKS LLC$11.0M$18.72+$22K−$645K—$479M
STOREBRAND ASSET MANAGEMENT AS$8.3M$18.40+$0+$0—$40.60B
Invesco Ltd.$7.3M$19.82+$911K+$2.3M—$1.26T
FRANKLIN RESOURCES INC$4.1M$19.19+$53K−$427K—$457.77B
SUSQUEHANNA INTERNATIONAL GROUP, LLPMM$3.2M$18.40+$3K+$62K—$112.57B
Qube Research & Technologies Ltd$2.4M$20.10+$686K+$694K—$89.77B
Yaupon Capital Management LP$2.2M$23.68+$113K−$1.7M—$3.00B
DIMENSIONAL FUND ADVISORS LPPassive$2.1M$18.40−$1.2M−$6.4M—$551.30B
DnB Asset Management AS$1.7M$18.40+$0−$38K—$35.69B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

01.3M2.5M3.8M5.0M$18$21$23$26$282023-122024-062024-122025-062025-122026-06
hover the chart for per-quarter detailprice (right axis)
Encompass Capital Advisors LLC—GOLDMAN SACHS GROUP INC18KJANUS HENDERSON GROUP PLC—BRIGHTLINE CAPITAL MANAGEMENT, LLC—Condire Management, LP540KNORGES BANK—VALUEWORKS LLC504KInvesco Ltd.333KSTOREBRAND ASSET MANAGEMENT AS381KSegantii Capital Management Ltd—

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
Buy: 1Consensus: Buy