EXK
Endeavour Silver Corp.v3 4.8/10 · 2026-11-03Endeavour Silver Corp., headquartered in Vancouver, Canada, is a mining enterprise specializing in precious metals. The company is involved in the entire lifecycle of mineral properties, from acquisition and exploration to development, extraction, processing, refining, and reclamation, operating in both Mexico and Chile. While its primary focus is silver, Endeavour also actively seeks gold and other valuable metal deposits. Currently, the company manages two productive silver-gold mines in Mexico: the Guanaceví mine situated in Durango and the Bolañitos mine located in Guanajuato. In addition to these operating assets, Endeavour is progressing two significant exploration and development projects within Mexico: the Terronera property in Jalisco and the Parral properties in Chihuahua. Further expanding its portfolio, the company holds interests in three distinct exploration ventures in northern Chile: the Aida silver project, the Paloma gold project, and the Cerro Marquez project, which explores for copper, molybdenum, and gold. Originally incorporated in 1981, the company underwent a name change from Endeavour Gold Corp. to Endeavour Silver Corp. in September 2004, aligning its identity with its core silver mining activities.
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
Endeavour Silver (NYSE: EXK, $7.03 at the 3 Nov 2026 close, a new 52-week low, down 50% from February's $14) is a mid-tier Mexico/Peru silver-gold miner: Guanaceví (old, grades falling, about 2 years of reserves, kept alive with purchased ore), Kolpa in Peru (bought in 2025, expanded to 2,500 tpd) and Terronera (new, still ramping, with higher grades arriving now and the La Luz gold zone in 2027). The next big step is Pitarrilla, one of the world's largest undeveloped silver deposits: about $500-600M to build, a construction decision targeted for early 2027 and first production around 2030. Its feasibility study, due at the end of Q3, has still not been published. Silver has fallen from over $90 in February to about $50 (down 19% in a month, with the market pricing a December Fed hike) and gold to about $3,925. The company also had a weak Q3: a 12-day blockade at Terronera, a mill failure at Guanaceví, production at or below the bottom of guidance, $18M of extra Kolpa capex, the VP of Operations leaving, and downgrades from CIBC and Citi. At spot prices the business makes about $250-280M of EBITDA but only about $110-120M of unlevered owner earnings, because Mexican and Peruvian taxes, royalties, mining duties and roughly $90M a year of sustaining capex take most of it. That means EV of about $2.16B is about 8x spot EBITDA and about 18-20x owner earnings, not the 5x trailing that the $70-silver first half implies. A DCF at a flat $50 silver price, paying for Pitarrilla out of cash flow, gives about $6.10 a share, with year-5 FCF of about $290M valued at 10x. Every $10/oz of silver moves that by about ±$3.5-4. The stock is fairly priced for spot silver. It is a geared call on the metal, not a mispriced business. Sentiment is poor (3/10) but this is not capitulation: silver at $50 is still nearly double its 2024 level, and the sell-side's $14-15.50 targets rest on much higher price decks and will probably be cut after the 9 Nov Q3 results and guidance reset. Rating 4.8/10: no margin of safety against the metal price, Mexican permitting and security risk, a long record of share dilution, and no capital return until about 2030. Research 6/10: if silver stabilizes at $55-60 and the Pitarrilla feasibility study comes in strong (or a major bids for Pitarrilla), a 40-50% re-rate is realistic, and the 9 Nov results plus the feasibility study will settle most of the open questions.
A deep dive would have to establish: Whether the delayed Pitarrilla feasibility study shows a buildable, permit-ready (TSF) project at about $550M capex that still earns well above 10% at $45-50 silver without large equity dilution, and what sustainable 2027 AISC looks like after the 9 Nov guidance reset.
Research (expand)
What the company does
Endeavour Silver is a Vancouver-based silver-gold miner. It reports in USD and is listed on NYSE (EXK) and TSX (EDR). It now runs three mines after selling Bolañitos in January 2026:
- Terronera (Jalisco, Mexico): a new 2,000 tpd underground mine that declared commercial production in October 2025. It ran on diesel until the LNG plant was commissioned in June-August 2026, which should roughly halve power cost. Management deliberately mined lower-grade stockwork first. Silver grade rose from 126 g/t in Q2 to 152 g/t in Q3, with recoveries at 91% by September. The high-grade La Luz gold zone (about 4 g/t Au in the feasibility study) has been pushed to 2027. Q2 AISC was $26.42/oz.
- Guanaceví (Durango, Mexico): the legacy cash cow, now in decline. Reserves cover about 2 years. Silver grades fell 24% year on year in Q3. Purchased third-party ore is about 25% of direct cost, there is a 16% NSR to the Frisco group, and Q2 AISC was $52/oz. Mine life is being stretched by mining lower grades and buying ore.
- Kolpa (Huancavelica, Peru): a polymetallic mine (Ag-Pb-Zn-Cu) bought in May 2025 and expanded to 2,500 tpd at the end of Q1 2026. Management says it can run 15-25 years, but it needs catch-up capex: dry-stack tailings, substations, water treatment and a camp, which added $18M to 2026 capex, of which $5M was overrun.
- Pitarrilla (Durango): one of the world's largest undeveloped silver deposits, with about 430Moz Ag indicated plus lead and zinc. The plan is a 3,500-4,000 tpd underground mine costing about $500-600M (management's own estimate). The feasibility study was promised for 'end of Q3 2026' and has not appeared. The gating item is permitting the dry-stack tailings facility (TSF) in Mexico. The goal is '30 by 30' (30Moz AgEq by 2030).
2026 guidance was 14.6-15.6Moz AgEq (8.3-8.9Moz Ag, 46-48koz Au), AISC $27-28 at a $36-38 silver assumption, and $158M capex, since raised to $181M. Year to date (9 months) the company produced about 10.4Moz AgEq. Full-year output will be 'at or slightly below the low end'. Revised guidance and Q3 financials come on 9 November 2026.
The investment case (and the problem)
The bull case is simple. Production capacity has roughly doubled in two years (Kolpa plus Terronera). Terronera's grades are finally rising. Pitarrilla could roughly double the company again around 2030. The balance sheet is fine: about $300M+ of cash after the VAT refund against $350M of 0.25% converts due 2031, convertible at $12.455. At $70 silver (the Q2 average) the company was running at about $360M of annualised adjusted EBITDA, which made the stock look like 5-6x EBITDA.
The problem is that the metal deck has moved. Silver is about $50 (tradingeconomics, 3-4 Nov 2026; down 19% in a month and down from over $90 in February). Gold is about $3,925, down from $5,000+ early in the year. The market is pricing a December rate hike. EXK is a high-cost, high-tax, high-royalty producer: consolidated AISC was $37/oz in Q2. Some of that cost falls with the silver price, because royalties, purchased ore, profit sharing and mining duties are linked to it (about -$13M a quarter of cost for -$20/oz silver, using management's per-tonne sensitivities). Even so, the margin at $50 is thin.
What it earns today (real owner earnings)
Q2 2026 actuals at $70.16 silver and $4,305 gold: revenue $212.1M, cash cost of sales about $112M, G&A $2.9M (helped by a DSU gain), exploration $6.4M, adjusted EBITDA $90.0M. Operating cash flow before working capital was only $44.9M. The rest went to cash taxes ($44.5M of current tax in H1 alone, including Mexico's 8.5% special mining duty) and to settling the legacy gold forward swaps. About 45koz remained at March 31 at $2,311/oz through June 2027, with a liability of $63.4M at June 30. Sustaining capex ran at $18.9M a quarter, against $91M guided for the year.
Re-pricing Q2 to spot ($50 Ag, $3,925 Au, base metals flat): revenue about $166M, direct costs about $99M after price-linked relief, EBITDA about $56M a quarter, or about $225M a year at 2026 volumes and about $270-280M on 2027 volumes. That rises with Terronera grades and La Luz gold, partly offset by Guanaceví's decline. Unlevered owner earnings for 2027 at spot:
- EBITDA about $275M
- less cash taxes about $65-70M (30% income tax plus 8.5% special mining duty plus 1% extraordinary duty in Mexico; Peruvian income tax and royalty)
- less sustaining capex and mine-life exploration about $90M
- equals about $115-120M. SBC is small, about $3-5M, and already inside G&A.
Only about 40-45% of EBITDA reaches owners. The gold-hedge drag (about $45M left, ending June 2027) is treated as debt, not as a running cost.
Balance sheet and EV
Shares are about 296.1M (stockanalysis; Q2 weighted basic 296.1M), giving a market cap of about $2.085B at $7.03. Cash at June 30 was $236.6M, plus about $70M of VAT refund due in Q3, plus Q3 cash flow, less Pitarrilla, capex and hedge settlements. I estimate year-end cash at about $290-315M. Against that:
- $350M of 0.25% converts due 2031, convertible at $12.455. That would be 28M shares if converted, but they are well out of the money at $7.
- about $10M of equipment loans
- about $45M of remaining gold-swap liability
Net debt is about $75M (range $20-150M). EV is about $2.16B: about 7.8x 2027 spot EBITDA, about 18-19x unlevered owner earnings, and an owner-earnings yield on market cap of about 5.5% (interest is negligible at a 0.25% coupon). On trailing H1 2026 numbers (about $397M annualised adjusted EBITDA at $77 silver) it looks like 5.4x. That is the optical cheapness that is now gone.
Five-year free cash flow (base deck: $50 Ag, $3,900 Au flat; unlevered, after tax, SBC, sustaining and growth capex including Pitarrilla)
| Year | Core mines owner earnings | Growth capex (Pitarrilla, Kolpa) | FCF |
|---|---|---|---|
| 2027 | ~$120M | ~$130M | ~-$10M |
| 2028 | ~$125M | ~$250M | ~-$125M |
| 2029 | ~$120M | ~$200M | ~-$80M |
| 2030 | ~$115M + ~$40M Pitarrilla start-up | ~$50M | ~+$105M |
| 2031 | ~$110M + ~$180M Pitarrilla | - | ~+$290M |
Assumptions behind this table:
- Pitarrilla at steady state: about 12Moz AgEq a year, about $510M of revenue at $50, about $280M of EBITDA and about $175-180M of after-tax FCF.
- Core mines: Guanaceví keeps going on purchased ore and exploration success, but is a fading contributor.
- Funding: the 2027-29 build pushes peak net debt to about $250-300M. That is fundable with a project loan or stream, but equity dilution is a real risk given history: the share count went from about 190M to 296M in four years through ATMs and the Kolpa deal.
What the company looks like in 5 years
If Pitarrilla gets permitted and built, by 2031 this is a roughly 25-30Moz AgEq senior silver producer. It would have one long-life cornerstone asset (Pitarrilla, 15+ years), Kolpa (15-25 years claimed) and Terronera, with Guanaceví probably closed or marginal. That is a growing income stream with a real company downstream, not a corpse. Mining FCF is still a depleting, price-taker stream, so I value year-5 FCF at 10x (range 8-12x).
I have low confidence in the projection because of three things:
- the silver price (every $10/oz is about ±$65M of core FCF and about ±$80M of Pitarrilla FCF a year)
- Mexican TSF permitting and timing
- capex overruns (Terronera itself ran far over its original budget)
Fair value
- DCF at 10%: PV of 2027-31 FCF about $80M, plus PV of 2031 terminal value (290 × 10 = $2.9B, discounted to about $1.80B), gives EV of about $1.88B. Less about $75M of net debt, that is equity of about $1.81B, or about $6.10/share.
- Sensitivity: about $10/share at $60 silver and $4,200 gold; about $3.50-4 at $40 silver, where Pitarrilla probably gets deferred; about $12-13 at the Q2 deck of $70.
- Base IRR: year-5 equity of about $3.0B (about $10/share, with net cash by then) against $7.03 today is about 7-8% a year. That is below the 10% hurdle.
- Fair value about $6.80. I give a little credit above the DCF for the take-out optionality: Pitarrilla is a scarce, large silver asset that the majors (Pan American, First Majestic, Fresnillo, Hecla) would look at. There is also cheap 0.25% convert funding.
This is not a <7x-EV/EBITDA buyout case on owner economics, and it is not a covered-call floor setup. ATM IV is about 65%, but earnings are not predictable and the stock is not at a valuation floor. It moves with the metal.
Management, governance, competition
CEO Dan Dickson (former CFO) and CFO Elizabeth Senez are straightforward on calls and candid about overruns. There is no fraud or governance red flag. The weaknesses are a long record of funding growth with equity (ATM programs and the Kolpa share deal), repeated schedule slips (Terronera, the LNG permit, the Pitarrilla feasibility study now late), and the departure of the VP of Operations in Q3. Management says plainly that there will be no dividends or buybacks until Pitarrilla is built (about 2030): all cash is 'earmarked for Pitarrilla'.
Competition is irrelevant in the usual sense, because the company is a price-taker. What matters is position on the cost curve, and EXK is high-cost (AISC $37 against peers such as Pan American, Fresnillo and First Majestic in the $20s-30s). That makes it among the most levered to silver in both directions.
Risks:
- Mexican security and community blockades (Terronera in Feb and Aug 2026)
- slow Mexican permitting
- a stronger peso inflating costs
- Guanaceví's 2-year reserve life
- Peruvian informal mining pulling away labour
- the gold hedge through June 2027
- equity dilution to fund Pitarrilla
Sentiment: 3/10 (disliked and falling, not yet capitulation)
- Price action: the stock is at a fresh 52-week low ($7.03, the bottom of a $7.03-14.12 one-year range), down 50% from February and down 18% over the past month.
- Ratings and the macro: CIBC cut to Hold (22 Sep) and Citi to Market Perform (9 Oct). Silver is breaking down on rate-hike fears.
- Short interest: about 22M shares (about 7% of shares), 2.6 days to cover.
- Targets: the sell-side has not capitulated. The MarketBeat consensus is Moderate Buy with a $14 target (range $11-17); HCW is at $17 and B. Riley at $14. Stockanalysis shows 7 analysts averaging $15.50. Those targets sit on $60-80 silver decks and will probably be cut after the 9 Nov guidance reset. That second leg of capitulation (target cuts, a guidance miss, a possible weak or late Pitarrilla feasibility study) may still be ahead.
- The metal: silver at $50 is still historically rich (about $30 in 2024), so this is not 'blood on the ground' for the metal.
A better entry probably comes after the guidance reset, or if the Pitarrilla feasibility study disappoints, when the stock trades closer to $5-5.50 with silver holding $45-50.
- /Users/gregwo/stocks2/data/analysisv3/context/EXK.md (context pack incl. Q2 2026 call transcript)
- https://edrsilver.com/site/assets/files/15051/2026-07-29-edr-nr.pdf
- https://www.sec.gov/Archives/edgar/data/0001277866/000117184326005027/exh_991.htm
- https://www.sec.gov/Archives/edgar/data/0001277866/000117184326006526/exh_991.htm
- https://www.panabee.com/news/endeavour-silver-earnings-q3-2026
- https://thedeepdive.ca/endeavour-silver-produces-3-6-million-silver-equivalent-ounces-in-q3-as-blockade-and-mill-repair-weigh-on-throughput/
- https://edrsilver.com/news-media/news/endeavour-silver-announces-removal-of-blockade-at-15421/
- https://edrsilver.com/news-media/news/endeavour-silver-provides-2026-guidance-13331/
- https://rallies.ai/news/endeavour-silver-forecasts-8389-moz-silver-output-and-2728oz-aisc-for-2026
- https://www.barchart.com/story/news/36458371/endeavour-silver-completes-us350-million-offering-of-convertible-senior-notes
- https://www.sec.gov/Archives/edgar/data/0001277866/000106299326002368/exhibit99-1.htm
- https://tradingeconomics.com/commodity/silver
- https://tradingeconomics.com/commodity/gold
- https://stockanalysis.com/stocks/EXK/
- https://www.marketbeat.com/stocks/NYSE/EXK/forecast
- https://mexicobusiness.news/mining/news/endeavour-silver-reports-600moz-silver-resources-la-pitarrilla
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 783+137% | 462+112% | 218+6% | 205-2% | 210 |
| Gross profit | 274+790% | 62.2+48% | 42.1+15% | 36.6-29% | 51.5 |
| Operating expenses | 27.3-25% | 32.3-4% | 33.7+21% | 27.9-1% | 28.1 |
| ▸Adj EBITDA | 345+607% | 105+165% | 39.5+5% | 37.5-24% | 49.6 |
| ▸Adj OCF | 112+329% | 25.8+19% | 21.7-25% | 29.1-36% | 45.7 |
| CapEx | -133 | -170 | -195 | -118 | -110 |
| Adj FCF | -20.5 | -144 | -174 | -88.7 | -64.1 |
| Interest expense | 28.5 | 14.0 | 0.89 | 1.26 | 0.94 |
| ▸Adj net income | 173 | 1.74 | -2.47 | -4.69-224% | 3.77 |
| ▸Owner's earnings | 25.0 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 378100% | 284100% | -16.2 | 10.0100% | 47.9100% | 52.0100% |
| FCF (OCF−capex) | -398-105% | 44.416% | -107 | -175 | -106-221% | -54.9-105% |
| Net income | 18.05% | 15655% | -119 | -31.5-314% | 6.1213% | 6.2012% |
| ▸Capital returned | -560-148% | 23.58% | -254 | -237 | -54.8-114% | -37.9-73% |
| Buybacks | -301 | -1.40 | -71.0 | -122 | -61.7 | -44.1 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 33.8 | 16.8 | 14.0 | 0.89 | 1.26 | 0.94 |
| Debt paid down | -294 | 8.13 | -197 | -116 | 5.63 | 5.27 |
| ▸Reinvestment | 970257% | 71.625% | 475 | 195 | 118246% | 110211% |
| Capex (PP&E) | 686 | 93.6 | 170 | 195 | 118 | 110 |
| Intangibles & M&A | 40.9 | -31.1 | 72.0 | -0.02 | 0.00 | 0.00 |
| Leases signed (net Δ) | 243 | 9.13 | 234 | -- | -0.06 | 0.07 |
| Retained / other | 12132% | 52.118% | 75.0 | 62.3622% | -51.2-107% | -17.0-33% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 15 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 1289 | 1233 | 719 | 475 | 399 |
| ▸Liabilities (total) | 549 | 655 | 235 | 88.5 | 83.5 |
| Net debt (incl. leases) | -43.4 | 27.4 | 12.7 | -30.9 | -76.5 |
| Net debt / Adj EBITDA | -0.13 | 0.26 | 0.32 | -0.82 | -1.54 |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | 12.1 | 7.47 | 44.4 | 29.8 | 52.5 |
| Shares outstanding | 296 | 262 | 262 | 262 | 262 |
| Dilution (YoY) | +0.0% | +0.0% | +21.3% | +9.4% | +11.5% |
| Employees | 1539 | 2.00 | 2.00 | 2.00 | 2.00 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 35.0%+25.7 | 13.4%-5.9 | 19.3%+1.5 | 17.8%-6.7 | 24.5% |
| Adj EBITDA margin | 44.1%+29.3 | 22.6%+4.5 | 18.1%-0.1 | 18.3%-5.4 | 23.6% |
| Adj OCF margin | 14.4%+6.4 | 5.6%-4.4 | 10.0%-4.2 | 14.2%-7.6 | 21.8% |
| Adj FCF margin | -2.6%+42.9 | -31.1%+48.6 | -79.7%-36.5 | -43.2%-12.7 | -30.5% |
| Net income margin | 16.9%+45.3 | -25.8%-11.3 | -14.5%-17.4 | 3.0%+0.0 | 3.0% |
| Adj NI margin | 22.1%+28.4 | 0.4%+1.5 | -1.1%+1.1 | -2.3%-4.1 | 1.8% |
| ROIC (adj, after-tax) | 18.5% | 2.9% | 1.1% | 1.4% | 4.6% |
| Cost of debt | 11.6% | 8.9% | 1.3% | -- | -- |
Earnings Calls
Earnings Call · 2026 Q2
Endeavour Silver delivered a materially stronger second quarter, benefiting from higher production, record metal sales, improved operating leverage and a stronger balance sheet. The company produced nearly 2 million ounces of silver and more than 10,000 ounces of gold, equivalent to 3 million silver-equivalent ounces, a 36% increase from the prior-year quarter. Revenue climbed 150% to $212 million, mine operating earnings rose to $74 million from $7 million, and mine operating cash flow before taxes increased 300% to $100 million. Adjusted net earnings were $45 million, or $0.15 per share. Cash stood at $236 million and working capital at $214 million at quarter-end. A further approximately $70 million VAT refund from Mexico is expected in Q3, which management considers on track and effectively raises near-term liquidity toward $300 million. Terronera’s ramp-up continued, with quarterly throughput remaining consistent while the plant focused on improving recoveries and grinding efficiency. Silver grades were in line with plan and are expected to increase incrementally through Q3 and the remainder of the year as mining reaches higher-grade portions of the Terronera shoot. Management does not expect an immediate step change, as some lower-grade and outside-resource material will continue to be processed. The higher-grade La Luz area, which contains the approximately 4 g/t gold material cited in the feasibility study, has been deferred primarily to 2027; 2026 gold grades are expected to remain near 2 g/t. The LNG plant was commissioned in June without significant technical problems, although permitting took longer because of additional emergency-response and storage requirements. The mine was expected to connect to LNG generation by mid-August, replacing diesel gensets. Exploration drilling has restarted at Terronera for the first time since 2020, and a new resource is expected by year-end. Management does not currently plan a new technical study or mine plan. Kolpa’s crusher and ball-mill expansion increased plant capacity to 2,500 tonnes per day, and throughput has occasionally exceeded that level. The 2026 capital budget was increased by $18 million. Roughly $5 million represents overruns or additional requirements, while about $13 million accelerates investments initially planned for 2027. Projects include power substations, water treatment, tailings expansion and filtration, conversion toward dry-stack tailings, and a new camp. Management characterized most of the spending as one-time capital needed to secure Kolpa’s long-term viability, retain skilled labor and support a potentially much longer mine life. An updated resource and mine plan is expected by year-end. Kolpa grades should remain broadly stable over the next six months. At Guanacevi, AISC was pressured by lower grades, more expensive purchased ore, royalties, special mining duty and profit sharing. Purchased ore represented roughly one-fifth of quarterly throughput, remains profitable at a 30%-33% margin, and helps satisfy local operating arrangements while extending mine life. Company-wide AISC guidance remains unchanged, though actual costs are currently above guidance due to higher silver prices, which increase royalties, duties and other profit-linked costs. Budget assumptions included roughly 3% general inflation and approximately 5% labor inflation, while diesel and supply-chain costs added pressure in Q2. Peso hedging continues selectively for operating expenses, but no additional metal hedging is planned after silver collars expired and gold hedges continue through June 2027. Pitarrilla’s feasibility study remains scheduled for late Q3. Some planned spending will shift into 2027 because equipment purchases and long-lead deposits depend on study completion. The main permitting hurdle is approval of the dry-stack tailings facility; other key project permits are already in place. Management currently estimates construction capital at $500-$600 million and mill throughput at 3,500-4,000 tonnes per day. Current and future cash generation is expected to fund Pitarrilla, while dividends or buybacks are more likely after the project is built and the company reaches greater scale, potentially around 2030.
▸Were there unexpected bottlenecks or costs during Terronera’s LNG commissioning, and when would the mine and related facilities be fully connected to the LNG system?Heiko Ihle · H.C. Wainwright
▸Given the approximately $250 million cash balance, what minimum cash level is needed, and when might shareholders see a special dividend or other capital return?Heiko Ihle · H.C. Wainwright
▸Should Terronera move immediately into higher grades in Q3, and should the first-year feasibility-study grades of more than 200 g/t silver and nearly 4 g/t gold be modeled in the second half of 2026?Wayne Lam · TD Securities
▸After first-half AISC performance and higher silver prices, is the existing AISC guidance still realistic, considering expected efficiency gains and lower sustaining capital in the second half?Wayne Lam · TD Securities
▸What is the forward Mexican peso hedging strategy, and might Endeavour extend silver hedging to protect Guanacevi margins as costs rise?Wayne Lam · TD Securities
▸What inflation assumptions were included in AISC guidance, and has realized inflation been higher than expected?Cosmos Chiu · CIBC
▸How much does third-party purchased ore contribute to Guanacevi’s more than $50/oz AISC, and how should the company’s strategy and profitability of this material be viewed?Cosmos Chiu · CIBC
▸Is the increase in annual capital expenditure from $157 million to $181 million, including $18 million at Kolpa, unexpected spending, or investment that will generate future throughput and cost benefits?Cosmos Chiu · CIBC
▸How should investors view Kolpa’s additional 2026 spending over the longer term: catch-up capital, or evidence of permanently higher sustaining costs?Alexander Terentiew · National Bank
▸When will an updated resource estimate and mine plan for Kolpa be released?Alexander Terentiew · National Bank
▸Will the higher silver grades expected at Terronera in the second half also bring higher gold grades?Alexander Terentiew · National Bank
▸Given higher silver prices and exploration success, does management plan to publish an updated Terronera mine plan?Alexander Terentiew · National Bank
▸Were slightly lower Kolpa grades a result of sequencing during the ramp-up to 2,500 tonnes per day, and how should grades and unit costs trend from here?Soundarya Iyer · B. Riley Securities
▸With $48 million budgeted for Pitarrilla but only about $5 million spent, what remains to be funded, and will the shortfall be catch-up spending or roll into 2027?Soundarya Iyer · B. Riley Securities
▸Should the expected $70 million VAT refund be viewed as roughly $70 million of additional cash on top of the reported balance?John Tumazos · John Tumazos Independent Research
▸How much of the current cash is committed to completing Kolpa and Terronera, and how much is expected to be needed for Pitarrilla?John Tumazos · John Tumazos Independent Research
▸What is the approximate capital requirement for Pitarrilla?John Tumazos · John Tumazos Independent Research
▸What will be the expected daily mining and milling throughput at Pitarrilla?John Tumazos · John Tumazos Independent Research
▸Would management want to repurchase Endeavour shares or its convertible bonds while the stock is depressed and the bonds may trade below value ahead of conversion?John Tumazos · John Tumazos Independent Research
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $2.50 | $5.10/$5.70 | 50 | --/$0.05 | 0 |
| $4.00 | $3.60/$4.10 | 0 | --/$0.10 | 0 |
| $5.00 | $2.75/$3.10 | 98 | --/$0.10 | 0 |
| $6.00 | $1.80/$2.10 | 200 | $0.05/$0.20 | 10 |
| $7.50 | $0.90/$1.05 | 115 | $0.50/$0.60 | 128 |
| $9.00 | $0.35/$0.40 | 46 | $1.35/$1.65 | 586 |
| $10.00 | $0.15/$0.25 | 1,022 | $2.25/$2.35 | 13 |
| $11.00 | $0.05/$0.20 | 26 | $3.10/$3.40 | 0 |
Short Interest
Web Traffic
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| VAN ECK ASSOCIATES CORP | $166M | $5.88 | −$29.2M | +$9.9M | — | $164.08B |
| Tidal Investments LLC | $149M | $4.21 | −$271K | +$32.9M | — | $41.21B |
| MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd. | $97.9M | $5.39 | +$76K | +$32.5M | — | $83.85B |
| JUPITER ASSET MANAGEMENT LTD | $83.0M | $3.84 | −$13.6M | −$4.5M | — | $20.15B |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $71.5M | $9.30 | +$976K | +$71.5M | — | $4.68T |
| TWO SIGMA INVESTMENTS, LP | $62.2M | $7.48 | −$5.4M | +$62.2M | — | $128.44B |
| ALPS ADVISORS INC | $38.6M | $6.85 | −$3.3M | +$21.3M | — | $21.31B |
| Condire Management, LP | $37.3M | $7.71 | +$0 | +$29.0M | — | $942M |
| SPROTT INC. | $36.9M | $6.25 | +$14.7M | +$12.9M | — | $3.02B |
| CITADEL ADVISORS LLC | $28.0M | $5.09 | +$4.5M | −$19.9M | — | $171.38B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2007 Q1 | 29M | -3M | -5M | $0.08 | $0.06 – $0.10 | 17 |
| 2008 Q3 | 3M | -6M | -13M | $-0.07 | $-0.09 – $-0.06 | 19 |
| 2009 Q1 | 42M | 1M | -3M | $-0.32 | $-0.39 – $-0.26 | 13 |
| 2009 Q2 | 12M | -0M | -2M | $-0.08 | $-0.10 – $-0.06 | 18 |
| 2009 Q3 | 10M | 3M | -1M | $-0.03 | $-0.04 – $-0.02 | 13 |
| 2010 Q1 | 37M | 8M | 2M | $0.08 | $0.06 – $0.10 | 16 |
| 2010 Q2 | 118M | 3M | -1M | $0.12 | $0.09 – $0.14 | 12 |
| 2010 Q3 | 35M | 4M | 0M | $0.09 | $0.07 – $0.11 | 17 |
| 2011 Q1 | 27M | 5M | 0M | $0.10 | $0.08 – $0.12 | 12 |
| 2011 Q2 | 45M | 38M | 20M | $0.18 | $0.14 – $0.22 | 12 |
| 2011 Q3 | 47M | 18M | 4M | $0.14 | $0.11 – $0.17 | 19 |
| 2012 Q1 | 36M | 29M | 12M | $0.10 | $0.08 – $0.12 | 13 |
| 2012 Q2 | 162M | 24M | 12M | $0.38 | $0.30 – $0.45 | 20 |
| 2012 Q3 | 84M | 7M | 0M | $0.18 | $0.14 – $0.22 | 17 |
| 2013 Q1 | 70M | 36M | 14M | $0.13 | $0.10 – $0.16 | 17 |
| 2013 Q2 | 71M | 13M | -0M | $-0.04 | $-0.05 – $-0.03 | 7 |
| 2013 Q3 | 15M | — | 30M | $0.07 | $0.06 – $0.09 | 7 |
| 2014 Q1 | 44M | 20M | 3M | $0.02 | $0.02 – $0.03 | 12 |
| 2014 Q2 | 92M | 15M | -0M | $-0.04 | $-0.04 – $-0.03 | 9 |
| 2014 Q3 | 26M | 9M | -5M | $-0.04 | $-0.04 – $-0.03 | 10 |
| 2015 Q2 | 286M | 8M | -2M | $-0.10 | $-0.12 – $-0.08 | 14 |
| 2015 Q3 | 40M | -3M | -13M | $-0.03 | $-0.04 – $-0.03 | 8 |
| 2016 Q1 | 104M | 10M | 3M | $0.07 | $0.06 – $0.09 | 16 |
| 2016 Q2 | 312M | 9M | 3M | $0.12 | $0.09 – $0.14 | 13 |
| 2016 Q3 | 42M | 12M | 6M | $0.04 | $0.03 – $0.05 | 10 |
| 2017 Q1 | 15M | 10M | 3M | $0.01 | $0.01 – $0.01 | 11 |
| 2017 Q2 | 59M | 4M | -0M | $0.04 | $0.03 – $0.04 | 12 |
| 2017 Q3 | 119M | 7M | 1M | $0.05 | $0.04 – $0.05 | 17 |
| 2017 Q4 | 42M | 9M | 3M | $0.02 | $0.02 – $0.02 | 16 |
| 2018 Q1 | 60M | 15M | 3M | $0.04 | $0.03 – $0.05 | 19 |
| 2018 Q2 | 19M | -12M | -20M | $0.07 | $0.06 – $0.09 | 13 |
| 2018 Q3 | 9M | 3M | -10M | $-0.01 | $-0.02 – $-0.01 | 10 |
| 2018 Q4 | 56M | 3M | -5M | $-0.06 | $-0.08 – $-0.05 | 11 |
| 2019 Q1 | 29M | -10M | -18M | $-0.03 | $-0.03 – $-0.03 | 6 |
| 2019 Q2 | 28M | 3M | -4M | $-0.04 | $-0.04 – $-0.04 | 8 |
| 2019 Q3 | 29M | 2M | -5M | $-0.04 | $-0.04 – $-0.03 | 5 |
| 2019 Q4 | 30M | -12M | -22M | $-0.04 | $-0.04 – $-0.04 | 5 |
| 2020 Q1 | 23M | -17M | -24M | $-0.03 | $-0.03 – $-0.03 | 6 |
| 2020 Q2 | 20M | 0M | -4M | $-0.04 | $-0.04 – $-0.03 | 8 |
| 2020 Q3 | 40M | 10M | 1M | $0.04 | $0.04 – $0.04 | 4 |
| 2020 Q4 | 52M | 40M | 18M | $0.06 | $0.05 – $0.06 | 4 |
| 2021 Q1 | 38M | 24M | 10M | $0.02 | $0.02 – $0.02 | 7 |
| 2021 Q2 | 49M | 23M | 10M | $0.03 | $0.03 – $0.03 | 1 |
| 2021 Q3 | 41M | -9M | -14M | $0.02 | $0.02 – $0.02 | 1 |
| 2021 Q4 | 54M | 26M | 12M | $0.04 | $0.04 – $0.04 | 1 |
| 2022 Q1 | 53M | 19M | 8M | $0.05 | $0.04 – $0.05 | 2 |
| 2022 Q2 | 39M | 25M | 13M | $0.01 | $0.01 – $0.01 | 2 |
| 2022 Q3 | 42M | -9M | -16M | $0.01 | $0.01 – $0.01 | 2 |
| 2022 Q4 | 58M | -12M | -21M | $0.04 | $0.04 – $0.04 | 2 |
| 2023 Q1 | 52M | 19M | 7M | $0.03 | $0.02 – $0.03 | 1 |
| 2023 Q2 | 53M | 30M | 14M | $0.01 | $0.01 – $0.01 | 1 |
| 2023 Q3 | 44M | -8M | -17M | $0.01 | $-0.03 – $0.06 | 4 |
| 2023 Q4 | 50M | -13M | -20M | $0.02 | $-0.02 – $0.05 | 2 |
| 2024 Q1 | 55M | 20M | 7M | $0.02 | $-0.02 – $0.13 | 4 |
| 2024 Q2 | 62M | 18M | 5M | $0.02 | $0.00 – $0.02 | 3 |
| 2024 Q3 | 52M | 9M | 1M | $0.00 | $0.00 – $0.00 | 1 |
| 2024 Q4 | 47M | 1M | -4M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2025 Q1 | 61M | 13M | 2M | $0.01 | $-0.02 – $0.04 | 3 |
| 2025 Q2 | 82M | 21M | 3M | $0.01 | $0.00 – $0.01 | 3 |
| 2025 Q3 | 131M | 42M | 10M | $0.03 | $0.02 – $0.04 | 2 |
| 2025 Q4 | 171M | 70M | 20M | $0.06 | $0.03 – $0.09 | 3 |
| 2026 Q1 | 200M | 94M | 41M | $0.13 | $0.09 – $0.16 | 2 |
| 2026 Q2 | 211M | 111M | 49M | $0.15 | $0.14 – $0.16 | 2 |
| 2026 Q3 | 197M | 85M | 33M | $0.10 | $0.10 – $0.10 | 2 |
| 2026 Q4 | 197M | 113M | 47M | $0.14 | $0.14 – $0.14 | 1 |
| 2027 Q1 | 228M | 129M | 54M | $0.17 | $0.17 – $0.17 | 1 |
| 2027 Q2 | 231M | 149M | 64M | $0.20 | $0.20 – $0.20 | 1 |
| 2027 Q3 | 239M | 160M | 68M | $0.21 | $0.21 – $0.21 | 1 |
| 2027 Q4 | 238M | 166M | 69M | $0.21 | $0.21 – $0.21 | 1 |
| 2028 Q1 | 248M | 162M | 64M | $0.20 | $0.20 – $0.20 | 1 |
| 2028 Q2 | 246M | 166M | 64M | $0.20 | $0.20 – $0.20 | 1 |
| 2028 Q3 | 244M | 167M | 62M | $0.19 | $0.19 – $0.19 | 1 |
| 2028 Q4 | 243M | 171M | 62M | $0.19 | $0.19 – $0.19 | 1 |
| 2029 Q1 | 175M | 183M | 69M | $0.21 | $0.21 – $0.21 | 1 |
| 2029 Q2 | 175M | 185M | 69M | $0.21 | $0.21 – $0.21 | 1 |
| 2029 Q3 | 175M | 185M | 68M | $0.21 | $0.21 – $0.21 | 1 |
| 2029 Q4 | 159M | 175M | 62M | $0.19 | $0.19 – $0.19 | 1 |
| 2030 Q1 | 193M | 232M | 95M | $0.29 | $0.29 – $0.29 | 1 |
| 2030 Q2 | 193M | 231M | 94M | $0.29 | $0.29 – $0.29 | 1 |
| 2030 Q3 | 193M | 235M | 95M | $0.29 | $0.29 – $0.29 | 1 |
v2 analysis (legacy, 2026-07-30) — for comparison onlyclick to expand
Thesis
Endeavour is transitioning from a small, inconsistent Mexican silver producer into a substantially larger multi-mine operator. Terronera and Kolpa have dramatically lifted revenue and adjusted EBITDA, and the latest quarter confirms strong operating leverage. The important distinction is that this is not yet a high-quality cash compounder: cumulative adjusted FCF from 2022 through the latest period is approximately negative $460M, while capex, acquisitions and lease commitments have consumed far more than reported EBITDA. Pitarrilla creates substantial long-term upside but also represents a $500M-$600M funding requirement before the company is likely to return capital. The base case assumes the current operational improvement is real but gives limited credit for exploration upside or a permanent precious-metals boom. Terronera's LNG conversion and higher silver grades should help, but management explicitly pushed the highest-grade La Luz gold material into 2027 and acknowledged that current AISC is above guidance. Kolpa's extra capital appears largely catch-up and life-extension spending, but it reinforces the reinvestment treadmill risk. The business is therefore improving rapidly, but the range of outcomes is wide. It has meaningful commodity, country, permitting, security, execution and financing exposure. At the same time, the company has ample near-term liquidity, expected VAT proceeds and operations that are increasingly capable of funding development. The central investment question is whether strong current metal prices are converted into durable free cash flow or simply recycled into the next major project.
Trade Signal
Lean short/no-trade: EXK's strong operating trajectory and silver exposure are real, but the shares appear materially above fair value and already discount successful execution while Pitarrilla creates substantial future funding risk.
The stock rallied sharply through late 2025 and January 2026, broadly alongside silver strength, the Terronera/Kolpa production step-up and renewed growth expectations. It then fell from $13.90 in late February to the $8-$10 range in March and drifted toward $7.56 in July, reflecting a combination of commodity/sector reversal, profit-taking and concern about operating and funding risks. The July decline was more drift and repricing than a clearly identifiable company-specific shock. Q2 earnings were materially strong, yet the stock was unchanged the day before versus the day after the release, suggesting the good news was largely discounted rather than missed. The pullback may be somewhat overshot, but it is not a clear panic dislocation; the valuation gap looks more durable than temporary.
The stock is broadly liked by analysts, with 11 Buys versus 2 Holds and 1 Sell and an average one-year target of $11.56. The bullish narrative is record silver prices, Terronera/Kolpa growth, falling costs and Pitarrilla's large resource. Bears focus on high valuation, volatile mine economics, Mexican security and cost inflation, and the need to fund Pitarrilla. Price has nevertheless fallen 45% from its 52-week high and short interest has risen from roughly 5% to 6.9%, indicating a more cautious positioning backdrop. The market is constructive rather than euphoric, but analyst optimism may be stale relative to funding risk.
The next operating inflection is positive: Terronera should benefit from LNG power, higher grades and continued ramp-up, while Kolpa is operating at expanded capacity. Q3 results and the Pitarrilla feasibility study could make the growth story more credible. Much of the operating improvement is already visible in record Q1/Q2 results, and the consensus Buy stance and $11.56 average target suggest the market already expects a favorable trajectory. The less-appreciated risk is that Pitarrilla's capital burden converts operational success into future dilution or leverage.
- ▲August-September 2026 · Terronera LNG power transition and approximately $70M Mexico VAT refund — The LNG plant should reduce operating costs, while the VAT refund could lift liquidity toward $300M; execution and timing are key.
- ▲Q3 2026 · Pitarrilla feasibility study — A credible study could validate a major long-term growth asset, though higher-than-expected capex or weak returns would be negative.
- ▲October-November 2026 · Q3 2026 earnings — Watch Terronera grades, LNG savings, Kolpa throughput, AISC and cash generation; confirmation of margin improvement could support the shares.
- •Late 2026 · Terronera exploration/resource update — High-grade drilling and a year-end resource could extend mine life, but the economic value is not yet established.
- •Late 2026 · Kolpa updated resource and mine plan — Could improve mine-life visibility, but the additional capital program and tailings spending remain execution risks.
TTM dilution was approximately zero and there is no stated near-term buyback or dividend. Current cash generation should help fund growth, but Pitarrilla's projected $500-$600M build likely creates future debt and/or equity issuance risk. Short interest is moderate at 6.9% of float, with limited squeeze fuel at 4.2 days to cover; insider and institutional flow data do not show a strong directional signal.
Cash of roughly $236M, expected VAT proceeds and profitable operating assets provide some support, but this is not a hard asset floor: reported FCF yield is negative, AISC is elevated, and Pitarrilla may require $500-$600M of construction capital. There is also no active buyback or committed acquisition floor. The principal ceiling is funding risk if the stock rises and management uses equity or expensive debt to finance Pitarrilla, but it is not an immediate hard cap.
Real buyers can own the strong production growth, record silver prices, Terronera/Kolpa ramp and potential Pitarrilla expansion. However, the stock is already followed and broadly rated Buy, while future Pitarrilla funding may require meaningful debt or dilution; it is buyable, but not an undiscovered bargain.
Fear is modestly stronger than greed at $7.56: the operating business has genuinely improved, but the market price discounts a favorable silver environment and substantial execution success while the analyst's own fair value is about 37% lower. I would prefer a small, catalyst-aware short or no position rather than an aggressive short because silver strength and Pitarrilla optionality can produce sharp upside.
Valuation
The quarter newly demonstrated that the stronger production platform is translating into much higher mine operating earnings and operating cash flow: revenue was approximately $212M, mine operating earnings $74M and pre-tax mine operating cash flow about $100M. It also confirmed that LNG commissioning was largely successful, Kolpa is operating at or above 2,500 tonnes per day, and approximately $70M of VAT refunds is expected in Q3. Conversely, the call clarified that the near-term Terronera grade uplift will be incremental, the approximately 4 g/t gold La Luz material is mainly deferred to 2027, AISC is currently above guidance, and some Pitarrilla spending is moving into 2027.
▸ How the cases moved
Versus the day before the Q2 release, the bear case improves modestly from roughly $130M to $150M as liquidity, operating cash flow and the expected $70M VAT refund reduce near-term stress; its probability falls from 0.28 to 0.25. The base case rises from roughly $900M to $1,020M because the quarter confirms Terronera and Kolpa production leverage, while its probability rises from 0.48 to 0.50. The bull case rises from roughly $1,900M to $2,040M on stronger throughput, LNG commissioning and continued resource potential, but its probability increases only from 0.24 to 0.25 because management deferred the highest-grade Terronera gold material and still faces the large Pitarrilla funding requirement.
Silver prices retreat, Terronera and Kolpa deliver only modest operating improvement, and Mexican security, inflation and permitting risks keep costs high. Pitarrilla requires substantial funding before it creates value, leaving the company with low free cash flow and a heavier effective capital burden.
▸ Valuation
5x $80M EBITDA = $400M EV - $250M net debt = $150M equity
Terronera reaches stable production, LNG reduces power costs, Kolpa operates near its expanded throughput and silver prices remain supportive but normalize from current elevated levels. Pitarrilla advances but consumes most available cash, so owner earnings improve without meaningful shareholder distributions.
▸ Valuation
6x $220M EBITDA = $1,320M EV - $300M net debt = $1,020M equity
Silver remains strong, Terronera reaches higher-grade zones, LNG and operational improvements materially reduce unit costs, and Kolpa's expansion works as intended. Pitarrilla receives a credible feasibility study and is funded without severe dilution, creating a larger, higher-margin mid-tier producer platform.
▸ Valuation
7x $320M EBITDA = $2,240M EV - $200M net debt = $2,040M equity
▸ Target Rationale
The probability-weighted scenario math produces an $846M present value. I set my analytical target at $800M because the arithmetic gives substantial credit to a successful Pitarrilla funding path while not fully capturing execution risk, likely future capital intensity, convertible-debt dilution, and the limited evidence that current adjusted EBITDA will convert into durable owner earnings. The target is not reduced for sentiment; the market's fear discount is handled separately.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Record Q1 2026 Financial Results: In May 2026, Endeavour reported record-breaking financial and operating performance for the first quarter of 2026. Fueled by the additions of the newly producing Terronera mine in Mexico and the Kolpa mine in Peru, consolidated production reached 3.3 million silver equivalent ounces (1.88 million ounces of silver and 11,740 ounces of gold), marking a 78% increase year-over-year. Revenue surged 230% to $209.7 million, with mine operating cash flow before taxes growing 419% to $114.6 million, benefiting from robust commodity prices.
- High-Grade Drill Intercepts at Terronera: On June 18, 2026, the company announced exceptionally high-grade silver and gold drill results from its exploration program at Terronera and the nearby La Luz system. Notable intercepts included 10 meters grading 282 g/t silver and 1.8 g/t gold (TRU-001) and 9 meters of 150 g/t silver and 6.3 g/t gold (TRU-003). Industry analysts noted that these findings strongly support long-term resource growth and the potential for a significant mine-life extension beyond the current plan.
- Bolañitos Divestment Completed: In mid-January 2026, Endeavour finalized the sale of its non-core Bolañitos mine, sharpening its focus and capital allocation toward its core, high-margin operations.
- 2026 Annual General Meeting: Shareholders approved all proposed items at the AGM on June 2, 2026, including the re-appointment of KPMG LLP as auditors and the re-election of all eight board directors.
▸ Thesis-test Findings
- Pitarrilla Feasibility Study Capex Updates 2026: Endeavour has budgeted $65.8 million to advance its world-class Pitarrilla project in Durango, Mexico for the 2026 fiscal year. This program allocates $15.0 million specifically to complete the Feasibility Study—expected to be finalized in mid-to-late 2026 (targeting Q3/August)—alongside $2.8 million for exploration drilling and $48.0 million for early growth capital expenditures (such as mine equipment, underground development, and site infrastructure). While the company has not yet released official capital expenditure projections for the full construction phase under the new study, third-party industry reports estimate the total project build cost will range between $400 million and $500 million. This highlights a massive organic growth catalyst but introduces a significant future capital funding requirement.
- Terronera Mine LNG Power Plant Commissioning Status: Although Terronera achieved commercial production in late 2025, early operations in Q1 2026 continued to rely on higher-cost temporary diesel-powered generation. On the Q1 2026 earnings call, management confirmed that the company has secured all necessary permits and expects to fully transition the mine's power generation to its on-site liquefied natural gas (LNG) vaporization plant before the end of Q2 2026. Transitioning to the LNG plant is a critical margin driver, expected to reduce direct operating costs by approximately $8 per tonne once fully online.
- Mexican Silver Mining Security and Cartel Logistics Impacts 2026: Geopolitical and operational security risks in Mexican mining jurisdictions spiked in early 2026 following retaliatory cartel violence in February. High-profile incidents—such as the kidnapping of mining workers in Sinaloa—highlight the parallel taxation and extortion systems targeting the industry. Endeavour was directly impacted at its flagship Jalisco-based Terronera mine, which was temporarily paused for three days in late February 2026 due to regional highway blockades and security concerns. While operations resumed quickly with minimal impact on total quarterly throughput, the situation underscores that security is an increasingly sticky operating cost, with transport corridors remaining the most vulnerable link in the logistics chain.