CMCL
Caledonia Mining Corporation Plcv3 6.3/10 · 2026-11-10Caledonia Mining Corporation Plc primarily operates a gold mine in Jersey. It also engages in the exploration and development of mineral properties for precious metals. The company holds a 64% interest in the Blanket Mine, a gold mine located in Zimbabwe. It also owns 100% interests in the Maligreen project, a brownfield gold exploration project located in the Gweru mining district in the Zimbabwe Midlands; the Bilboes, a gold deposit located to the north of Bulawayo, Zimbabwe; and the Motapa, a gold exploration property located in Southern Zimbabwe. The company was formerly known as Caledonia Mining Corporation and changed its name to Caledonia Mining Corporation Plc in March 2016. Caledonia Mining Corporation Plc was incorporated in 1992 and is headquartered in Saint Helier, Jersey.
2-Year Price History
Valuation v3 Opus worker · 2026-11-10
Caledonia owns 64% of Blanket, a deep, high-cost underground gold mine in Zimbabwe (about 70koz a year at an AISC of $2,650-2,850), and 100% of Bilboes, a $584M refractory open-pit build that should produce about 200koz at its peak, at roughly first-half-of-the-cost-curve costs, from 2029. At $20.95 (the 10 Nov close, 26% of the way up its 1-year range) the $405M market cap gives Bilboes little credit. The challenger is right on all five points. Bilboes's 2029 ramp and $584M cost are both about to be re-tested (a firmer cost estimate is due around the 12 Nov Q3 results, and every milestone so far has slipped). The terminal value has to reflect a depleting mine plan that averages about 143koz, not the 200koz peak. The financing is not solved: the $150M bridge costs about 12%, is secured on Blanket and needs more hedging, and $263-303M of senior debt is unsigned. The 10% royalty above $5,000/oz is law, not scrapped. And Blanket earns about $30M of attributable owner earnings at $3,800 gold, not $40M. I rebuilt the DCF with a half- to one-year Bilboes slip, a 10% overrun, a declining mine plan and a 3.9x terminal (about $1.35B). At $3,800 gold that gives about $50/share (90% range $15-90), against the pitch's $62. The value is real if the mine gets built, and the stock trades at about 0.4x that DCF. A single-asset build in Zimbabwe, with the debt unsigned and a cost update two days away, deserves a large discount, though, so fair value is about $29. Rating 6.3: a moderately attractive, gold-levered, execution-dependent long. It is not a high-conviction mispricing until the cost update and the senior debt are in hand.
A deep dive would have to establish: Whether the November 2026 Bilboes cost update holds capex within about 10-15% of $584M and keeps first gold in late 2028 / early 2029, and whether the $263-303M senior debt closes without forced forwards or an equity raise.
Research (expand)
What it does
Caledonia owns 64% of Blanket (Gwanda, Zimbabwe), a 1.2km-deep underground mine that sells to Fidelity, the state refinery. The other 36% belongs to NIEEF and to employee and community trusts. Caledonia also owns 100% of Bilboes, a refractory BIOX open-pit project. Its feasibility study (Nov 2025) shows 1.55Moz mined over 10.8 years (about 143koz a year on average, about 200koz in the first full year), $584M of capex (already up 45% on the PEA) and an NPV8 of $1.23B at $3,648 gold. It also owns Motapa, an exploration project whose maiden resource was promised in August and is still pending. The dividend is $0.14 a quarter (2.7% yield).
What the market believes
The market sees Blanket as a melting, inflating asset. Q3 grade was 2.67g/t against the roughly 3.1g/t targeted for H2, 2026 guidance was cut twice to 69-72.5koz, and AISC is $2,650-2,850. It also sees a $405M company in Zimbabwe building a $584M+ project, with the long-term debt still unsigned. It values Bilboes at a steep discount.
The investment case (corrected)
Part of the financing is done. Cash was $168M at June 30, the $150M convertible (conversion price $40.51, capped call to $56.72) has closed, and a $150M bridge from eight local banks was signed on 5 Nov. But the bridge costs about 12% (SOFR+7.9-8.1%), runs 36 months, is secured on Blanket's cash flows, and needs extra hedging before the revolver can be drawn. The $263-303M of senior project debt is unsigned and has no date. Management calls its own equity 'eye-wateringly expensive', which tells you an equity raise is the fallback. If Bilboes is built close to plan, it makes $350-450M a year of pre-tax cash at $3,800 gold in its first years, roughly today's market cap each year. That is the whole case. The Zimbabwe discount is real but argues for a haircut, not zero. The 30% FX surrender in ZiG and the royalty structure (5% up to $5,000/oz and 10% above it, enacted in the Finance Act; Blanket paid 10% on three H1 2026 shipments) cap the upside. They are not existential at $3,800-4,100 gold (spot about $4,100 on 5 Nov).
What it earns today
At $3,800 gold, Blanket makes about 70koz at about $1,050-1,180/oz of AISC margin once sustaining capex is normalized to about $35M (2026's $44M includes the 132kV power line, which slipped into 2027). That is about $75-83M before tax and about $58-64M after about $18M of tax. Attributable at 64%, that is about $40M, and after about $12M of group costs, about $28-30M of unlevered owner earnings. The pitch's $40M used $4,100 gold and a recovering grade that Q3 did not deliver. Q4's 20-23koz guide includes about 2.3koz of one-off recoveries (trapped gold, gold in carbon). EV of about $445M is about 15x those owner earnings and about 6.5x attributable EBITDA at $3,800 (about $66M). Only about 45% of attributable EBITDA reaches owners. The reported P/E of about 6-8x reflects H1 2026 gold above $5,000 and is not run-rate.
Free cash flow, next 5 years (attributable, before interest, $3,800 gold, $M)
Bilboes capex is about $595M (FS plus a 10% overrun) spread over 2027-28. First gold comes in late 2028 / early 2029, with about 140koz in 2029 (a ramp and half-year slip, not the FS's 200koz), 200koz in 2030 and 180koz in 2031. The mine's AISC is about $1,300 (FS $1,060 at $2,548 gold, plus royalty and cost escalation). Tax is near zero until the capital allowances are used up in 2030, then 24.7%. There is about $15M a year of FX-surrender drag. Blanket and group add about $20-28M a year.
- 2027: -340
- 2028: -207
- 2029: +368
- 2030: +451
- 2031: +349
What kind of company in year 5
A depleting two-mine mid-tier producer of about 250koz. Neither a category leader nor a corpse: Bilboes is a finite mine plan that averages about 143koz and steps down when throughput falls from 240 to 180kt a month after about year 6. I value it at end-2031 directly from the mine plan rather than with a multiple. Bilboes is worth about $1.1B (about $267M a year for 2032-34, about $200M a year for 2035-38, less closure). Blanket at about 5.5x of about $25M is about $140M. Sulphide and Motapa life extension adds about $100M. That makes about $1.35B, or 3.9x 2031 FCF (the pitch had 5.5x, $1.68B). Confidence in the projection is low: each $500/oz move in gold shifts the DCF by about $20/share, and execution and timing matter as much.
Fair value and multiples
The discounted flows (PV about -$480M for 2027-28 and +$800M for 2029-31) plus the terminal value (PV about $840M) total about $1.16B. Less about $40M of net debt, and about 19.5M diluted shares (the capped call neutralizes conversion up to about $57), that gives a base DCF of about $56 with a half-year slip, and about $42-45 with a full one-year slip and a 20% overrun. I use $50 as the midpoint. The 90% range is $15-90. The low end is $3,000 gold or a 30% overrun with a dilutive equity raise; the high end is $4,500 gold, on time. The pitch's DCF before the corrections, done properly, is about $70; the challenger is right that the inputs, not the arithmetic, were the problem. Debt at about 12% costs more than the 10% hurdle, so it subtracts a little more. Fair value is $29, about 0.55-0.6x of the DCF. That fits a pre-production, single-asset African developer whose senior debt is unsigned and whose cost estimate is about to be reset; it would re-rate toward 0.8x as financing closes and construction proceeds. Base IRR is about 28% a year if the mine is built and the market values it at its DCF by 2031.
Management, risks and competition
Learmonth has a long anti-dilution record and has paid dividends for a decade, and the puts and capped call are sensible. But the timelines have repeatedly slipped (2026 Bilboes spend cut from $132M to $43M, the bridge late, Motapa late). Fatalities at Blanket in 2021, 2022, 2024 and 2025 count against them. Because the bridge is secured on Blanket and Blanket's cash is directed to Bilboes, the dividend is not secure through 2028. The main risks: Bilboes cost and schedule (the update is due about 12 Nov), the senior debt failing to close leading to equity dilution, Zimbabwe fiscal changes (royalty, the 30% FX surrender, any indigenisation demands on Bilboes), power supply, and the gold price. Gold is a price-taker commodity: Blanket is high-cost, and Bilboes would sit in the first half of the cost curve.
Sentiment: 3/10
The stock is down about 43% from its 2025 peak and sits 26% of the way up its 1-year range ($16.79-32.85). Guidance has been cut twice, short interest is about 1.7M shares (about 8 days to cover), and broker coverage is thin. It is not capitulation, and the stock tracks gold. The options are illiquid.
Thesis test
1. Bilboes schedule and capex: the challenger is right. 200koz in 2029 at $584M ignores the pending cost update and a history of slippage. I cut 2029 to 140koz and added a 10% overrun, worth about $8-14/share depending on how big the slip is.
2. Terminal value: the challenger is right. The FS mine plan averages about 143koz and steps down after year 6, so year-5 FCF is near the peak. Valued from the mine plan, the terminal value is about $1.35B, not $1.68B.
3. Financing: the challenger is mostly right. The bridge is roughly 12%, secured on Blanket and requires hedging, and the senior debt is unsigned with no date, so dilution is a real tail and the dividend is not secure. This widens the low end and justifies a lower fair-value multiple of the DCF, but it does not erase the asset.
4. Royalty: the challenger is right on the facts. The hike was moved to a $5,000 threshold and enacted, not scrapped, and Blanket paid 10% in H1 2026. It does not affect the $3,800 base case, but it caps the high case.
5. Blanket earnings: the challenger is right. At the DCF's own gold price, attributable owner earnings are about $28-30M, not $40M, and the 6x P/E came from H1 earnings at gold above $5,000.
Conclusion: every objection holds, and together they cut the DCF from the pitch's $62 (about $70 done properly) to about $50, and fair value from $36 to $29. The pitch's core survives. The market cap is about the size of one year of Bilboes's pre-tax cash, and the stock trades at about 0.4x a sober DCF near the bottom of its range. But the value depends on a Zimbabwe build whose cost and debt are both unresolved this month. It is a moderately attractive long, best re-assessed right after the 12 Nov cost update and the senior-debt signing.
- /Users/gregwo/stocks2/data/analysisv3/context/CMCL.md (Q2 2026 call transcript, price history, short interest)
- /Users/gregwo/stocks2/data/analysisv3/CMCL/pitch/2026-11-10.md
- /Users/gregwo/stocks2/data/analysisv3/CMCL/2026-11-10.challenge.md
- /Users/gregwo/stocks2/data/edgar_filings/CMCL/20-F_2026-04-23_0001104659-26-047739.html
- https://www.miningweekly.com/article/caledonia-secures-150m-bridge-facility-for-zimbabwes-biggest-gold-project-2026-11-05
- https://www.miningweekly.com/article/caledonia-highlights-strong-second-quarter-recovery-at-blanket-2026-08-11
- https://www.mining.com/web/caledonia-plans-to-spend-132-million-on-zimbabwes-biggest-gold-mine-this-year
- https://www.barchart.com/story/news/36897801/caledonia-mining-corporation-plc-enactment-of-zimbabwe-s-2026-national-budget
- https://www.mining.com/web/zimbabwe-scraps-gold-royalty-hike-sets-higher-threshold-for-windfall-tax
- https://equityaxis.net/post/18906/2026/3/decoding-the-sustainability-of-zimbabwe-s-gold-fiscal-framework
- https://www.nationthailand.com/business/trading-investment/40073160
- https://www.lse.co.uk/rns/feasibility-study-for-bilboes-gold-project-mlq7jsfqyedqriq.html
| date | price | rating | research | fair value | DCF | base IRR | sentiment |
|---|---|---|---|---|---|---|---|
| 2026-11-03 | 19.02 | 6.5 | 8.0 | 38.00 | 72.00 | 33% | 3 |
| 2026-11-10 | 20.95 | 6.3 | 7.0 | 29.00 | 50.00 | 28% | 3 |
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 284+18% | 264+46% | 181+24% | 146+6% | 139 |
| Gross profit | 153+29% | 137+70% | 80.9+95% | 41.5-38% | 66.7 |
| Operating expenses | 21.0-6% | 20.3-47% | 38.1+45% | 26.3+0% | 26.4 |
| ▸Adj EBITDA | 144+29% | 132+126% | 58.8+98% | 29.7-42% | 50.9 |
| ▸Adj OCF | 101+22% | 108+115% | 50.4+93% | 26.0-34% | 39.3 |
| CapEx | -36.1 | -36.1 | -27.4 | -29.7 | -44.1 |
| Adj FCF | 64.9+44% | 72.3+215% | 23.0 | -3.71 | -4.83 |
| Interest expense | 7.19 | 3.51 | 3.14 | 3.02 | 0.66 |
| ▸Adj net income | 63.5+28% | 62.4+265% | 17.1 | -4.20-123% | 17.9 |
| ▸Owner's earnings | 65.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 383100% | 111100% | 126100% | 68.5100% | 33.5100% | 44.4100% |
| FCF (OCF−capex) | 70.318% | 32.629% | 40.332% | 13.820% | -14.9-44% | -1.47-3% |
| Net income | 12934% | 42.638% | 55.244% | 17.125% | -4.20-13% | 17.940% |
| ▸Capital returned | -69.4-18% | -116-105% | 22.918% | 15.222% | -1.01-3% | 9.7122% |
| Buybacks | -15.7 | 0.00 | 0.00 | -0.04 | -15.6 | 0.00 |
| Dividends | 72.8 | 20.8 | 19.9 | 12.1 | 11.1 | 8.91 |
| Interest paid | 16.4 | 6.05 | 3.51 | 3.14 | 3.02 | 0.66 |
| Debt paid down | -143 | -143 | -0.52 | 0.03 | 0.47 | 0.15 |
| ▸Reinvestment | 17044% | 28.025% | 40.632% | 27.440% | 29.789% | 44.199% |
| Capex (PP&E) | 166 | 28.6 | 36.1 | 27.4 | 29.7 | 44.1 |
| Intangibles & M&A | -0.02 | -0.02 | 0.00 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | 3.92 | -0.58 | 4.50 | -- | -- | -- |
| Retained / other | 15641% | 155140% | 20.917% | 1.712% | -10.9-32% | -10.5-24% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: -1.9 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 570 | 412 | 348 | 328 | 235 |
| ▸Liabilities (total) | 244 | 128 | 114 | 104 | 41.7 |
| Net debt (incl. leases) | -44.6 | -3.14 | 20.8 | 18.4 | 5.92 |
| Net debt / Adj EBITDA | -0.31 | -0.02 | 0.35 | 0.62 | 0.12 |
| Net debt / Adj FCF | -0.69 | -0.04 | 0.91 | -- | -- |
| Adj EBITDA / interest | 20.0 | 37.7 | 18.7 | 9.81 | 77.4 |
| Shares outstanding | 19.3 | 19.3 | 19.2 | 19.2 | 12.8 |
| Dilution (YoY) | +0.5% | +0.5% | +0.1% | +49.5% | +0.6% |
| Employees | 2900 | 2357 | 2204 | 2332 | 2147 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 53.7%+4.4 | 52.0%+7.3 | 44.7%+16.3 | 28.4%-19.8 | 48.1% |
| Adj EBITDA margin | 50.6%+4.0 | 50.2%+17.8 | 32.4%+12.2 | 20.3%-16.5 | 36.7% |
| Adj OCF margin | 35.5%+1.0 | 41.1%+13.3 | 27.8%+10.0 | 17.8%-10.6 | 28.3% |
| Adj FCF margin | 22.8%+4.1 | 27.4%+14.7 | 12.7%+15.2 | -2.5%+1.0 | -3.5% |
| Net income margin | 18.7%-1.9 | 20.9%+11.5 | 9.4%+12.3 | -2.9%-15.8 | 12.9% |
| Adj NI margin | 22.3%+1.7 | 23.6%+14.2 | 9.4%+12.3 | -2.9%-15.8 | 12.9% |
| ROIC (adj, after-tax) | 20.8% | 26.0% | 11.6% | 4.3% | 14.3% |
| Cost of debt | 7.5% | 12.5% | 12.3% | 13.1% | -- |
Earnings Calls
Earnings Call · 2026 Q2
Caledonia Mining delivered a materially improved second quarter after a weak first quarter, driven principally by better access to higher-grade underground mining areas at Blanket. Quarterly production increased 18% sequentially, with head grade rising from 2.5 g/t in Q1 to approximately 2.88 g/t in Q2. Management said the mine is now operating around its targeted grade of 3.1 g/t and expects an average of roughly 3.16 g/t for the rest of the year. A shift to seven-day operations in June was primarily intended to manage worker fatigue, but it also increased blasting days by 18% and should support higher run-of-mine production. The stockpile was depleted during Q2 but has begun rebuilding. Incremental material will initially be processed through the repurposed Lima plant from September, while a main-plant upgrade planned for 2027 is intended to accommodate approximately 990,000 tonnes per year. An Alluvion plant upgrade due by the end of August will allow Caledonia to process about 40 tonnes of accumulated material grading 600–700 g/t, adding approximately 1,200 ounces across September–December. Safety performance was outstanding, with more than 400 consecutive days and nearly 5.5 million man-hours without a lost-time injury. Management attributed this to greater emphasis on proactive risk assessments, near-miss reporting, training and workforce readiness. Financial performance benefited from a 34% sequential increase in the realized gold price to $4,259 per ounce, offsetting lower ounces sold. Revenue rose 16% to $76 million, EBITDA increased 16% to nearly $46 million, profit after tax grew 27% to $30 million and EPS rose 29% to $1.36. Operating cash flow was $28.4 million, while cash and equivalents ended the quarter at approximately $168 million. Including bullion on hand, total liquidity exceeded $200 million. Reported costs were affected by higher royalties, increased electricity wheeling charges, a $3.2 million employee-trust distribution reclassified into production costs, and advisory and transaction fees related to financing activities. These items, along with lower first-half grades and ounces, increased unit-cost metrics. 2026 guidance was therefore raised to $1,600–$1,800 per ounce for on-mine cash costs and $2,500–$2,700 per ounce for AISC. Capital expenditure guidance fell from $162 million to $103 million, mainly because Bilboes spending has been rephased. The reduction from $132 million to $48 million in 2026 Bilboes expenditure reflects milestone-based payment terms and deferred deposits, not a change in project scope, economics or financing capability. Bilboes remains on schedule, with contractors expected on site around October and first production targeted for late 2028, followed by the first full production year in 2029. Financing progress has been strong. Caledonia completed its gold hedging program and an oversubscribed convertible-note offering, and has credit approval from two co-lead arrangers for a planned $150 million interim facility, targeted for completion in late August or early September. Project-finance discussions are also advancing, with closure now targeted by year-end or early 2027. At a $3,500 per ounce price assumption, total Bilboes funding needs are close to $600 million, supported by cash, Blanket cash flow and more than $300 million of senior debt; higher gold prices would reduce the required debt. Exploration added further growth potential. K-Pits, within the Blanket lease, returned shallow oxide intersections of approximately 1.5–2.5 g/t and sulfide intervals of around 6 g/t over 7–16 metres. Metallurgical testing is ongoing, but management said there is no current indication that the sulfides are refractory compared with Blanket’s free-milling ore. Deeper drilling below the current mine also continues to show substantial widths and grades, including potential new zones. At Motapa, a maiden resource based on 2024–2025 drilling is expected within weeks, while the 2026 program continues to test central and southern shear zones. Management’s near-term focus is to sustain Blanket’s operational recovery, improve cash generation, secure Bilboes funding and execution, and advance the company’s exploration pipeline.
▸Whether moving the underground mine to 18% more blasting days would ultimately produce approximately 18% more potential production, independent of mill capacity.Nic Dinham
▸What the plant’s eventual annual production capacity would be after the ball mill, crushing and elution/CIL upgrades are completed.Nic Dinham
▸Whether management is confident it can spend the substantially increased Blanket capital budget given that only approximately $13 million had been spent in the first half.Nic Dinham
▸Why the schedule for the proposed 132 kV power line has changed and when it is expected to be completed.Nic Dinham
▸Whether the expanded mine and processing plant will be able to obtain enough power through the new transmission line.Nic Dinham
▸Whether pricing for power supplied through the new line has been settled and whether it is expected to be cheaper than current electricity costs.Nic Dinham
▸Whether the lower near-term Bilboes capital spending means Caledonia can be more relaxed about arranging the interim funding facility.Nic Dinham
▸Whether management could provide guidance on commitment fees, interest rates and tenors for the interim funding and project-finance facilities for modeling purposes.Yuan Low
▸What the metallurgical characteristics of the K-Pits sulfides and possible transition zone are, including whether the material may be refractory or contain preg-robbing carbon.Yuan Low
▸Why Craig Harvey was wearing a heavy jacket during the presentation.Yuan Low
▸Whether the underlying K-Pits sulfide is likely to be refractory or otherwise difficult to treat.Yuan Low
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $12.50 | $6.60/$8.60 | 4 | --/$2.15 | 14 |
| $15.00 | $3.80/$7.30 | 30 | --/$2.15 | 16 |
| $17.50 | $1.50/$4.50 | 3 | --/$1.85 | 97 |
| $20.00 | $0.55/$2.70 | 153 | $0.85/$1.40 | 416 |
| $22.50 | $0.15/$2.10 | 19 | $1.90/$4.70 | 15 |
| $25.00 | $0.30/$0.75 | 129 | $3.80/$6.60 | 38 |
| $30.00 | --/$0.75 | 218 | $8.50/$11.10 | 83 |
| $35.00 | --/$0.55 | 248 | $13.30/$15.70 | 25 |
Short Interest
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $25.4M | $15.76 | +$2.6M | +$5.0M | — | $5.69T |
| DIMENSIONAL FUND ADVISORS LPPassive | $12.3M | $15.43 | +$1.9M | +$4.1M | -0.3% | $480.92B |
| VAN ECK ASSOCIATES CORP | $9.4M | $12.14 | −$1.7M | −$3.8M | +1.7% | $133.17B |
| Alyeska Investment Group, L.P. | $9.1M | $22.46 | +$9.0M | +$9.1M | +0.7% | $35.33B |
| Invesco Ltd. | $7.9M | $24.06 | +$5.0M | +$7.3M | -0.3% | $652.04B |
| NOMURA HOLDINGS INC | $7.4M | $22.46 | +$7.4M | +$7.4M | -0.6% | $9.84B |
| AMERICAN CENTURY COMPANIES INC | $6.5M | $17.44 | −$6.7M | −$1.8M | -0.4% | $193.48B |
| STATE STREET CORPPassive | $5.8M | $20.47 | +$35K | +$1.6M | -0.2% | $2.89T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $4.7M | $11.23 | +$116K | +$71K | -0.1% | $1.61T |
| ARROWSTREET CAPITAL, LIMITED PARTNERSHIP | $4.4M | $24.07 | +$2.3M | +$4.4M | +0.5% | $184.72B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2019 Q4 | 25M | 15M | 11M | $0.54 | $0.54 – $0.54 | 1 |
| 2020 Q1 | 19M | 9M | 6M | $0.34 | $0.34 – $0.34 | 1 |
| 2020 Q2 | 22M | 9M | 6M | $0.46 | $0.46 – $0.46 | 1 |
| 2020 Q3 | 28M | 18M | 13M | $0.68 | $0.68 – $0.68 | 1 |
| 2020 Q4 | 28M | 18M | 13M | $0.67 | $0.67 – $0.67 | 1 |
| 2022 Q1 | 19M | 11M | 7M | $0.34 | $0.34 – $0.34 | 1 |
| 2022 Q2 | 22M | 14M | 9M | $0.46 | $0.46 – $0.46 | 1 |
| 2022 Q3 | 36M | 20M | 13M | $0.68 | $0.68 – $0.68 | 1 |
| 2022 Q4 | 28M | 20M | 13M | $0.67 | $0.67 – $0.67 | 1 |
| 2023 Q1 | 36M | 39M | 28M | $1.43 | $1.43 – $1.43 | 1 |
| 2023 Q3 | 41M | 13M | 7M | $0.33 | $0.33 – $0.33 | 1 |
| 2024 Q1 | 149M | 44M | 31M | $1.57 | $1.57 – $1.57 | 1 |
| 2024 Q2 | 149M | 39M | 27M | $1.34 | $1.34 – $1.34 | 1 |
| 2024 Q4 | 44M | 9M | 3M | $0.16 | $0.16 – $0.16 | 1 |
| 2025 Q1 | 51M | 9M | 4M | $0.19 | $0.19 – $0.19 | 1 |
| 2025 Q2 | 68M | 30M | 20M | $1.04 | $1.04 – $1.04 | 1 |
| 2025 Q3 | 65M | 24M | 15M | $0.78 | $0.78 – $0.78 | 1 |
| 2025 Q4 | 72M | 19M | 11M | $0.59 | $0.59 – $0.59 | 1 |
| 2026 Q1 | 79M | 24M | 13M | $0.67 | $0.67 – $0.67 | 1 |
| 2026 Q2 | 82M | 19M | 10M | $0.54 | $0.54 – $0.54 | 1 |
| 2026 Q3 | 79M | 15M | 8M | $0.39 | $0.39 – $0.39 | 1 |
| 2026 Q4 | 79M | 10M | 3M | $0.14 | $0.14 – $0.14 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-08-13 | BUY | Ndlovu July | director | 21,400 | $23.03 | $493K | $5.77M |
| 2026-06-11 | BUY | Gapare Victor | director, 10 percent owner: | 11,750 | $18.70 | $220K | $45.91M |
| 2026-05-18 | SELL | Ndlovu July | director | 20,000 | $17.19 | $344K | $3.94M |
| 2026-05-13 | BUY | Ndlovu July | director | 15,000 | $24.81 | $372K | $5.68M |
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand
Thesis
Caledonia has become a highly cash-generative gold producer, with TTM revenue of $274M, adjusted EBITDA of $137M and adjusted FCF of $75M. The balance sheet is currently unusually strong, with approximately $170M of cash and investments against total debt and leases of roughly $116M. The Q2 recovery at Blanket, higher grades, improved access to underground areas and the lower 2026 capex requirement improve near-term liquidity. The central issue is that recent earnings are heavily supported by an exceptional gold price, while Blanket is becoming a deeper and more operationally complex mine. Bilboes could transform the company into a much larger producer, but it requires roughly $600M of total funding, significant debt and flawless execution in Zimbabwe. The 132 kV power line is delayed, financing terms remain undisclosed, and the lower near-term Bilboes spend reflects rephasing rather than lower project cost. The likely path is continued strong cash generation over the next two years, with substantial strategic value from Bilboes but limited certainty that all planned growth will arrive on schedule. The equity has meaningful upside if gold and project execution cooperate, but the range of outcomes is wide and the current earnings run rate should not be capitalized as permanent.
Trade Signal
Buy, with meaningful Zimbabwe and project-financing risk: CMCL trades at a low cash-flow multiple with a recovering mine and credible growth assets, while the market still discounts the business for recent operational weakness.
The stock rose from roughly $16.8 in late July to $22.6 by August 11, including a 4% move around the August 10 earnings release, as investors began to recognize the Q2 operational recovery and stronger liquidity. Before that, it fell from approximately $30 in February to below $17 in July. The decline was driven primarily by Q1's 21% year-over-year production drop, equipment and ground-condition issues, lower-grade mining, power concerns, elevated cost guidance and uncertainty around Bilboes funding; some of the later weakness also appears to have reflected gold-miner beta and sector risk. The selloff likely overshot the deterioration because cash generation remained strong and Q2 showed tangible recovery, but it was not a pure panic: Zimbabwe, deeper mining and Bilboes execution risks are real. The recent rebound is an initial correction of that dislocation, with further upside dependent on repeat operational evidence.
The stock appears disliked and under-owned relative to its fundamentals: it is roughly 40% below its 52-week high, short interest has risen from about 2% to 11.4% of float, and the sharp February-to-July decline reflects concern over Blanket's lower grades, equipment and power issues, elevated costs, and Bilboes funding needs. Analysts are unanimously positive, but the small analyst coverage and persistent short positioning suggest the consensus buy view has not translated into strong marginal demand. The market narrative is focused on Zimbabwe and project risk, while the Q2 recovery and balance-sheet strength may be underappreciated.
The Q2 improvement is a credible near-term operational inflection: production rose 18% sequentially, grades improved toward target, guidance was maintained or improved on several metrics, and capex was rephased lower. The market already expects some recovery, as consensus forecasts show improving revenue and EBITDA into the second half, so this is not a completely unanticipated step-up. The Motapa resource and Bilboes financing could add a second, less fully priced inflection, but the market will likely demand execution evidence before capitalizing it aggressively.
- ▲2026-08 to 2026-09 · Bilboes interim facility completion — The planned approximately $150M facility, targeted for late August or early September, would reduce near-term funding uncertainty.
- ▲2026-08 to 2026-12 · Alluvion plant upgrade and processing of high-grade stockpile — The upgrade is expected by end-August, with roughly 1,200 incremental ounces targeted from September through December.
- ▲2026-Q3 · Motapa maiden resource estimate — A Q3 resource could validate substantial adjacent mineralization and add strategic value through potential shared infrastructure with Bilboes.
- ▲2026-11 · Q3 2026 production and earnings print — The key test is whether Blanket sustains the Q2 recovery, targeted grades around 3.16 g/t and improved cash generation.
- ▲Late 2026 to early 2027 · Bilboes project-finance close — Completion by year-end or early 2027 would materially de-risk construction funding, though it would also formalize additional leverage.
- •Ongoing over next 12 months · Gold-price and Zimbabwe policy developments — Gold near current levels supports cash flow, while a sharp retreat or renewed tax/power intervention would pressure valuation.
Underlying share-count growth has been negligible over the trailing year, and insider activity is broadly mixed, including a modest insider purchase and sale. The $150M convertible notes create potential future dilution, while Bilboes financing may increase debt rather than shares. Short interest of 11.4% of float provides some squeeze fuel if operational results continue improving, but there is no active buyback or major committed buyer.
The balance sheet provides some support: approximately $168M of cash, over $200M including bullion and roughly $116M of debt and leases imply meaningful net liquidity. However, much of the cash is effectively committed to Bilboes and future development, so this is not a hard liquidation floor. The principal ceiling is execution and financing risk: additional debt, convertible dilution if the share price rallies materially, and investor reluctance to assign a full growth multiple to a Zimbabwe-focused miner.
Moderately attractive for specialist precious-metals investors: CMCL offers an 11% trailing FCF yield, substantial liquidity, a recovering Blanket operation and Bilboes growth. The main limitations are Zimbabwe jurisdictional risk, dependence on a very strong gold price, and the financing/execution burden of Bilboes, which may deter generalist buyers.
Greed pulls somewhat stronger than fear because the valuation is modest against current cash generation and the Q2 operating recovery is arriving quickly after the selloff. Fear remains meaningful: recent owner earnings are unusually gold-price-sensitive, Blanket is becoming more technically difficult, and Bilboes could consume cash and add leverage before contributing production.
Valuation
The quarter showed a meaningful sequential operating recovery: production rose 18%, head grade improved from about 2.5 g/t to 2.88 g/t, management expects approximately 3.16 g/t for the balance of the year, and Q2 EBITDA reached nearly $46M. The company also raised cost guidance, reduced 2026 capex largely through Bilboes rephasing, confirmed progress toward a $150M interim facility and reported more than $200M of liquidity including bullion. Offsetting new information was the delay of the 132 kV power line to around June 2027 and management's refusal to provide financing rates, commitment fees or tenors.
▸ How the cases moved
Relative to the day before the Q2 event, the bear equity value rises modestly from roughly $375M to $400M because Blanket's operational recovery and balance-sheet liquidity reduce near-term downside; bear probability falls from 0.33 to 0.30. The base value rises from approximately $850M to $900M as Q2 grades, throughput and cash generation validate the recovery, with base probability rising from 0.48 to 0.50. The bull value increases from about $1,550M to $1,650M because the mine is moving toward its targeted grade and Bilboes financing progress is better, while bull probability rises from 0.19 to 0.20. The capex reduction is treated as timing relief, not a reduction in project scope or funding needs.
Gold prices retreat materially and Blanket remains constrained by deeper mining, power issues and elevated costs. Bilboes funding or construction is delayed, while debt and development spending absorb much of the group's cash generation. The company remains solvent, but owner earnings normalize sharply and Zimbabwe/project risk merits a low multiple.
▸ Valuation
10x $40M owner earnings = $400M equity value
Blanket recovers toward its targeted grade and benefits from the expanded operating schedule, but costs remain elevated and gold prices moderate from exceptional 2026 levels. Bilboes proceeds broadly on schedule with financing completed, though construction and leverage introduce execution risk. Cash generation supports a growing multi-asset platform, but Zimbabwe exposure prevents a premium valuation.
▸ Valuation
10x $90M owner earnings = $900M equity value
Gold remains near current elevated levels, Blanket reaches higher throughput after the power and plant upgrades, and Bilboes construction stays on schedule. The project is funded primarily with relatively cheap debt and begins to receive substantial strategic value well before first production. Motapa and K-Pits add further resource upside, allowing the company to command a growth-producer multiple.
▸ Valuation
11x $150M owner earnings = $1,650M equity value
▸ Target Rationale
The probability-weighted scenario value discounts to $720M today. I set the analytical target at $700M because the arithmetic does not fully capture the execution and financing risk of Bilboes, the delayed power infrastructure, Zimbabwe jurisdictional exposure and the possibility that current owner earnings are temporarily flattered by extraordinary gold prices. The deduction is modest because the company has substantial cash, strong current coverage and a credible operating recovery.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Operational & Financial Results (May 2026): Caledonia experienced a contrast between operational hurdles and financial success. Gold production at the flagship Blanket Mine fell 20.9% year-over-year to 14,767 ounces due to equipment availability issues, ground conditions, and planned mining sequences in lower-grade zones. However, soaring global gold prices more than offset this volume dip, driving revenue up 18.3% to $66.4 million and profit after tax up 69.4% to $18.9 million. Management maintained its full-year guidance of 72,000 to 76,500 ounces, implementing a 7-day work week and appointing a contractor to accelerate access to higher-grade zones.
- Exceptional FY2025 Results (March 2026): Powered by strong gold pricing, Caledonia's 2025 profit after tax skyrocketed 193% to $67.5 million (up from $23.1 million in 2024). The company generated $267.7 million in revenue, $125.3 million in EBITDA, and $62.1 million in free cash flow, while producing 76,213 ounces of gold at Blanket Mine. A quarterly dividend of $0.14 per share was declared.
- Secured Bilboes Funding (January 2026): Caledonia completed an upsized offering of 5.875% convertible senior notes due 2033, raising $150 million in gross proceeds to kickstart the initial development stages of the Bilboes project.
- Reversal of Punitive Zimbabwe Tax Proposals (December 2025): The Zimbabwean government withdrew proposed changes that would have doubled the gold royalty rate and altered capital expenditure tax write-offs. Instead, royalties will remain at 5% unless gold prices exceed $5,000 per ounce, preserving the lucrative project economics of Caledonia's assets.
▸ Thesis-test Findings
- Caledonia Mining Bilboes project feasibility update 2026:
The definitive Feasibility Study for the massive Bilboes gold project was formally published in late November 2025 and refiled in May 2026 (solely to update the listing of qualified persons for Canadian regulatory compliance, with no changes to the underlying economics). The study confirms a single-phase development model with highly compelling project economics, including an NPV exceeding $580 million at an 8% discount rate (assuming a conservative gold price of $2,548/oz), an IRR above 32%, and a competitive AISC of $1,061/oz. Peak capital expenditure is estimated at $484 million plus $100 million in financing costs. With $150 million in notes already raised and a 3-year gold hedge secured at a minimum strike price of $3,500/oz (expected to yield $200 million in internal cash flow), construction is slated to begin in H2 2026, aiming for first gold in late 2028. This strongly bolsters the long-term growth thesis.
- Zimbabwe power grid agreements gold miners 2026:
Specific new bilateral grid agreements between Caledonia and the state utility (ZETDC) were not announced in early 2026; however, a major regulatory shift occurred. In March 2026, Zimbabwe's Cabinet approved the "Own-Consumption Licensing Regulations 2026," a new energy governance framework designed to formalize "captive power generation" (self-supply). This policy reduces legal and financing risks for mines seeking to build independent power infrastructure to bypass grid unreliability. Power remains a key operational risk for Caledonia, as grid interruptions negatively impacted Blanket Mine's output in late 2025. In response, Caledonia is relying on its 12.2 MW solar facility (which supplied 19% of Blanket's power in 2025, with the rest coming from the grid and backup diesel) and has increased capital expenditure to shore up power backups.
- Motapa gold exploration maiden resource estimate results:
Caledonia has not yet published its maiden mineral resource estimate (MRE) for the Motapa gold project; the MRE is officially scheduled to be released in Q3 2026. However, the company reported highly encouraging results from its 2025 drilling program on June 10, 2026. The program confirmed extensive gold mineralization across a 6km strike, highlighted by standout intersections at Motapa North of 19.0 meters at 8.08 g/t gold and 6.38 meters at 13.95 g/t gold. Because Motapa lies directly adjacent to the Bilboes project, it offers immense potential for shared infrastructure and operational synergies. If the upcoming Q3 MRE confirms a significant resource, Motapa could act as a low-capital-intensity extension to dramatically expand the mine life and economics of the Bilboes mining complex.