FLR
Fluor Corporationv3 5.0/10 · 2026-11-13Fluor Corporation provides engineering, procurement, and construction (EPC); fabrication and modularization; and project management services worldwide. The company operates through three segments: Urban Solutions, Energy Solutions, and Mission Solutions. The Urban Solutions segment offers EPC and project management services to the advanced technologies and manufacturing, life sciences, mining and metals, and infrastructure industries. This segment also provides professional staffing services to the company and third-party clients with technical, professional, and craft resources on a contract or permanent placement basis, as well as maintenance services. The Energy Solutions segment offers EPC services for traditional oil and gas markets, including the production and fuels, chemicals, LNG, and power markets. This segment also provides solutions to the energy transition markets, including nuclear power and other low-carbon energy sources, asset decarbonization, carbon capture, renewable fuels, waste-to-energy, green chemicals, and hydrogen; and consulting services, such as feasibility studies, process assessments, and project finance structuring. The Mission Solutions segment offers technical solutions to the U.S. and other governments, as well as it provides site management, environmental remediation, and decommissioning for nuclear remediation at governmental facilities, as well as services to commercial nuclear clients. It also delivers solutions for nuclear security and operation, nuclear waste management, and laboratory management; and operation and maintenance, logistics, EPC, and life support solutions for mission-critical facilities across U.S. military service organizations. The company was founded in 1912 and is headquartered in Irving, Texas.
2-Year Price History
Valuation v3 Opus worker · 2026-11-13
Fluor is a cleaned-up global EPC contractor. In Q3 it booked a record $10.9B of awards and ended with $34.3B of backlog. It has about $1.4B of usable net cash and has retired more than 20% of its shares in two years (128.2M left at Oct 30). The bull case is that megaproject burn and better utilization lift adjusted EBITDA from about $465M (2026, after the ECA Fluor sale) toward $800M+. Testing the pitch weakened that case. Fluor has missed every EBITDA target since its 2021 plan, which aimed for $800-950M in 2026 against about $510M actual. Adjusted EBITDA has been flat at $500-530M for three years. Urban margins have slid from a 4-5% guide in 2025 to about 2.5%. The backlog is getting riskier: LNG Canada Phase 2 is mainly lump-sum, and the reimbursable share has dropped from 81% to 69%, below the 75% floor management set in 2025. The Savannah River site contract, a large share of Mission profit, is in a competitive rebid that will be decided in early 2027. The cash, share count and DCF arithmetic all hold up. With year-5 unlevered FCF of about $490M (not $560M) at 12x, plus net cash, less risk provisions, plus a probability-weighted Santos appeal option, fair value is about $51 against $49.87 (Nov 12 close; no Nov 13 close found). The stock is fairly priced. The market's skepticism is earned, not a mispricing. There are real catalysts in Q1 2027: the Santos appeal ruling (about +$4/share if Fluor wins), the Savannah River decision (about -$3-4 if Fluor loses), the February 2027 guidance and big awards. But they cut both ways. Rating 5.0, hold. Setup 4.0: no clear variant view, only modest upside, and the asymmetry depends on a coin-flip legal appeal.
A deep dive would have to establish: Will the $34B record backlog, now only 69% reimbursable and anchored by a mostly lump-sum LNG Canada Phase 2, convert into ~$700M+ of adjusted EBITDA by 2030 without new fixed-price charges, and will Fluor keep Savannah River and win the Santos appeal in Q1 2027?
Research (expand)
What it does. Fluor engineers and builds very large projects: copper and fertilizer mines, LNG, gas and nuclear power, refining, pharma plants and data centers. Urban Solutions is about 65% of revenue, Energy 20%. It also runs DOE sites such as Savannah River (Mission, 15%). 2026 revenue is about $15.5B.
What the market believes. Fluor is a low-margin contractor whose plans do not come true. In the market's view, backlog turns into profit slowly and another charge always shows up. In 2026 alone there was a $62M mining JV hit, a $100M LOGCAP ruling and Gordie Howe bridge losses. The stock has gone nowhere since 2023 despite more than $2B of buybacks. Short interest rose steadily to about 10.9M shares (~8% of shares).
What it may be getting wrong. 1) Earnings lag awards. Megaprojects take about 2 years to reach peak burn, so the 2026 base (Energy margin about 3% ex-gains) understates 2028. Management says new-award margins beat its 2025 investor-day assumptions. 2) Legacy losses are nearly over: about $120M of legacy backlog and about $20M of legacy funding left. The Q3 10-Q still carries $134M of accrued loss-position investments, mainly the mining JV and an Energy JV. 3) The pipeline has 25 megaprojects averaging $4.5B, mostly negotiated sole-source deals, plus TeraWulf (low single-digit $B, expected in Q4), a near-term multibillion-dollar copper award and gas power EPCs in 2027. 4) The Santos appeal was heard in August 2026, with a decision due by Q1 2027. The A$1.07B was paid in December 2025, so a win would be pure upside.
What it earns today. 2026 adjusted EBITDA guidance is $500-525M. Adjusted EBITDA is reconciled from net earnings attributable to Fluor, so the minority partners' share is already excluded. Removing ECA Fluor (about $45M) and subtracting D&A (~$75M), 26% tax and capex roughly equal to D&A gives unlevered owner earnings of about $290M. Netting the ERP spend that adjusted EBITDA excludes takes it to about $275-280M.
Projected unlevered FCF ($M), 2027-2031 (revised): 290, 370, 430, 470, 490, down from 300/400/480/530/560. Year 5 now needs about $740M of adjusted EBITDA, roughly a 10% CAGR from the $465M ex-ECA base. That is still a large step up for a company whose adjusted EBITDA was $530M (2024), $504M (2025) and ~$512M (2026). It is supported by $34.3B of backlog, guided low-double-digit growth in 2027 and a utilization step-up in 2028. It no longer assumes management's ~$900M 2028 ambition comes true.
Year-5 business. Neither a compounder nor a corpse. It will be a larger contractor in a supportive capex cycle (power, copper, nuclear, onshoring), but less reimbursable than before. Backlog was 69% reimbursable at Sep 30, against 81% at year-end 2025, and is heading to the 60s. The cause is the mostly lump-sum LNG Canada Phase 2 contract ($7.5B Fluor share) and fixed-price gas power. 2031 sits close to peak execution of the 2026 award wave, so I apply 12x rather than 13x. Confidence is moderate to low.
Valuation (revised).
- PV of FCF is about $1.52B. The PV of the terminal value (12 x $490M) is about $3.65B, for an EV of about $5.17B.
- Net cash is about $1.4B. Per the Q3 10-Q: $2,678M of cash plus $401M of securities, less $1,058M of debt, less $300M of VIE cash and $117M of NCI, gives about $1.6B. Subtracting the $134M of loss-position accruals and Santos legal fees still to be assessed leaves about $1.4B.
- I subtract about $130M of expected-value provisions: a lump-sum overrun on about $10.6B of fixed-price backlog, and the risk of losing the Savannah River rebid.
- That gives an equity value of about $6.44B, or about $50/share on 128.2M shares.
- Adding the probability-weighted Santos option (~25% x ~$4) brings fair value to about $51.
- At $49.87 we pay about 18x 2026 adjusted EPS of $2.75, about 9.8x EV/2026 EBITDA, and get about a 5.6% unlevered FCF yield.
Management and capital return. CEO Breuer and CFO Regan have been candid. They named the Santos, LOGCAP and mining problems plainly, monetized NuScale for $2.4B, sold Stork and ECA Fluor, and are buying back $1.4B in 2026 ($1.12B done through Q3). From 2027, buybacks are set at about half of FCF. They explicitly want M&A, which is a risk for an E&C company flush with cash. The company has a record of setting multi-year targets it then misses (the 2021 plan; 2024-2026 guidance).
Risks. The main ones are lump-sum LNG Canada Phase 2 and fixed-price power, and an Urban margin that is still falling. Other risks:
- the Savannah River management contract rebid, run by the government's NNSA (RFP March 2026, decision early 2027, bidders likely include Bechtel, BWXT, Amentum and Jacobs);
- the $2B reimbursable scope cut in Q4;
- data center contract terms;
- $97M of Kuwait letters of credit;
- the ERP rollout;
- M&A.
Sentiment: 4/10. Investors were burned repeatedly. Wellington cut from 8.2% to 3.8%, short interest is rising and the stock is range-bound at $40-58. ATM implied volatility of about 53-62% reflects the binary events due in Q1 2027.
Thesis test
1. The year-5 EBITDA is unsupported by the track record. Challenger mostly right. The 2021 plan targeted $800-950M for 2026 against ~$510M actual, and the 2024, 2025 and 2026 guides were each missed or cut. Record backlog justifies growth, but not $830M. I cut year-5 FCF from $560M to $490M (EBITDA ~$740M).
2. LNG Canada Phase 2 is mainly lump-sum and the reimbursable share is falling. Challenger right on the facts, partly offset. JGC describes the contract as primarily lump-sum turnkey, and reimbursable backlog fell from 81% to 69%. But Phase 1 was delivered well, with warranty money released early, and the Phase 2 contract includes Phase 1 learnings on labor and force majeure. I added an expected overrun provision (~$80M) and widened the low case.
3. Margins are still falling. Challenger right, but this overlaps #1. Urban went from a 4-5% guide to ~2.5%, underlying Energy is ~3%, and Q3 adjusted EBITDA fell year on year on +10% revenue. Backlog margin cannot show up before the burn, so this is absorbed in #1, not double-counted.
4. The Savannah River rebid is unpriced. Challenger right. NNSA is running a competitive rebid with a decision in early 2027. It is now in value as an ~$50M expected-value provision, and the downside sits in the low case.
5. The terminal year is near the peak. Challenger partly right. Book-to-burn above 1 guided for 2027 argues against an imminent peak, but 2031 coincides with peak megaproject burn. The multiple moves from 13x to 12x, not 11x.
What held: the DCF arithmetic, net cash of ~$1.4B, the share count (128.2M), NCI already excluded from adjusted EBITDA, and LNG Canada Phase 1 execution.
Conclusion: fair value is about $51 versus the pitch's $56, which is about the current price. The market is not obviously wrong. It is discounting a management team whose targets have repeatedly slipped. The Q1 2027 events (Santos ruling, Savannah River award, 2027 guidance) are real, roughly offsetting binaries. Hold, not buy.
- /Users/gregwo/stocks2/data/analysisv3/context/FLR.md (Q3 2026 call transcript, prior call summaries, short interest, options)
- /Users/gregwo/stocks2/data/analysisv3/FLR/2026-11-13.challenge.md
- https://www.sec.gov/Archives/edgar/data/1124198/000112419826000078/flr-20260930.htm (Q3 2026 10-Q: 128,184,260 shares at Oct 30; cash $2,678M, securities $401M, debt $1,058M, VIE cash $300M, NCI $117M, backlog 69% reimbursable, $134M loss-position accruals, Santos appeal)
- /Users/gregwo/stocks2/data/edgar_filings/FLR/8-K_2026-08-07_0001124198-26-000074_EX99-1.html (adjusted EBITDA reconciled from net earnings attributable to Fluor)
- https://finviz.com/news/418207/fluor-reports-third-quarter-2026-results
- https://finviz.com/news/418464/fluor-misses-on-earnings-but-books-a-record-109-billion-in-awards-widening-the-gap-between-trough-profits-and-a-swelling-backlog
- https://www.businesswire.com/news/home/20250218823650/en/Fluor-Reports-Fourth-Quarter-and-Full-Year-2024-Results
- https://s203.q4cdn.com/957337755/files/doc_presentations/2025/Apr/HO20250087-001-Strategy-Update-final.pdf
- https://chemxplore.com/news/jgc-fluor-joint-venture-lng-canada
- https://ieefa.org/sites/default/files/2026-09/09-29_LNG%20Canada%20Phase%202_September%202026.pdf
- https://www.govconwire.com/articles/nnsa-rfp-savannah-river-site-contract
- https://www.santos.com/news/santos-confirms-receipt-of-payment-following-fluor-court-judgment/
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 15888+2% | 15504-5% | 16315+5% | 15474+13% | 13743 |
| Gross profit | 528 | -120-121% | 573+20% | 477+34% | 356 |
| Operating expenses | 163-19% | 258+135% | 110-67% | 331-2% | 338 |
| ▸Adj EBITDA | 429 | -310-158% | 536+144% | 220+142% | 91.0 |
| ▸Adj OCF | 133 | -650-244% | 450+62% | 278+261% | 77.0 |
| CapEx | -38.0 | -50.0 | -164 | -106 | -75.0 |
| Adj FCF | 95.0 | -700-345% | 286+66% | 172 | 2.00 |
| Interest expense | 40.0 | 42.0 | 46.0 | 59.0 | 59.0 |
| ▸Adj net income | 877 | -614 | 40.0-71% | 138 | -47.0 |
| ▸Owner's earnings | 260 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 1875100% | 635100% | -230 | 652100% | 448100% | 370100% |
| FCF (OCF−capex) | 24213% | -47.0-7% | -437 | 664102% | 10624% | -44.0-12% |
| Net income | 2809150% | 43268% | -51.0 | 2145329% | 13831% | 14539% |
| ▸Capital returned | 153082% | 1161183% | 833 | 58.09% | -222-50% | -300-81% |
| Buybacks | 1382 | 1116 | 754 | -45.0 | 0.00 | -443 |
| Dividends | 68.0 | 0.00 | 0.00 | 0.00 | 29.0 | 39.0 |
| Interest paid | 236 | 30.0 | 42.0 | 46.0 | 59.0 | 59.0 |
| Debt paid down | -156 | 15.0 | 37.0 | 57.0 | -310 | 45.0 |
| ▸Reinvestment | 74740% | -180-28% | 306 | 35454% | 13931% | 12835% |
| Capex (PP&E) | 421 | 26.0 | 50.0 | 164 | 106 | 75.0 |
| Intangibles & M&A | 326 | -206 | 256 | 190 | 33.0 | 53.0 |
| Leases signed (net Δ) | -- | -- | -- | -- | -- | -- |
| Retained / other | -1378-73% | -972-153% | -1484 | 46271% | 35479% | 26271% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 113 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 7253 | 8236 | 9143 | 6973 | 6827 |
| ▸Liabilities (total) | 4554 | 4959 | 5151 | 4921 | 4831 |
| Net debt (incl. leases) | -2021 | -2703 | -1855 | -1430 | -1494 |
| Net debt / Adj EBITDA | -4.71 | -- | -3.46 | -6.50 | -16.4 |
| Net debt / Adj FCF | -21.3 | -- | -6.49 | -8.31 | -747 |
| Adj EBITDA / interest | 10.7 | -7.38 | 11.7 | 3.73 | 1.54 |
| Shares outstanding | 134 | 152 | 169 | 170 | 142 |
| Dilution (YoY) | -17.3% | -10.2% | -0.7% | +19.7% | +0.6% |
| Employees | 22995 | 5500 | 7100 | 20340 | 19573 |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 3.3%+3.6 | -0.8%-4.3 | 3.5%+0.4 | 3.1%+0.5 | 2.6% |
| Adj EBITDA margin | 2.7%+3.8 | -2.0%-5.3 | 3.3%+1.9 | 1.4%+0.8 | 0.7% |
| Adj OCF margin | 0.8%+2.9 | -4.2%-7.0 | 2.8%+1.0 | 1.8%+1.2 | 0.6% |
| Adj FCF margin | 0.6%+3.1 | -4.5%-6.3 | 1.8%+0.6 | 1.1%+1.1 | 0.0% |
| Net income margin | -7.2%-28.9 | -0.3%-13.5 | 13.2%+12.3 | 0.9%-0.2 | 1.1% |
| Adj NI margin | 5.5%+15.1 | -4.0%-4.2 | 0.3%-0.6 | 0.9%+1.2 | -0.3% |
| ROIC (adj, after-tax) | 7.9% | -5.7% | 7.1% | 3.1% | 0.4% |
| Cost of debt | 3.8% | 3.9% | 4.1% | 5.1% | 5.1% |
Revenue Breakdown
Revenue Segments
| Urban Solutions Segment | $2.4B | +13% |
| Energy Solutions Segment | $703.0M | -42% |
| Other Operating Segment | $-1.0M | -105% |
| North America | $2.8B | +4% |
| Europe | $587.0M | -30% |
| Asia Pacific | $202.0M | -36% |
| Central And South America | $79.0M | -43% |
| Middle East And Africa | $27.0M | -16% |
Earnings Calls
Earnings Call · 2026 Q3
Fluor reported a strong third quarter 2026 with record new awards of $10.9 billion, nearly 3x quarterly revenue, and ending backlog of $34.3 billion, the highest this decade. Revenue was $3.7 billion versus $3.4 billion a year ago; adjusted EBITDA was $142 million versus $161 million; adjusted EPS was $0.77 versus $0.68, helped by 32 million shares retired over twelve months. Awards were led by the $7.5 billion LNG Canada full notice to proceed, two copper projects in Chile, and a six-month Savannah River extension. Backlog is about 70% reimbursable, expected to trend into the 60s as power opportunities convert. Segments: Urban Solutions profit was $100 million (4.3% margin) on late-stage change orders, a construction milestone and life sciences activity, partly offset by a $25 million charge on a mining project now on a path to mid-2027 completion. Energy Solutions profit was $93 million including a $73 million gain on the ECA Fluor sale, or about $20 million (3% margin) otherwise, as mature projects rolled off faster than new ones ramped. Mission Solutions earned $55 million versus $34 million on better DOE award fees and EPC ramp-up. Cash was $3.1 billion. Operating cash flow was $186 million, helped by working capital, lower LNG warranty funding and DOE fees. Fluor spent $300 million on buybacks in the quarter, over $2 billion since Q4 2024, and remains on pace for $1.4 billion in 2026. Remaining legacy project obligations are about $20 million, expected in Q4. Inorganic opportunities now look like a 2027 consideration. Full-year guidance was maintained: adjusted EBITDA $500–525 million and adjusted EPS $2.70–2.80, implying Q4 EBITDA of $150–175 million. Q3 benefited from closeouts and settlements that will not repeat. Adjusted operating cash flow guidance was raised to $430–460 million, and G&A rose to $180–190 million as incentive compensation links to cash generation. Full-year book-to-burn could approach 1.4x. A reimbursable client changed project scope, which could reduce backlog by about $2 billion in Q4. For 2027, Fluor expects adjusted EBITDA growth in the low double digits, absorbing roughly $45 million of EBIT lost from the ECA Fluor sale, a gradual ramp of mega projects, and fewer closeouts. Peak earnings from the new mega projects begin in 2028. Fluor expects book-to-burn above 1 and buybacks of about half of free cash flow. Management highlighted a pipeline of 25 mega projects averaging $4.5 billion over two years, a $30 billion mining pipeline with a multibillion South American copper award near, a TeraWulf data center award to be booked in Q4, expanding X-energy nuclear work, rising domestic refining front-end activity, and re-entry into Venezuela. Investments in AI, an ERP replacement and Project of the Future continue.
▸What is the size of the TeraWulf award to be booked in Q4, and is there upside beyond the first three buildings?Sangita Jain · KeyBanc Capital Markets
▸What is driving the stronger operating cash flow outlook, and what M&A targets are being considered for 2027?Sangita Jain · KeyBanc Capital Markets
▸How will the election affect data center, energy and booking opportunities, and what are customers saying?Steven Fisher · UBS
▸What must happen to book the gas-fired power opportunities, and what about simple cycle projects?Steven Fisher · UBS
▸Could 2027 bookings be similar to or exceed 2026 given the mega project timing, and how should we frame the awards cycle?Andrew Kaplowitz · Citi
▸How will utilization develop in 2027, particularly in Energy Solutions, and could 2028 see a bigger earnings step-up?Andrew Kaplowitz · Citi
▸Why was Urban revenue light in Q3?Andrew Kaplowitz · Citi
▸Which markets drive the 25 mega projects and what is the competitive dynamic?Jamie Cook · Truist Securities
▸What else is coming in nuclear, and on what timeframe?Jamie Cook · Truist Securities
▸Is the business model shifting toward strategic partnerships, creating more stable earnings?Jamie Cook · Truist Securities
▸How do returns and margins in the new backlog compare with prior large project cycles, given the lump sum versus reimbursable mix?Michael Dudas · Vertical Research
▸What contribution could the ERP and technology investments make to margins?Michael Dudas · Vertical Research
▸Explain the Urban Q3 moving pieces: is the $25 million mining charge consolidated, and how do the favorable items compare to underlying margin?Brent Thielman · Baird
▸Over what period will the $7.5 billion LNG Canada award burn?Brent Thielman · Baird
▸What is driving the potential $2 billion backlog reduction, and how likely is it?Steven Fisher · UBS
▸Does the preliminary 2027 guidance include the impact of this project's scope reduction?Andrew Kaplowitz · Citi
SEC Filing Findings
SEC Filing — material findings
2026-08-07 · depth 8/10risk 7Litigation▸Santos litigation: appeal to Queensland Court of Appeal commenced July 2026; judgment-related exposure net of insurance/reserves was $643M; insurers disputing coverage and Santos legal fees still to be assessed, so ultimate obligation could change.
Santos litigation: appeal to Queensland Court of Appeal commenced July 2026; judgment-related exposure net of insurance/reserves was $643M; insurers disputing coverage and Santos legal fees still to be assessed, so ultimate obligation could change.
risk 6Contingent Liabilities▸Performance guarantees of $12 billion outstanding; letters of credit of $762M under uncommitted lines plus $335M under committed facility, with $97M tied to Kuwait lump-sum projects with unresolved change orders.
Performance guarantees of $12 billion outstanding; letters of credit of $762M under uncommitted lines plus $335M under committed facility, with $97M tied to Kuwait lump-sum projects with unresolved change orders.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $40.00 | $7.30/$9.10 | 1 | $0.95/$1.15 | 119 |
| $42.50 | $6.60/$7.20 | 22 | $1.55/$1.80 | 285 |
| $45.00 | $4.90/$5.50 | 22 | $2.40/$2.75 | 84 |
| $47.50 | $3.50/$4.20 | 65 | $3.50/$3.90 | 19 |
| $50.00 | $2.40/$3.00 | 576 | $4.80/$5.30 | 75 |
| $52.50 | $1.60/$2.20 | 78 | $6.50/$7.00 | 143 |
| $55.00 | $1.05/$1.50 | 5,081 | $8.40/$9.00 | 55 |
| $57.50 | $0.65/$1.05 | 281 | $10.30/$12.30 | 30 |
Short Interest
Web Traffic
Executive Compensation (2023.0-2025.0)
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| BlackRock, Inc.Passive | $1.01B | $47.32 | −$97.0M | −$108M | — | $6.70T |
| VANGUARD PORTFOLIO MANAGEMENT LLCPassive | $352M | $46.65 | −$16.6M | +$352M | — | $2.22T |
| VANGUARD CAPITAL MANAGEMENT LLCPassive | $330M | $46.65 | −$22.6M | +$330M | — | $4.68T |
| STATE STREET CORPPassive | $294M | $41.29 | −$29.5M | −$32.8M | — | $3.38T |
| GEODE CAPITAL MANAGEMENT, LLCPassive | $272M | $40.50 | −$8.1M | +$42.2M | — | $1.87T |
| Rubric Capital Management LP | $263M | $45.36 | +$45.8M | +$53.3M | — | $10.90B |
| DME Capital Management, LP | $244M | $48.38 | −$4.6M | +$44.0M | — | $3.91B |
| HOTCHKIS & WILEY CAPITAL MANAGEMENT LLC | $243M | $39.59 | +$32.2M | +$52.1M | — | $33.97B |
| D. E. Shaw & Co., Inc. | $155M | $36.85 | +$4.1M | +$76.5M | — | $153.37B |
| DIMENSIONAL FUND ADVISORS LPPassive | $154M | $39.28 | −$42.7M | −$45.7M | — | $551.30B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Related Stocks
Investors who own this also own
Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2003 Q2 | 2.3B | 79M | 47M | $0.29 | $0.23 – $0.35 | 10 |
| 2003 Q3 | 2.1B | 78M | 44M | $0.28 | $0.22 – $0.34 | 14 |
| 2003 Q4 | 2.1B | 80M | 46M | $0.26 | $0.21 – $0.31 | 10 |
| 2004 Q1 | 2.1B | 90M | 47M | $0.26 | $0.21 – $0.31 | 18 |
| 2004 Q2 | 2.2B | 76M | 45M | $0.27 | $0.22 – $0.32 | 14 |
| 2004 Q3 | 2.5B | 96M | 49M | $0.29 | $0.23 – $0.35 | 15 |
| 2004 Q4 | 2.7B | 93M | 48M | $0.28 | $0.22 – $0.34 | 15 |
| 2005 Q1 | 2.9B | 93M | 47M | $0.28 | $0.22 – $0.34 | 9 |
| 2005 Q2 | 8.1B | 0M | -35M | $0.53 | $0.42 – $0.64 | 10 |
| 2005 Q3 | 2.9B | 164M | 105M | $0.32 | $0.26 – $0.39 | 12 |
| 2006 Q1 | 2.4B | 101M | 47M | $0.18 | $0.14 – $0.21 | 13 |
| 2006 Q2 | 3.4B | 126M | 65M | $0.35 | $0.28 – $0.42 | 20 |
| 2006 Q3 | 1.3B | 191M | 115M | $-0.25 | $-0.30 – $-0.20 | 9 |
| 2007 Q1 | 3.3B | 139M | 77M | $0.39 | $0.31 – $0.47 | 13 |
| 2007 Q2 | 3.7B | 141M | 83M | $0.41 | $0.33 – $0.49 | 13 |
| 2007 Q3 | 4.4B | 192M | 99M | $0.57 | $0.46 – $0.68 | 14 |
| 2007 Q4 | 3.8B | 265M | 193M | $0.44 | $0.35 – $0.53 | 15 |
| 2008 Q1 | 4.0B | 185M | 112M | $0.51 | $0.41 – $0.61 | 10 |
| 2008 Q2 | 5.4B | 296M | 196M | $0.77 | $0.62 – $0.92 | 17 |
| 2008 Q3 | 5.1B | 254M | 163M | $0.81 | $0.65 – $0.97 | 12 |
| 2008 Q4 | 5.4B | 252M | 165M | $0.80 | $0.64 – $0.96 | 11 |
| 2009 Q1 | 4.8B | 253M | 163M | $0.74 | $0.59 – $0.89 | 14 |
| 2009 Q2 | 5.2B | 257M | 166M | $0.89 | $0.71 – $1.07 | 14 |
| 2009 Q3 | 5.5B | 256M | 164M | $0.91 | $0.73 – $1.09 | 11 |
| 2009 Q4 | 5.9B | 250M | 159M | $0.94 | $0.75 – $1.13 | 19 |
| 2010 Q1 | 4.8B | 218M | 133M | $0.72 | $0.58 – $0.86 | 8 |
| 2010 Q2 | 4.2B | 202M | 122M | $0.55 | $0.44 – $0.66 | 9 |
| 2010 Q3 | 4.8B | 5M | -45M | $-0.22 | $-0.26 – $-0.18 | 20 |
| 2010 Q4 | 4.1B | 158M | 83M | $0.53 | $0.42 – $0.64 | 9 |
| 2011 Q1 | 4.9B | 224M | 136M | $0.74 | $0.59 – $0.89 | 7 |
| 2011 Q2 | 5.2B | 230M | 139M | $0.68 | $0.54 – $0.82 | 7 |
| 2011 Q3 | 6.6B | 238M | 147M | $0.92 | $0.74 – $1.10 | 8 |
| 2011 Q4 | 5.7B | 234M | 138M | $0.74 | $0.59 – $0.89 | 12 |
| 2012 Q1 | 6.0B | 246M | 148M | $0.83 | $0.66 – $1.00 | 20 |
| 2012 Q2 | 6.9B | 256M | 156M | $0.89 | $0.71 – $1.07 | 19 |
| 2012 Q3 | 8.0B | 264M | 161M | $1.08 | $0.86 – $1.30 | 11 |
| 2012 Q4 | 4.4B | 61M | -2M | $0.42 | $0.33 – $0.50 | 15 |
| 2013 Q1 | 6.8B | 259M | 156M | $0.90 | $0.72 – $1.08 | 12 |
| 2013 Q2 | 6.9B | 257M | 155M | $0.97 | $0.78 – $1.16 | 12 |
| 2013 Q3 | 6.6B | 277M | 171M | $1.03 | $0.82 – $1.24 | 15 |
| 2013 Q4 | 6.1B | 256M | 162M | $0.95 | $0.76 – $1.14 | 12 |
| 2014 Q1 | 5.7B | 254M | 157M | $1.02 | $0.82 – $1.22 | 15 |
| 2014 Q2 | 5.1B | 150M | 75M | $0.96 | $0.77 – $1.15 | 20 |
| 2014 Q3 | 5.2B | 139M | 66M | $1.05 | $0.84 – $1.26 | 16 |
| 2014 Q4 | 4.3B | 252M | 154M | $0.79 | $0.63 – $0.95 | 7 |
| 2015 Q1 | 4.6B | 246M | 147M | $1.00 | $0.80 – $1.20 | 19 |
| 2015 Q2 | 5.1B | 255M | 156M | $1.10 | $0.88 – $1.32 | 20 |
| 2015 Q3 | 4.1B | 256M | 158M | $1.03 | $0.82 – $1.24 | 11 |
| 2015 Q4 | 4.6B | 6M | -54M | $0.97 | $0.78 – $1.16 | 7 |
| 2016 Q1 | 5.1B | 211M | 118M | $0.96 | $0.77 – $1.15 | 15 |
| 2016 Q2 | 5.9B | 232M | 120M | $1.04 | $0.83 – $1.25 | 16 |
| 2016 Q3 | 138.2B | 87M | 8M | $1.54 | $1.23 – $1.85 | 11 |
| 2016 Q4 | 4.8B | 163M | 68M | $0.76 | $0.61 – $0.91 | 18 |
| 2017 Q1 | 7.5B | 178M | 82M | $0.91 | $0.73 – $1.09 | 18 |
| 2017 Q3 | 4.4B | 179M | 83M | $0.53 | $0.42 – $0.64 | 8 |
| 2017 Q4 | 4.5B | 142M | 54M | $0.56 | $0.45 – $0.67 | 14 |
| 2018 Q1 | 28.6B | 39M | -34M | $1.50 | $1.20 – $1.80 | 13 |
| 2018 Q2 | 4.3B | 197M | 99M | $0.61 | $0.49 – $0.73 | 12 |
| 2018 Q3 | 5.4B | 189M | 88M | $0.73 | $0.58 – $0.88 | 8 |
| 2018 Q4 | 8.1B | 151M | 64M | $0.77 | $0.62 – $0.93 | 18 |
| 2019 Q1 | 4.8B | -79M | -148M | $0.52 | $0.50 – $0.53 | 9 |
| 2019 Q2 | 4.7B | -4.7B | -4.8B | $0.50 | $0.49 – $0.52 | 11 |
| 2019 Q3 | 4.8B | -11.1B | -11.1B | $0.25 | $0.25 – $0.26 | 9 |
| 2019 Q4 | 4.0B | 109M | 49M | $0.35 | $0.34 – $0.36 | 9 |
| 2020 Q1 | 4.2B | 86M | 32M | $0.23 | $0.22 – $0.24 | 9 |
| 2020 Q2 | 3.9B | 80M | 28M | $0.20 | $0.19 – $0.21 | 8 |
| 2020 Q3 | 3.9B | 237M | 157M | $0.28 | $0.27 – $0.29 | 14 |
| 2020 Q4 | 3.7B | -911M | -956M | $0.29 | $0.28 – $0.30 | 9 |
| 2021 Q1 | 3.2B | -11M | -57M | $0.05 | $0.04 – $0.05 | 8 |
| 2021 Q2 | 3.2B | 16M | -20M | $0.08 | $0.08 – $0.09 | 3 |
| 2021 Q3 | 3.2B | 80M | 21M | $0.15 | $0.15 – $0.15 | 3 |
| 2021 Q4 | 3.3B | -221M | -249M | $0.27 | $0.27 – $0.28 | 1 |
| 2022 Q1 | 3.1B | 106M | 59M | $0.22 | $0.22 – $0.23 | 2 |
| 2022 Q2 | 3.4B | 132M | 78M | $0.29 | $0.28 – $0.29 | 4 |
| 2022 Q3 | 3.6B | 63M | 23M | $0.42 | $0.41 – $0.43 | 4 |
| 2022 Q4 | 4.1B | -240M | -274M | $0.51 | $0.49 – $0.52 | 2 |
| 2023 Q1 | 3.5B | 117M | 65M | $0.37 | $0.36 – $0.38 | 1 |
| 2023 Q2 | 3.7B | 144M | 86M | $0.43 | $0.42 – $0.45 | 3 |
| 2023 Q3 | 3.8B | 66M | 25M | $0.56 | $0.50 – $0.58 | 5 |
| 2023 Q4 | 4.1B | -272M | -302M | $0.57 | $0.56 – $0.59 | 3 |
| 2024 Q1 | 4.0B | 122M | 72M | $0.54 | $0.46 – $0.62 | 5 |
| 2024 Q2 | 4.3B | 158M | 103M | $0.73 | $0.66 – $0.78 | 6 |
| 2024 Q3 | 4.7B | 166M | 107M | $0.76 | $0.72 – $0.79 | 3 |
| 2024 Q4 | 4.4B | 164M | 105M | $0.78 | $0.72 – $0.83 | 5 |
| 2025 Q1 | 4.2B | 116M | 68M | $0.50 | $0.49 – $0.52 | 4 |
| 2025 Q2 | 4.5B | 121M | 75M | $0.55 | $0.47 – $0.61 | 7 |
| 2025 Q3 | 4.2B | 105M | 61M | $0.45 | $0.42 – $0.49 | 5 |
| 2025 Q4 | 4.3B | 85M | 46M | $0.34 | $0.27 – $0.40 | 5 |
| 2026 Q1 | 3.9B | 132M | 84M | $0.62 | $0.59 – $0.63 | 4 |
| 2026 Q2 | 3.9B | 148M | 95M | $0.70 | $0.66 – $0.74 | 4 |
| 2026 Q3 | 4.2B | 163M | 109M | $0.80 | $0.78 – $0.83 | 3 |
| 2026 Q4 | 4.1B | 181M | 122M | $0.90 | $0.87 – $0.93 | 3 |
| 2027 Q1 | 3.9B | 152M | 99M | $0.73 | $0.70 – $0.75 | 2 |
| 2027 Q2 | 4.3B | 166M | 109M | $0.80 | $0.78 – $0.83 | 1 |
| 2027 Q3 | 4.4B | 179M | 120M | $0.88 | $0.85 – $0.91 | 1 |
| 2027 Q4 | 4.4B | 188M | 126M | $0.93 | $0.90 – $0.96 | 1 |
| 2028 Q1 | 4.5B | 186M | 124M | $0.91 | $0.89 – $0.94 | 1 |
| 2028 Q2 | 5.4B | 216M | 148M | $1.09 | $1.05 – $1.12 | 1 |
| 2028 Q3 | 5.3B | 216M | 147M | $1.08 | $1.05 – $1.11 | 1 |
| 2028 Q4 | 5.6B | 225M | 153M | $1.13 | $1.10 – $1.17 | 1 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-08-07 | SELL | Bechelany Pierre Edward | officer: Group President | 5,000 | $55.24 | $276K | $1.99M |
| 2026-03-10 | SELL | Collins Alvin C III | officer: GROUP PRESIDENT | 15,610 | $45.62 | $712K | $3.26M |
| 2026-03-06 | SELL | Morgan Anthony | officer: GROUP PRESIDENT | 8,500 | $44.78 | $381K | $1.68M |
| 2026-02-27 | SELL | Regan John C | officer: CHIEF FINANCIAL OFFICER | 11,989 | $51.67 | $619K | $5.37M |
| 2026-02-26 | SELL | Regan John C | officer: CHIEF FINANCIAL OFFICER | 16,773 | $52.74 | $885K | $6.11M |
| 2026-02-23 | SELL | Alexander Michael E. | officer: GROUP PRESIDENT | 3,387 | $53.07 | $180K | $3.64M |
| 2026-02-23 | SELL | Morgan Anthony | officer: GROUP PRESIDENT | 3,387 | $53.09 | $180K | $2.44M |
| 2026-02-20 | SELL | Hammonds Kevin B | officer: CHIEF LEGAL OFFICER | 2,988 | $52.61 | $157K | $856K |
| 2026-02-19 | SELL | Bechelany Pierre Edward | officer: Group President | 4,581 | $53.10 | $243K | $1.74M |
| 2026-02-19 | SELL | Cook Tracey H | officer: Chief HR Officer | 2,589 | $53.22 | $138K | $571K |
| 2026-02-19 | SELL | Fields Mark E | officer: GROUP PRESIDENT | 5,178 | $52.36 | $271K | $10.18M |
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand
Thesis
Fluor is attempting to move from a troubled legacy-project portfolio toward a healthier, more selective EPC and project-services model. The Q2 result was encouraging: awards exceeded $6B, backlog reached $26.9B, Urban Solutions improved, Mission Solutions remained solid, and the company reported stronger-than-expected adjusted EBITDA. Nuclear fuel, mining, LNG, gas-fired power and government work provide credible sources of future activity. The principal issue is conversion, not demand. Q2 Energy profit benefited from closeouts that will not recur, management expects Energy to moderate in the second half, and new power and data-center awards are mostly a 2027 opportunity. Fluor also remains exposed to fixed-price execution, unresolved Kuwait disputes, legal liabilities and the possibility that project economics delay the large pipeline. The base case therefore assumes improvement, but not a rapid transformation into a high-margin contractor. The probability-weighted terminal value is supported by the company's net cash, but cash will be reduced by buybacks and may be needed for remaining loss projects. The business trajectory is improving, while the current operating level remains weak relative to its backlog and strategic potential.
Trade Signal
Short, with caution: the market has already priced Fluor near the analyst bull case after a strong but partly nonrecurring Q2, while current earnings and cash conversion support fair value around half the stock price.
The stock fell from roughly $53 to $43 around the May 8 Q1 report, when revenue declined 8%, adjusted EPS missed badly and guidance was narrowed amid legacy-project issues. It then recovered through June as the LNG Canada Phase 2 notice to proceed, Fluor's asset monetization/liquidity and broader infrastructure/power enthusiasm improved sentiment, reached the low-to-mid $50s in late June, and drifted back toward $49–52 before Q2. The latest leg was a 16% jump from $48.75 to $56.71 on August 7 after awards topped $6B, backlog reached $26.9B and EBITDA/EPS beat. Q2 was genuinely better, so the initial recovery was justified; the immediate jump to a price near the bull-case value appears to have overshot the durable earnings evidence. That is a temporary upside dislocation likely to close if the next prints show normalizing rather than accelerating profits.
The market is constructive to bullish: analyst consensus is Buy, with 15 Buys, 13 Holds and no Sells, and the average target is effectively at the current price. The stock is at a 52-week high after a 31% three-month rally and a 16% post-earnings jump. Bulls see a clean-up of legacy projects, strong backlog and nuclear/power/mining exposure; bears point to thin EPC margins, poor current cash conversion, Kuwait claims, litigation and the nonrecurring nature of some Q2 profit. Short interest at 6.9% is elevated enough to reflect skepticism but not extreme. The market is not ignoring the facts; it appears to be capitalizing the favorable transition early.
The operational inflection is real but not sufficiently underappreciated. Q2 showed better execution, more than $6B of awards, a $26.9B backlog and stronger Urban and Mission performance, while legacy projects are nearing completion. However, consensus already embeds a recovery, analysts are broadly Buy with a 1-year target around $56.43, and the market has immediately repriced the stock to the bull-case range. The key earnings step-up from nuclear fuel, power and newer reimbursable work is mainly a 2027 event, while 2026 Energy earnings are expected to decline in the second half.
- ▼2026-11 · Q3 2026 earnings and cash-conversion update — The market will test whether Q2's strong Energy profit was mostly nonrecurring closeout benefit and whether the remaining loss-project funding is contained.
- ▼2027-02 · FY2026 results and FY2027 guidance — Guidance will need to validate the transition to higher-quality reimbursable work; rollover in Energy or new project charges would pressure the stock.
- ▲H2 2026–2027 · Centrus/nuclear-fuel project ramp and new power awards — Meaningful revenue and margin contribution should begin in 2027, but early procurement and staffing milestones could improve confidence sooner.
- ▲Early 2027 · Savannah River extension and rebid decision — A favorable early-2027 outcome would support Mission Solutions backlog and earnings visibility.
- ▼H2 2026–2027 · Kuwait claims and letters-of-credit resolution — The $343M of outstanding letters of credit remain a liquidity and working-capital overhang; adverse settlement or further delay would reinforce the bear case.
- ▲Through 2026-12 · Continued share repurchases — Management targets roughly $1.4B of FY2026 repurchases, providing tangible demand and reducing share count if maintained.
The company repurchased 6M shares for $300M in Q2 and targets $1.4B for FY2026; reported TTM dilution is -15%, making corporate flow strongly supportive. Offsetting this, ten insiders sold $3.8M over the last year with no insider purchases, and the buyback may partly represent cash returned after the NuScale monetization rather than a durable long-term capital-allocation regime. Short interest is moderate at 6.9% of float and has not created an extreme squeeze setup.
There is meaningful but distant support from cash and the planned buyback: the study assumes roughly $1.8B of net cash after repurchases and project funding, while the $1.4B annual buyback is a real source of demand. This is not a hard floor near $57 because legacy claims, Kuwait letters of credit, legal exposure and working-capital needs can consume cash. The practical ceiling is also evident: the price is already near the analyst consensus target and around the bull-case value, with insider selling and a valuation unsupported by current owner earnings creating sellers on further strength.
Fluor is buyable as a liquid, established contractor with $3.0B of cash, a $26.9B backlog, credible nuclear/power/mining demand and an unusually large buyback program. However, margins remain structurally thin, cash conversion is weak, and new growth work is mostly a 2027 story; marginal buyers may prefer to wait for evidence that backlog converts profitably.
Fear pulls more strongly at $57: the price now discounts much of the successful-transition scenario, while current TTM EBITDA and cash flow are negative, Q2 Energy profit included nonrecurring closeouts, and the next major growth contributions are delayed. The buyback and cash balance prevent this from being an aggressive short, but greed is already reflected in the price.
Valuation
The genuinely new information is the stronger Q2 operating result and the scale and mix of new awards: adjusted EBITDA reached $149M, awards exceeded $6B, backlog reached $26.9B, and management expects full-year book-to-bill well above one. The quarter also clarified that Energy's outperformance was driven by closeouts and will moderate, while meaningful power and data-center awards are more likely in 2027. Management reduced the full-year adjusted EBITDA guide to $500M-$525M from the prior $525M-$560M range, partly offsetting the positive operational evidence.
▸ How the cases moved
Before the Q2 result, I would have used approximately $2,500M bear, $4,600M base and $7,800M bull equity values with probabilities of 0.30, 0.55 and 0.15. After the result, the bear value rises to $2,700M and its probability falls to 0.25 because remaining legacy funding needs appear manageable and backlog has strengthened. The base value rises to $5,000M as Q2 execution, $6B-plus awards and the $26.9B backlog improve visibility, with probability unchanged at 0.55. The bull value rises to $8,300M and probability to 0.20 because book-to-bill is now expected to be well above one and new-margin opportunities are improving, although the delayed timing of power and data-center awards limits the shift.
Legacy project disputes, Kuwait letters of credit and residual loss projects consume cash, while Energy Solutions rolls over before replacement work contributes. Urban improves only modestly and Fluor remains a low-margin EPC contractor. Owner earnings recover to roughly $150M annually, but confidence in their durability is limited.
▸ Valuation
6x $150M EBITDA = $900M EV + $1,800M net cash = $2,700M equity value
Legacy projects substantially finish, with no major additional charge, while new reimbursable mining, power, nuclear-fuel and government work gradually replaces completed mega-projects. Revenue is broadly stable to modestly higher, margins normalize but remain below best-in-class EPC levels, and owner earnings reach approximately $400M by year two. The assumed $1.8B net cash balance reflects buybacks and ongoing project funding.
▸ Valuation
8x $400M EBITDA = $3,200M EV + $1,800M net cash = $5,000M equity value
Book-to-bill remains well above one, higher-margin power, LNG, mining, nuclear-fuel and data-center-related work converts rapidly, and the legacy portfolio exits without further material losses. Fluor becomes a more asset-light, reimbursable and disciplined EPC/services platform. Owner earnings rise to approximately $650M as backlog mix and execution improve materially.
▸ Valuation
10x $650M EBITDA = $6,500M EV + $1,800M net cash = $8,300M equity value
▸ Target Rationale
The probability-weighted scenario value discounts to $4,068M today at 12%. I set the analytical target modestly lower at $3,900M because the arithmetic gives substantial credit to net cash that is being returned through buybacks, while execution risk, unresolved project claims, legal exposure and the weak recent cash-conversion record are not fully captured by EBITDA multiples. I nevertheless retain most of the model value because the balance sheet is strong and Q2 provided evidence that the business is moving beyond its worst legacy-project period.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Results: On May 8, 2026, Fluor reported its Q1 2026 results. The company achieved a net income of $160 million, reversing a net loss from 2025, supported by Q1 operating cash flow of $110 million (its strongest Q1 cash performance in nine years). However, adjusted EPS of $0.14 significantly missed consensus expectations due to ongoing legacy project execution challenges and a project charge in the quarter. Revenue fell 8% year-over-year to $3.6 billion.
- Capital Allocation and Share Repurchases: Fluor executed $516 million in share repurchases during Q1 and is targeting $1.4 billion in total repurchases for fiscal year 2026.
- Asset Divestitures & NuScale Monetization: In April 2026, Fluor completed the sale of its NuScale investment, bringing total proceeds from the position to $2.4 billion since September 2025. The company also finalized a $124 million divestiture of its fabrication yard in China.
- LNG Canada Phase 2 Progress: On June 1, 2026, Fluor’s joint venture (JGC Fluor BC LNG II) received a Limited Notice to Proceed (LNTP) for the proposed Phase 2 expansion of the LNG Canada export facility in Kitimat, British Columbia, significantly improving backlog visibility.
- Supreme Court Legal Defeat (Hencely v. Fluor Corp.): On April 22, 2026, the U.S. Supreme Court ruled unanimously against Fluor, holding that military and construction contractors are not automatically shielded from state-law tort claims in war zones under the "government contractor defense". The ruling allows a lawsuit regarding a 2016 suicide-bombing incident at an Afghan base (perpetrated by a Fluor subcontractor's employee) to proceed, exposing Fluor to potential tort liability.
- S&P Credit Rating Affirmation: In June 2026, S&P Global affirmed Fluor's 'BB+' credit rating with a stable outlook. While S&P expects flat revenue growth in 2026 due to customer spending delays and ongoing litigation costs, they forecast a material rebound in 2027 with normalized EBITDA margins rising to 2%–3%.
▸ Thesis-test Findings
Kuwait Dispute Change Orders
According to Fluor’s Q1 2026 10-Q filing, the company continues to carry $343 million in outstanding letters of credit (slightly down from $347 million in mid-2025) tied to two legacy lump-sum projects in Kuwait. Although these projects are substantially complete, they remain unresolved due to ongoing disputes surrounding unapproved change orders and extension of time claims. This represents a persistent bear-case factor, demonstrating how legacy fixed-price projects can trap working capital and drag on liquidity over several years.
Gordie Howe Bridge Completion Date and Cost Overruns
The Gordie Howe International Bridge—constructed by the "Bridging North America" consortium (which includes Fluor)—has experienced severe delays and cost escalation. Total estimated project costs have risen from an initial $5.7 billion CAD to $6.4 billion CAD. Although physical construction was substantially completed in late 2025/early 2026, the official opening of the bridge was delayed again in June 2026 with no opening date in sight. This latest delay is driven by a geopolitical and diplomatic permit standoff between the U.S. and Canadian governments. This highlights a complex execution environment where external regulatory and geopolitical risks can postpone commercial completion even after physical construction is successfully wrapped up.
EPC Contractor Margins: Data Center & Semiconductor Projects
High-tech infrastructure remains a massive bull-case tailwind, emphasized by Fluor's master-planning data center award with TeraWulf in Kentucky and its January 2026 leadership expansion to pursue semiconductor builds under the U.S. CHIPS Act. However, the sector carries high margin-erosion risks. EPC contractors face intense execution pressures from skilled labor shortages, specialized MEP complexity, and long-lead equipment delays (e.g., transformer prices are up 77% since 2019). Project delays are highly punitive; data center commissioning delays can cost developers up to $14.2 million per month in lost revenues. To protect its consolidated EBITDA margins, Fluor is selectively pursuing higher-margin, technology-led contracts (like fab support facilities rather than front-end construction) to control risk.