Stocks/ERO

ERO

Ero Copper Corp.v3 5.0/10 · 2026-10-26
Basic Materials·Copper
$21.60
$2.4B market cap
v3 Rating
5.0/103.5–6.5
Setup
5.0/103.5–6.5
Fair Value
$29.00$20.00–$40.00+34%
DCF (10%)
$25.00+16%
Base IRR
+7%-8%–+20%
Visibility
moderate±34%
Wall Street
$32.00 target(3 analysts last year)(2 buy, 2 hold)
Rating
Revenue (TTM)
$1.2B
Owner Earnings
$225M
Next-Yr Owner Earnings
$295M
Growth
+5.0% × 4y
P / Next-Yr OE
7.6x
Net Debt
$370M

Ero Copper Corp. is a base metals mining enterprise engaged in the exploration, development, and operation of various projects throughout Brazil. The company produces and markets copper concentrate from its MCSA Mining Complex, located in the Curaçá Valley of northeastern Bahia state, with gold and silver recovered as secondary products. Additionally, Ero Copper Corp. possesses full ownership of the Boa Esperança property, a copper development venture in southeastern Pará state, and the NX Gold property in Mato Grosso state. Founded in 2016, the company's headquarters are situated in Vancouver, Canada.

2-Year Price History

$30.44+75.5%
$10$15$20$25$30$35Initial target $29.00 · 2026-10-26volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-26

Rating
5.03.5–6.5
Setup
5.03.5–6.5
Fair value (USD)
29.0020.00 – 40.00
Upside vs 21.60
+34%
DCF (10%)
25.0015.00 – 38.00+16%
Base IRR
7%-8% – 20%
Visibility
moderaterange ±34%
Sentiment
6/10
2026-10-26 · claude-opus-5-5 · priced at 31.21

Ero Copper (NYSE: ERO, US$31.21 close on 2026-10-26, also on TSX at about C$43) runs three Brazilian mines: Caraiba copper in Bahia, Tucuma copper in Para and Xavantina gold in Mato Grosso. It is also earning 60% of Furnas from Vale, a large and very low-cost copper-gold project. After a messy 2024-25 ramp-up, the business has turned. H1-2026 adjusted EBITDA was $269M against $146M a year earlier. Leverage fell from 2.6x to 0.8x. Peak capex is passing, with the Pilar shaft finishing in 2027. Copper output is guided from about 72kt in 2026 to 80-90kt in 2028. Copper is near records at roughly $6.5-6.7/lb, which puts the stock at about 6x 2026E EV/EBITDA and roughly 9x forward earnings. The real earnings power is lower than those multiples suggest. Ero is an underground miner on a heavy sustaining-capex treadmill (about $180M a year), and after cash taxes, interest, leases and SBC I estimate today's equity free cash flow at about $225M, a 7% yield. There is no dividend or buyback yet; capital returns are promised once the revolver is repaid, likely in early 2027. At a conservative $5.75/lb long-term copper price, the 15% BRL-rate DCF (about 12.2% in USD after expected real depreciation) gives about $25/share. That includes roughly $6/share for a risk-weighted Furnas. At spot copper the same model gives about $33. The stock is therefore fairly priced for today's copper price. It is down 23% from its early-October high, partly on broker downgrades over valuation, and it rose 4% on the Lula-crash day because it earns in dollars and pays costs in reais. A 50% upside needs higher copper, a takeover (Vale is the natural buyer), or a full re-rating for Furnas. None of those is in the price, but none is the base case either. Rating 5.0: a decent, improving operator at a cyclical-high price, with no cash yield yet. Research 5.0: the main unknown is the copper price, which more work cannot resolve, but the Q3 print on Nov 2, the size of the 2027 capital-return program and the Furnas PFS economics can be checked.

A deep dive would have to establish: Whether 2027-28 sustaining capex falls enough, and the 2027 capital-return program is large enough, that equity FCF reaches $350M+ (10%+ yield) at $5.75 copper, and whether the Furnas PFS supports valuing Ero's 60% at $1B+ net of the 11% carry.

Owner earnings, TTM
$225M$170M – $290M
Realistic peak profit
$450M$320M – $800M
Growth rate
5.0%-5.0% – 15.0%
Years of growth
42 – 8
Market cap
$3.3B$3.1B – $3.4B
EV
$3.6B$3.5B – $3.7B
Net debt
$370M$320M – $430M
Capital return / cap
-0.6%-1.2% – 0.0%
P/E
9.5×7.5× – 12.5×
EV/EBITDA
6.2×5.0× – 7.5×
FCF yield
6.9%5.0% – 9.0%
Projected FCF, base case (USD millions)
Y1$295M$190M – $420M
Y2$275M$150M – $420M
Y3$285M$140M – $440M
Y4$285M$120M – $450M
Y5$280M$100M – $460M
Competition: Commodity copper producer in the second cost quartile on C1 but higher on AISC because of deep underground development at Caraiba; it competes for capital with Hudbay, Capstone, Lundin Mining, Taseko and Sandfire at roughly 5-8x forward EBITDA, and Furnas is a scarce low-cost growth asset that differentiates it.
Governance: No serious issues; 2024-25 brought repeated guidance cuts (Tucuma ramp-up, Xavantina mechanization) that management has since largely repaired, and no capital return has been made yet.
Research (expand)

What the company does

Ero Copper is a Vancouver-headquartered, Brazil-operated miner with three mines.

  • Caraiba (Bahia): the underground Pilar mine plus the Vermelhos and Surubim mines. It produced 36kt of copper in 2025 and is guided to 35-40kt in 2026, 40-45kt in 2027 and 45-50kt in 2028.
  • Tucuma (Para): an open pit that reached commercial production in July 2025. It produced 28kt in 2025 and is guided to 32.5-40kt a year through 2028. Tailings filtration is the bottleneck, and three modular filters are due in Q4-26.
  • Xavantina (Mato Grosso): a high-grade underground gold mine guided to 40-50koz in 2026 (low end) and 50-60koz in 2027-28. It also has a stockpile of historic gold concentrate selling at about $633/oz C1 cost, expected to last through at least mid-2027.

Ero also funds the exploration and studies needed to earn 60% of Furnas, a Vale Base Metals project in Carajas. Ero must also carry up to 11% of Vale's share of construction capex. The March 2026 PEA shows:

  • a 24-year life;
  • 70ktpa of copper for the first 15 years at a $0.24/lb C1 cost;
  • $1.3B of initial capex;
  • an after-tax NPV8 of $2.0B and an IRR of more than 27% at long-term consensus prices.

The PFS is due in 2027. Royal Gold holds precious-metal streams, including the Xavantina gold stream.

The investment case

1. The cash inflection has happened. H1-26 operating cash flow was $231M versus $156M in H1-25, and adjusted EBITDA was $269M versus $146M. LTM EBITDA is $533M.

2. Deleveraging is done. Net debt was $453M at June 30, 0.8x EBITDA. Another $25M of revolver was repaid in July, leaving about $95M. I estimate net debt at about $370M today. Management's three steps are: (1) leverage below 1x, done; (2) repay the revolver, likely by year-end 2026; (3) then a return-of-capital program. That points to a dividend or buyback announcement around the Q4-26 results in early 2027.

3. Capex is past its peak. 2026 is the last big year: $285-330M, including about $80-90M for the new Pilar shaft. The shaft brings workforce productivity gains from 2028.

4. Volume growth: about 64kt in 2025, about 72kt in 2026E, 75-85kt in 2027 and 80-90kt in 2028.

5. Furnas is an option. It is a top-tier, low-cost project next to Vale's Carajas infrastructure. Ero is one of very few mid-caps with this kind of second leg, which makes it a logical takeover target in a copper M&A market where scarce pounds command premiums.

6. Brazil macro is a net tailwind. The real fell about 9% to about 5.45/USD after Lula's re-election. Revenue is in USD and most costs are in BRL. The 2026 hedge book has a 5.54 floor, so the hedges are now near the money. The stock rose 4.2% on the crash day.

What it earns today (real free cash flow, IFRS check)

Step 1: H1-26 operating cash flow. OCF was $230.6M, built from:

  • adjusted EBITDA of $269.2M;
  • minus a $30.8M working-capital build;
  • minus $14.1M of cash taxes, which are very low because of SUDENE regional incentives and loss pools;
  • minus $8.9M of non-cash stream deferred-revenue amortization;
  • plus $3.7M of derivative settlements.

Step 2: H1-26 investing. Sustaining capex was $90.5M. This is underground development at a deep mine and is a true treadmill, so I treat it all as maintenance. Growth capex was $32.5M (shaft, filtration, Xavantina ventilation) and exploration $20.5M, mostly Furnas.

Step 3: costs outside operating cash flow. Finance expense was $23.7M in H1. Interest paid sits outside operating cash flow, and I deduct it. Leases run about $20M a year. SBC is about $12M a year.

Step 4: normalized annual equity FCF (after interest, before growth capex):

  • LTM EBITDA: $533M
  • less normalized cash tax: about $30M
  • less interest: about $45M
  • less leases: about $20M
  • less sustaining capex: about $185M
  • less SBC: about $12M
  • less stream deferred revenue: about $18M
  • = about $225M, roughly a 6.9% yield on the $3.26B market cap.

That figure includes high-margin concentrate gold, which runs off in mid-2027. It excludes the roughly $40-45M of 2026 FX hedge gains, which I treat as non-recurring.

Step 5: other checks. I found no material capitalized interest or recurring intangibles. Reported net income ($311M LTM) is flattered by FX gains on USD debt and deferred tax, so do not trust the headline P/E.

Projected free cash flow (unlevered, after leases, SBC, cash tax, sustaining and growth capex, and Furnas study spend; excluding Furnas construction, which is valued separately)

Price deck: copper $6.00/lb in 2027, then $5.75/lb (below the roughly $6.5-6.7 spot); gold $3,800/oz, then $3,500 (spot is about $4,200); BRL weakening from 5.45.

| Year | FCF | Drivers |

|---|---|---|

| 2027 | ~$295M | 78kt copper, last of the concentrate gold, shaft stub capex |

| 2028 | ~$275M | 85kt copper, no concentrate, higher cash tax |

| 2029 | ~$285M | |

| 2030 | ~$285M | |

| 2031 | ~$280M | |

In BRL terms, 2027 is about R$1.65B at an FX of about 5.59.

Sensitivity: each $0.25/lb of copper moves FCF by about $32M a year. At spot copper, FCF is about $380-400M a year.

What kind of company in 5 years? Neither a corpse nor a compounder on the existing assets alone. Excluding Furnas, Ero is a steady 85kt producer with flat-to-slowly-declining output: Caraiba is long-lived thanks to the new shaft, and Tucuma's reserve life runs into the late 2030s with an updated technical report due in 2026. That is a 7-10x FCF business.

Furnas is what could turn it into a growing 140kt+ copper company in the early 2030s. Getting there means funding about $0.9-1.1B (60% plus the 11% carry on capex that will likely inflate past $1.3B), probably with debt or a stream. Confidence in the volumes is moderate to high. Confidence in the price of copper is low.

Fair value and multiples

EV is about $3.63B: 104.3M shares x $31.21 = $3.26B market cap, plus about $370M net debt.

  • EV/EBITDA: 6.8x LTM, about 6.2x 2026E (~$590M), about 5.5x 2027E at $6.00 copper.
  • P/E: about 9-10x adjusted.
  • FCF yield: 6.9% on today's equity FCF.

DCF per the brief. Cash flows are in BRL at a 15% discount rate. Assuming BRL depreciation of about 2.5% a year (the inflation differential), that equals about 12.2% in USD terms.

  • PV of 2027-31 FCF: about $1.02B
  • Plus the year-5 value at 9x FCF: $2.52B, which discounts to $1.42B
  • = EV of about $2.44B
  • Less net debt of about $0.37B
  • Plus Furnas at about $0.6B (Ero's ~60% of a price-adjusted NPV of about $3B less the carry, discounted for PEA stage, permitting, financing and execution risk)
  • = about $25/share on 106M diluted shares.

Sensitivities: at a plain 10% USD rate, about $28. At spot copper of about $6.5, about $33. At $5.00 copper, about $17.

Base IRR from $31.21 is about 7% a year, with no capital returns until 2027.

Fair value is about $29. That weighs the conservative DCF against spot copper, takeover optionality, and capital returns arriving in 2027. Strategic value is higher: 7x 2027E EBITDA at spot copper in a takeover would be about $40-45/share.

Management, risks and competition

Management. CEO Makko DeFilippo, CFO Wayne Drier and founder-chair David Strang have delivered on the OneEro turnaround in 2025-26. Before that, 2024-25 brought repeated guidance cuts, including the late Tucuma ramp-up and the slow mechanization at Xavantina. Capital allocation is disciplined: debt first, then returns. They have not over-promised on Furnas. There are no governance red flags.

Risks:

  • Copper price: this is a high-beta stock with about 55% implied volatility.
  • Execution at deep underground Pilar; the shaft is running a month or two late.
  • Tucuma filtration.
  • Xavantina grade volatility.
  • A cliff in gold concentrate sales after mid-2027 (only 20% of the stockpile is sampled).
  • Brazilian fiscal policy under a fourth Lula term: a new 10% withholding on dividends to non-residents, possible CFEM royalty or tax changes, and Para permitting and social risk.
  • BRL strength would reverse the current tailwind.
  • Funding Furnas could crowd out capital returns.

Competition. Copper is a commodity. Ero sits in the second cost quartile on C1 ($2.15-2.35/lb), but its AISC is higher because of Caraiba's development intensity. Peers are Hudbay, Capstone, Lundin Mining, Taseko and Sandfire, at roughly 5-8x forward EBITDA.

How investors feel right now: 6/10

  • Analysts are mostly Buy, with an average target of about US$42 (C$49-56 at TD, CIBC and ATB).
  • Scotiabank cut to Sector Perform and Jefferies has a Hold on valuation after the stock's run to about US$40 in early October.
  • Short interest rose to about 6.3M shares (about 6% of the float, 5 days to cover).
  • The stock is down about 15% in October and sits mid-range: US$19-41 over 52 weeks, 55% of the way up.
  • No forced seller, insider buying or index event was found.
  • Implied volatility is high (53-60%), but this is not a valuation-floor covered-call setup: copper is near record highs, so the downside comes from the commodity, not from sentiment.
Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue1217+107%791+68%470+10%429+2%422
Gross profit560+140%347+92%181+16%155-15%184
Operating expenses74.6+39%75.9+12%67.6-20%84.1+49%56.3
▸Adj EBITDA651+126%407+103%200+46%137-27%188
▸Adj OCF610+105%433+168%161-8%174+14%153
CapEx-293-281-338-461-296
Adj FCF317152-176-286-142
Interest expense29.320.84.6720.228.2
▸Adj net income370+176%187+56%120+177%43.2-49%84.9
▸Owner's earnings150--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1420100%512100%486100%13.8100%192100%215100%
FCF (OCF−capex)-348-25%18837%10722%-192-298-155%-152-71%
Net income70450%31361%26554%-68.5-497%92.548%10247%
▸Capital returned-253-18%16232%24.25%-15424.913%-310-144%
Buybacks-8.82-1.45-7.370.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid94.620.720.84.6720.228.2
Debt paid down-33914310.8-1594.77-338
▸Reinvestment1605113%22845%27256%336469244%300139%
Capex (PP&E)1591216281338461296
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)13.611.8-8.95-1.728.643.85
Retained / other-0.110%46.09%10321%-33.1-240%-302-157%18686%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 45 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)22051920145815121188
▸Liabilities (total)865984867702646
Net debt (incl. leases)374526570334112
Net debt / Adj EBITDA0.571.292.842.440.59
Net debt / Adj FCF1.183.46------
Adj EBITDA / interest22.319.642.96.796.66
Shares outstanding10410510498.892.6
Dilution (YoY)+0.6%+1.1%+4.7%+6.8%+0.9%
Employees36900.000.000.000.00
MarginsTTM2025202420232022
Gross margin46.0%+6.343.9%+5.538.4%+2.236.2%-7.343.5%
Adj EBITDA margin53.5%+4.551.4%+8.842.6%+10.731.9%-12.644.5%
Adj OCF margin50.1%-0.454.7%+20.434.3%-6.440.6%+4.336.4%
Adj FCF margin26.1%+23.319.2%+56.7-37.5%+29.3-66.8%-33.1-33.7%
Net income margin32.1%+8.733.5%+48.1-14.6%-36.121.6%-2.624.2%
Adj NI margin30.4%+7.623.6%-1.825.4%+15.310.1%-10.020.1%
ROIC (adj, after-tax)21.8%13.9%7.4%4.8%10.7%
Cost of debt5.1%3.2%0.8%4.6%6.7%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-03

Arrow Copper (the Ero Copper-style operator in Brazil) reported record Q3 2026 results. Revenue was $348 million, up 22% quarter on quarter. Cash flow from operations reached about $191 million and adjusted EBITDA about $201 million, both up roughly 39% sequentially. Year to date, cash flow from operations is over $420 million and adjusted EBITDA is $470 million. Management has applied $0.97 of every available dollar to debt reduction this year. Net debt fell about $99 million in Q3 to roughly $353 million, and net leverage dropped to about 0.5x from a 2.6x peak in early 2025. Liquidity rose to $264 million. The company expects to fully repay its revolver in Q4 and is discussing a shareholder return framework with its board, with no timing given. Copper produced 18.3 kt at a consolidated C1 cost of just over $2.50/lb. Caraíba produced 9.39 kt at $2.89/lb, with costs hurt by accelerated stripping at Surubim and high diesel prices. Tucumã produced 8.96 kt at $2.12/lb, with recoveries temporarily hit after a mill reline. Q4 is expected to be the strongest quarter of the year, and full-year copper guidance is on track. Three new filters at Tucumã are on site and due for commissioning before year end, with a 4 Mtpa throughput exit rate expected and maintained in 2027. Xavantina mine gold output was just under 8 koz, below expectations because of delayed access to high-grade stopes. Total gold recovered, including historic concentrates, hit a record of about 25 koz. Historic concentrate recovery was 17.4 koz at $621/oz C1. Management expects 75–80 koz of gold from Xavantina in 2026, a company record. About 15 koz of concentrate has been assayed and is available for Q4 sale, with over 6 koz already invoiced in October. There is no outlook beyond Q4 because the underwater material cannot be sampled until pumped and dried. Management says Q4, annualized, better reflects the asset's run rate, supported by record development. On FX, the BRL hedge produced $30 million of realized gains year to date. Applied pro rata, that equals a $0.15/lb reduction in copper C1 and $50/oz at Xavantina. Q4 hedge floor is 5.54 and ceiling 6.42, and 2027 hedges are being built. Corporate G&A rose about $4 million because of expensed SAP cloud ERP implementation, expected to last 2–3 quarters. At Furnas, the 45,000-metre Phase III drilling finished more than two years early, with full results due before year end. The pre-feasibility study is due in 2027, by September at the latest under the earn-in agreement. FID timing will be discussed after the PFS, and permitting is advancing in parallel. The Caraíba shaft is about 1,250 m complete with about 300 m to go, completion is expected in Q1, and about $70 million of the $370 million cost remains. An updated Tucumã technical report with reserves and resources is due before year end.

Analyst Q&A (18)
▸
With leverage at 0.5x, when should we expect a shareholder return program announcement and how is management thinking about it?
Fahad Tariq · Jefferies
Management covered this at its September Capital Markets Day. It is below its target leverage and expects to repay the revolver in Q4. The board has discussed the framework actively, but no timing was given for the announcement.
▸
How will the recent BRL weakening affect Q4 given the hedges, floor price and operating costs?
Fahad Tariq · Jefferies
The 2026 hedge book is already in place and covers Q4 well, though not all opex and capex, so some tailwind will help. Management has used the weakness to add 2027 hedges. The Q4 floor is 5.54 and the ceiling 6.42, so the company participates in further BRL weakness up to the cap.
▸
Has Xavantina grade turned in Q4 to closer to reserve grade after the low Q3 grade?
Orest Wowkodaw · Scotiabank
Q4 is expected to be the strongest quarter, as high-grade stopes delayed from late Q3 shift into Q4. Reserve grade is a life-of-mine average, and grades are climbing as expected, supported by infill drilling and channel sampling. Record development is a good leading indicator, though it is too early to declare victory.
▸
Why is Q4 concentrate gold guided at about 15 koz, below Q3? Is it conservative or constrained?
Orest Wowkodaw · Scotiabank
Q3 benefited from new drying infrastructure and a seasonal dry period. Management only guides on material already assayed, which is about 15 koz and includes over 6 koz invoiced in October. More is expected to be added.
▸
What is the status and remaining capex of the Caraíba shaft sinking project?
Orest Wowkodaw · Scotiabank
The shaft is about 1,250 m complete with about 300 m to go, and completion is still expected in Q1. Of the $370 million total, about $70 million remains, with a good chunk to be spent in Q4 and the balance in 2027.
▸
How are the Tucumã filters progressing and what is the 2027 outlook versus 2026?
Guilherme Rosito · Bank of America
All filters are on site and installation is on track for year end. Tucumã should exit 2026 at a 4 Mtpa throughput rate, which is the expected level for 2027.
▸
Given weak year-to-date Xavantina performance, could the 3-year outlook of 50-60 koz be revised lower?
Guilherme Rosito · Bank of America
Management pointed to Q4 annualized as a better representation of the asset's capability than 2026 or the first nine months. The lower 2026 guidance reflects delays in ventilation and cooling development. Q4 shows the throughput, mine performance and grade the asset can deliver.
▸
How will Caraíba grades and the Pilar, Vermelhos and Surubim mix evolve into 2027?
Matthew Murphy · Bradesco BBI
Higher grades come from the lower Surubim benches, at about 1% copper. Some material slipped from Q3 into Q4 and Q1. The 2027 transition from Surubim to N8 and the source mix were detailed at the Capital Markets Day.
▸
Does finishing Phase III drilling early allow an earlier Furnas FID, and what milestones remain?
Matthew Murphy · Bradesco BBI
Drilling early was a deliberate use of growth capital, but further engineering remains, including the PFS and a feasibility study. FID timing can be discussed next year after the PFS, and permitting is running in parallel.
▸
Is the Furnas PFS more likely early or late in 2027?
Matthew Murphy · Bradesco BBI
Management is moving as fast as possible, but the earn-in agreement allows until September, so September at the latest.
▸
Why were Tucumã recoveries below expectations and how confident is management of reaching high-80s or low-90s?
Ricardo Monagalia · Banco Safra
The mill reline and maintenance at the end of Q2 required operational adjustments, mainly around liberation, that hurt early Q3 recoveries. Recovery improved through the quarter and Q4 should be strong. Recovery also depends on grade, and further initiatives are planned.
▸
Corporate G&A rose about 30% year on year. What was one-off and what run rate should be modeled?
Ricardo Monagalia · Banco Safra
The roughly $4 million increase from Q2 to Q3 is due to the SAP HANA cloud ERP implementation, which must be expensed under IFRS. Expect it to continue for 2-3 quarters, with implementation done by Q2. The Q1 and Q2 levels are the typical run rate.
▸
What is the outlook for gold in concentrate through mid-2027?
Stefan Ioannou · ATB Cormark
There is no outlook beyond Q4 because the material is underwater and can only be sampled once pumped and dried. Management believes material remains and that sales could continue for a couple of quarters into 2027, but grades are unknown.
▸
What is the status and timeline of the updated technical reports for the three mines?
Rodrigo Fidelis · BTG
The updated Tucumã technical report is in late stages and due before year end. Caraíba and Xavantina will follow the normal reporting process with no guidance now. Higher metal prices offer a chance to optimize plans, but the focus remains on margin.
▸
How does management see the equity story through 2029 ahead of Furnas?
Rodrigo Fidelis · BTG
Ero is at the tail end of a capital-intensive phase and generates strong cash. It can fund Furnas, brownfield growth and exploration. Near-term priorities are repaying the revolver in Q4 and then shareholder returns, supported by the concentrate program, 1 Arrow and FX hedging.
▸
What parameters for Q4 at Xavantina support using it as a 2027 run rate?
Anita Soni · CIBC World Markets
No specific parameters were given. The run rate is an implied extrapolation from guidance. Mine and plant throughput is expected at 20-25 kt per month, and Q3 came close. Delayed high-grade stopes shift into Q4.
▸
Can Caraíba sustain the 4.5-4.7 Mtpa throughput in 2027, or is additional work required?
Anita Soni · CIBC World Markets
Yes, it is sustainable. There are no major tie-ins, only normal planned maintenance downtime. The debottlenecking work led by Gelson drove sequential throughput gains.
▸
Will the Tucumã technical report include an updated life-of-mine production plan or only reserves and resources?
Orest Wowkodaw · Scotiabank
It will include an updated resource and reserve estimate before year end. It will not include a detailed operational phasing plan, though some information on phases and how the reserve is constructed will be given.

Options

Chain Snapshot (daily)

Call IV (ATM)66%
Put IV (ATM)56%
ATM Spread1.5%
Call $OI (near money)$3.9M
Put $OI (near money)$2.4M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$30.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$27.00$4.30/$5.201$0.75/$1.0574
$28.00$3.80/$4.502$1.15/$1.359
$29.00$3.20/$3.9019$1.55/$1.7034
$30.00$2.85/$3.30223$1.85/$2.25528
$31.00$2.30/$2.7553$2.25/$2.6547
$32.00$1.95/$2.3082$3.00/$3.3056
$33.00$1.55/$1.9576$3.60/$4.0025
$34.00$1.20/$1.60127$4.30/$4.905
Snapshot: 2026-11-04

Short Interest

Short % of Float6.4%
Short Shares6.5M
Days to Cover4.6
Change (vs Prior)-1.4%
Short % Float History
6.40%+1.00pp
2.0%3.0%4.0%5.0%6.0%10-1512-3103-1305-2908-1410-30

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
FIL Ltd$249M$18.57−$30.7M+$151M—$139.12B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$127M$23.11+$11.4M+$67.1M—$83.85B
FMR LLC$120M$19.57−$136M−$198M—$2.30T
Invesco Ltd.$109M$20.63−$21.2M+$54.7M—$1.26T
VANGUARD CAPITAL MANAGEMENT LLCPassive$79.3M$26.68+$5.9M+$79.3M—$4.68T
GMT CAPITAL CORP$75.5M$12.97−$22.0M−$124M—$1.92B
Cape Ann Asset Management Ltd$54.9M$22.26+$2.8M+$27.2M—$434M
JENNISON ASSOCIATES LLC$47.4M$17.17+$3.3M−$99.4M—$166.63B
AMERICAN CENTURY COMPANIES INC$44.9M$16.89+$20.4M+$44.9M—$225.72B
MASSACHUSETTS FINANCIAL SERVICES CO /MA/$43.7M$24.50+$35.6M+$43.7M—$314.43B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

013.5M27.0M40.5M54.0M$8.43$13$18$23$282021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
FMR LLC4.5MFIL Ltd9.3MPRICE T ROWE ASSOCIATES INC /MD/627KGMT CAPITAL CORP2.8MInvesco Ltd.4.1MMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.4.8MJENNISON ASSOCIATES LLC1.8MT. Rowe Price Investment Management, Inc.—Impala Asset Management LLC1.2M683 Capital Management, LLC—

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (3 analysts)$32.00+37.0%
Current Price$23.36
Analyst Ratings
2
2
Buy: 2Hold: 2Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2019 Q163M42M21M$0.19$0.19 – $0.202
2019 Q274M40M20M$0.19$0.18 – $0.202
2019 Q367M34M16M$0.15$0.14 – $0.162
2019 Q475M35M18M$0.17$0.16 – $0.172
2020 Q177M40M21M$0.20$0.19 – $0.211
2020 Q271M36M20M$0.19$0.18 – $0.201
2020 Q387M56M36M$0.34$0.32 – $0.351
2020 Q494M58M43M$0.40$0.39 – $0.421
2021 Q1104M81M55M$0.52$0.50 – $0.541
2021 Q2109M84M61M$0.57$0.55 – $0.601
2021 Q3107M77M52M$0.49$0.47 – $0.511
2021 Q4128M93M65M$0.61$0.59 – $0.641
2022 Q1114M68M43M$0.40$0.39 – $0.422
2022 Q2121M82M49M$0.46$0.45 – $0.482
2022 Q385M42M19M$0.18$0.17 – $0.182
2022 Q4114M66M32M$0.30$0.29 – $0.312
2023 Q198M48M22M$0.21$0.20 – $0.211
2023 Q2110M61M27M$0.26$0.24 – $0.271
2023 Q3117M29M19M$0.17$0.17 – $0.284
2023 Q4118M62M27M$0.26$0.18 – $0.364
2024 Q1110M38M9M$0.09$0.04 – $0.163
2024 Q2118M44M18M$0.17$0.15 – $0.182
2024 Q3137M54M27M$0.25$0.22 – $0.272
2024 Q4143M47M22M$0.20$0.08 – $0.357
2025 Q1121M49M23M$0.22$0.20 – $0.236
2025 Q2164M66M34M$0.32$0.19 – $0.3912
2025 Q3193M93M34M$0.32$0.26 – $0.478
2025 Q4309M186M109M$1.03$1.01 – $1.057
2026 Q1246M119M63M$0.59$0.49 – $0.657
2026 Q2278M137M78M$0.74$0.71 – $0.797
2026 Q3343M179M108M$1.02$0.92 – $1.127
2026 Q4359M216M131M$1.24$1.06 – $1.413
2027 Q1320M213M123M$1.16$1.06 – $1.263
2027 Q2377M227M127M$1.20$1.10 – $1.301
2027 Q3434M248M136M$1.28$1.18 – $1.391
2027 Q4365M237M121M$1.14$1.04 – $1.241
2028 Q1382M237M115M$1.08$0.99 – $1.172
2028 Q2382M253M122M$1.15$1.05 – $1.242
2028 Q3382M255M118M$1.11$1.02 – $1.212
2028 Q4382M269M124M$1.17$1.07 – $1.272
2029 Q1201M—0M$0.00$0.00 – $0.000
2029 Q2203M—0M$0.00$0.00 – $0.000
2029 Q3199M—0M$0.00$0.00 – $0.000
2029 Q4196M—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

Ero has moved from a leveraged construction story toward a cash-generating producer. Tucuma is increasingly operational, Xavantina is benefiting from concentrate processing and improved infrastructure, and net leverage has fallen to roughly 0.8x after the second quarter. The most important near-term question is whether the operating improvement persists after unusually strong metal prices, concentrate sales and hedge gains. The long-term upside is substantial: lower capex after the Caraiba shaft, additional Tucuma throughput, deeper Caraiba access and the Furnas project could create a larger, lower-cost Brazilian copper platform. However, owner earnings have historically lagged EBITDA because the company repeatedly reinvested heavily. Commodity prices, Brazilian power and FX, mine execution, permitting and the still-unproven Furnas development path keep the outcome range wide.

Trade Signal

Trade rating
-3.8/10
No trade
Horizon
~3mo
gpt-5.6-luna2026-08-07 · saw $34.31-37.0% since

Modest short: Ero is becoming a better business, but the stock's 147% one-year rerating and roughly 30x P/FCF price in strong execution and commodity conditions well ahead of normalized owner earnings.

Temporary mispricing-4.0

The stock rose from roughly $25-$27 in late July to $30.43 before earnings and then from $31.10 on August 6 to $34.05 on August 7 after the strong Q2 release. Earlier 2026 volatility reflected broad commodity and mining sentiment, with a sharp March decline followed by a recovery into April-May; the latest leg was specifically driven by improving operations, higher cash flow, lower leverage and the earnings beat. The immediate post-earnings move looks like an overreaction rather than a missed repricing: the facts improved, but the 12% jump leaves the stock around 32% above the analyst's fair value and above the consensus target. This is a potentially temporary valuation dislocation, although a sustained copper bull market could make some of the repricing durable.

Market view+5.0

The market is constructive and increasingly momentum-oriented rather than skeptical: consensus is Buy, there are no sell ratings, retail participation has risen to 32%, call open interest is much larger than put open interest, and the stock is up 147% over twelve months. Bulls point to Tucuma execution, Xavantina recovery, rapid deleveraging and Furnas optionality. Bears argue that the rerating has outrun normalized cash flow, with high capex, Brazilian power/FX risks and commodity-price dependence still unresolved. The consensus appears somewhat stale on the magnitude of the price appreciation: the average one-year target is $30.25, below the current price.

Inflectionwindow ~3mo+2.0

The business is clearly inflecting operationally: Tucuma is ramping, Xavantina has improved sharply, cash flow is rising and leverage has fallen to roughly 0.8x. But the market has already seen the major evidence—Q2 EBITDA rose to $144M, operating cash flow to $138M, and the stock rose 12% immediately after earnings. Further upside from Q4 filtration, lower costs and eventual Caraiba productivity is real, but consensus and price action already anticipate a substantial portion of it. The next positive inflection would require sustained normalized owner earnings rather than another strong commodity-assisted print.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and operating update — Should show whether Tucuma throughput, lower unit costs and Xavantina's improved production persist beyond the strong Q2 print; a miss could challenge the rerating.
  • ▲2026-10 to 2026-12 · Tucuma modular tailings-filter commissioning — Three additional filters are scheduled for Q4 and could lift throughput beyond current 2026 guidance if executed on time.
  • ▲late 2026 · Furnas earn-in drilling completion and preliminary-license application — Completion of the 45,000-meter Phase 3 program and a permitting submission could add resource and long-duration growth value, though much of the project excitement is already reflected.
  • •late 2026 · Caraiba shaft reaches bottom and updated development outlook — Year-end progress is expected, but the meaningful productivity benefit is targeted for 2028, making this more confirmation than an immediate earnings catalyst.
  • ▼2027-02 · Q4 2026 results and 2027 capex/guidance reset — The key test is whether high metal prices, concentrate sales and hedge gains are masking normalized owner earnings and whether capex remains elevated.
Flow+1.0

Net flow is broadly neutral to mildly positive. Dilution was only about 1% TTM, there is no death-spiral or major lockup overhang, and deleveraging reduces balance-sheet risk. Management is prioritizing debt repayment rather than buybacks or dividends, so there is no active capital-return bid; short interest at 4.5% of float and heavy call activity provide some squeeze fuel but also indicate speculative positioning.

Floor / Ceiling+2.0

There is no hard asset or net-cash floor: net debt is still about $453M and the business remains exposed to copper/gold prices, Brazilian power costs, FX and development capex. Cash generation, falling leverage and improving operations provide meaningful support below the current price, but a normalized FCF yield of only about 3% offers limited valuation protection. There is also no obvious structural ceiling, though the $30-$32 analyst target zone and recent momentum create potential selling pressure.

Buyability

A credible, increasingly cash-generative copper-and-gold producer with improving leverage and genuine operating catalysts; real buyers can own the growth and copper exposure. However, Brazil, commodity prices, execution risk and elevated capex make it less compelling after the recent rerating.

Fear vs Greedfear 5/10 (-2.0)greed 7/10 (+3.0)

Fear pulls harder than greed at $34: the operating trend is genuinely good, but the stock has already risen 147% in a year and trades at roughly 30x P/FCF while sitting about 32% above the analyst's fair value. The risk is not that Ero is broken; it is that excellent execution and commodity conditions are already capitalized.

Valuation

Our Target
$2.4B-4%
Market Should Pay
$2.2B-8%
target ×0.95 (fear discount)
Current Market Cap
$2.4BSlightly bearish
What Changed
transcript · 2026-08-06
+10%fair value on this information

The genuinely new information is that the Q2 operating improvement broadened across the portfolio rather than coming only from one asset: copper production reached 17,315 tonnes, Tucuma throughput increased 27% quarter over quarter, Xavantina produced more than 20,000 ounces including historical concentrate, operating cash flow rose to approximately $138M, and net debt declined to roughly $453M. Management also confirmed the modular Tucuma filters remain scheduled for Q4 and that $95M remains on the revolver repayment program. The call did not provide a firm shareholder-return timetable, which limits the upside reaction.

▸ How the cases moved

The Q2 result raises the operating cases versus the day-before assessment: bear equity value increases modestly from $850M to $900M because liquidity and leverage risk are lower; base rises from $2,900M to $3,300M as Q2 EBITDA reached $144M, operating cash flow was approximately $138M and net debt fell to about $453M; bull rises from $4,800M to $5,100M as the 8% filtration expansion, three modular filters and improved Xavantina concentrate handling offer additional upside. Probabilities shift from bear/base/bull of 0.30/0.55/0.15 to 0.25/0.55/0.20.

2-Year Plausible Outcomes
bear25%
$900M
rev -5%/yrOE $70M

Copper and gold prices weaken, Tucuma fails to sustain its ramp, and Brazilian power, FX and operating costs compress margins. Caraiba's shaft and Furnas absorb cash while sustaining capex remains high, leaving only modest owner earnings and keeping leverage elevated.

▸ Valuation

4x $350M EBITDA = $1,400M EV - $500M net debt = $900M equity

base55%
$3.3B
rev +10%/yrOE $300M

Tucuma reaches a more reliable steady state, Xavantina's concentrate program provides meaningful but partly temporary cash flow, and Caraiba productivity improves gradually. Capital spending falls after the shaft and development cycle, allowing owner earnings to converge toward EBITDA less sustaining capex and debt to decline materially.

▸ Valuation

6x $600M EBITDA = $3,600M EV - $300M net debt = $3,300M equity

bull20%
$5.1B
rev +15%/yrOE $430M

Tucuma's additional filtration capacity and throughput improvements work ahead of expectations, copper and gold prices remain favorable, and Xavantina's concentrate inventory converts into strong cash flow. Caraiba's shaft begins delivering visible productivity benefits and capex drops sharply, producing high owner earnings and a premium-quality multi-asset growth profile.

▸ Valuation

7x $750M EBITDA = $5,250M EV - $150M net debt = $5,100M equity

▸ Target Rationale

The probability-weighted scenario value discounts to $2,448M. I set the analytical target at $2,350M because the arithmetic assumes a relatively clean conversion from EBITDA to owner earnings while Ero still has meaningful mining capex, project execution and commodity-price exposure. The target is not reduced for investor sentiment; those considerations are captured separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now7/10
Trajectory8/10
Risk5/10
Governance6/10
Insolvency prob (2yr)3%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Results: In May 2026, Ero Copper reported its first-quarter operating and financial results. The company generated revenues of $263.2 million, representing a 110.4% increase year-over-year, heavily driven by the commercial ramp-up of the Tucumã open-pit mine. Net income attributable to owners was $108.8 million (adjusted net income of $72.4 million), and adjusted EBITDA came in at $125.2 million. Cash flow from operations was $92.8 million.
  • Deleveraging and Balance Sheet Improvement: Ero made progress on strengthening its balance sheet, cutting its net debt by $11.0 million during the quarter to $490.7 million. This reduction dropped the company's net leverage ratio down to approximately 1.0x, reinforcing management's commitment to post-development phase deleveraging.
  • Operational Performance: Consolidated copper production reached 17,287 tonnes at a C1 cash cost of $2.39 per pound. The Tucumã operation contributed 8,461 tonnes of copper in concentrate at a highly competitive C1 cash cost of $1.97 per pound.
  • Xavantina Gold Upgrades: Gold production at the Xavantina operation stood at 5,495 ounces, with elevated C1 cash costs of $2,120 per ounce caused by scheduled, capital-intensive ventilation and cooling circuit upgrades completed in late April. Ero also began shipping gold concentrate from Xavantina, unlocking a new high-margin revenue stream, and reported a maiden inferred mineral resource for the project.
▸ Thesis-test Findings
  • Ero Copper Tucuma filtration circuit expansion progress 2026: In the first quarter of 2026, Ero ordered modular tailings filters to expand and optimize Tucumã's tailings filtration circuit. The installation and commissioning of these additional filters are slated for the second half of 2026. Management confirmed that the project remains on schedule for Q4 2026. Because the resulting throughput increases and operational benefits have not been factored into Ero’s full-year 2026 guidance, the successful on-time execution of this filtration circuit expansion serves as a major source of operational upside (bull case).
  • Vale Furnas copper project permit status and drilling updates: The Furnas Copper-Gold Project (60% earn-in from Vale Base Metals) is showing rapid advancement. In February 2026, Ero filed an inaugural Preliminary Economic Assessment (PEA) demonstrating exceptional economics, including a 24-year mine life and an after-tax NPV of $2.0 billion. In June 2026, Ero released assay results from a 24,000-meter drilling campaign (within a broader 75,000-meter program). Step-out drilling significantly extended the mineralized footprint down-dip and below existing models—highlighted by hole FURN-DD-00357 which intersected 90 meters grading 0.74% copper, 0.50 g/t gold, and 3.18 g/t silver. Ero is on track to complete the earn-in drilling and expenditure requirements by year-end 2026, two years ahead of schedule. On permitting, baseline environmental studies are complete, and Ero expects to submit its application for a Preliminary License (the first of a three-phase Brazilian process) by the end of 2026, targeting a Prefeasibility Study (PFS) in 2027.
  • Brazil mining sector electricity grid reliability and tariff rates 2026: Brazil’s National Interconnected System (SIN) is undergoing extensive modernization. In March 2026, the electricity regulator ANEEL approved a $108 million transmission modernization program to strengthen system reliability, which works alongside massive ongoing grid expansions like State Grid’s $3.2B transmission line to integrate northern solar and wind resources. However, macro hydrological pressures represent a growing risk for energy-heavy industrial players like Ero. Due to lower-than-average regional rainfall, Fitch Ratings increased its spot electricity price assumptions for 2026–2028. Industrial energy consumers face nationwide electricity tariff hikes projected to average 8% in 2026, outstripping inflation. While localized green tariff flags offer temporary relief, the long-term trend of rising spot power prices and complex grid balancing during periods of drought remains an inflationary headwind (bear case) for Brazilian miners' margins.