CVU
CPI Aerostructures, Inc.v3 4.0/10 · 2026-11-26CPI Aerostructures, Inc. specializes in the bespoke manufacturing of aircraft structural components, catering to both commercial aviation and military sectors for fixed-wing aircraft and helicopters alike. Beyond fundamental structural elements, the company also develops and supplies intricate aerospace systems, such as reconnaissance pod frameworks and fuel panel solutions. Their offerings further extend to providing essential components for maintenance, repair, and overhaul (MRO) operations, and they undertake various kitting contracts. The firm functions as a key supplier, acting as a subcontractor for leading defense and commercial enterprises, in addition to securing direct contracts with the United States Department of Defense. Their comprehensive suite of services encompasses engineering design, program oversight, meticulous supply chain coordination, kitting solutions, and vital MRO support. Among their diverse product portfolio are items like machine gunner window assemblies, specialized hover infrared suppression system module assemblies, complete wing sets with accompanying spares, various lock mechanisms, canopy activation drive shaft components, rudder island and drag chute canister units, composite electronics racks, critical structural wing elements, fixed leading edges, and engine inlet structures. Established in 1980, the company initially operated under the name Consortium of Precision Industries, Inc., before adopting its current moniker, CPI Aerostructures, Inc., in July 1992. Its operational base is located in Edgewood, New York.
2-Year Price History
Valuation v3 Opus worker · 2026-11-26
CPI Aerostructures is a ~$57M-cap build-to-print subcontractor of defense aerostructures and pods (E-2D wing kits, Black Hawk parts, Raytheon/Collins pods) for Northrop, Lockheed, Sikorsky, RTX and the US Air Force. 2026 is a clean recovery year after the 2025 A-10 termination: 9M revenue $54.9M (+10%), gross margin 23.6%, net income $3.2M, Q3 EPS $0.10, and total backlog jumped to $634M, though only $106M of that is funded. The bull pitch is a long defense upcycle filling a small, sole-source shop with operating leverage. But the market already prices that: at $4.37 (last close 2026-11-25; the pack quote is the latest we have) the EV is ~$74M (net debt ~$17.7M on a near-fully drawn revolver) for ~$7.5M of adjusted EBITDA and ~$5M of unlevered owner earnings before working capital, and cash conversion has historically been poor: contract assets of ~$34M, receivables up 72% this year, debt up $3M year over year, and negative estimate-at-completion revisions every quarter ($2.7M in 9M 2026). In year 5 this is most likely a 'neither' business: a captive, low-moat supplier growing mid-single digits that deserves 10-12x FCF. Our DCF at 10% gives ~$2.80/share in the base case (range ~$1.20-5.70), below the price, so the rating is 4.0: no obvious mispricing, not a short either (profitable, growing, defense tailwind, no dilution). Setup 3.0: no variant perception; the next read is the Q4/FY26 10-K around March 2027 and the leverage covenant step-down to 3.50x on 2027-01-01.
Flow: Nothing large: no buyback and no ATM; SBC dilution is small (~2%/yr diluted share growth). Royce rose to 6.33% (July 2026) while Richard Strong cut to 5.0% (July 2026). With the revolver ~92% drawn, an equity raise is a tail risk if the 2027-01-01 covenant step-down bites.
A deep dive would have to establish: Will the $528M of unfunded backlog convert into funded production at ~23% gross margins fast enough to grow revenue well past $75M, without working capital and negative EAC revisions eating the cash and tripping the 3.50x leverage covenant in 2027?
Research (expand)
What it does. CPI Aero (Edgewood, NY) builds structural assemblies and pod structures for defense primes: E-2D outer wing panels (Northrop), UH-60 parts and gunner windows (Sikorsky/Lockheed), F-16 rudder/drag-chute assemblies, MS-110 and jammer pods (Collins/RTX), T-38 parts for the Air Force, plus welding and MRO through its WMI unit. Over 90% of revenue is defense. Customers are giants, so CPI is a captive, build-to-print supplier with limited pricing power.
The case and the market's view. After the 2020 restatement, material weaknesses and the 2025 A-10 termination (FY25 revenue $69.3M, net loss), 2026 looks like a turnaround: 9M revenue $54.9M, gross margin 23.6%, net income $3.2M, total backlog $634M (+$101M in Q3, almost all of it unfunded options). The stock went from ~$2.50 (Oct 2025) to ~$5.20 (May-Sep 2026), and is now $4.37. The market seems to price a steady, slowly growing defense subcontractor with real execution risk, and we think that is about right. The $528M of unfunded backlog is a ceiling, not a forecast, and funded backlog (~$106M, about 1.4 years of revenue) has been flat.
What it earns. FY26 run-rate: revenue ~$75M, operating income ~$6.3M, adjusted EBITDA ~$7.5M. After SBC (~$0.7M), D&A ~$0.5M, maintenance capex ~$0.6M, and low cash taxes (NOLs), unlevered owner earnings are ~$5M before working capital. But working capital eats a lot: contract assets ~$34M, receivables up 72% year to date, the revolver $9.2M of $10M drawn, and total debt up from $15.9M to $19.0M year over year. Real FCF over the last few years is near zero.
Projection (unlevered FCF, $M): 3.5 / 4.0 / 4.5 / 5.0 / 5.5, assuming ~6% revenue growth, ~9% EBIT margin and working capital that stops ballooning. Year 5: a 'neither' business, a durable but low-moat captive supplier at ~5% growth, so 10-12x FCF (~$60M terminal value). PV of the FCF ~$16.7M plus PV of the terminal value ~$37M gives an EV of ~$54M. Less ~$17.7M of net debt, equity is ~$36M, or ~$2.80/share. Bull (revenue to $110M on pod/E-2D ramps, 10% margin, 14x): ~$5.70. Bear (more negative EACs, covenant trouble, equity raise): ~$1.20.
Multiples at $4.37: EV ~$74M; ~10x EV/adj. EBITDA, ~13x P/E, ~15x EV/owner earnings before working capital. Not a sub-7x buyout setup, and not a covenant-floor value case.
Management and risks. CEO Dorith Hakim (since 2021) cleaned up the restatement era and refinanced in Dec 2025 (Western Alliance, maturity 2030). Risks: the funded leverage covenant tightens to 3.50x on 2027-01-01 after breaches in 2025; EAC revisions have been negative every quarter (Phenom-300 inlets, UH-60 windows, MS-110); customer concentration; fixed-price contracts; possible program terminations (A-10 precedent); tiny float. Competition comes from other build-to-print shops (Ducommun, Park-Ohio-type job shops, offshore suppliers) and from primes insourcing.
Sentiment: 5/10. The stock roughly doubled off its 2025 lows on the turnaround, then gave back ~15% from its highs. One analyst covers it, short interest is negligible (~1 day to cover), and Royce lifted its stake to 6.3%. Neither hated nor loved.
- https://www.quiverquant.com/news/CPI+Aero+Posts+%2420.0+Million+Third-Quarter+Revenue+and+%241.3+Million+Net+Income
- https://finsee.ai/earnings/cvu/2026/q3/en/
- https://finviz.com/news/382149/cpi-aerostructures-reports-second-quarter-and-six-month-2026-results
- https://www.barchart.com/story/news/1076738/cpi-aerostructures-reports-fourth-quarter-and-full-year-2025-results
- CVU 10-Q filed 2026-11-16 (forensic findings in context pack)
- /Users/gregwo/stocks2/data/analysisv3/context/CVU.md
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 74.3+4% | 69.3-15% | 81.1-6% | 86.5+4% | 83.3 |
| Gross profit | 16.9+54% | 10.6-39% | 17.2+1% | 17.1+5% | 16.3 |
| Operating expenses | 10.8+5% | 10.7+2% | 10.5-2% | 10.8-6% | 11.4 |
| ▸Adj EBITDA | 5.53+149% | 0.24-97% | 8.57+26% | 6.78+21% | 5.58 |
| ▸Adj OCF | 2.94 | -1.47-129% | 5.02+12% | 4.47+23% | 3.63 |
| CapEx | -0.08 | -0.07 | -0.40 | -0.14 | -0.04 |
| Adj FCF | 2.86 | -1.54-133% | 4.62+7% | 4.33+20% | 3.59 |
| Interest expense | 1.32 | 1.57 | 2.29 | 2.46 | 2.27 |
| ▸Adj net income | 3.78 | -0.84-126% | 3.30-81% | 17.2+87% | 9.18 |
| ▸Owner's earnings | 4.50 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 26.6100% | 5.44100% | 0.24100% | 8.57100% | 6.78100% | 5.58100% |
| FCF (OCF−capex) | 2.8911% | 0.255% | -5.27 | 3.1637% | 3.8457% | 0.9016% |
| Net income | 32.1120% | 3.2259% | -0.84-346% | 3.3039% | 17.2254% | 9.18164% |
| ▸Capital returned | 16.863% | 0.458% | 0.61250% | 4.9858% | 5.1376% | 5.64101% |
| Buybacks | 0.20 | 0.20 | 0.00 | 0.00 | 0.00 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 9.50 | 0.92 | 1.57 | 2.29 | 2.46 | 2.27 |
| Debt paid down | 7.12 | -0.67 | -0.96 | 2.69 | 2.68 | 3.37 |
| ▸Reinvestment | 1.536% | -0.88-16% | 6.73 | -1.64-19% | -1.58-23% | -1.09-20% |
| Capex (PP&E) | 0.73 | 0.08 | 0.07 | 0.40 | 0.14 | 0.04 |
| Intangibles & M&A | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | 0.80 | -0.96 | 6.66 | -2.04 | -1.72 | -1.13 |
| Retained / other | -4.43-17% | 0.7213% | -4.31 | 0.465% | 1.1617% | -2.46-44% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 3.1 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 77.8 | 75.2 | 68.0 | 76.9 | 59.4 |
| ▸Liabilities (total) | 48.2 | 49.4 | 42.0 | 54.8 | 55.3 |
| Net debt (incl. leases) | 26.4 | 27.1 | 15.0 | 20.1 | 25.8 |
| Net debt / Adj EBITDA | 4.79 | 111 | 1.75 | 2.97 | 4.63 |
| Net debt / Adj FCF | 9.25 | -- | 3.25 | 4.65 | 7.19 |
| Adj EBITDA / interest | 4.17 | 0.16 | 3.74 | 2.76 | 2.46 |
| Shares outstanding | 13.2 | 13.2 | 13.0 | 12.8 | 12.5 |
| Dilution (YoY) | +1.7% | +1.4% | +1.6% | +2.1% | +1.4% |
| Employees | 212 | 192 | 212 | 203 | 208 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 22.7%+7.4 | 15.2%-6.0 | 21.3%+1.5 | 19.7%+0.2 | 19.6% |
| Adj EBITDA margin | 7.4%+4.3 | 0.3%-10.2 | 10.6%+2.7 | 7.8%+1.1 | 6.7% |
| Adj OCF margin | 4.0%+5.3 | -2.1%-8.3 | 6.2%+1.0 | 5.2%+0.8 | 4.4% |
| Adj FCF margin | 3.9%+5.4 | -2.2%-7.9 | 5.7%+0.7 | 5.0%+0.7 | 4.3% |
| Net income margin | 5.3%+6.1 | -1.2%-5.3 | 4.1%-15.8 | 19.9%+8.9 | 11.0% |
| Adj NI margin | 5.1%+5.9 | -1.2%-5.3 | 4.1%-15.8 | 19.9%+8.9 | 11.0% |
| ROIC (adj, after-tax) | 8.5% | -0.3% | 10.8% | 13.3% | 14.4% |
| Cost of debt | 4.8% | 6.3% | 10.3% | 9.1% | 7.2% |
Revenue Breakdown
Revenue Segments
| Government subcontracts | $14.7M | NEW |
| Prime government contracts | $1.8M | NEW |
| Commercial contracts | $0.9M | NEW |
Earnings Calls
Results Release (8-K) · 2026 Q3
Summarized from the 8-K earnings release — no earnings-call transcript for this period.
CPI Aero reported Q3 2026 results. Revenue was $20.0M vs $19.3M (+3.6%). Gross profit was $4.6M vs $4.3M, and gross margin was 23.1% vs 22.3%. SG&A rose to $2.77M from $2.55M. Operating income was $1.85M. Net income was $1.3M vs $1.1M, or EPS $0.10 vs $0.09. Adjusted EBITDA was $2.1M (10.3% margin) vs $1.9M. Interest expense fell to $0.31M from $0.39M. Operating cash flow was $0.8M vs $0.2M. Nine-month revenue was $54.9M (+10.2%). Gross margin was 23.6% vs 13.3% (20.4% excluding the A-10 impact). Net income was $3.2M vs a $(1.5)M loss, and adjusted EBITDA was $5.5M vs $3.9M excluding A-10. Backlog is $634M, up from $505M at year-end 2025. Funded backlog is $106M, and 94% of backlog is government. 2026 awards include RTX NGJ Mid-Band (+$66M), Embraer Phenom 300 (+$17M) and RTX pods (+$16M). At September 30, cash was $1.3M. The line of credit was $9.2M, up from $8.4M. Term debt was about $9.8M. Receivables rose to $9.9M. Equity was $29.6M. No formal guidance was given. Q3 growth was modest, and the Q3 gross margin of 23.1% was below Q1's 25.8%.
SEC Filing Findings
SEC Filing — material findings
2026-11-16 · depth 9/10risk 7Covenants / Liquidity▸The Western Alliance credit facility's funded leverage covenant tightens from 3.75x to 3.50x on January 1, 2027, and the company already had covenant breaches in 2025. The filing does not disclose the current covenant ratio or headroom. Cross-default and change-of-control events of default also apply.
The Western Alliance credit facility's funded leverage covenant tightens from 3.75x to 3.50x on January 1, 2027, and the company already had covenant breaches in 2025. The filing does not disclose the current covenant ratio or headroom. Cross-default and change-of-control events of default also apply.
risk 6Liquidity▸The $10M revolver is nearly fully drawn ($9.17M outstanding), leaving roughly $0.8M of nominal undrawn capacity against $1.3M of cash. Total debt outstanding under the facility is $19.0M. Availability may also be subject to borrowing-base limits not disclosed here.
The $10M revolver is nearly fully drawn ($9.17M outstanding), leaving roughly $0.8M of nominal undrawn capacity against $1.3M of cash. Total debt outstanding under the facility is $19.0M. Availability may also be subject to borrowing-base limits not disclosed here.
risk 6Contract Estimates / Earnings Quality▸Cumulative negative estimate-at-completion (EAC) adjustments continue. In Q3 2026 they totaled $1.33M, about 29% of Q3 gross profit of $4.6M. For 9M 2026 they totaled $2.7M, driven by Embraer Phenom-300 inlet assemblies, Sikorsky UH60 gunner windows, and Collins MS-110 POD. Reported margin improvement therefore depends on estimate revisions that have been consistently negative.
Cumulative negative estimate-at-completion (EAC) adjustments continue. In Q3 2026 they totaled $1.33M, about 29% of Q3 gross profit of $4.6M. For 9M 2026 they totaled $2.7M, driven by Embraer Phenom-300 inlet assemblies, Sikorsky UH60 gunner windows, and Collins MS-110 POD. Reported margin improvement therefore depends on estimate revisions that have been consistently negative.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $2.50 | $1.90/$2.85 | 0 | --/$0.35 | 0 |
| $5.00 | $0.15/$0.60 | 38 | $0.15/$0.90 | 0 |
| $7.50 | --/$0.40 | 0 | $2.20/$3.40 | 0 |
| $10.00 | --/$0.40 | 0 | $4.50/$5.60 | 0 |
Short Interest
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| ROYCE & ASSOCIATES LP | $4.3M | $4.89 | +$1.2M | +$852K | — | $12.37B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $2.2M | $3.94 | +$26K | +$2.2M | — | $4.68T |
| LPL Financial LLC | $1.0M | $3.92 | −$30K | +$1.0M | — | $440.52B |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $642K | $3.77 | +$31K | +$53K | — | $1.87T |
| KORNITZER CAPITAL MANAGEMENT INC /KS | $568K | $3.96 | −$114K | +$568K | — | $4.79B |
| JANE STREET GROUP, LLCMM | $508K | $4.34 | +$198K | +$508K | — | $156.23B |
| DIMENSIONAL FUND ADVISORS LPPassive | $473K | $4.17 | +$120K | −$306K | — | $551.30B |
| STATE STREET CORPPassive | $389K | $3.95 | −$3K | +$389K | — | $3.38T |
| VANGUARD FIDUCIARY TRUST COPassive | $360K | $3.93 | +$2K | +$360K | — | $454.10B |
| NewEdge Advisors, LLC | $336K | $4.20 | +$155K | +$198K | — | $33.40B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 1997 Q2 | 2M | 1M | 0M | $0.07 | $0.06 – $0.09 | 19 |
| 1997 Q3 | 2M | 0M | 0M | $0.06 | $0.05 – $0.07 | 18 |
| 1998 Q1 | 5M | 1M | 0M | $0.12 | $0.10 – $0.14 | 11 |
| 1998 Q2 | 6M | 1M | 0M | $0.21 | $0.17 – $0.25 | 10 |
| 1998 Q3 | 7M | 1M | 1M | $0.36 | $0.29 – $0.43 | 16 |
| 2000 Q3 | 6M | 1M | 0M | $0.10 | $0.08 – $0.12 | 15 |
| 2001 Q1 | 21M | -2M | -3M | $0.49 | $0.39 – $0.58 | 17 |
| 2001 Q2 | 9M | 1M | 0M | $-0.08 | $-0.10 – $-0.06 | 16 |
| 2009 Q1 | 14.0B | 1M | 1M | $0.17 | $0.14 – $0.20 | 13 |
| 2009 Q2 | 9M | 1M | 1M | $0.08 | $0.06 – $0.10 | 18 |
| 2009 Q3 | 13.2B | 2M | 1M | $0.25 | $0.20 – $0.30 | 17 |
| 2010 Q2 | 1.4B | 1M | 1M | $0.14 | $0.11 – $0.17 | 13 |
| 2010 Q3 | 370M | 2M | 1M | $0.15 | $0.12 – $0.18 | 8 |
| 2011 Q1 | 19.4B | 2M | 2M | $0.27 | $0.22 – $0.32 | 11 |
| 2011 Q2 | 22M | 2M | 2M | $0.34 | $0.27 – $0.41 | 19 |
| 2011 Q3 | 13M | 2M | 1M | $0.15 | $0.12 – $0.18 | 17 |
| 2012 Q1 | 19.6B | 3M | 2M | $0.39 | $0.31 – $0.47 | 9 |
| 2012 Q2 | 4.4B | 3M | 2M | $0.30 | $0.24 – $0.36 | 14 |
| 2012 Q3 | 516M | 4M | 3M | $0.37 | $0.30 – $0.44 | 18 |
| 2013 Q1 | 19.9B | 2M | 2M | $0.20 | $0.16 – $0.24 | 13 |
| 2013 Q2 | 23M | 3M | 2M | $0.25 | $0.20 – $0.30 | 16 |
| 2013 Q3 | 18.0B | 2M | 2M | $0.17 | $0.14 – $0.20 | 19 |
| 2014 Q1 | 18.6B | 2M | 1M | $0.14 | $0.11 – $0.17 | 17 |
| 2014 Q2 | 22.6B | -28M | -28M | $0.18 | $0.14 – $0.22 | 14 |
| 2014 Q3 | 20M | 2M | 2M | $0.18 | $0.14 – $0.22 | 17 |
| 2015 Q1 | 25M | 2M | 1M | $0.17 | $0.14 – $0.20 | 20 |
| 2015 Q2 | 27M | 2M | 1M | $0.18 | $0.14 – $0.22 | 16 |
| 2015 Q3 | 23M | 3M | 2M | $0.20 | $0.16 – $0.24 | 17 |
| 2016 Q1 | 28M | -12M | -13M | $0.15 | $0.12 – $0.18 | 11 |
| 2016 Q2 | 16M | 2M | 1M | $0.09 | $0.07 – $0.11 | 15 |
| 2016 Q3 | 22M | 3M | 2M | $0.19 | $0.15 – $0.23 | 18 |
| 2017 Q1 | 17M | 2M | 1M | $0.05 | $0.04 – $0.06 | 7 |
| 2017 Q2 | 13M | 1M | 1M | $0.05 | $0.04 – $0.06 | 9 |
| 2017 Q3 | 17M | 2M | 1M | $0.13 | $0.10 – $0.16 | 15 |
| 2018 Q1 | 13M | 2M | 1M | $0.07 | $0.05 – $0.08 | 13 |
| 2018 Q2 | 17M | 2M | 1M | $0.10 | $0.08 – $0.12 | 13 |
| 2018 Q3 | 16M | 2M | 1M | $0.11 | $0.09 – $0.13 | 19 |
| 2019 Q1 | 22M | 3M | 2M | $0.13 | $0.13 – $0.13 | 18 |
| 2019 Q2 | 23M | 3M | 2M | $0.16 | $0.16 – $0.16 | 13 |
| 2019 Q3 | 24M | 3M | 2M | $0.18 | $0.18 – $0.18 | 9 |
| 2019 Q4 | 28M | 4M | 3M | $0.20 | $0.20 – $0.20 | 9 |
| 2020 Q1 | 27M | 3M | 2M | $0.17 | $0.17 – $0.17 | 8 |
| 2020 Q2 | 27M | -1M | -2M | $0.17 | $0.17 – $0.17 | 8 |
| 2020 Q3 | 27M | 1M | 0M | $0.17 | $0.17 – $0.17 | 14 |
| 2020 Q4 | 22M | 2M | 1M | $0.06 | $0.06 – $0.06 | 11 |
| 2021 Q1 | 25M | 1M | 0M | $0.02 | $0.02 – $0.02 | 10 |
| 2021 Q2 | 25M | 2M | 1M | $0.06 | $0.06 – $0.06 | 8 |
| 2021 Q3 | 25M | 2M | 1M | $0.07 | $0.07 – $0.07 | 8 |
| 2021 Q4 | 24M | 2M | 1M | $0.07 | $0.07 – $0.07 | 17 |
| 2022 Q1 | 24M | 1M | 1M | $0.06 | $0.06 – $0.06 | 17 |
| 2022 Q2 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 12 |
| 2022 Q3 | 32M | 2M | 1M | $0.10 | $0.10 – $0.10 | 9 |
| 2022 Q4 | 26M | 2M | 1M | $0.09 | $0.09 – $0.09 | 9 |
| 2023 Q1 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 8 |
| 2023 Q2 | 25M | 2M | 1M | $0.07 | $0.07 – $0.07 | 17 |
| 2023 Q3 | 24M | 2M | 1M | $0.07 | $0.07 – $0.07 | 13 |
| 2023 Q4 | 24M | 2M | 1M | $0.06 | $0.06 – $0.06 | 10 |
| 2024 Q1 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 9 |
| 2024 Q2 | 32M | 3M | 1M | $0.10 | $0.10 – $0.10 | 8 |
| 2024 Q3 | 26M | 3M | 1M | $0.09 | $0.09 – $0.09 | 1 |
| 2024 Q4 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 1 |
| 2025 Q1 | 28M | 3M | 1M | $0.11 | $0.11 – $0.11 | 1 |
| 2025 Q4 | 25M | 1M | 1M | $0.07 | $0.07 – $0.07 | 1 |
| 2026 Q1 | 25M | 2M | 1M | $0.07 | $0.07 – $0.07 | 1 |
| 2026 Q2 | 25M | 2M | 1M | $0.07 | $0.07 – $0.07 | 1 |
| 2026 Q3 | 25M | 2M | 1M | $0.07 | $0.07 – $0.07 | 1 |
| 2026 Q4 | 24M | 2M | 1M | $0.07 | $0.07 – $0.07 | 1 |
| 2027 Q1 | 24M | 2M | 1M | $0.06 | $0.06 – $0.06 | 1 |
| 2027 Q2 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 1 |
| 2027 Q3 | 32M | 2M | 1M | $0.10 | $0.10 – $0.10 | 1 |
| 2027 Q4 | 26M | 2M | 1M | $0.09 | $0.09 – $0.09 | 1 |
| 2028 Q1 | 26M | 2M | 1M | $0.10 | $0.10 – $0.10 | 1 |
| 2028 Q2 | 28M | 2M | 1M | $0.11 | $0.11 – $0.11 | 1 |
v2 analysis (legacy, 2026-07-04) — for comparison onlyclick to expand
Thesis
CPI Aerostructures is a small-cap, NADCAP-certified aerostructures subcontractor serving military and commercial OEMs (Boeing, Northrop, Lockheed, Embraer, Sikorsky, Raytheon). FY2025 was disrupted by Boeing's termination of the A-10 Main Landing Gear Pods program, which drove a 15% revenue decline, a net loss, and a covenant breach that forced a December 2025 refinancing with Western Alliance (maturity pushed to 2030, lower rate). Q1 2026 shows a real inflection: revenue +13% YoY, gross margin back to 25.8% GAAP (21.6% ex-A-10), and a swing to $1.2M net income / $2.2M adj EBITDA. A $495M backlog (7x TTM revenue, ~$95M funded) plus a wave of 2026 contract wins (Embraer Phenom 100EX life-of-program deal, Northrop E-2D follow-ons, Lockheed F-16 orders, Sikorsky/Raytheon/Collins awards) diversify the customer base away from the lost A-10 program and support multi-year growth. Offsetting this: leverage remains high (net debt ~$27M vs TTM EBITDA of only $3.1M), a $17M ATM program signals ongoing dilution, and Boeing's damages claim over the alleged contract default is an open litigation overhang with no visible resolution timeline. The stock is a leveraged, small-float turnaround story where the next several quarters of margin durability will determine whether this is a real re-rating or a one-quarter blip.
Trade Signal
CVU has re-rated too far, too fast on one clean quarter and a refinancing — at $5.47 it trades well above even the probability-weighted fair value (~$3.31-3.48/share), with dilution, thin short-covering fuel, and unresolved Boeing litigation risk offering no real floor for a short-side pullback trade.
Stock has rallied 60% in a year and 47% in 3 months, driven by concrete events: the Dec-2025 Western Alliance refinancing removing covenant risk, then the May 18 Q1 2026 8-K showing a swing to net income and margin expansion, followed by a string of contract wins (Embraer, Northrop, Lockheed) through June. The move tracks real news, not drift — but the magnitude now prices in a durable multi-year recovery (P/S 1.01x, EV/EBITDA 32x TTM) well beyond what even the analyst's base case supports. This looks like an overshoot: good news correctly triggered a re-rating, but the market has extrapolated one strong quarter into a re-rated multiple that assumes bull-case execution.
Consensus is thin (1 buy/1 hold) but retail attention and price action suggest the market has turned bullish and is chasing the turnaround narrative — high retail order flow (44%), rising price on light volume, extreme put IV (124% vs 57% call) suggesting hedging/skepticism coexists with momentum buying. Short interest is negligible (0.5%) and has been covered aggressively, meaning there's little bearish fuel left and most of the good news is already reflected. The A-10 termination and dilution/litigation risks are known but seem to be forgotten amid the rally.
Q1 2026 was a genuine inflection versus FY2025's disaster, and backlog ($495M) plus new OEM diversification (Embraer, Northrop, Lockheed, Sikorsky, Raytheon) supports a real multi-year recovery story. However, consensus analyst estimates (rev ~$24-26M/quarter, EBITDA ~$1.5-2M/quarter, EPS $0.06-0.11) already capture continued improvement — the market/analysts are not asleep at the wheel here. The stock's re-rating already prices in much of this recovery; the incremental surprise potential from here is smaller than the recent move implies.
- •2026-08 · Q2 2026 earnings — Will show whether Q1 margin recovery (25.8% GAAP) is sustainable or reverts toward ex-A-10 21%; key confirm/deny moment.
- ▲H2 2026 · Backlog conversion updates / new contract announcements — Continued wins would support bull case but likely already partly priced given recent rally.
- ▼2026-2027 · Potential Boeing A-10 litigation developments — Unresolved overhang; a material settlement/damages award would hit thin equity value hard given $30M+ net debt.
- ▼ongoing · ATM equity issuance — $17M ATM facility remains a dilution drag on a name with limited FCF.
- •2027-03 · FY2026 full-year results — First full clean read on post-A-10 run-rate profitability.
Modest dilution (~2% TTM) via ATM continues and is a real per-share drag; no buyback in place. Short interest has collapsed to near zero (0.5%, -42% recent change), meaning short-covering fuel that helped drive the rally is largely exhausted. No major insider buying disclosed. Net flow is mildly negative to neutral going forward given continued ATM usage against high leverage (EV $99.8M vs mktcap $72.3M implies ~$27M net debt now, though study says $18-30M range).
No net cash — meaningful net debt post-refinancing ($18-30M depending on scenario), so no hard balance-sheet floor. FCF is negative (-4% margin), so no buyback support. The floor is really the refinancing itself (extended to 2030, lower rate) removing insolvency risk, and the diversified backlog providing revenue visibility — a soft floor, not a hard one. Above the current price there's no obvious hard ceiling but the stock already trades well above analyst fair value with consensus estimates modest, so upside from here needs the bull case to actually materialize, which is a real ceiling on further re-rating without more evidence.
Yes, this is buyable/ownable — it's not a distressed shell; it has real revenue, blue-chip customers (Boeing, Northrop, Lockheed, Embraer), a de-risked balance sheet, and a turnaround narrative retail and small-cap value investors can rally around. The concern is not investability but price: buyers chasing the story at $5.47 are paying well ahead of the base-case fundamentals ($3.18 base fair value per share), leaving little margin of safety if Q2 disappoints.
Fear dominates here — the stock has already run 47% in three months on real but modest news (one good quarter), short covering is exhausted, and the price sits 57% above the analyst's fair value with even the bull case only implying modest further upside from a much lower entry. This smells like a name priced for a flawless continuation of a single strong print.
Valuation
The market already knew about the A-10 termination and FY2025 weakness from the March 2026 8-K. What's new here is confirmation that the turnaround is real and quantifiable: gross margin snapped back to 25.8% (21.6% ex-A-10), adj EBITDA nearly tripled sequentially to ~$2.2M, and the company posted its first net income in three quarters ($1.2M) with revenue growth resuming (+13% YoY). This is the first hard evidence since the Boeing termination that the backlog and new-customer wins are translating into actual P&L improvement rather than just headline announcements.
▸ How the cases moved
Base case equity value nudges up modestly (from an implied pre-print ~$38M to $42M) as confidence in margin durability improves; bull case probability effectively increases at the expense of bear (bear probability trimmed from ~0.30 to 0.25, bull raised from ~0.20 to 0.25) since the quarter demonstrates the diversification thesis is working faster than a single data point would normally justify, given how depressed sentiment was after FY2025 results.
Boeing litigation results in a material damages award or settlement, A-10 replacement revenue ramps slower than backlog implies, and margins revert toward FY2025 lows as new programs face startup inefficiencies. Continued ATM dilution and debt service pressure keep leverage elevated; covenant stress resurfaces.
▸ Valuation
5.5x $3.0M EBITDA = $16.5M EV - $30M net debt (dilution-funded, limited paydown) = negative; floored at nominal option value of $3M equity
Backlog conversion proceeds steadily; A-10 hole is gradually filled by Embraer, Northrop, Lockheed and other new awards. Margins recover toward historical 2023-2024 levels (~9-10% EBITDA margin) as mix normalizes and fixed costs are absorbed on higher volume. Debt is slowly paid down from refinanced facility; dilution continues modestly via ATM.
▸ Valuation
8x $7.5M EBITDA = $60M EV - $18M net debt = $42M equity
The Q1 2026 turnaround proves durable; new life-of-program and follow-on contracts scale faster than expected, backlog conversion accelerates, and specialized NADCAP welding capability commands premium pricing amid defense rearmament tailwinds. Margins expand toward 12%+, leverage falls meaningfully as EBITDA grows into the balance sheet.
▸ Valuation
10.5x $11M EBITDA = $115.5M EV - $13M net debt = $102.5M equity
▸ Target Rationale
I nudge slightly above the probability-weighted model value because the Q1 2026 print, the Western Alliance refinancing (removing near-term covenant risk), and the breadth of new 2026 contract wins (Embraer, Northrop, Lockheed, Sikorsky, Raytheon) collectively de-risk the bear case more than the base-case math alone captures - this looks like early evidence of a genuine multi-customer diversification away from the single-program concentration that caused the 2025 blowup. I don't go further because litigation exposure to Boeing and continued dilution via the $17M ATM are real, unresolved drags on per-share value that the scenario arithmetic doesn't fully price.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Turnaround: On May 18, 2026, CPI Aerostructures announced a significant financial recovery for the first quarter ended March 31, 2026. Revenue rose 13% year-over-year to $17.4 million, compared to $15.4 million in Q1 2025. The company successfully swung to a net income of $1.2 million (EPS of $0.10) compared to a net loss of $1.3 million (loss per share of $0.10) in Q1 2025. Gross profit margin expanded to 25.8% (up from 10.7% in Q1 2025), fueled by a favorable product mix and operational efficiencies. Adjusted EBITDA reached $2.1 million.
- Life-of-Program Agreement with Embraer: On June 4, 2026, CPI Aero secured a life-of-program supply agreement with Embraer to manufacture engine inlet assemblies for the Phenom 100EX business jets. This expands on CPI Aero's long-term relationship with Embraer, which already includes supplying assemblies for the Phenom 300E. The initial deliveries under this contract commenced in May 2026.
- Northrop Grumman Follow-On Orders: On May 26, 2026, CPI Aero announced that its subsidiary, Welding Metallurgy, Inc. (WMI), received follow-on orders from Northrop Grumman to manufacture over 20 different complex welded assemblies for the E-2D Advanced Hawkeye aircraft. Deliveries under this agreement are scheduled to run through 2028.
- FY 2025 Results and Debt Refinancing: Reported on March 31, 2026, the company's full-year 2025 results highlighted a challenging fiscal year, with revenue declining to $69.3 million from $81.1 million in 2024, resulting in a net loss of $0.8 million. This decline was heavily driven by the termination of the Boeing A-10 Main Landing Gear Pods program. To stabilize its capital structure after covenant breaches resulting from the termination, CPI Aero refinanced its debt with Western Alliance Bank in December 2025, extending the maturity to December 2030, which lowered its interest rates and improved operational flexibility.
▸ Thesis-test Findings
- CPI Aerostructures Boeing A-10 litigation update 2026: Direct searches for active litigation or court updates in 2026 between CPI Aero and Boeing regarding the A-10 program turned up no results. However, the commercial and financial impact of Boeing's program termination is highly clear. The termination of the Boeing A-10 Main Landing Gear Pods program in 2025 was the primary drag on CPI Aero’s FY 2025 performance, triggering a $2.3 million write-off, revenue declines, and temporary debt covenant non-compliance. By Q1 2026, the company has officially turned the corner; excluding the historical A-10 program impacts, Q1 2026 gross margin was 21.6% (compared to 25.8% GAAP), and Adjusted EBITDA grew 53% year-over-year.
- CPI Aerostructures new contract awards backlog 2026: CPI Aero enters the remainder of 2026 with a robust total backlog of $495 million, consisting of over $95 million in funded backlog and approximately $400 million in unfunded backlog. This backlog has been supported by a flurry of late-2025 and 2026 contract wins, including the life-of-program Embraer Phenom 100EX supply agreement (June 2026), Northrop Grumman E-2D welded assemblies (May 2026), $9 million in F-16 structural assembly orders from Lockheed Martin (February 2026), and March 2026 orders from Collins Aerospace, Sikorsky, and Raytheon. Additionally, the company has begun preparations for production on previously announced missile work, expanding its presence in high-growth defense segments.
- military aviation sub-contractor margin trends 2026: Industry-wide trends show a divergence between strong demand and pressurized margins for military aviation subcontractors. While geopolitical tensions and rearmament are fueling a projected 13.4% expansion in the global military fleet through 2036, subcontractors are squeezed by fixed-price contracts, labor constraints, and supply chain bottlenecks. Smaller tier-2/3 vendors are experiencing margin compression that is driving industry consolidation and PE-backed roll-ups. Even prime contractors face profit adjustments due to supplier constraints (e.g., Lockheed Martin’s Q1 2026 earnings hit on F-16/C-130 programs). However, subcontractors with highly specialized, certified capabilities—such as CPI Aero's NADCAP welding certification—are better positioned to secure long-term agreements and sustain improved margins.