Stocks/FLR

FLR

Fluor Corporationv3 5.0/10 · 2026-11-13
Industrials·Engineering & Construction
$47.38
$6.3B market cap
v3 Rating
5.0/104.0–6.0
Setup
4.0/103.0–5.0
Fair Value
$51.00$38.00–$66.00+8%
DCF (10%)
$50.00+6%
Base IRR
+7%-8%–+20%
Visibility
moderate±27%
Wall Street
$59.38 target(8 analysts last year)(15 buy, 13 hold)
Rating
Revenue (TTM)
$15.9B
Owner Earnings
$280M
Next-Yr Owner Earnings
$290M
Growth
+9.0% × 4y
P / Next-Yr OE
20.9x
Net Debt
-$1.4B

Fluor Corporation provides engineering, procurement, and construction (EPC); fabrication and modularization; and project management services worldwide. The company operates through three segments: Urban Solutions, Energy Solutions, and Mission Solutions. The Urban Solutions segment offers EPC and project management services to the advanced technologies and manufacturing, life sciences, mining and metals, and infrastructure industries. This segment also provides professional staffing services to the company and third-party clients with technical, professional, and craft resources on a contract or permanent placement basis, as well as maintenance services. The Energy Solutions segment offers EPC services for traditional oil and gas markets, including the production and fuels, chemicals, LNG, and power markets. This segment also provides solutions to the energy transition markets, including nuclear power and other low-carbon energy sources, asset decarbonization, carbon capture, renewable fuels, waste-to-energy, green chemicals, and hydrogen; and consulting services, such as feasibility studies, process assessments, and project finance structuring. The Mission Solutions segment offers technical solutions to the U.S. and other governments, as well as it provides site management, environmental remediation, and decommissioning for nuclear remediation at governmental facilities, as well as services to commercial nuclear clients. It also delivers solutions for nuclear security and operation, nuclear waste management, and laboratory management; and operation and maintenance, logistics, EPC, and life support solutions for mission-critical facilities across U.S. military service organizations. The company was founded in 1912 and is headquartered in Irving, Texas.

2-Year Price History

$49.87-3.9%
$35$40$45$50$55Initial target $51.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
5.04.0–6.0
Setup
4.03.0–5.0
Fair value (USD)
51.0038.00 – 66.00
Upside vs 47.38
+8%
DCF (10%)
50.0037.00 – 66.00+6%
Base IRR
7%-8% – 20%
Visibility
moderaterange ±27%
Sentiment
4/10
Reputation
5/10
2026-11-13 · claude-opus-5-5 · priced at 49.87

Fluor is a cleaned-up global EPC contractor. In Q3 it booked a record $10.9B of awards and ended with $34.3B of backlog. It has about $1.4B of usable net cash and has retired more than 20% of its shares in two years (128.2M left at Oct 30). The bull case is that megaproject burn and better utilization lift adjusted EBITDA from about $465M (2026, after the ECA Fluor sale) toward $800M+. Testing the pitch weakened that case. Fluor has missed every EBITDA target since its 2021 plan, which aimed for $800-950M in 2026 against about $510M actual. Adjusted EBITDA has been flat at $500-530M for three years. Urban margins have slid from a 4-5% guide in 2025 to about 2.5%. The backlog is getting riskier: LNG Canada Phase 2 is mainly lump-sum, and the reimbursable share has dropped from 81% to 69%, below the 75% floor management set in 2025. The Savannah River site contract, a large share of Mission profit, is in a competitive rebid that will be decided in early 2027. The cash, share count and DCF arithmetic all hold up. With year-5 unlevered FCF of about $490M (not $560M) at 12x, plus net cash, less risk provisions, plus a probability-weighted Santos appeal option, fair value is about $51 against $49.87 (Nov 12 close; no Nov 13 close found). The stock is fairly priced. The market's skepticism is earned, not a mispricing. There are real catalysts in Q1 2027: the Santos appeal ruling (about +$4/share if Fluor wins), the Savannah River decision (about -$3-4 if Fluor loses), the February 2027 guidance and big awards. But they cut both ways. Rating 5.0, hold. Setup 4.0: no clear variant view, only modest upside, and the asymmetry depends on a coin-flip legal appeal.

A deep dive would have to establish: Will the $34B record backlog, now only 69% reimbursable and anchored by a mostly lump-sum LNG Canada Phase 2, convert into ~$700M+ of adjusted EBITDA by 2030 without new fixed-price charges, and will Fluor keep Savannah River and win the Santos appeal in Q1 2027?

Owner earnings, TTM
$280M$220M – $330M
Realistic peak profit
$520M$400M – $700M
Growth rate
9.0%2.0% – 15.0%
Years of growth
42 – 6
Market cap
$6.4B$6.3B – $6.5B
EV
$5.0B$4.7B – $5.3B
Net debt
-$1.4B-$1.6B – -$1.1B
Capital return / cap
5.0%3.0% – 7.0%
P/E
18.0×16.0× – 20.0×
EV/EBITDA
9.8×8.5× – 11.0×
FCF yield
5.6%4.5% – 6.5%
Projected FCF, base case (USD millions)
Y1$290M$250M – $320M
Y2$370M$290M – $430M
Y3$430M$320M – $520M
Y4$470M$350M – $580M
Y5$490M$380M – $620M
Competition: Fluor competes for scarce craft labor and megaproject mandates with Bechtel, Kiewit, KBR, Worley, Technip and Jacobs. Most of its 25-project mega pipeline is negotiated sole-source work where few rivals have comparable resumes. The Savannah River management contract is a contested rebid against Bechtel, BWXT, Amentum, Jacobs and others.
Governance: 2023 SEC penalty ($14.5M) for overly optimistic project cost accounting, a long history of project charges, and repeated misses of multi-year targets. Current management is more candid, but heavy cash plus an M&A appetite is a capital allocation risk.
Research (expand)

What it does. Fluor engineers and builds very large projects: copper and fertilizer mines, LNG, gas and nuclear power, refining, pharma plants and data centers. Urban Solutions is about 65% of revenue, Energy 20%. It also runs DOE sites such as Savannah River (Mission, 15%). 2026 revenue is about $15.5B.

What the market believes. Fluor is a low-margin contractor whose plans do not come true. In the market's view, backlog turns into profit slowly and another charge always shows up. In 2026 alone there was a $62M mining JV hit, a $100M LOGCAP ruling and Gordie Howe bridge losses. The stock has gone nowhere since 2023 despite more than $2B of buybacks. Short interest rose steadily to about 10.9M shares (~8% of shares).

What it may be getting wrong. 1) Earnings lag awards. Megaprojects take about 2 years to reach peak burn, so the 2026 base (Energy margin about 3% ex-gains) understates 2028. Management says new-award margins beat its 2025 investor-day assumptions. 2) Legacy losses are nearly over: about $120M of legacy backlog and about $20M of legacy funding left. The Q3 10-Q still carries $134M of accrued loss-position investments, mainly the mining JV and an Energy JV. 3) The pipeline has 25 megaprojects averaging $4.5B, mostly negotiated sole-source deals, plus TeraWulf (low single-digit $B, expected in Q4), a near-term multibillion-dollar copper award and gas power EPCs in 2027. 4) The Santos appeal was heard in August 2026, with a decision due by Q1 2027. The A$1.07B was paid in December 2025, so a win would be pure upside.

What it earns today. 2026 adjusted EBITDA guidance is $500-525M. Adjusted EBITDA is reconciled from net earnings attributable to Fluor, so the minority partners' share is already excluded. Removing ECA Fluor (about $45M) and subtracting D&A (~$75M), 26% tax and capex roughly equal to D&A gives unlevered owner earnings of about $290M. Netting the ERP spend that adjusted EBITDA excludes takes it to about $275-280M.

Projected unlevered FCF ($M), 2027-2031 (revised): 290, 370, 430, 470, 490, down from 300/400/480/530/560. Year 5 now needs about $740M of adjusted EBITDA, roughly a 10% CAGR from the $465M ex-ECA base. That is still a large step up for a company whose adjusted EBITDA was $530M (2024), $504M (2025) and ~$512M (2026). It is supported by $34.3B of backlog, guided low-double-digit growth in 2027 and a utilization step-up in 2028. It no longer assumes management's ~$900M 2028 ambition comes true.

Year-5 business. Neither a compounder nor a corpse. It will be a larger contractor in a supportive capex cycle (power, copper, nuclear, onshoring), but less reimbursable than before. Backlog was 69% reimbursable at Sep 30, against 81% at year-end 2025, and is heading to the 60s. The cause is the mostly lump-sum LNG Canada Phase 2 contract ($7.5B Fluor share) and fixed-price gas power. 2031 sits close to peak execution of the 2026 award wave, so I apply 12x rather than 13x. Confidence is moderate to low.

Valuation (revised).

  • PV of FCF is about $1.52B. The PV of the terminal value (12 x $490M) is about $3.65B, for an EV of about $5.17B.
  • Net cash is about $1.4B. Per the Q3 10-Q: $2,678M of cash plus $401M of securities, less $1,058M of debt, less $300M of VIE cash and $117M of NCI, gives about $1.6B. Subtracting the $134M of loss-position accruals and Santos legal fees still to be assessed leaves about $1.4B.
  • I subtract about $130M of expected-value provisions: a lump-sum overrun on about $10.6B of fixed-price backlog, and the risk of losing the Savannah River rebid.
  • That gives an equity value of about $6.44B, or about $50/share on 128.2M shares.
  • Adding the probability-weighted Santos option (~25% x ~$4) brings fair value to about $51.
  • At $49.87 we pay about 18x 2026 adjusted EPS of $2.75, about 9.8x EV/2026 EBITDA, and get about a 5.6% unlevered FCF yield.

Management and capital return. CEO Breuer and CFO Regan have been candid. They named the Santos, LOGCAP and mining problems plainly, monetized NuScale for $2.4B, sold Stork and ECA Fluor, and are buying back $1.4B in 2026 ($1.12B done through Q3). From 2027, buybacks are set at about half of FCF. They explicitly want M&A, which is a risk for an E&C company flush with cash. The company has a record of setting multi-year targets it then misses (the 2021 plan; 2024-2026 guidance).

Risks. The main ones are lump-sum LNG Canada Phase 2 and fixed-price power, and an Urban margin that is still falling. Other risks:

  • the Savannah River management contract rebid, run by the government's NNSA (RFP March 2026, decision early 2027, bidders likely include Bechtel, BWXT, Amentum and Jacobs);
  • the $2B reimbursable scope cut in Q4;
  • data center contract terms;
  • $97M of Kuwait letters of credit;
  • the ERP rollout;
  • M&A.

Sentiment: 4/10. Investors were burned repeatedly. Wellington cut from 8.2% to 3.8%, short interest is rising and the stock is range-bound at $40-58. ATM implied volatility of about 53-62% reflects the binary events due in Q1 2027.

Thesis test

1. The year-5 EBITDA is unsupported by the track record. Challenger mostly right. The 2021 plan targeted $800-950M for 2026 against ~$510M actual, and the 2024, 2025 and 2026 guides were each missed or cut. Record backlog justifies growth, but not $830M. I cut year-5 FCF from $560M to $490M (EBITDA ~$740M).

2. LNG Canada Phase 2 is mainly lump-sum and the reimbursable share is falling. Challenger right on the facts, partly offset. JGC describes the contract as primarily lump-sum turnkey, and reimbursable backlog fell from 81% to 69%. But Phase 1 was delivered well, with warranty money released early, and the Phase 2 contract includes Phase 1 learnings on labor and force majeure. I added an expected overrun provision (~$80M) and widened the low case.

3. Margins are still falling. Challenger right, but this overlaps #1. Urban went from a 4-5% guide to ~2.5%, underlying Energy is ~3%, and Q3 adjusted EBITDA fell year on year on +10% revenue. Backlog margin cannot show up before the burn, so this is absorbed in #1, not double-counted.

4. The Savannah River rebid is unpriced. Challenger right. NNSA is running a competitive rebid with a decision in early 2027. It is now in value as an ~$50M expected-value provision, and the downside sits in the low case.

5. The terminal year is near the peak. Challenger partly right. Book-to-burn above 1 guided for 2027 argues against an imminent peak, but 2031 coincides with peak megaproject burn. The multiple moves from 13x to 12x, not 11x.

What held: the DCF arithmetic, net cash of ~$1.4B, the share count (128.2M), NCI already excluded from adjusted EBITDA, and LNG Canada Phase 1 execution.

Conclusion: fair value is about $51 versus the pitch's $56, which is about the current price. The market is not obviously wrong. It is discounting a management team whose targets have repeatedly slipped. The Q1 2027 events (Santos ruling, Savannah River award, 2027 guidance) are real, roughly offsetting binaries. Hold, not buy.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue15888+2%15504-5%16315+5%15474+13%13743
Gross profit528-120-121%573+20%477+34%356
Operating expenses163-19%258+135%110-67%331-2%338
▸Adj EBITDA429-310-158%536+144%220+142%91.0
▸Adj OCF133-650-244%450+62%278+261%77.0
CapEx-38.0-50.0-164-106-75.0
Adj FCF95.0-700-345%286+66%1722.00
Interest expense40.042.046.059.059.0
▸Adj net income877-61440.0-71%138-47.0
▸Owner's earnings260--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA1875100%635100%-230652100%448100%370100%
FCF (OCF−capex)24213%-47.0-7%-437664102%10624%-44.0-12%
Net income2809150%43268%-51.02145329%13831%14539%
▸Capital returned153082%1161183%83358.09%-222-50%-300-81%
Buybacks13821116754-45.00.00-443
Dividends68.00.000.000.0029.039.0
Interest paid23630.042.046.059.059.0
Debt paid down-15615.037.057.0-31045.0
▸Reinvestment74740%-180-28%30635454%13931%12835%
Capex (PP&E)42126.050.016410675.0
Intangibles & M&A326-20625619033.053.0
Leases signed (net Δ)------------
Retained / other-1378-73%-972-153%-148446271%35479%26271%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 113 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)72538236914369736827
▸Liabilities (total)45544959515149214831
Net debt (incl. leases)-2021-2703-1855-1430-1494
Net debt / Adj EBITDA-4.71---3.46-6.50-16.4
Net debt / Adj FCF-21.3---6.49-8.31-747
Adj EBITDA / interest10.7-7.3811.73.731.54
Shares outstanding134152169170142
Dilution (YoY)-17.3%-10.2%-0.7%+19.7%+0.6%
Employees22995550071002034019573
MarginsTTM2025202420232022
Gross margin3.3%+3.6-0.8%-4.33.5%+0.43.1%+0.52.6%
Adj EBITDA margin2.7%+3.8-2.0%-5.33.3%+1.91.4%+0.80.7%
Adj OCF margin0.8%+2.9-4.2%-7.02.8%+1.01.8%+1.20.6%
Adj FCF margin0.6%+3.1-4.5%-6.31.8%+0.61.1%+1.10.0%
Net income margin-7.2%-28.9-0.3%-13.513.2%+12.30.9%-0.21.1%
Adj NI margin5.5%+15.1-4.0%-4.20.3%-0.60.9%+1.2-0.3%
ROIC (adj, after-tax)7.9%-5.7%7.1%3.1%0.4%
Cost of debt3.8%3.9%4.1%5.1%5.1%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Urban Solutions Segment$2.4B+13%
Energy Solutions Segment$703.0M-42%
Other Operating Segment$-1.0M-105%
By Geography (2026-Q1)
North America$2.8B+4%
Europe$587.0M-30%
Asia Pacific$202.0M-36%
Central And South America$79.0M-43%
Middle East And Africa$27.0M-16%

Earnings Calls

12 calls

Earnings Call · 2026 Q3

Fluor reported a strong third quarter 2026 with record new awards of $10.9 billion, nearly 3x quarterly revenue, and ending backlog of $34.3 billion, the highest this decade. Revenue was $3.7 billion versus $3.4 billion a year ago; adjusted EBITDA was $142 million versus $161 million; adjusted EPS was $0.77 versus $0.68, helped by 32 million shares retired over twelve months. Awards were led by the $7.5 billion LNG Canada full notice to proceed, two copper projects in Chile, and a six-month Savannah River extension. Backlog is about 70% reimbursable, expected to trend into the 60s as power opportunities convert. Segments: Urban Solutions profit was $100 million (4.3% margin) on late-stage change orders, a construction milestone and life sciences activity, partly offset by a $25 million charge on a mining project now on a path to mid-2027 completion. Energy Solutions profit was $93 million including a $73 million gain on the ECA Fluor sale, or about $20 million (3% margin) otherwise, as mature projects rolled off faster than new ones ramped. Mission Solutions earned $55 million versus $34 million on better DOE award fees and EPC ramp-up. Cash was $3.1 billion. Operating cash flow was $186 million, helped by working capital, lower LNG warranty funding and DOE fees. Fluor spent $300 million on buybacks in the quarter, over $2 billion since Q4 2024, and remains on pace for $1.4 billion in 2026. Remaining legacy project obligations are about $20 million, expected in Q4. Inorganic opportunities now look like a 2027 consideration. Full-year guidance was maintained: adjusted EBITDA $500–525 million and adjusted EPS $2.70–2.80, implying Q4 EBITDA of $150–175 million. Q3 benefited from closeouts and settlements that will not repeat. Adjusted operating cash flow guidance was raised to $430–460 million, and G&A rose to $180–190 million as incentive compensation links to cash generation. Full-year book-to-burn could approach 1.4x. A reimbursable client changed project scope, which could reduce backlog by about $2 billion in Q4. For 2027, Fluor expects adjusted EBITDA growth in the low double digits, absorbing roughly $45 million of EBIT lost from the ECA Fluor sale, a gradual ramp of mega projects, and fewer closeouts. Peak earnings from the new mega projects begin in 2028. Fluor expects book-to-burn above 1 and buybacks of about half of free cash flow. Management highlighted a pipeline of 25 mega projects averaging $4.5 billion over two years, a $30 billion mining pipeline with a multibillion South American copper award near, a TeraWulf data center award to be booked in Q4, expanding X-energy nuclear work, rising domestic refining front-end activity, and re-entry into Venezuela. Investments in AI, an ERP replacement and Project of the Future continue.

Analyst Q&A (16)
▸
What is the size of the TeraWulf award to be booked in Q4, and is there upside beyond the first three buildings?
Sangita Jain · KeyBanc Capital Markets
The first two buildings are a low single-digit multibillion award. A third Kentucky building is still being estimated and will be released later. Fluor is also talking to the client about other sites, so the award could grow.
▸
What is driving the stronger operating cash flow outlook, and what M&A targets are being considered for 2027?
Sangita Jain · KeyBanc Capital Markets
Cash flow improved across all three segments: better working capital in Urban, lower-than-expected LNG warranty funding in Energy, and strong DOE fee scores in Mission, with collections due in Q4. On M&A, Fluor has ample cash but has not yet gotten deals across the line. It will increase its focus and provide more transparency in 2027.
▸
How will the election affect data center, energy and booking opportunities, and what are customers saying?
Steven Fisher · UBS
Management is watching closely but expects no significant impact on its trajectory. Its markets have bipartisan support, data center and power work looks resilient, its diversification limits exposure, and permitting reform momentum should help.
▸
What must happen to book the gas-fired power opportunities, and what about simple cycle projects?
Steven Fisher · UBS
The most mature opportunity is a combined cycle plant. Two simple cycle projects for another client could convert around mid-2027. Estimates, execution plans and contract terms are mature, and the first client needs board approval before giving the go-ahead. Several EPC contracts are expected next year.
▸
Could 2027 bookings be similar to or exceed 2026 given the mega project timing, and how should we frame the awards cycle?
Andrew Kaplowitz · Citi
2026 is already about $20 billion booked through Q3. Fluor expects 2027 book-to-burn above 1, but timing of large awards, such as the South American copper project in Q4 or Q1, is uncertain. Backlog should keep growing, supported by diversified markets. Board approvals are a key hurdle.
▸
How will utilization develop in 2027, particularly in Energy Solutions, and could 2028 see a bigger earnings step-up?
Andrew Kaplowitz · Citi
Utilization should improve gradually in 2027, including in Energy, as front-end and service work feeds later EPC awards. The big step-up is expected in 2028, as illustrated on slide 14.
▸
Why was Urban revenue light in Q3?
Andrew Kaplowitz · Citi
Nothing unusual; it reflects typical burn across the portfolio.
▸
Which markets drive the 25 mega projects and what is the competitive dynamic?
Jamie Cook · Truist Securities
The pipeline spans copper, power, life sciences and manufacturing, US and international. Most are front-end work or sole-source negotiations rather than competitive bids, so the main hurdle is client board approval and financial hurdles.
▸
What else is coming in nuclear, and on what timeframe?
Jamie Cook · Truist Securities
Fluor has two X-energy projects, and Cernavoda in Romania is near finishing LNTP with full release in late 2027 or 2028. It is in talks with two established nuclear technology providers, one SMR and one conventional, with front-end announcements in 2027 and EPC announcements in 2028–2029.
▸
Is the business model shifting toward strategic partnerships, creating more stable earnings?
Jamie Cook · Truist Securities
Yes. Fluor is working to add predictability through project execution, contractor partnerships and longer-term client relationships, while balancing that with growth objectives.
▸
How do returns and margins in the new backlog compare with prior large project cycles, given the lump sum versus reimbursable mix?
Michael Dudas · Vertical Research
New awards are carrying better margins than expected at the early-2025 investor day, on both lump sum and reimbursable work. Fluor is working to improve reimbursable margins, and with better utilization and project-level performance expects margins to grow materially as projects reach peak execution. Overhead absorption should also expand bottom-line margins.
▸
What contribution could the ERP and technology investments make to margins?
Michael Dudas · Vertical Research
It is hard to quantify now, but management expects a leaner organization with greater efficiency in bidding, planning and the back office, and expects margins to improve.
▸
Explain the Urban Q3 moving pieces: is the $25 million mining charge consolidated, and how do the favorable items compare to underlying margin?
Brent Thielman · Baird
The mining project is a 50% JV with partial consolidation. The charge was largely offset by favorable change orders on a Dallas project and a milestone-driven forecast reduction on another project. The three items roughly offset, so Urban's result reflects underlying performance with a slight uplift expected in Q4.
▸
Over what period will the $7.5 billion LNG Canada award burn?
Brent Thielman · Baird
The client has announced start-up in the first half of the 2030s, implying a five- to six-year burn. The slide 14 graph is a theoretical project. Because of the earlier limited notice to proceed, LNG Canada should start faster, though its size moderates first-year ramp.
▸
What is driving the potential $2 billion backlog reduction, and how likely is it?
Steven Fisher · UBS
A reimbursable client changed project scope in late October. It is still being evaluated, but Fluor expects roughly $2 billion of derecognition as early as Q4. It is project-specific and a fairly ordinary in-flight scope reevaluation, not a macro issue.
▸
Does the preliminary 2027 guidance include the impact of this project's scope reduction?
Andrew Kaplowitz · Citi
Yes, everything discussed on the call is incorporated into the preliminary 2027 outlook.

SEC Filing Findings

SEC Filing — material findings

2026-08-07 · depth 8/10
risk 7Litigation
▸

Santos litigation: appeal to Queensland Court of Appeal commenced July 2026; judgment-related exposure net of insurance/reserves was $643M; insurers disputing coverage and Santos legal fees still to be assessed, so ultimate obligation could change.

“We have appealed the court's decision to the Queensland Court of Appeal. The appeal hearing commenced in July 2026.”
risk 6Contingent Liabilities
▸

Performance guarantees of $12 billion outstanding; letters of credit of $762M under uncommitted lines plus $335M under committed facility, with $97M tied to Kuwait lump-sum projects with unresolved change orders.

“letters of credit totaling $97 million for two lump-sum projects in Kuwait that are substantially complete except for the resolution of unapproved change orders and extension of time claims.”

Options

Chain Snapshot (daily)

Call IV (ATM)53%
Put IV (ATM)62%
ATM Spread1.5%
Call $OI (near money)$6.5M
Put $OI (near money)$4.0M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$47.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$40.00$7.30/$9.101$0.95/$1.15119
$42.50$6.60/$7.2022$1.55/$1.80285
$45.00$4.90/$5.5022$2.40/$2.7584
$47.50$3.50/$4.2065$3.50/$3.9019
$50.00$2.40/$3.00576$4.80/$5.3075
$52.50$1.60/$2.2078$6.50/$7.00143
$55.00$1.05/$1.505,081$8.40/$9.0055
$57.50$0.65/$1.05281$10.30/$12.3030
Snapshot: 2026-11-04

Short Interest

Short % of Float9.9%
Short Shares12.4M
Days to Cover5.3
Change (vs Prior)+14.2%
Short % Float History
9.90%+2.40pp
5.0%6.0%7.0%8.0%9.0%10.0%10-1512-3103-1305-2908-1410-30

Web Traffic

fluor.com
Web rank#672,298
Est. visits/mo687K
Traffic YoY▲ 8.5%
Traffic QoQ (12w)▼ 0.3%
Web Rank History
#672,298-168,318
rankest. visits/mo
500k600k700k800k900k1.0m565K624K682K741K799K06-0209-2201-1904-2007-1310-0511-16

Executive Compensation (2023.0-2025.0)

Direct Pay$118.5M
Incentive & Other$55.0M
Total Compensation$173.6M
% of Revenue0.4%

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
BlackRock, Inc.Passive$1.01B$47.32−$97.0M−$108M—$6.70T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$352M$46.65−$16.6M+$352M—$2.22T
VANGUARD CAPITAL MANAGEMENT LLCPassive$330M$46.65−$22.6M+$330M—$4.68T
STATE STREET CORPPassive$294M$41.29−$29.5M−$32.8M—$3.38T
GEODE CAPITAL MANAGEMENT, LLCPassive$272M$40.50−$8.1M+$42.2M—$1.87T
Rubric Capital Management LP$263M$45.36+$45.8M+$53.3M—$10.90B
DME Capital Management, LP$244M$48.38−$4.6M+$44.0M—$3.91B
HOTCHKIS & WILEY CAPITAL MANAGEMENT LLC$243M$39.59+$32.2M+$52.1M—$33.97B
D. E. Shaw & Co., Inc.$155M$36.85+$4.1M+$76.5M—$153.37B
DIMENSIONAL FUND ADVISORS LPPassive$154M$39.28−$42.7M−$45.7M—$551.30B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

012.5M25.0M37.5M50.0M$24$31$38$45$522021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
FMR LLC1.8MWELLINGTON MANAGEMENT GROUP LLP156KUBS Group AG1.4MRubric Capital Management LP5.0MBank of New York Mellon Corp2.2MDME Capital Management, LP4.7MHOTCHKIS & WILEY CAPITAL MANAGEMENT LLC4.6MMILLENNIUM MANAGEMENT LLC194KMORGAN STANLEY2.8MStarboard Value LP1.6M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
CNRCore Natural Resources, Inc.348.95×
FLSFlowserve Corporation346.62×
NXTNextpower Inc.344.50×
TEVATeva Pharmaceutical Industries Limited436.26×
CCJCameco Corporation316.59×

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (8 analysts)$59.38+26.6%
Current Price$46.90
Analyst Ratings
15
13
Buy: 15Hold: 13Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2003 Q22.3B79M47M$0.29$0.23 – $0.3510
2003 Q32.1B78M44M$0.28$0.22 – $0.3414
2003 Q42.1B80M46M$0.26$0.21 – $0.3110
2004 Q12.1B90M47M$0.26$0.21 – $0.3118
2004 Q22.2B76M45M$0.27$0.22 – $0.3214
2004 Q32.5B96M49M$0.29$0.23 – $0.3515
2004 Q42.7B93M48M$0.28$0.22 – $0.3415
2005 Q12.9B93M47M$0.28$0.22 – $0.349
2005 Q28.1B0M-35M$0.53$0.42 – $0.6410
2005 Q32.9B164M105M$0.32$0.26 – $0.3912
2006 Q12.4B101M47M$0.18$0.14 – $0.2113
2006 Q23.4B126M65M$0.35$0.28 – $0.4220
2006 Q31.3B191M115M$-0.25$-0.30 – $-0.209
2007 Q13.3B139M77M$0.39$0.31 – $0.4713
2007 Q23.7B141M83M$0.41$0.33 – $0.4913
2007 Q34.4B192M99M$0.57$0.46 – $0.6814
2007 Q43.8B265M193M$0.44$0.35 – $0.5315
2008 Q14.0B185M112M$0.51$0.41 – $0.6110
2008 Q25.4B296M196M$0.77$0.62 – $0.9217
2008 Q35.1B254M163M$0.81$0.65 – $0.9712
2008 Q45.4B252M165M$0.80$0.64 – $0.9611
2009 Q14.8B253M163M$0.74$0.59 – $0.8914
2009 Q25.2B257M166M$0.89$0.71 – $1.0714
2009 Q35.5B256M164M$0.91$0.73 – $1.0911
2009 Q45.9B250M159M$0.94$0.75 – $1.1319
2010 Q14.8B218M133M$0.72$0.58 – $0.868
2010 Q24.2B202M122M$0.55$0.44 – $0.669
2010 Q34.8B5M-45M$-0.22$-0.26 – $-0.1820
2010 Q44.1B158M83M$0.53$0.42 – $0.649
2011 Q14.9B224M136M$0.74$0.59 – $0.897
2011 Q25.2B230M139M$0.68$0.54 – $0.827
2011 Q36.6B238M147M$0.92$0.74 – $1.108
2011 Q45.7B234M138M$0.74$0.59 – $0.8912
2012 Q16.0B246M148M$0.83$0.66 – $1.0020
2012 Q26.9B256M156M$0.89$0.71 – $1.0719
2012 Q38.0B264M161M$1.08$0.86 – $1.3011
2012 Q44.4B61M-2M$0.42$0.33 – $0.5015
2013 Q16.8B259M156M$0.90$0.72 – $1.0812
2013 Q26.9B257M155M$0.97$0.78 – $1.1612
2013 Q36.6B277M171M$1.03$0.82 – $1.2415
2013 Q46.1B256M162M$0.95$0.76 – $1.1412
2014 Q15.7B254M157M$1.02$0.82 – $1.2215
2014 Q25.1B150M75M$0.96$0.77 – $1.1520
2014 Q35.2B139M66M$1.05$0.84 – $1.2616
2014 Q44.3B252M154M$0.79$0.63 – $0.957
2015 Q14.6B246M147M$1.00$0.80 – $1.2019
2015 Q25.1B255M156M$1.10$0.88 – $1.3220
2015 Q34.1B256M158M$1.03$0.82 – $1.2411
2015 Q44.6B6M-54M$0.97$0.78 – $1.167
2016 Q15.1B211M118M$0.96$0.77 – $1.1515
2016 Q25.9B232M120M$1.04$0.83 – $1.2516
2016 Q3138.2B87M8M$1.54$1.23 – $1.8511
2016 Q44.8B163M68M$0.76$0.61 – $0.9118
2017 Q17.5B178M82M$0.91$0.73 – $1.0918
2017 Q34.4B179M83M$0.53$0.42 – $0.648
2017 Q44.5B142M54M$0.56$0.45 – $0.6714
2018 Q128.6B39M-34M$1.50$1.20 – $1.8013
2018 Q24.3B197M99M$0.61$0.49 – $0.7312
2018 Q35.4B189M88M$0.73$0.58 – $0.888
2018 Q48.1B151M64M$0.77$0.62 – $0.9318
2019 Q14.8B-79M-148M$0.52$0.50 – $0.539
2019 Q24.7B-4.7B-4.8B$0.50$0.49 – $0.5211
2019 Q34.8B-11.1B-11.1B$0.25$0.25 – $0.269
2019 Q44.0B109M49M$0.35$0.34 – $0.369
2020 Q14.2B86M32M$0.23$0.22 – $0.249
2020 Q23.9B80M28M$0.20$0.19 – $0.218
2020 Q33.9B237M157M$0.28$0.27 – $0.2914
2020 Q43.7B-911M-956M$0.29$0.28 – $0.309
2021 Q13.2B-11M-57M$0.05$0.04 – $0.058
2021 Q23.2B16M-20M$0.08$0.08 – $0.093
2021 Q33.2B80M21M$0.15$0.15 – $0.153
2021 Q43.3B-221M-249M$0.27$0.27 – $0.281
2022 Q13.1B106M59M$0.22$0.22 – $0.232
2022 Q23.4B132M78M$0.29$0.28 – $0.294
2022 Q33.6B63M23M$0.42$0.41 – $0.434
2022 Q44.1B-240M-274M$0.51$0.49 – $0.522
2023 Q13.5B117M65M$0.37$0.36 – $0.381
2023 Q23.7B144M86M$0.43$0.42 – $0.453
2023 Q33.8B66M25M$0.56$0.50 – $0.585
2023 Q44.1B-272M-302M$0.57$0.56 – $0.593
2024 Q14.0B122M72M$0.54$0.46 – $0.625
2024 Q24.3B158M103M$0.73$0.66 – $0.786
2024 Q34.7B166M107M$0.76$0.72 – $0.793
2024 Q44.4B164M105M$0.78$0.72 – $0.835
2025 Q14.2B116M68M$0.50$0.49 – $0.524
2025 Q24.5B121M75M$0.55$0.47 – $0.617
2025 Q34.2B105M61M$0.45$0.42 – $0.495
2025 Q44.3B85M46M$0.34$0.27 – $0.405
2026 Q13.9B132M84M$0.62$0.59 – $0.634
2026 Q23.9B148M95M$0.70$0.66 – $0.744
2026 Q34.2B163M109M$0.80$0.78 – $0.833
2026 Q44.1B181M122M$0.90$0.87 – $0.933
2027 Q13.9B152M99M$0.73$0.70 – $0.752
2027 Q24.3B166M109M$0.80$0.78 – $0.831
2027 Q34.4B179M120M$0.88$0.85 – $0.911
2027 Q44.4B188M126M$0.93$0.90 – $0.961
2028 Q14.5B186M124M$0.91$0.89 – $0.941
2028 Q25.4B216M148M$1.09$1.05 – $1.121
2028 Q35.3B216M147M$1.08$1.05 – $1.111
2028 Q45.6B225M153M$1.13$1.10 – $1.171

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$4.04M
11 txns · 8 insiders · 79,982 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-08-07SELLBechelany Pierre Edwardofficer: Group President5,000$55.24$276K$1.99M
2026-03-10SELLCollins Alvin C IIIofficer: GROUP PRESIDENT15,610$45.62$712K$3.26M
2026-03-06SELLMorgan Anthonyofficer: GROUP PRESIDENT8,500$44.78$381K$1.68M
2026-02-27SELLRegan John Cofficer: CHIEF FINANCIAL OFFICER11,989$51.67$619K$5.37M
2026-02-26SELLRegan John Cofficer: CHIEF FINANCIAL OFFICER16,773$52.74$885K$6.11M
2026-02-23SELLAlexander Michael E.officer: GROUP PRESIDENT3,387$53.07$180K$3.64M
2026-02-23SELLMorgan Anthonyofficer: GROUP PRESIDENT3,387$53.09$180K$2.44M
2026-02-20SELLHammonds Kevin Bofficer: CHIEF LEGAL OFFICER2,988$52.61$157K$856K
2026-02-19SELLBechelany Pierre Edwardofficer: Group President4,581$53.10$243K$1.74M
2026-02-19SELLCook Tracey Hofficer: Chief HR Officer2,589$53.22$138K$571K
2026-02-19SELLFields Mark Eofficer: GROUP PRESIDENT5,178$52.36$271K$10.18M
v2 analysis (legacy, 2026-08-07) — for comparison onlyclick to expand

Thesis

Fluor is attempting to move from a troubled legacy-project portfolio toward a healthier, more selective EPC and project-services model. The Q2 result was encouraging: awards exceeded $6B, backlog reached $26.9B, Urban Solutions improved, Mission Solutions remained solid, and the company reported stronger-than-expected adjusted EBITDA. Nuclear fuel, mining, LNG, gas-fired power and government work provide credible sources of future activity. The principal issue is conversion, not demand. Q2 Energy profit benefited from closeouts that will not recur, management expects Energy to moderate in the second half, and new power and data-center awards are mostly a 2027 opportunity. Fluor also remains exposed to fixed-price execution, unresolved Kuwait disputes, legal liabilities and the possibility that project economics delay the large pipeline. The base case therefore assumes improvement, but not a rapid transformation into a high-margin contractor. The probability-weighted terminal value is supported by the company's net cash, but cash will be reduced by buybacks and may be needed for remaining loss projects. The business trajectory is improving, while the current operating level remains weak relative to its backlog and strategic potential.

Trade Signal

Trade rating
-5.8/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-07 · saw $57.00-16.9% since

Short, with caution: the market has already priced Fluor near the analyst bull case after a strong but partly nonrecurring Q2, while current earnings and cash conversion support fair value around half the stock price.

Temporary mispricing-7.0

The stock fell from roughly $53 to $43 around the May 8 Q1 report, when revenue declined 8%, adjusted EPS missed badly and guidance was narrowed amid legacy-project issues. It then recovered through June as the LNG Canada Phase 2 notice to proceed, Fluor's asset monetization/liquidity and broader infrastructure/power enthusiasm improved sentiment, reached the low-to-mid $50s in late June, and drifted back toward $49–52 before Q2. The latest leg was a 16% jump from $48.75 to $56.71 on August 7 after awards topped $6B, backlog reached $26.9B and EBITDA/EPS beat. Q2 was genuinely better, so the initial recovery was justified; the immediate jump to a price near the bull-case value appears to have overshot the durable earnings evidence. That is a temporary upside dislocation likely to close if the next prints show normalizing rather than accelerating profits.

Market view+4.5

The market is constructive to bullish: analyst consensus is Buy, with 15 Buys, 13 Holds and no Sells, and the average target is effectively at the current price. The stock is at a 52-week high after a 31% three-month rally and a 16% post-earnings jump. Bulls see a clean-up of legacy projects, strong backlog and nuclear/power/mining exposure; bears point to thin EPC margins, poor current cash conversion, Kuwait claims, litigation and the nonrecurring nature of some Q2 profit. Short interest at 6.9% is elevated enough to reflect skepticism but not extreme. The market is not ignoring the facts; it appears to be capitalizing the favorable transition early.

Inflectionwindow ~4mo+2.0

The operational inflection is real but not sufficiently underappreciated. Q2 showed better execution, more than $6B of awards, a $26.9B backlog and stronger Urban and Mission performance, while legacy projects are nearing completion. However, consensus already embeds a recovery, analysts are broadly Buy with a 1-year target around $56.43, and the market has immediately repriced the stock to the bull-case range. The key earnings step-up from nuclear fuel, power and newer reimbursable work is mainly a 2027 event, while 2026 Energy earnings are expected to decline in the second half.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and cash-conversion update — The market will test whether Q2's strong Energy profit was mostly nonrecurring closeout benefit and whether the remaining loss-project funding is contained.
  • ▼2027-02 · FY2026 results and FY2027 guidance — Guidance will need to validate the transition to higher-quality reimbursable work; rollover in Energy or new project charges would pressure the stock.
  • ▲H2 2026–2027 · Centrus/nuclear-fuel project ramp and new power awards — Meaningful revenue and margin contribution should begin in 2027, but early procurement and staffing milestones could improve confidence sooner.
  • ▲Early 2027 · Savannah River extension and rebid decision — A favorable early-2027 outcome would support Mission Solutions backlog and earnings visibility.
  • ▼H2 2026–2027 · Kuwait claims and letters-of-credit resolution — The $343M of outstanding letters of credit remain a liquidity and working-capital overhang; adverse settlement or further delay would reinforce the bear case.
  • ▲Through 2026-12 · Continued share repurchases — Management targets roughly $1.4B of FY2026 repurchases, providing tangible demand and reducing share count if maintained.
Flow+4.0

The company repurchased 6M shares for $300M in Q2 and targets $1.4B for FY2026; reported TTM dilution is -15%, making corporate flow strongly supportive. Offsetting this, ten insiders sold $3.8M over the last year with no insider purchases, and the buyback may partly represent cash returned after the NuScale monetization rather than a durable long-term capital-allocation regime. Short interest is moderate at 6.9% of float and has not created an extreme squeeze setup.

Floor / Ceiling+1.5

There is meaningful but distant support from cash and the planned buyback: the study assumes roughly $1.8B of net cash after repurchases and project funding, while the $1.4B annual buyback is a real source of demand. This is not a hard floor near $57 because legacy claims, Kuwait letters of credit, legal exposure and working-capital needs can consume cash. The practical ceiling is also evident: the price is already near the analyst consensus target and around the bull-case value, with insider selling and a valuation unsupported by current owner earnings creating sellers on further strength.

Buyability

Fluor is buyable as a liquid, established contractor with $3.0B of cash, a $26.9B backlog, credible nuclear/power/mining demand and an unusually large buyback program. However, margins remain structurally thin, cash conversion is weak, and new growth work is mostly a 2027 story; marginal buyers may prefer to wait for evidence that backlog converts profitably.

Fear vs Greedfear 6/10 (-2.0)greed 7/10 (+3.0)

Fear pulls more strongly at $57: the price now discounts much of the successful-transition scenario, while current TTM EBITDA and cash flow are negative, Q2 Energy profit included nonrecurring closeouts, and the next major growth contributions are delayed. The buyback and cash balance prevent this from being an aggressive short, but greed is already reflected in the price.

Valuation

Our Target
$3.9B-38%
Market Should Pay
$3.5B-44%
target ×0.9 (fear discount)
Current Market Cap
$6.3BSlightly bullish
What Changed
transcript · 2026-08-07
+8%fair value on this information

The genuinely new information is the stronger Q2 operating result and the scale and mix of new awards: adjusted EBITDA reached $149M, awards exceeded $6B, backlog reached $26.9B, and management expects full-year book-to-bill well above one. The quarter also clarified that Energy's outperformance was driven by closeouts and will moderate, while meaningful power and data-center awards are more likely in 2027. Management reduced the full-year adjusted EBITDA guide to $500M-$525M from the prior $525M-$560M range, partly offsetting the positive operational evidence.

▸ How the cases moved

Before the Q2 result, I would have used approximately $2,500M bear, $4,600M base and $7,800M bull equity values with probabilities of 0.30, 0.55 and 0.15. After the result, the bear value rises to $2,700M and its probability falls to 0.25 because remaining legacy funding needs appear manageable and backlog has strengthened. The base value rises to $5,000M as Q2 execution, $6B-plus awards and the $26.9B backlog improve visibility, with probability unchanged at 0.55. The bull value rises to $8,300M and probability to 0.20 because book-to-bill is now expected to be well above one and new-margin opportunities are improving, although the delayed timing of power and data-center awards limits the shift.

2-Year Plausible Outcomes
bear25%
$2.7B
rev -3%/yrOE $150M

Legacy project disputes, Kuwait letters of credit and residual loss projects consume cash, while Energy Solutions rolls over before replacement work contributes. Urban improves only modestly and Fluor remains a low-margin EPC contractor. Owner earnings recover to roughly $150M annually, but confidence in their durability is limited.

▸ Valuation

6x $150M EBITDA = $900M EV + $1,800M net cash = $2,700M equity value

base55%
$5.0B
rev +3%/yrOE $400M

Legacy projects substantially finish, with no major additional charge, while new reimbursable mining, power, nuclear-fuel and government work gradually replaces completed mega-projects. Revenue is broadly stable to modestly higher, margins normalize but remain below best-in-class EPC levels, and owner earnings reach approximately $400M by year two. The assumed $1.8B net cash balance reflects buybacks and ongoing project funding.

▸ Valuation

8x $400M EBITDA = $3,200M EV + $1,800M net cash = $5,000M equity value

bull20%
$8.3B
rev +10%/yrOE $650M

Book-to-bill remains well above one, higher-margin power, LNG, mining, nuclear-fuel and data-center-related work converts rapidly, and the legacy portfolio exits without further material losses. Fluor becomes a more asset-light, reimbursable and disciplined EPC/services platform. Owner earnings rise to approximately $650M as backlog mix and execution improve materially.

▸ Valuation

10x $650M EBITDA = $6,500M EV + $1,800M net cash = $8,300M equity value

▸ Target Rationale

The probability-weighted scenario value discounts to $4,068M today at 12%. I set the analytical target modestly lower at $3,900M because the arithmetic gives substantial credit to net cash that is being returned through buybacks, while execution risk, unresolved project claims, legal exposure and the weak recent cash-conversion record are not fully captured by EBITDA multiples. I nevertheless retain most of the model value because the balance sheet is strong and Q2 provided evidence that the business is moving beyond its worst legacy-project period.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now5/10
Trajectory7/10
Risk6/10
Governance5/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q1 2026 Financial Results: On May 8, 2026, Fluor reported its Q1 2026 results. The company achieved a net income of $160 million, reversing a net loss from 2025, supported by Q1 operating cash flow of $110 million (its strongest Q1 cash performance in nine years). However, adjusted EPS of $0.14 significantly missed consensus expectations due to ongoing legacy project execution challenges and a project charge in the quarter. Revenue fell 8% year-over-year to $3.6 billion.
  • Capital Allocation and Share Repurchases: Fluor executed $516 million in share repurchases during Q1 and is targeting $1.4 billion in total repurchases for fiscal year 2026.
  • Asset Divestitures & NuScale Monetization: In April 2026, Fluor completed the sale of its NuScale investment, bringing total proceeds from the position to $2.4 billion since September 2025. The company also finalized a $124 million divestiture of its fabrication yard in China.
  • LNG Canada Phase 2 Progress: On June 1, 2026, Fluor’s joint venture (JGC Fluor BC LNG II) received a Limited Notice to Proceed (LNTP) for the proposed Phase 2 expansion of the LNG Canada export facility in Kitimat, British Columbia, significantly improving backlog visibility.
  • Supreme Court Legal Defeat (Hencely v. Fluor Corp.): On April 22, 2026, the U.S. Supreme Court ruled unanimously against Fluor, holding that military and construction contractors are not automatically shielded from state-law tort claims in war zones under the "government contractor defense". The ruling allows a lawsuit regarding a 2016 suicide-bombing incident at an Afghan base (perpetrated by a Fluor subcontractor's employee) to proceed, exposing Fluor to potential tort liability.
  • S&P Credit Rating Affirmation: In June 2026, S&P Global affirmed Fluor's 'BB+' credit rating with a stable outlook. While S&P expects flat revenue growth in 2026 due to customer spending delays and ongoing litigation costs, they forecast a material rebound in 2027 with normalized EBITDA margins rising to 2%–3%.
▸ Thesis-test Findings
Kuwait Dispute Change Orders

According to Fluor’s Q1 2026 10-Q filing, the company continues to carry $343 million in outstanding letters of credit (slightly down from $347 million in mid-2025) tied to two legacy lump-sum projects in Kuwait. Although these projects are substantially complete, they remain unresolved due to ongoing disputes surrounding unapproved change orders and extension of time claims. This represents a persistent bear-case factor, demonstrating how legacy fixed-price projects can trap working capital and drag on liquidity over several years.

Gordie Howe Bridge Completion Date and Cost Overruns

The Gordie Howe International Bridge—constructed by the "Bridging North America" consortium (which includes Fluor)—has experienced severe delays and cost escalation. Total estimated project costs have risen from an initial $5.7 billion CAD to $6.4 billion CAD. Although physical construction was substantially completed in late 2025/early 2026, the official opening of the bridge was delayed again in June 2026 with no opening date in sight. This latest delay is driven by a geopolitical and diplomatic permit standoff between the U.S. and Canadian governments. This highlights a complex execution environment where external regulatory and geopolitical risks can postpone commercial completion even after physical construction is successfully wrapped up.

EPC Contractor Margins: Data Center & Semiconductor Projects

High-tech infrastructure remains a massive bull-case tailwind, emphasized by Fluor's master-planning data center award with TeraWulf in Kentucky and its January 2026 leadership expansion to pursue semiconductor builds under the U.S. CHIPS Act. However, the sector carries high margin-erosion risks. EPC contractors face intense execution pressures from skilled labor shortages, specialized MEP complexity, and long-lead equipment delays (e.g., transformer prices are up 77% since 2019). Project delays are highly punitive; data center commissioning delays can cost developers up to $14.2 million per month in lost revenues. To protect its consolidated EBITDA margins, Fluor is selectively pursuing higher-margin, technology-led contracts (like fab support facilities rather than front-end construction) to control risk.