FRMI
Fermi Inc. Common Stockv3 4.5/10 · 2026-11-13Fermi Inc. is dedicated to establishing essential energy infrastructure. The company plans to build an integrated campus that combines energy production with data center facilities, designed to meet the significant requirements of forthcoming artificial intelligence infrastructure. Co-founded by Rick Perry, Toby Neugebauer, and Griffin Perry, the firm was established on January 10, 2025, and operates from its headquarters in Amarillo, Texas.
2-Year Price History
Valuation v3 Opus worker · 2026-11-13
Fermi is a pre-revenue developer of Project Matador, a behind-the-meter gas-powered AI data-center campus on Texas Tech land in Amarillo. It has about $1.67B of PP&E, including more than 2 GW of turbines that are now scarce, a 6 GW air permit and a gas supply line. On the other side it has $958M of debt, all of it classified as current, a going-concern warning and three hard deadlines. The Texas Tech notice to proceed is due Dec 31, 2026, and Texas Tech can terminate the ground lease if it is missed. A Keystone loan must be prepaid if there is no approved customer agreement by Dec 31. The $445M turbine facility defaults if Phase-1 project financing is not in place by Feb 10, 2027. Its first tenant walked away in Dec 2025 and its second (TensorWave/AMD) was terminated on Nov 12. Its third is a non-binding LOI with an unnamed investment-grade hyperscaler for 600 MW, which comes with a $200M prepayment due by wire on Nov 13 (not yet confirmed). The bull case is real: power, permits and turbines are the scarcest inputs in AI infrastructure, and if the lease closes, 600 MW of powered land could earn roughly $400M a year in fixed charges, with a path to 2.2 GW. But the stock at $2.06 (about $1.33B market cap, about $2.0B EV) is pricing roughly a coin flip, and my probability-weighted DCF is about $2.3 a share. The success case is about $4.6 after heavy capex and dilution. The failure case is about $0.5, because secured lenders own the turbines and the site can be lost. The governance record adds risk: the CEO was fired for cause, a director resigned over records access, there are an EDNY subpoena and an SEC document request, a $415M Class B unit suit, and the general counsel has related-party ties. Management is also promotional ('$4B' of equipment value). Rating 4.5: roughly fairly priced as a binary with no margin of safety. Interest 4: a lottery ticket on one unsigned lease, not a mispricing we can explain.
A deep dive would have to establish: Will the unnamed investment-grade hyperscaler actually wire the $200M and sign a definitive 600 MW lease before the Dec 31, 2026 Texas Tech notice-to-proceed and Feb 10, 2027 turbine-financing deadlines?
Research (expand)
What it does. Fermi America (IPO Oct 2025) is building Project Matador, a private, behind-the-meter power campus on Texas Tech land near Amarillo. It wants to sell gas-fired capacity (later nuclear) plus powered land to AI data-center tenants under 15-20 year triple-net take-or-pay leases. It has a 6 GW air permit, an Energy Transfer gas supply, 200 MW of Xcel grid power and more than 2 GW of turbines (SGT-800s, GE 6B/TM2500 units, three Siemens F-class units) on site or under contract. Net PP&E is $1.67B.
What the market believes. Price is $2.06 (Nov 13 intraday, flat after results), down 94% from the peak and at the bottom of its range. The market has watched two tenants walk away. The Q3 10-Q carries a going-concern warning. All $958M of debt is current. Without a signed lease, Texas Tech can terminate the ground lease after Dec 31, Keystone requires prepayment, and the turbine lenders can accelerate after Feb 10, 2027. The new 600 MW hyperscaler deal is a non-binding LOI. A fair read is that the market prices this as a coin flip.
Bull case. Grid queues are frozen (ERCOT large-load pause, state moratoria, turbine backlogs into 2029-30), so a permitted site with turbines already in hand is genuinely scarce. A hyperscaler wiring $200M before signing a lease would be strong evidence. Powered Land Plus keeps tenant construction off Fermi's balance sheet. At the $55-69/kW-month market benchmarks, 600 MW is about $400M a year of fixed charges, and 2.2 GW is about $1.5B.
What it earns today. Nothing; this is a cash furnace. Q3 cash operating outflow was $54.5M and capex was $133M. G&A was $142M, of which $66M was SBC and $21.5M was advisory fees paid in stock. Unlevered owner earnings run at about -$450M a year after counting SBC as a cost.
Projected unlevered FCF, success case ($M). 2027: -1,500. 2028: -2,000. 2029: -1,500 (build-out to about 2 GW, mostly project debt plus prepayments; Hillcore BOOT for the rest). 2030: +100. 2031: +1,000. By year 5 it would be a contracted, IG-tenant power-and-land landlord that deserves about 12x FCF, for a terminal value of about $12B. At 10% that gives an EV of about $3.7B, equity of about $3.0B, or about $4.6/share. Failure case: lenders take the turbines and the site may be lost. Equity keeps only residual liquidation value, about $0.3-0.8/share before litigation. Weighted 45/55, that is about $2.3/share against $2.06. Multiples are meaningless: EV of about $2.0B is about 1.2x PP&E, and P/E and EV/EBITDA are negative.
Management, risks, competition. Co-founder and CEO Toby Neugebauer was fired for cause, and a proxy fight followed. Director Everson resigned citing books-and-records access. The company faces an EDNY subpoena, an SEC document request, an IPO securities class action and a $415M Class B reclamation suit. The general counsel runs MAD Energy, the counterparty to a $100M NPI, and his law firm bills Fermi. Interim CEO McIntire (Bechtel, TerraPower) is credible on construction, but the call was promotional: he claimed '$4B' of equipment value against $1.67B of book. Competitors include Crusoe, the utility-adjacent campuses, and hyperscalers' own behind-the-meter builds. Turbine scarcity is Fermi's edge, but that edge erodes as OEM capacity grows. Even in success, financing about $8B of build-out will mean heavy dilution or asset-level giveaways.
Sentiment: 2/10. The stock is hated: it has fallen 94%, short interest is about 63M shares, put open interest is 20x call open interest, Macquarie cut its target to $7 and two tenants have walked. Retail is still churning it.
- /Users/gregwo/stocks2/data/edgar_filings/FRMI/10-Q_2026-11-12_0002071778-26-000058.html
- https://www.sec.gov/Archives/edgar/data/0002071778/000121390026118351/ea031197701ex99-1.htm
- /Users/gregwo/stocks2/data/analysisv3/context/FRMI.md
- https://stockanalysis.com/stocks/frmi/
- https://www.ajbell.co.uk/news/articles/fermi-shares-fall-subsidiarys-contract-tensorwave-expires
- https://www.datacenterdynamics.com/en/news/fermis-data-center-lease-with-tensorwave-misses-closing-deadline/
- https://www.schaeffersresearch.com/content/news/2025/12/12/fermi-stock-sinks-to-record-low-following-tenant-exit
| date | price | rating | research | fair value | DCF | base IRR | sentiment |
|---|---|---|---|---|---|---|---|
| 2026-10-18 | 3.16 | 3.5 | 4.5 | 2.80 | 2.60 | -8% | 3 |
| 2026-11-10 | 1.54 | 3.5 | 5.5 | 1.00 | 0.90 | -2% | 2 |
| 2026-11-13 | 2.06 | 4.5 | 4.0 | 2.00 | 2.30 | 10% | 2 |
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 |
|---|---|---|
| Revenue | 0.00 | 0.00 |
| Gross profit | 0.00 | 0.00 |
| Operating expenses | 469 | 178 |
| ▸Adj EBITDA | -469 | -178 |
| ▸Adj OCF | -455 | -132 |
| CapEx | -1725 | -516 |
| Adj FCF | -2180 | -648 |
| Interest expense | 0.00 | 0.01 |
| ▸Adj net income | -460 | -173 |
| ▸Owner's earnings | -350 | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2025→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 |
|---|---|---|---|
| ▸Claimed: EBITDA | -843 | -357 | -486 |
| FCF (OCF−capex) | -1907 | -1363 | -544 |
| Net income | -842 | -356 | -486 |
| ▸Capital returned | -1555 | -814 | -741 |
| Buybacks | -746 | 0.00 | -746 |
| Dividends | 0.00 | 0.00 | 0.00 |
| Interest paid | 0.01 | 0.00 | 0.01 |
| Debt paid down | -809 | -814 | 5.00 |
| ▸Reinvestment | 1803 | 1289 | 516 |
| Capex (PP&E) | 1768 | 1252 | 516 |
| Intangibles & M&A | 0.00 | 0.00 | 0.00 |
| Leases signed (net Δ) | 34.9 | 36.2 | -- |
| Retained / other | -353 | -549 | 196 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 289 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 |
|---|---|---|
| ▸Assets (total) | 2101 | 1413 |
| ▸Liabilities (total) | 1143 | 317 |
| Net debt (incl. leases) | 731 | -277 |
| Net debt / Adj EBITDA | -- | -- |
| Net debt / Adj FCF | -- | -- |
| Adj EBITDA / interest | -- | -- |
| Shares outstanding | 640 | 630 |
| Dilution (YoY) | +4.3% | -- |
| Margins | TTM | 2025 |
|---|---|---|
| Gross margin | -- | -- |
| Adj EBITDA margin | -- | -- |
| Adj OCF margin | -- | -- |
| Adj FCF margin | -- | -- |
| Net income margin | -- | -- |
| Adj NI margin | -- | -- |
| ROIC (adj, after-tax) | -18.8% | -11.4% |
| Cost of debt | 0.0% | 0.0% |
Earnings Calls
Earnings Call · 2026 Q3
Fermi America held its fiscal Q3 2026 call, the first under new CEO Lee Alan McIntire. He described a tougher environment: scarcer power, state moratoriums, ERCOT's freeze on new large-load connections, harder land and permitting in Texas, community opposition to data centers, and a tighter high-yield market. These conditions are pushing investment grade hyperscalers toward safe harbor sites like Fermi's Project Matador campus on Texas Tech University system land. Management announced that the TensorWave lease, a complex turnkey neo-cloud deal needing third-party credit, will not proceed. In its place, Fermi reached an agreement with an unnamed investment grade hyperscaler for 600 MW of 2027 power capacity. The deal includes a $200 million prepayment, due by November 13, and an early construction and site development agreement. A further roughly $90 million for steel is being negotiated. Mobilization is targeted for December 1. The customer builds its own data centers, so Fermi avoids construction capital, and dilution is little or none. A definitive long-term lease is still being negotiated and management said it is very far along. Initial power is targeted for late Q2 or early Q3 2027, with up to eight buildings delivered over time. Fermi highlighted $1.6 billion invested in the site, air permits for 6 GW, 2+ GW of generation equipment secured with turbines on site, Energy Transfer gas supply, and a water-conservative design. Chief Commercial Officer Anna Bofa described the "Powered Land Plus" offering and a strategy to anchor the campus with 4 to 5 investment grade hyperscalers that land and expand. The pipeline could absorb the planned 2.2 GW if it converts. CFO Robert Masson explained the three offerings. Powered Land Plus costs about $3.9–5.1M per MW and earns about $55–69 per kW-month in fixed charges. Powered shell costs $5.1–6.1M per MW and earns $64–80. Turnkey takes about 3x the capital for 2.4x the revenue. These are market benchmarks from 45 deals, not Fermi terms. Leases run 15–20 years, triple net, with take-or-pay structures. Financially, Fermi ended the quarter with about $316M of cash including $286M unrestricted. PP&E was $1.67B and debt $958M after a $430M convertible offering. Operating cash outflow was $54.5M and CapEx was $133M, down from $185M. Remaining equipment commitments are $126M, of which $112M is facility-funded. The MUFG turbine facility was amended with a new lender syndicate, removing the November 10 lease deadline and keeping minimum principal payments at 5%, avoiding more than $55M of payments, for about $25M in fees. Fermi aims to shift funding to customer prepayments and project-level debt and equity. Priorities are finalizing the lease, converting the pipeline, protecting liquidity, advancing financing, and delivering first power next year.
SEC Filing Findings
SEC Filing — material findings
2026-11-12 · depth 9/10risk 9Going Concern▸Management concludes substantial doubt about ability to continue as going concern before management's plans; cash and restricted cash not sufficient for obligations within one year; plans (not yet executed) relied upon to alleviate doubt.
Management concludes substantial doubt about ability to continue as going concern before management's plans; cash and restricted cash not sufficient for obligations within one year; plans (not yet executed) relied upon to alleviate doubt.
risk 9Liquidity/Covenants▸Event of default under $445M Turbine Warehouse facility if a fully committed project financing for 400 MW of Phase 1 is not consummated by Feb 10, 2027; lenders could accelerate and exercise remedies against financed equipment. Project financing not yet secured.
Event of default under $445M Turbine Warehouse facility if a fully committed project financing for 400 MW of Phase 1 is not consummated by Feb 10, 2027; lenders could accelerate and exercise remedies against financed equipment. Project financing not yet secured.
risk 7Liquidity/Covenants▸High Voltage Equipment Financing requires mandatory prepayment if no approved customer agreement is received by Dec 31, 2026, and a $20M minimum liquidity covenant.
High Voltage Equipment Financing requires mandatory prepayment if no approved customer agreement is received by Dec 31, 2026, and a $20M minimum liquidity covenant.
risk 8Hidden Liability▸Ground lease with Texas Tech: notice to proceed required by Dec 31, 2026 or TTU may terminate; condition (200 MW Phase 1 tenant lease) not satisfied; loss of site would be material. Also $9M escrow due Dec 31, 2026, unfunded.
Ground lease with Texas Tech: notice to proceed required by Dec 31, 2026 or TTU may terminate; condition (200 MW Phase 1 tenant lease) not satisfied; loss of site would be material. Also $9M escrow due Dec 31, 2026, unfunded.
risk 6Hidden Liability▸Unconditional purchase obligations of $126.2M for turbines, ~$111.6M expected to be funded via equipment facility draws; collateral posting and credit support obligations for gas and electric contracts due by Dec 31, 2026 with no credit support yet provided.
Unconditional purchase obligations of $126.2M for turbines, ~$111.6M expected to be funded via equipment facility draws; collateral posting and credit support obligations for gas and electric contracts due by Dec 31, 2026 with no credit support yet provided.
risk 7Litigation▸Putative securities class action (Lupia v. Fermi) alleging false statements in IPO registration statement; damages unspecified and loss not estimable.
Putative securities class action (Lupia v. Fermi) alleging false statements in IPO registration statement; damages unspecified and loss not estimable.
risk 7Litigation▸Peña/Summers Class B Unit reclamation suit seeking over $415M (vs. ~11.25M share conversion claim); compelled to arbitration and stayed; loss reasonably possible but not estimable.
Peña/Summers Class B Unit reclamation suit seeking over $415M (vs. ~11.25M share conversion claim); compelled to arbitration and stayed; loss reasonably possible but not estimable.
risk 6Government Inquiry▸Company received EDNY subpoena and SEC voluntary document request covering Project Matador, the Company and former management.
Company received EDNY subpoena and SEC voluntary document request covering Project Matador, the Company and former management.
risk 6Dilution▸Convertible notes ($431M, 5%, conversion ~$9.52, ~45.3M shares underlying) with cash-or-share settlement at company election; capped call out of the money; $25M amendment fee paid to lenders.
Convertible notes ($431M, 5%, conversion ~$9.52, ~45.3M shares underlying) with cash-or-share settlement at company election; capped call out of the money; $25M amendment fee paid to lenders.
risk 7Related-Party▸General Counsel George Wentz is CEO of MAD Energy (counterparty to a $100M-capped NPI on first 1.0 GW and indemnitor in Firebird litigation) and a member of Davillier Law Group which received legal fees; creates related-party exposure in litigation and contingent consideration.
General Counsel George Wentz is CEO of MAD Energy (counterparty to a $100M-capped NPI on first 1.0 GW and indemnitor in Firebird litigation) and a member of Davillier Law Group which received legal fees; creates related-party exposure in litigation and contingent consideration.
risk 6Hidden Liability▸Siemens Rated Capacity Agreement contingent payments up to ~$240M undiscounted over ten years based on turbine reliability.
Siemens Rated Capacity Agreement contingent payments up to ~$240M undiscounted over ten years based on turbine reliability.
risk 6Covenants▸Turbine Warehouse facility amended with $25M fees; loan-to-value default triggers and negative covenants (including change of control) restrict the company; lenders waived prior potential defaults on a one-time basis.
Turbine Warehouse facility amended with $25M fees; loan-to-value default triggers and negative covenants (including change of control) restrict the company; lenders waived prior potential defaults on a one-time basis.
risk 6Customer Concentration▸TensorWave lease terminated after closing date passed; replacement is a non-binding LOI with one unnamed hyperscaler; no definitive lease with any tenant exists.
TensorWave lease terminated after closing date passed; replacement is a non-binding LOI with one unnamed hyperscaler; no definitive lease with any tenant exists.
Options
Chain Snapshot (daily)
| Strike | Call Bid/Ask | Call OI | Put Bid/Ask | Put OI |
|---|---|---|---|---|
| $1.00 | $0.85/$0.95 | 60 | --/$0.10 | 116 |
| $1.50 | $0.45/$0.55 | 18 | $0.10/$0.20 | 2 |
| $2.00 | $0.25/$0.30 | 142 | $0.35/$0.45 | 654 |
| $2.50 | $0.15/$0.20 | 742 | $0.75/$0.90 | 2,880 |
| $3.00 | $0.05/$0.15 | 178 | $1.15/$1.30 | 275 |
| $3.50 | $0.05/$0.10 | 799 | $1.55/$1.80 | 175 |
| $4.00 | --/$0.05 | 1,039 | $2.00/$2.40 | 14,725 |
| $4.50 | --/$0.10 | 953 | $2.55/$2.80 | 0 |
Short Interest
Web Traffic
Cash Runway
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| SRS Investment Management, LLC | $185M | $9.16 | +$185M | +$185M | — | $10.68B |
| CITADEL ADVISORS LLC | $78.7M | $7.06 | +$21.7M | +$78.7M | — | $171.38B |
| Point72 Asset Management, L.P. | $64.5M | $8.84 | +$53.0M | +$64.5M | — | $62.77B |
| D. E. Shaw & Co., Inc. | $49.6M | $8.95 | +$42.0M | +$49.6M | — | $153.37B |
| MILLENNIUM MANAGEMENT LLC | $39.4M | $8.88 | +$38.9M | +$39.4M | — | $142.62B |
| BlackRock, Inc.Passive | $38.5M | $8.75 | +$31.1M | +$38.5M | — | $6.70T |
| MARSHALL WACE, LLP | $38.1M | $9.05 | +$35.6M | +$38.1M | — | $117.88B |
| ExodusPoint Capital Management, LP | $37.3M | $9.13 | +$37.0M | +$37.3M | — | $10.79B |
| Gotham Asset Management, LLC | $36.1M | $9.05 | +$32.8M | +$36.1M | — | $42.94B |
| HIGHLAND CAPITAL MANAGEMENT FUND ADVISORS, L.P. | $36.1M | $8.78 | +$24.2M | +$36.1M | — | $1.50B |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2025 Q2 | 12M | -15M | -15M | $-0.02 | $-0.03 – $-0.02 | 2 |
| 2025 Q3 | 12M | -15M | -15M | $-0.02 | $-0.02 – $-0.02 | 2 |
| 2025 Q4 | 6M | -6M | -6M | $-0.01 | $-0.02 – $-0.01 | 3 |
| 2026 Q1 | 2M | -22M | -22M | $-0.03 | $-0.06 – $-0.02 | 3 |
| 2026 Q2 | 3M | -29M | -29M | $-0.05 | $-0.09 – $-0.01 | 4 |
| 2026 Q3 | 3M | -25M | -25M | $-0.04 | $-0.07 – $-0.02 | 3 |
| 2026 Q4 | 13M | -25M | -25M | $-0.04 | $-0.07 – $-0.02 | 3 |
| 2027 Q1 | 22M | -19M | -19M | $-0.03 | $-0.04 – $-0.02 | 1 |
| 2027 Q2 | 37M | -19M | -19M | $-0.03 | $-0.04 – $-0.02 | 1 |
| 2027 Q3 | 79M | -10M | -10M | $-0.02 | $-0.02 – $-0.01 | 1 |
| 2027 Q4 | 236M | 194M | 153M | $0.24 | $0.17 – $0.30 | 1 |
| 2028 Q1 | 479M | 273M | 215M | $0.33 | $0.24 – $0.43 | 1 |
| 2028 Q2 | 619M | 501M | 396M | $0.62 | $0.45 – $0.79 | 1 |
| 2028 Q3 | 807M | 725M | 573M | $0.89 | $0.65 – $1.14 | 1 |
| 2028 Q4 | 972M | 930M | 734M | $1.14 | $0.83 – $1.46 | 1 |
| 2029 Q1 | 1.8B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q2 | 1.8B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q3 | 1.8B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2029 Q4 | 2.0B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q1 | 2.0B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q2 | 2.0B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
| 2030 Q3 | 2.2B | — | 0M | $0.00 | $0.00 – $0.00 | 0 |
Corporate
Insider Trading (last 12mo)
| Date | Side | Insider | Title | Shares | Price | Dollars | Owned $ |
|---|---|---|---|---|---|---|---|
| 2026-11-05 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 5,000,000 | $1.52 | $7.60M | $128.97M |
| 2026-11-04 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 94,000 | $1.99 | $188K | $179.16M |
| 2026-11-03 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 2,563,800 | $2.04 | $5.23M | $85.80M |
| 2026-10-20 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 420,749 | $3.04 | $1.28M | $276.81M |
| 2026-10-14 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 1,297,200 | $3.15 | $4.09M | $136.69M |
| 2026-10-13 | SELL | NEUGEBAUER TOBY R | 10 percent owner | 2,750,000 | $3.73 | $10.27M | $342.01M |
| 2026-06-30 | SELL | Perry James Richard | director | 863,637 | $7.31 | $6.31M | $115.70M |
| 2026-06-03 | SELL | Uzman Mesut | officer: Chief Nuclear Constr. Officer | 158,541 | $6.31 | $1.00M | $4.23M |
| 2026-04-09 | SELL | Everson Miles E. | officer: Chief Financial Officer | 427,004 | $4.58 | $1.96M | $45.66M |
| 2026-04-09 | SELL | Hamilton Charles Lynn | officer: Chief Site Development Officer | 398,140 | $4.58 | $1.82M | $25.31M |
| 2026-04-09 | SELL | Ortiz Blanes Jacobo | officer: Chief Operating Officer | 427,363 | $4.58 | $1.96M | $25.05M |
| 2026-04-08 | SELL | Everson Miles E. | officer: Chief Financial Officer | 403,205 | $4.91 | $1.98M | $51.05M |
| 2026-04-08 | SELL | Hamilton Charles Lynn | officer: Chief Site Development Officer | 375,950 | $4.91 | $1.85M | $29.09M |
| 2026-04-08 | SELL | Ortiz Blanes Jacobo | officer: Chief Operating Officer | 403,545 | $4.91 | $1.98M | $28.95M |
| 2026-03-31 | SELL | Perry Griffin | 10 percent owner | 2,000,000 | $5.54 | $11.08M | $337.55M |
| 2026-03-30 | SELL | Perry Griffin | 10 percent owner | 9,000,000 | $5.02 | $45.19M | $316.07M |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
Fermi is a highly speculative attempt to turn scarce power access, permits, land and equipment into an AI data-center infrastructure platform. The Q2 call materially improved the commercial story: TensorWave is now a binding customer agreement for an initial 222 MW and up to 650 MW, with approximately $6.5B of stated initial-term revenue, while Hillcore and construction partners may reduce the capital and execution burden. However, the economics remain opaque. Management would not disclose project cost, margins or total required spending, and the customer backstop and financing milestones are not yet completed. The company is still pre-revenue and has consumed enormous cash relative to its balance sheet. The investment case is therefore driven almost entirely by successful 2027 execution, not current earnings.
Trade Signal
Short FRMI: even after the post-earnings decline, the $4.2B equity value prices in successful financing and execution far ahead of a pre-revenue, heavily dilutive developer whose analyst-supported fair value is closer to $1.3B.
The stock fell from $26.21 at the October 2025 IPO month-end to $8 by December, a durable broken-IPO repricing as the market discounted the pre-revenue model and execution risk. It then drifted and sold off to $4.87 in April amid financing and vacancy concerns, rebounded to $9.50 in June on the Fermi 2.0 pivot, the 6 GW air permit, financing progress and renewed AI-power enthusiasm, and fell to roughly $5.75–$7.40 in July after governance conflict, the director resignation and the convertible-note offering highlighted dilution and oversight risk. The move from $7.60 to $6.60 on the August 13 earnings release was a further negative reaction despite the binding TensorWave agreement and improved liquidity. Overall, the decline is mostly a justified durable repricing from promotional expectations, though the latest earnings-day drop may modestly overstate the value of the commercial progress. This is not a clean temporary panic dislocation.
The stock is a broken-IPO, high-attention speculative name rather than a consensus-quality utility. Sell-side opinion remains unusually bullish, with a Buy consensus and high price targets, but trading sentiment is cautious after a greater-than-75% decline from the IPO and repeated governance and financing controversies. Bears focus on pre-revenue status, vacancy risk, capital intensity, the lost anchor-tenant LOI and opaque project economics; bulls focus on scarce permitted power and AI data-center demand. Short interest has climbed steadily to 7%, insider selling is heavy, retail participation is meaningful but declining, and the recent earnings-day selloff suggests the market treated the new agreement as insufficient proof rather than a clean positive surprise. The prevailing view is disliked and skeptical, but not truly left for dead because the scarcity narrative still attracts speculative capital.
The Q2 call produced a genuine commercial improvement: TensorWave moved from an LOI-style narrative to a binding agreement for an initial 222 MW and up to 650 MW, and Hillcore and construction partners may reduce capital and execution burdens. However, the inflection is only partially realized because the investment-grade backstop, project financing, construction economics and customer-funded delivery remain incomplete. Consensus already embeds approximately $1.8B–$2.2B of revenue by 2029–2030, while it does not yet provide meaningful EBITDA or EPS estimates, so the market is not wholly unaware of the upside but is likely overcapitalizing an unproven outcome.
- ▼2026-09 · September 2026 earnings / project-financing update — The market will look for the TensorWave investment-grade backstop, committed financing, project costs and evidence that liquidity is sufficient; missing milestones would pressure the stock.
- ▼2026-12 · December 2026 TensorWave tenant and notice-to-proceed milestones — These appear to be binding requirements for the commercial arrangement; failure would undermine the base case and could force unfavorable financing.
- ▲H2 2026 · Announcement of turnkey data-center construction partner — A credible partner could reduce execution and capital risk for the initial 222 MW project, although economics and funding terms remain critical.
- ▲Q4 2026–Q1 2027 · 2026 Q4 / early 2027 construction and power-delivery updates — Equipment deployment and progress toward the first 210 MW would provide the first tangible validation of the 2027 operating schedule.
- ▲late 2027 · First phased TensorWave revenue and rent commencement — Revenue is targeted for late Q3 or early Q4 2027, but this is beyond the normal resolution window and requires multiple interim financing and execution milestones.
Flow is decisively negative. Trailing dilution was approximately 74%, the company issued roughly $431M of convertible notes, SBC was $134M in the latest reported quarter, and there has been no insider buying against approximately $18.9M of officer/director sales and a major-holder sale of roughly $56M. Short interest has risen to 7% of float, providing some squeeze fuel, but only 2.3 days to cover and heavy call open interest do not offset the structural share-supply risk.
There is some asset support from land, permits, turbines, cash and project infrastructure, but it is not a hard floor: assets are concentrated at one development site, the company has substantial debt and ongoing cash burn, and forced financing or an asset sale could occur at a discount. The $4.2B equity value already capitalizes substantial success, while convertible debt and further project-level funding create dilution and priority risk. There is no credible hard ceiling either, given the stock's extreme volatility and genuine AI-power scarcity optionality, but insider selling and financing overhang would likely emerge on rallies.
Speculative buyers can still be attracted by the AI-power scarcity narrative, the TensorWave agreement and permitted Texas campus, but the company is pre-revenue, cash-burning, highly dilutive and dependent on project financing. The next marginal buyer likely needs hard evidence of an investment-grade backstop and funded construction, not another aspirational capacity announcement.
Fear is stronger than greed at $6.60. The opportunity is real enough to prevent an easy fundamental short, but the valuation assumes successful financing, construction, tenant credit, attractive margins and limited dilution before the company has demonstrated recurring revenue or project economics.
Valuation
The genuinely new information is a binding TensorWave agreement covering up to 650 MW, with an initial 222 MW phase and approximately $6.5B of stated 15-year revenue, plus management's claimed late-2027 revenue commencement target. The call also disclosed the intended investment-grade backstop, Hillcore's 2.6 GW BOOT partnership, a new execution-focused CEO and more than $430M of convertible financing. These are materially stronger commercial milestones than the prior LOI and pipeline narrative, although the backstop, project financing, margins and total capex remain incomplete.
▸ How the cases moved
The bear case remains approximately $300M, as the event did not eliminate financing, tenant-performance or liquidity risks. The base case rises from roughly $800M to $1,100M because a binding 222 MW TensorWave commitment makes initial revenue and financing more plausible; its probability rises from 0.40 to 0.50. The bull case rises from roughly $4,500M to $7,200M because the agreement provides a credible route to a scaled campus and the Hillcore/turnkey partnerships improve capacity execution; its probability rises from 0.10 to 0.20. Bear probability falls from 0.50 to 0.30, but the unresolved backstop, undisclosed margins and capital requirements prevent a full re-rating to the bull case.
The TensorWave arrangement fails to reach financing or commercial operation, the December 2026 tenant and notice-to-proceed requirements become binding constraints, and Fermi remains a cash-burning pre-revenue developer. The company raises capital on unfavorable terms or sells project assets at a substantial discount; residual value is primarily cash, permits, equipment and partially completed infrastructure.
▸ Valuation
1.0x $400M asset/contract EV = $400M EV − $100M net debt = $300M equity
Fermi secures the TensorWave investment-grade backstop and project financing, delivers approximately 200-640 MW during 2027, and begins phased rent and infrastructure revenue late in 2027. The initial project works economically but requires substantial debt and additional equity, while follow-on tenants develop more slowly than management suggests. By year two, Fermi has become a credible infrastructure operator, but earnings remain below the most aggressive gigawatt claims.
▸ Valuation
8.0x $250M EBITDA = $2,000M EV − $900M net debt = $1,100M equity
The TensorWave backstop, financing and turnkey construction partner are completed promptly; Fermi delivers the initial 222 MW and expands toward the full 650 MW, while Hillcore and additional hyperscaler or neocloud commitments accelerate the campus. Power scarcity supports strong pricing and Fermi converts its permits, land and partnerships into a high-growth contracted infrastructure platform. Capital intensity is increasingly funded at the project level, allowing owner earnings to approach the underlying EBITDA.
▸ Valuation
10.0x $900M EBITDA = $9,000M EV − $1,800M net debt = $7,200M equity
▸ Target Rationale
The probability-weighted scenario value is $1,664M, but I set the analytical target at $1,300M to reflect risks not fully captured by the terminal EBITDA arithmetic: uncertain project margins, substantial unquantified funding needs, probable dilution, incomplete visibility into convertible and equipment debt, dependence on a single campus, and unresolved governance and leadership issues. The TensorWave agreement justifies a value above the pre-event development-stage asset value, but the target does not capitalize management's $700M-$900M EBITDA-per-gigawatt aspiration without demonstrated economics.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-07-09Company news
In July 2026, Fermi Inc. announced a $350 million offering of convertible senior notes due 2031 to fund anti-dilution "capped call" transactions and general corporate needs (Source: ACCESS Newswire). This follows the formal launch of "Fermi 2.0," a strategic pivot toward institutionalizing the company after the "for cause" termination of its co-founder. A contentious proxy battle with former CEO Toby Neugebauer ended in early July 2026 when Neugebauer suspended his campaign to retake the board, citing judicial delays (Source: PR Newswire). Operationally, the company secured an agreement with Primoris Services Corporation to begin balance-of-plant construction for its first six gas turbines at "Project Matador," an 11-gigawatt-plus private power campus in Texas (Source: Stock Titan).
Thesis findings
The bull case centers on scarcity value: Fermi controls 5,200 acres with secured permits for 6 GW of power (scaling to 17 GW), aiming to bypass grid bottlenecks for AI hyperscalers (Source: Seeking Alpha). The "behind-the-meter" model integrates natural gas, solar, and battery storage, offering a faster timeline than traditional utility connections. Conversely, the bear case is rooted in execution and vacancy risk. Fermi remains a pre-revenue venture with massive capital requirements, having recently lost its only major anchor tenant LOI (Source: Portfolio Income Solutions). Critics highlight a heavy cash burn and a total reliance on a single project site, noting that infrastructure currently earning zero revenue may lead to further liquidity pressure (Source: YouTube/Machina Capitalis).
Market opinion (price-aware)
The market narrative is defined by a "broken IPO" sentiment; FRMI has plunged over 75% from its $21 October 2025 IPO price to the $7.00 range. Following the July 9th announcement of the $350M convertible note offering, shares fell another 14% as investors reacted to potential dilution (Source: GuruFocus). While the sell-side maintains a "Buy" consensus (8 of 9 analysts), the narrative has shifted from growth to a "sum-of-the-parts" floor, with Evercore valuing the assets between $7 and $14 (Source: Reddit). Retail sentiment on X and Reddit is "speculatively cautious"; while some see an asymmetric bet on a future hyperscale tenant, most vocal investors remain wary of the company’s history of governance drama and its persistent lack of a binding lease agreement (Source: Seeking Alpha, StockTwits).