Stocks/FTS.TO

FTS.TO

Fortis Inc.v3 3.5/10 · 2026-11-13
Utilities·Regulated Electric
83.69 CAD
43.5B CAD market cap
1.5% div yield
v3 Rating
3.5/102.5–4.5
Setup
2.5/101.5–3.5
Fair Value
75.00 CAD62.00 CAD–88.00 CAD-10%
DCF (10%)
19.00 CAD-77%
Base IRR
+7%+3%–+11%
Visibility
clear±17%
Wall Street
(3 buy, 9 hold, 1 sell)
Rating
Revenue (TTM)
12.5B CAD
Owner Earnings
C$3.2B
Next-Yr Owner Earnings
C$0M
Growth
+6.5% × 10y
P / Next-Yr OE
--
Net Debt
C$36.0B

Fortis Inc. operates as an electric and gas utility company in Canada, the United States, and the Caribbean countries. The company generates, transmits, and distributes electricity to approximately 459,000 retail customers in southeastern Arizona, including the greater Tucson metropolitan area; and 107,000 retail customers in southeastern Arizona with an aggregate capacity of 3, 443 megawatts (MW). It also sells wholesale electricity to other entities in the western United States; owns gas-fired and hydroelectric generating capacity totaling 43 MW; and distributes natural gas to approximately 1,105,000 residential, commercial, and industrial customers in British Columbia, Canada. In addition, it owns and operates the electricity distribution system that serves approximately 615,000 customers in southern and central Alberta; owns four hydroelectric generating facilities with a combined capacity of 225 MW; and provides operation, maintenance, and management services to hydroelectric generating facilities. Further, the company distributes electricity in the island portion of Newfoundland and Labrador with an installed generating capacity of 145 MW; and on Prince Edward Island with a generating capacity of 90 MW. Additionally, it provides integrated electric utility service to approximately 70,000 customers in Ontario; approximately 280,000 customers in Newfoundland; approximately 35,000 customers on Grand Cayman, Cayman Islands; and approximately 92,000 customers on Maritime Electric. It also owns and operates approximately 91,100 circuit Kilometers (km) of distribution lines; and approximately 51,700 km of natural gas pipelines. Fortis Inc. was founded in 1885 and is headquartered in St. John's, Canada.

2-Year Price History

$84.39+43.3%
$60$65$70$75$80Initial target $75.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
3.52.5–4.5
Setup
2.51.5–3.5
Fair value (CAD)
75.0062.00 – 88.00
Upside vs 83.69
-10%
DCF (10%)
19.006.00 – 46.00-77%
Base IRR
7%3% – 11%
Visibility
clearrange ±17%
Sentiment
7/10
Reputation
5/10
2026-11-13 · claude-opus-5-5 · priced at 85.02

Fortis is a 100% regulated North American utility holding company (ITC transmission, TEP/UNS in Arizona, FortisBC, FortisAlberta, Central Hudson). Q3 2026 was clean: adjusted EPS was C$0.92 (+6%), the new 2027-31 capital plan rose to C$32.2B with rate base growing about 7.5% a year to C$63.9B, the dividend went up 4% for a 53rd straight year, and the plan has upside from MISO Tranche 2.1, Tilbury LNG and Arizona data centers. The business is excellent and highly visible, but none of that is hidden. At C$85 (intraday 13 Nov; last close C$84.39) the stock is near the top of its 3-year range, up about 80% from C$48, and trades at about 23.5x 2026 EPS, 14.4x EV/EBITDA and roughly 26x unlevered owner earnings of about C$3.2B. Its free cash flow is about zero after capex, and it keeps issuing equity through the DRIP and the ATM program. The new capital earns regulated returns of about 7% before leverage, below our 10% hurdle, so growth adds little value at that rate. Our 10% DCF, with 17x applied to year-5 owner earnings, comes out around C$19 a share. At the market's own utility cost of capital the stock looks about fair to slightly rich. We see no mispricing: it is not a short (it is a quality monopoly that keeps growing), and it is not a buy at this multiple. Rating 3.5 because the price is far above our DCF. Interest 2.5: the stock is fairly priced, offers no variant view, and is a pass.

A deep dive would have to establish: Can Fortis keep compounding rate base at 7.5% without regulators in Arizona, New York and Alberta squeezing allowed returns, and while bond yields stay low enough to justify about 23x earnings for a business whose incremental capital earns only about 7% before leverage?

Owner earnings, TTM
C$3.2BC$2.9B – C$3.5B
Realistic peak profit
C$4.5BC$4.0B – C$5.0B
Growth rate
6.5%5.0% – 8.0%
Years of growth
105 – 15
Market cap
C$44BC$44B – C$44B
EV
C$84BC$83B – C$85B
Net debt
C$36BC$35B – C$37B
Capital return / cap
1.6%1.0% – 2.2%
P/E
23.5×22.0× – 25.0×
EV/EBITDA
14.4×13.8× – 15.0×
FCF yield
3.8%3.4% – 4.2%
Projected FCF, base case (CAD millions)
Y1C$0M-C$800M – C$800M
Y2C$100M-C$800M – C$1.0B
Y3C$500M-C$500M – C$1.4B
Y4C$1.1BC$0M – C$2.0B
Y5C$1.7BC$500M – C$2.7B
Competition: There is essentially no competition inside its franchised territories; the real counterparties are regulators and political backlash over affordability, plus rivals in competitive MISO transmission bids.
Governance: none flagged
Research (expand)

What it does. Fortis owns ten regulated utilities. About 95% of its assets are transmission and distribution. Its rate base is C$45.3B in 2026, split roughly ITC 1/3, UNS (Arizona) about 1/6, FortisBC gas and electric, FortisAlberta, Central Hudson (NY), and smaller Canadian and Caribbean utilities. The need it serves is becoming more urgent: load growth from data centers, mining, electrification and LNG, plus MISO's long-range transmission build-out.

What the market believes. The market treats Fortis as a bond-like compounder with a long runway: rate base growth of about 7.5% a year, EPS growth of 5-6% after dilution, and dividend growth of 4-6% guided through 2031. It has paid up for that. The stock rose from about C$48 in late 2023 to C$85 as rates fell and the 'AI power' utility trade took hold. I can't find anything the market is getting wrong. The upside the company points to (about 10 GW in ITC's large-load queue, TEP's high-growth IRP worth up to US$1.5B, Tilbury Phase 2 worth C$2-4B) is visible and is largely what supports the premium multiple.

What it earns today. TTM EBITDA is about C$5.8B and D&A about C$2.0B. After roughly 17% cash tax, unlevered owner earnings come to about C$3.2B. Cross-check: net income of C$1.79B, plus after-tax interest of about C$1.25B, plus minority interests and preferred dividends of about C$0.25B. Depreciation is a reasonable proxy for maintenance capex. Actual capex (C$6-6.5B a year) is far above that. TTM operating cash flow is C$4.55B, so levered FCF is about -C$1.9B, and the gap is funded with debt, hybrids, the DRIP and about C$250M a year of ATM equity.

Projected unlevered FCF (C$M, after all capex). 2027 about 0, 2028 about 100, 2029 about 500, 2030 about 1,100, 2031 about 1,700, as pre-interest operating cash flow grows about 7% against a flat capex plan of about C$6.4B a year. By year 5 owner earnings are about C$4.5B (rate base up 41%, less some regulatory lag).

What it is in year 5. It falls in the 'neither' bucket: a highly durable monopoly still growing 5-7%. We apply 17x (the top of the 10-18x range, for durability) to year-5 owner earnings, which gives C$76B. Discounted at 10% plus interim FCF, EV is about C$50B. Net debt of C$36B, C$1.6B of preferreds and about C$2.5B of minority interest come off, leaving equity of about C$10B, or C$19 a share. The reason is simple: regulated assets earn about 7% before leverage. The market prices utilities at roughly a 6-6.5% WACC, and on that basis Fortis is about fair. At 19-20x 2027 EPS (about C$3.85) fair value is C$73-77. Base IRR from today is about 7%: a 3.1% dividend plus about 5.5% EPS growth, less a modest derating from 23.5x.

Multiples paid. 23.5x 2026 EPS, 14.4x EV/EBITDA, a 3.8% unlevered owner-earnings yield on EV, and negative levered FCF.

Management and risks. Hutchens and Perry are steady and candid, and Fortis tops governance rankings. The risks are political affordability backlash: TEP has asked for 14% against the Arizona AG's 4%, with the ACC vote on 17 November; the ALJ recommended a 9.65% ROE and a formula rate. Others are the Central Hudson billing fiasco, Alberta's PBR appeal loss, a data-center backlash in elections, rising rates (the stock trades as a long-duration bond), and creeping equity issuance. Customers rate it 4/10, which is typical for a utility facing bill anger, and competition is nil inside its franchises.

Sentiment: 7/10. It is a loved defensive name trading near all-time highs with a 'Hold' consensus. Implied volatility is too low for an attractive covered-call setup.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue12496+4%12170+6%11508+0%11517+4%11043
Gross profit3532-30%4519-13%5219+7%4857+10%4408
Operating expenses0.00-100%1027-47%1927+9%1773+6%1668
▸Adj EBITDA5671+2%5549+6%5219+7%4857+10%4408
▸Adj OCF4533+16%4174+12%3714+2%3626+2%3553
CapEx-6556-6143-5166-4169-3865
Adj FCF-2023-1969-1452-543-312
Interest expense15231478140613051102
▸Adj net income1535+3%1502+3%1456+7%1358+9%1246
▸Owner's earnings1450--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA25030100%4430100%5889100%5292100%4919100%4500100%
FCF (OCF−capex)-6109-24%-1329-30%-2081-35%-1284-24%-624-13%-791-18%
Net income788231%143632%179931%168032%157332%139431%
▸Capital returned-417-2%-950-21%-107-2%1603%54811%-68.0-2%
Buybacks-502-300-60.0-46.0-43.0-53.0
Dividends3543637788744701673
Interest paid644511541478140613051102
Debt paid down-9903-2441-2313-1944-1415-1790
▸Reinvestment2355994%4824109%5964101%517898%372376%387086%
Capex (PP&E)2420548626143516641693865
Intangibles & M&A-6350.00-1810.00-4540.00
Leases signed (net Δ)-11.0-38.02.0012.08.005.00
Retained / other13886%77517%-315-5%-38.0-1%58712%3798%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)8172274830750636741365873
▸Liabilities (total)5364548961492104408143031
Net debt (incl. leases)3603334306335032941828837
Net debt / Adj EBITDA6.356.186.426.066.54
Net debt / Adj FCF----------
Adj EBITDA / interest3.723.753.713.724.00
Shares outstanding516507498489481
Dilution (YoY)+1.7%+1.6%+1.9%+1.7%+1.1%
Employees9809--------
MarginsTTM2025202420232022
Gross margin28.3%-13.437.1%-8.245.4%+3.242.2%+2.239.9%
Adj EBITDA margin45.4%-0.645.6%+0.245.4%+3.242.2%+2.239.9%
Adj OCF margin36.3%+3.834.3%+2.032.3%+0.831.5%-0.732.2%
Adj FCF margin-16.2%+2.4-16.2%-3.6-12.6%-7.9-4.7%-1.9-2.8%
Net income margin15.0%+0.314.8%+0.214.6%+0.913.7%+1.012.6%
Adj NI margin12.3%-0.112.3%-0.312.7%+0.911.8%+0.511.3%
ROIC (adj, after-tax)4.7%4.9%4.7%4.9%4.5%
Cost of debt4.2%4.3%4.4%4.4%4.0%

Earnings Calls

11 calls

Earnings Call · 2026 Q3

2026-11-03

Fortis reported Q3 2026 reported earnings of $474 million, or $0.92 per share, and $1.4 billion, or $2.69 per share, year to date. Adjusted EPS rose $0.05 in the quarter and $0.06 year to date. By segment, ITC was up $0.03 on rate base growth and lower stock compensation. The US electric and gas segment added $0.02, mainly from UNS Energy on higher sales and customer growth, partly offset by milder weather and regulatory lag. Western Canadian utilities added $0.02, other electric fell $0.01 after the Fortis TCI disposition, and Central Hudson was flat in the quarter. The company has invested $4.2 billion year to date and expects about $6 billion for 2026, up $400 million from plan. The main announcement was a new five-year capital plan of $32.2 billion, $3.4 billion above the prior plan and the largest in company history. Rate base is expected to grow at a 7.5% CAGR, up 50 bps, from $45 billion in 2026 to about $56 billion in 2029 and $64 billion in 2031. The plan is 100% regulated, about 75% transmission and distribution, and includes 11 major projects. Dividend growth guidance of 4-6% was extended through 2031, and Q4 brings a 4% increase to $0.665, the 53rd consecutive annual increase. ITC's $11.6 billion plan supports 8.6% rate base growth and includes MISO Tranche 2.1 projects. ITC won the competitive Mark project in Iowa, a roughly US$1 billion investment with about $500 million in the plan. Further upside includes US$2.9-3.4 billion of post-2031 Tranche 2.1 projects and more than 10 GW of proposed large-load connections, up from 8 GW. UNS Energy's $5.6 billion plan supports 7.4% growth. TEP has one approved 300 MW data center agreement that begins ramping in 2027, and its integrated resource plan includes up to $1.5 billion of high-growth upside that is not in the base plan. FortisBC's $6 billion plan supports 7.9% growth, driven by Tilbury Phase 1B (about $1.7 billion) and the LNG storage tank (up to $1.1 billion). Phase 2 liquefaction offers a further $2-4 billion, mostly after 2031. The ALJ recommended TEP an ROE of 9.65% on a 55% equity ratio, with a formula rate adjuster whose first adjustment is in April 2028. Commission approval is expected this month, with new rates effective December 1. Funding relies on operating cash flow, utility debt and the DRIP. The company issued US$1 billion of hybrids and about $260 million of ATM equity in Q3 and plans about $250 million more over the next 12 months. S&P FFO to debt is expected to average above 12%, and Fitch FFO leverage about 5.9x.

Analyst Q&A (16)
▸
Does the new plan include some large-load CapEx at UNS, given the up to $1.5 billion on Slide 14 versus the prior $1.5-2 billion generation estimate? How might the US election shape the outlook?
Maurice Choy · RBC
No data center capex is in the plan. The $1.5 billion is a smaller slice of the earlier bucket (the 300 MW site build-out to 500-600 MW and a second 500-700 MW site) used for the high-growth IRP scenario. On the election, he hopes the debate moves past rhetoric. Done right, large loads lower rates, as with the 20% reduction in Iowa and $13 per month in Arizona.
▸
How will ATM be used versus discrete issuances, and how is the buffer above the 12% FFO/debt threshold sized?
Maurice Choy · RBC
The DRIP provides most equity needs. The target is a 50-75 bps buffer above rating thresholds, and funding is anchored to credit metrics. ATM will be one tool alongside hybrids, which are only about 6% of the capital structure. Choices will be made once growth beyond the plan becomes visible.
▸
With governments friendlier to conventional energy, can Tilbury LNG do more on site or move timelines forward?
Robert Hope · Scotiabank
Phase 2 could add up to 2.5 MTPA and might begin in the next plan. Roger Dall'Antonia said the environmental certificate covers the site potential. Tilbury 1B and the storage tank are in design, with construction starting in 2027 and in service from end-2030 to 2032. Tilbury 2 could be phased, starting with the bunkering market, but needs upstream gas supply work.
▸
How is the company thinking about M&A given large utility deals in the sector?
Robert Hope · Scotiabank
Organic growth remains the focus because each dollar invested goes into rate base and benefits customers. Management monitors M&A but does not need it.
▸
What are the puts and takes in the TEP ALJ recommendation, and how does the post-test-year plan and April 2028 first adjustment affect regulatory lag?
John Mould · TD Securities
The process is ongoing, and exceptions were filed on ROE and other issues. The adjuster resembles UNS Gas's mechanism, with the first one in April 2028 reflecting investment through 2027. Some lag remains and it is not a forward test year, but it smooths Arizona earnings.
▸
How should the 10 GW ITC load pipeline be paced and what investment might it bring?
John Mould · TD Securities
It is incremental to the plan, which already has $800 million for announced, approved data centers. The 10 GW ranges from negotiation stage to early planning, and not all will materialize. Nothing goes in the plan until it is real.
▸
Why is the plan highly executable, and what about labor, materials and the hardest parts of execution?
Ben Pham · BMO
The company has gradually raised rate base growth over time and routinely does this work. Larger projects need more attention to supply chain queues and labor, as in any sector, but management believes it can manage this.
▸
Is the federal mega-deduction reflected in the plan, and does it affect credit metrics or Canadian rate base?
Ben Pham · BMO
It is not reflected because the legislation is not final. Faster tax write-offs would lower taxes but also reduce amounts collected from customers, especially at the western utilities. No material credit impact is expected, and more detail will come once rules are final.
▸
How far could hybrid issuance be pushed, and what ATM usage is reasonable over the next two years?
Mark Jarvi · CIBC Capital Markets
Hybrids are about 6% of capital structure against limits of 10% (DBRS) and 15% (S&P). Going to 10% would allow over $2.5 billion. ATM use is limited to the stated plan, with more only if capital is added.
▸
Would new capital requiring ATM come in the next couple of years or later in the plan?
Mark Jarvi · CIBC Capital Markets
More likely in the later years, as large projects take time and growth has been evolutionary.
▸
How would the Arizona IRP base case handle a large load, such as bigger existing sites or new ones, and how far along is planning?
Mark Jarvi · CIBC Capital Markets
The company has many sites and options for generation and transmission, and is evaluating them for the high-growth scenario.
▸
How are customers thinking about timelines for expansion, and is there a chance to go faster?
Mark Jarvi · CIBC Capital Markets
Susan Gray said the company is working closely with customers to meet their schedules and has not been given a timeline it cannot meet. Project Blue's first phase already has generation available.
▸
Have customer timelines changed, accelerated or delayed?
Mark Jarvi · CIBC Capital Markets
No shift either way. Project Blue expansion is still under negotiation, Copper World is planned later in the plan, and South32 is on its original timeline.
▸
Should the dividend growth stay at the low end of 4-6%, or accelerate, and is there a target payout ratio?
Michael Lonegan · Barclays
There is no target payout ratio. Guidance is 4-6%, and the company wants to keep nudging the payout ratio lower, as it has over three to four years.
▸
After the Alberta PBR appeal was dismissed, how does the company view the regulatory environment there?
Michael Lonegan · Barclays
The Fortis Alberta leader said the outcome was not surprising. The relationship with the AUC is constructive, and discussions are under way on rebasing and future rate-making, whether PBR or cost of service. Alberta growth is strong, with new loads and reliability and wildfire investment opportunities.
▸
Since the ALJ recommendation tracks the original TEP request, will the company revisit its EPS guidance?
Elias Jossen · JPMorgan
Still considering it, but the lag of about 1.5 years until the first adjuster must be managed.

Web Traffic

fortisinc.com
Web rank#711,360
Est. visits/mo671K
Traffic QoQ (12w)▼ 1.7%
Web Rank History
#711,360+278,297
rankest. visits/mo
400k500k600k700k800k900k1.0m538K673K807K942K1.1M04-2807-2809-0811-0312-2202-09

Cash Runway

11.3months
CRITICAL

Analyst Coverage

Analyst Coverage
Analyst Ratings
3
9
Buy: 3Hold: 9Sell: 1Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2005 Q4466M209M131M$0.26$0.20 – $0.348
2006 Q1462M296M194M$0.36$0.31 – $0.468
2006 Q2362M264M169M$0.33$0.30 – $0.378
2006 Q3342M245M156M$0.31$0.28 – $0.348
2006 Q4396M216M131M$0.27$0.19 – $0.338
2007 Q1476M299M189M$0.37$0.34 – $0.416
2009 Q3724M323M109M$0.21$0.19 – $0.247
2009 Q41.2B268M68M$0.52$0.45 – $0.5810
2010 Q11.3B301M88M$0.59$0.56 – $0.6310
2010 Q2802M273M67M$0.32$0.29 – $0.359
2010 Q3700M270M55M$0.24$0.23 – $0.259
2010 Q41.4B322M105M$0.51$0.46 – $0.5810
2011 Q11.2B296M78M$0.63$0.60 – $0.668
2011 Q2825M308M87M$0.35$0.33 – $0.388
2011 Q3715M276M60M$0.24$0.22 – $0.259
2011 Q41.1B332M103M$0.47$0.44 – $0.518
2012 Q11.3B353M111M$0.68$0.64 – $0.728
2012 Q2846M318M86M$0.34$0.31 – $0.3611
2012 Q3735M294M64M$0.26$0.25 – $0.2811
2012 Q41.1B315M82M$0.49$0.42 – $0.5513
2013 Q11.2B367M115M$0.67$0.64 – $0.7113
2013 Q2923M382M124M$0.32$0.28 – $0.3710
2013 Q3817M322M60M$0.27$0.24 – $0.3011
2013 Q41.3B375M100M$0.49$0.45 – $0.538
2014 Q11.6B703M333M$0.65$0.60 – $0.727
2014 Q2977M469M151M$0.28$0.24 – $0.369
2014 Q3886M533M149M$0.27$0.23 – $0.368
2014 Q41.5B675M250M$0.49$0.43 – $0.569
2015 Q11.9B751M310M$0.62$0.56 – $0.677
2015 Q21.3B659M230M$0.45$0.41 – $0.507
2015 Q31.2B676M246M$0.47$0.37 – $0.568
2015 Q41.7B666M238M$0.45$0.40 – $0.516
2016 Q12.1B828M351M$0.68$0.65 – $0.747
2016 Q21.6B560M138M$0.46$0.43 – $0.499
2016 Q31.6B562M127M$0.50$0.41 – $0.5711
2016 Q42.1B744M188M$0.52$0.42 – $0.6012
2017 Q12.5B851M251M$0.72$0.66 – $0.7812
2017 Q22.2B877M268M$0.56$0.52 – $0.6112
2017 Q32.2B865M270M$0.57$0.52 – $0.6411
2017 Q42.4B946M327M$0.64$0.57 – $0.6911
2018 Q12.4B729M147M$0.71$0.66 – $0.7612
2018 Q22.1B941M300M$0.58$0.54 – $0.6412
2018 Q32.2B897M261M$0.63$0.58 – $0.8013
2018 Q42.3B969M309M$0.62$0.56 – $0.7013
2019 Q12.4B980M291M$0.73$0.73 – $0.736
2019 Q22.1B971M285M$0.57$0.57 – $0.576
2019 Q32.2B1.6B785M$0.65$0.65 – $0.656
2019 Q42.3B982M307M$0.60$0.60 – $0.607
2020 Q12.5B1.1B403M$0.73$0.73 – $0.736
2020 Q22.1B969M262M$0.57$0.57 – $0.577
2020 Q32.2B1.0B318M$0.66$0.66 – $0.668
2020 Q42.4B1.0B339M$0.67$0.67 – $0.679
2021 Q12.4B1.1B361M$0.75$0.75 – $0.759
2021 Q22.0B1.0B304M$0.59$0.59 – $0.594
2021 Q32.2B1.0B320M$0.64$0.64 – $0.644
2021 Q42.3B1.1B356M$0.71$0.71 – $0.715
2022 Q12.7B1.2B394M$0.78$0.78 – $0.789
2022 Q22.3B1.1B300M$0.59$0.59 – $0.595
2022 Q32.4B1.1B345M$0.68$0.68 – $0.685
2022 Q42.7B1.2B356M$0.71$0.71 – $0.717
2023 Q13.1B1.3B413M$0.82$0.82 – $0.829
2023 Q22.6B1.2B310M$0.61$0.61 – $0.614
2023 Q32.9B1.3B415M$0.82$0.74 – $0.8511
2023 Q43.0B1.2B355M$0.70$0.67 – $0.759
2024 Q13.4B1.4B451M$0.89$0.88 – $0.9211
2024 Q22.8B1.3B332M$0.65$0.63 – $0.684
2024 Q33.0B1.4B420M$0.82$0.82 – $0.824
2024 Q43.3B1.4B417M$0.81$0.77 – $0.8411
2025 Q13.4B1.5B499M$0.97$0.95 – $1.0112
2025 Q22.9B1.3B360M$0.70$0.68 – $0.7314
2025 Q33.1B1.5B436M$0.85$0.83 – $0.8611
2025 Q43.1B1.4B436M$0.85$0.82 – $0.8813
2026 Q13.6B1.6B511M$1.00$0.95 – $1.0511
2026 Q22.6B1.4B391M$0.76$0.74 – $0.7913
2026 Q33.2B1.5B452M$0.88$0.84 – $0.9410
2026 Q43.4B1.6B479M$0.93$0.89 – $0.988
2027 Q13.6B1.7B541M$1.05$1.03 – $1.083
2027 Q22.7B1.6B419M$0.82$0.82 – $0.821
2027 Q33.2B1.7B500M$0.97$0.97 – $0.971
2027 Q43.6B1.8B534M$1.04$1.04 – $1.041
2028 Q13.7B1.8B524M$1.02$1.02 – $1.022
2028 Q22.8B1.7B431M$0.84$0.84 – $0.842
2028 Q33.4B1.9B549M$1.07$1.07 – $1.072
2028 Q43.8B2.0B595M$1.16$1.16 – $1.162
2029 Q13.1B2.0B554M$1.08$1.08 – $1.081
2029 Q23.1B1.9B452M$0.88$0.88 – $0.881
2029 Q33.1B2.0B575M$1.12$1.12 – $1.121
2029 Q43.1B2.1B626M$1.22$1.22 – $1.221
2030 Q13.1B2.1B585M$1.14$1.14 – $1.141
2030 Q23.1B2.0B477M$0.93$0.93 – $0.931
2030 Q33.1B2.2B606M$1.18$1.18 – $1.181
2030 Q43.1B2.2B657M$1.28$1.28 – $1.281
v2 analysis (legacy, 2026-08-04) — for comparison onlyclick to expand

Thesis

Fortis is a high-quality, diversified regulated utility with unusually visible rate-base expansion. Its 2026-2030 capital plan targets approximately 7% annual rate-base growth, supported by ITC transmission, Arizona load growth, Western Canadian investment and potential Tilbury expansion. The latest quarter was operationally steady rather than transformational: first-half investment is on track, ratings remain investment grade, and management reiterated 4%-6% dividend growth. The central trade-off is that Fortis must continually reinvest. TTM capex of CAD 6.2B overwhelms adjusted OCF of CAD 4.3B, while net debt is CAD 35.9B, or 6.4x adjusted EBITDA, and shares have diluted approximately 1.5%-2% annually. The company is not financially distressed, but the equity depends on regulators allowing the spending into rate base and on management funding growth without excessive dilution. Tilbury 1B and the Arizona/ITC large-load pipeline improve the long-term opportunity set, but much of that value is not yet contracted, approved into rates or reflected in a completed funding plan. I therefore assign the greatest probability to steady execution with moderate earnings growth, while retaining meaningful bear and bull cases for regulatory outcomes and financing terms.

Trade Signal

Trade rating
-6.2/10
Short
Horizon
~6mo
gpt-5.6-luna2026-08-04 · saw 78.96 CAD+6.0% since

Short Fortis: the company is excellent but the stock price discounts an unusually favorable growth and financing outcome, with the analyst's base fair value implying roughly 26% downside and the bear case roughly 41% downside.

Temporary mispricing-1.5

The move has been a durable, largely steady rerating rather than a sharp event-driven overshoot: the stock rose from about CAD 57 at the end of 2024 to CAD 70.77 at 2025 year-end and then to roughly CAD 79.7, with a 19% one-year return. The recent leg was mostly drift/sector and defensive-quality sympathy, punctuated by Tilbury and data-center optimism; Q1 and Q2 earnings were operationally steady, and the stock fell only about 1% around the July 31 report. The market has arguably missed the significance of negative free cash flow, leverage and dilution, but this is primarily a durable valuation repricing rather than a temporary panic dislocation. A short can work as expectations normalize, though the correction may require a catalyst or higher rates.

Market view+3.0

The stock is liked as a high-quality defensive utility and consensus is Hold (4 buys, 8 holds, 1 sell), not outright euphoric. The prevailing narrative emphasizes reliable dividends, investment-grade credit, 7% rate-base growth and AI/data-center transmission demand. Bears focus on leverage, negative free cash flow, regulatory lag, equity funding and the possibility that prospective projects are capital-intensive without near-term earnings. Price action suggests the market is not fully engaging with the balance-sheet and per-share-compounding risks: the stock gained steadily through 2024-25 and is only about 4% below its high despite flat recent earnings and a muted post-earnings reaction.

Inflectionwindow ~3mo+1.5

The business has a credible positive long-term inflection through approximately 7% annual rate-base growth, ITC transmission expansion, Arizona data-center demand and Tilbury. However, the latest quarter was steady rather than transformational, and the market already recognizes the growth narrative: the stock has risen 19% over the past year and trades near its 52-week high. The analyst's base case already assumes meaningful execution, while the consensus data is too sparse and inconsistent to establish a clear upside surprise. Near-term evidence is more likely to be incremental than exceptional.

Catalysts
  • ▼2026-11 · Q3 2026 earnings and refreshed five-year capital/funding plan — Expected in fall 2026; watch for higher equity needs, financing costs, dilution, regulatory lag, and whether Tilbury 1B materially expands the capital program.
  • ▼2026-11 to 2026-12 · TEP Arizona rate-case decision and implementation — A November decision, with implementation expected in December, should clarify rate recovery and the economics of data-center load; adverse treatment could undermine the growth narrative.
  • ▲Late 2026 · Tilbury Phase 2 environmental-assessment decision — A favorable certificate would reduce permitting risk and support long-term rate-base growth, though it would also confirm substantial future funding requirements.
  • ▲2027-02 · 2026 Q4 / FY earnings — A clean print with continued rate-base execution could support the premium multiple; weak per-share growth or rising financing costs would expose the valuation gap.
  • ▲H2 2026 to 2027 · TEP and ITC data-center/transmission commitments — Conversion of queued load into funded, approved projects could validate the bull case, but much of the opportunity remains prospective rather than earnings-producing.
Flow-2.5

Net flow is modestly negative. The company is investing heavily, issuing long-term debt and relying partly on equity funding/DRIP while TTM dilution is approximately 2%. There is no stated buyback or imminent tender, and future Tilbury, Arizona and transmission spending could require additional equity. The dividend supports long-only demand, but does not offset likely capital-market supply.

Floor / Ceiling-3.5

The regulated asset base, recurring earnings, investment-grade ratings and 3% dividend provide a quality/income floor, but not a hard floor near CAD 79.7. There is no meaningful buyback support; Fortis is funding heavy capex with debt, equity issuance and its dividend reinvestment plan. The valuation itself creates a ceiling: at roughly 27x TTM earnings and 3.3x sales, the stock requires sustained execution and favorable financing conditions to hold this price.

Buyability

High-quality, investment-grade regulated utility with dependable dividends and visible rate-base growth; real buyers include income and defensive investors, but the current price offers only a roughly 3% yield while embedding optimistic growth and financing assumptions. The next buyer needs to believe Fortis becomes a scarce grid-growth platform rather than a leveraged, capital-intensive utility.

Fear vs Greedfear 5/10 (+1.0)greed 6/10 (+2.0)

Fear is stronger than greed at CAD 79.7: the business is sound, but the market is paying a premium for growth that is still several years away while accepting negative free cash flow, 6.4x net debt/adjusted EBITDA, financing risk and ongoing dilution. The main risk to the short is that defensive utility demand and falling rates sustain the premium longer than valuation warrants.

Valuation

Our Target
24.0B CAD-45%
Market Should Pay
22.1B CAD-49%
target ×0.92 (fear discount)
Current Market Cap
43.5B CADBullish
What Changed
transcript · 2026-07-31
+3%fair value on this information

The genuinely new information is the provincial support for approximately CAD 2B of Tilbury 1B regulated rate-base investment versus about CAD 350M currently in the plan, with construction potentially beginning in 2027. The call also clarified that management must still refine the spending profile and funding mix, including possible equity issuance. Current-quarter earnings themselves were largely steady and broadly consistent with the market's prior expectations.

▸ How the cases moved

The bear case rises modestly from roughly CAD 23,000M to CAD 24,000M because the new Tilbury rate-base opportunity and continued capital execution reduce the probability of a low-growth outcome, although funding risk remains. The base case moves from roughly CAD 29,500M to CAD 30,006M as first-half execution remains on track and the existing 7% rate-base-growth objective is reiterated. The bull case rises from roughly CAD 36,000M to CAD 38,000M because Tilbury 1B adds approximately CAD 2B of potential regulated investment and Arizona/ITC load pipelines remain substantial. Probabilities shift slightly: bear 0.22 to 0.20, base 0.61 to 0.60, bull 0.17 to 0.20.

2-Year Plausible Outcomes
bear20%
24.0B CAD
rev +2%/yrOE $1500M

Regulated rate-base growth continues, but Arizona data-center demand is delayed or scaled back, regulatory lag persists, and Tilbury requires more equity funding than expected. Heavy capex remains necessary while earnings growth is modest and dilution continues. The business remains solvent and investment grade, but valuation compresses as investors focus on leverage, negative free cash flow and execution risk.

▸ Valuation

16x CAD 1,500M owner earnings = CAD 24,000M equity value

base60%
30.0B CAD
rev +4%/yrOE $1667M

Fortis executes the existing capital plan and achieves broadly targeted rate-base growth, while only a portion of the Arizona and Tilbury opportunities becomes financeable within two years. Regulated earnings grow steadily, but debt funding, regulatory lag and modest equity issuance limit per-share compounding. Fortis remains a high-quality, defensive utility, warranting a normal regulated-utility earnings multiple.

▸ Valuation

18x CAD 1,667M owner earnings = CAD 30,006M equity value

bull20%
38.0B CAD
rev +7%/yrOE $1900M

The 7% rate-base growth plan is delivered with favorable regulatory outcomes, TEP and ITC convert a meaningful portion of their large-load pipelines into committed investment, and Tilbury 1B is incorporated into the growth program with manageable funding. Regulatory lag improves and financing costs stabilize, allowing owner earnings to approach CAD 1.9B. The market rewards Fortis as a scarce, visible North American grid-growth platform rather than merely a slow-growth utility.

▸ Valuation

20x CAD 1,900M owner earnings = CAD 38,000M equity value

▸ Target Rationale

The probability-weighted terminal values discounted at 12% produce approximately CAD 24,323M. I set the analytical target modestly below that arithmetic result at CAD 24,000M because the scenario framework does not fully capture Fortis's persistent negative free cash flow, 6.4x net debt-to-adjusted-EBITDA leverage, ongoing equity dilution and the possibility that Tilbury and large-load projects require additional equity before they generate earnings. This is a modest execution and capital-structure haircut, not a distress adjustment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now7/10
Trajectory7/10
Risk5/10
Governance7/10
Insolvency prob (2yr)2%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

Fortis Inc. (FTS) reported its Q1 2026 financial and operational results on May 6, 2026.

  • Financial Performance: The company posted Q1 2026 net earnings of $501 million (or $0.99 per common share), compared to $499 million ($1.00 per share on a lower share count) in Q1 2025. The steady earnings were driven by rate base growth across its utilities, offset slightly by a $0.01 per share impact from asset dispositions and foreign exchange headwinds. Q1 revenue grew to $3.40 billion, up from $3.34 billion in Q1 2025.
  • Capital Plan: Quarterly capital expenditures reached $1.4 billion, keeping Fortis on track to execute its $5.6 billion annual capital program. The broader 2026–2030 five-year capital plan remains at $28.8 billion, designed to support a 7% compound annual growth rate (CAGR) in rate base, expanding it from $42.4 billion in 2025 to $57.9 billion by 2030.
  • Dividends: Management reaffirmed its long-term dividend growth guidance of 4% to 6% annually through 2030. In Q1 2026, the company paid a common share dividend of $0.64, up 4.1% from the prior year’s first quarter.
  • Regulatory and Operations: In March 2026, UNS Energy (a Fortis subsidiary in Arizona) received approval for its UNS Gas general rate application, which includes formulaic rates. Additionally, Fortis made progress on its data center infrastructure backlog; through ITC Holdings, the company completed the substation at the Big Cedar Industrial Center, enabling 300 MW of load growth for its first data center client, with transmission upgrades for the broader 1,600 MW Big Cedar project underway.
  • Leadership and Financing: Gary Smith, Executive Vice President of Operations and Technology, retired on May 31, 2026, after a 42-year career with the corporation. On the financing front, Fortis raised $800 million in long-term debt during Q1, and ITC Holdings successfully issued $900 million in unsecured notes in April 2026.
▸ Thesis-test Findings
Tucson Electric Power (TEP) Data Center Contract (Arizona AG Objections)

A key regulatory hurdle has emerged for Fortis's Arizona operations. In December 2025, the Arizona Corporation Commission (ACC) approved an Energy Supply Agreement (ESA) between Tucson Electric Power (TEP) and Humphrey's Peak Power LLC (and affiliate Beale Infrastructure Group) to power "Project Blue," a planned hyperscale data center campus requiring 286 MW of power by 2028. However, on February 19, 2026, Arizona Attorney General Kris Mayes escalated her opposition by filing a formal appeal in the Maricopa County Superior Court. The Attorney General argues that the contract creates a loophole allowing TEP and the data center developers to privately set electricity rates without ACC oversight, violating the Arizona Constitution and risking rate increases for residential customers to subsidize the new infrastructure. TEP has defended the contract, asserting that its ongoing rate case application does not pass data center costs to public consumers. This litigation introduces near-term regulatory uncertainty for Fortis’s load growth pipeline in Arizona.

ITC Holdings MISO Tranche 2.1 Project Approvals and CapEx

The regulatory progress for ITC Holdings (80.1% owned by Fortis) remains robust, reinforcing the company's long-term capital deployment case. In December 2024, the Midcontinent Independent System Operator (MISO) approved the historic $21.8 billion Long-Range Transmission Plan (LRTP) Tranche 2.1, consisting of 24 major transmission projects. In September 2025, several state utility commissions challenged the approval at the Federal Energy Regulatory Commission (FERC). However, ITC and regional partners heavily defended the projects as essential for AI and data center load demands, urging FERC to dismiss the complaints. In April 2026, Charles L. Marshall (President of ITC Michigan) submitted compliance reports and cost estimates to the Michigan Public Service Commission (MPSC) for major regionally cost-shared projects, such as Project 33 (Greentown-Sorenson-Lulu) and Project 34 (Oneida-Sabine Lake), under the state's Transmission Infrastructure Planning Act (TIPA). This confirms that ITC's high-voltage grid upgrades, which make up a major portion of Fortis's five-year CapEx budget, are advancing steadily through state compliance frameworks.

FortisBC Tilbury LNG Storage Expansion Regulatory Approval Timeline

The regulatory outlook for FortisBC’s LNG infrastructure significantly improved over the last six months, supporting the bull case for Canadian utility expansion. In October 2025, FortisBC received British Columbia Utilities Commission (BCUC) approval for the Tilbury LNG Storage Expansion project, enabling a projected construction start as early as 2027. More materially, in May 2026, the British Columbia government officially designated the broader Tilbury Phase 2 LNG Expansion Project (which includes the storage facility) as a "priority major project," doubling down on efforts to fast-track permits and approvals to stimulate the provincial economy. The B.C. Environmental Assessment Office (EAO) accepted FortisBC's revised application and scheduled a public comment period on the draft assessment report and environmental certificate from June 25 to July 27, 2026. A final provincial decision on the environmental assessment certificate is expected before the end of 2026, materially reducing permitting timeline risks for this major asset.