Stocks/FLY

FLY

Firefly Aerospace Inc.v3 4.0/10 · 2026-11-03
Industrials·Aerospace & Defense
$19.44
$3.2B market cap
v3 Rating
4.0/102.5–5.5
Setup
4.5/103.5–6.0
Fair Value
$11.00$4.00–$26.00-43%
DCF (10%)
$9.00-54%
Base IRR
-3%-30%–+22%
Visibility
wide±100%
Wall Street
$37.50 target(2 analysts last quarter)(7 buy, 3 hold)
Rating
Revenue (TTM)
$366.9M
Owner Earnings
-$330M
Next-Yr Owner Earnings
-$363M
Growth
+30.0% × 9y
P / Next-Yr OE
--
Net Debt
-$520M

Firefly Aerospace Inc. is an innovative aerospace and defense technology firm that provides advanced mission capabilities for a wide range of clients, including national security initiatives, governmental bodies, and commercial ventures. The company specializes in integrated technologies for space launches and in-orbit operations, designed to facilitate efficient access, transit, and ongoing activities within the space environment. Its suite of key offerings includes: Alpha, a rapid-response small launch vehicle; Eclipse, a robust medium-lift launch system; Blue Ghost, which provides lunar payload delivery and surface operations; Elytra, offering in-space maneuverability and satellite servicing; and Ocula, a dedicated lunar imaging service. Established in 2017, the company is based in Cedar Park, Texas.

2-Year Price History

$17.02-66.1%
$20$30$40$50Initial target $11.00 · 2026-11-03volAug 25Oct 25Jan 26Mar 26Jun 26Aug 26

Valuation v3 Opus worker · 2026-11-03

Rating
4.02.5–5.5
Setup
4.53.5–6.0
Fair value (USD)
11.004.00 – 26.00
Upside vs 19.44
-43%
DCF (10%)
9.002.00 – 24.00-54%
Base IRR
-3%-30% – 22%
Visibility
very widerange ±100%
Sentiment
4/10
2026-11-03 · claude-opus-5-5 · priced at 17.02

Firefly Aerospace (USD 17.02 at the 3 Nov 2026 close, 167.4M shares, about $2.85B market cap, about $2.33B EV after an estimated $520M of net cash) is a ten-year-old space and defense contractor. It has four businesses: Blue Ghost lunar landers (six NASA/JPL moon missions won), Elytra orbiters, the Alpha small rocket plus the Eclipse medium rocket it is co-developing with Northrop, and SciTec, a missile-warning AI software house bought for $855M that now brings in about 45% of revenue. Revenue is surging, from $160M in 2025 to $420-450M guided for 2026 and about $600-690M expected by analysts for 2027. The stock is down 77% from its $73.80 August-2025 high, sits at the bottom of its 3-year range and is 65% below the $48 June follow-on (sold alongside 8M shares from sponsor AE Industrial). That looks like capitulation, but the business is the opposite of our template: it earns nothing yet. Owner earnings run at about -$330M a year (adjusted EBITDA about -$245M, stock comp about $65M, plus maintenance capex). Gross margin is 20%. Firm, contracted backlog (RPO) is only $564M, against the $1.5B headline. Alpha has a long failure record, and Block II has slipped to Q4 2026 with only 3 launches this year. On a realistic path (revenue about $1.6B by 2031, gross margin rising to about 33%, cash opex growing slowly) free cash flow stays negative for all five years, about -$1.0B in total. That is more than its cash, so an equity raise in 2027-28 at depressed prices is likely. Valuing the 2031 business at about $3B (about 25x a normalized $120M of free cash flow) gives a DCF of about $9 a share. I put fair value at about $11, adding something for SciTec's strategic value and a possible prime-contractor buyout. Rating 4.0: a real franchise (first commercial moon landing, Golden Dome prime, FORGE) at a hated price, but no cash flow for 5+ years, dilution ahead and execution risk on rockets. It is not a short either: it has already crashed, implied volatility is about 90%, analysts sit at Buy with about $35 targets, and binary catalysts are near (Q3 results on 10 Nov, Alpha Flight 8, CLPS 2.0 awards). Research rating 4.5: worth a look only to establish whether SciTec plus lunar could reach break-even before the cash runs out.

A deep dive would have to establish: Can SciTec's profits plus repeat-production lunar margins and a working Block II Alpha get Firefly to EBITDA break-even before its roughly $560M of covenant-adjusted liquidity runs out, or is a large dilutive raise in 2027 unavoidable?

Owner earnings, TTM
-$330M-$400M – -$270M
Realistic peak profit
$200M$40M – $450M
Growth rate
30.0%15.0% – 42.0%
Years of growth
95 – 14
Market cap
$2.9B$2.8B – $2.9B
EV
$2.3B$2.3B – $2.4B
Net debt
-$520M-$570M – -$460M
Capital return / cap
-3.0%-12.0% – 0.0%
P/E
-7.7×-9.5× – -6.0×
EV/EBITDA
-9.5×-12.0× – -7.0×
FCF yield
-13.0%-16.0% – -10.0%
Projected FCF, base case (USD millions)
Y1-$363M-$450M – -$280M
Y2-$280M-$390M – -$170M
Y3-$195M-$330M – -$60M
Y4-$118M-$290M – $30M
Y5-$47M-$250M – $120M
Competition: Rocket Lab and SpaceX dominate small/medium launch, Intuitive Machines, Astrobotic and Blue Origin compete for NASA lunar landers, and Palantir/Anduril/primes crowd the Golden Dome software field, leaving Firefly a narrow moat in lunar flight heritage and SciTec's FORGE incumbency.
Governance: A pending securities class action over IPO disclosures on Alpha readiness, a roughly 30% private-equity holder (AE Industrial) that is actively selling, and a monthly $381M minimum-liquidity covenant; no fraud history.
Research (expand)

What the company does

Firefly Aerospace (Cedar Park/Leander, Texas; IPO August 2025 at $45; peak $73.80) is a vertically integrated space and defense company with two reported segments.

  • Spacecraft Solutions (about 92% of Q2 revenue, $108.3M):

- Blue Ghost lunar landers. Mission 1 made the first fully successful commercial moon landing in March 2025. Firefly now has six lunar missions under contract, with five being built in parallel. Mission 2 (to the far side) launches early 2027.

- Elytra orbiters / transfer vehicles: the DIU Sinequone mission, the $75M JPL MoonFall subcontract and the $13M SkyFall Mars aeroshell.

- Ocula lunar imaging.

- SciTec (acquired late 2025 for $855M: $300M cash plus $555M stock). SciTec makes AI ground-processing software for missile warning and tracking: FORGE (a $259M Space Force program), a $94M ground-based radar modernization contract (GBRD) and a Golden Dome space-based interceptor prime slot (shared $3.2B ceiling). SciTec had about $164M of trailing revenue at acquisition and is now about 45% of group revenue.

  • Launch (about 8%, $9.4M in Q2):

- Alpha, a 1-ton small launcher. It is on Flight 8, the first Block II, now slipped to Q4 2026. Its record includes failures on Flight 1, Flight 6 and the 2025 ground-test booster loss.

- Eclipse, a reusable medium launcher co-developed with Northrop Grumman. First-stage delivery to Northrop in 2027; first launch no earlier than 2027.

The investment case (bull)

  • Demand is real and growing. NASA's Moon Base push (30 landers in 3 years, the $6B CLPS 2.0 bid), Golden Dome, a Space Force budget that may double, and a shortage of launch capacity. Management says 95% of the 2026 revenue midpoint is booked and most of Alpha's 2027 manifest is sold. Lockheed extended its 25-launch agreement to 2031.
  • Firefly has the lunar credential. Blue Ghost 1 worked where peers tipped over. Firefly has gone from one landing a year to three missions slated for 2028.
  • SciTec makes the company more than a rocket company. It is a battle-tested missile-warning software franchise with sticky, cost-plus-style government work.
  • The price has capitulated. Down 77% from peak, 65% below the $48 follow-on of only five months ago, at the bottom of its range. EV of about $2.3B is about 3.5x 2027 consensus revenue, far below Rocket Lab's sales multiple.

What it earns today (real owner earnings)

It earns nothing yet. In H1 2026:

  • Revenue: $198.6M.
  • GAAP gross margin: about 21%.
  • Non-GAAP opex: about $94M a quarter.
  • Adjusted EBITDA: -$125.9M.
  • Stock comp: $29.5M (rising; Q2 was $17.0M).
  • Operating cash flow: -$144.1M.
  • Capex: $41.1M.
  • Reported free cash flow: -$185M. That includes a roughly $24M final SciTec payment, so the underlying figure is about -$161M.

Counting stock comp as a cost:

  • Adjusted EBITDA run rate: about -$245M.
  • Less stock comp: about -$65M, leaving about -$310M of EBITDA after stock comp.
  • No cash taxes (large NOLs).
  • Maintenance capex (test stands and tooling refresh): about $20-25M.
  • Unlevered owner earnings: about -$330M a year.

Most of the remaining capex (about $100M a year: clean rooms that quadruple spacecraft capacity, Alpha test stands, Eclipse) is growth capex and is added back here. Even so, the core business is deeply loss-making. No share of EBITDA reaches owners because EBITDA is negative.

Balance sheet

  • June 30: $635.3M of cash and short-term investments; $27M of notes payable (down from $288M at Dec-25 after the term loan was cleared); an undrawn $305M revolver. Total liquidity: $940M.
  • Covenant: the revolver now carries a $381.3M minimum-liquidity covenant, tested monthly. Real headroom is about $560M, not $940M.
  • Net cash: I estimate about $520M at Sept 30, after roughly $85M of Q3 burn.
  • Funding gap: at about $350-400M a year of burn, Firefly reaches the covenant floor around late 2027. One independent model has cash at about $43M by end-2027. A 2027-28 equity raise, or SciTec-backed debt, is likely. Share count already rises about 1M a quarter from stock comp.

Five-year free cash flow (unlevered, after stock comp, all reinvestment)

Base-case assumptions:

  • Revenue: 2027 $640M, 2028 $870M, 2029 $1.10B, 2030 $1.35B, 2031 $1.60B (about 30% CAGR from the 2026 midpoint).
  • Gross margin rises from 23% to 33% as Alpha cadence, Ocula and lander repeat builds kick in.
  • Cash opex including stock comp grows slowly, from about $410M to $470M, as Eclipse development rolls off.
  • Capex: $85-95M a year.
  • Working capital: modest drag.

| Year | Revenue | EBITDA after stock comp | Capex + working capital | FCF |

|---|---|---|---|---|

| 2027 | 640 | -263 | -100 | -363 |

| 2028 | 870 | -185 | -95 | -280 |

| 2029 | 1,100 | -100 | -95 | -195 |

| 2030 | 1,350 | -18 | -100 | -118 |

| 2031 | 1,600 | +58 | -105 | -47 |

Cumulative burn is about -$1.0B, roughly double today's net cash.

Years of growth left: many, at least 8-12 if lunar cadence, Golden Dome and Eclipse arrive. Growth is lumpy and contract-driven, though: only $564M of the $1.5B headline backlog is firm RPO, and firm RPO has fallen for four straight quarters. The 2027 consensus needs about $500M+ of revenue that is not yet contracted.

What it looks like in five years

This is a young company, not a corpse. In 2031 the likely shape is a $1.5-2B revenue space and defense prime-lite growing 15-20% a year and around free-cash break-even. Its parts would be:

  • a SciTec software arm, probably profitable;
  • a repeat-production lunar and orbiter line;
  • Alpha flying 10-20 times a year from three pads (Vandenberg, Wallops, Sweden);
  • Eclipse in early operations.

Whether it reaches that point without heavy dilution, and whether rockets and landers keep working, is the whole question. My confidence in the projection is low: 90% ranges on 2031 FCF run from about -$250M to +$120M.

Fair value and multiples we are paying

  • Market cap: about $2.85B. EV: about $2.33B.
  • EV/sales: about 5.4x on 2026 guidance, about 3.6x on 2027.
  • EV/EBITDA and P/E are meaningless (negative). FCF yield is about -13%.
  • DCF (10%, 5 years plus terminal): PV of 2027-31 FCF is about -$0.82B. The terminal is about $3.0B for the 2031 company: about 25x a normalized roughly $120M of FCF, about 1.9x sales, the 10-15%-growth category. That has a PV of about $1.86B. EV is about $1.05B; plus about $0.52B of net cash, equity is about $1.57B. On about 172M diluted shares that is about $9 a share.
  • Bull case: revenue of about $2.5B in 2031, 15% EBITDA margin, terminal about $6B. Gives roughly $22-25.
  • Bear case: another Alpha failure, a Blue Ghost 2 loss, a raise at $10. Gives $2-4.
  • Fair value about $11: the DCF plus some credit for SciTec's standalone strategic value (bought for $855M) and for a possible takeout by Northrop or Lockheed, both of which are partners.
  • Base return: if burn is funded by equity at around $15, the 2031 equity of about $3B spread over about 205M shares is about $14.6 a share, roughly -3% a year from $17.

It is not a buyout candidate on our <7x EBITDA rule because there is no EBITDA. It is also not a covered-call floor setup, despite 90% implied volatility, because there are no predictable earnings underneath.

Management, governance, risks, competition

Management. CEO Jason Kim (ex-Millennium/Boeing) and CFO Darren Ma execute well on contract wins but have repeatedly missed launch schedules: Alpha 4 launches became 3 in 2026, and Flight 8 slipped from late summer to Q4. Capital allocation has been acquisitive (SciTec, Space-ng). There is no capital return; the share count grows.

Governance.

  • AE Industrial Partners still owns roughly 30% after selling 8M shares at $48 in June. That is a long-dated overhang.
  • A putative securities class action (Sections 10(b)/11) alleges IPO misstatements about Alpha readiness and spacecraft demand.
  • Director Thomas Zurbuchen (ex-NASA science chief) resigned on 30 Sept (no disagreement stated). He was replaced by Rick Ambrose, ex-Lockheed Space EVP.
  • These are not fraud-grade issues, but they are not clean either.

Risks.

  • Launch failure: Alpha's history is spotty.
  • Fixed-price lander overruns.
  • Lunar mission loss.
  • The covenant floor and dilution.
  • Government budget, award timing and the midterm overhang flagged by KeyBanc.
  • Customer concentration: NASA plus DoD are the large majority.
  • Gross margin squeezed by low-margin pass-through hardware (Q2 GAAP GM fell to 20.3%).

Competition.

  • Small launch: Rocket Lab (Electron, with Neutron coming), plus SpaceX rideshare pricing.
  • Medium launch: SpaceX, Rocket Lab Neutron, Blue Origin, ULA.
  • Landers: Intuitive Machines, Astrobotic, ispace, Blue Origin's Blue Moon.
  • Defense software: a crowded Golden Dome field (Palantir, Anduril, the primes).

Firefly's moat is real but narrow: lunar flight heritage and SciTec's incumbency on FORGE.

Sentiment: 3.5 / 10

The stock has fallen 77% from its peak and 65% since a June raise at $48. October alone was -28% with no company news, including an 11% drop on 30 Oct. It sits about 2% above its 52-week low. Short interest is about 12M shares (3-5 days to cover). Retail commentary has swung from "next Rocket Lab" to "why is it down 75%".

The sell side has not capitulated:

  • 12 analysts: 7 Buy, 4 Hold, 1 Sell. Average target about $35-37.
  • Recent cuts: KeyBanc $50 to $35 (Overweight), Roth $60 to $45, B. Riley $60 to $50.
  • Wells Fargo is Equal Weight at $25; Barclays is Equal Weight at $34.

The price is near blood-on-the-ground, but analysts still model profitability more than three years out. The fundamental capitulation (estimate cuts, a dilutive raise) probably has not happened yet. Near-term catalysts: Q3 results on 10 Nov 2026, Alpha Flight 8 (Block II debut), CLPS 1.0 and 2.0 awards, Blue Ghost 2 in early 2027.

Sources

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025
Revenue367160
Gross profit72.127.4
Operating expenses446283
▸Adj EBITDA-334-232
▸Adj OCF-307-226
CapEx-68.7-32.8
Adj FCF-376-259
Interest expense11.514.8
▸Adj net income-323-222
▸Owner's earnings-330--

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2025→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025
▸Claimed: EBITDA-544-247-297
FCF (OCF−capex)-508-270-238
Net income-582-283-298
▸Capital returned-98774.6-1062
Buybacks-1179-198-982
Dividends4.990.004.99
Interest paid21.97.0414.8
Debt paid down165265-99.9
▸Reinvestment39889.6310
Capex (PP&E)89.556.632.8
Intangibles & M&A2813.70277
Leases signed (net Δ)27.629.2--
Retained / other220-342561

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 63 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025
▸Assets (total)15821825
▸Liabilities (total)438635
Net debt (incl. leases)-463-584
Net debt / Adj EBITDA----
Net debt / Adj FCF----
Adj EBITDA / interest-29.2-15.7
Shares outstanding167159
Dilution (YoY)+14.2%--
Employees780--
MarginsTTM2025
Gross margin19.6%17.1%
Adj EBITDA margin-91.0%-145.4%
Adj OCF margin-83.6%-141.7%
Adj FCF margin-102.3%-162.2%
Net income margin-88.4%-186.6%
Adj NI margin-88.0%-139.1%
ROIC (adj, after-tax)-24.3%-13.5%
Cost of debt9.4%8.6%

Revenue Breakdown

Revenue Segments

By Product (2026-Q1)
Spacecraft Solutions Revenue$127.6MNEW
Launch Revenue$71.1MNEW

Earnings Calls

5 calls

Earnings Call · 2026 Q2

2026-08-11

Firefly Aerospace delivered a record second quarter, marking the first time quarterly revenue exceeded $100 million. Revenue reached $117.7 million, representing 46% sequential growth and a 659% year-over-year increase. Spacecraft Solutions contributed $108.3 million, reflecting execution across five lunar missions in parallel, while Launch generated $9.4 million. Management emphasized that the company’s milestone-based spacecraft contracts provide more predictable revenue than its event-driven Alpha launch business. Backlog rose to a record approximately $1.5 billion from $1.3 billion in the prior quarter, despite converting $117.7 million of backlog into revenue. Firefly reiterated 2026 revenue guidance of $420 million to $450 million and said approximately 95% of midpoint revenue is already booked. The company reported second-quarter GAAP gross margin of 20.3%, down from 21.6% due primarily to FORGE hardware purchases supporting a government program amid heightened geopolitical activity. Non-GAAP operating loss improved to $70.4 million from $76.2 million in the first quarter, and non-GAAP net loss improved to $67.7 million from $74.0 million. Adjusted EBITDA loss was $61.2 million. Capital expenditures increased to $24.8 million as Firefly invested in Alpha Block II testing infrastructure and spacecraft manufacturing capacity. Free cash flow was negative $106.3 million, including the final approximately $24 million SciTec acquisition payment. Liquidity ended at $940.3 million, comprising $635.3 million of cash, equivalents and short-term investments plus $305 million of undrawn revolver capacity. The June equity offering contributed approximately $182.6 million of net proceeds. Lunar activity remains a central growth engine. NASA awarded Firefly an additional CLPS mission using a near-build-to-print Blue Ghost design intended to shorten the time between missions and enable multiple annual lunar landings. The company is pursuing three further CLPS 1.0 opportunities in the second half of the year and has submitted a proposal for CLPS 2.0, targeting modular landers capable of carrying multi-ton payloads to support future Moon-base infrastructure. Blue Ghost missions to the lunar far side, Gruithuisen Domes and the south pole are advancing through assembly, design reviews and production. Firefly also won the $75 million MoonFall subcontract to deliver Elytra vehicles carrying JPL drones to the lunar south pole in 2028. Elytra is additionally being developed for national-security fast-transfer missions, including potential GTO-to-GEO transportation of critical payloads. The company’s first Mars-related award, a $13 million SkyFall aeroshell contract from JPL, extends its lunar capabilities to planetary exploration. SciTec continued to expand its national-security role. Its FORGE missile-warning and tracking platform integrated GEO wide-field-of-view spacecraft and received a superior government performance rating for supporting operations during the Iran conflict. New awards include Air Force data-fusion and AI algorithm work, Golden Dome prime-contractor participation and a $94 million Space Force Ground-Based Radar Digitization Phase 1 contract. Management sees substantial opportunities to replicate FORGE across radar, tracking and other defense phenomenologies. In Launch, Alpha Flight 8 is targeting the fourth quarter of 2026, with Flights 9 and later vehicles progressing through production. Firefly now expects three Alpha launches in 2026 rather than four, citing customer readiness, regulatory approvals, range availability and weather as factors outside its control. Demand remains strong, with most of the 2027 manifest sold and Lockheed Martin extending its multi-launch agreement through 2031. A second hypersonic task order reinforces confidence in Alpha Block II. Production throughput improved substantially from May through August through new composite tooling, greater Reaver engine capacity and the 55,000-square-foot Cortex facility. Wallops is expected to provide a second launch site in 2027, while Sweden is targeted for 2028. Eclipse development is also advancing. The Miranda engine has completed more than 150 hot-fire tests, including a 226-second flight-like mission-duty-cycle test exceeding the 206-second requirement. First-stage tanks, COPVs, forward-bay hardware and other components are qualified, in test or in production. Firefly expects to deliver the first stage to co-developer Northrop Grumman no earlier than next year, with inaugural flight no earlier than 2027. Management expects gross-margin expansion as Blue Ghost volume spreads fixed manufacturing costs, commercial payloads and Ocula services add higher-margin revenue, Alpha cadence improves and Eclipse development-related R&D declines. No specific profitability or free-cash-flow breakeven date was provided.

Analyst Q&A (19)
▸
How should investors view the two-year Lockheed Martin extension through 2031, the additional hypersonic task order, Alpha’s shift toward a fourth-quarter Flight 8, and demand and launch capacity through 2027?
Sheila Kahyaoglu · Jefferies
Management said launch demand is exceptionally strong, with Lockheed Martin’s extension reaffirming confidence in Block II Alpha and the 25-launch agreement. The second hypersonic task order reflects Alpha’s ability to carry two tons suborbitally and supports a large testing backlog. Production, rather than demand, is the principal constraint; Flight 8 is in integration, Flight 9 follows, and later vehicles are already progressing.
▸
Was the reduction from four to three 2026 Alpha launches caused by production constraints or customer factors, and how should investors think about 2027 cadence?
Sheila Kahyaoglu · Jefferies
The reduction from four to three planned 2026 launches reflects customer readiness, regulatory approvals, range availability and weather—not production limitations. Firefly is building ahead for 2027, has sold most of its 2027 manifest, and expects additional capacity from Wallops in 2027 and Sweden in 2028.
▸
Can management break down the approximately 60% sequential growth in Spacecraft revenue among the five lunar programs, AI software strength and the accelerated hardware order?
Alex · JPMorgan
The quarter included revenue-mix and timing effects, including an accelerated national-security hardware order. Firefly’s diversified product portfolio and execution across five lunar lander programs and AI software supported growth, while 95% of midpoint 2026 revenue guidance is already booked.
▸
Has Firefly updated its expected timing for Eclipse’s first flight?
Alex · JPMorgan
Miranda engine qualification is imminent after more than 150 hot-fire tests, including a successful 226-second flight-like test. First-stage hardware is largely built, qualified or in test, and Firefly expects to deliver the first stage to Northrop Grumman no earlier than next year, with Eclipse’s inaugural launch targeted for no earlier than 2027.
▸
If the fourth-quarter launch succeeds, what Alpha launch cadence is Firefly targeting in 2027—monthly, quarterly or more frequent?
Xin Yu · Deutsche Bank
Firefly is not providing 2027 guidance, but production is at record levels: Flight 8 is in final integration, Flight 9 follows, and Flights 10 and 11 are progressing. Workforce experience from Flight 7 and additional launch pads should support higher cadence, with Wallops coming online in 2027 and Sweden in 2028.
▸
What NASA CLPS task-order opportunities should investors expect through year-end, and is the focus shifting from CLPS 1.0 to CLPS 2.0?
Xin Yu · Deutsche Bank
CLPS 1.0 is not finished; three opportunities remain in the second half, including two lander missions and an orbiter imaging-services opportunity. Firefly has submitted a CLPS 2.0 proposal and expects to hear from NASA in coming months. Expanded clean rooms, manufacturing capacity and vertical integration position the company to pursue additional awards.
▸
What are the key factors that could drive 2026 revenue toward the high or low end of guidance, and does the unchanged range despite reducing planned Alpha launches imply higher ex-Alpha revenue?
Michael Leshock · KeyBanc Capital Markets
Firefly reiterated its $420 million-$450 million 2026 revenue range, with 95% of midpoint revenue already booked. Additional CLPS awards could move results toward the high end, while diversified spacecraft, AI, FORGE, Golden Dome and newer programs such as GBRD and SkyFall can offset lower Alpha-launch revenue.
▸
How do geopolitical conflicts affect SciTec revenue and contract economics—through higher customer demand, pricing or other mechanisms?
Michael Leshock · KeyBanc Capital Markets
SciTec demand is strengthening as geopolitical conflicts increase missile-warning and tracking requirements. A national-security customer accelerated a hardware order into the second quarter. FORGE processed thousands of threat messages during the Iran conflict, and management expects continued demand for AI-enabled warning, tracking and battlespace-awareness capabilities.
▸
As the $1.5 billion backlog converts into revenue, how should investors think about associated profitability, cash milestones and margin evolution, particularly for proven capabilities?
Kristine Liwag · Morgan Stanley
Most Spacecraft contracts are milestone-based, allowing Firefly to receive cash as work progresses and fund teams and long-lead items. Lunar missions also offer higher-margin bolt-ons such as commercial payloads and Ocula imaging. Higher Alpha cadence should expand margins as production scales and operating efficiency improves.
▸
What is the path to company-wide positive EBITDA and free-cash-flow breakeven, and is there a revenue or scale threshold that drives the inflection?
Kristine Liwag · Morgan Stanley
Positive EBITDA and free-cash-flow breakeven depend on operational milestones: achieving Alpha production rate and cadence, completing Eclipse development and reducing related R&D, and scaling the spacecraft and AI software businesses. Management did not provide a specific revenue threshold.
▸
How is the national-security community approaching potential relaxation of NSSL on-ramp requirements, and what are Eclipse’s prospects for early NSSL participation?
Colin Canfield · Cantor
Firefly is focused on qualifying Miranda, testing tanks and delivering Eclipse’s first stage to Northrop Grumman. Northrop leads government-facing NSSL work, and management believes the American-made vehicle meets Space Force requirements. Firefly is prioritizing the first launch and demonstrating mission-orbit performance before pursuing broader opportunities.
▸
What pricing changes are embedded in the Lockheed Martin launch-services extension, and how much reflects hypersonic missions or other national-security requirements?
Colin Canfield · Cantor
Alpha average selling prices should rise over time in the constrained launch market. Near-term launches will include some lower-priced legacy backlog, but those missions should burn off over the next six to 12 months, allowing pricing to increase.
▸
What additional details can Firefly provide about the larger Blue Ghost lander proposed for CLPS 2.0, including its potential payload capacity?
Griffin Boss · B. Riley Securities
The proposed larger Blue Ghost design is modular and scalable, using common components proven on the Moon while increasing size, volume and payload capacity. NASA’s stated Moon-base needs include landers in roughly two-to-four-ton and eight-ton down-mass classes, and Firefly is targeting multi-ton capability.
▸
What is the current status of Firefly’s tactically responsive-space work with True Anomaly, given that Rocket Lab launched Victus Haze instead of Firefly?
Griffin Boss · B. Riley Securities
Firefly remains highly bullish on tactically responsive space as Space Force funding and the responsive-space line grow. The Space Force moved Firefly’s future mission, using upgraded Alpha Block II to launch True Anomaly’s Jackal, to a later date. The mission will incorporate lessons from Victus Nox, Victus Diem and Victus Haze.
▸
Does the change mean the tactically responsive-space mission remains in Firefly’s pipeline but has simply been deferred?
Griffin Boss · B. Riley Securities
Yes. The mission has not been lost; it was deferred at the Space Force’s direction and is expected to occur at a later date using Alpha Block II.
▸
How will the accelerated Blue Ghost cadence affect margins, and is there a production rate at which margins inflect meaningfully?
Benjamin Tomick · Wells Fargo
Higher Blue Ghost and spacecraft volume should spread fixed manufacturing overhead and expand gross margins. Additional commercial payloads and Ocula imaging services provide further margin upside beyond NASA’s base contracts.
▸
How should investors think about SciTec’s forward contract mix, including the company’s objective of pursuing more fixed-price work?
Benjamin Tomick · Wells Fargo
Management characterized the expected remainder-of-year mix as approximately 85% Spacecraft and 15% Launch. SciTec is generating strategic synergies across Golden Dome, GBRD and other missile-warning, radar and tracking opportunities, with FORGE serving as a repeatable platform.
▸
Can Firefly provide a Launch-versus-Spacecraft breakdown of the $1.5 billion backlog and indicate how much is expected to convert over the next 12 months?
Sujeeva De Silva · ROTH Capital
Firefly has not separated the $1.5 billion backlog between Launch and Spacecraft or disclosed the portion due within 12 months. Management said roughly $117.7 million of second-quarter revenue came from backlog conversion, but the Lockheed agreement extends through 2031, making a simple extrapolation imprecise.
▸
What is the current Elytra demand, backlog and pipeline, and how much revenue should Elytra contribute in the second half of 2026 and 2027?
Sujeeva De Silva · ROTH Capital
Elytra demand includes the DIU Sinequone mission, Blue Ghost 2-4 transfer vehicles, and NASA’s $75 million MoonFall contract through 2028. Elytra vehicles also host communications and Ocula services. Firefly is pursuing fast-transfer-vehicle opportunities for Space Force missions from GTO to GEO, while Elytra revenue is embedded in broader spacecraft contracts rather than reported separately.

SEC Filing Findings

SEC Filing — material findings

2026-08-11 · depth 9/10
risk 7Liquidity/Covenants
▸

Revolving Credit Facility ($305M commitment, undrawn) requires minimum liquidity of $381.3M tested monthly; cash plus ST investments of $635M leaves limited headroom against a business burning ~$144M operating cash in six months, and the minimum liquidity covenant is only removed after positive consolidated EBITDA.

“Maintenance of minimum liquidity of $381.3 million, tested as of the last day of each calendar month (commencing with the calendar month ending April 30, 2026).”
risk 6Litigation
▸

Securities class action (In re Firefly Aerospace Securities Litigation) under Exchange Act and Securities Act, naming company, officers, IPO underwriters and investors; outcome and loss range not estimable; derivative action stayed pending it.

“Firefly and the other defendants moved to dismiss the amended complaint in full, which motion remains pending. Firefly intends to defend itself vigorously against these allegations and claims, but is currently unable to predict the outcome of this lawsuit and therefore cannot determine the likelihood of loss nor estimate a range of possible loss.”
risk 6Customer Concentration
▸

Heavy customer concentration: Customer 1 was 41.3% of Q2 2026 revenue and Customer 2 was 16.2%; Customer 2 is 24.3% of receivables at June 30, 2026.

“Customer 1 41.3 % — 34.4 % — Customer 2 16.2 % 59.2 %”

Options

Chain Snapshot (daily)

Call IV (ATM)105%
Put IV (ATM)84%
ATM Spread4.1%
Call $OI (near money)$7.8M
Put $OI (near money)$3.0M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$17.0
Major Expirations4
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$14.00$3.00/$4.9020--/$2.0534
$15.00$2.45/$4.101$0.85/$1.5076
$16.00$2.00/$3.603$1.50/$1.7045
$17.00$2.15/$2.85163$1.55/$2.3074
$18.00$1.35/$2.45120$2.35/$2.9086
$19.00$1.25/$2.0014$2.85/$4.00117
$20.00$1.00/$1.5041$3.90/$4.30555
$21.00$0.85/$1.2561$4.00/$5.300
Snapshot: 2026-11-04

Short Interest

Short % of Float8.7%
Short Shares12.9M
Days to Cover5.3
Change (vs Prior)-4.5%
Short % Float History
8.70%+7.30pp
2.0%4.0%6.0%8.0%10-1512-3103-1305-2908-1410-30

Web Traffic

fireflyspace.com
Web rank#615,576
Est. visits/mo714K
Web Rank History
#615,576-343,238
rankest. visits/mo
600k700k800k900k1.0m573K611K650K688K726K07-2107-2810-0612-15

Executive Compensation (2024.0-2025.0)

Direct Pay$58.8M
Incentive & Other$4.9M
Total Compensation$63.7M
% of Revenue13.6%

Cash Runway

18.3months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
AE INDUSTRIAL PARTNERS, LP$1.02B$29.32−$20.5M+$1.02B—$1.37B
BlackRock, Inc.Passive$174M$28.75+$114M+$174M—$6.70T
STATE STREET CORPPassive$123M$28.85+$108M+$123M—$3.38T
VANGUARD PORTFOLIO MANAGEMENT LLCPassive$106M$28.77+$34.2M+$106M—$2.22T
VANGUARD CAPITAL MANAGEMENT LLCPassive$90.3M$28.69+$21.7M+$90.3M—$4.68T
VAN ECK ASSOCIATES CORP$89.6M$28.75+$27.3M+$89.6M—$164.08B
JPMORGAN CHASE & CO$81.2M$29.38+$63.5M+$81.2M—$1.71T
TWO SIGMA INVESTMENTS, LP$79.8M$28.51+$79.3M+$79.8M—$128.44B
TEMA ETFS LLC$67.1M$29.40+$67.0M+$67.1M—$3.09B
Tidal Investments LLC$63.7M$29.40+$63.7M+$63.7M—$41.21B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

013.2M26.3M39.5M52.7M$22$24$26$28$292025-092025-122026-032026-06
hover the chart for per-quarter detailprice (right axis)
AE INDUSTRIAL PARTNERS, LP34.5MVAN ECK ASSOCIATES CORP3.0MJPMORGAN CHASE & CO2.8MTWO SIGMA INVESTMENTS, LP2.7MTEMA ETFS LLC2.3MTidal Investments LLC2.2MPRICE T ROWE ASSOCIATES INC /MD/1.7MPhoenix Holdings Ltd.1.8MHudson Bay Capital Management LP61KUBS Group AG1.6M

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (2 analysts)$37.50+95.9%
Last Year (13 analysts)$39.38+105.7%
Current Price$19.14
Analyst Ratings
7
3
Buy: 7Hold: 3Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2008 Q146M33M10M$0.16$0.13 – $0.2012
2008 Q242M29M7M$0.15$0.12 – $0.1819
2008 Q342M33M10M$0.20$0.16 – $0.247
2009 Q1116M86M50M$1.63$1.30 – $1.9615
2009 Q222M38M12M$0.14$0.11 – $0.1716
2009 Q334M43M16M$0.26$0.21 – $0.3211
2010 Q158M41M14M$0.39$0.31 – $0.4713
2010 Q225M33M8M$0.12$0.10 – $0.1517
2010 Q338M33M8M$0.24$0.19 – $0.2913
2011 Q1107M30M4M$0.43$0.35 – $0.529
2011 Q260M32M4M$0.25$0.20 – $0.3019
2011 Q384M33M4M$0.36$0.29 – $0.4311
2012 Q1128M62M26M$0.40$0.32 – $0.4818
2012 Q236M54M19M$0.27$0.22 – $0.327
2012 Q3181M-7M-41M$0.62$0.50 – $0.7520
2013 Q175M56M18M$0.41$0.33 – $0.4910
2013 Q261M39M3M$0.11$0.09 – $0.1311
2013 Q3114M37M0M$0.03$0.02 – $0.0320
2014 Q1167M45M5M$0.17$0.14 – $0.217
2014 Q276M55M12M$0.14$0.11 – $0.1620
2014 Q3100M59M15M$0.33$0.26 – $0.4020
2015 Q199M61M15M$0.18$0.14 – $0.2115
2015 Q264M23M-19M$0.04$0.03 – $0.0516
2015 Q3155M89M35M$0.83$0.66 – $1.007
2016 Q1193M61M10M$0.71$0.57 – $0.8512
2016 Q2110M57M7M$0.47$0.37 – $0.568
2016 Q377M75M20M$0.33$0.26 – $0.4014
2017 Q1148M59M7M$0.40$0.32 – $0.4819
2017 Q2204M60M4M$0.33$0.27 – $0.407
2017 Q368M17M-37M$1.00$0.80 – $1.2020
2018 Q199M68M11M$0.42$0.34 – $0.5015
2018 Q282M77M18M$0.51$0.41 – $0.6114
2018 Q372M70M13M$0.29$0.23 – $0.3418
2019 Q1120M105M39M$1.08$0.86 – $1.3018
2019 Q2125M112M45M$1.18$0.94 – $1.4214
2019 Q3156M131M58M$2.15$1.72 – $2.589
2019 Q4107M117M46M$1.05$0.84 – $1.2520
2020 Q1142M115M44M$1.66$1.33 – $1.9914
2020 Q284M75M12M$0.58$0.46 – $0.7013
2020 Q3146M41M-20M$0.88$0.71 – $1.0611
2020 Q464M-300M-360M$-0.50$-0.60 – $-0.4011
2021 Q176M51M-8M$0.42$0.34 – $0.517
2021 Q292M76M14M$0.64$0.51 – $0.7716
2021 Q3136M41M-18M$0.83$0.66 – $0.9913
2021 Q481M-396M-455M$-0.63$-0.76 – $-0.5120
2022 Q183M50M-9M$0.47$0.37 – $0.5617
2022 Q2101M78M15M$0.70$0.56 – $0.8514
2022 Q3150M40M-20M$0.91$0.73 – $1.0913
2022 Q4103M-515M-576M$-0.80$-0.96 – $-0.6516
2023 Q191M51M-10M$0.51$0.41 – $0.6212
2023 Q2111M82M16M$0.78$0.62 – $0.9412
2023 Q3165M41M-22M$1.00$0.80 – $1.2015
2023 Q4130M-664M-728M$-1.02$-1.21 – $-0.8217
2024 Q1116M-7M-12M$0.65$0.52 – $0.7818
2025 Q217M-64M-73M$-0.43$-0.51 – $-0.392
2025 Q328M-63M-69M$-0.41$-0.46 – $-0.354
2025 Q452M-60M-74M$-0.44$-0.54 – $-0.363
2026 Q177M-67M-87M$-0.51$-0.67 – $-0.434
2026 Q288M-71M-86M$-0.51$-0.62 – $-0.445
2026 Q3102M-69M-84M$-0.50$-0.54 – $-0.484
2026 Q4141M-63M-82M$-0.48$-0.54 – $-0.454
2027 Q1143M-49M-72M$-0.42$-0.45 – $-0.402
2027 Q2185M-37M-64M$-0.38$-0.45 – $-0.351
2027 Q3187M-30M-61M$-0.36$-0.43 – $-0.331
2027 Q4256M-9M-46M$-0.28$-0.33 – $-0.251
2028 Q1215M26M-15M$-0.09$-0.11 – $-0.081
2028 Q2266M20M-27M$-0.16$-0.19 – $-0.151
2028 Q3265M27M-25M$-0.15$-0.18 – $-0.141
2028 Q4336M88M22M$0.13$0.12 – $0.151
2029 Q1221M—0M$0.00$0.00 – $0.000
2029 Q2309M—0M$0.00$0.00 – $0.000
2029 Q3318M—0M$0.00$0.00 – $0.000
2029 Q4405M—0M$0.00$0.00 – $0.000

Corporate

Insider Trading (last 12mo)

Open-market only (Form 4 P-Purchase + S-Sale). Excludes grants, option exercises, tax withholding, gifts.
Officers & directors
Buys ($, 12mo)
$0
0 txns · 0 insiders · 0 sh
Sells ($, 12mo)
$339K
2 txns · 1 insider · 7,531 sh
Recent transactions
DateSideInsiderTitleSharesPriceDollarsOwned $
2026-05-18SELLWheeler David Leighofficer: General Counsel3,765$45.12$170K$6.44M
2026-04-17SELLWheeler David Leighofficer: General Counsel3,766$45.04$170K$6.43M
v2 analysis (legacy, 2026-08-16) — for comparison onlyclick to expand

Thesis

Firefly is an unusually promising but extremely early-stage aerospace platform. Revenue has accelerated dramatically, backlog has reached approximately $1.5B, and the portfolio now spans lunar spacecraft, launch vehicles, orbiters and national-security software. The Q2 result confirmed substantial demand and backlog conversion, but it did not demonstrate operating leverage: TTM adjusted EBITDA was -$302M and adjusted FCF was -$339M on $287M of revenue. The company is still consuming capital while simultaneously funding Alpha Block II, Eclipse, expanded clean rooms and spacecraft capacity. The next two years are a contest between backlog conversion and execution risk. Spacecraft milestone contracts and SciTec software offer more predictable economics than Alpha launches, while higher lunar volume could spread fixed costs. However, management reduced planned 2026 Alpha launches from four to three, provided no specific EBITDA or FCF breakeven threshold, and faces a liquidity covenant requiring a $381.3M minimum. The balance sheet currently provides meaningful protection, but that protection depends on continued access to capital if the operating ramp takes longer than expected. The base case assumes impressive revenue growth but only modest near-term owner earnings. The upside is substantial if Alpha becomes reliable, SciTec develops into a sticky software platform and Eclipse launches successfully; the downside is a capital-intensive company that repeatedly raises money before proving its economics.

Trade Signal

Trade rating
-6.8/10
Short
Horizon
~5mo
gpt-5.6-luna2026-08-16 · saw $26.67-27.1% since

Short, with substantial risk management around launches and squeezes: the stock is priced for a successful multi-segment aerospace platform while current evidence still shows extreme cash burn, dilution and no demonstrated path to self-funded economics.

Temporary mispricing-4.5

The stock fell from roughly $49.50 in late May to $25.54 by late June and then to $17.84 on July 29. The selloff followed the spring valuation peak and equity-offering/dilution concerns, with launch timing and execution risk also weighing; it was not simply a fundamental collapse. It then rebounded to $26.67 by August 14 as lunar/defense enthusiasm, improving production commentary and anticipation of the record Q2 result returned. The immediate post-earnings move was another roughly 4% gain despite a $92M GAAP loss, high cash burn and no profitability date. The July panic may have overshot temporarily, but the August rebound looks more like a durable narrative repricing than a dislocation: the price has not missed good news so much as capitalized it aggressively.

Market view+5.5

The market is constructive to euphoric on the narrative: analyst consensus is Buy, the average one-year target is $42.43, passive and thematic holders have increased positions, and call open interest and recent call volume dominate puts. Bulls cite 659% year-over-year Q2 revenue growth, a $1.5B backlog, lunar awards, Golden Dome/SciTec exposure and Eclipse optionality. Bears point to extreme valuation, negative margins, reduced 2026 launch cadence, execution risk and dilution. Short interest has risen materially over the past year to 8.4% of float but has recently declined 9%, suggesting skepticism exists without the stock being truly left for dead. The +4% move immediately after earnings, despite a much larger net loss and continued cash burn, suggests the bullish narrative is overpowering unfavorable earnings quality.

Inflectionwindow ~4mo-2.5

The business has a real operational inflection in revenue scale, backlog conversion and potential gross-margin improvement, but the critical valuation inflection—self-funded profitability—has not arrived. Q2 revenue reached $117.7M and backlog approximately $1.5B, yet GAAP losses widened, adjusted EBITDA remained about -$61M for the quarter and FCF was -$106M. Management gave no specific profitability or FCF-breakeven date. Consensus is not demanding near-term profitability either—the available estimates still show deeply negative EBITDA—so the study's eventual $60M owner-earnings base case is a meaningful but distant and unproven step-up rather than an underappreciated near-term surprise.

Catalysts
  • ▲Q4 2026 · Alpha Flight 8 / Alpha Block II launch — Expected in Q4 2026; a successful launch would validate reliability, payload and manufacturing improvements, while delay or failure would damage the premium valuation.
  • ▲November 2026 · Q3 2026 earnings and updated guidance — Watch backlog conversion, gross-margin progression, cash burn and whether FY26 revenue guidance remains achievable without further dilution.
  • ▲H2 2026 · Additional CLPS 1.0 awards and CLPS 2.0 selection activity — Further lunar awards would support the backlog and platform narrative, but awards do not yet establish attractive returns on capital.
  • ▲Q4 2026-H1 2027 · Alpha Flights 9 and subsequent launch cadence — Repeated successful launches are necessary to prove that the launch business can scale beyond an event-driven story.
  • ▲2027 · Eclipse first-stage delivery to Northrop Grumman — Progress is expected no earlier than 2027; meaningful execution would support the long-term bull case but is too distant to justify current valuation alone.
  • ▼Q1 2027 · FY2026 earnings and cash runway review — The key risk is another large operating and free-cash-flow loss, potentially forcing additional equity financing despite current liquidity.
Flow-3.5

Flow is modestly negative. The June offering included company shares and selling-stockholder shares, trailing dilution is 13%, and ongoing losses plus Eclipse, Alpha and capacity investment create financing risk. Insider activity is mixed with small purchases but also two sales by one officer; passive holders have been adding, and call-heavy options activity plus 8.4% short interest can create upside squeezes. There is no buyback or committed strategic bid.

Floor / Ceiling-1.5

The approximately $582M of net cash provides an asset cushion, but it is only about $3.60 per share and is being consumed rapidly: trailing adjusted FCF is roughly -$339M. Backlog and government relationships have strategic value, but neither is a hard liquidation floor. Above the current price there is a substantial valuation ceiling: the stock already capitalizes a successful Blue Ghost, SciTec, Alpha and Eclipse outcome, while the May/June equity offering and 13% trailing dilution demonstrate that capital needs can create supply.

Buyability

Firefly is genuinely buyable for growth, aerospace and national-security investors because revenue, backlog and government relevance are rising sharply; however, at 14.9x sales, deeply negative FCF and no stated breakeven date, the next buyer must underwrite a very successful 2027-29 execution path. The likely marginal buyer is a momentum or thematic investor, not a fundamental value buyer.

Fear vs Greedfear 7/10 (+1.0)greed 8/10 (+2.0)

Greed is warranted for the business trajectory but fear dominates at this price. The operating story is impressive, yet the market is paying for a large portion of the bull case while the company still loses more than it earns and consumes substantial cash.

Valuation

Our Target
$1.1B-67%
Market Should Pay
$893M-72%
target ×0.85 (fear discount)
Current Market Cap
$3.2BSlightly bullish
What Changed
financials release · 2026-08-11
+6%fair value on this information

The genuinely new information was the record $117.7M Q2 revenue, approximately $1.5B backlog, 95% booking of midpoint 2026 guidance, stronger-than-expected spacecraft and national-security hardware activity, and additional detail on the $94M radar contract and $75M MoonFall subcontract. Against that, management reduced planned 2026 Alpha launches from four to three and again provided no concrete EBITDA or free-cash-flow breakeven date.

▸ How the cases moved

The Q2 release modestly improved the valuation distribution: the bear case moves from roughly $450M to $475M as backlog conversion, $940M of liquidity including revolver capacity, and continued government demand reduce near-term financial-distress risk; the base case moves from approximately $1,100M to $1,200M because 95% of midpoint 2026 revenue is booked and spacecraft/SciTec execution is stronger; the bull case moves from about $3,500M to $3,850M on stronger defense awards, backlog growth and evidence of manufacturing progress. Probabilities shift from approximately bear/base/bull 0.32/0.50/0.18 to 0.30/0.50/0.20. The Alpha launch plan reduction and absence of a profitability timetable prevent a larger upward revision.

2-Year Plausible Outcomes
bear30%
$475M
rev +20%/yrOE $-300M

Revenue grows but remains heavily dependent on milestone timing and government awards. Alpha launch cadence stays inconsistent, Eclipse absorbs substantial R&D, and spacecraft gross margins fail to scale meaningfully. Cash burn continues, reducing net cash to roughly $200M by the terminal date; the company remains strategically valuable but is valued on a distressed growth basis.

▸ Valuation

0.5x $550M revenue = $275M EV + $200M net cash = $475M equity

base50%
$1.2B
rev +35%/yrOE $60M

Firefly converts most of its backlog, grows spacecraft and SciTec revenue, and increases Alpha production, but remains loss-making for much of the next two years. Gross margin improves as Blue Ghost volume rises and Eclipse development begins to taper, producing modest positive owner earnings by the terminal period. Cash remains a meaningful asset, although ongoing investment limits its growth.

▸ Valuation

15x $60M owner earnings = $900M EV + $300M net cash = $1,200M equity

bull20%
$3.9B
rev +50%/yrOE $140M

Blue Ghost, Elytra and SciTec scale rapidly, FORGE and related defense software become repeatable high-margin platforms, and Alpha Block II achieves reliable high cadence. Eclipse progresses toward a successful 2027 launch without another major funding requirement. Operating leverage and declining development R&D lift owner earnings sharply, while strong government demand supports a premium growth multiple.

▸ Valuation

25x $140M owner earnings = $3,500M EV + $350M net cash = $3,850M equity

▸ Target Rationale

The probability-weighted scenario value is $1,210M after discounting the terminal outcomes at 12% for two years. I set the analytical target at $1,050M, below the mechanical model, because none of the current operating segments has yet demonstrated self-funded economics, adjusted losses remain exceptionally large, Alpha cadence was reduced, and the liquidity covenant limits flexibility. The target still gives substantial credit for the $582M net cash position, backlog, government customer access and the strategic value of SciTec; the reduction is for execution, financing and dilution risk rather than sentiment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now3/10
Trajectory7/10
Risk8/10
Governance4/10
Insolvency prob (2yr)3%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Artemis MoonFall Subcontract (May/June 2026): Firefly Aerospace was awarded a $75 million subcontract from NASA’s Jet Propulsion Laboratory (JPL) under the "MoonFall" mission (targeted for launch no earlier than 2028). Firefly will use its Elytra Dark spacecraft to transport and deploy four JPL-developed "hopping" drones to the lunar south pole to map the surface, search for water ice, and scout landing sites for future crewed Artemis missions.
  • Public Common Stock Offering (May 2026): Firefly launched a proposed public offering of 12,000,000 shares of common stock, which includes 4,000,000 shares offered directly by the company and 8,000,000 shares from selling stockholders. Net proceeds to Firefly will be utilized for general corporate purposes, including supporting the scaling of its core business and recently won initiatives.
  • Q1 2026 Financials & Operational Progress (March/May 2026): The company reported a GAAP net loss of $0.46 per share for Q1 2026. However, management highlighted meaningful gains in manufacturing repeatability and operational efficiency, pointing toward a targeted launch cadence in the second half of 2026 to kickstart first revenue-generating flights. The news followed the successful launch of Alpha Flight 7 in March, which tested several Block II subsystems in shadow mode.
  • Texas Production Campus Expansion (May 2026): To meet accelerating demand for its spacecraft platforms, Firefly announced the expansion of its manufacturing footprint and the opening of a new Innovation Lab in Central Texas.
▸ Thesis-test Findings
  • Firefly Aerospace Alpha Block 2 launch schedule 2026 2027:

Following the final flight of its legacy configuration (Flight 7) in March, Firefly is transitioning to its upgraded Alpha Block II configuration starting with Flight 8. This upgraded rocket features larger liquid oxygen tanks and consolidated components designed to boost launch reliability, payload capacity, and manufacturing efficiency. The late 2026 launch manifest is highly active: NOAA's *QuickSounder* satellite and the Space Force's *VICTUS HAZE* tactical responsive space mission are scheduled for September 2026, followed by NASA's dedicated *INCUS* atmospheric-science launch in October 2026 and *TacSat* in December 2026. This dense, high-priority government manifest supports the bull case that Firefly can successfully transition to a reliable, higher-cadence orbital launch model.

  • Space Force Golden Dome contract awards Firefly SciTec:

In May 2026, Firefly’s wholly owned subsidiary, SciTec, was awarded an Other Transaction Authority (OTA) agreement from the U.S. Space Force Space Systems Command under the $3.2 billion Space-Based Interceptor (SBI) program. The SBI program is a core pillar of the "Golden Dome for America" missile defense architecture, which plans to demonstrate a proliferated Low Earth Orbit constellation by 2028 to counter hypersonic and ballistic threats. SciTec will provide specialized AI-powered data processing, sensing, and real-time data fusion software rather than hardware interceptor buses. This validates the strategic value of the SciTec acquisition, reinforcing the bull case that Firefly is expanding into high-margin, sticky national security software services alongside its traditional launch and hardware offerings.

  • NASA Moon Base Initiative task order awards commercial landers:

Under NASA’s latest update on Moon Base plans and Commercial Lunar Payload Services (CLPS) task orders, the space agency allocated hundreds of millions of dollars toward lunar infrastructure. While primary Lunar Terrain Vehicle contracts went to Astrolab ($219 million) and Lunar Outpost ($220 million), and lander-specific awards went to Blue Origin ($188 million), Firefly won a significant $75 million subcontract under the initiative to deliver JPL's MoonFall drones. This demonstrates that Firefly is successfully positioning its Elytra spacecraft and lander services inside NASA’s permanent Moon Base ecosystem, providing diversified commercial revenue streams that support the long-term bull thesis.