Gulf Keystone Petroleum Limitedv3 4.8/10 · 2026-11-18Gulf Keystone Petroleum Limited engages in the exploration, development, and production of oil and gas in the Kurdistan Region of Iraq. The company holds an 80% interest in the Shaikan Field covering an area of approximately 280 square kilometers located in north-west of Erbil. The company was incorporated in 2001 and is based in Pembroke, Bermuda.
2-Year Price History
Valuation v3 Opus worker · 2026-11-18
Gulf Keystone (181p on 18 Nov 2026; 217.5m shares; market cap ~GBP394m / ~$520m) runs Shaikan, a low-cost Kurdistan oil field. Since September 2025 Shaikan has exported under interim deals that invoice at international prices but pay ~$30/bbl in cash. The difference builds a 'top-up' receivable (~$130m+), which has just started converting: $16.5m was received in November. The pitch valued a standalone GKP holding 80% of Shaikan at ~250p. Testing showed that company no longer exists in that form. On 20 Oct 2026 GKP agreed an all-share reverse takeover by ShaMaran (Atrush, Sarsang and a 25% Hamrin stake). GKP will double its share count, its holders keep ~50% of the combined company, and the LSE listing moves to Oslo by mid-2027. The same release says GKP's Shaikan stake falls from 80% to 61.5% under the 2nd PSC amendment. Scaled for the 61.5% stake and a flatter FCF path, the 10% DCF is ~182p standalone. Merged, it is ~185p per current GKP share, including the $50m (~17p) special dividend at completion. That is about the current price, and the board's own dissent-rights fair value of $2.99 (~226p) sits at the optimistic end. Rating 4.8: a real asset with real optionality (international pricing, top-up recovery, Hamrin), but no margin of safety once the dilution and the WI cut are counted. The risks are Kurdistan payments, ~$375m of combined bonds, and forced UK selling ahead of the London delisting. Setup 4.0: catalysts are near (SGMs ~22 Dec 2026, interim export deal expiry end-Jan 2027, KRG approval within 6-9 months), but there is no clear variant perception left.
Flow: The all-share ShaMaran merger (announced 20 Oct 2026; SGMs ~22 Dec 2026; completion mid-2027) issues ~217.5m new shares (100% of current) and cancels the LSE listing in favour of Oslo, so UK-only and index holders are likely to sell into mid-2027. Lansdowne (~13%) and the Lundin family (12.8% post-deal) support the deal. There is no buyback. Offsets: ~$20m/yr dividends plus a $50m special dividend at completion.
A deep dive would have to establish: After GKP's Shaikan stake falls to 61.5% and its share count doubles in the ShaMaran merger, will Baghdad pay international prices and top-ups reliably enough, and Hamrin deliver, for the combined company to be worth more than ~$1bn?
Research (expand)
What it does. GKP operates Shaikan in the Kurdistan Region of Iraq: ~40-45k bopd gross, ~$4.4/bbl gross opex, and 416 MMbbl internally estimated gross 2P (end-2025, down from 443, including a 12 MMbbl negative revision; no CPR since 2022). Its working interest is 80% today and is expected to fall to 61.5% under the 2nd Shaikan PSC amendment. Exports through Ceyhan restarted in September 2025 under interim tripartite deals, now extended to end-January 2027.
Corporate change the pitch missed. On 20 Oct 2026 GKP agreed an all-share merger with ShaMaran, valued at ~$601m, a 22.9% premium (13.5% after GKP's special dividend).
- GKP issues ~217.5m shares, and each side owns ~50% of the combined company.
- The combined company has ~53 kbopd WI production pro forma and 323 MMbbl WI 2P.
- Conditions: KRG approval, SGMs around 22 Dec 2026, and completion of ShaMaran's Hamrin purchase. Target completion is mid-2027.
- GKP pays its holders a $50m special dividend (~$0.23/share) at completion.
- The deal is a reverse takeover: the LSE listing will be cancelled and the primary listing moves to Oslo Børs.
- Combined bonds will be ~$375m: GKP's $175m at 10.25% plus ShaMaran's ~$200m refinancing.
What it earns. At ~43k bopd, ~$70 realised and falling entitlement as the cost pool depletes, standalone EBITDA is ~$190m at 80% WI, or ~$145m at 61.5%. There is no cash tax. Less ~$40m maintenance capex (net, at 61.5%), owner earnings are ~$100m (GBP~73m). Cash earnings are lower until top-ups catch up: export cash is ~$30/bbl, against DNO's $38.5-45 prepaid local sales. Reported FCF was $65m in 2024, $29m in 2025 and -$2m in H1 2026.
Projection (standalone, 61.5% WI, GBP m): 2027 58, 2028 18, 2029 28, 2030 55, 2031 72. This assumes receivable recovery in 2027, then FDP capex. In year 5 the business is 'neither', drifting toward a corpse: licence-term limited, Kurdistan risk. Terminal value is 4x (GBP288m).
Value. PV of FCF ~GBP171m plus PV of terminal ~GBP179m, plus ~GBP45m net cash, gives ~GBP395m, or ~182p standalone. For the merged company, take half of (GKP ~GBP395m + ShaMaran ~GBP350-395m - GBP38m special dividend), which is ~165-173p, then add back the ~17p special dividend. That gives ~182-190p per current GKP share. EV/EBITDA is ~3.4x at 61.5% WI.
Management. Harris and Papineau-Legris are conservative operators and will run the combined company. They paid $45m (2024), $50m (2025) and $22.5m (2026) in dividends. The Lundin family (12.8% post-deal) will chair the combined company. Concerns:
- Cash fell from $102m to $66m before the bond.
- Dividends were halved.
- The CEO is promoting Hamrin's '7bn barrels in place'.
Sentiment: 4/10. The stock is down from ~210p to 181p since the merger was announced and the oil price fell.
Money fields are in GBP millions (standalone GKP basis); per-share values are in pence; USD converted at 1.32.
Thesis test
- Merger/dilution (challenge right): confirmed in the 20 Oct release. The standalone per-share DCF was invalid, and per-share value now depends on ShaMaran/Hamrin, at a ~13.5% premium paid away, offset by the $50m special dividend.
- WI cut to 61.5% (challenge right): stated in the release and consistent with the 323 MMbbl combined 2P. It cuts Shaikan cash flows ~23%.
- Entitlement and decline (challenge mostly right): management itself says international prices deplete the cost pool, and 2026 guidance shows decline without drilling. FCF path and terminal value were cut.
- Cash and payment risk (facts right, partly already priced): cash below the $80m floor, dividend cuts and the bond at ~10.8% are real. But the top-up did pay, so I kept a haircut rather than a write-off.
- Wartime price (pitch mostly right): it already used ~$70 long-term. Only the 2026-27 accruals are inflated.
- Conclusion: the business case survives, but the per-share upside does not. Fairly priced at ~185p; pass.
- /Users/gregwo/stocks2/data/analysisv3/context/GKP.L.md
- https://www.inderes.se/en/releases/gulf-keystone-to-combine-with-shamaran-petroleum
- https://www.iraq-businessnews.com/2026/10/20/gulf-keystone-and-shamaran-to-merge-in-1bn-plus-deal/
- https://mfn.se/a/gulf-keystone-petroleum/receipt-of-first-top-up-cargo-payment
- https://www.inderes.se/en/releases/successful-pricing-of-bond-issuance
- https://www.gulfkeystone.com/2025-full-year-results-announcement/
- https://www.energy-pedia.com/news/general/dno-announces-q3-2026-trading-update-205660
- https://stockanalysis.com/quote/lon/GKP/
Financials — Adjusted
Adjusted · TTM 2025-Q4 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 165+9% | 165+9% | 151+22% | 124-73% | 460 |
| Gross profit | 23.8+16% | 23.8+16% | 20.5-46% | 37.7-88% | 303 |
| Operating expenses | -1.46-109% | -1.46-109% | 15.8-69% | 50.8+76% | 28.8 |
| ▸Adj EBITDA | 105+27% | 105+27% | 83.0+207% | 27.1-92% | 352 |
| ▸Adj OCF | 78.1-1% | 78.1-1% | 79.0+34% | 58.9-83% | 347 |
| CapEx | -33.0 | -33.0 | -27.6 | -65.4 | -105 |
| Adj FCF | 45.1-12% | 45.1-12% | 51.4 | -6.48-103% | 242 |
| Interest expense | 0.00 | 0.00 | 1.68 | 0.00 | 0.00 |
| ▸Adj net income | 27.5+243% | 27.5+243% | 8.02 | -9.42-103% | 280 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025
| Where the Cash Went | Total | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 581100% | 96.3100% | 88.3100% | 42.1100% | 354100% |
| FCF (OCF−capex) | 35060% | 29.030% | 65.975% | -14.1-33% | 26976% |
| Net income | 27748% | 15.216% | 7.168% | -11.5-27% | 26675% |
| ▸Capital returned | 29150% | 53.355% | 46.753% | 25.761% | 16547% |
| Buybacks | 14.0 | 3.90 | 10.1 | 0.00 | 0.00 |
| Dividends | 274 | 49.1 | 34.9 | 25.4 | 165 |
| Interest paid | 1.68 | 0.00 | 1.68 | 0.00 | 0.00 |
| Debt paid down | 0.73 | 0.22 | 0.00 | 0.26 | 0.26 |
| ▸Reinvestment | 23440% | 32.534% | 28.933% | 65.3155% | 10730% |
| Capex (PP&E) | 231 | 33.0 | 27.6 | 65.4 | 105 |
| Intangibles & M&A | 2.63 | 0.13 | 0.42 | 0.00 | 2.07 |
| Leases signed (net Δ) | -0.28 | -0.58 | 0.90 | -0.10 | -0.50 |
| Retained / other | 58.310% | -24.4-25% | 20.523% | -39.7-94% | 10229% |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 32 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 646 | 646 | 668 | 697 | 744 |
| ▸Liabilities (total) | 167 | 167 | 155 | 150 | 171 |
| Net debt (incl. leases) | -76.9 | -76.9 | -101 | -81.3 | -119 |
| Net debt / Adj EBITDA | -0.73 | -0.73 | -1.21 | -3.00 | -0.34 |
| Net debt / Adj FCF | -1.70 | -1.70 | -1.96 | -- | -0.49 |
| Adj EBITDA / interest | -- | -- | 49.5 | -- | -- |
| Shares outstanding | 217 | 223 | 228 | 222 | 226 |
| Dilution (YoY) | -2.0% | -2.0% | +2.5% | -1.4% | -0.2% |
| Employees | 433 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | 14.4%+0.8 | 14.4%+0.8 | 13.6%-17.0 | 30.5%-35.2 | 65.8% |
| Adj EBITDA margin | 63.9%+8.9 | 63.9%+9.0 | 54.9%+33.0 | 21.9%-54.6 | 76.6% |
| Adj OCF margin | 47.3%-5.0 | 47.3%-5.0 | 52.2%+4.5 | 47.7%-27.8 | 75.5% |
| Adj FCF margin | 27.3%-6.7 | 27.3%-6.7 | 34.0%+39.2 | -5.2%-57.8 | 52.6% |
| Net income margin | 9.2%+4.5 | 9.2%+4.5 | 4.7%+14.0 | -9.3%-67.1 | 57.8% |
| Adj NI margin | 16.6%+11.3 | 16.6%+11.3 | 5.3%+12.9 | -7.6%-68.5 | 60.9% |
| ROIC (adj, after-tax) | 5.2% | 5.2% | 0.8% | -1.9% | 47.4% |
| Cost of debt | -- | -- | -- | -- | 0.0% |
Earnings Calls
Earnings Call · 2026 Q2
Gulf Keystone Petroleum reported its 2026 half-year results, a period dominated by regional disruption from the conflict between the U.S. and Iran. CEO Jon Harris said the company delivered a resilient operational and financial performance and extended its record of zero lost time incidents to over 3.5 years. Decisive cost cuts after the production shut-in limited cash outflow, protected the balance sheet and funded a $12.5 million dividend paid in April. Operations: Production was disrupted by two precautionary shut-ins linked to the regional security environment, totaling almost five months. The first ran from February 28 to June 23, and the second began July 19, with production restarted on August 16. Gross average production in H1 2026 was 14,600 barrels of oil per day, versus 44,100 in H1 2025. Before the first shut-in, output exceeded 44,000 bopd on several days after well workovers, and after the June restart it exceeded 45,000 bopd before the second shutdown. At the time of the presentation, gross volumes were approaching 40,000 bopd, with well activities underway to return to prior levels. Investment: Net capex was $18 million in H1, nearly half of it incurred before the February shut-in. Spending was moderated afterwards, but safety-critical and strategic projects continued, notably the water handling facilities at PF-2, which remain on track for full start-up in Q1 2027. That project is expected to add 4,000 to 8,000 bopd of incremental gross production and lift total capacity to around 77,000 bopd. Preparation for field development and drilling in 2027 continues, contingent on restoring full production sharing contract entitlement on export sales. Export and pricing: The tripartite interim export agreements signed in September 2025 between the IOCs, the Kurdistan Regional Government and the Federal Government of Iraq have worked effectively, with consistent payments following liftings. The Shaikan discount to Brent averaged around $9 per barrel in H1, an improvement helped by strong demand for the Kirkuk blend. The independent consultant's review of IOC invoices and contractual costs was submitted to the Iraqi government in June. GKP holds a top-up receivable of around $80 million net, reflecting the gap between cash received at about $30 per barrel and international prices in entitlement invoices. Recovery is sought through additional liftings from September 2026. The interim agreements were extended six months to the end of January 2027, following a one-year extension of the Iraq-Turkey pipeline agreement. The goal is to replace interim arrangements with longer-term agreements at international prices. Reserves and development: Jurassic gross 2P reserves were 416 million barrels at end-2025, implying a 27-year life at 2025 production levels. Gross contingent resources were 311 million barrels, including 157 million in the Triassic, based on a 2022 CPR. The draft field development plan targets more than doubling Jurassic production, a Triassic test of up to 10,000 bopd, and elimination of routine gas flaring through a gas management plan. Financials: Adjusted EBITDA rose 26% to $52 million from $41 million, driven by considerably higher realized prices and lower operating costs, more than offsetting lower volumes. Operating costs fell 25% to $20 million, and other G&A fell 6% to $4.3 million despite one-off costs related to the Oslo dual listing. OpEx per barrel was about $4.4 before the February shut-in. Free cash outflow was limited to $2 million. GKP's net entitlement was about 36% of Shaikan sales. The board announced an interim semiannual dividend of $10 million, payable in September 2026. Q&A: Analysts questioned reserve life against license expiry, the sustainability of operating cost savings, the pace of ramp-up and H2 production, receivable recovery timing, second-half capex, whether export pricing must be agreed before recovery, the drilling timetable and FDP approval, FDP scope and gas management alternatives, funding options including debt, and the outlook for the Shaikan discount. Management said reserves were not materially affected by the shut-ins, that the cost savings were mainly due to the shut-in, that capex would not necessarily double in H2, and that the discount would likely rise from current levels. Drilling is expected in H2 2027 with a rig tender underway. Webcast investor questions covered valuation, historical 2022-2023 receivables under MNR discussions, M&A, updated CPR timing and the security situation.
▸Given 27 years of reserve life at last year's production and license expiry including two 5-year extensions, do the revised FDP discussions with the MNR allow a development period that produces all those reserves?Werner Riding · Peel Hunt
▸Could the revised FDP lead to an extended license period to enable the development?Werner Riding · Peel Hunt
▸How much of the H1 operating cost reduction reflects the temporary shut-in versus sustainable structural efficiencies?Werner Riding · Peel Hunt
▸When will production return to the pre-shutdown level of around 40,000 bopd, and what should be expected for H2 assuming no further shutdowns?Teodor Nilsen · SB1 Market
▸Could repeated shutdowns and restarts affect the reserves?Teodor Nilsen · SB1 Market
▸What is the expected repayment profile for the receivable, and how much could be recovered this year?Teodor Nilsen · SB1 Market
▸Given accelerated H2 production, should capex in H2 be higher than in H1?Teodor Nilsen · SB1 Market
▸Must full export pricing be agreed before the September lifting that recovers the Q4 true-up, and has the Q4 receivable been agreed with the authorities?Charlie Sharp · Canaccord
▸What is the possible timetable for drilling in 2027, and does it require FDP agreement or approval?Charlie Sharp · Canaccord
▸Has the draft FDP changed much in recent years, particularly the gas management system, and does the earlier estimate of $800 million to $925 million for the next phase still stand? How will it be funded?David Round · Stifel
▸Are the discounts on slide 7 for the Kurdistan blend or specific to Shaikan, and what is assumed going forward?David Round · Stifel
Institutional Ownership
Ownership Over Time
Ownership composition
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2024 Q4 | 78M | 41M | -2M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2025 Q2 | 85M | 45M | 2M | $0.01 | $0.01 – $0.01 | 1 |
| 2025 Q4 | 66M | 25M | -14M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2026 Q2 | 71M | 19M | 2M | $0.01 | $0.01 – $0.01 | 1 |
| 2026 Q4 | 71M | 14M | -2M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2027 Q2 | 155M | 90M | 57M | $0.25 | $0.25 – $0.25 | 1 |
| 2027 Q4 | 159M | 97M | 62M | $0.27 | $0.27 – $0.27 | 1 |
| 2028 Q2 | 138M | 72M | 41M | $0.18 | $0.18 – $0.18 | 1 |
| 2028 Q4 | 123M | 55M | 27M | $0.12 | $0.12 – $0.12 | 1 |
| 2029 Q2 | 105M | 35M | 11M | $0.05 | $0.05 – $0.05 | 1 |
| 2029 Q4 | 99M | 41M | 16M | $0.07 | $0.07 – $0.07 | 1 |
| 2030 Q2 | 99M | 41M | 16M | $0.07 | $0.07 – $0.07 | 1 |
| 2030 Q4 | 99M | 42M | 16M | $0.07 | $0.07 – $0.07 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- Dual Listing on Euronext Growth Oslo: On February 18, 2026, Gulf Keystone Petroleum (GKP) successfully completed a dual listing on Euronext Growth Oslo. This move was implemented to increase share liquidity, attract a broader pool of institutional and retail energy investors, and improve capital market access. In April 2026, GKP activated cross-border transfers to allow seamless shifting of shares between the London Stock Exchange (LSE) and Oslo.
- Precautionary Field Shut-in Due to Regional Conflict: Following the outbreak of regional conflict in late February 2026, the Shaikan Field was shut in on a precautionary basis on February 28, 2026. As of the June 19, 2026 operational update, the field remains offline. However, GKP noted encouraging signs following a recent framework peace agreement in the region and is working with Erbil and Baghdad to prepare for an immediate restart once security conditions permit.
- Decisive Cost Controls and Liquidity Preservation: In response to the shut-in, GKP acted swiftly to preserve its balance sheet, cutting its monthly cash burn rate by nearly 50%. The company accomplished this by suspending or slowing almost all non-essential capital expenditure, reducing staff costs, and minimizing G&A expenses. Despite these measures, GKP maintained a robust liquidity profile with $66 million in cash as of June 18, 2026.
- Ongoing Receivable Recovery and Dividends: Cash outflows have been offset by the continuous recovery of receivables for oil produced prior to the February shut-in. GKP expects additional payments following a recent crude lifting in June 2026. Underscoring its commitment to shareholder returns, GKP paid a semi-annual dividend of $12.5 million in April 2026, bringing total dividends declared over the prior 12 months to $50 million.
▸ Thesis-test Findings
Iraq Turkey Pipeline (ITP) Restart Negotiations
The ITP successfully resumed operations on September 27, 2025, under an interim tripartite agreement between Baghdad, Erbil, and international oil companies (IOCs), carrying initial volumes of roughly 180,000 to 220,000 bpd. However, a new geopolitical challenge has emerged as of June 2026. The bilateral treaty governing the pipeline is set to expire on July 27, 2026. Turkey has rejected Iraq’s formal request for a temporary one-year extension, insisting on negotiating a new 5-to-10-year agreement. Turkey is using this negotiation as leverage to demand higher oil throughput volumes and resolve outstanding arbitration disputes. Furthermore, while the pipeline is operational, local flows from Kurdistan have been halted since the February 2026 regional security shut-in, although the Iraqi Prime Minister ordered companies to prepare for a resumption in June 2026 to offset southern export disruptions caused by the closure of the Strait of Hormuz.
Kurdistan Local Refinery Oil Demand & Trucking Capacity
Prior to the late-2025 pipeline restart, Kurdistan’s oil producers relied heavily on trucking crude to local refineries (such as Kalak and Lanaz) at heavily discounted local prices of $27–$28 per barrel. Kurdistan's active local refineries have a combined processing capacity exceeding 200,000 bpd, but local trucking routes present severe logistical bottlenecks, high transport risks, and lower profit margins. With the September 2025 pipeline restart, GKP transitioned its sales from trucking to pipeline exports, immediately improving realized prices to over $30 per barrel. Following the February 2026 regional security shut-in, local sales became restricted again, with the region's overall production capacity temporarily dropping to 75,000 bpd (of which 50,000 bpd was allocated to local refineries). The evidence indicates that while the local refinery market serves as a valuable backup, it cannot match the economics, margins, or volume capacity of pipeline exports.
Gulf Keystone Petroleum PF-2 Water Handling Project Updates
The PF-2 water handling project is a highly strategic initiative designed to manage produced water, unlock incremental production above the field baseline, and reduce reservoir recovery risks. First sanctioned in August 2025, the project has proceeded undisturbed despite the current operational shut-in. In its June 19, 2026 corporate update, GKP confirmed that while almost all of its capital programs have been suspended to preserve cash, the installation of water handling facilities at PF-2 is one of the only "highly strategic" projects allowed to proceed. Detailed engineering design work is well advanced, and the project remains on track for commissioning at the beginning of 2027, positioning GKP to support organic production growth once safe operations resume.