Stocks/ENLT.TA

ENLT.TA

Enlight Renewable Energy Ltdv3 3.5/10 · 2026-11-06
Utilities·Renewable Utilities
21,820.00 ILA
$29.5B market cap
v3 Rating
3.5/102.5–5.0
Setup
4.0/103.0–5.5
Fair Value
15,000.00 ILA9,000.00 ILA–23,000.00 ILA-31%
DCF (10%)
10,900.00 ILA-50%
Base IRR
+2%-10%–+13%
Visibility
wide±47%
Wall Street
(5 buy, 1 hold, 2 sell)
Rating
Revenue (TTM)
$637.8M
Owner Earnings
ILA 1.1B
Next-Yr Owner Earnings
-ILA 5.3B
Growth
+27.0% × 6y
P / Next-Yr OE
--
Net Debt
ILA 15.3B

Enlight Renewable Energy Ltd, an enterprise established in 1981 and headquartered in Rosh Ha'ayin, Israel, actively participates in the clean energy sector across the United States, Europe, and its home country. The company manages the full spectrum of solar and wind power initiatives, from their initial development and design through construction, financing, and ultimately, ownership and operation. Its substantial renewable energy portfolio encompasses 16,974 megawatts of capacity, complemented by 12,200 megawatt-hours in battery energy storage solutions.

2-Year Price History

$20780.00+266.3%
$10.0k$15.0k$20.0k$25.0k$30.0kInitial target $15000.00 · 2026-11-06volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-11-06

Rating
3.52.5–5.0
Setup
4.03.0–5.5
Fair value (ILA)
15,000.009,000.00 – 23,000.00
Upside vs 21,820.00
-31%
DCF (10%)
10,900.004,000.00 – 21,000.00-50%
Base IRR
2%-10% – 13%
Visibility
widerange ±47%
Sentiment
6/10
2026-11-06 · · priced at 21,350.00

Enlight is a well-run Israeli renewable developer and owner-operator, now with most of its growth in the US through Clenera, plus Europe storage and Israel. It is executing very well. 9M-2026 revenue grew 49% and adjusted EBITDA 38%. FY26 guidance was raised again to $810-830M revenue and $575-590M EBITDA. The mature portfolio of 12.7 factored GW carries $2.4B of expected annual revenue. 8.7 factored GW is under construction or starting by 2027, with about 70% of project debt and 60% of equity already secured. The 2028 plan (more than $2.2B run-rate revenue) looks highly visible. The problem is the price. The stock is 21,350 agorot (TASE close 6 Nov 2026, up from the pack's 20,780; Nasdaq $68.32). That has fallen about 30% from the May peak of roughly 30,400-31,750 but is still up 3.5x since mid-2025. At this price we pay about 26x 2026 adjusted EBITDA and about 37x cash EBITDA once the roughly $170M of non-cash US tax benefits is stripped out. Unlevered owner earnings are about $335M (about ILS 1.05B), a 2.2% yield on an EV of about ILS 47B. The company burns roughly $2B a year of net capex funded with project debt, tax equity and periodic share placements (6M shares at NIS 220 in Feb 2026). On the house method it does not pass. Unlevered FCF stays negative until about 2029. Capitalising 2031 cash EBITDA of about $1.65B at about 12x, discounting at 10% and subtracting about $4.9B of net debt gives about 10,900 agorot per share, roughly half the price. The base-case IRR is only about 2% a year, because the market is already paying about 14x 2029 cash EBITDA. A real-world 7-8% cost of capital for contracted infrastructure explains the gap, so I set fair value at about 15,000 agorot. This is a quality compounder priced as one, not a fear-driven bargain. Sentiment is mid-cycle (6/10): the analysts are split 4 Buy, 1 Hold, 2 Sell, with targets from $41 to $115. The AI-power euphoria has cooled but there is no capitulation. Rating 3.5 (modestly overvalued; avoid, not a compelling short). Research rating 4: a deep dive would only change the answer if 2029+ cash EBITDA is far above $1.3B or the data-center optionality turns into contracts.

A deep dive would have to establish: Whether 2029-2031 cash EBITDA (excluding non-cash US tax benefits) can reach well above $1.5B with net debt held near $8B, which is what the current price needs to earn more than 10% a year.

Owner earnings, TTM
ILA 1.1BILA 900M – ILA 1.3B
Realistic peak profit
ILA 4.7BILA 3.4B – ILA 6.0B
Growth rate
27.0%15.0% – 35.0%
Years of growth
63 – 10
Market cap
ILA 30BILA 29B – ILA 31B
EV
ILA 47BILA 45B – ILA 50B
Net debt
ILA 15BILA 14B – ILA 18B
Capital return / cap
-2.0%-5.0% – 0.0%
P/E
80.0×60.0× – 110.0×
EV/EBITDA
26.0×23.0× – 29.0×
FCF yield
2.2%1.8% – 2.7%
Projected FCF, base case (ILA millions)
Y1-ILA 5.3B-ILA 7.5B – -ILA 3.5B
Y2-ILA 2.6B-ILA 5.0B – -ILA 800M
Y3-ILA 150M-ILA 2.5B – ILA 1.5B
Y4ILA 300M-ILA 1.5B – ILA 2.0B
Y5ILA 1.0B-ILA 1.0B – ILA 2.8B
Competition: Enlight competes with US and European IPPs and infrastructure funds for PPAs and storage sites; its durable edge is interconnection queue position and execution, but returns face pressure from tariffs, credit phase-downs and crowded European BESS arbitrage.
Governance: none flagged
Research (expand)

What the company does

Enlight Renewable Energy (TASE/Nasdaq: ENLT), founded 1981 (as a renewables platform since about 2008), develops, finances, builds and operates utility-scale solar, wind and battery storage. It has three platforms: (1) US via Clenera (Boise, ID). This is now the largest segment, with WECC mega-projects (Atrisco, Roadrunner, Quail Ranch, CO Bar 1.2 GW PV plus 4 GWh BESS, Snowflake A 594 MW plus 1.9 GWh, Country Acres, Crimson Orchard) and a new push into PJM, MISO and SPP (Blackwater VA, Solstice OK with a 200 MW Google PPA). (2) Europe: wind in Spain, Sweden, Croatia, Serbia and Hungary (Gecama, Bjornberget), plus a fast-growing storage pipeline in Germany (Jupiter 2 GWh, Bertikow), Finland, Romania and Poland. The mature European portfolio carries about $630M of expected annual revenue. (3) Israel: the market leader in solar plus storage, agrivoltaics, high-voltage storage, and a growing, lower-margin electricity-trading business ($34M of Q3 revenue). The total portfolio is 46.2 factored GW, of which 12.7 factored GW is mature (operating, under construction or pre-construction), with $2.365B of expected annual revenue. A data-center development pipeline of about 2 GW IT is not in the 2028 plan.

Investment case (bull)

  • Execution track record: it has repeatedly beaten and raised guidance. 2025 revenue grew 46% and EBITDA 51%. 9M-2026 revenue grew 49% and EBITDA 38% (48% excluding the Sunlight sell-down). FY26 guidance was raised twice, to $810-830M revenue and $575-590M adjusted EBITDA.
  • Visibility: 8.7 factored GW is under construction or starting through 2027, 85% contracted or intentionally merchant. About 70% of project finance is secured and 60% of equity invested. Projects reaching COD in 2027-28 are shielded from Section 232 polysilicon tariffs (equipment already in the country), and about 17.9 factored GW of US projects are safe-harbored.
  • Returns: unlevered project IRRs are about 13% (US) and 15-17% (European storage), and about 18% after leverage. 80% of $5.6B debt is non-recourse and about 90% is fixed or hedged.
  • Tailwinds: AI and data-center load growth, rising power prices in Israel and Europe, scarce grid interconnection (its real moat), and PJM/SPP 'bring your own generation' frameworks.

Bear case

  • Capital intensity: capex was $2.1B in 9M-2026 against about $400M of operating cash flow. Growth needs permanent external funding. Shares rose from about 118M (2024) to about 140M today, plus a convertible (about 150M diluted).
  • A large share of EBITDA is non-cash US tax benefits (Q3: $70M of tax benefits from new projects). Reported EBITDA overstates cash earnings by about 30%.
  • Policy: the OBBBA phase-down of solar and wind credits after 2027-2030, Section 232 polysilicon tariffs (effective December 2026), FEOC rules, and US political hostility to renewables. Storage ITC runs to about 2033-2037 under company assumptions.
  • Small slippage is starting to show: CO Bar capex is up about $40M with EBITDA slightly lower, some CO Bar phases moved into 2028, and a $20M PPA termination fee was paid to re-market Gemstone and Rustic Hills.
  • Israel geopolitical risk, and the FX mismatch for TASE holders: the company reports in USD and the shekel is strong at about 3.1 per USD.

What it earns today (real owner earnings, USD then ILS at 3.12)

  • FY26 adjusted EBITDA guidance midpoint is about $582M. Less non-cash tax benefits of about $165-175M and the one-off $17M Sunlight sell-down gain, cash EBITDA is about $400-410M. This matches management's 'recurring operating cash flow of about $100M per quarter' (9M OCF $289M; interest is largely in financing or capitalised).
  • Less SBC of about $20M (real), cash taxes of about $10M, maintenance capex of about $15M (solar, BESS and wind O&M is mostly expensed; augmentation is small before about 2030), and cash distributions to tax-equity and minority partners of about $30M.
  • Unlevered owner earnings: about $335M, or about ILS 1,050M (range 900-1,250). Only about 58% of adjusted EBITDA reaches owners as cash before interest.
  • After interest: finance expense is about $210M a year (9M $159M), so levered owner earnings are about $120M, a 1.2% yield on the about ILS 29.9B market cap. Reported net income attributable is about $112M for 2026E.

Five-year FCF projection (unlevered, after SBC and all net growth capex net of tax-equity and ITC-transfer funding; USD, then ILS M)

| Year | Cash owner earnings | Net capex | FCF ($M) | FCF (ILS M) |

|---|---|---|---|---|

| 2027 | 500 | 2,200 | -1,700 | -5,300 |

| 2028 | 750 | 1,600 | -850 | -2,650 |

| 2029 | 1,150 | 1,200 | -50 | -150 |

| 2030 | 1,300 | 1,200 | +100 | +300 |

| 2031 | 1,420 | 1,100 | +320 | +1,000 |

The 2028 plan ($2.2B+ run-rate revenue at about 78% EBITDA conversion) gives roughly $1.75B of adjusted EBITDA, of which about $1.3B is cash once the CO Bar and Snowflake tax benefits are stripped. After 2028, I assume growth of about 8-10% a year, which needs about $1.1-1.2B of net capex annually.

What it is in 5 years: clearly a growing income stream, not a corpse. It will be a roughly 18-20 factored GW IPP with $1.6-1.8B of cash EBITDA, still growing high single digits from the 33 GW development pipeline and possibly data centers. Its category is a 'durable, contracted, mid-to-high single-digit grower': 11-14x cash EBITDA, or about 15-20x owner FCF. Confidence in 2028-29 numbers is fairly high (projects are built, financed and contracted). It is lower after 2029, because of US credit phase-downs, tariff costs and merchant exposure in European storage.

Fair value and multiples

  • Price 21,350 agorot (TASE close 6 Nov 2026, +2.7% on the day; the pack showed 20,780 on 5 Nov). Nasdaq closed at $68.32, implying about 3.12 ILS per USD. There are about 139.95M shares, giving a market cap of about ILS 29.9B ($9.6B). Net debt is about $4.9B (ILS 15.3B): $5.6B gross debt including the convertible and $286M of leases, less about $1.0B of cash and deposits. Tax-equity liabilities are excluded because they are settled by the tax benefits that I exclude from earnings. NCI at market value is about $0.6B. EV is about ILS 47B ($15.1B).
  • Multiples: about 26x 2026 adjusted EBITDA, about 37x cash EBITDA, about 80x 2026 EPS, and about 2.2% unlevered owner-earnings yield on EV. On 2029 numbers, with net debt rising to about $8B, today's equity value implies about 14x cash EBITDA, or about 10x including tax benefits.
  • DCF (10%, 5 years plus 12x 2031 cash EBITDA of about $1.65B, which is about $20B): PV of FCF is -$2.0B and PV of the terminal value $12.4B, giving EV of $10.4B. Less $4.9B net debt and $0.6B NCI leaves $4.9B, or about $35 per share, which is about 10,900 agorot. At 15x terminal it is about 19,000-21,000. In a low case (delays, tariff costs, merchant storage disappointment, 10x) it is about 4,000. The method is punitive for long-life contracted infrastructure that the market discounts at 7-8%. At 8% the DCF is about 14,000-15,000.
  • Fair value: about 15,000 agorot (range 9,000-23,000). The base IRR from 21,350 is about 2% a year: 2031 equity is about $10.2B versus $9.6B today, before further dilution and FX. The upside case (TV about $27B, rates falling, data-center PPAs) gives about 13% a year. A 50% return within a year would need a return to the May euphoria (about $108 on Nasdaq).
  • Chart: 1-year range about 11,290-31,750 agorot. The stock sits about halfway, about 30% below the May 2026 peak, but 3.5x the mid-2025 level (about 6,000). It is not near a floor. It is not a covered-call setup either (forward earnings are visible, but the multiple is not low).

Management, risks and competition

  • Management: co-founder Gilad Yavetz became Executive Chairman in October 2025, and Adi Leviatan (ex-3M, McKinsey) became CEO. CFO Nir Yehuda is long-tenured, and Jared McKee runs Clenera. The record is excellent (consistent beats, disciplined project-level returns, recycling via sell-downs such as Sunlight). There are no governance red flags. Insiders sold some stock in June 2026 near the highs. Equity has been issued opportunistically at high prices (NIS 220 in Feb 2026, above today's price), which is sensible but dilutive. There is no dividend or buyback; all cash is reinvested at about 13% unlevered, which is value-creating only if the cost of capital stays below that.
  • Competition: US utility-scale developers and IPPs (NextEra, AES, Brookfield Renewable, Clearway, Invenergy and private funds) compete for PPAs, but Enlight's edge is interconnection queue position and system-impact studies (more than 20 factored GW). In Israel it leads but faces Energix, Doral and OPC. European storage is crowded with infrastructure funds, and merchant arbitrage spreads may compress as BESS floods in.
  • Key risks: US policy and tariffs beyond 2028, interest rates (the multiple is rate-sensitive), execution slippage on the 2027-28 mega-projects, merchant price exposure, Israel geopolitics, and the shekel.

Sentiment: 6/10

The stock was a 2025-26 'AI power' darling: it went from about 6,000 to 30,000+ agorot and hit $108 on Nasdaq in May. It has since cooled with the broader AI-capex scepticism and the solar-tariff news (Section 232), not on any fundamental miss. Sell-side is split. Buys: Barclays $89 (4 Nov, after Q3), Truist $104, Roth $105, UBS $115. Deutsche Bank is Hold at $83. JPMorgan is Underweight at $65 (cut from $80, 19 Oct) and Mizuho Underperform at $41, both on valuation and funding intensity. The consensus average is about $81, implying about 19% upside. There is no forced seller, no capitulation, and no euphoria now. It is a fairly priced-to-rich quality growth story where the price already assumes the 2028 plan is delivered.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue638+33%491+23%399+58%253-50%505
Gross profit306-5%315+51%209+52%138-52%289
Operating expenses-19.1-248%-15.7-147%33.6-90%340+772%39.1
▸Adj EBITDA513+14%482+81%266-137-130%460
▸Adj OCF297+4%223-17%269+95%138-28%193
CapEx-2775-1586-2209-1063-1700
Adj FCF-2478-1363-1939-925-1508
Interest expense18816599.0156554
▸Adj net income101-21%134+187%46.6-57%109-110
▸Owner's earnings220--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA2054100%433100%514100%274100%255100%578100%
FCF (OCF−capex)-7536-367%-1858-429%-1362-265%-1919-700%-915-359%-1483-256%
Net income60429%83.119%13226%44.216%13252%21237%
▸Capital returned-7730-376%-1613-373%-1589-309%-447-163%-1667-654%-2414-417%
Buybacks-3937-407-285-0.05-945-2300
Dividends1.340.000.000.000.001.34
Interest paid113415916599.0156554
Debt paid down-4928-1365-1470-546-878-669
▸Reinvestment9036440%2199508%987192%2620956%1184464%2046354%
Capex (PP&E)865520961586220910631700
Intangibles & M&A19848.5-26.666.90.83108
Leases signed (net Δ)18353.7-573345120238
Retained / other112955%-134-31%41981%-1441-526%907356%1378238%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 97 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)111428632201651668212179
▸Liabilities (total)8516666214927115138560
Net debt (incl. leases)58374444992782456649
Net debt / Adj EBITDA11.49.2237.4--14.5
Net debt / Adj FCF----------
Adj EBITDA / interest2.732.912.68-0.880.83
Shares outstanding140142126126104
Dilution (YoY)+11.6%+13.1%+0.2%+20.5%+9.7%
Employees360--------
MarginsTTM2025202420232022
Gross margin48.0%-19.664.2%+11.852.5%-2.054.4%-2.757.1%
Adj EBITDA margin80.4%-14.098.1%+31.566.6%+120.7-54.1%-145.191.0%
Adj OCF margin46.6%-13.445.4%-22.167.5%+13.054.6%+16.538.1%
Adj FCF margin-388.4%-87.9-277.5%+208.8-486.3%-120.9-365.5%-67.0-298.4%
Net income margin15.3%-10.427.0%+15.911.1%-40.952.0%+10.042.0%
Adj NI margin15.8%-10.827.3%+15.611.7%-31.343.0%+64.7-21.7%
ROIC (adj, after-tax)2.5%3.5%0.8%-1.2%1.6%
Cost of debt3.1%1.4%0.9%2.1%8.3%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

2026-11-03

Enlight Renewable Energy reported record Q3 2026 results. Total revenues and income rose 40% year over year to $231 million, adjusted EBITDA rose 38% to $154 million, and operating cash flow rose 26% to about $104 million. Growth came from newly operational projects ($21 million electricity sales and $70 million tax benefits), $9 million of favorable FX, and Israeli electricity trading revenue of $34 million, up $7 million. Net income was $34 million versus $32 million, with higher depreciation, financial expenses and other costs offsetting EBITDA growth; excluding one-time items, net income rose 76%. One-time items included a $20 million PPA termination fee for the Gemstone project, a $12 million supplier compensation and refund, and $13 million of prior-year financial income. For nine months, revenues rose 49%, adjusted EBITDA rose 38% to $469 million, and operating cash flow rose 39% to $289 million. Management again raised and narrowed 2026 guidance: revenue of $810-830 million (from $790-820 million) and adjusted EBITDA of $575-590 million (from $565-585 million), reflecting stronger Israeli trading and higher electricity prices in Europe and Israel. The balance sheet is resilient: 80% of $5.6 billion of long-term debt is non-recourse, and close to 90% is effectively fixed rate. Top-core cash was $420 million, with $360 million more at subsidiaries. Enlight repaid a roughly $185 million bond. Capex was about $760 million in the quarter and $2.1 billion year to date. The mature portfolio reached 12.7 factored GW, representing $2.4 billion of expected annual revenue. Development and advanced development grew 9% to 33.5 GW, and the total portfolio reached 46.2 GW. About 1.2 GW entered construction in the quarter, and another 1.3 GW is expected to start in the coming months. About 80% of the mature portfolio should be operational or under construction by year-end. The company targets more than $2.2 billion of annual revenue run rate and 12 GW by end-2028, a 41% CAGR. About 70% of project financing is secured and 60% of equity is invested. Expected unlevered returns are about 13%, rising to over 18% levered. In the U.S., Clenera is building more than 4 GW across eight projects. Cobar is fully mobilized, with first COD in Q4 2027. Snowflake A is targeted for 2H27, Country Acres for year-end 2026, and Crimson Orchard for Q2 2027. Projects reaching COD in 2027-2028 are shielded from Section 232 tariffs, and the safe-harbored portfolio is nearly 18 GW. Blackwater in Virginia received local permitting, with construction expected in 2027 and COD in 2030. Gemstone and Rustic Hills were taken back to market after $20 million of termination fees. In Europe, the mature portfolio reached 4.2 GW, with about $630 million of revenue run rate, doubled over the year, after the acquisition of two Finnish storage projects.

Analyst Q&A (8)
▸
Q4 guidance implies slower year-over-year revenue and EBITDA growth than the first three quarters. Is that driven by COD timing or by nonrecurring or timing items?
Justin Clare · ROTH Capital Partners
There is no slowdown. It is quarterly COD timing, since two projects connected in December last year. Nine-month growth is nearly 50% in revenue, and management looks at growth on an annual basis.
▸
Why is Cobar CapEx higher and EBITDA slightly lower than before, and are tariffs and equipment costs causing inflation across the U.S. portfolio, or are price declines offsetting them?
Justin Clare · ROTH Capital Partners
The change is about $40 million on roughly $3 billion of CapEx, and returns remain very high. It reflects tariff allocation and changes in how ITC/PTC is allocated across the five Cobar phases. Fine-tuning can also raise returns, as it did at Snowflake.
▸
What is baked into guidance for electricity trading in Q4, and how durable is that growth into 2027?
Christopher Souther · Truist
Trading started as an add-on to Enlight's own Israeli projects and expanded to third-party producers, exceeding expectations. Q4 will be seasonally lower because of less solar irradiance and lower demand. It has lower margins but very low risk and almost no G&A, and it is expanding. No Q4 breakdown was given.
▸
What are the timing and next steps for Blackwater, the expansion opportunity (solar or storage), and data center contracting terms?
Christopher Souther · Truist
Blackwater is targeted for COD in 2030, with construction of 24-28 months starting in 2027, and it is safe harbored. It has 500 MWac of solar and can add storage, which increases ELCC and capacity value for large-load customers under PJM's evolving bring-your-own-generation framework. Management cannot yet discuss specific offtake terms.
▸
Do you control the land for Rustic Hills and Gemstone, is there any deadline to lose it, and when will there be updates on new offtakers?
Jonathan Windham · UBS
Enlight has 100% site control: it owns the land at Rustic Hills and owns portions of Gemstone, with the rest under option or contract. It is in advanced talks with potential customers and expects to update by year-end or early next year, citing strong PJM and MISO demand.
▸
What is the view on Section 232 tariffs and how will the company navigate them?
Corinne Blanchard · Deutsche Bank
Projects reaching COD in 2027-2028 are unaffected because cells and modules were already contracted and in the country. Future projects use domestic suppliers, and scale gives an advantage. Post-2028 costs will rise, but most of the impact should be passed through in higher PPA prices.
▸
Does local community pushback on data centers change the portfolio approach to data center strategy?
Corinne Blanchard · Deutsche Bank
Enlight also develops data centers in Israel and Europe, where there is less opposition. In the U.S., Clenera's grassroots community relationships create opportunities. Power availability, rather than permitting, is the main constraint, and Enlight's projects help enable data center growth.
▸
What is the view on the midterm elections and potential policy changes, such as support for 45X or data center policy?
Corinne Blanchard · Deutsche Bank
Enlight and Clenera have delivered projects across administrations. Management does not know the outcome, but says the U.S. needs affordable, sustainable power regardless of party, and it will continue on that path.

Analyst Coverage

Analyst Coverage
Analyst Ratings
5
1
2
Buy: 5Hold: 1Sell: 2Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2023 Q378M48M10M$0.07$0.00 – $0.113
2023 Q482M71M2M$0.01$0.01 – $0.021
2024 Q2313M116M48M$0.33$0.31 – $0.341
2024 Q3336M—0M$0.00$0.00 – $0.000
2024 Q4289M—0M$0.00$0.00 – $0.000
2025 Q1403M—0M$0.00$0.00 – $0.000
2025 Q2419M—0M$0.00$0.00 – $0.000
2025 Q3492M—0M$0.00$0.00 – $0.000
2025 Q4472M—0M$0.00$0.00 – $0.000
2026 Q1505M—0M$0.00$0.00 – $0.000
2026 Q2570M—0M$0.00$0.00 – $0.000
2026 Q3660M—0M$0.00$0.00 – $0.000
2026 Q4585M—0M$0.00$0.00 – $0.000
2027 Q1788M—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-08-06) — for comparison onlyclick to expand

Thesis

Enlight is executing against an unusually large renewable-development pipeline, with strong revenue and EBITDA growth, improving U.S. positioning, expanding storage exposure and a growing opportunity to contract power with hyperscalers. The Q2 update increased 2026 guidance and confirmed financing progress on CO Bar, while the Google PPA provides external validation of the U.S. commercial strategy. The central analytical problem is cash conversion. TTM adjusted OCF was $268M against approximately $2.2B of capex, cumulative free cash flow is deeply negative, net debt including leases is about $4.4B, and shares have risen materially. The business may be creating valuable long-duration assets, but shareholders remain dependent on successful project financing, asset sell-downs and future operating cash flow rather than current free cash generation. The trajectory is positive, but the range of outcomes is wide because modest execution or funding problems can materially impair equity value.

Trade Signal

Trade rating
-8.1/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-06 · saw 25,590.00 ILA-14.7% since

Strong short: operational growth is genuine, but a roughly $35.8B equity value is radically disconnected from the analyst's $3.5B-$3.8B fair value, negative free cash flow and substantial dilution needs.

Temporary mispricing-1.5

The stock rose from roughly 6,200 at the end of 2024 to 14,480 at the end of 2025 and then to a 52-week high of 30,380, driven by renewable/storage enthusiasm, U.S. project progress, financing milestones, raised guidance and the Google PPA. It has since declined about 17% from the high, including a volatile move around the August 4 earnings release, but the latest earnings reaction was broadly flat to slightly negative despite strong results. This is not an oversold panic: the 6-month gain remains about 33% and the 1-year gain about 214%. The market has begun to recognize risk, but the move has not come close to reflecting the cash-flow and valuation facts. That leaves a durable overvaluation with a likely temporary downside dislocation if funding or owner-earnings concerns become central.

Market view+5.0

The market remains constructive and highly receptive to the renewable-energy, storage, U.S. buildout and AI-power narrative. Consensus is four Buys, one Hold and two Sells, while the stock has returned roughly 214% over one year despite the fundamental funding concerns. The recent 5%-6% pullback and post-earnings volatility suggest some profit-taking, but not capitulation. Bulls emphasize 55% revenue growth, raised guidance, CO Bar financing and hyperscaler demand; bears emphasize negative free cash flow, leverage, dilution and the difference between adjusted EBITDA and common-shareholder cash flow. The prevailing bullish view appears stale relative to the capital intensity and valuation.

Inflectionwindow ~3mo-6.5

The business is executing well operationally, but the next important inflection is likely negative for the stock: the market may increasingly focus on owner earnings, free cash flow, leverage and equity funding rather than adjusted EBITDA. Management's 2028 recurring revenue ambition and the data-center pipeline are already central to the bullish narrative, while the analyst's $400M base-case terminal owner earnings and $600M bull case remain far below the current $35.8B equity value. New projects and PPAs can improve the business, but the evidence does not support a near-term profitability step-up large enough to close the valuation gap.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and updated full-year outlook — A cash-flow, financing or dilution-focused update could expose the gap between EBITDA growth and cash available to shareholders.
  • ▼2026-12 · 2026 year-end construction and financing update — More than 7 GW under construction and the roughly $700M of expected equity funding will test execution and dilution assumptions.
  • ▼H1 2027 · CO Bar and portfolio funding milestones — Further project financing is positive operationally but may highlight the large capital burden and dependence on external equity or asset recycling.
  • ▲Late 2026 · Country Acres expected commercial operation — COD would validate execution and add operating assets, although the benefit appears heavily capitalized in the current valuation.
  • ▲H2 2026-H1 2027 · Additional hyperscaler offtake announcements — New PPAs could support the long-term growth narrative, but would need to be large and economically superior to change the valuation debate.
Flow-6.5

Strongly negative. TTM dilution was approximately 17%, management expects roughly $700M of additional equity over the next year, and the business requires large ongoing project financing. Asset sales can recycle capital and reduce dilution, but they do not eliminate the funding burden. No meaningful buyback or other offsetting source of share demand is identified.

Floor / Ceiling-5.0

There is no hard floor near the current price. Cash at the parent and subsidiaries, project assets and the ability to recycle mature stakes provide some asset support, but these are offset by approximately $4.4B of net debt including leases, deeply negative cumulative free cash flow, heavy capex and recurring equity requirements. At the current valuation, the dominant structural feature is a very high ceiling: existing holders can monetize strength and future funding needs can create dilution. The analyst's base and bull values are both materially below the share price.

Buyability

Poor for a fundamental long at this price. Renewable growth, hyperscaler demand and strong reported EBITDA can attract momentum buyers, but the stock trades at roughly 9x the analyst's fair equity value, with negative free cash flow, approximately $4.4B of net debt including leases and substantial future equity needs. The likely marginal buyers are growth and thematic investors rather than cash-flow-focused institutions.

Fear vs Greedfear 7/10 (-1.0)greed 8/10 (+2.0)

Greed is visible in the operating story, but fear dominates at this price. Revenue and EBITDA growth, CO Bar progress and Google validation are real, yet the stock price has outrun owner earnings and cash generation by an extreme margin. The setup looks more like a crowded growth narrative vulnerable to a funding or cash-conversion reset than an attractive long investment.

Valuation

Our Target
$3.5B-61%
Market Should Pay
$2.6B-71%
target ×0.75 (fear discount)
Current Market Cap
$8.9BSlightly bullish
What Changed
transcript · 2026-08-04
+8%fair value on this information

The genuinely new information is the Q2 guidance increase, first-half EBITDA and operating-cash-flow outperformance, completion of the $2.6B CO Bar financing, the first Google PPA, and the disclosed expansion of the Finnish and Romanian storage platform. The report also clarified that no further 2026 Sunlight sell-downs are assumed and that approximately $700M of additional equity is expected over the next year, which limits the positive surprise.

▸ How the cases moved

The Q2 report raises the base case from approximately $4,300M to $4,800M as 2026 guidance increased, first-half execution was strong and financing for CO Bar closed. The bull case rises from roughly $8,300M to $9,000M because the Google PPA, 43.1GW portfolio, 17.9GW U.S. safe-harbored capacity and additional storage markets improve long-term commercial visibility. The bear case moves only modestly from $1,400M to $1,440M: the quarter did not remove leverage, dilution or construction-risk concerns. Base probability rises from 0.50 to 0.55, bull from 0.18 to 0.20, and bear falls from 0.32 to 0.25.

2-Year Plausible Outcomes
bear25%
$1.4B
rev +10%/yrOE $180M

Growth remains capital-intensive, European merchant/storage returns disappoint, and project delays or additional equity issuance absorb much of the operating progress. Revenue grows modestly, while interest, dilution and execution risk keep owner earnings near current levels. The market values the company at 8x terminal owner earnings because leverage and funding needs remain prominent.

▸ Valuation

8x $180M owner earnings = $1,440M equity value

base55%
$4.8B
rev +28%/yrOE $400M

The mature portfolio is built largely on schedule, CO Bar and other U.S. projects begin contributing, and European storage adds meaningful revenue. EBITDA conversion improves, but the company continues to require substantial project equity and remains exposed to construction, merchant-price and dilution risks. Terminal owner earnings reach approximately $400M and receive a 12x equity multiple.

▸ Valuation

12x $400M owner earnings = $4,800M equity value

bull20%
$9.0B
rev +40%/yrOE $600M

Enlight executes its U.S. buildout with limited delays, monetizes strong hyperscaler and utility demand, and captures attractive storage returns in Europe. CO Bar, Country Acres and related projects lift recurring cash generation, while higher-margin U.S. assets push EBITDA conversion toward the high end of management's range. Capital recycling substantially reduces the need for dilutive equity, allowing terminal owner earnings of $600M to support a 15x multiple.

▸ Valuation

15x $600M owner earnings = $9,000M equity value

▸ Target Rationale

The probability-weighted terminal value discounted at 12% produces $3,840M. I set the analytical target below that model output at $3,500M because the scenario framework does not fully capture the company's unusually heavy funding burden, continuing dilution risk, dependence on asset recycling and the gap between EBITDA and cash available to common shareholders. This is a fundamental adjustment for capital structure and execution risk, not a sentiment discount.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory8/10
Risk8/10
Governance6/10
Insolvency prob (2yr)5%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Strong Q1 2026 Financial Results: In May 2026, Enlight reported that total revenues and income grew 54% year-over-year to $200 million. Adjusted EBITDA reached $154 million, registering a 58% increase when excluding prior-year effects from the Sunlight asset sale. Net income was $38 million. Backed by this momentum, management reiterated its full-year 2026 guidance, targeting revenues of $755 to $785 million (a 32% increase at the midpoint from 2025) and Adjusted EBITDA of $545 to $565 million.
  • 200 MWac PPA Signed with Google in Oklahoma: On May 26, 2026, Enlight’s U.S. subsidiary, Clēnera Holdings, finalized a 15-year physical power purchase agreement (PPA) with Google. Under the fixed-price agreement, Clēnera will supply 200 MWac (250 MWdc) of solar energy from its Solstice project in Oklahoma into the Southwest Power Pool (SPP) market to power Google's regional data centers. Construction is expected to begin in 2028, with commercial operations starting in 2029.
  • Majority Acquisition of Project Jupiter in Germany: In early 2026, Enlight agreed to buy a 51% to 60% majority stake in Project Jupiter in Brandenburg, Germany, partnering with German asset manager Prime Capital AG. The co-located asset features up to 150 MWp of solar capacity and 2,000 MWh of battery energy storage (BESS). Crucially, the project is structured to supply an on-site, planned 500 MW data center. The total investment is estimated at €470 to €500 million, targeting a Ready-to-Build status by late 2026.
  • Crimson Orchard Financing Closed: In March 2026, Clēnera secured $304 million in construction and term debt commitments from global lenders (HSBC, ING Capital, KeyBanc, and MUFG Bank) for the Crimson Orchard solar-and-storage project in Idaho. The project (120 MW solar, 400 MWh storage) is currently under construction, with commercial operations scheduled for the first half of 2027.
▸ Thesis-test Findings
  • Clenera CO Bar project interconnection progress 2026:

In February 2026, Enlight reached final development milestones for its flagship 1.21 GW solar and 4.0 GWh storage CO Bar Complex in Arizona. Critically, the project entered into a 1 GW AC Large Generator Interconnection Agreement and signed two 20-year busbar Energy Service Agreements (tolling agreements) with Salt River Project (SRP) for its storage-only phases. Civil construction has already commenced on the first two phases. This progress strongly bolsters the bull case: securing a 1 GW interconnection agreement eliminates grid queue and congestion delays—one of the primary execution bottlenecks for massive U.S. renewable projects—and paves the way for full execution on a complex expected to generate $264 to $278 million in electricity sales in its first full year of operation.

  • US solar PPA price trends data centers AI demand 2026:

In Q1 2026, North American solar PPA prices continued to escalate, rising 4.6% to 4.7% quarter-over-quarter and more than 13% year-over-year to a market average of $64.49/MWh. This pricing surge is driven by tight developer supply, permitting bottlenecks, and new tariff headwinds, paired with an unprecedented demand shock from tech hyperscalers looking to secure power for energy-intensive AI data centers. Corporate procurement is shifting from small tranches to gigawatt-scale commitments, positioning hyperscalers as "anchor tenants" of the energy transition. This trend is highly bullish for Enlight; rising PPA prices significantly improve project economics, and the insatiable demand for AI workloads is opening major commercial opportunities, as demonstrated by Enlight’s new 200 MWac deal with Google in Oklahoma.

  • Enlight Renewable Energy asset sales capital recycling valuations:

Capital recycling remains a central component of Enlight’s strategy to accelerate growth and self-fund its heavy CAPEX pipeline without relying excessively on dilutive equity financing. During late 2025, Enlight completed the divestment of a 7% (following a prior 44%) stake in the Israeli Sunlight solar-and-storage cluster to institutional investors, which yielded $80 million in net profit. This model of selling partial or entire stakes of mature assets allows Enlight to lock in substantial up-front premiums. These findings support the bull case by showing that Enlight can successfully recycle capital to fund massive, high-yield U.S. construction projects (such as the $326–$342 million Crimson Orchard project) and European acquisitions while minimizing shareholder dilution.