Stocks/GEOS

GEOS

Geospace Technologies Corporationv3 2.5/10 · 2026-11-13
Energy·Oil & Gas Equipment & Services
$2.19
$31M market cap
v3 Rating
2.5/101.5–4.0
Setup
3.0/102.0–4.0
Fair Value
$2.00$0.80–$5.00-9%
DCF (10%)
$0.00-100%
Base IRR
-35%-100%–+50%
Visibility
wide±105%
Wall Street
(1 buy, 7 hold)
Rating
Revenue (TTM)
$80.7M
Owner Earnings
-$24M
Next-Yr Owner Earnings
$3M
Growth
-5.0% × 3y
P / Next-Yr OE
9.4x
Net Debt
$7M

Geospace Technologies Corporation, founded in Houston, Texas, in 1980, specializes in the development and manufacturing of cutting-edge instruments and equipment. Its primary focus is on supporting the oil and gas industry by providing tools designed to acquire seismic data, which is essential for the precise location, characterization, and ongoing monitoring of hydrocarbon-producing reservoirs. The company organizes its operations across three distinct segments: Oil and Gas Markets: This division delivers advanced wireless seismic data acquisition systems and comprehensive reservoir characterization products and services. It also supplies a range of traditional seismic exploration components, such as geophones, hydrophones, specialized wires, connectors, cables, and marine streamer retrieval and steering devices, alongside other related seismic products. Adjacent Markets: Geospace’s Adjacent Markets segment offers a diverse portfolio of industrial goods. This includes imaging equipment, water meter products, remote shut-off valves, Internet of Things (IoT) platforms, and offshore cables. Additionally, it provides seismic sensors for applications like vibration monitoring and geotechnical analysis, encompassing mine safety and earthquake detection. The segment also produces electronic pre-press products that leverage direct thermal imaging, direct-to-screen printing, and digital inkjet printing technologies, catering to the commercial and industrial graphics, textile, and flexographic printing industries. Emerging Markets: This segment is dedicated to designing and selling products for border and perimeter security surveillance, subterranean tunneling detection, and other solutions focused on movement monitoring, intrusion detection, and enhancing situational awareness. Its customer base primarily comprises various United States government agencies, including but not limited to the Department of Defense, Department of Energy, and Department of Homeland Security. Geo

2-Year Price History

$3.48-72.6%
$5.0$10$15$20$25Initial target $4.40 · 2026-10-15Initial target $4.00 · 2026-11-10Initial target $2.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
2.51.5–4.0
Setup
3.02.0–4.0
Fair value (USD)
2.000.80 – 5.00
Upside vs 2.19
-9%
DCF (10%)
0.000.00 – 6.00-100%
Base IRR
-35%-100% – 50%
Visibility
very widerange ±105%
Sentiment
2/10
Reputation
6/10
2026-11-13 · claude-opus-5-5 · priced at 3.56 · call 2026Q3

Geospace closed at USD 3.56 on 2026-11-13; the pack's $3.48 was the 11-12 close. With 12.94M shares that is a $46M market cap, about 0.37x June book of $95.7M and 0.51x tangible book of $89.7M. The bull case rests on assets: about $98M of contracted backlog (the ~$90M Petrobras Mero permanent reservoir monitoring (PRM) phase-2 job plus a $10.8M Navy contract), a ~$35M PRM milestone payment, $12M of cost cuts, and real demand for Pioneer land nodes (Faraday plans to grow from 7,000 to 40,000 nodes by 2028). Testing the pitch made the bear side stronger. Over the last twelve months it lost ~$40M on ~$92M of revenue. Cash was $2.8M in June, and the revolver balance grew to $7.5M by October. The 2026-10-29 switch from Woodforest to Amerisource very probably came after a breach of the $85M tangible-net-worth covenant: June TNW was $89.7M and quarterly losses run about $10M. The new lender's $65M floor leaves only about $15M of headroom, roughly 2-4 quarters at the current burn. Smart Water is down 56% while Badger Meter's utility water sales are down only ~3%, which points to share loss rather than destocking. Nothing follows Petrobras Mero phase 2. Our 10% DCF comes to about $0 per share. A floor that allows for the burn and the lender's priority is about $1.5-2.5, so we put fair value at $2.0, about 44% below the price. Rating 2.5: a short lean, but not a strong short. The stock already sits at its 3-year low, the float is illiquid, and borrow and options are thin. Upside surprises include Pioneer node orders, an early PRM payment and the 0.5x tangible book. Trade setup 3.0: the catalysts are Q4 FY26 results on 2026-11-19 and a likely equity raise or covenant squeeze in H1 2027. The edge is that the market still prices the stock off book value the lender's terms effectively put out of shareholders' reach.

A deep dive would have to establish: Does Q4 FY26 (2026-11-19) show tangible net worth near $80M and continued ~$10M quarterly losses? That would put the $65M Amerisource covenant within 2-4 quarters and force a dilutive raise before the Petrobras PRM job ends. Or do Pioneer node orders and the PRM milestone stop the burn first?

Owner earnings, TTM
-$24M-$32M – -$14M
Realistic peak profit
$8M$2M – $18M
Growth rate
-5.0%-15.0% – 8.0%
Years of growth
31 – 5
Market cap
$46M$45M – $47M
EV
$52M$48M – $60M
Net debt
$7M$3M – $15M
Capital return / cap
-5.0%-30.0% – 0.0%
P/E
-1.2×-1.6× – -0.8×
EV/EBITDA
-1.8×-3.0× – 10.0×
FCF yield
-50.0%-90.0% – 10.0%
Projected FCF, base case (USD millions)
Y1$3M-$12M – $15M
Y2-$8M-$20M – $5M
Y3-$5M-$15M – $8M
Y4-$3M-$12M – $10M
Y5-$1M-$10M – $12M
Competition: Seismic hardware is a shrinking, oversupplied market: Viridien's land equipment sales fell from $51M to $30M year on year in Q1 2026. Sercel's new Accel land nodes compete for the same contractors that buy Pioneer. Hydroconn is losing share (down 56% versus Badger's ~-3%), leaving little pricing power outside the rare PRM project.
Governance: The February 2026 10-Q was filed late. Inventory rose while sales fell. In October 2026 the company moved from Woodforest's $85M-TNW bank revolver to a prime+3.5% Amerisource asset-based loan with an 18% default rate. The move closed before the 10-K, very likely avoiding disclosure of a covenant breach. There has been no insider buying in 2026.
Research (expand)

What it does. Geospace is a Houston maker of seismic sensors, ocean-bottom and land nodes (OBX, Pioneer) and permanent reservoir monitoring arrays (Energy Solutions; the OptoSeis fiber-optic PRM system is installed on Petrobras' Mero field). It also sells Hydroconn meter connectors and Aquana valves (Smart Water). A third segment, Intelligent Industrial, covers industrial sensors, contract manufacturing and GeoVox/Quantum security products. Customers are a handful of seismic contractors and oil majors, utilities' meter OEMs, and US agencies. The work is lumpy and project-based, with little recurring revenue.

What the market believes. The stock is down 87% from its 2025 peak. The market sees a decade-long money loser whose PRM hope has narrowed to one delayed, low-margin job. It sees the liquidity crunch and prices the stock as if book value will be eaten or diluted. The bull variant says a forced seller (DGI went from 8.5% to 0%) overshot: the ~$35M PRM installment, $12M of cuts and an inventory sell-down restore cash, and 0.5x tangible book is too cheap. I can't make that case hold. TTM losses (~$40M) are bigger than the cuts, and the lender's terms tell us what a secured creditor thinks of that book.

Real earnings today. TTM revenue is ~$92M and the net loss is ~$39.6M. The Q3 operating loss was -$10.1M and 9-month operating cash flow was -$27.3M. D&A runs about $10M a year and stock-based comp about $1.3M. Unlevered owner earnings come to roughly -$24M a year, or about -$12M to -$15M after a full year of the cuts.

FCF projection (FY27-FY31, $M). +3, -8, -5, -3, -1. FY27 gets PRM collections and inventory release. After the PRM job ends, revenue falls back to roughly $60-70M; ex-PRM revenue in the first nine months of FY26 ran at about $63M annualized. The FY27 +3 depends on a milestone that has already slipped once. The main upside to these numbers is Pioneer land nodes. Faraday wants 40,000 nodes by 2028, and Dawson's order was $24M, so this could add $30-60M of revenue over FY27-28 if Geospace keeps the account. But Sercel launched competing Accel land nodes in June 2026, and Explor adopted them. On a 10% DCF, the five FCFs have a present value of about -$10M. A 7x terminal value on a generous +$2M year-6 FCF adds about +$9M. After ~$7M of net debt, the equity comes to about $0 per share (range $0-6). The pitch's "$1/share" was an arithmetic error.

Assets. It is not a net-net. Current assets of $68.8M less total liabilities of $29.4M leave ~$39M (~$3.0/share), before the Q4 loss. That figure includes $39.6M of seismic inventory, which historically sells well below book. The realistic floor is the Houston real estate, receivables (~$17.5M, $14.7M of it from Petrobras) and discounted inventory, about $2-2.5/share in an orderly wind-down today. That floor is not static. Management is not winding down, and the pitch's own FY28-31 burn (~$17M, ~$1.3/share) erodes it. The Amerisource lender ranks ahead of shareholders, has a $65M TNW trigger, a material-adverse-change clause and an 18% default rate. Burn-adjusted and lender-adjusted, the floor is about $1.5-2. Fair value is ~$2.0. P/E and EV/EBITDA are meaningless because earnings are negative. The FCF yield is about -50%, and there are no dividends or buybacks.

Management and governance. CEO Rich Kelley and CFO Robert Curda give no guidance. They talk up GeoVox heartbeat detection, mining nodes and Navy work, but those projects are years from mattering. In Q2 the CEO said the Smart Water slump was market-wide destocking, and competitor data contradicts that. The red flags: a late 10-Q (NT 10-Q, Feb 2026); inventory climbing while sales fall; $2.3M of inventory write-downs; a lender switch closed on 2026-10-29, before the 10-K, which very likely avoided disclosing an $85M TNW covenant breach. No insider has bought in the open market in 2026, only $0 director grants.

Competition. The seismic market is shrinking and oversupplied. Viridien's land equipment sales fell to $30M in Q1 2026 from $51M a year earlier. Rivals are Sercel/Viridien (now with Accel land nodes), STRYDE and Chinese node makers. Hydroconn revenue is down 56% while Badger Meter's utility water sales are down only ~3% excluding an acquisition. That looks like share loss or customers designing the connector out, not a destock.

Sentiment: 2/10. The stock sits at its 3-year low, one holder exited completely, and options have 110-143% implied volatility with no open interest. Short interest is small (318k shares) and falling.

Thesis test

1. Covenant breach and the new lender's $65M TNW floor (challenge right, on inference). June TNW was $89.7M against an $85M covenant, and the last three quarters each lost $9.7-11.1M. The refinancing closed before the 10-K, and the revolver balance grew to $7.5M. The breach is not disclosed, but it is the only reading that fits the numbers. Headroom of about $15M means a raise or squeeze in 2027, which cuts the shareholder floor.

2. DCF arithmetic (challenge right). The pitch's base FCFs plus terminal value minus net debt give about $0 per share, not $1. Fair value is the floor, not a blend.

3. The $35M PRM installment is not fresh cash, and there is no phase 3 (challenge right, and it confirms the pitch's base case). $14.7M was already in receivables, the milestone has slipped once, and the press names no Mero phase after 2027.

4. Smart Water share loss (challenge right; the pitch said this already, and now there is evidence). Geospace is down 56% while Badger is down ~3%. This removes the one growth segment that supported the year-5 recovery.

5. Pioneer node demand (challenge right that the pitch left it out). It supports the $5-6 high case, not the base, because Sercel's Accel competes for the same contractors. Even a win arrives as low-margin hardware revenue while the company is still burning cash.

Conclusion: the attacks lower the floor rather than prop up the business. Fair value moves from $2.5 to $2.0 against $3.56, and the rating moves from 3.0 to 2.5. This is a short lean, held back from a strong short by illiquidity, the 0.5x tangible book, and upside optionality from node orders or a new PRM award.

Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-10-154.634.05.54.403.30-1%2
2026-11-103.644.56.04.003.35-2%2
2026-11-133.562.53.02.000.00-35%2

Financials — Adjusted

Adjusted · TTM 2026-Q4 · USD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue80.7-27%80.7-27%111-18%136+9%125
Gross profit2.80-91%2.80-91%32.9-37%52.6+2%51.7
Operating expenses46.1+4%46.1+4%44.2-3%45.5+13%40.4
▸Adj EBITDA-33.1-33.1-1.14-105%21.9-21%27.6
▸Adj OCF-22.9-22.9-17.7-5.56-122%24.9
CapEx-3.93-3.93-7.98-12.2-13.9
Adj FCF-26.8-26.8-25.7-17.7-261%11.1
Interest expense0.260.260.170.190.13
▸Adj net income-41.4-41.4-9.30-211%8.37-26%11.4
▸Owner's earnings-25.0--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA5.34100%-33.10.98100%8.49100%28.9100%
FCF (OCF−capex)-88.8-39.0-30.2-21.3-250%1.676%
Net income-48.4-905%-44.3-9.72-993%-6.58-77%12.242%
▸Capital returned0.6111%-6.270.1717%6.5777%0.130%
Buybacks7.300.920.006.380.00
Dividends0.000.000.000.000.00
Interest paid0.750.260.170.190.13
Debt paid down-7.44-7.440.000.000.00
▸Reinvestment-46.6-872%-12.6-12.9-18.8-222%-2.24-8%
Capex (PP&E)38.03.937.9812.213.9
Intangibles & M&A-84.2-16.2-21.3-30.7-15.9
Leases signed (net Δ)-0.35-0.310.46-0.26-0.24
Retained / other-4.49-84%-16.3-8.86-905%3.1036%17.661%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 4.8 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)116116153152153
▸Liabilities (total)30.330.327.517.620.3
Net debt (incl. leases)1.911.91-25.4-36.6-33.0
Net debt / Adj EBITDA-------1.67-1.20
Net debt / Adj FCF---------2.98
Adj EBITDA / interest-129-129-6.73117206
Shares outstanding12.912.912.812.713.2
Dilution (YoY)+0.9%+0.9%+0.9%-3.6%+2.9%
Employees450--519478681
MarginsTTM2026202520242023
Gross margin3.5%-26.23.5%-26.229.7%-9.138.8%-2.841.5%
Adj EBITDA margin-41.0%-39.9-41.0%-39.9-1.0%-17.216.1%-6.022.1%
Adj OCF margin-28.3%-12.3-28.3%-12.3-16.0%-11.9-4.1%-24.120.0%
Adj FCF margin-33.2%-10.0-33.2%-10.0-23.2%-10.1-13.1%-22.08.9%
Net income margin-54.8%-46.1-54.8%-46.1-8.8%-3.9-4.8%-14.79.8%
Adj NI margin-51.3%-42.9-51.3%-42.9-8.4%-14.66.2%-3.09.1%
ROIC (adj, after-tax)-36.5%-36.5%-7.0%4.2%8.2%
Cost of debt----------

Revenue Breakdown

Revenue Segments

By Product (2026-Q2)
Product$19.0M+1%
Rental$2.0M-22%
By Geography (2026-Q2)
UNITED STATES$12.0M-14%
South America$3.7MNEW
Asia$1.6M-14%
Europe$1.2M+3%
Other$0.9M+233%
CANADA$0.3M-51%
MEXICO$0.1M-93%

Earnings Calls

10 calls

Earnings Call · 2026 Q3

2026-08-07

Geospace Technologies’ fiscal third-quarter 2026 results reflected continued weakness across its markets. Revenue was $15.8 million, down from $24.8 million in the prior-year quarter, while the company posted a net loss of $9.7 million, or $0.75 per diluted share, compared with net income of $0.8 million, or $0.06 per share, a year earlier. For the first nine months, revenue fell to $61.1 million from $80.1 million and the net loss widened to $30.5 million, or $2.37 per share, versus a $0.7 million loss last year. Management cited geopolitical uncertainty, project timing, lower customer purchasing volumes, constrained customer capital, unfavorable mix, inflation, raw-material costs and component availability. Cost-reduction initiatives, lower personnel costs and improved manufacturing productivity helped mitigate the pressure. Smart Water was the weakest segment. Third-quarter revenue declined 56% to $4.6 million, while nine-month revenue fell to $14.1 million from $27.3 million, primarily because of reduced Hydroconn connector demand. Geospace launched its Series V connector in June, which management described as the company’s most universally compatible domestic portfolio of Smart Water meter connectors and adapters. The product is intended to improve customer flexibility and address ongoing infrastructure and supply-chain requirements. Energy Solutions generated $5.9 million in quarterly revenue, down 28%, and $30.1 million for nine months, down 14%. The declines reflected lower demand for seismic acquisition equipment and ocean-bottom nodal products, as well as the absence of revenue from streamer-recovery assets sold in the prior year. Increased land-wireless sales and PRM revenue partially offset those factors. The Petrobras PRM contract was delayed because the customer altered the planned equipment layout, requiring engineering modifications and sensor and cable rerouting. The contract’s total value is unchanged, and Petrobras extended the period of performance. Geospace has entered full production, with final revenue recognition now expected between fiscal third-quarter and fourth-quarter 2027. Management said Petrobras retains a long-term interest in PRM, but no next project is scheduled because of geopolitical, oil-price and internal considerations. Geospace is also in discussions with major oil companies. Intelligent Industrial revenue decreased 14% to $5.2 million in the quarter and was approximately $16.7 million for nine months, versus $17.6 million previously. Lower industrial-sensor demand drove the decline, with quarterly results also affected by weaker contract manufacturing activity. Management nevertheless sees prospective growth in its security portfolio. Quantum Technology Sciences won a $10.8 million Navy SBIR contract to combine SADAR and PRM technologies for underwater threat detection. The project is expected to be completed by December 2027, with revenue recognized over time across fiscal 2027 and 2028. The Navy will use the results to assess potential larger-scale deployment. The heartbeat detector program has completed several pilots and has a developing customer pipeline; management said it is slightly ahead of plan, though government sales cycles will produce a gradual revenue ramp. Operating expenses declined $1.2 million in the quarter, while nine-month capital investment was $3.3 million. Geospace had $41 million of working capital, including $17 million of trade accounts and financing receivables, $25 million of available credit-facility borrowings and a strong focus on cash conservation. Management is reviewing expenses and expects its liquidity resources to support the business until the next Petrobras milestone payment.

Analyst Q&A (10)
▸
What were the PRM contract scope changes, and what are their implications for the project and economics?
William Dezellem · Tieton Capital
The PRM contract’s total value is unchanged. The customer modified the equipment layout, requiring engineering changes and rerouting of sensors and cables, which delayed the project. The customer accepted the delay and extended the performance period.
▸
Could the customer-requested engineering changes affect Geospace competitively or influence future contracts?
William Dezellem · Tieton Capital
Management does not expect the engineering changes to affect Geospace’s competitive position or future opportunities because there was no technical change to the equipment being supplied.
▸
Should investors view the PRM modification essentially as a one-quarter delay with no other material change?
William Dezellem · Tieton Capital
Yes. From an investor perspective, the change primarily represents a one-quarter delay, with the contract value and other fundamental terms remaining the same.
▸
What is the outlook for the next PRM contract, whether with Petrobras or another customer?
William Dezellem · Tieton Capital
Petrobras continues to have a long-term strategy involving PRM systems, but geopolitical conditions, oil-price volatility and internal considerations are affecting its timing. No date has been provided for the next proposal. Geospace expects to bid on future Petrobras opportunities and remains in discussions with major oil companies, although no other project is currently firm.
▸
Can management provide more detail about the newly announced U.S. Navy contract?
William Dezellem · Tieton Capital
The $10.8 million Navy project combines Quantum Technology Sciences’ SADAR technology with Geospace’s PRM technology to provide an in-water threat-detection solution. It is being performed under an SBIR program, with delivery planned by the end of calendar 2027.
▸
Does the reference to an initial Navy contract imply that additional contracts could be awarded before this one is completed?
William Dezellem · Tieton Capital
The initial SBIR contract is intended to demonstrate that the combined solution meets the Navy’s technical-performance expectations. It is not simply a proof of concept because the technologies are viable, and the Navy will use the results to determine whether to proceed at larger scale. Management does not expect additional contracts before completion of the current one.
▸
How will revenue from the Navy contract be recognized?
William Dezellem · Tieton Capital
Navy revenue will be recognized over time, similarly to percentage-of-completion accounting, independent of the timing of milestone payments. Revenue recognition is expected in fiscal 2027 and fiscal 2028 as the project progresses.
▸
Following the scope changes and production start, when is the final quarter of PRM revenue recognition expected?
William Dezellem · Tieton Capital
PRM production has now entered its full-production phase, and the final revenue recognition is currently expected between fiscal third-quarter and fiscal fourth-quarter 2027.
▸
What is the current status and outlook for the heartbeat detector opportunity?
William Dezellem · Tieton Capital
The heartbeat detector program is progressing as planned and is somewhat ahead of management’s internal plan. Several pilots have been completed and a customer pipeline is developing, but sales cycles are lengthy because government agencies are involved. Revenue is expected to ramp gradually and meet expectations over coming periods.
▸
How is the company addressing cash burn and liquidity concerns following the stock-price reaction?
William Dezellem · Tieton Capital
Management is closely managing cash, reviewing expenses, eliminating costs where possible and monitoring cash inflows and outflows. With support from its bank credit facility, Geospace expects to reach the next Petrobras milestone payment.

SEC Filing Findings

SEC Filing — material findings

2026-08-07 · depth 9/10
risk 8Liquidity/Covenants
▸

Cash fell to $2.8M (plus $2.0M pledged restricted cash) and the company drew $5M on its revolver in July 2026, with possible further draws needed to bridge to the next PRM payment of about $35M. Tangible net worth is about $89.7M against an $85M covenant (roughly $4.7M headroom), and minimum liquidity is $10M.

“In July 2026, we funded $5 million from the Agreement and may require additional fundings to bridge the gap until the next PRM installment payment is received.”
risk 7Liquidity/Covenants
▸

Revolver covenants include a minimum tangible net worth of $85M and minimum liquidity of $10M. Tangible net worth headroom is thin given the ongoing losses, and the facility is secured by substantially all assets plus a $2M pledged cash reserve.

“The Agreement requires the Company to maintain (i) a minimum consolidated tangible net worth of $ 85 million, (ii) minimum liquidity of $ 10 million, and (iii) a minimum asset coverage ratio of 2.00 to 1.00.”
risk 7Customer Concentration
▸

One customer (Energy Solutions, PRM contract) accounts for $14.7M of trade and notes receivable, which is most of the company's receivables. Nine-month revenue from this customer was $14.2M.

“The Company had trade accounts and notes receivable from one customer of $ 14.7 million at June 30, 2026.”
upsideHidden Upside
▸

Contracted backlog of unsatisfied performance obligations (contracts longer than one year) is about $98M, with most expected to be fulfilled by Q3 FY2027. This is a sizable contracted revenue base relative to the current $92M TTM revenue run-rate.

“the aggregate amount of transaction price allocation to unsatisfied performance obligations on contracts with a duration in excess of one year was approximately $ 98 million.”

Options

Chain Snapshot (daily)

Call IV (ATM)110%
Put IV (ATM)143%
ATM Spread8.6%
Call $OI (near money)$185K
Put $OI (near money)$156K
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$5.0
Major Expirations2
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$2.50$1.35/$2.10352--/$0.351,120
$5.00$0.15/$0.50303$0.80/$2.00398
$7.50$0.05/$0.201,267$2.90/$3.8041
$10.00--/$0.30842$5.10/$6.30741
$12.50--/$0.2039$7.60/$9.100
$15.00--/$0.0532$10.10/$11.800
$17.50--/$0.3531$12.70/$14.300
Snapshot: 2026-11-04

Short Interest

Short % of Float2.4%
Short Shares0.3M
Days to Cover3.8
Change (vs Prior)-6.5%
Short % Float History
2.40%-3.50pp
2.0%3.0%4.0%5.0%6.0%7.0%10-1512-3103-1305-2908-1410-30

Executive Compensation (2023.0-2025.0)

Direct Pay$7.1M
Incentive & Other$1.5M
Total Compensation$8.6M
% of Revenue2.6%

Cash Runway

1.9months
CRITICAL

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Tieton Capital Management, LLC$6.1M$7.39−$33K+$6.1M—$348M
GRACE & WHITE INC /NY$4.6M$8.76+$1.4M+$2.3M—$632M
VANGUARD CAPITAL MANAGEMENT LLCPassive$3.5M$12.20−$420K+$3.5M—$4.68T
DIMENSIONAL FUND ADVISORS LPPassive$2.7M$11.86−$667K−$1.9M—$551.30B
MARSHALL WACE, LLP$2.0M$10.36+$766K+$2.0M—$117.88B
BlackRock, Inc.Passive$1.6M$10.42+$42K−$1.2M—$6.70T
US BANCORP \DE\$1.4M$8.01+$580K+$601K—$91.55B
SEI INVESTMENTS CO$1.3M$14.46−$1.4M+$1.3M—$113.05B
GEODE CAPITAL MANAGEMENT, LLCPassive$1.1M$9.39+$81K+$156K—$1.87T
STATE STREET CORPPassive$1.1M$11.62+$178K+$757K—$3.38T
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

01.2M2.4M3.6M4.8M$4.22$7.91$12$15$192021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
DISCIPLINED GROWTH INVESTORS INC /MN—Moors & Cabot, Inc.20KFMR LLC1KTieton Capital Management, LLC907KFirst Eagle Investment Management, LLC—GRACE & WHITE INC /NY673KG2 Investment Partners Management LLC—RUTABAGA CAPITAL MANAGEMENT LLC/MA—SEI INVESTMENTS CO199KHEARTLAND ADVISORS INC—

Analyst Coverage

Analyst Coverage
Analyst Ratings
1
7
Buy: 1Hold: 7Consensus: Hold
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
1998 Q18M2M1M$0.04$0.04 – $0.057
1998 Q215M2M1M$0.11$0.09 – $0.1315
1998 Q318M3M1M$0.14$0.11 – $0.1718
1998 Q411M1M0M$0.01$0.01 – $0.0114
1999 Q16M2M0M$0.02$0.02 – $0.037
1999 Q25M1M0M$0.01$0.01 – $0.0118
1999 Q39M1M0M$0.01$0.01 – $0.0116
1999 Q46M2M0M$0.02$0.02 – $0.037
2000 Q115M2M0M$0.04$0.03 – $0.0515
2000 Q21M-24M-25M$0.15$0.12 – $0.1818
2000 Q332M-0M-1M$0.13$0.10 – $0.158
2000 Q410M1M0M$0.01$0.01 – $0.0113
2001 Q114M2M0M$0.03$0.02 – $0.0410
2001 Q211M2M0M$0.02$0.02 – $0.0317
2001 Q331M1M-0M$0.14$0.11 – $0.1610
2001 Q445M4M2M$0.03$0.03 – $0.0413
2002 Q229M3M1M$0.24$0.19 – $0.2918
2002 Q33M-3M-4M$0.06$0.05 – $0.0818
2002 Q47M0M-1M$-0.04$-0.05 – $-0.048
2003 Q117M1M0M$-0.03$-0.03 – $-0.0218
2003 Q230M-1M-2M$0.15$0.12 – $0.1819
2003 Q36M-1M-2M$0.07$0.06 – $0.0913
2003 Q417M5M3M$0.26$0.21 – $0.3113
2004 Q110M2M1M$0.03$0.03 – $0.0413
2004 Q23M—3M$0.05$0.04 – $0.0619
2005 Q418M2M1M$0.07$0.06 – $0.0820
2006 Q238M6M4M$0.42$0.34 – $0.5014
2006 Q441M10M7M$0.55$0.44 – $0.669
2007 Q138M6M4M$0.36$0.29 – $0.4319
2007 Q231M5M4M$0.30$0.24 – $0.3614
2007 Q440M6M4M$0.41$0.33 – $0.497
2008 Q138M6M3M$0.29$0.23 – $0.3511
2008 Q230M5M3M$0.24$0.19 – $0.2912
2008 Q457M4M2M$0.33$0.27 – $0.4016
2009 Q138M4M2M$0.22$0.18 – $0.2611
2009 Q221M3M1M$0.09$0.07 – $0.1113
2009 Q426M3M1M$0.09$0.07 – $0.1115
2010 Q125M5M2M$0.15$0.12 – $0.1817
2010 Q225M5M3M$0.15$0.12 – $0.1820
2010 Q434M9M6M$0.39$0.31 – $0.4713
2011 Q135M9M5M$0.30$0.24 – $0.3619
2011 Q246M13M9M$0.72$0.58 – $0.869
2011 Q442M12M8M$0.64$0.51 – $0.7710
2012 Q152M16M10M$0.75$0.60 – $0.9016
2012 Q264M18M12M$1.12$0.90 – $1.3414
2012 Q455M20M14M$0.77$0.62 – $0.9217
2013 Q1100M30M21M$2.10$1.68 – $2.5213
2013 Q270M22M15M$1.03$0.82 – $1.2418
2013 Q368M20M14M$1.05$0.84 – $1.2619
2013 Q4108M36M26M$2.09$1.67 – $2.5111
2014 Q186M22M13M$1.24$0.99 – $1.4914
2014 Q252M10M5M$0.45$0.36 – $0.549
2014 Q345M0M-4M$0.56$0.45 – $0.6719
2014 Q45M-6M-10M$-0.19$-0.23 – $-0.1520
2015 Q123M2M-4M$-0.26$-0.31 – $-0.2119
2015 Q217M-3M-7M$-0.34$-0.41 – $-0.2716
2015 Q311M-3M-8M$-0.34$-0.41 – $-0.2817
2015 Q413M-6M-11M$-0.85$-1.02 – $-0.6814
2016 Q112M-2M-8M$-0.48$-0.58 – $-0.3813
2016 Q211M-0M-5M$-0.25$-0.30 – $-0.2015
2016 Q313M-5M-10M$-0.36$-0.43 – $-0.2920
2016 Q412M-4M-9M$-0.36$-0.43 – $-0.2916
2017 Q116M-3M-8M$-0.46$-0.55 – $-0.379
2018 Q3278M4M-0M$-0.47$-0.56 – $-0.3713
2018 Q46M-1M-5M$-0.14$-0.17 – $-0.1118
2019 Q121M—0M$0.00$0.00 – $0.009
2019 Q217M—0M$0.00$0.00 – $0.0011
2019 Q328M—0M$0.00$0.00 – $0.009
2020 Q28M4M-2M$-0.14$-0.17 – $-0.1119
2020 Q3260M5M-0M$-0.43$-0.52 – $-0.3519
2020 Q46M0M-5M$-0.13$-0.16 – $-0.1014
2021 Q115M-2M-7M$-0.43$-0.51 – $-0.3519
2021 Q210M2M-3M$1.01$1.01 – $1.018
2021 Q3243M5M-0M$1.25$1.25 – $1.258
2021 Q45M0M-5M$1.89$1.89 – $1.8917
2022 Q114M-2M-7M$1.43$1.43 – $1.4317
2022 Q212M1M-3M$1.15$1.15 – $1.1512
2022 Q3227M4M-0M$1.27$1.27 – $1.279
2022 Q45M0M-4M$1.95$1.95 – $1.959
2023 Q113M-2M-6M$1.43$1.43 – $1.438
2023 Q214M0M-4M$1.19$1.19 – $1.1917
2023 Q3213M3M-0M$1.39$1.39 – $1.3913
2023 Q45M0M-4M$2.09$2.09 – $2.0910
2024 Q112M-2M-6M$1.58$1.58 – $1.589
2024 Q421M—0M$0.00$0.00 – $0.000
2025 Q117M—0M$0.00$0.00 – $0.000
2025 Q228M—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-08-11) — for comparison onlyclick to expand

Thesis

Geospace is in a severe operating trough. TTM revenue is down 20%, gross margin has collapsed to 8%, adjusted EBITDA is negative $33M and adjusted FCF is negative $38M. The 20% workforce reduction and targeted $12M of annual savings are necessary but have not yet appeared in the results. The balance sheet is not highly levered, but cash is only $2.8M, the company has pledged its manufacturing facility and $2M of cash to preserve credit access, and a $15.5M receivable from one customer creates material concentration risk. The central asset is the Petrobras PRM contract, whose total value reportedly remains unchanged, but whose timing has slipped to final revenue recognition in fiscal Q3-Q4 2027. The anticipated approximately $35M installment could materially extend liquidity. That is helpful, but it is not the same as recurring profitability; there is no firm follow-on PRM project. Smart Water may recover after destocking, while the Navy contract and Heartbeat Detector provide upside but are early-stage and have long government sales cycles. The likely path is a sharp but uncertain recovery rather than a dependable compounder. The business can be worth substantially more if PRM execution converts into cash and fixed costs are reset, but the downside remains meaningful because current cash burn is extreme and the company has repeatedly invested without producing durable cumulative free cash flow.

Trade Signal

Trade rating
-1.7/10
No trade
Horizon
~6mo
gpt-5.6-luna2026-08-11 · saw $5.35-59.1% since

No trade, with a modest bearish bias: the headline valuation discount is outweighed by severe cash burn, uncertain Petrobras timing and the absence of a credible near-term earnings floor.

Temporary mispricing+1.5

The stock fell from roughly $7.3-$7.4 in early August to $5.36 after the August 7 earnings release. The latest leg was a specific reaction to revenue down 36%, a $9.7M quarterly loss, gross margin collapsing to approximately 3%, weaker Smart Water and Energy Solutions demand, and the delayed Petrobras configuration. The broader decline from above $28 in late 2025 reflects the fading of a prior recovery/PRM enthusiasm as operating results deteriorated. The post-earnings move may have overshot the long-term value of the Petrobras contract, but it was not a panic reaction divorced from facts; it is more likely a durable repricing until cash flow and milestone timing improve.

Market view-7.0

The market is deeply skeptical and has effectively treated GEOS as a distressed, cyclical equipment company rather than a technology platform. The 81% decline from the 52-week high and the post-earnings 21% drop reflect the collapse in margins, persistent losses and uncertainty around Petrobras timing. Bulls point to the existing PRM contract, cost cuts, the Navy award and Smart Water destocking; bears point to cash scarcity, customer concentration, weak demand and the absence of follow-on awards. Consensus is Hold, with little analyst coverage, modest short interest and high volatility. The bearish view is broadly justified rather than obviously stale, although it may underprice a successful PRM milestone.

Inflectionwindow ~6mo+1.0

There is a potentially large earnings and cash-flow inflection from Petrobras, workforce reductions and eventual Smart Water normalization, but the market is already aware of the core recovery story. The latest earnings report pushed the evidence in the wrong direction, and management's timing appears less certain than the bullish study assumes. The $12M savings have not yet appeared in results, owner earnings are approximately negative $25M and consensus coverage is sparse. This is a possible 2027 recovery, not an unrecognized near-term inflection.

Catalysts
  • ▼2026-12 · Fiscal Q4 2026 earnings and cash/liquidity update — Likely around December 2026; the key questions are cash consumption, restructuring savings and whether the expected Petrobras milestone is arriving on schedule.
  • ▲late 2026 to 2027 · Expected Petrobras PRM milestone / revenue recognition — Management has discussed a significant milestone, but the latest call indicates revenue recognition may extend into fiscal Q3-Q4 2027; any confirmed payment or acceleration would materially improve solvency and earnings visibility.
  • ▼2026-12 to 2027-03 · Further quarterly losses or financing requirement — A weak fiscal Q4 or delayed customer receipts could force borrowing, asset-backed financing or equity dilution while liquidity is already constrained.
  • ▲2027-01 to 2027-03 · Series V Smart Water connector recovery — Evidence of customer destocking ending would support a recovery narrative, but management only expects gradual improvement.
  • ▲2027 · Navy SADAR/PRM contract execution milestones — The $10.8M SBIR award is strategically valuable, though revenue is spread across fiscal 2027-2028 and larger follow-on deployment is unproven.
  • ▲2027-02 · Fiscal Q1 2027 earnings — The first clean test of whether the 20% workforce reduction and approximately $12M annual savings are translating into improved margins.
Flow-2.0

Reported trailing dilution is only about 1%, and there is no meaningful buyback or insider-buying signal. However, cash burn, pledged assets and potential financing create latent dilution risk. Short interest is modest at 3.7% of float, while elevated retail participation does not provide durable buying support. Net flow is slightly negative absent evidence of internally funded operations.

Floor / Ceiling-2.5

There is some asset and contract value, including working capital, the Petrobras project and manufacturing capabilities, but there is no hard floor near the current price. Cash is only approximately $2.8M, the facility and $2M of cash are pledged to preserve credit access, and a sizable customer receivable is concentrated. Continued negative owner earnings create financing and dilution risk; the Petrobras contract provides recovery value but is not equivalent to net cash.

Buyability

Low. The stock is cheap on sales, but current buyers must underwrite severe cash burn, customer concentration, execution risk and possible financing. The Petrobras contract and Navy award provide a reason to own it, but neither currently establishes recurring, profitable cash flow; the likely next buyer is a special-situations investor after liquidity and PRM execution become clearer.

Fear vs Greedfear 9/10 (+4.0)greed 6/10 (-3.0)

Fear is slightly stronger than greed. The stock has already suffered a major de-rating, but the latest results show the operating trough is still worsening: revenue fell 36%, gross profit nearly disappeared and the nine-month loss reached $30.5M. The Petrobras contract creates real upside, yet the timing and liquidity risk make the apparent discount difficult to monetize safely.

Valuation

Our Target
$85M+172%
Market Should Pay
$55M+76%
target ×0.65 (fear discount)
Current Market Cap
$31MExtremely bearish
What Changed
financials release · 2026-08-07
-18%fair value on this information

The quarter newly showed another sharp deterioration: revenue declined 36% year over year, gross profit fell to only $0.5M and the net loss reached $9.7M. The PRM contract’s total value was maintained, but management disclosed that final revenue recognition is now expected in fiscal Q3-Q4 2027 after customer-requested engineering changes. The $10.8M Navy SBIR award is positive new information, but it is an initial development contract with no expected follow-on award before completion. The cash-liquidity discussion also made the dependence on the next Petrobras milestone more explicit.

▸ How the cases moved

The day-before assessment would have been approximately bear $55M, base $145M and bull $320M, with probabilities of 0.25, 0.55 and 0.20. After the quarter, bear value falls to $47M and bear probability rises to 0.40 because the revenue collapse, negative margins and continued cash burn confirm that the trough is deeper and liquidity more urgent. Base value falls to $120M and probability declines modestly to 0.48 because PRM completion was pushed toward fiscal Q3-Q4 2027 and no next PRM award is firm. Bull value declines to $300M and probability falls to 0.12 despite the $10.8M Navy award, since that project is an initial demonstration contract with revenue spread across fiscal 2027-2028 rather than an immediate commercial inflection.

2-Year Plausible Outcomes
bear40%
$47M
rev -20%/yrOE $-30M

The PRM project remains delayed, Smart Water destocking persists, and cost reductions are insufficient to offset weak demand. The company continues burning cash, with no meaningful follow-on PRM award and elevated customer, execution and financing concentration risk. A distressed asset/revenue value is more appropriate than an earnings multiple.

▸ Valuation

0.5x $90M revenue = $45M EV + $2M net cash = $47M equity

base48%
$120M
rev +25%/yrOE $12M

The Petrobras PRM contract is substantially executed through fiscal 2027, including the expected milestone payment, while the workforce reduction lowers the cost base. Smart Water recovers gradually from destocking and Intelligent Industrial grows modestly, but the business remains cyclical and margins normalize below the 2023 peak. Owner earnings recover to a modest positive level.

▸ Valuation

10x $12M owner earnings = $120M equity

bull12%
$300M
rev +45%/yrOE $25M

PRM production proceeds smoothly and creates a strong earnings and cash-flow inflection, Smart Water inventory normalizes faster than expected, and the Navy/SADAR and Heartbeat Detector programs generate credible follow-on opportunities. Fixed-cost reductions produce substantial operating leverage and investors assign a growth-industrial multiple to a diversified, higher-margin technology platform.

▸ Valuation

12x $25M owner earnings = $300M equity

▸ Target Rationale

The probability-weighted scenario value is $97.16M after discounting the terminal outcomes by 12% for two years. I set the analytical target at $85M, below the model, because the arithmetic gives substantial credit to a successful PRM recovery while not fully capturing liquidity timing, customer concentration, execution risk, the absence of a firm follow-on contract and the company’s poor cumulative cash conversion. The target remains above the bear value because the existing PRM contract and expected milestone payment provide real asset value and a plausible recovery path.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality4/10
Situation now2/10
Trajectory4/10
Risk9/10
Governance5/10
Insolvency prob (2yr)20%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Q2 Fiscal 2026 Financial Results: In May 2026, Geospace Technologies reported its financial results for the second quarter ended March 31, 2026. Revenue for the quarter rose 9.4% year-over-year to $19.7 million, but net loss widened to $11.1 million, or $0.86 per diluted share, compared to a net loss of $9.8 million in Q2 fiscal 2025. For the first six months of fiscal 2026, total revenue declined to $45.3 million (down from $55.2 million) and the net loss ballooned to $20.8 million, compared to a net loss of $1.4 million in the first half of the prior fiscal year. The widening loss is largely attributed to higher operating expenses and a steep contraction in the Smart Water segment, which offset strong gains in Energy Solutions.
  • Workforce Reduction & Restructuring: At the close of Q2 fiscal 2026, executive management initiated an organizational restructuring program consisting of a Voluntary Early Retirement plan and a Reduction in Force. This action resulted in an approximate 20% reduction in Geospace’s global workforce. Combined with other cost-containment measures, the restructuring is expected to yield approximately $12 million in annualized cost savings. Restructuring charges of $1.3 million are expected to be recorded across the second and third quarters of fiscal 2026.
  • FLC Impact Award: In May 2026, Geospace Technologies and Oak Ridge National Laboratory (ORNL) were selected to receive the 2026 Impact Award from the Federal Laboratory Consortium for Technology Transfer (FLC). The award recognizes their collaborative success in commercializing and transferring the Heartbeat Detector® security technology.
▸ Thesis-test Findings
  • Petrobras PRM Contract Installation Updates: Following the multi-year contract awarded by Petrobras in June 2025 to supply and install its OptoSeis® Permanent Reservoir Monitoring (PRM) system in Mero Fields 3 and 4, Geospace confirmed in its May 2026 earnings call that first revenues from the project have now been recognized. Looking forward, the company expects a significant acceleration in revenue recognition from this project, anticipating a $35 million contract installment by the end of calendar year 2026. The majority of the PRM contract's total revenue is projected to be recognized by Q3 2027. This project remains the primary catalyst behind the 272.1% surge in Geospace's Energy Solutions quarterly revenue.
  • Smart Water Meter AMI Market Destocking Trends: The Smart Water segment has faced severe headwinds in the first half of 2026, with segment revenues plunging 60.6% year-over-year in Q2. CEO Richard Kelley explained that this decline was due to market-wide inventory corrections. Customers who had previously built up excess inventories of HydroConn connector products in anticipation of high demand are currently destocking. Management emphasized that the slowdown is a temporary, industry-wide trend rather than a loss of market share. They anticipate a gradual recovery and modest revenue improvement in the coming quarters as customer inventories begin to normalize.
  • GeoVox Heartbeat Detector Contracts US Customs and Border Protection: Although Geospace acquired Geovox Security (and its exclusive ORNL-licensed heartbeat detection algorithm) in August 2025, a search for new contracts specifically with the US Customs and Border Protection (CBP) over the last six months yielded no results. The company continues to target border agencies and showcased the device at the Border Security Expo in May 2026. While direct 2026 US CBP contracts were not announced, Geospace did secure a notable international contract in April 2026: a three-year deal valued at over €400,000 to supply seven enhanced Heartbeat Detector systems to Spain’s Guardia Civil.