Stocks/DUOT

DUOT

Duos Technologies Group, Inc.v3 5.0/10 · 2026-11-13
Technology·Software - Application
$2.78
$102M market cap
v3 Rating
5.0/103.5–6.5
Setup
4.0/103.0–5.5
Fair Value
$5.50$2.50–$11.00+98%
DCF (10%)
$6.00+116%
Base IRR
+8%-45%–+60%
Visibility
wide±77%
Wall Street
$18.25 target(2 analysts last quarter)(4 buy)
Rating
Revenue (TTM)
$28.9M
Owner Earnings
-$6M
Next-Yr Owner Earnings
-$40M
Growth
+35.0% × 4y
P / Next-Yr OE
--
Net Debt
-$80M

Duos Technologies Group, Inc. (DUOT) is a North American enterprise that conceives, develops, implements, and manages intelligent technology solutions. Their core technological framework includes Centraco, an overarching system for managing enterprise information. Another key platform is Truevue360, an integrated environment crafted for the creation and deployment of advanced artificial intelligence algorithms. This platform supports machine learning, computer vision, object detection, and deep neural network-based processing, all optimized for real-time applications. Furthermore, Praesidium is utilized to integrate and oversee various image capture devices and sensors, funneling their data into the Centraco software. Among their proprietary applications are the Railcar Inspection Portal, designed for the automated examination of freight and transit trains while in motion. They also offer the Vehicle Undercarriage Examiner and the Thermal Undercarriage Examiner for in-depth scrutiny of railcar undercarriages. The Enterprise Command and Control Suite is another solution, centralizing information, enhancing connectivity, and streamlining communications. Additionally, the Automated Logistics Information Systems (ALIS) represents an intelligent system engineered to automate security gate processes. Beyond their product portfolio, Duos Technologies provides a range of services, including IT asset management for data center operators, comprehensive maintenance and technical assistance, consulting and auditing services, and software licensing, often with accompanying hardware sales options. They also deliver specialized training programs. The company's corporate base is located in Jacksonville, Florida.

2-Year Price History

$5.15+37.0%
$4.0$6.0$8.0$10$12Initial target $8.50 · 2026-11-03Initial target $5.50 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
5.03.5–6.5
Setup
4.03.0–5.5
Fair value (USD)
5.502.50 – 11.00
Upside vs 2.78
+98%
DCF (10%)
6.002.50 – 12.50+116%
Base IRR
8%-45% – 60%
Visibility
very widerange ±77%
Sentiment
3/10
Reputation
6/10
2026-11-13 · claude-opus-5-5 · priced at 5.15

Duos has sold its rail business and turned itself into a small AI colocation landlord. It owns a 20 MW-capable building in Columbus, GA, has a JV pipeline of 55 MW and a $112M cash pile at June 30, and management talks of a $70M+ annualized recurring revenue exit rate and $160M+ of 2027 revenue. At $5.15 (last close 2026-11-12, down 62% from the May high of $13.50), roughly 42M diluted shares put the market cap near $216M and the EV near $135M, about 7x a heavily haircut 2027 EBITDA and 2-3x management's numbers. If the contracts are real, the stock is cheap. The market's doubt is reasonable, though: nearly every growth contract runs through one counterparty, Axe Compute (AGPU). Axe is a renamed oncology microcap with about $22M of cash and a crypto-token (ATH) treasury. It is the tenant on the $111M Columbus colocation deal and on the $500M 55 MW hosting order, it promised up to $140M of JV equity, it is now Duos's GPU-capacity supplier, and on September 30 it bought Duos's GPU entity for $42.9M paid in unsecured monthly installments over 60 months, against $68.8M Duos had deposited on the equipment. Add a related-party rail sale to the interim CFO, three CFOs in a year, roughly $230M of equity raised in 12 months and a very promotional CEO, and the base-case DCF (about $6/share) sits only modestly above the price, with a range from about $2.5 to $12.5. Rating 5.0: roughly fair for a coin-flip on counterparty credit. Interest 4.0: Q3 results on Nov 16 are a catalyst, but the outcome turns on Axe Compute's solvency and on contract terms we cannot see, which is too hard to call with an edge.

A deep dive would have to establish: Will Axe Compute, a cash-thin former oncology microcap, and the unnamed hyperscaler behind it actually pay the $111M Columbus, $500M 55 MW and $42.9M GPU-sale obligations, so that Duos's contracted colocation revenue turns into real cash flow without further dilution?

Owner earnings, TTM
-$6M-$12M – $2M
Realistic peak profit
$32M$5M – $70M
Growth rate
35.0%0.0% – 80.0%
Years of growth
41 – 6
Market cap
$216M$205M – $230M
EV
$136M$100M – $175M
Net debt
-$80M-$110M – -$40M
Capital return / cap
-5.0%-15.0% – 0.0%
P/E
15.0×8.0× – 60.0×
EV/EBITDA
7.0×3.0× – 20.0×
FCF yield
-18.0%-35.0% – 0.0%
Projected FCF, base case (USD millions)
Y1-$40M-$80M – -$10M
Y2$0M-$40M – $25M
Y3$30M-$15M – $55M
Y4$32M-$10M – $65M
Y5$32M-$10M – $70M
Competition: A crowded field of modular/edge AI hosts (Crusoe, Armada, Applied Digital, repurposed bitcoin miners with stranded power) competes for sub-20 MW deployments; Duos's edge is speed and a clean-room patent, which is a thin moat.
Governance: Rail unit sold to an entity 50% owned by the interim CFO for a setoff-able note; three CFOs in a year; heavy serial equity issuance; extreme counterparty concentration in Axe Compute, which simultaneously acts as tenant, JV partner, GPU buyer and GPU supplier.
Research (expand)

What it does. Duos Technologies sold its legacy railcar-inspection unit (DTI) in August 2026 and cashed its 5% APR Energy stake for about $60M ($50.4M received, $10M held back). What remains: (1) Duos Edge AI, which builds and leases modular, high-density colocation sites (Columbus GA: bought for $15M cash plus a $15M power-contingent seller note, with 7 MW fitted out in under 60 days); and (2) Technology Solutions, low-capex procurement of data-center equipment ($3.2M Q2 revenue, $25M backlog). There are about 25 employees.

What the market believes. The stock fell from $13.50 (May) to $5.15. The market treats the $611M of headline contracts as low quality. It has good reason. Axe Compute (AGPU, formerly Predictive Oncology) is the tenant on the 10 MW/$111M Columbus deal and the 55 MW/$500M hosting order, the would-be $140M JV equity partner, and since 9/30 the buyer of Duos's GPU entity. Axe pays for that entity at $715k a month for 60 months ($42.9M, unsecured) and also leases the GPUs back to Duos to serve the hyperscaler end-customer. Axe had about $22M of cash at June 30 against billions of claimed backlog. Duos had deposited $68.8M on those GPUs, so the sale looks like a write-down dressed up as 'debt removal'.

Variant view (bull). If the unnamed 'tier-1 hyperscaler' behind Axe is real and pays, Columbus alone (20 MW at about $2.2M/MW/yr) supports about $40M of revenue at 60%+ EBITDA margins, and 51% of the 55 MW JV adds about $50M. On that path, 2028 EBITDA of $50-70M against a $135M EV is absurdly cheap.

Real earnings today. Q2 continuing operations: $6.2M revenue, of which $2.7M was one-off APR deferred revenue, and +$0.5M adjusted EBITDA before SBC. Underlying owner earnings after SBC run around -$6M a year. H1 operating cash flow of +$11.9M was mostly customer prepayments.

FCF projection (unlevered, Duos share, $M), with revenue haircut to about $90M in 2027: 2027 -40 (JV and Columbus capex); 2028 0; 2029 +30; 2030 +32; 2031 +32. In year 5 this is a small, counterparty-concentrated colocation landlord, neither a category leader nor a corpse. We give it 8x terminal FCF, because its 5-year contracts roll off around then. PV of the flows is about $174M. Adding about $80M of net cash and risk-weighted receivables (cash about $65M after Columbus build-out, less the $15M seller note, plus the APR holdback, the Axe installment PV and the rail note) gives about $254M, or about $6.0 per diluted share (31.5M common + 3.8M pre-funded warrants + 5.1M as-converted preferred + RSUs ≈ 42M). If Axe fails, value falls to about $2.5-3 (cash, the building and Technology Solutions). If contracts are honored and debt-funded growth follows, $12+.

Multiples. EV/2027E EBITDA (our $20M) is about 7x. The price is about 1.0x stated equity, but much of that equity is deposits and receivables.

Management and risks. CEO Recker is a data-center operator (sold Colo5) but highly promotional ('get your popcorn ready'). The rail unit went to a firm 50% owned by interim CFO Goldfarb for a $5.4M note subject to setoff. The company has had three CFOs in 12 months (new: DeAlmeida, ex-Wrap). Expect more dilution: the JV needs about $30M per site from Duos. Competitors: Crusoe, Armada, Applied Digital and countless ex-bitcoin miners with stranded power; the clean-room patent is a thin moat.

Sentiment: 3/10. Down 62% from peak; short interest of about 5.8M shares (about 18% of common), 6-11 days to cover; holders Bleichroeder (18.5%) and Alyeska (10%) are still there.

Sources
Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-11-036.164.56.58.5012.0020%4
2026-11-135.155.04.05.506.008%3

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue28.9+52%27.0+271%7.28-3%7.47-50%15.0
Gross profit11.9+138%7.880.47-64%1.31-72%4.75
Operating expenses20.8+44%17.6+54%11.5-10%12.8+10%11.6
▸Adj EBITDA-8.35-7.12-8.43-10.8-6.33
▸Adj OCF-20.8-2.83-8.29-10.2-5.92
CapEx-139-23.7-1.84-1.09-0.64
Adj FCF-160-26.5-10.1-11.3-6.57
Interest expense1.560.440.290.010.01
▸Adj net income-13.4-9.79-11.3-11.5-6.87
▸Owner's earnings-10.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-33.7-2.12-6.75-7.92-10.6-6.32
FCF (OCF−capex)-185-124-37.4-5.33-9.84-8.52
Net income6.5145.2-9.84-10.8-11.2-6.86
▸Capital returned-186-111-46.4-8.87-11.2-8.71
Buybacks-192-113-51.5-7.39-11.7-8.80
Dividends0.000.000.000.000.000.00
Interest paid2.301.560.440.290.010.01
Debt paid down4.080.544.69-1.770.540.08
▸Reinvestment14712021.63.590.840.85
Capex (PP&E)15112323.71.841.090.64
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)-3.45-3.03-2.121.75-0.250.21
Retained / other2.71-12.19.493.831.320.20

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 6.5 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)25263.435.012.813.1
▸Liabilities (total)41.314.932.77.489.04
Net debt (incl. leases)-43.0-10.82.272.614.22
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-5.35-16.2-29.5----
Shares outstanding31.520.48.927.317.16
Dilution (YoY)+151.6%+129.2%+22.1%+2.1%+74.1%
Employees79.084.086.071.075.0
MarginsTTM2025202420232022
Gross margin41.4%+15.029.1%+22.76.4%-11.117.5%-14.131.6%
Adj EBITDA margin-28.9%+3.7-26.3%+89.4-115.7%+28.8-144.6%-102.4-42.2%
Adj OCF margin-71.9%-52.5-10.5%+103.4-113.9%+23.1-136.9%-97.5-39.5%
Adj FCF margin-554.7%-492.7-98.1%+41.1-139.2%+12.4-151.6%-107.8-43.8%
Net income margin145.6%+198.4-36.4%+111.5-147.8%+2.6-150.5%-104.7-45.7%
Adj NI margin-46.4%+5.3-36.2%+118.6-154.8%-1.5-153.3%-107.5-45.8%
ROIC (adj, after-tax)-3.1%-14.5%-80.4%-86.8%-57.8%
Cost of debt--7.0%4.5%0.1%0.2%

Revenue Breakdown

Revenue Segments

By Product (2025-Q4)
Services and consulting$2.5MNEW
Technology Service$0.1MNEW
Hosting$0.1MNEW
Hosting Revenue$0.0MNEW
By Geography (2025-Q4)
North America$9.5M+548%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-17

Duos Technologies described Q2 2026 as the most consequential quarter in its history, marking the practical completion of its transformation into a pure-play AI infrastructure, Edge Data Center, and technology-solutions company. The company completed the sale of its legacy rail subsidiary on August 5, with the business now operating independently as DuosTI. New APR Energy also sold substantially all of its assets during the quarter. Duos’s 5% interest generated approximately $60 million of value, including $50.4 million in cash and a $10 million receivable subject to a 12-month holdback. Against a $7.2 million carrying value, the APR transaction produced a $53.2 million gain. Management said these transactions allow it to devote capital, personnel, and attention to AI infrastructure while materially strengthening the balance sheet. Duos also added Dipan Patel as COO and is searching for a public-market-experienced CFO. Continuing-operations revenue increased 30% year over year to $6.18 million in Q2. Technology Solutions contributed $3.23 million, versus no comparable revenue a year earlier, and backlog increased to $25 million. Related-party services and consulting revenue was $2.91 million, including $2.71 million from accelerated recognition of remaining APR deferred revenue; ongoing APR asset-management revenue will be minimal through the third quarter. First-half revenue was $8.32 million versus $8.68 million in the prior-year period, reflecting the deliberate replacement of declining APR revenue with higher-quality technology and infrastructure revenue. Q2 cost of revenue declined 9% to $2.73 million, while gross margin rose to $3.45 million, or 55.8%, from 37.3%. Management characterized the improvement as structural. Q2 operating income reached approximately $50,000 compared with a $1.54 million loss, and adjusted EBITDA was positive at roughly $500,000, excluding the investment-sale gain and stock compensation. The company ended Q2 with $112.3 million of cash and $207.4 million of stockholders’ equity. First-half operating cash flow from continuing operations was positive $11.9 million. Investing outflows included $68.8 million of GPU-equipment deposits and $5.8 million of real-estate and construction deposits. Customer funding remains important, with $18.8 million of long-term deferred revenue, including GPU-program prepayments. Subsequent to quarter-end, Duos completed the $30 million Columbus, Georgia acquisition using $15 million of cash and a $13 million zero-coupon seller note tied to incremental power delivery. The facility is being equipped for 2,304 NVIDIA GPUs. Demand for Duos’s modular, high-density infrastructure accelerated. Its initial five-year Axe Compute colocation agreement covers 10 MW in Georgia and more than $111 million of contracted revenue, expected to begin operating in Q4 2026. New orders add 55 MW across several U.S. sites, bringing the total to 65 MW and expected base payments above $500 million over the initial five-year terms. Axe may invest up to $140 million for a 49% share of jointly owned facilities, while Duos retains 51% and acts as managing partner. Management views this as a non-dilutive method to accelerate construction. Sites under consideration are primarily powered locations in Texas, South Carolina, Iowa, and Alabama, with two in LOI status. Duos emphasized its focus on 1–20 MW deployments, stranded power, low-cost electricity, available fiber, and modular deployment speed. It also cited its patented clean-room design as a differentiator for protecting sensitive GPUs. Hydra Host deployment and customer onboarding continued, with revenue expected to rise as GPU systems become operational and utilization ramps. Nyrstar’s approximately 2 MW deployment remains on schedule, while a Zero Latency opportunity could cover up to 15 sites and 225 cabinets. Duos reaffirmed its goal of approximately 25 MW deployed in 2026 and said more than 75 MW is now under contract following the Axe expansion. Financial guidance was maintained. Management expects 2026 revenue above $50 million, consisting of approximately $26 million from GPU-as-a-service and $25 million from Technology Solutions, including deferred revenue recognition. Adjusted EBITDA should remain positive in Q3 and Q4, with Q4 projected at $8 million–$10 million. Q4 recurring infrastructure revenue is expected at $17 million–$18 million per month, implying an annualized recurring-revenue exit rate above $70 million with gross margins well above 70%. The preliminary 2027 framework calls for at least $160 million of revenue from announced and contracted programs, with additional sites and partnerships potentially incremental. Management expects substantial adjusted EBITDA margin expansion as recurring revenue scales against a relatively fixed cost structure.

Analyst Q&A (17)
▸
Asked whether the newly announced 55 MW Axe Compute capacity was IT load or gross capacity and whether it was incremental to the original 10 MW agreement.
Brett Knoblauch · Cantor Fitzgerald
Doug said the 55 MW is gross and incremental to the previously signed 10 MW Georgia deployment, bringing the Axe Compute total to 65 MW.
▸
Asked whether the sites for the additional Axe Compute capacity had already been secured, identified, and paid for, or remained to be determined.
Brett Knoblauch · Cantor Fitzgerald
Duos is evaluating six or seven sites, with two under letters of intent. The sites are primarily in Texas, South Carolina, Iowa, and Alabama, and already have utility power available rather than relying on behind-the-meter generation or lengthy utility approvals.
▸
Asked whether Axe Compute’s up-to-$140 million investment for its 49% stake would effectively fund most of the data-center buildout while Duos retained 51% ownership, and clarified the expected contribution per deployment.
Brett Knoblauch · Cantor Fitzgerald
Doug confirmed that Axe Compute’s potential $140 million equity investment should fund most of the data-center capital expenditure, giving Duos a 51% ownership stake in the developed portfolio. Duos expects costs below $6 million per MW and approximately $30 million of contribution for the two Axe deployments.
▸
Asked whether the non-binding Zero Latency term sheet represented lower-power-density cabinet deployments, allowing Duos to focus its higher-density capacity on Edge Data Centers.
Brett Knoblauch · Cantor Fitzgerald
Doug confirmed the Zero Latency opportunity is for lower-density, bare-metal deployments across the sites, with the customer potentially consuming an entire pod at each location under a 10-year arrangement.
▸
Asked whether Duos had seen any changes in the competitive environment.
Edward Woo · Ascendiant Capital
Doug said Duos is focused on the 1–20 MW niche, where demand is rapidly increasing. He expects competition to emerge, but believes Duos has advantages from nine years of modular deployment experience and its patented clean-room design, which protects sensitive, high-value GPUs from dust and other contaminants.
▸
Asked how large the expanding demand funnel and contracted backlog were and how long management expected it would take to deliver the backlog.
Bill Papanastasiou · Chardan Capital Markets
Doug said the initial Georgia orders, including the additional 10 MW, are expected to come online by year-end. The second recently signed expansion is expected around mid-Q1 2027, with management conservatively allowing until the end of Q1; delivery could therefore occur in less than six months.
▸
Asked which markets were most attractive for scaling the portfolio and whether recent political headwinds had affected Duos’s strategy.
Bill Papanastasiou · Chardan Capital Markets
Duos is targeting markets with stranded, readily available power, particularly South Carolina and Iowa, where electricity costs can be approximately $0.04–$0.07 per kWh. It is also evaluating powered sites formerly used by unsuccessful Bitcoin miners, generally in the 5–20 MW range, while pursuing numerous 2–7 MW opportunities. Recent political developments have not materially changed the strategy.
▸
Asked about the pipeline in Tier 3 and Tier 4 markets beyond the 25 MW 2026 target and Axe Compute’s 55 MW, and whether power, capital, or customers represented the binding constraint.
Scott Buck · Titan Partners
Doug said Tier 3 and Tier 4 markets offer available fiber, low latency—generally within 130 miles and under five milliseconds—and, most importantly, stranded power. Duos’s internal funnel exceeds 100 MW in 5–10 MW tranches for the year, although it cannot deploy all of it in 2026. The principal constraint is executing quickly and correctly while selecting financially strong, diversified customers; power availability and deployment execution are more limiting than demand.
▸
Asked how quickly Duos could move from site selection to customer billing at the Columbus facility.
Scott Buck · Titan Partners
Duos purchased the Columbus building in early July and, by mid-August, had installed more than seven MW of infrastructure in under 60 days. The work included generators, cooling, PDUs, cabinets, lighting, and approximately 17,000 square feet of raised floor, with customer billing expected as capacity becomes operational.
▸
Asked whether the higher first-half operating costs should be viewed as largely one-time and whether OpEx growth would be more muted in 2027.
Scott Buck · Titan Partners
Adrian agreed that much of the first-half operating-expense increase was one-time in nature, reflecting the APR sale, rail divestiture, accounting complexity, staffing changes, growth hiring, and public-company costs. The organization has declined from roughly 100 employees to about 25, so future SG&A growth should be modest and tied mainly to specific opportunities.
▸
Asked whether Duos could identify or characterize the end customer behind the Axe Compute arrangement and whether the customer’s credit quality supported the expected investment.
Justin Tapper · Shea Capital
Doug said the end customer is a Tier 1 hyperscaler whose identity cannot be disclosed. The customer visited the site, was considered highly credible and creditworthy, and was sufficiently strong that Duos funded the GPU deployment based on the relationship. Axe and Duos also performed due diligence before entering the SPV.
▸
Asked for clarification on the structure and purpose of the Axe Compute joint-venture SPV.
Justin Tapper · Shea Capital
Dipan explained that the SPV funds data-center development. Duos will be the managing partner and majority owner, Axe will provide equity capital, and Duos will develop the facilities, which Axe will lease and use as the offtaker.
▸
Asked about the expected longevity of Duos’s modular pods and facilities and how management thinks about contract duration relative to the infrastructure payback period.
Justin Tapper · Shea Capital
Doug said the pods and facilities should have useful lives exceeding 20 years. The primary expected replacement item after roughly 10–12 years is the UPS battery system; the core infrastructure should last more than 20 years.
▸
Asked how Duos would finance the additional roughly 100 MW in its pipeline after using the SPV and balance-sheet cash to support the currently announced projects.
Justin Tapper · Shea Capital
Doug said Axe’s capital enables Duos to order infrastructure immediately and meet the targeted Q1 timing without diluting shareholders. Once revenue begins, Duos expects to borrow against the SPV and its infrastructure, using contracted cash flow and GPU revenue to support future financing. He cited approximately $4.4 million per month of anticipated near-term revenue as an additional source of balance-sheet strength.
▸
Asked whether the prior capital constraint—needing significant upfront funding to build facilities before generating contracted, high-margin revenue—was now behind Duos, and whether the modular infrastructure could be redeployed if a tenant left.
Nico Sacchetti · RBC
Doug said the financing and operating model is substantially de-risked by strong current demand, customer commitments, and infrastructure that can be redeployed if necessary. Even if a customer left after several years, the infrastructure would be largely paid for and available power is scarce; Doug said numerous customers are seeking immediately available capacity. He also highlighted demand from Fortune 100 and enterprise customers whose legacy data centers cannot support AI-level power and cooling requirements.
▸
Asked whether the Iowa opportunity had simply been shifted to Georgia for faster cash flow, whether Duos retained the Iowa site, and whether the Georgia facility was receiving an additional 10 MW.
Nico Sacchetti · RBC
Doug confirmed that the Iowa project was not abandoned; the related 10 MW opportunity was moved to Georgia because the Georgia site could be made operational and cash-generating more quickly. Duos still owns the Iowa land and could develop it later. The Georgia building is being expanded by another 10 MW, in addition to the initial 10 MW agreement.
▸
Asked why one 10 MW arrangement was valued at approximately $176 million over three years while another was valued at $111 million over five years.
Nico Sacchetti · RBC
Doug explained that the first 10 MW deployment includes GPUs owned or funded by Duos and therefore has different economics and contract value. The additional 10 MW is a pure colocation arrangement in which the customer owns the GPUs, reflecting Duos’s core infrastructure model.

SEC Filing Findings

SEC Filing — material findings

2026-08-19 · depth 8/10
risk 6Related-Party
▸

Divestiture of legacy rail subsidiary DTI sold to Sandbank Acosta LLC, 50% owned by Interim CFO Adrian Goldfarb; consideration is a $5.4M promissory note (5% simple, due 2031) subject to setoff for installation costs on NY/MD contracts.

“The transaction is considered a related-party transaction because Adrian Goldfarb, the Company's Interim CFO is also a 50% owner of the Purchaser.”
risk 7Hidden Liability
▸

GPU infrastructure commitments of ~$145M with only $68.8M deposited; ~70% to be funded by senior debt not yet secured, remainder via customer prepayments; Company bears full customer nonpayment risk and residual GPU value risk.

“As of June 30, 2026, the aggregate estimated cost of these commitments is approximately $145 million. The Company had deposited approximately $68.8 million with Hydra Host”
risk 7Customer Concentration
▸

GPU-as-a-service revenue concentrated with a single customer; Company bears full credit risk as Hydra Host does not guarantee customer payment.

“Revenue will be significantly concentrated with a single customer agreement for use of all purchased GPU servers. In the arrangement, the Company bears the full risk of customer nonpayment”
upsideHidden Upside
▸

Axe Compute JV structure: Axe may invest up to $140M for 49% of facilities, with Duos retaining 51% and managing, a non-dilutive funding route for data center buildout.

“Axe may invest up to $140 million for a 49% share of jointly owned facilities, while Duos retains 51% and acts as managing partner.”

Options

Chain Snapshot (daily)

Call IV (ATM)99%
Put IV (ATM)144%
ATM Spread18.7%
Call $OI (near money)$399K
Put $OI (near money)$498K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$6.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$3.00$2.20/$3.70100--/$1.000
$4.00$1.50/$2.709--/$0.850
$5.00$0.45/$2.106--/$0.7510
$6.00$0.35/$1.50102$0.35/$1.850
$7.00$0.05/$0.4018$0.85/$2.3025
$8.00--/$0.753$1.65/$2.750
$9.00--/$1.005$2.40/$3.900
$10.00--/$0.9510$3.30/$4.900
Snapshot: 2026-11-04

Short Interest

Short % of Float24.9%
Short Shares6.3M
Days to Cover6.8
Change (vs Prior)+7.8%
Short % Float History
24.90%+22.10pp
5.0%10.0%15.0%20.0%25.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$12.4M
Incentive & Other$0.4M
Total Compensation$12.8M
% of Revenue23.1%

Cash Runway

3.8months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Alyeska Investment Group, L.P.$24.0M$7.10+$1.1M+$24.0M—$38.84B
BlackRock, Inc.Passive$19.9M$11.84+$18.8M+$19.4M—$6.70T
Bleichroeder LP$19.5M$4.77+$0+$0—$559M
ROYAL BANK OF CANADA$16.0M$7.60−$8K+$12.2M—$589.47B
Northern Right Capital Management, L.P.$14.6M$7.34+$1.7M+$14.6M—$337M
MORGAN STANLEY$14.1M$9.27+$1.4M+$12.1M—$1.88T
VANGUARD CAPITAL MANAGEMENT LLCPassive$13.6M$7.58+$1.9M+$13.6M—$4.68T
Shay Capital LLC$11.2M$8.05+$3.2M+$11.0M—$907M
GEODE CAPITAL MANAGEMENT, LLCPassive$7.6M$10.65+$5.7M+$6.5M—$1.87T
JANE STREET GROUP, LLCMM$7.4M$11.63+$6.9M+$7.4M—$156.23B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

02.3M4.7M7.0M9.4M$2.00$4.50$7.00$9.50$122021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Alyeska Investment Group, L.P.2.0MBleichroeder LP1.6MROYAL BANK OF CANADA1.3MNorthern Right Capital Management, L.P.1.2MMORGAN STANLEY1.2MShay Capital LLC932KPrivate Advisor Group, LLC511KMink Brook Asset Management LLC—Covalis Capital LLP—GRATIA CAPITAL, LLC270K

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$18.25+512.4%
Last Year (5 analysts)$18.70+527.5%
Current Price$2.98
Analyst Ratings
4
Buy: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q13M0M0M$-0.42$-0.42 – $-0.421
2019 Q21M-1M-1M$-0.42$-0.42 – $-0.421
2019 Q33M-56M-56M$-0.14$-0.14 – $-0.141
2019 Q46M—8M$0.35$0.35 – $0.351
2020 Q11M-1M-1M$-0.57$-0.57 – $-0.571
2020 Q22M-1M-2M$-0.47$-0.47 – $-0.471
2020 Q35M-42M-42M$-0.03$-0.03 – $-0.031
2020 Q43M-12M-13M$-0.53$-0.53 – $-0.531
2021 Q15M-5M-5M$-0.22$-0.22 – $-0.221
2021 Q27M0M0M$0.01$0.01 – $0.011
2021 Q44M-1M-2M$-0.07$-0.07 – $-0.071
2022 Q11M-3M-3M$-0.53$-0.53 – $-0.531
2022 Q23M-2M-2M$-0.26$-0.26 – $-0.261
2022 Q36M-40M-40M$-0.22$-0.22 – $-0.221
2022 Q47M-2M-3M$-0.11$-0.11 – $-0.111
2023 Q12M-7M-7M$-0.29$-0.29 – $-0.291
2023 Q23M-5M-5M$-0.23$-0.23 – $-0.231
2023 Q32M-7M-8M$-0.32$-0.32 – $-0.321
2023 Q43M-6M-6M$-0.25$-0.25 – $-0.251
2024 Q11M-9M-9M$-0.38$-0.38 – $-0.381
2024 Q21M-7M-8M$-0.33$-0.33 – $-0.331
2024 Q33M-8M-9M$-0.25$-0.30 – $-0.202
2024 Q43M-9M-10M$-0.29$-0.33 – $-0.252
2025 Q14M-5M-6M$-0.17$-0.17 – $-0.172
2025 Q25M-7M-8M$-0.21$-0.23 – $-0.192
2025 Q37M-4M-4M$-0.12$-0.13 – $-0.121
2025 Q410M-0M-0M$-0.01$-0.01 – $-0.011
2026 Q110M-1M-1M$-0.03$-0.03 – $-0.031
2026 Q25M—23M$0.66$0.64 – $0.701
2026 Q314M-3M-3M$-0.08$-0.09 – $-0.081
2026 Q430M4M3M$0.08$0.08 – $0.081
2027 Q129M-0M-1M$-0.03$-0.03 – $-0.031
2027 Q236M6M3M$0.10$0.09 – $0.101
2027 Q347M13M8M$0.24$0.23 – $0.251
2027 Q450M14M9M$0.25$0.24 – $0.271

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$218K
2 txns · 2 insiders · 24,264 sh
Sells ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-09-22BUYRecker Frank Douglasdirector, officer: Chief Executive Officer18,500$9.14$169K$85K
2026-09-18BUYNixon James Craigdirector5,764$8.55$49K$723K
v2 analysis (legacy, 2026-08-18) — for comparison onlyclick to expand

Thesis

Duos is attempting a rapid transformation from a loss-making rail and services technology company into an AI-infrastructure platform. The operating evidence is improving: Q2 gross margin reached approximately 56%, adjusted EBITDA was modestly positive, backlog reached $25M, and the company announced substantial contracted or expected infrastructure demand. The APR asset sale also provided a large liquidity cushion. However, the valuation case depends on execution rather than demonstrated historical economics. TTM adjusted FCF was approximately negative $103M, GPU and infrastructure commitments are large relative to the balance sheet, and much of the GPU business is concentrated in one customer relationship for which the intermediary does not guarantee credit performance. The Axe projects and customer prepayments can substantially reduce funding risk, but financing, deployment timing, utilization, and customer credit remain unresolved. I therefore assign the highest probability to a successful but less-than-management-plan ramp, with a wide outcome range.

Trade Signal

Trade rating
-2.8/10
No trade
Horizon
~4mo
gpt-5.6-luna2026-08-18 · saw $11.59-76.1% since

No trade, with a modest short bias: the AI-infrastructure inflection is credible, but the 28% earnings rally has pushed the stock above conservative fair value before durable owner earnings or deployment economics are proven.

Temporary mispricing-4.0

The stock rose from roughly $8.46-$8.50 in mid-July to $9.11 immediately before earnings, then jumped to $10.28 on August 17 and $11.66 on August 18 after Q2 results. The July period was mostly drift and consolidation after the June financing/liquidity and GPU-financing news, while the latest leg was a specific earnings reaction to improved margins, positive adjusted EBITDA, backlog growth, and reaffirmed AI-infrastructure guidance. The move was directionally justified, but the 28% post-earnings jump appears to have overshot the demonstrated earnings base: current valuation still depends on future deployments and owner earnings. This looks like a temporary overreaction toward the bull case rather than a fully durable repricing, though a continued operational beat could validate part of it.

Market view+5.0

The visible consensus is bullish: all three tracked analysts rate the stock Buy with an average one-year target of $19, and the AI infrastructure narrative has attracted substantial attention. Bulls point to GPU contracts, contracted colocation demand, APR-sale liquidity, and improving margins. Bears point to the abrupt transition from a loss-making services/rail business, concentrated counterparties, uncertain utilization, large infrastructure commitments, and dilution. Short interest has risen dramatically to 18.1% of float, indicating a meaningful skeptical faction and potential squeeze risk. The market is not ignoring the story; after the post-earnings rally, it is increasingly pricing in successful execution, although the negative consensus EBITDA estimates suggest some disagreement about timing.

Inflectionwindow ~3mo+4.0

There is a potentially important positive inflection as Duos shifts from declining APR-related revenue toward higher-margin recurring GPU and colocation revenue. Q2 showed better gross margin, positive adjusted EBITDA, positive operating cash flow, and a $25M technology backlog. The market appears to expect a substantial ramp: the consensus revenue path rises sharply, analysts are unanimous Buy, and the stock has already rallied heavily. However, consensus EBITDA estimates remain deeply negative while management guides to positive Q4 EBITDA, so a genuine beat is possible if the Q4 ramp occurs. The inflection is therefore promising but execution-dependent rather than clearly overlooked.

Catalysts
  • ▼November 2026 · Q3 2026 earnings and GPU deployment update — Expected positive adjusted EBITDA, Hydra Host ramp, utilization, customer payments, and capex/financing requirements will test whether the AI transition is real.
  • ▲Q4 2026 · Initial Axe Compute 10 MW facility enters operations — The first large colocation deployment, with more than $111M of contracted five-year revenue, could validate the recurring infrastructure model if delivered on schedule.
  • ▲February-March 2027 · Q4 2026 earnings and 2027 outlook — Management is targeting $8M-$10M of Q4 adjusted EBITDA and a greater-than-$70M annualized recurring-revenue exit rate; achievement could support a rerating.
  • ▼By August 2027 · APR sale escrow resolution and capital-allocation update — Release of the roughly $10M holdback is supportive, but investors will focus on how much cash is consumed by GPU equipment, facilities, and contingent earnout obligations.
  • ▲H2 2026-H1 2027 · Additional Axe pipeline conversions and site announcements — Converting the announced 65 MW-plus pipeline into binding, funded projects would improve confidence; delays or reliance on equity financing would be negative.
Flow-5.0

Flow is net negative. TTM dilution is reported at 152%, with a June registered direct offering involving 2.0M shares and 3.8M pre-funded warrants. The company is funding a capital-intensive expansion rather than repurchasing stock, and further equity or equity-linked financing remains a risk if project cash flows lag. Short interest at 18.1% of float creates squeeze fuel, but that is volatile rather than fundamentally supportive.

Floor / Ceiling+2.0

The approximately $112M cash balance and APR proceeds provide some support, and the reported enterprise value is much lower than market capitalization. That is not a hard floor: cash is being deployed into GPU deposits, facilities, and acquisitions, while infrastructure commitments, seller earnouts, project debt, customer concentration, and potential dilution can absorb value. The main support is balance-sheet liquidity, not current FCF or tangible operating earnings. There is also a meaningful ceiling from the recent $9.50 financing, pre-funded warrants, and the market's already elevated expectations after the earnings rally.

Buyability

Moderately buyable but not a clean institutional-quality compounder yet. AI infrastructure demand, contracted backlog, substantial cash, and improving margins can attract growth and infrastructure investors; however, realized owner earnings are unproven, customer concentration is high, project financing is complex, and the recent share issuance/warrant structure weakens the equity story.

Fear vs Greedfear 7/10 (+1.0)greed 8/10 (+4.0)

Fear is stronger than greed at this price. The operating story is attractive and could produce a very large outcome, but the stock has already risen 28% around the latest earnings, trades above the analyst's fair value, has no established owner-earnings record, and embeds a successful multi-site AI infrastructure ramp. I would rather wait for execution evidence than pay up for the narrative.

Valuation

Our Target
$275M+169%
Market Should Pay
$248M+142%
target ×0.9 (fear discount)
Current Market Cap
$102MSlightly bearish
What Changed
transcript · 2026-08-17
+22%fair value on this information

The quarter provided more than a routine confirmation of guidance: management disclosed the expanded Axe Compute framework covering 65MW in total, more than $500M of stated initial-term base payments, expected near-term deployments, and a potential $140M partner equity contribution. Q2 also showed approximately 56% gross margin and positive adjusted EBITDA. Against that, the call made clear that several sites remain under evaluation, the pipeline is execution-dependent, and the GPU business remains exposed to customer credit and financing risk.

▸ How the cases moved

The bull case rises from approximately $900M to $1,240M as the quarter adds the expanded 65MW Axe framework, more than $500M of stated five-year base payments, and a clearer project-financing structure; bull probability rises from 0.15 to 0.20. The base case rises from approximately $400M to $500M because Q2 showed structural gross-margin improvement, positive adjusted EBITDA, and better evidence that the pivot is beginning to replace APR revenue; base probability rises from 0.45 to 0.50. The bear case rises only from approximately $60M to $75M because the stronger balance sheet and customer commitments reduce immediate liquidity risk, although bear probability remains meaningful at 0.30 because commitments, financing, and concentration risks remain.

2-Year Plausible Outcomes
bear30%
$75M
rev +10%/yrOE $15M

The GPU program is delayed or a concentrated customer fails to pay, while the $145M infrastructure commitment burden requires expensive financing or dilution. Technology Solutions grows modestly, but utilization and recurring data-center economics remain unproven; the company reaches only modest positive EBITDA by 2028.

▸ Valuation

5x $40M EBITDA = $200M EV − $125M net debt = $75M equity

base50%
$500M
rev +55%/yrOE $40M

Hydra ramps successfully, the initial Axe Compute projects come online, and a portion of the broader 65MW contracted pipeline is delivered. Revenue becomes predominantly recurring infrastructure and technology-solutions revenue, with gross margins remaining strong and owner earnings reaching approximately $40M after interest, maintenance capex, working capital, and stock compensation.

▸ Valuation

10x $60M EBITDA = $600M EV − $100M net debt = $500M equity

bull20%
$1.2B
rev +85%/yrOE $85M

Duos executes close to management's deployment plan, converts most of the announced Axe pipeline, and finances expansion through customer prepayments, project-level capital, and contracted cash flows without material corporate dilution. GPU-as-a-service and colocation scale rapidly, producing a high-growth, high-margin infrastructure platform with approximately $85M of annual owner earnings by 2028.

▸ Valuation

12x $120M EBITDA = $1,440M EV − $200M net debt = $1,240M equity

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is $310M, but I set the analytical target at $275M to reflect risks not fully captured by the simple scenario arithmetic: concentrated customer exposure, potentially large project-level and corporate financing needs, uncertain treatment of infrastructure liabilities, execution risk across multiple sites, and the absence of a proven owner-earnings track record. The substantial cash balance and APR proceeds prevent a more severe target, while the target remains below the model value because management's ambitious contracted pipeline is not equivalent to realized, durable cash earnings.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality4/10
Situation now5/10
Trajectory8/10
Risk8/10
Governance4/10
Insolvency prob (2yr)8%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • APR Energy Asset Sale Cash Windfall (June 2, 2026): Duos Technologies announced it received approximately $50.4 million in cash proceeds from the sale of New APR Energy, LLC assets, resulting from its 5% non-voting interest in the parent holding company, Sawgrass APR Holdings, LLC. An additional $9.9 million is being held in escrow for up to 12 months, boosting the company's liquidity to support its ongoing AI transition.
  • $55 Million Registered Direct Offering (June 17, 2026): Duos closed a registered direct offering with a single large institutional investor, raising approximately $55 million in gross proceeds. The transaction consisted of 2,000,000 shares of common stock and 3,800,000 pre-funded warrants priced at $9.50 each, with proceeds earmarked to expand and commercialize the company's Edge Data Center (EDC) business.
  • $98.1 Million GPU Financing and Hydra Host Agreement (June 5, 2026): USD.AI provided a $98.1 million, three-year debt facility to support Duos Edge AI’s deployment of 2,304 NVIDIA B300 GPUs. This leverages the March 13, 2026, definitive contract with Hydra Host, which is expected to generate approximately $176 million in revenue over a 36-month term with an initial $18 million customer prepayment.
  • First Quarter 2026 Financial Results (May 18, 2026): Duos reported total Q1 revenues of $2.72 million—a 45% year-over-year decline attributed to the planned wind-down of its legacy APR Energy services contract. Despite a net loss of $3.49 million, gross margins expanded sharply to 59% (up from 26.5% YoY). The company maintained its full-year 2026 revenue target of over $50 million, supported by the Hydra Host partnership and data center backlog.
  • Executive Leadership Transition (April 1, 2026): Doug Recker officially assumed the role of CEO of Duos Technologies Group, focusing the company's operational trajectory toward becoming a modular, high-density AI infrastructure provider.

---

▸ Thesis-test Findings
  • Hydra Host NVIDIA GPU deployment progress and credit risk:

The GPU deployment has progressed rapidly, moving from an executed definitive contract with Hydra Host in March 2026 to a secured $98.1 million debt facility in June 2026. This facility will fund the rollout of 2,304 NVIDIA B300 GPUs, with Hydra Host managing the workload distribution via its Brokkr AI Factory Operating System. For the bull case, credit risk is heavily mitigated; the debt facility is structured as completely non-recourse, non-dilutive, and off-balance-sheet. The debt is secured strictly by the underlying GPU infrastructure and associated offtake contracts, isolating financial liabilities from Duos' corporate balance sheet.

  • Duos Edge AI Texas modular data center occupancy rates:

No specific overall occupancy rate percentages are publicly available in the company’s recent filings. However, the company has deployed modular Edge Data Centers (EDCs) across multiple rural and underserved Texas communities, including Hereford, Amarillo, Dumas, Lubbock, Waco, Victoria, Abilene, and Corpus Christi. The operational model relies on immediate monetization upon deployment via public and regional "anchor" tenants, such as Region 14 ESC (serving 40 school districts in West Texas) and the Hereford Independent School District. It also secured a global technology company as a 4.3MW anchor tenant for its high-power modular EDC model. While early deployments show strong momentum, a notable risk factor is whether utilization rates can scale beyond these anchor-tenant arrangements to prove long-term unit economics.

  • APR Energy acquisition rumors Elon Musk:

The rumors of Elon Musk's involvement are officially confirmed. Federal Trade Commission (FTC) filings show that on May 14, 2026, Elon Musk was granted clearance to acquire CF APR Super Holdings LLC (the ultimate parent of New APR Energy, LLC). Shortly thereafter, on May 26, 2026, substantially all assets of New APR Energy were sold to a third party. As a 5% non-voting shareholder, Duos received a substantial, non-dilutive $50.4 million cash payout, with an additional $9.9 million held in escrow. This liquidity windfall heavily favors the bull case, as it replaces the cash flow lost from the expiration of the APR management contract (which previously generated the majority of Duos' 2025 revenue) and directly funds their ongoing pivot toward AI-centric edge computing.