Stocks/FER

FER

Ferrovial SEv3 4.5/10 · 2026-11-13
Industrials·Engineering & Construction
$60.25
43.0B EUR market cap
1.2% div yield
v3 Rating
4.5/103.5–5.5
Setup
3.5/102.5–4.5
Fair Value
$54.00$46.00–$64.00-10%
DCF (10%)
$48.00-20%
Base IRR
+8%+3%–+11%
Visibility
clear±17%
Wall Street
$70.93 target(1 analyst last year)(1 buy, 3 hold)
Rating
Revenue (TTM)
9.9B EUR
Owner Earnings
$1.4B
Next-Yr Owner Earnings
$1.4B
Growth
+6.5% × 10y
P / Next-Yr OE
30.0x
Net Debt
-$1.6B

Ferrovial SE, a global entity operating through its various subsidiaries, specializes in the entire lifecycle management of transport infrastructure and urban services, encompassing their design, construction, financing, operation, and ongoing maintenance. Its diverse operations are organized into four primary divisions: Construction, Toll Roads, Airports, and Energy Infrastructures and Mobility. In the Construction division, the firm undertakes the planning and execution of a wide array of public and private projects, notably including public infrastructure development. Simultaneously, the Toll Roads segment is devoted to developing, funding, and managing major thoroughfares. The Airports segment focuses on establishing, investing in, and managing aviation facilities. Moreover, its Energy Infrastructures and Mobility unit undertakes the promotion, construction, and operation of various energy generation and transmission assets, specifically developing, financing, and operating power transmission lines and renewable energy generation plants. This segment also extends its offerings to include mobility and waste management plants and specialized services for the mining sector in Chile. Established in 1952, Ferrovial SE's corporate headquarters are located in Amsterdam, the Netherlands.

2-Year Price History

$61.18+61.6%
$40$45$50$55$60$65$70Initial target $54.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
4.53.5–5.5
Setup
3.52.5–4.5
Fair value (USD)
54.0046.00 – 64.00
Upside vs 60.25
-10%
DCF (10%)
48.0041.00 – 54.00-20%
Base IRR
8%3% – 11%
Visibility
clearrange ±17%
Sentiment
5/10
Reputation
4/10
2026-11-13 · claude-opus-5-5 · priced at 61.65

Ferrovial is a holding company. It owns 48.29% of Toronto's 407 ETR, majority stakes in five US managed-lane concessions (NTE, LBJ, NTE 35W, I-66, I-77), 49% of JFK's New Terminal One, a construction arm (including 50.1% of Budimex) and about EUR 1.66bn of corporate net cash. The stock fell from $74 in February to about $54 in September. Three things drove the fall: the huge, front-loaded concession payments on the new I-24 (Nashville, $21bn present value) and I-285 East (Atlanta, $23.1bn) awards; 407 traffic down 7.1% in Q3; and NTO delays, with no dividends now possible before June 2033. Since then the stock has climbed back to $61.65 (intraday Nov 13; the pack showed 61.42/61.18). The bull case is real. The 407 dividend rose 40% to CAD 2.1bn in 2026. The US lanes are growing revenue per transaction by double digits. Construction margins are 4.1%. The balance sheet is clean, and the share count shrinks through buybacks. But the market already prices these long-dated, inflation-linked toll roads like the quality infrastructure they are. Look-through holding-company free cash flow (dividends from projects plus normal construction cash, less corporate costs, taxes and Budimex minorities) is about $1.45bn, a 3.3% yield. A 10% DCF with 6-7% growth and a 22x year-5 multiple gives about $48. The return in a year is closer to 7-9% than 50%. And there is a real fight over whether I-24 and I-285 were overbid, with up to about EUR 4bn of equity due mostly in 2033-35. Rating 4.5: fairly to modestly overvalued on a 10% hurdle, but a quality, low-risk business that we would not short. Interest 3.5: there is no variant view the sell side lacks, and nothing like a 40% discount.

A deep dive would have to establish: Can 407 ETR and the US managed lanes keep growing distributions 6-8% a year while I-24 and I-285 East (about EUR 4bn of back-ended equity at a high-single-digit project IRR) avoid becoming value-destroying overbids?

Owner earnings, TTM
$1.4B$1.3B – $1.6B
Realistic peak profit
$2.3B$1.9B – $2.9B
Growth rate
6.5%3.0% – 9.0%
Years of growth
105 – 20
Market cap
$44B$44B – $45B
EV
$43B$42B – $44B
Net debt
-$1.6B-$1.9B – -$1.1B
Capital return / cap
2.8%2.2% – 3.4%
P/E
50.0×40.0× – 66.0×
EV/EBITDA
27.0×24.0× – 31.0×
FCF yield
3.3%2.8% – 3.7%
Projected FCF, base case (USD millions)
Y1$1.4B$1.3B – $1.6B
Y2$1.5B$1.3B – $1.8B
Y3$1.6B$1.4B – $1.9B
Y4$1.7B$1.4B – $2.1B
Y5$1.9B$1.4B – $2.2B
Competition: Concessions are local monopolies on congested corridors; for new P3 awards, Ferrovial/Cintra competes with ACS-Iridium, Macquarie, Plenary and others, and it outbid them by a wide margin on I-24 and I-285.
Governance: The del Pino family controls about 31% (Rafael del Pino 22.3%, Maria del Pino 8.8%), which aligns it with shareholders but makes it the effective controller; otherwise none.
Research (expand)

What it does. Ferrovial designs, builds, finances and runs transport infrastructure. Almost all of its value sits in toll roads. It owns 48.29% of the 407 ETR, a Toronto toll road with a concession to 2098 and no cap on tolls; Schedule 22 payments to Ontario only penalise congestion. It also owns majority stakes in the US managed lanes, whose dynamic tolls are capped at soft and hard levels that rise with inflation plus, and it runs a 3.5-4% margin construction business with a EUR 19bn order book.

What the market believes. Three worries sent the stock from $74 to $54. First, Ferrovial won I-24 and I-285 East by promising very large concession payments: $21bn present value for I-24, $23.1bn for I-285 Phase 1, with the I-285 payments spread over 7 instalments during construction. Rival bids were far lower, and JPMorgan, UBS, Deutsche Bank and Jefferies all downgraded. Second, 407 traffic fell 7.1% in Q3. Third, NTO keeps slipping: Phase A opens March 2027, the Phase B milestones were pushed to 2030/2033, and no dividends are allowed before June 2033. The October disclosure of present-value payment schedules, and Citi's upgrade, recovered about half of the fall.

Variant view, weak. The worry over the bids is partly misplaced. Equity is back-ended (2033-35). The grantor carries most of the interest-rate risk until financial close. TIFIA allows 75% leverage. The concessions run 50+ years on congested corridors with toll escalators of 2-3% or more. Management walks away when returns fall short and does not issue stock. Still, management's own answer was that the project IRR is 'super high single digit'. At a 10% hurdle that is roughly break-even, not hidden value.

What it earns today. Dividends from projects come to about EUR 1.1-1.15bn in 2026: EUR 604m in the first nine months, plus the 407's CAD 1.05bn Q4 dividend (about EUR 315m to Ferrovial) and the December payouts from the Dallas lanes. Add normal construction cash flow of about EUR 350-400m (2026's EUR 591m was flattered by prepayments). Subtract corporate costs, taxes, construction maintenance capex and Budimex minorities. That leaves about EUR 1.25bn, or roughly $1.45bn, of owner earnings, a 3.3% yield on $44.5bn. Consolidated EV/EBITDA is about 27x, and reported P/E is about 66x trailing and 46x forward.

FCF projection (USD m). 1,450 / 1,540 / 1,640 / 1,740 / 1,850. The 407 dividend grows with tolls and modest re-leveraging (DSCR 2.6x). US lanes grow 8-12% as the Dallas technology tailwind fades. Construction stays flat.

In year 5. A durable compounder growing 5-7%, on 60-to-80-year inflation-linked concessions: worth 18-26x. At 22x and a 10% discount rate, plus net cash of about $1.6bn and NTO at about $1.2bn, the DCF gives about $48 a share (range $41-54). The market is in effect discounting at about 7%, which is normal for core infrastructure. Fair value of about $54 reflects the quality. The base IRR is about 7.5%.

Management and risks. Madridejos and López Mozo are candid and disciplined: they sold Heathrow and AGS, top-up dividends are paid in scrip, and buybacks run all the time. The del Pino family owns about 31% and is aligned with shareholders. The risks: Ontario's economy (tariffs) and toll pushback, since customers rate the product 4/10 and dislike its prices; construction cost overruns on two mega-projects at once; NTO cost and ramp; FX; and a new strategic plan due in early 2027 that could commit more equity to the US. Competitors (Cintra's rivals ACS/Macquarie/Plenary) bid more cheaply. Ferrovial's edge is operating data.

Sentiment: 5/10. The stock is off its highs, short interest is rising (about 5m shares) and the sell side is split, but long-only infrastructure investors still own it and it is in the Nasdaq-100.

Financials — Adjusted

Adjusted · TTM 2026-Q2 · EUR

TTM & Fiscal-Year P&LTTM20252024
Revenue9859+5%9627+5%9148
Gross profit8591+6%8418+6%7958
Operating expenses7601+56%7241+49%4849
▸Adj EBITDA1409-61%1565-55%3457
▸Adj OCF1746+56%1273+37%932
CapEx-548-653-412
Adj FCF1198+107%620+19%520
Interest expense0.000.000.00
▸Adj net income750-74%995-64%2727
▸Owner's earnings720----

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2024→FY2025 +2026YTD

Where the Cash WentTotal2026YTD20252024
▸Claimed: EBITDA3549100%746100%1457100%1346100%
FCF (OCF−capex)324091%1086146%127387%88165%
Net income4385124%25835%88861%3239241%
▸Capital returned264575%885119%65745%110382%
Buybacks1924450501973
Dividends38498.0156130
Interest paid0.000.000.000.00
Debt paid down3373370.000.00
▸Reinvestment142240%25234%71349%45734%
Capex (PP&E)1231166653412
Intangibles & M&A58.058.00.000.00
Leases signed (net Δ)13328.060.045.0
Retained / other53715%14319%61642%-222-16%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 27 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM20252024
▸Assets (total)272192742028999
▸Liabilities (total)198231975520879
Net debt (incl. leases)679364906723
Net debt / Adj EBITDA4.824.151.94
Net debt / Adj FCF5.6710.512.9
Adj EBITDA / interest------
Shares outstanding721721722
Dilution (YoY)-0.2%-0.2%--
Employees252642260925501
MarginsTTM20252024
Gross margin87.1%+0.187.4%+0.587.0%
Adj EBITDA margin14.3%-24.416.3%-21.537.8%
Adj OCF margin17.7%+5.713.2%+3.010.2%
Adj FCF margin12.2%+6.06.4%+0.85.7%
Net income margin6.2%-29.89.2%-26.235.4%
Adj NI margin7.6%-23.310.3%-19.529.8%
ROIC (adj, after-tax)5.0%6.4%16.9%
Cost of debt0.0%0.0%0.0%

Earnings Calls

8 calls

Earnings Call · 2026 Q3

2026-10-28

Ferrovial reported nine-month 2026 results showing strong growth in highways and construction, then gave extra detail on two recent U.S. managed-lane awards (I-24 in Nashville and I-285 East in Atlanta). Net cash excluding infrastructure projects was EUR 1.66 billion at September, up from EUR 1.3 billion at end-2025. Inflows included EUR 604 million of project dividends (EUR 315 million from the 407 ETR), EUR 591 million of construction operating cash flow and EUR 96 million of divestments. Outflows included EUR 461 million of shareholder distributions and a final EUR 63 million equity injection into New Terminal One (NTO). A second scrip dividend of EUR 600 million was announced. 407 ETR revenue rose 18.4% and EBITDA 21% on higher tolls, despite a 7.1% traffic fall in Q3. Management attributed the decline to more targeted promotions, weak heavy-vehicle and discretionary demand, weather and fewer road works nearby. Dividends approved for 2026 total CAD 2.1 billion. The Dallas managed lanes showed double-digit revenue-per-transaction growth, though the benefit from improved vehicle classification and mandatory-mode events is now normalizing. I-66 was strong, with revenue up 17.7%. I-77 EBITDA fell 6.1% on a higher revenue-share band and heavy vehicles diverting during I-81 construction. NTO's Phase A opening remains March 2027, and Phase B1 and B2 notice-to-proceed deadlines were extended to September 2030 and June 2033. Dalaman traffic fell 4%. Construction revenue was EUR 5.8 billion, with an adjusted EBIT margin of 4.1% (5.1% in Q3) and a record EUR 19 billion order book. On I-24, Ignacio Madridejos said the $24.8 billion headline equals $21 billion of payments to TDOT on a present-value basis. The profile is front-loaded, with about $7.7 billion nominal during 2027-2033 and the rest through 2085. Two revenue-sharing mechanisms with TDOT sit on top of that and apply only above thresholds. TIFIA allows up to 75% debt. I-285 East is a 90%-owned consortium project. Phase 1 covers about 23 miles, with construction cost of about $8.9 billion, a proposed concession payment of $23.1 billion, financial close by October 2027 and opening in 2034. Phases 2 and 3 are not committed and must be negotiated. The corridor carries 200,000-240,000 vehicles a day with up to eight hours of congestion. The design serves 95% of trips versus 55% in the reference design. Pricing starts from a $2.01 per mile soft cap, with dynamic pricing up to twice that, performance adjustments of 3% and 18%, and extended-vehicle multipliers up to 5x. GDOT bears base-rate risk and 85% of margin risk until financial close. The company targets a double-digit equity IRR, will fund equity mainly from operating cash with some corporate debt, keeps its BBB rating and plans no equity raise. In Q&A, management declined to give more I-285 numbers before financial close and said Phase 2 should not be assumed identical to Phase 1. They said they are not worried about the I-24 legal challenge and ruled out cutting 407 tolls. They said a partner may be brought into I-285 at an undecided time. Equity needs are back-ended, mostly 2033-2035. The new business plan goes to the board in December. The buyback buys more at lower prices.

Options

Chain Snapshot (daily)

Call IV (ATM)29%
Put IV (ATM)20%
ATM Spread0.35%
Call $OI (near money)$60K
Put $OI (near money)$16K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$60.0
Major Expirations2
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$40.00$17.70/$19.5011--/$0.150
$45.00$12.00/$16.202--/$2.150
$50.00$7.30/$11.2013--/$1.3527
$55.00$4.10/$6.004--/$2.6523
$60.00$1.35/$1.55225$1.20/$4.6061
$65.00--/$2.0012$4.60/$8.905
$70.00--/$1.3518$9.60/$12.30316
$75.00--/$1.7524$14.60/$17.30178
Snapshot: 2026-11-04

Short Interest

Short % of Float1.1%
Short Shares5.3M
Days to Cover2.1
Change (vs Prior)+6.1%
Short % Float History
1.10%+0.80pp
0.2%0.4%0.6%0.8%1.0%1.2%1.4%10-1512-3103-1305-2908-1410-30

Web Traffic

ferrovial.com
Web rank#528,293
Est. visits/mo762K
Traffic YoY▲ 13.4%
Traffic QoQ (12w)▲ 5.3%
Web Rank History
#528,293-326,953
rankest. visits/mo
400k500k600k700k800k900k1.0m538K672K806K939K1.1M05-1908-2512-0103-0906-1509-2111-16

Institutional Ownership

14.2%retail+6.1pp
12.2%dark-1.4pp
week of 2026-09-21
0%10%20%30%40%50%25-0425-0725-0925-1226-0326-0726-09retail (non-ATS)dark (ATS)
Off-exchange volume from FINRA. Retail = non-ATS (wholesaler PFOF + broker internalization). Dark = ATS (dark-pool crossing networks, institutional). Lit-exchange = remainder.

Ownership Over Time

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (1 analysts)$70.93+19.0%
Current Price$59.61
Analyst Ratings
1
3
Buy: 1Hold: 3Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2024 Q21.3B417M146M$0.20$0.20 – $0.201
2024 Q31.5B—0M$0.00$0.00 – $0.000
2024 Q41.1B425M99M$0.14$0.14 – $0.141
2025 Q11.1B128M94M$0.13$0.13 – $0.131
2025 Q21.0B232M-130M$-0.18$-0.18 – $-0.181
2025 Q31.0B3M-130M$-0.18$-0.18 – $-0.181
2025 Q41.3B374M-108M$-0.15$-0.15 – $-0.151
2026 Q11.3B17M-110M$-0.15$-0.15 – $-0.151
2026 Q21.4B352M-111M$-0.15$-0.15 – $-0.151
2026 Q31.4B130M-114M$-0.16$-0.16 – $-0.161
2026 Q41.7B210M-92M$-0.13$-0.13 – $-0.131
2027 Q11.7B247M-45M$-0.06$-0.06 – $-0.061
2027 Q21.8B424M105M$0.15$0.15 – $0.151
2027 Q33.1B416M105M$0.15$0.15 – $0.151
2027 Q43.8B—0M$0.00$0.00 – $0.000
2028 Q14.0B—0M$0.00$0.00 – $0.000
2028 Q24.0B—0M$0.00$0.00 – $0.000
2028 Q34.8B—0M$0.00$0.00 – $0.000
2028 Q44.4B—0M$0.00$0.00 – $0.000
2029 Q14.4B—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-07-29) — for comparison onlyclick to expand

Thesis

Ferrovial is a global infrastructure operator now increasingly US-focused: North American toll roads (407 ETR, Texas/DFW managed lanes), a large construction arm (Budimex, Webber, ~€18bn backlog), and airport development (JFK New Terminal One). The core toll-road portfolio is a high-quality, monopolistic cash generator with real pricing power (dynamic tolling, inflation-linked caps, Schedule 22 management), evidenced by double-digit revenue/EBITDA growth at 407 ETR and Texas lanes even amid construction disruption. Construction is a lower-margin (3.5-4.6% EBIT) but stable, cash-generative business with record backlog and strong working-capital dynamics. The main overhang is JFK New Terminal One, now delayed to March 2027 with $500k/day liquidated damages accruing from July 2026 and complex systems integration still outstanding — equity commitments are largely complete (>€1bn invested) so downside is capped but execution risk persists. The consolidated balance sheet shows elevated net debt/EBITDA (4.4x) mostly from ring-fenced, non-recourse project debt at the toll concessions, while ex-infrastructure the group sits in a net cash position (~€1.3bn), funding an aggressive capital-return program (buybacks + dividends = 81% of TTM claimed EBITDA). The corporate conversion to Ferrovial N.V. and Nasdaq-100 inclusion cements the US-listing strategy. New optionality (data centers in Madrid/Warsaw, capital-light) is early-stage but shows management still finding growth avenues beyond the core toll/airport/construction mix.

Trade Signal

Trade rating
-4.0/10
No trade
Horizon
~9mo
Claude2026-07-29 · saw $61.55-2.1% since

Short-biased, not a full conviction short: FER trades at premium infrastructure multiples (31x EV/EBITDA, 56x FCF) that likely overstate what a construction-heavy, JFK-execution-risk business is worth relative to owner earnings, but the quality of the toll-road franchise, net-cash balance sheet and ongoing buybacks argue against sizing this as an aggressive short.

Temporary mispricing0.0

Stock ran hard from ~€41 (2024) to a 52w high of €74 in Feb 2026 on 407 ETR/Texas toll growth, record construction backlog and US P3 win momentum, then has drifted down ~16% off highs over the last 3 months (no single negative catalyst — JFK's Phase A slip to March 2027 was already flagged and construction margins/backlog remain intact). The Q2 print was a non-event (+1% on the day), consistent with a stock that is simply digesting a prior re-rating rather than reacting to new information. This looks like normal give-back after a multiple-driven run, not a panic dislocation, and not a case where the market missed something — toll pricing power and backlog strength are already well known and reflected in the premium multiple.

Market view+3.0

The market treats FER as a high-quality, monopoly-like infrastructure compounder: 407 ETR and Texas managed lanes have pricing power, construction has a record €18bn backlog, and the ex-infra balance sheet is net cash with an active buyback. Sell-side coverage is thin (1 analyst, Hold, target €70.93, ~13% above spot) — not euphoric, but constructively above current price. Short interest is negligible (0.8% of float) and retail/dark-pool flow is unremarkable — this is an institutionally-owned, largely ignored-by-retail name with no crowding on either side. The prevailing view is calm confidence in toll-road cash generation and JFK eventually working out, which is roughly in line with the facts, not stale.

Inflectionwindow ~8mo+1.0

No near-term step-change is evident beyond steady execution: 407 ETR/Texas toll growth continuing at double digits, construction converting record backlog at stable 3.5-4% margins, and JFK Phase A opening (pushed to March 2027) removing an overhang once it happens. Data-center diversification is optionality, not yet a P&L driver. Consensus estimates already embed continued EBITDA growth (2027-2029 EBITDA path ~€1.5-1.8bn), so the market is broadly tracking the trajectory rather than missing it — this is a steady compounder story, not a surprise inflection.

Catalysts
  • ▲2027-03 · JFK NTO Phase A completion/opening — Removes liquidated-damages/execution overhang if on track; further slippage would be a negative surprise
  • •2026-10 / 2027-02 · Q3/Q4 2026 earnings (407 ETR tolling, Schedule 22 outcome) — Watch whether 2026 avoids further Schedule 22 penalties as management claims
  • •H2 2026 · New strategic plan post-'Horizon 24' — Could reset capital allocation/growth targets; market will re-anchor multiple off this
  • ▲late 2026 · Georgia I-285 / Grand Parkway / I-24 P3 award decisions — Wins would expand concession pipeline and support bull case; losses would remove growth optionality
  • ▲ongoing 2026 · Continued share buyback execution — Modest but steady support for shares, signals management confidence in valuation
Flow+3.0

Ex-infrastructure net cash of ~€1.3bn, ongoing buyback program, and a 2% dividend yield are mild net positives for share count/support. No large insider selling or dilution flagged; TTM dilution is ~0%. Not a major squeeze setup (short interest only 0.8%) nor a dilution risk.

Floor / Ceiling+3.0

There is a real floor from the ex-infrastructure net cash position (~€1.3bn) and the durable, monopoly-like toll-road cash flows (407 ETR, Texas lanes) with an active buyback — this is not a stock at risk of a balance-sheet-driven collapse. However, there's no hard ceiling either: multiple analyst target (€70.93) and continued backlog/toll growth could support further re-rating, so it's a two-sided setup rather than a capped one, though current multiples (EV/EBITDA ~31x, P/FCF ~56x) leave little room for further expansion without fundamental delivery.

Buyability

This is a liquid, well-covered (institutionally, if not analyst-wise) infrastructure name with real toll-road cash flows, a net-cash balance sheet, dividends and buybacks — genuinely investable, unlike a distressed optionality name. The question is price: at ~31x EV/EBITDA and 2% FCF yield, it's priced as a premium infrastructure compounder, and buyers here are index/infra-focused institutions paying for duration and pricing power, not value investors. A short is buyable too given decent liquidity ($101M/day) and very low borrow cost (0.8% short interest).

Fear vs Greedfear 4/10 (+2.0)greed 5/10 (-1.0)

Greed dominates on the buy side (infrastructure duration story, buyback, toll pricing power) but the valuation math is hard to ignore — paying 56x FCF and 31x EV/EBITDA for a business the analyst's owner-earnings framework pegs at under a quarter of market cap is a lot of hope. My gut says the market is paying for scarcity/duration of a monopoly asset class more than the analyst's owner-earnings model captures, so I don't fully trust the -75% fair-value gap, but the stock is undeniably priced for a lot of things to keep going right.

Valuation

Our Target
10.3B EUR-74%
Market Should Pay
10.8B EUR-73%
target ×1.05 (greed premium)
Current Market Cap
39.4B EURExtremely bullish
What Changed
transcript · 2026-07-29
-3%fair value on this information

The market already knew broadly about strong 407 ETR/Texas lane growth and the construction backlog from prior quarters. What's genuinely new: JFK NTO's Phase A completion date has slipped from 'fall 2026' (stated as recently as the Q4 2025 call) to March 2027, with liquidated damages of $500k/day now accruing from July 2026 and no clarity yet on contractor recourse; H1 2026 construction working capital was unusually strong due to one-off prepayment/compensation collections that won't repeat; and management confirmed no specific buyback/dividend guidance until after the October board meeting, deferring capital-return clarity the market had been pushing for.

▸ How the cases moved

Bear case probability nudges up slightly (0.20->0.25) on the confirmed JFK delay and liquidated-damages exposure, though equity commitments are already largely funded so the equity-value hit is contained (bear equity value roughly unchanged at ~€7.0bn). Base case largely unchanged (~€12.6bn) as underlying toll-road and construction fundamentals remain intact and even slightly ahead of expectations. Bull case probability trimmed modestly (0.25->0.20) given the JFK setback tempers near-term execution confidence, even though longer-term US pipeline (I-285 shortlist, Grand Parkway win) remains bullish.

2-Year Plausible Outcomes
bear25%
7.0B EUR
rev +3%/yrOE $580M

JFK NTO further slips past March 2027 with escalating liquidated damages and contractor disputes; Schedule 22-style penalties or toll pushback re-emerge at 407 ETR; US managed-lanes traffic softens on macro weakness; construction bid costs (Nashville/Atlanta) compress margins below 3.5% target; buyback pace slows as management prioritizes balance sheet.

▸ Valuation

12x $580M owner earnings = $6,960M equity value

base55%
12.6B EUR
rev +8%/yrOE $840M

Toll road pricing power continues (407 ETR + Texas lanes), construction stays at ~3.5-4% EBIT margin with record backlog converting to revenue, JFK opens (with modest penalty drag) around March 2027, capital returns continue at a steady clip, and data-center diversification remains a small optionality rather than a driver.

▸ Valuation

15x $840M owner earnings = $12,600M equity value

bull20%
18.0B EUR
rev +12%/yrOE $1000M

407 ETR and Texas lanes sustain mid-teens EBITDA growth via yield management, JFK opens smoothly with limited penalty, new US P3 wins (I-285, Grand Parkway, I-24) materially expand the concession pipeline, buybacks accelerate on confidence, and data-center capital-light platform starts contributing meaningfully by year 2.

▸ Valuation

18x $1,000M owner earnings = $18,000M equity value

▸ Target Rationale

Model math yields ~€9.9bn; I nudge slightly above for the demonstrated quality of the toll-road franchise (pricing power validated repeatedly across quarters, record construction backlog providing multi-year visibility, and an ex-infrastructure net-cash balance sheet that gives real flexibility for continued buybacks). I don't go further above the model given genuine JFK execution risk (liquidated damages now accruing, contractor uncertainty for future phases) and the opacity of consolidated net debt/EBITDA at 4.4x, which — while mostly non-recourse project debt — still warrants some caution versus taking the model at face value.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now6/10
Trajectory6/10
Risk5/10
Governance7/10
Insolvency prob (2yr)1%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Corporate Legal Form Conversion: On April 30, 2026, Ferrovial successfully converted its corporate form from a European Company (SE) into a Dutch public limited liability company (N.V.). The legal and commercial name of the company officially changed from Ferrovial SE to Ferrovial N.V., retaining all of its existing assets, liabilities, and legal relationships.
  • Strong Q1 2026 Financial Results: Ferrovial reported robust performance for the first quarter of 2026, driven primarily by its North American highways. Revenues grew to €2.1 billion ($2.48 billion), representing a 10.2% increase like-for-like (LfL). Adjusted EBITDA increased by 15.0% LfL to reach €321 million. The company closed the quarter in a strong financial position, with €5.5 billion in ex-infrastructure liquidity and consolidated ex-infrastructure net debt of -€1.2 billion.
  • Record Construction Backlog: At the end of March 2026, the Construction division’s order book reached an all-time high of €17.55 billion (excluding approximately €1.3 billion in pre-awarded contracts), providing solid medium-term revenue visibility.
  • Significant Project Wins:

* In May 2026, Ferrovial was awarded a $1.5 billion design-build contract by the Texas Department of Transportation to extend the State Highway 99 (Grand Parkway) southeast of Houston.

* In June 2026, the company secured a $1.079 billion contract from the U.S. Army Corps of Engineers (USACE) to construct a flood control canal section in San Juan, Puerto Rico.

* In February 2026, a Ferrovial-led consortium was shortlisted for bidding on the I-77 South Express Lanes project in North Carolina.

---

▸ Thesis-test Findings
Georgia DOT I-285 Managed Lanes Bidding Updates

Ferrovial has successfully advanced its pipeline of U.S. public-private partnerships (P3). On May 20, 2026, the Georgia Department of Transportation (GDOT) officially shortlisted the Ferrovial-led consortium, Top End Mobility Group (TEMG), for the I-285 East Express Lanes Project. Within TEMG, Ferrovial's toll road subsidiary Cintra Global BV is acting as a Phase 1 Equity Member and Lead O&M Provider, while Ferrovial Construction-Webber 285 (a joint venture of Ferrovial Construction US Corp and Webber, LLC) is the designated Phase 1 Lead Contractor. This status supports the bull case, demonstrating Ferrovial’s strong bidding competitiveness for major U.S. express lane concessions.

JFK New Terminal One Construction Progress Reports 2026

Progress at John F. Kennedy International Airport's New Terminal One (NTO) continues to tracking positively. In its Q1 2026 results, Ferrovial confirmed that construction of the $9.5 billion international terminal has reached 87% completion. The consortium target date for opening the first phase remains set for fall 2026, with operational readiness trials having commenced in Q1 2026. On the commercial front, NTO has already secured commitments from 30 airlines through 21 executed agreements and 9 letters of intent. In June 2026, NTO released its inaugural ESG report, highlighting its state-of-the-art microgrid and solar array systems. This progress limits construction delay risks and supports the bull case for a timely operational ramp-up.

407 ETR Traffic Volume and Schedule 22 Penalty Updates
  • Traffic Volume & Revenue: The 407 ETR toll highway in Toronto delivered strong operational performance in early 2026. Q1 2026 revenues grew to CAD 492 million (a 20% increase over Q1 2025), and EBITDA rose 25.4%. Traffic volumes (measured in Gross Vehicle Kilometres Traveled, or VKT) rebounded cleanly; January 2026 saw 185.9 million VKT (up from 169.5 million in Jan 2025) and March 2026 registered 199.0 million VKT (up from 197.0 million in Mar 2025).
  • Schedule 22 Congestion Penalties: Because 407 ETR implemented toll rate increases in 2024, the pandemic-related Force Majeure protections formally ended, exposing the asset to potential Schedule 22 congestion payments for 2025. For the full year 2025, 407 ETR recorded a CAD 40.9 million Schedule 22 provision as an operating expense in its financial statements, which became payable to the Province of Ontario in April 2026. While this penalty hurts short-term cash flow, the bull case is supported by the fact that the actual penalty was significantly lower than prior high-risk forecasts, proving that management's dynamic toll pricing strategies (such as adding more toll zones in 2025 and implementing a new rate schedule on January 1, 2026) have successfully mitigated congestion. Financial analysts project that with the newly optimized 2026 toll rates, 407 ETR will effectively manage peak traffic and avoid any Schedule 22 penalties for the 2026 calendar year.