Stocks/EVEX

EVEX

Eve Holding, Inc.v3 3.5/10 · 2026-11-26
Industrials·Aerospace & Defense
$1.29
$432M market cap
v3 Rating
3.5/102.5–4.5
Setup
2.5/101.5–3.5
Fair Value
$0.90$0.20–$3.00-30%
DCF (10%)
$0.70-46%
Base IRR
-10%-100%–+35%
Visibility
wide±156%
Wall Street
$5.70 target(3 analysts last year)(4 buy)
Rating
Revenue (TTM)
$0.0M
Owner Earnings
-$225M
Next-Yr Owner Earnings
-$230M
Growth
+40.0% × 5y
P / Next-Yr OE
--
Net Debt
-$34M

Eve Holding, Inc. specializes in pioneering urban air mobility initiatives. The firm is actively engaged in crafting and producing electric Vertical Take-off and Landing (eVTOL) vehicles. Beyond manufacturing, Eve also furnishes a complete array of operational and maintenance support for its eVTOLs, encompassing everything from parts supply and upkeep to technical assistance, pilot and ground crew training, ground operations management, and data intelligence services. Furthermore, the company develops sophisticated air traffic management systems specifically tailored for urban environments. Eve Holding, Inc.'s operations are anchored in Melbourne, Florida.

2-Year Price History

$1.24-70.4%
$1.0$2.0$3.0$4.0$5.0$6.0$7.0Initial target $0.90 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
3.52.5–4.5
Setup
2.51.5–3.5
Fair value (USD)
0.900.20 – 3.00
Upside vs 1.29
-30%
DCF (10%)
0.700.00 – 3.00-46%
Base IRR
-10%-100% – 35%
Visibility
very widerange ±156%
Sentiment
2/10
Flow
3/10
2026-11-26 · claude-opus-5-5 · priced at 1.24

Eve is Embraer's majority-owned eVTOL developer: no revenue, a prototype still 8-10 flights short of full wing-borne transition (slipped from Q3 to year-end), six conforming prototypes to build in 2027, and certification/entry into service targeted for late 2028. It burns about $225M a year and guides the same for 2027, against $356M of cash, roughly $322M of debt (BNDES/EXIM/syndicated) and $470M of total liquidity including undrawn lines. That carries it into 2028, but not through first deliveries and the factory ramp, so a large raise before revenue is likely, probably Embraer-backed at depressed prices. The backlog is shrinking (2,700 to about 2,500 LOIs, $12.6B list) and is mostly non-binding; firm orders are only about 100 aircraft. At $1.24 (last close 2026-11-25, down 75% in a year, at the bottom of its 3-year range) the market cap is about $430M. Pre-dilution, that is roughly what a successful program might be worth discounted back. The DCF is dominated by an unknowable year-5 value and by the dilution needed to get there. Embraer engineering and parent backing put a floor under the program's survival but not under the share price. Rating 3.5: not cheap for the risk, but not a clean short either (Embraer backstop, 12-13 days to cover, squeeze risk after a 75% fall). It is a pass. Setup 2.5: there is no variant perception beyond 'science project that needs money', which the market already prices.

Flow: Dilution ahead: liquidity covers burn only into 2028, so a sizeable equity raise (likely Embraer-backed rights or PIPE, potentially 50-100% of the ~350M shares) is probable in 2027-2028. Short interest has risen to ~15M shares (~4% of shares, a larger share of the small non-Embraer float, 12.5 days to cover). The warrants expiring May 2027 are far out of the money and being delisted. No buybacks.

A deep dive would have to establish: Can Eve certify the Eve 100 by late 2028 and fund the ~$400-600M gap to first deliveries without diluting today's holders by half or more?

Owner earnings, TTM
-$225M-$260M – -$200M
Realistic peak profit
$200M$0M – $600M
Growth rate
40.0%0.0% – 100.0%
Years of growth
50 – 10
Market cap
$432M$400M – $470M
EV
$400M$360M – $450M
Net debt
-$34M-$60M – $20M
Capital return / cap
0.0%0.0% – 0.0%
P/E
-1.9×-2.4× – -1.6×
EV/EBITDA
-1.8×-2.2× – -1.5×
FCF yield
-52.0%-65.0% – -43.0%
Projected FCF, base case (USD millions)
Y1-$230M-$270M – -$190M
Y2-$220M-$300M – -$150M
Y3-$150M-$280M – -$50M
Y4-$60M-$220M – $50M
Y5$20M-$150M – $150M
Competition: Joby and Archer are better funded and further along with the FAA, while Lilium and Volocopter's failures show how unforgiving the race is; Eve's edge is Embraer's certification and production know-how and a Brazil launch market.
Governance: Embraer controls Eve, supplies most of its engineering under a related-party MSA (payables $62M), and would set the terms of any rescue financing.
Research (expand)

What it does. Eve develops the Eve 100, a 4-passenger, 1-pilot lift+cruise eVTOL for ~100 km urban shuttle routes. Around it sit TechCare (support/MRO) and Vector (urban air-traffic software, already used for helicopter ground ops by launch customer Revo). Engineering is done mostly by ~800-1,000 Embraer engineers under a master service agreement, and production will be in a modular Taubaté plant (120 to 480 aircraft a year).

What the market believes. eVTOL is a cash furnace with an uncertain payoff, and Eve will need more equity before it earns anything. The stock has fallen from ~$5 to $1.24 as milestones slipped (EIS moved to 2028, the transition flight slipped from Q3 to year-end) and the LOI book shrank (2,700 to ~2,500 aircraft).

What it earns today. Nothing. Owner earnings ≈ cash burn: about -$225M in 2026 (9M: -$173M), R&D ~$50M a quarter, SG&A ~$6M. Management guides 2027 burn flat while building six prototypes, helped by $100-150M of Embraer synergies ($50M captured in 2026). Interest is $5.5M a quarter and rising.

Balance sheet. Cash and investments $356M, total debt ~$322M, so net cash ~$34M; total liquidity $470M including ~$114M undrawn. Stockholders' equity is now negative (-$34.5M). Payables to Embraer are $62M. The ~350M shares (inferred from the vendor market cap) are mostly held by Embraer.

FCF projection (USD M), 2027-2031: -230, -220 (certification year, factory capex, PDPs partly offsetting), -150 (first deliveries), -60, +20. The money for 2028-2030 does not exist yet: roughly $400-600M must be raised, likely equity/rights from Embraer plus BNDES debt, at a price near today's. That could double the share count.

Year-5 company. We do not know. The bull case is ~150-250 deliveries a year at ~$4-5M plus recurring services, a profitable niche aerospace business by the early 2030s, worth $2-4B. The bear case is certification slips again, demand never converts from LOIs, and Embraer folds Eve back in at a low price. The middle case is a sub-scale program that keeps raising. DCF at 10%: PV of years 1-5 ≈ -$530M; a $1.5B year-5 value (PV ~$930M) plus $34M net cash gives ~$430M, about $1.23/share before dilution and ~$0.70 after the funding gap is filled with equity near current prices. That is a wide range, from 0 to ~$3.

Multiples. None are meaningful: EV ≈ $400M against -$225M burn, an FCF yield of about -55%.

Management, risks, competition. CEO Bordais is a former Embraer services executive. Management is promotional on the backlog ('leap of faith') but candid about slips. Competitors are Joby and Archer (better funded, ahead on FAA), Vertical, and Chinese EHang; Lilium and Volocopter have already failed. Eve's edges are Embraer's certification know-how, the Brazil launch market with Revo/FlyBIS, and a conservative design. The risks are certification timing, battery and noise performance, unit economics at a $5M list price, the LOI book being fluff, and dilution.

Sentiment: 2/10. The stock is down 75% in a year, short interest has climbed to ~15M shares (12.5 days to cover), the warrants are being delisted, and the sell side is cheerful but irrelevant.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue0.000.000.000.000.00
Gross profit0.000.00-0.060.000.00
Operating expenses225+13%225+44%156+20%131-31%189
▸Adj EBITDA-223-224-156-130-189
▸Adj OCF-226-222-148-116-76.8
CapEx-9.30-14.7-5.22-0.17-0.48
Adj FCF-235-237-153-116-77.2
Interest expense18.210.13.660.280.00
▸Adj net income-243-237-158-122-189
▸Owner's earnings-240--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA-683-144-212-134-123-71.2
FCF (OCF−capex)-641-170-175-141-94.7-59.9
Net income-825-161-224-138-128-174
▸Capital returned-293-124-36.2-107-25.20.00
Buybacks0.000.000.000.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid29.515.410.13.660.280.00
Debt paid down-322-140-46.3-111-25.50.00
▸Reinvestment23.63.0214.75.220.170.48
Capex (PP&E)23.63.0214.75.220.170.48
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)------------
Retained / other-318-30.1-129-30.4-69.2-59.9

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 18 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)409435318245313
▸Liabilities (total)44431119480.326.0
Net debt (incl. leases)-25.6-204-171-132-228
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-12.2-22.1-42.7-461--
Shares outstanding348348298269269
Dilution (YoY)+15.8%+17.0%+10.5%+0.1%--
Employees174200174180149
MarginsTTM2025202420232022
Gross margin----------
Adj EBITDA margin----------
Adj OCF margin----------
Adj FCF margin----------
Net income margin----------
Adj NI margin----------
ROIC (adj, after-tax)-55.1%-58.7%-48.3%-54.0%-52.2%
Cost of debt6.6%6.3%5.0%3.0%--

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-05

Eve Holding reported Q3 2026 results and described steady progress on its eVTOL development. After the engineering prototype's inaugural flight in December 2025 and a hover phase that ended in April, the aircraft was upgraded with software changes and reinforcements. Flights resumed in July with partial transition, with the pusher engaged while the lifters stayed powered. The prototype has flown 73 times and logged 3 hours 6 minutes, reaching 45 knots with the pusher at about 1,200 RPM. Full transition happens at about 100 knots, when the lifters can be powered down. Management said the aircraft is 8–10 flights from that point and plans the first full transition before year-end. Of 185 planned engineering test points, 170 (91%) are validated. Component rig testing continues, including lifter motors, inverters and battery thermal-runaway containment. The first parts for the first of six conforming prototypes, including fuselage sections and wing and pylon tooling, have arrived. Assembly starts early 2027, with the other five following about 30 days apart. The next piloted prototype flight is expected in the second half of 2027. Only 10–11 critical design reviews remain open. Commercially, Eve signed a binding agreement with Brazilian regional operator FlyBIS for 12 aircraft: 2 firm orders and 10 options, worth up to $60 million. Total preorder backlog is about 2,500 aircraft, or $12.6 billion at list price. About 1,100 of those aircraft carry service contracts, worth roughly $0.5 billion in first-year TechCare revenue. Management acknowledged a sequential backlog decline. It called this natural, because some early LOI holders may fail or change strategy, and it said the focus is now converting LOIs to firm orders. Some firm orders bring pre-delivery payments of up to about 40% of the aircraft value. Payments start at signing, with further payments 18, 12 and 6 months before delivery. Financially, Eve ended the quarter with $356 million in cash and $471 million in total liquidity, which includes $114 million of undrawn standby credit. Management believes this funds operations through 2028 without new funding. Q3 R&D was $48 million, SG&A was $6 million (down from $7 million), net loss was $58 million, and cash burn was $55 million. For the first nine months, net loss was $161 million and cash burn was $174 million. Synergies with Embraer target $100–150 million of savings, and about $50 million has been captured in 2026. Full-year cash burn is now pointing to the low end of the $225–275 million guidance. R&D should stay around $50 million a quarter, and 2027 burn should be similar to 2026 even with six prototypes being assembled. CapEx is light because most engineering and prototype costs flow through payments to Embraer. It should rise late next year as the production facility is prepared. That facility is modular, starting at 120 aircraft a year and scaling to about 500, and is financed by existing facilities. On certification, the detailed design standards are 99% closed and the noise certification basis was accepted by ANAC. Test proposals are being written for readiness by end-2027. The prototypes support envelope opening, handling, systems, propulsion, interiors and reliability flights. Management expects a TIA around mid-2028, with FAA validation by the end of 2028. Vector traffic management is already in use by Revo at the São Paulo F1 weekend. Management sees Brazil, the US, Asia-Pacific and later EASA as key markets.

Analyst Q&A (13)
▸
What is left to reach the first full transition flight by year-end, what gives confidence, and what comes after?
Andres Sheppard · Cantor Fitzgerald
Johann described the three-phase campaign (hover, upgrades, transition). The 91% of test points matches the year-end target, and the aircraft is 8–10 flights from full transition. After that, with CDRs and configuration finalized, Eve starts building the conforming prototypes. Marcelo said the uncrewed prototype campaign is nearly finished.
▸
What is the timeline and plan for the six ANAC conforming prototypes?
Andres Sheppard · Cantor Fitzgerald
Marcelo said the six prototypes are sized to reach certification in 2028, with the first starting at the end of 2027 (the transcript says 2007/2008, apparently a transcription error). Prototype 1 opens the envelope. Prototype 2 flies at least a month later for handling and performance. Prototype 3 covers systems, 4 propulsion, 5 interiors, electrical and IFR, and 6 functional and reliability flights.
▸
How is ANAC certification progressing, including means of compliance and test plans, and is it on target to finalize by year-end?
Savi Syth · Raymond James
Marcelo said certification plans are being closed this year. Detailed design standards are 99% closed, and the noise certification basis was accepted by ANAC after public consultation. Specific ground and flight test proposals will be written next year for readiness by end-2027, so flights can start in early 2028.
▸
Do pre-delivery payments (PDPs) come closer to certification, or will there be any in 2027?
Savi Syth · Raymond James
Eduardo said converting LOIs to firm orders brings down payments, and some aircraft get nearly 40% of value before delivery. More PDPs should flow into cash over time. Johann said customers want production slots and are committing as progress is shown, citing Revo, AirX and now FlyBIS.
▸
Do you have to start certification flights before receiving those funds?
Savi Syth · Raymond James
No. Payments start at signing, with additional payments 18, 12 and 6 months before delivery and the balance at delivery.
▸
Is about $50 million a quarter of R&D the new peak, or will there be a step-up in 2027 with six conforming aircraft?
Adam Samuelson · Jefferies
Eduardo said R&D should stay around $50 million a quarter, or about $200 million a year. Embraer synergies and SG&A control let Eve assemble six prototypes next year while keeping cash burn and total expenses about flat versus this year.
▸
How is the modular manufacturing ramp expected to scale in 2028, 2029 and beyond?
Adam Samuelson · Jefferies
Eduardo said the Brazilian facility is modular, starting at 120 aircraft a year and scaling to 240 and 480 (about 500). The first phase is funded by an already committed loan facility, so it adds no extra burn. Prototypes are assembled at Embraer, and more investment comes in late 2027 and early 2028.
▸
What help does Embraer provide today and what support can Eve expect later?
Amit Dayal · H.C. Wainwright
Johann said Embraer helps daily under an MSA, with about 1,000 engineers on program development. It also helps with industrialization (lean philosophy, a brownfield factory), the quality system, and aftermarket support, including logistics and MRO. Eve will be the customer-facing company, with Embraer supporting in the background.
▸
Why did the order backlog decline sequentially?
Andre Madrid · BTIG
Johann called it natural for early adopters, since some LOI holders may go bankrupt or change strategy. Eve is adding new customers such as FlyBIS and AirX, and the focus is on quality LOIs and conversion. Seeing real prototypes in 2027–28 should help. Eduardo said the exact backlog number matters less than growing the firm order backlog.
▸
What drives the low end of the cash burn range given light CapEx: synergies, CapEx, or both?
Andre Madrid · BTIG
Eduardo said most burn goes to development, with about 800 Embraer engineers plus production staff. Those costs and prototype expenses are paid to Embraer and run through operating cash flow, not CapEx. CapEx covers only tooling and machines. It should rise late next year as the final facility is prepared for late-2028 deliveries.
▸
Does full transition by year-end set up closing CDR in early 2027, and when will ANAC or the FAA step in on the final prototype?
Austin Moeller · Canaccord
Johann said full transition and CDR closure are both targeted for year-end, with only 10–11 CDRs left. Authorities are already engaged. Marcelo said they will take part after mid-2027, once the envelope is open and with local system certification first. He expects a TIA around mid-2028 and FAA validation by end-2028.
▸
Which countries or cities will launch the Vector air traffic management system first?
Austin Moeller · Canaccord
Johann said Vector is already live. Revo used its first module (ground and helipad management) at the Brazilian Grand Prix last year and again this weekend. Fleet and air traffic management modules will follow over about five years as part of TechCare. Eduardo noted Revo expects about 300 flights over the São Paulo F1 weekend.
▸
Why is Brazil a strong opportunity, and where are the strongest global opportunities?
Pat McCann · D. Boral Capital
Johann cited government support, São Paulo's large helicopter fleet and helipad base, traffic congestion, Brazil's aerospace DNA, and operators like Revo and FlyBIS. He also named the US (Florida and SunTrax), EASA (later), and Asia-Pacific (about 20% of eVTOL growth, with AirX in Japan and Australia) as key markets.

SEC Filing Findings

SEC Filing — material findings

2026-11-05 · depth 9/10

Nothing material flagged — a clean filing.

Options

Chain Snapshot (daily)

Call IV (ATM)--
Put IV (ATM)--
ATM Spread--
Call $OI (near money)$5K
Put $OI (near money)$0
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$1.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$0.50$0.75/$1.600--/$0.500
$1.00$0.20/$1.100--/$0.500
$1.50--/$0.750--/$0.650
$2.00--/$0.550$0.05/$1.050
$2.50--/$0.500$0.45/$1.450
$5.00--/$0.500$2.90/$3.900
$7.50--/$0.500$5.40/$6.400
Snapshot: 2026-11-04

Short Interest

Short % of Float27.8%
Short Shares15.0M
Days to Cover12.5
Change (vs Prior)-1.7%

Cash Runway

20.6months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$17.7M$3.87+$1.4M+$9.8M—$6.70T
VANGUARD CAPITAL MANAGEMENT LLCPassive$11.3M$2.48+$634K+$11.3M—$4.68T
BW Gestao de Investimentos Ltda.$9.3M$3.87+$0+$9.3M—$4.15B
Fourth Sail Capital LP$8.2M$2.51+$8.2M+$8.2M—$660M
United Airlines Holdings, Inc.$6.7M$3.99+$0+$6.7M—$385M
GEODE CAPITAL MANAGEMENT, LLCPassive$6.4M$4.77+$642K+$3.5M—$1.87T
UBS Group AG$5.9M$3.24+$1.2M+$5.4M—$627.66B
STATE STREET CORPPassive$5.7M$4.71+$570K+$3.0M—$3.38T
AQR CAPITAL MANAGEMENT LLC$5.3M$2.62+$3.5M+$5.1M—$286.62B
MASTERS CAPITAL MANAGEMENT LLC$5.0M$3.80+$0+$0—$711M
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

04.4M8.8M13.2M17.6M$2.48$4.48$6.48$8.48$102022-062023-032023-122024-092025-062026-032026-06
hover the chart for per-quarter detailprice (right axis)
BW Gestao de Investimentos Ltda.3.7MMASTERS CAPITAL MANAGEMENT LLC2.0MSPX Gestao de Recursos Ltda415KUnited Airlines Holdings, Inc.2.7MCOOPER CREEK PARTNERS MANAGEMENT LLC—Fourth Sail Capital LP3.3MUBS Group AG2.4MIlex Capital Partners (UK) LLP—AQR CAPITAL MANAGEMENT LLC2.1MKapitalo Investimentos Ltda1.1M

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (3 analysts)$5.70+359.7%
Current Price$1.24
Analyst Ratings
4
Buy: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2022 Q40M-35M-35M$-0.10$-0.10 – $-0.101
2023 Q40M-60M-60M$-0.17$-0.17 – $-0.172
2024 Q11M-45M-46M$-0.13$-0.15 – $-0.112
2024 Q21M-46M-47M$-0.13$-0.13 – $-0.122
2024 Q32M-48M-49M$-0.14$-0.15 – $-0.134
2024 Q41M-54M-56M$-0.16$-0.22 – $-0.122
2025 Q32M-54M-57M$-0.16$-0.16 – $-0.161
2025 Q42M-52M-55M$-0.16$-0.17 – $-0.132
2026 Q20M—-65M$-0.18$-0.19 – $-0.161
2026 Q30M-57M-63M$-0.18$-0.18 – $-0.172
2026 Q40M-60M-65M$-0.19$-0.23 – $-0.142
2027 Q15M-60M-66M$-0.19$-0.19 – $-0.191
2027 Q27M-60M-66M$-0.19$-0.19 – $-0.191
2027 Q314M-66M-72M$-0.20$-0.20 – $-0.201
2027 Q422M-77M-82M$-0.23$-0.23 – $-0.231
2028 Q16M-53M-58M$-0.17$-0.17 – $-0.171
2028 Q26M-53M-59M$-0.17$-0.17 – $-0.171
2028 Q36M-52M-58M$-0.16$-0.16 – $-0.161
2028 Q46M-52M-57M$-0.16$-0.16 – $-0.161
2029 Q142M-19M-25M$-0.07$-0.07 – $-0.071
2029 Q244M-19M-25M$-0.07$-0.07 – $-0.071
2029 Q344M-19M-25M$-0.07$-0.07 – $-0.071
2029 Q445M-19M-25M$-0.07$-0.07 – $-0.071
2030 Q1111M-6M-11M$-0.03$-0.03 – $-0.031
2030 Q2115M-2M-8M$-0.02$-0.02 – $-0.021
2030 Q3115M-2M-8M$-0.02$-0.02 – $-0.021
2030 Q4120M1M-4M$-0.01$-0.01 – $-0.011
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand

Thesis

Eve has a potentially valuable aircraft platform and an unusually large stated backlog, but it remains a pre-revenue, pre-certification aerospace program. The engineering prototype has produced encouraging flight-test data and Embraer provides meaningful technical and industrial support. However, the 2028 entry-into-service delay extends the period before revenue, while the latest financial data show severe cash consumption, rising debt and substantial dilution. Most of the backlog remains soft LOIs rather than deposit-backed firm orders, so it cannot be valued like contracted aerospace revenue. The current owner-earnings position is deeply negative and is likely to remain so through the certification campaign. The investment case depends on successful transition testing, conforming prototypes, regulatory approval and access to additional capital without excessive dilution. I assign the largest probability to a technically viable but slower, capital-intensive commercialization, with a substantial bear probability because a single major certification, funding or schedule failure could destroy common-equity value.

Trade Signal

Trade rating
-5.8/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-04 · saw $2.86-54.9% since

Short, with caution around the Q3 flight-test squeeze: the stock still values a speculative pre-revenue program above the analyst's already-discounted fair value despite a 2028 launch, severe cash burn, soft backlog, and substantial dilution risk.

Temporary mispricing+1.0

EVEX has fallen from $2.85 before the May 5 earnings release to roughly $2.40-$2.86 in the latest data, with the broader six-month decline reaching 37% and the one-year decline 62%. The specific recent negative leg was the announcement that certification and entry into service moved from 2027 to 2028, extending cash burn and financing risk. The positive counter-event was successful hover and low-speed testing in late May, but it did not reverse the repricing. The decline was not a panic overreaction: it largely reflects a durable increase in time-to-revenue and dilution risk, though the market may still be underestimating the downside if backlog conversion remains weak. The price has therefore undershot the technical progress but not the economic consequences of the delay.

Market view-2.0

The stock is disliked by short sellers but not fully abandoned by the sell side: all four analyst ratings are Buy and the average one-year target is $6.53, implying a highly optimistic long-term narrative. The bear case focuses on certification risk, cash burn, dilution, and the poor quality of the mostly non-binding backlog. The recent 64% drawdown from the 52-week high and 18.2% short interest show that the market has become more skeptical, but the remaining analyst optimism and speculative retail participation suggest the stock is mixed rather than hated. Positioning is vulnerable to a sharp squeeze on successful transition testing, although the prevailing valuation still appears too optimistic relative to near-term fundamentals.

Inflectionwindow ~2mo-1.5

The Q3 2026 transition test is a genuine technical inflection, and successful wing-borne flight could improve confidence in the platform. However, the larger commercial inflection has been pushed from 2027 to 2028, while consensus still expects negligible revenue through 2027 and continuing losses. The favorable prototype data are partly offset by the certification delay, and the analyst's $75M-$200M terminal owner-earnings assumptions remain highly uncertain. The market already expects a successful development story to some extent, as reflected in the analyst consensus Buy rating and elevated long-term targets, so the near-term upside surprise is limited.

Catalysts
  • ▲2026-08 · Q2 2026 earnings / liquidity update — Investors will look for cash burn, financing availability, and whether the 2028 certification plan remains adequately funded.
  • ▲2026-Q3 · Transition flight testing begins — Moving beyond hover into wing-borne flight above 85 knots is the key near-term technical milestone; success could support the platform, while delays or failures would be sharply negative.
  • ▼Late 2026 to 2027 · Further conforming-aircraft development and certification updates — The 2028 entry-into-service target requires assembly of the conforming vehicle and a lengthy flight-test campaign; any slippage would extend cash burn and financing risk.
  • ▲H2 2026 · Backlog conversion and customer deposits — Additional binding orders and meaningful pre-delivery payments would validate the $13.5B headline backlog, most of which remains soft LOIs.
  • ▼Next 6-12 months · Financing, guarantee, or capital-raise update — BNDES access is conditioned on third-party guarantees, and ongoing losses make further debt or equity financing—and dilution—likely before commercial revenue.
  • ▲H2 2026 to 2027 · Embraer synergy implementation update — Evidence of the targeted $100M-$150M three-year savings program could reduce burn and improve the eventual economics, though benefits are not yet proven.
Flow-5.5

Net flow is negative. TTM dilution is approximately 17%, losses and development spending require ongoing financing, and there is no active buyback. Short interest is elevated at 18.2% of float with 9.8 days to cover, providing some squeeze potential around successful flight-test news, but it is more a volatility factor than durable demand. No meaningful insider or institutional accumulation is evident.

Floor / Ceiling-2.5

There is no hard equity floor at the current price. The $578M liquidity balance and Embraer/BNDES support provide runway, but the company is burning roughly $200M-$250M annually, carries meaningful debt, and may need additional capital before revenue. In a downside case, debt, financing claims, and dilution can consume most or all common equity. There is also no clear ceiling in the mechanical sense, but a rally would likely attract financing and dilution overhang rather than a committed acquirer.

Buyability

Low for fundamental buyers: Eve has credible Embraer backing, encouraging prototype data, and a large stated backlog, but it remains pre-revenue, pre-certification, cash-burning, and exposed to substantial dilution. The next buyer is likely a speculative eVTOL investor or momentum trader, not a conventional aerospace investor seeking contracted revenue and cash flow.

Fear vs Greedfear 8/10 (+3.0)greed 7/10 (-2.0)

Fear pulls stronger than greed. The technology may work and Embraer materially improves the industrial credibility, but the stock price still capitalizes a valuable future platform while the company has no meaningful revenue, negative owner earnings, soft backlog, a delayed 2028 launch, and a high probability of interim dilution.

Valuation

Our Target
$650M+50%
Market Should Pay
$455M+5%
target ×0.7 (fear discount)
Current Market Cap
$432MSlightly bearish
What Changed
financials release · 2026-08-04
-18%fair value on this information

The quarter confirms that Eve remains pre-revenue despite continued development progress and shows the financial consequence of extending the certification and entry-into-service schedule to 2028: another period of approximately $50M quarterly cash burn, materially lower cash, and substantially higher debt. The market already knew about the 2028 timing change and the general certification risk; the genuinely incremental information is the continued pace of cash consumption and the weakened balance-sheet cushion while the company is still several years from commercial revenue.

▸ How the cases moved

Before the quarter, I would have assigned approximately bear/base/bull probabilities of 0.28/0.55/0.17. The quarter increases bear probability to 0.35 because cash fell sharply relative to the prior reported liquidity position, net debt rose to approximately $257M, losses and adjusted FCF remained near -$240M annually, and revenue remained zero. The base terminal value falls from roughly $1,000M to $900M as funding and dilution risk increase. The bull value falls from roughly $3,300M to $3,000M: successful testing remains possible, but the company has less financial flexibility. The base probability falls to 0.50 and bull to 0.15.

2-Year Plausible Outcomes
bear35%
$0M
rev 0%/yrOE $-250M

Certification and production slip beyond 2028, soft LOIs fail to convert, and the company must raise substantial capital while still burning more than $200M annually. Debt, dilution and funding constraints consume the residual equity, leading to restructuring or an effectively wiped-out common stock.

▸ Valuation

0x $0M owner earnings = $0M equity value; ongoing cash burn and financing needs leave $0M for common equity

base50%
$900M
rev +100%/yrOE $75M

The transition-flight program works, certification progresses toward 2028, and a modest portion of the backlog becomes firm and deposit-backed. Eve begins early commercial deliveries but remains in a capital-intensive ramp, with Embraer synergies helping the company reach positive owner earnings of approximately $75M by the terminal year.

▸ Valuation

12x $75M owner earnings = $900M equity value

bull15%
$3.0B
rev +200%/yrOE $200M

Transition and conforming-prototype testing are successful, certification remains achievable in 2028, and Eve converts a meaningful share of its large backlog into firm orders and deposits. Embraer's industrial support, cost synergies and early production scale allow owner earnings to reach roughly $200M, supporting a premium growth-company multiple.

▸ Valuation

15x $200M owner earnings = $3,000M equity value

▸ Target Rationale

The probability-weighted terminal values are ($0M x 35%) + ($900M x 50%) + ($3,000M x 15%) = $900M; discounted two years at 12% gives $720M. I set the analytical target below that model result at $650M because the scenario math understates likely interim dilution, the need to refinance or raise capital before meaningful revenue, the weak quality of the largely non-binding backlog, and the possibility that debt and financing claims absorb more of the eventual enterprise value than assumed.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now2/10
Trajectory6/10
Risk9/10
Governance6/10
Insolvency prob (2yr)25%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Milestone Flight Testing & Envelope Expansion: In late May 2026, Eve Air Mobility successfully completed the hover and low-speed flight test block for its full-scale engineering prototype in Brazil. Accumulating over two and a half hours across 59 flights, the campaign generated high-fidelity data validating its control laws, aerodynamics, and propulsion models, while also testing its "simplified fly-by-wire" secondary control mode.
  • Type Certification Postponement: During its May 5, 2026 investor call, Eve announced that it has pushed back its timeline for type certification and entry into service from 2027 to 2028. Management attributed this to the gradual, step-by-step nature of testing required by regulatory authorities.
  • New Financing & Capital Infusion: In January 2026, Eve secured a new $150 million financing package to accelerate its eVTOL development. This follows a December 2025 BNDES (Brazilian Development Bank) loan of R$200 million (~$40 million) focused on electric propulsion integration. Additionally, in early 2026, Eve obtained a $15 million loan from the Export-Import Bank of the United States (EXIM) and the Private Export Funding Corporation specifically for battery procurement.
  • Transitioning to Firm Agreements: In early 2026, Eve secured its first major binding/firm commitments. This includes a firm order with Tokyo-based AirX for up to 50 eVTOLs (consisting of 2 firm deliveries and 48 options) and a commitment for up to 50 eVTOLs plus maintenance services from São Paulo operator Revo.

---

▸ Thesis-test Findings
1. Eve Air Mobility transition flight test Q3 2026

In its May 5, 2026 investor call, Eve’s leadership confirmed they are targeting the third quarter of 2026 to initiate transition flight testing of its full-scale engineering prototype. This phase is arguably the most critical engineering milestone, moving the aircraft from vertical thrust to horizontal, wing-borne flight at speeds exceeding 85 knots.

  • *Bull/Bear Impact:* Mixed. Successfully wrapping up hover testing in May 2026 validates Eve's step-by-step engineering maturity, keeping the Q3 2026 transition test schedule intact (Bull). However, the concurrent announcement delaying commercial type certification to 2028 prolongs Eve's cash-burn window before generating meaningful revenue (Bear).
2. BNDES loan guarantee renewals Eve Holding Embraer

Specific news on loan guarantee "renewals" was not reported in the first half of 2026. However, BNDES remains Eve's most vital debt-funding pillar, with cumulative approved credit lines totaling R$1.2 billion (~$240 million). SEC filings from late 2025 clarify that the disbursement of these BNDES credit lines remains strictly contingent upon Eve’s Brazilian subsidiary providing guarantee letters from approved, third-party financial institutions (such as previous green ESG guarantee operations structured through Banco Bradesco).

  • *Bull/Bear Impact:* Neutral-to-Bearish. While the continuous support from BNDES offers robust liquidity backstops (Bull), the access to this capital is tightly gated by bank guarantee requirements (Bear). Any future friction in renewing these bank guarantees could lock up vital development capital.
3. eVTOL LOI to firm contract conversion rates 2026

There is no standardized industry-wide conversion rate reported for 2026, as the broader eVTOL market remains pre-commercial. However, industry reports indicate that globally, less than 1% of total eVTOL order commitments have actual cash deposits or prepayments, meaning the vast majority of backlogs are soft LOIs. Recognizing this risk, Eve's CEO stated in March and May 2026 that the company has paused seeking new LOIs to focus purely on converting its existing 2,700–2,900 aircraft backlog into firm, deposit-backed orders.

  • *Bull/Bear Impact:* Bearish with early Bull progress. The industry-wide lack of firm deposits underscores how fragile backlogs are (Bear). However, Eve’s early 2026 firm order signings with AirX and Revo show it is actively executing its conversion strategy to collect pre-delivery payments (PDPs) as certification draws closer (Bull).