Stocks/EROC

EROC

ERock, Inc.v3 5.2/10 · 2026-11-26
Industrials·Industrial - Machinery
$5.37
$1.2B market cap
v3 Rating
5.2/103.5–7.5
Setup
4.5/103.0–6.5
Fair Value
$6.30$2.50–$14.00+17%
DCF (10%)
$6.50+21%
Base IRR
+11%-30%–+40%
Visibility
wide±91%
Wall Street
$20.33 target(3 analysts last quarter)(4 buy)
Rating
Revenue (TTM)
$224.4M
Owner Earnings
$50M
Next-Yr Owner Earnings
$65M
Growth
+20.0% × 3y
P / Next-Yr OE
19.6x
Net Debt
-$240M

ERock, Inc. designs, deploys, sells, operates, and maintains distributed power generation systems designed to provide power for commercial and industrial customers in the United States. Its offerings include the design, installation, and operation of modular power systems, as well as ongoing operations and maintenance and asset management services. Its systems support a range of customer applications, including bridge power, backup power, and dispatchable power solutions. The company primarily serves data centers, utilities, and commercial and industrial customers across the United States. The company was founded in 2006 and is based in Houston, Texas.

2-Year Price History

$5.60-59.3%
$6.0$8.0$10$12$14$16Initial target $6.30 · 2026-11-26volJun 26Jul 26Aug 26Aug 26Sep 26Oct 26Oct 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
5.23.5–7.5
Setup
4.53.0–6.5
Fair value (USD)
6.302.50 – 14.00
Upside vs 5.37
+17%
DCF (10%)
6.502.50 – 15.00+21%
Base IRR
11%-30% – 40%
Visibility
very widerange ±91%
Sentiment
3/10
Flow
3/10
2026-11-26 · claude-opus-5-5 · priced at 5.60

ERock (formerly Enchanted Rock) assembles natural-gas RockBlock gensets around Hyundai engines, then installs and runs them as bridge, backup and dispatchable power for data centers, utilities and C&I sites. It IPO'd at $21.50 in June and closed at $5.60 on 2026-11-25, down 74% and at its low. 2027 looks largely locked in: backlog was ~$1.6B at 9/30 plus $300M+ signed after quarter-end, the company has no debt, and Texas's grid-connection pause exempts behind-the-meter power. The thesis test cut the pitch, though. Q3 bookings were only ~$40M. Part of the post-quarter $300M is soft 'financial commitments' with contract details still being finalized, and the Anthropic order still has no named site. The 2 GW of 2028 capacity, at margins the company has never earned, is unbooked. Owned net cash is ~$240M, not $300M, because the $248M of 9M operating cash flow is all customer deposits. Competitors (Caterpillar, VoltaGrid/INNIO, Bloom) are scaling at GW size. Re-run with 2028-31 FCF of ~$140-170M and a 9x year-5 multiple, the base DCF is ~$6.5 per ~245M diluted shares: ~15% above the price, with a $2.5 bear and a $15 bull. On top of that, the lock-up ends ~Dec 8 against a sponsor holding ~78%. Rating 5.2: a fairly priced, hated, high-variance AI-power assembler. It is not a mispricing until 2028 bookings show up, which the Q4 report and 2027 guidance (~March 2027) will test.

Flow: The IPO lock-up ends around Dec 8, 2026 (180 days from June 11). Energy Impact Partners (~78%, with registration rights) and the other pre-IPO holders own ~171M Class B shares/units, against a 48M Class A float, so block sales or a secondary are likely in Dec 2026-Mar 2027. Class M profits interests (51M Class A shares reserved) add more supply. There is no buyback. Short interest is 13.3M shares (~28% of the float) and rising.

A deep dive would have to establish: Does ERock book $1B+ of 2028 deliveries at mid-20s margins with customers beyond Meta before Atlas ramps, or was 2026-27 a one-project peak?

Owner earnings, TTM
$50M$0M – $100M
Realistic peak profit
$220M$100M – $400M
Growth rate
20.0%-10.0% – 45.0%
Years of growth
31 – 5
Market cap
$1.3B$1.2B – $1.4B
EV
$1.1B$950M – $1.3B
Net debt
-$240M-$280M – -$180M
Capital return / cap
0.0%0.0% – 1.0%
P/E
14.0×9.0× – 40.0×
EV/EBITDA
8.4×5.5× – 20.0×
FCF yield
6.0%1.0% – 10.0%
Projected FCF, base case (USD millions)
Y1$65M$10M – $110M
Y2$140M$20M – $280M
Y3$170M$10M – $350M
Y4$160M$0M – $380M
Y5$150M$0M – $380M
Competition: A crowded and scaling field (Caterpillar at multi-GW campuses, VoltaGrid/INNIO 2.3 GW for Oracle, Bloom fuel cells, oilfield-service entrants): ERock wins on emissions, fast start and turnkey O&M, but it assembles around Hyundai engines and the barriers to entry are low.
Governance: Sponsor-controlled Up-C (EIP ~78%) with Class M profits interests convertible into up to ~51M Class A shares, plus unremediated material weaknesses in internal controls.
Research (expand)

What it does. ERock designs, assembles, installs and operates natural-gas gensets. Assembly is at Hyperion in Houston (1.2 GW/yr by end-2026), and Atlas adds ~0.9 GW from H1 2028 for $20-30M of capex. Revenue = power-system sales (equipment + balance-of-plant install) and 5-15-year O&M services. Customers include El Paso Electric/Meta (366 MW), Anthropic (~470 MW equipment), Microsoft, Entergy, H-E-B. Bridge periods are lengthening to 5-7 years, earning ~3x the services revenue of backup mode.

What the market believes. From a $21.50 IPO to $5.60:

  • AI-infrastructure fear.
  • Backlog dipping from $1.7B to $1.6B in Q3.
  • A sponsor-owned float, with the lock-up ending around Dec 8.
  • Short interest of 13.3M shares, ~28% of the 48M Class A float.

Texas risk is smaller than it looked. The August grid-connection pause exempts behind-the-meter projects, and El Paso is outside ERCOT.

What it earns.

  • 9M 2026 revenue was $224M. Q3 was $153M with $12.6M of adjusted EBITDA (~8%), the first profit in a 20-year history; Q3 2025 gross margin was 9%.
  • 2026 guide is $435-465M of revenue and $3-9M of EBITDA.
  • Today's run-rate owner earnings are ~$50M. G&A is ~$105M/yr.
  • Cash plus restricted cash is $619M, but ~$570M of contract liabilities and deferred income sit against it, so owned net cash is ~$240M.
  • 9M operating cash flow of $248M consists of +$393M of deposits and ~-$145M from operations.

Projection (unlevered FCF, $M).

  • 2027 ~65: revenue ~$1.3B, EBITDA ~$130M.
  • 2028 ~140: capacity partly sold, and margins move toward the low-to-mid 20s only on newly priced deals.
  • 2029 ~170, 2030 ~160, 2031 ~150.

Year 5 is 'we do not know': a cyclical assembler with a recurring services tail. Base case 9x FCF; bear 5x on ~$30M; bull 14x on ~$330M.

Value. Base DCF: PV of FCF ~$505M + PV of terminal value ~$840M + owned net cash ~$240M = ~$1.58B, or ~$6.5/share on ~245M diluted shares (219M basic + Class M profits interests). Bear ~$2.5, bull ~$15. At $5.60 we pay ~$1.09B EV, ~8.4x 2027 EBITDA and ~14x 2027 earnings. Fair value ~$6.3.

Management, risks.

  • CEO John Carrington's call is promotional, but the company has hit guidance since the IPO.
  • One counterparty was 68% of Q3 revenue.
  • Material weaknesses are unremediated.
  • Up-C structure, with 51.2M Class A shares reserved for Class M conversions; at today's price fewer would likely convert.
  • EIP has ~78% control.
  • Single engine supplier, Hyundai, fixed-price through 2028.
  • Capital-light means low barriers to entry.

Sentiment: 2.5/10. Hated: down 74% since the IPO, at the low of its range, short interest rising.

Thesis test

  • Bookings stalled, 2028 unbooked: the challenger was right. Backlog fell $0.1B on $136M of conversions (~$40M of Q3 bookings), the post-quarter $300M is partly unsigned, and the Anthropic site is unnamed. 2028-31 FCF cut ~30%.
  • Thin history of profit: the challenger was mostly right. The first profit came after 20 years, and the mid-20s margin is only management's claim. Kept the 2027 numbers, trimmed the 2028+ margin.
  • Owned cash ~$240M, not $300M: the challenger was right, from the 10-Q cash flow statement and balance sheet. -$0.25/share.
  • Competition and engine dependence: partly right. Every supplier is sold out today, so it does not hurt 2027-28, but it caps the year-5 multiple at ~9x instead of 10x.
  • Supply wall (lock-up ~Dec 8, EIP 78%, Class M): the challenger was right on timing. It is not a value hit, but it is a strong reason the price can stay low into Q1 2027.

Conclusion: the core business is real and 2027 is funded and booked, but the pitch's upside sat on unbooked 2028 capacity at unproven margins. On the corrected numbers the DCF is ~$6.5 against $5.60: fairly priced, with a fat-tailed range both ways. Pass for now. Revisit after the lock-up and the Q4 print, if 2028 bookings of $1B+ show up or the stock trades nearer owned cash plus 2027 earnings (~$4).

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM
Revenue224
Gross profit50.7
Operating expenses79.4
▸Adj EBITDA-23.2
▸Adj OCF-15.5
CapEx-29.6
Adj FCF-45.1
Interest expense4.05
▸Adj net income-40.3
▸Owner's earnings-15.0

claimed profit vs where the cash actually went — % = share of claimed EBITDA

Where the Cash WentTTM
▸Claimed: EBITDA-20.2
FCF (OCF−capex)220
Net income-83.2
▸Capital returned-290
Buybacks-369
Dividends0.00
Interest paid4.05
Debt paid down75.0
▸Reinvestment29.6
Capex (PP&E)29.6
Intangibles & M&A0.00
Leases signed (net Δ)--
Retained / other514

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 6.6 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM
▸Assets (total)1000
▸Liabilities (total)732
Net debt (incl. leases)-511
Net debt / Adj EBITDA--
Net debt / Adj FCF--
Adj EBITDA / interest-5.72
Shares outstanding219
Dilution (YoY)--
Employees385
MarginsTTM
Gross margin22.6%
Adj EBITDA margin-10.3%
Adj OCF margin-6.9%
Adj FCF margin-20.1%
Net income margin-37.1%
Adj NI margin-17.9%
ROIC (adj, after-tax)-25.6%
Cost of debt7.5%

Earnings Calls

3 calls

Earnings Call · 2026 Q3

2026-11-12

ERock reported a strong third quarter 2026 and reaffirmed its full-year outlook. Revenue rose roughly fourfold sequentially to $153 million (from $40 million), driven by the El Paso Electric/Meta project. Power systems sales were $136 million, up 5x. Ongoing services revenue, excluding pass-through, was $8.6 million, up 23% on seasonality. Adjusted gross margin was 24.1%, versus 22.2% in Q2. Net income was $8.9 million, the first positive quarter as a public company. Adjusted EBITDA was $12.6 million, a nearly $27 million improvement from the prior quarter. Contracted backlog was about $1.6 billion, versus $1.7 billion at June 30, as deliveries converted to revenue. More than $300 million of bookings were signed after quarter end, which pushes backlog to a record. Those bookings are a mix of C&I deals and data center customers making financial commitments to preserve schedules. The company holds $549 million of unrestricted cash and no debt. Its $250 million credit facility is undrawn. Year-to-date CapEx was $30 million, including a roughly $10 million equipment purchase from a customer. Guidance for 2026 is unchanged: revenue of $435–465 million and adjusted EBITDA of $3–9 million. That implies Q4 revenue of $211–240 million, a record, and Q4 EBITDA of $17–23 million. Operationally, Hyperion ramped after the July move from Titan and is on track to exit 2026 at 1.2 GW of annual capacity. El Paso (366 MW for Meta) is in active construction, with gensets arriving and installation due by mid-2027. The project compresses an estimated five-year interconnection wait into about 15 months. Management reported a favorable proposal for decision from the administrative law judge and no impact from the Texas large-load discussions. A multiyear fixed-price Hyundai engine long block agreement covers 2027–2028, and talks on 2029 and beyond are under way. The new Atlas facility in Houston is 650,000 square feet. It should add about 900 MW of annual capacity by 1H 2028, expandable to 1.2 GW, for $20–30 million of CapEx funded from existing liquidity. Total capacity would reach about 2.1 GW, or 2.4 GW with the expansion. Production is sold out through 2027 and into early 2028. Management said bridge-power periods are lengthening from three years to five to seven. Bridge periods generate about 3x the services revenue of backup periods. C&I is growing, driven by reshoring (Wistron, a health care system), and Jason Altobelli, formerly of Google Cloud, joined as Chief Revenue Officer. Margins on 2026–2027 deliveries are in the high teens to low 20s. Recently priced deals are in the mid-20s or higher, which mainly benefits 2028 and beyond. Management said 2027 is largely locked in, with upside leverage in 2028. Demand is focused on 2028 and 2029 deliveries, and inbound interest rose after the midterms. Management said the permitting and community profile (low emissions, no water, a fast air permit) is an advantage. They saw no delay in the Meta CCN and no moratorium issues, and the Anthropic site is not yet named.

Analyst Q&A (12)
▸
What does the demand profile look like as you fill expanded capacity? Is it mainly data centers, or are utilities showing up more?
Nick Amicucci · Evercore
Demand is strong across all three segments (data center, utility, C&I) with no softness. Large deals are lumpy, so one quarter's bookings don't capture the trend. Customers returned with more interest after the midterms. Most 2027 capacity is gone, so the pipeline is now focused on 2028 and increasingly 2029. ERock passed on many 2026–27 opportunities for lack of capacity.
▸
How firm is the Hyundai engine block supply agreement, and will Hyundai scale with your capacity growth?
Nick Amicucci · Evercore
The relationship is more than 10 years old and very strong, and Hyundai's leadership recently visited Hyperion. The contract is fixed price for 2027–2028, which gives cost visibility and supports margins and quoting. Talks on 2029 and beyond are under way, driven by demand and interest in larger framework agreements from hyperscalers.
▸
Has customer activity, pipeline conversation or deployment timing changed since the midterms, including for existing backlog projects?
Bhairav Manawat (for Mark Strouse) · JPMorgan
No real change to backlog timing, and El Paso is on schedule. Inbound interest has picked up for new deals and for speeding up existing conversations. Management's themes: community fit (no water, small footprint, quiet, low emissions), El Paso as a proof point, and the turnkey offering. Corey Amthor added that both parties appear pro-business, states are competing for data centers, and execution is what counts.
▸
What is the customer mix and timing of the $300 million-plus of post-quarter bookings, and are they from existing or new customers?
Bhairav Manawat (for Mark Strouse) · JPMorgan
It is a mix. There were sizable C&I deals, plus data center customers making financial commitments to preserve project schedules while contract details are finalized. That shows customers want to keep projects on schedule rather than delay them.
▸
What drives 2027 margin gains, given higher pricing on new orders mostly shows up in 2028?
Mike Stratoti (for Joseph Osha) · Guggenheim Partners
2027 margins mostly reflect project mix and some assembly economies of scale. All 2027 deliveries were priced in 2025, in the low-20s range. The big margin drivers are 2028 and beyond, where deals being priced now are at mid-20s or higher.
▸
Are 2027 EBITDA expectations moving higher, and how should we think about 2027 EBITDA?
Angel Castillo Malpica · Morgan Stanley
2027 is largely locked in, so there's little leverage to beat it. The upside is in 2028, from better pricing and cost control. John added that Atlas puts capacity ahead of demand, offers gas access and logistics, and may include extra tooling and automation. It is funded from existing cash with no need to return to capital markets.
▸
Why commit to 900 MW rather than 1.2 GW, and why is CapEx of up to $30 million higher than the prior roughly $15 million per GW?
Angel Castillo Malpica · Morgan Stanley
ERock is staying prudent. It has preserved the ability to reach 1.2 GW or more and will commit to the increment as contracts are signed. The 900 MW is above the 600 MW expansion discussed pre-IPO. The higher CapEx reflects general cost inflation, efficiency investments, and potential extra automation and tooling, which will be done only with a strong payback. Design is still being finalized.
▸
Have you locked in the longer five-to-seven-year bridge power periods?
Michael Sullivan · Wolfe Research
Contracts let customers extend bridge periods as needed, so ERock is indifferent to duration. Bridge generates about 3x the services revenue of non-bridge, so longer bridge periods are accretive. Periods are now trending to five to six years or more, from three.
▸
Where can you be opportunistic given permitting issues others face?
Michael Sullivan · Wolfe Research
Corey Amthor said low emissions and low water usage are big advantages. El Paso got an air permit in under 45 days, and ERock is looking at similar or larger sites where it can get the same standard air permit. Customers are excited about this.
▸
What is the risk to the Meta site CCN expected in December if it slips into the new governor's administration with a possible moratorium, and where is the air permit for the Anthropic project, given TCEQ pauses?
Ross Fowler · Bank of America
Corey Amthor said no delay is seen on the CCN and little risk. If it slipped, the project's low emissions, low water use, Meta's community fund and the potential to lower rates would support it. The Anthropic site hasn't been named yet. ERock sees no moratorium issue, sees a window for approvals, and expects the new governor to be pro-business.
▸
After a big equipment order (e.g., Anthropic), how long until customers add design, installation and services?
Tim Moore · Clear Street
ERock expects to provide the full package on all deals. The ESI contract (balance of plant and installation) typically follows the equipment agreement by three to nine months. It requires a final site and a final fixed-price design, which can take 15–20 iterations. Services follow after commissioning.
▸
Do you have visibility into existing customers needing more bridge power, and a sales team that follows up?
Tim Moore · Clear Street
Yes. A dedicated C&I sales team and leader stays close to customers, and the NOC monitors every site. Reshoring is driving expansions (Wistron and others), and grid interconnection delays push customers to add more ERock capacity. C&I sites range from 5 to 100 MW, and the dynamics resemble the data center side.

SEC Filing Findings

SEC Filing — material findings

2026-11-12 · depth 9/10
risk 7Dilution / Share Overhang
▸

Public Class A holders own a minority of economic interest. Class B shares (171M) are paired with Class M and Class B units held by pre-IPO and employee holders, who can exchange them one-for-one into Class A (or the Company may settle in cash). Reserved Class A shares (51.2M) exceed the 48.2M Class A shares outstanding. Class M exchanges are subject to threshold valuation amounts, vesting, and exchange windows.

“As of September 30, 2026, 51,247,532 shares of Class A common stock were reserved for issuance upon the exchange of Class B Units issued upon conversion of 56,745,408 Class M Units”
risk 7Customer Concentration
▸

Revenue and receivables are highly concentrated. Two counterparties made up 68% and 12% of Q3 revenue, and one customer held 48% of receivables at quarter-end. The summary does not quantify this.

“sales to two counterparties accounted for approximately 68 % and 12 % of the Company’s total revenue. ... One customer accounted for approximately 48 % of the total accounts receivable balance at September 30, 2026.”
risk 6Internal Controls / Material Weakness
▸

Material weaknesses in internal control over financial reporting (identified in the FY2025 audit) remain unremediated. Disclosure controls were concluded to be not effective as of September 30, 2026. The weaknesses cover segregation of duties, lack of public-company and technical accounting staff, and IT general controls. Management also cannot assure remediation on its timeline.

“The material weaknesses have not yet been remediated as of the date of this Quarterly Report.”
risk 6Customer-Funded Cash / Working Capital
▸

A large part of the reported cash balance is customer prepayments, not owned earnings. Contract liabilities plus noncurrent deferred income total roughly $570M against $549M of cash. Operating cash flow was driven by these deposits, which are performance obligations to be unwound as deliveries occur. Inventory also rose sharply.

“A $320.6 million increase in contract liabilities primarily driven by new customer deposits associated with contracts entered into during the nine months ended September 30, 2026.”

Short Interest

Short % of Float46.4%
Short Shares13.3M
Days to Cover3.8
Change (vs Prior)+3.0%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
PRICE T ROWE ASSOCIATES INC /MD/$33.0M$14.50+$33.0M+$33.0M—$999.12B
BALYASNY ASSET MANAGEMENT LLC$30.4M$14.50+$30.4M+$30.4M—$52.74B
Cinctive Capital Management LP$28.2M$14.50+$28.2M+$28.2M—$2.49B
Encompass Capital Advisors LLC$27.6M$14.50+$27.6M+$27.6M—$2.32B
Zimmer Partners, LP$27.4M$14.50+$27.4M+$27.4M—$4.23B
AMERIPRISE FINANCIAL INC$26.5M$14.50+$26.5M+$26.5M—$494.20B
MASSACHUSETTS FINANCIAL SERVICES CO /MA/$25.8M$14.50+$25.8M+$25.8M—$314.43B
ALLIANCEBERNSTEIN L.P.$24.7M$14.50+$24.7M+$24.7M—$292.08B
CITADEL ADVISORS LLC$21.8M$14.50+$21.8M+$21.8M—$171.38B
Value Aligned Research Advisors, LLC$19.5M$14.50+$19.5M+$19.5M—$16.73B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

Not enough holder history to plot.

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (3 analysts)$20.33+263.0%
Last Year (9 analysts)$22.44+300.7%
Current Price$5.60
Analyst Ratings
4
Buy: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2026 Q220M-8M-12M$-0.24$-0.29 – $-0.173
2026 Q3167M2M-0M$-0.01$-0.02 – $0.012
2026 Q4226M5M1M$0.02$-0.06 – $0.122
2027 Q1303M9M4M$0.08$0.06 – $0.092
2027 Q2298M10M4M$0.09$0.08 – $0.091
2027 Q3390M13M6M$0.13$0.12 – $0.131
2027 Q4399M15M7M$0.15$0.14 – $0.161
2028 Q1476M14M5M$0.11$0.11 – $0.111
2028 Q2500M19M9M$0.18$0.17 – $0.191
2028 Q3576M21M10M$0.20$0.19 – $0.211
2028 Q4600M24M11M$0.22$0.21 – $0.231

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Major holders (≥10% beneficial owners)
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$0
1 txn · 1 insider · 465,116 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-06-11SELLMcAndrew Walter Thomas Jr.10 percent owner465,116$0.00$0$0
v2 analysis (legacy, 2026-07-06) — for comparison onlyclick to expand

Thesis

ERock is a newly public (June 2026, via de-SPAC) distributed/onsite power generation company selling modular natural-gas generation systems marketed as 'bridge power' for data centers and industrial sites stuck in multi-year grid interconnection queues. TTM revenue is only $32M with negative EBITDA (-$13M) and negative FCF (-$16M), but the company reports a $1.28B contracted backlog (+778% YoY), implying the current P&L massively understates the demand the company has already booked. The balance sheet shows $301M cash against modest funded debt ($64M) plus $30M of lease obligations, giving large net cash (-$207M net debt), which buys real runway to fund manufacturing scale-up and working-capital build as backlog converts to revenue. The core investment question is execution: can ERock scale manufacturing, diversify beyond Texas/California and a handful of large customers, and convert backlog into profitable, recurring revenue before cash burn or dilution erodes the equity story. This is a hype-adjacent, early-commercialization power-infrastructure name riding the AI-datacenter power shortage narrative rather than a proven earner today.

Trade Signal

Trade rating
+0.8/10
No trade
Horizon
~9mo
Claude2026-07-07 · saw $13.32-59.7% since

EROC is essentially fairly valued (analyst fair value ~$12.45-13.93 vs. $14.26 price) with a genuinely exciting AI-power-bridge story but unproven execution, thin margins, dilution risk, and a lockup overhang — no real edge here, so it's a pass rather than a buy or short despite the enticing narrative.

Temporary mispricing+1.5

The stock IPO'd (de-SPAC) in June 2026 at $21.50, fell hard to the $13.76-17 range within days—a classic post-IPO/lockup-driven air pocket with no negative company news, just early aftermarket flow and volatility (86% annualized). It then bounced modestly off the $13.76 low back to ~$14.5-15.5 as dip-buyers stepped in on the backlog story. This looks like normal IPO price-discovery drift rather than a reaction to fundamentals—no bear-case datapoint (customer cancellation, margin miss) has actually landed yet. The move is largely noise around a name still finding its natural clearing price, not a clean overreaction to digest.

Market view+4.0

Wall Street's lone analyst cohort (JPM, Morgan Stanley, Evercore) is uniformly bullish with price targets ($21-28) far above spot, framing EROC as a pure-play on the AI/data-center power-scarcity bottleneck with a backlog that grew 778% YoY. Retail sentiment on StockTwits/Seeking Alpha is polarized but engaged. Bears flag the still-unprofitable P&L, thin 20.5% gross margins, Texas/customer concentration, and a rich 21x EV/Sales multiple. Reported short interest (2,543% of float, 1.7 days to cover) looks like a data artifact tied to a very small free float post-IPO rather than a real crowded short. Net: the stock is loved by sell-side and hyped by momentum retail, but genuinely untested as a public operating story — expectations (analyst $28 avg target) are already well ahead of what our base case supports.

Inflectionwindow ~9mo-1.0

The bull thesis (AI data centers need bridge power now, backlog up 778% YoY to $1.28B) is real and could genuinely re-rate the stock if manufacturing scale-up and margin expansion land on schedule — but the market (via a $28 average sell-side target) already prices in much of that optimism, well beyond our $12-16 fair-value range. Our base case shows backlog conversion and modest EBITDA turn by year two, which is a slow, multi-quarter grind rather than a single visible surprise. The market is arguably ahead of, not behind, this inflection.

Catalysts
  • •2026-08 · First full-quarter post-IPO earnings as public co — First real test of backlog-to-revenue conversion and margin trajectory; high scrutiny given aggressive multiple.
  • ▼2026-12 · Lock-up expiry — Typical 180-day de-SPAC/IPO lockup unlock brings insider/PE-sponsor share supply to market.
  • ▲H2 2026 · New contract wins / backlog updates — Additional large data-center contracts would validate bull case and reduce concentration risk.
  • •Q4 2026-Q1 2027 · Manufacturing capacity ramp updates — Key swing factor for whether base or bear margin scenario plays out.
  • ▼H1 2027 · Potential capital raise / dilution event — Company needs capital to scale manufacturing; bear case explicitly assumes dilutive raise.
Flow-3.0

No TTM dilution yet, but this is a freshly de-SPAC'd, cash-burning company (-$16M FCF, -$13M EBITDA) that will likely need to raise capital to fund manufacturing scale-up to convert the backlog — the bear case explicitly assumes future dilution. A lockup expiry later in 2026 adds sponsor/insider share overhang. No buyback, no meaningful insider buying disclosed. Net flow picture is modestly negative over the next 6-12 months.

Floor / Ceiling+1.0

There's a genuine cash cushion (~$150-200M net cash per scenario math) against an EV of only $480M, which provides some downside support, and FCF yield/margin metrics are distorted (positive due to working-capital swings, not sustainable operating cash generation). But this is not a hard floor — the business is operationally loss-making, and a bear scenario sees equity value nearly halve to ~$250M as cash burns and dilution kicks in. Above the price, a 180-day lockup expiry and eventual capital-raise needs cap near-term upside, and sell-side targets ($21-28) look disconnected from realistic near-term fundamentals, meaning any rally toward those levels likely draws sellers (insiders, PE sponsors) rather than being sustained.

Buyability

Yes, this is buyable — momentum/growth investors chasing the AI-power-infrastructure theme, sell-side-driven institutional flow off high-profile Overweight ratings, and retail enthusiasm around the data-center bridge-power narrative all provide a real, engaged buyer base, unlike a distressed micro-cap nobody wants. The risk isn't a lack of buyers; it's that current buyers are paying for a bull-case outcome that our base case doesn't yet support.

Fear vs Greedfear 6/10 (+1.0)greed 7/10 (+3.0)

Neither strong fear nor strong greed — the stock is sitting almost exactly at fair value with a wide bimodal outcome distribution (cash-plus-option bear case vs. multi-bagger bull case). The setup is more binary-uncertainty than mispriced, so it doesn't inspire high conviction either way; if anything the analyst consensus optimism (targets nearly 2x spot) feels like the bigger risk of disappointment.

Valuation

Our Target
$600M-51%
Market Should Pay
$660M-46%
target ×1.1 (greed premium)
Current Market Cap
$1.2BSlightly bullish
What Changed
financials release · 2026-07-07
+9%fair value on this information

This is ERock's first quarterly report as a newly public NYSE company. The market now sees hard, audited-quality figures for the first time: a $1.28B contracted backlog (+778% YoY), confirmation of still-deep unprofitability (Adj EBITDA -$13M, Adj FCF -$16M TTM), thin 20.5% gross margins, and a large cash balance ($301M) alongside newly disclosed leadership expansion (CMO hire) aimed at geographic diversification. The scale and growth rate of the backlog is a genuinely new, quantified data point beyond generic de-SPAC investor-deck claims, while the persistent unprofitability and thin margins are also now concretely confirmed rather than assumed.

▸ How the cases moved

Bull equity value modestly raised (from an implied ~$1,800M to $2,000M) and bull probability nudged up slightly (0.15->0.20) on the strength/scale of the disclosed backlog and demand signal; base case largely unchanged in value but probability shifted up slightly at bear's expense as the backlog de-risks near-term revenue visibility; bear probability trimmed (0.45->0.35) since the cash cushion and backlog reduce near-term insolvency/dilution urgency, though margin thinness keeps bear from disappearing.

2-Year Plausible Outcomes
bear35%
$250M
rev +20%/yrOE $-10M

Manufacturing scale-up disappoints, a large customer concentration event (delay/cancellation in Texas) trims the backlog, and gross margins stay thin as competition and component costs bite. Revenue grows modestly but the company remains unprofitable and needs to raise additional capital, diluting shareholders. By 2028 the stock trades mainly as a cash-plus-discounted-option story.

▸ Valuation

Residual net cash ~$150M (after 2 yrs of burn/capex) + discounted core operating business ~$100M (no EBITDA multiple applied, still loss-making) = $250M equity value

base45%
$780M
rev +75%/yrOE $25M

ERock steadily converts backlog into revenue as manufacturing capacity ramps and geographic diversification (new CMO-led expansion) reduces concentration risk. Revenue scales meaningfully but margins improve gradually; EBITDA turns modestly positive by year 2. Market applies a growth-infrastructure multiple reflecting real but unproven profitability.

▸ Valuation

14x $45M EBITDA (on ~$300M revenue, 15% margin) = $630M EV + $150M net cash = $780M equity

bull20%
$2.0B
rev +130%/yrOE $75M

AI-datacenter power shortage accelerates bookings well beyond the current backlog, manufacturing scales faster than expected, and ERock becomes a recognized national bridge-power platform with strong repeat business. Margins expand as scale kicks in and the company is re-rated as a critical infrastructure grower.

▸ Valuation

18x $100M EBITDA (on ~$500M revenue, 20% margin) = $1,800M EV + $200M net cash = $2,000M equity

▸ Target Rationale

I discount modestly below the probability-weighted model value because (1) current gross margins (20.5%) are far below what's implicitly required to hit the base/bull EBITDA margin assumptions, so execution risk on margin expansion is high; (2) the reported cash-flow statement's huge OCF/working-capital swings and 'other liabilities' balance make the balance sheet harder to interpret cleanly, warranting some data-quality haircut; (3) customer/geographic concentration and newness as a public company add governance/track-record uncertainty not fully captured in the scenario math.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality5/10
Situation now3/10
Trajectory7/10
Risk7/10
Governance5/10
Insolvency prob (2yr)6%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-07-07

Company news

ERock, Inc. officially transitioned to a public entity on the NYSE in June 2026, positioning itself as a national provider of large-scale onsite power solutions. The company reported a massive expansion in its commercial pipeline, with a contracted power system sales backlog of $1.28 billion as of March 31, 2026—a 778% year-over-year increase. Recent operational milestones include the launch of its ERT500™ and RockBlock™ advanced generation technologies, designed to provide "bridge power" for data centers waiting on grid interconnections. Management also expanded its executive leadership in early 2026, appointing Niki Herr as Chief Marketing Officer to lead national expansion efforts beyond its historical core markets in Texas and California (Sources: Business Wire, Reuters, Quartr).

Thesis findings

The bull case rests on ERock’s status as a "bridge-to-grid" solution for AI data centers facing 24-to-60-month utility interconnection delays. Its modular natural gas systems offer faster deployment than traditional grid upgrades and provide critical baseload power that intermittent renewables cannot. The massive backlog provides high revenue visibility for the next several years. Conversely, the bear case focuses on persistent unprofitability and operational growing pains. High customer and geographic concentration—with the majority of sales originating in Texas and a handful of large clients—pose significant structural risks. Additionally, skeptics question the company's ability to scale manufacturing rapidly enough to convert its backlog into realized revenue without further diluting its balance sheet (Sources: Seeking Alpha, JPMorgan, MarketBeat).

Market opinion (price-aware)

Wall Street has greeted EROC with a bullish initiation cycle despite a lackluster post-IPO debut. Major firms including JPMorgan ($24 target), Morgan Stanley ($21), and Evercore ISI ($28) have assigned Overweight or Outperform ratings, citing structural U.S. power scarcity. The stock priced its June IPO at $21.50 but quickly traded down to the $15 range, representing a roughly 25% decline. Retail sentiment is polarized; on StockTwits and Seeking Alpha, proponents highlight it as a "pure-play" on the AI electricity bottleneck. However, critics point to an aggressive 21x EV/Sales multiple and the lack of a path to near-term profitability. The prevailing narrative is that EROC is a high-conviction "power scarcity" trade currently searching for a price floor (Sources: Investing.com, GuruFocus, TradingView).