Stocks/GLNG

GLNG

Golar LNG Limitedv3 5.5/10 · 2026-11-13
Energy·Oil & Gas Midstream
$40.44
$4.0B market cap
1.3% div yield
v3 Rating
5.5/104.0–7.0
Setup
5.5/104.5–7.0
Fair Value
$47.00$30.00–$65.00+16%
DCF (10%)
$45.00+11%
Base IRR
+11%+2%–+20%
Visibility
moderate±37%
Wall Street
$75.00 target(1 analyst last quarter)(31 buy, 13 hold, 4 sell)
Rating
Revenue (TTM)
$484.6M
Owner Earnings
$100M
Next-Yr Owner Earnings
-$830M
Growth
+30.0% × 5y
P / Next-Yr OE
--
Net Debt
$2.1B

Golar LNG Limited specializes in providing marine-based infrastructure for the liquefaction and regasification of liquefied natural gas (LNG). The company's core business encompasses the design, construction, ownership, and operation of these specialized assets. Its operations are organized into two key segments: Shipping and Floating Liquefied Natural Gas (FLNG). Golar LNG's activities involve both the management and chartering of LNG carriers, FLNG vessels, and floating storage regasification units (FSRUs), in addition to operating third-party owned vessels. As of December 31, 2021, its fleet comprised nine LNG carriers, one FSRU, and three FLNGs. Established in 1946, the company maintains its headquarters in Hamilton, Bermuda.

2-Year Price History

$43.09+31.7%
$30$35$40$45$50$55Initial target $48.00 · 2026-11-10Initial target $47.00 · 2026-11-13volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-13

Rating
5.54.0–7.0
Setup
5.54.5–7.0
Fair value (USD)
47.0030.00 – 65.00
Upside vs 40.44
+16%
DCF (10%)
45.0028.00 – 68.00+11%
Base IRR
11%2% – 20%
Visibility
moderaterange ±37%
Sentiment
5/10
Reputation
7/10
2026-11-13 · claude-opus-5-5 · priced at 43.09

Golar is the only proven provider of floating LNG liquefaction (FLNG) as a service. Three units are on roughly 20-year charters. Gimi (Golar 70%) works for BP in Mauritania/Senegal and runs about 15% above contract. Hilli finished Cameroon with 100% economic uptime, is being upgraded for $350M in Singapore, and starts in Argentina in H2 2027. Esperanza is 74% built, on budget, and starts in Argentina in H2 2028. That gives about $800M of base EBITDA to Golar from 2029, before any LNG-price upside (25% of FOB above $8/MMBtu in Argentina, plus a 10% stake in SESA). A fourth Mark II unit ($2.45B, delivery 2029) was ordered in August, and its donor vessel (Grace Dahlia) has since been bought, but it has no charter yet. Earnings are at their low point right now. Only Gimi produces, unlevered owner earnings are about $100M, and roughly $2.5B of capex is still to be spent through 2029. The H1 6-K says Golar 'needs to raise additional capital', and in October it sold another $500M of 7.5% 2031 notes. At $43.09 (last close 2026-11-12; nothing newer found) the EV is about $6.5B, about 8x the contracted 2029 EBITDA. That is a fair price for long-dated contracted offshore infrastructure plus a commodity option. My DCF charges all growth capex, values year 5 at 9.5x FCF and puts a 75% probability on unit #4 getting chartered. It gives about $45/share, roughly today's price. The stock has fallen from $57 (the Ras Laffan LNG spike) and sits at 36% of its 1-year range. The market is not badly wrong. The upside depends on the board's strategic review (started because it thinks private buyers value the fleet above the public price), a charter for #4 and LNG prices staying high. All three are real, but none is visible yet, and Q3 results on Nov 18 are an early check. Rating 5.5: fairly priced, with good assets and execution, and exposure to Argentina and financing. Interest 5.5: a decent business without a clear mispricing, so we pass unless the review or a #4 charter turns up.

A deep dive would have to establish: Can unit #4 be chartered on Esperanza-like terms (about $400M EBITDA, 20 years) and the Hilli/Esperanza refinancings close before the 2028-29 capex peak without an equity raise, or does the strategic review deliver a sale above about $55?

Owner earnings, TTM
$100M$60M – $150M
Realistic peak profit
$1.1B$800M – $1.8B
Growth rate
30.0%15.0% – 45.0%
Years of growth
53 – 7
Market cap
$4.4B$4.3B – $4.5B
EV
$6.5B$6.2B – $7.0B
Net debt
$2.1B$1.9B – $2.5B
Capital return / cap
2.3%1.5% – 3.5%
P/E
25.0×15.0× – 60.0×
EV/EBITDA
30.0×20.0× – 45.0×
FCF yield
-2.0%-4.0% – 0.0%
Projected FCF, base case (USD millions)
Y1-$830M-$1.1B – -$600M
Y2-$270M-$550M – $0M
Y3-$30M-$350M – $250M
Y4$900M$400M – $1.3B
Y5$1.1B$700M – $1.6B
Competition: Golar is the only proven FLNG-as-a-service provider and offers the earliest available capacity (2029 vs 2031+ at Samsung), competing against owner-built newbuilds (ENI, Petronas, Wison-built units) and onshore US/Qatar liquefaction.
Governance: No serious issues. Past disputes (the BP Gimi arbitration, since settled; Nakilat; Ghana) are minor, but management is promotional, orders units on spec and leans on capital markets (the H1 6-K says it needs to raise additional capital).
Research (expand)

What it does. Golar converts old LNG carriers into floating liquefaction plants and charters them, with operations included, for about 20 years. The customers are BP/Kosmos for Gimi (Keppel owns 30%) and the Argentine SESA consortium (PAE, YPF, Pampa, Harbour; Golar 10%) for Hilli and Esperanza. Since the last legacy O&M contract ended in Q2, Golar is a pure FLNG company. Its edge is the lowest capex per tonne in the industry, a perfect uptime record (197 cargoes) and the earliest available capacity: #4 delivers in 2029, while Samsung cannot deliver before 2031. Demand is becoming more urgent. Ras Laffan damage and US/Qatar concentration (rising to 53% of supply) are pushing buyers to diversify.

What the market believes. EV is about $6.5B: about 102M shares times $43.09 is $4.4B, plus about $2.15B of net debt, estimated from $1.77B at June 30 plus Q3 capex. That is about 8x the contracted 2029 EBITDA, so the backlog is credited and very little else is. Fears behind the fall from $57: the LNG premium fading, the going-concern-style financing language, an uncharted $2.45B unit, more debt ($500M 7.5% notes in October), and short interest rising from 6.7M to about 9-10M shares (partly hedges on the $575M convert, strike $57.53). I cannot name a clear market error. The best variant view is that a private infrastructure buyer would pay 9-10x contracted EBITDA, as the board says.

Earnings today. About $185M a year of EBITDA attributable to Golar (Gimi's 70% plus small items) less about $45M of corporate cost leaves about $140M. After about $22M of SBC (including RSUs to consultants, which are capitalized), near-zero Bermuda tax and small maintenance, unlevered owner earnings are about $100M. Equity earnings after interest are about zero until 2028. Sell-side 2027 EPS is negative.

Projected unlevered FCF ($M, all capex charged): 2027 -830 (Esperanza about $500M, Hilli about $160M, #4 about $400M); 2028 -270; 2029 -30 (peak spend on #4); 2030 +900; 2031 +1,150. EBITDA is about $1.35B in 2031, including #4 at Esperanza-like terms and about $150-250M of commodity upside. In 5 years it is neither a corpse nor a compounder: a 4-unit contracted lessor with 15-18 years of charter left and options on units 5-7 (CIMC option, Seatrium LOI) at 5-6x capex/EBITDA.

DCF. Discounted cash flows are worth about +$390M. Terminal value is 9.5x the $1.15B of year-5 FCF, about $6.9B in present value. Less net debt (adjusted for Keppel's 30% share of Gimi's debt and the Q4 burn) that is about $5.2B, or $50/share if #4 gets chartered. Without a charter it is about $27. Weighted 75/25, the result is about $45/share. Bear case $28: #4 sits idle, LNG falls below $8 FOB in the 2027-29 supply wave, there is an Argentine shock and an equity raise. Bull case $68: LNG at $12-15 adds $8+, plus a takeout. Fair value $47. Base IRR is about 11% including the $1 dividend (2.3%).

Management and risks. Staubo and Troim are capable dealmakers who have recycled capital well (the Gimi refi, buybacks, the dividend). They are also promotional: they show EBITDA scenarios of '$4B at 2022 prices' and order units on spec. Key risks: SESA is the counterparty on 2 of 3 units (mitigated by RIGI, English law and offshore payment), cost inflation (#4 is +10%), refinancing reliance, and newbuild competition from Wison, Samsung and ENI. Call IV of 28% is too low for covered calls.

Sentiment: 5/10. Holders are mixed. Event-driven funds rotate (TOMS 6.1% to 0.1%; Luxor 7% as of Nov 9; T. Rowe 6.2%). Short interest is rising and put skew is heavy (48% put IV vs 28% call), but the sell side is constructive.

Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-11-1043.505.56.548.0045.0012%5
2026-11-1343.095.55.547.0045.0011%5

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue485+48%394+51%260-13%298+11%268
Gross profit266+90%184+116%85.3-45%155+10%141
Operating expenses43.1-18%48.8+23%39.8-45%72.6+69%43.0
▸Adj EBITDA277+101%185+87%98.9-25%133-11%149
▸Adj OCF308+27%233-10%259-35%396-27%543
CapEx-509-866-437-336-262
Adj FCF-202-633-178-393%60.6-78%281
▸Interest expense85.633.71.071.9124.4
▸Adj net income101+62%85.2+49%57.2-23%74.6-254
▸Owner's earnings110--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA2027100%263100%190100%143100%53.4100%1377100%
FCF (OCF−capex)-700-35%-167-63%-430-227%-120-84%-204-381%22116%
Net income88844%14455%65.735%49.735%-46.8-88%67549%
▸Capital returned1427%25998%-876-462%184129%59.6111%51537%
Buybacks137-5.691468.26-37.025.1
Dividends65376.831410912429.9
Interest paid12362.033.71.071.9124.4
Debt paid down-771126-136966.4-29.6436
▸Reinvestment2042101%426162%843445%418293%204381%15111%
Capex (PP&E)2294393866437336262
Intangibles & M&A-24633.1-21.6-18.3-135-105
Leases signed (net Δ)-5.65---1.39-0.632.43-6.06
Retained / other-473-23%-398-151%501264%-285-199%-127-237%-165-12%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 18 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)56685326436840844280
▸Liabilities (total)34683258199814821379
Net debt (incl. leases)1967158289354590.6
Net debt / Adj EBITDA7.118.569.024.110.61
Net debt / Adj FCF------9.000.32
Adj EBITDA / interest3.235.4892.169.56.13
Shares outstanding102101105105107
Dilution (YoY)-3.1%-3.1%-0.0%-2.5%--
Employees474220200200260
MarginsTTM2025202420232022
Gross margin54.8%+12.046.9%+14.132.8%-19.151.9%-0.752.6%
Adj EBITDA margin57.1%+15.047.0%+9.038.0%-6.444.4%-11.455.8%
Adj OCF margin63.5%-10.459.3%-40.499.7%-33.2132.8%-70.0202.8%
Adj FCF margin-41.7%+177.1-160.8%-92.5-68.2%-88.520.3%-84.7105.0%
Net income margin31.9%+14.016.7%-2.419.1%+34.8-15.7%-267.6251.9%
Adj NI margin20.8%+1.821.6%-0.322.0%-3.025.0%+120.0-95.0%
ROIC (adj, after-tax)4.7%2.8%1.3%2.0%2.6%
Cost of debt3.2%1.7%0.1%0.2%1.8%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-13

Golar LNG delivered a strong second quarter operationally and announced a major expansion of its FLNG platform. The company placed a firm order for its fourth FLNG unit, a Mark II conversion to be constructed at CIMC Raffles in China and delivered in 2029. Golar believes this will be the earliest available FLNG capacity globally, potentially one to two years ahead of alternatives. The order increases Golar-controlled liquefaction capacity by 41%, from 8.6 million tonnes per annum to more than 12 million tonnes on a fully delivered basis. Assuming charter terms similar to those achieved for Esperanza, management estimates a potential 50% increase in earnings capacity and contracted EBITDA above $1.2 billion annually by 2030. The company also secured an option for another Mark II at CIMC and signed a letter of intent with Seatrium for additional Mark I or Mark II units. These arrangements, together with options on long-lead equipment and efforts to secure donor vessels, provide a potential pathway to a fleet of more than seven units. Golar attributes the near-term scarcity of FLNG capacity to limited shipyard availability and intense competition for turbines, dual-fuel engines, steam generators and cold boxes. Management expects competing yards to be largely occupied through the 2030s and intends to maintain its policy of ordering no more than one open FLNG at a time. Unit five will not be committed until unit four has a clear long-term charter. Q2 operating revenue was $130 million, while EBITDA increased approximately 20% sequentially to $127 million from $106 million. The improvement was primarily driven by Hilli’s commodity-linked earnings, which rose to $37 million from $10 million in Q1. Net income was $56 million, bringing year-to-date net income to $158 million, and Golar declared another $0.25-per-share quarterly dividend. Gimi continued to outperform, producing 15% above contractual capacity and delivering its 41st cargo, although seasonal heat is expected to weigh on performance in Q3 before conditions improve in winter. Hilli completed its eight-year Perenco contract in Cameroon with 100% economic uptime and 156 cargoes delivered. It is transiting to Singapore for modifications and is expected to begin a 20-year Argentina contract in the second half of 2027, generating approximately $285 million of annual EBITDA before commodity upside. The refurbishment and redeployment budget is approximately $350 million. Esperanza was 74% complete, with more than 15 million construction manhours completed without lost-time incidents. It remains on schedule and on budget for sail-away by year-end 2027 and Argentine operations in the second half of 2028. Golar has invested approximately $1.3 billion of the project’s $2.2 billion budget. Liquidity was approximately $1.5 billion, including the new undrawn $600 million revolving credit facility. Management estimates that refinancing Hilli and adding asset-level financing for Esperanza could release approximately $2.3 billion of incremental liquidity. Golar emphasized that its long-term contracted earnings base is complemented by substantial LNG-price exposure through Hilli, Esperanza and its 10% SESA stake. At higher LNG prices, annual EBITDA could rise materially above the contracted base, while the ongoing strategic review remains focused on addressing a perceived valuation gap and accelerating FLNG growth.

Analyst Q&A (14)
▸
Asked how Golar plans to commercialize FLNG unit four, including the customer-signing process and target return profile.
John Mackay · Goldman Sachs
Management said Golar chose Mark II because it has the strongest near-term charter engagement, attractive economics, and suitable gas-reserve opportunities. The company is targeting a roughly 20-year charter and expects returns in the established range of approximately 5–6 times CapEx to EBITDA.
▸
Asked for the remaining timeline and milestones before signing a customer for unit four.
John Mackay · Goldman Sachs
The typical process has three stages: signing a term sheet or framework agreement, executing definitive contracts, and lifting conditions precedent such as export, environmental and tax approvals. Timing varies by project and country.
▸
Asked how quickly Golar could deploy units and reach a seven-FLNG fleet in a blue-sky scenario.
John Mackay · Goldman Sachs
Golar could reach seven units through unit five under the CIMC option and units six and seven potentially at Seatrium, although the exact sequence may change. The company will not order unit five until unit four has a long-term charter, then plans to repeat the chartering and asset-level financing model for subsequent units.
▸
Asked how Golar will choose between Seatrium and CIMC for the next unit and whether the yards offer different advantages.
Alexander Bidwell · Webber Research & Advisory
Golar is comfortable with both shipyards. Selection will primarily depend on price, payment terms and delivery timing, with charterer preferences also potentially relevant. A Mark I would likely be built at Seatrium.
▸
Asked for the cost difference between Esperanza’s approximately $2.2 billion budget and the second Mark II conversion’s $2.45 billion budget.
Alexander Bidwell · Webber Research & Advisory
The approximately 10% increase reflects inflation in long-lead equipment, steel-price increases and currency movements. Some long-lead items have risen 40%–60%, so Golar views the total increase as favorable. The $2.45 billion budget is an all-in delivered cost, including EPC, training, bunkering, transport and mooring.
▸
Asked why Golar chose a Mark II for unit four and whether that decision reflects progress in charter discussions.
Sherif Elmaghrabi · BTIG
The Mark II was selected because it has the strongest charter interest for relatively near-term employment, the most attractive CapEx per tonne and OpEx per MMBtu, and active demand associated with the relevant gas reserves. Esperanza’s construction performance also increased confidence in CIMC.
▸
Asked when the additional yard options expire and how long the optional units would take to be delivered.
Sherif Elmaghrabi · BTIG
Golar considers the precise option-expiry dates commercially sensitive and did not disclose them. Delivery would generally be around 38–40 months, depending on the shipyard and timing.
▸
Asked whether unit five could be deployed alongside unit four in the same country, as in Argentina, or whether opportunities are more geographically diversified.
Christopher Robertson · Deutsche Bank
Both scenarios are possible. Some countries can accommodate multiple FLNGs, while others want only one. Argentina has potential for several additional units, and Mozambique is also taking multiple units from ENI. Golar generally prefers to start with one unit and expand, supported by its new option package.
▸
Asked how the fourth-unit FID and expansion pathway relate to the ongoing strategic review and when the review might conclude.
Christopher Robertson · Deutsche Bank
The strategic review remains ongoing. Its objectives are to address a perceived valuation gap and accelerate FLNG growth. Management will not comment on timing, outcome or details until there is material information or the Board ends the review.
▸
Asked whether the previously provided timeline and CapEx guidance for Hilli’s refurbishment and redeployment remain unchanged.
Christopher Robertson · Deutsche Bank
The Hilli refurbishment and redeployment budget remains approximately $350 million, measured from departure from Cameroon through arrival and commissioning in Argentina.
▸
Asked about unit four’s CapEx schedule, including delivery timing and the sequence of cash spending.
Jostein Aschjem · Clarksons
Unit four will use pay-as-you-go payment terms, but its CapEx curve has been negotiated substantially lower than Esperanza’s, particularly during the first two construction years. This reduces near-term cash outlays while Esperanza is being completed; delivery remains targeted for 2029.
▸
Asked whether Golar will begin ordering long-lead equipment for optional units and how much it is willing to commit.
Jostein Aschjem · Clarksons
When ordering unit four, Golar secured packages for most potential unit-five long-lead items at no incremental cost, with total incremental cost below $1 million. These options have time limits; extensions may be possible but could result in later delivery because of equipment scarcity.
▸
Asked about geographic and credit-quality preferences for the fourth charter counterparty and what investors should look for.
Sunil Sibal · Seaport Global
Golar is in advanced discussions across several geographies with NOCs, independents and IOCs. Counterparty credit affects contract structure and financeability, with IOCs generally easier to finance, while other buyers may offer more commodity upside. Golar will balance credit protection, economic returns, equity returns and leverage.
▸
Asked whether the desired ultimate leverage for a four-unit fleet would remain around the prior 3–3.5 times net debt-to-EBITDA range or become more aggressive.
Sunil Sibal · Seaport Global
Golar does not intend to overextend its balance sheet. Asset-level financing has reached approximately 5.5 times EBITDA in suitable structures, and substantial liquidity could be released by refinancing Hilli and financing Esperanza. As additional contracted EBITDA is secured, management expects leverage ratios to remain broadly stable rather than rise materially.

Options

Chain Snapshot (daily)

Call IV (ATM)28%
Put IV (ATM)48%
ATM Spread1.4%
Call $OI (near money)$2.6M
Put $OI (near money)$3.8M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$46.0
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$42.00$3.40/$4.301$0.80/$1.3069
$43.00$2.80/$3.800$1.15/$1.6027
$44.00$2.55/$3.000$1.50/$2.10206
$45.00$1.80/$2.45115$2.00/$2.603,539
$46.00$1.40/$2.052$2.75/$3.5054
$47.00$1.10/$1.707$3.20/$4.00199
$48.00$0.80/$1.605$4.10/$5.0066
$49.00$0.85/$1.35122$4.90/$5.808
Snapshot: 2026-11-04

Short Interest

Short % of Float10.8%
Short Shares9.3M
Days to Cover6.8
Change (vs Prior)+0.3%
Short % Float History
10.80%+2.80pp
7.0%8.0%9.0%10.0%11.0%12.0%10-1512-3103-1305-2908-1410-30

Cash Runway

43.7months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
Naria Inc.$513M$41.01+$0+$0—$513M
Rubric Capital Management LP$457M$37.90+$0+$0—$10.90B
T. Rowe Price Investment Management, Inc.$314M$47.19+$71.3M+$314M—$152.57B
BlackRock, Inc.Passive$278M$36.18+$15.5M−$3.6M—$6.70T
Sachem Head Capital Management LP$180M$49.84+$180M+$180M—$4.82B
MORGAN STANLEY$100M$28.42−$11.7M+$7.4M—$1.88T
Invesco Ltd.$100.0M$44.50+$27.5M+$60.3M—$1.26T
STATE STREET CORPPassive$90.5M$27.77+$1.5M−$4.9M—$3.38T
Rokos Capital Management LLP$89.6M$52.62+$31.3M+$89.6M—$7.96B
Wolf Hill Capital Management, LP$80.5M$38.97+$5.9M−$57.5M—$1.03B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

07.9M15.8M23.7M31.6M$18$27$36$45$542021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Naria Inc.10.3MRubric Capital Management LP9.2MT. Rowe Price Investment Management, Inc.6.3MOrbis Allan Gray Ltd—MILLENNIUM MANAGEMENT LLC64KSachem Head Capital Management LP3.6MJefferies Financial Group Inc.—PointState Capital LP—MORGAN STANLEY2.0MTOMS Capital Investment Management LP87K

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
CXWCoreCivic, Inc.469.07×
KBRKBR, Inc.365.93×
GDSGDS Holdings Limited456.88×
GEOThe GEO Group, Inc.456.88×
GCIGannett Co., Inc.453.72×
TLNTalen Energy Corporation848.35×
PFGCPerformance Food Group Co345.33×
CTRICenturi Holdings, Inc.345.33×
ALKAlaska Air Group, Inc.342.66×
PRMBPrimo Brands Corporation440.29×
CELHCelsius Holdings, Inc.340.29×
SHCSotera Health Company438.68×

Analyst Coverage

Analyst Coverage
Price Targets
Last Quarter (1 analysts)$75.00+91.1%
Last Year (6 analysts)$66.50+69.5%
Current Price$39.24
Analyst Ratings
30
13
4
Strong Buy: 1Buy: 30Hold: 13Sell: 4Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2004 Q363M10M7M$0.31$0.24 – $0.3713
2005 Q282M-9M-9M$0.42$0.34 – $0.5115
2006 Q161M39M30M$0.31$0.25 – $0.3715
2006 Q281M34M26M$0.41$0.32 – $0.4920
2006 Q383M-9M-9M$0.37$0.30 – $0.4413
2007 Q185M97M74M$0.48$0.38 – $0.5814
2007 Q383M15M-13M$0.32$0.25 – $0.3814
2007 Q457M108M1M$0.14$0.11 – $0.1718
2008 Q1137M5M-22M$0.20$0.16 – $0.2420
2008 Q223M—45M$0.15$0.12 – $0.1815
2008 Q393M—122M$0.19$0.15 – $0.2310
2008 Q4119M-10M-130M$0.05$0.04 – $0.0615
2009 Q17M3M-28M$-0.05$-0.06 – $-0.0416
2009 Q239M42M10M$-0.08$-0.10 – $-0.0617
2009 Q350M30M-1M$-0.02$-0.02 – $-0.0218
2009 Q415M—19M$0.13$0.10 – $0.1518
2010 Q113M12M-15M$0.05$0.04 – $0.067
2010 Q249M12M-16M$0.20$0.16 – $0.2413
2010 Q3176M27M6M$0.22$0.17 – $0.2610
2011 Q179M49M19M$0.32$0.26 – $0.3812
2011 Q285M24M-1M$0.26$0.21 – $0.3110
2011 Q492M49M19M$0.28$0.22 – $0.3415
2012 Q1109M53M20M$0.34$0.27 – $0.4113
2012 Q2109M77M36M$0.46$0.37 – $0.5517
2012 Q3121M90M45M$0.56$0.45 – $0.6718
2013 Q143M—100M$0.41$0.33 – $0.499
2013 Q249M—75M$0.31$0.24 – $0.3711
2014 Q17M—16M$-0.11$-0.13 – $-0.0913
2014 Q26M-18M-37M$-0.11$-0.13 – $-0.0918
2014 Q4477M-578M-601M$0.14$0.11 – $0.168
2015 Q11M—532M$-0.24$-0.29 – $-0.197
2015 Q219M—24M$-0.30$-0.35 – $-0.2418
2015 Q322M-68M-107M$-0.22$-0.26 – $-0.1815
2016 Q214M-39M-86M$-0.43$-0.52 – $-0.3412
2016 Q325M15M-17M$-0.45$-0.54 – $-0.3611
2016 Q425M44M9M$-0.40$-0.48 – $-0.327
2017 Q110M16M-29M$-0.14$-0.17 – $-0.117
2017 Q222M9M-51M$-0.27$-0.32 – $-0.2219
2017 Q325M1M-31M$-0.26$-0.31 – $-0.2113
2018 Q152M15M-15M$-0.12$-0.14 – $-0.0920
2018 Q218M—48M$-0.25$-0.30 – $-0.2016
2018 Q330M—125M$-0.21$-0.25 – $-0.1710
2018 Q463M-212M-271M$0.13$0.10 – $0.1618
2019 Q1106M33M-24M$-0.21$-0.23 – $-0.189
2019 Q296M-35M-87M$-0.31$-0.34 – $-0.2711
2019 Q3103M2M-43M$-0.25$-0.28 – $-0.229
2019 Q4134M78M27M$0.06$0.06 – $0.079
2020 Q1118M-2.1B-2.2B$-0.04$-0.05 – $-0.049
2020 Q295M-20M-64M$-0.14$-0.16 – $-0.138
2020 Q388M29M-14M$-0.15$-0.17 – $-0.1314
2020 Q4107M51M7M$0.08$0.07 – $0.099
2021 Q1110M131M82M$0.06$0.05 – $0.068
2021 Q2104M—435M$0.04$0.04 – $0.051
2021 Q3101M-113M-153M$-0.04$-0.04 – $-0.031
2021 Q4113M46M14M$0.11$0.10 – $0.121
2022 Q1106M—608M$0.23$0.20 – $0.262
2022 Q281M—550M$0.22$0.19 – $0.242
2022 Q370M-156M-169M$0.35$0.30 – $0.392
2022 Q468M28M8M$0.52$0.45 – $0.582
2023 Q169M—669M$0.66$0.57 – $0.731
2023 Q265M—605M$0.49$0.43 – $0.551
2023 Q367M-173M-186M$0.51$0.45 – $0.734
2023 Q472M24M9M$0.52$0.49 – $0.554
2024 Q172M—736M$0.40$0.32 – $0.514
2024 Q263M82M52M$0.42$0.32 – $0.474
2024 Q367M67M41M$0.40$0.34 – $0.461
2024 Q468M64M39M$0.38$0.33 – $0.424
2025 Q166M39M20M$0.19$0.16 – $0.222
2025 Q275M41M22M$0.22$0.16 – $0.272
2025 Q3125M76M42M$0.41$0.32 – $0.493
2025 Q4129M92M43M$0.42$0.38 – $0.453
2026 Q1130M95M42M$0.41$0.20 – $0.603
2026 Q2131M109M56M$0.55$0.35 – $0.733
2026 Q379M46M4M$0.04$-0.18 – $0.374
2026 Q473M37M-6M$-0.06$-0.19 – $0.064
2027 Q173M30M-16M$-0.16$-0.18 – $-0.131
2027 Q271M28M-21M$-0.20$-0.23 – $-0.171
2027 Q3141M105M40M$0.39$0.33 – $0.441
2027 Q4160M134M57M$0.56$0.48 – $0.631
2028 Q1153M138M56M$0.55$0.47 – $0.622
2028 Q2153M141M54M$0.53$0.45 – $0.602
2028 Q3221M226M113M$1.11$0.95 – $1.262
2028 Q4274M294M158M$1.54$1.32 – $1.762
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Golar is transitioning from a volatile and capital-intensive LNG shipping/infrastructure hybrid into a contracted FLNG platform. The operating evidence is strong: Gimi is outperforming its contracted capacity, Hilli completed its Cameroon contract with 100% economic uptime, and the backlog provides unusually high long-term visibility. Hilli's Argentine redeployment and Esperanza are the key near-term value inflection points. The company nevertheless remains in the difficult middle of a large investment cycle. TTM adjusted EBITDA is $249M, but adjusted FCF is negative $571M and net debt is $1.7B, or 6.8x adjusted EBITDA. Management expects asset-level refinancing and contracted EBITDA growth to improve this profile, but those benefits depend on execution, financing terms and the timing of Argentine infrastructure. The fourth-unit order expands the opportunity set but is not yet backed by a disclosed long-term charter, so its value should not be fully capitalized today. The most likely outcome is materially higher earnings by 2028, with the three-unit platform operating closer to its intended run rate and owner earnings recovering as construction intensity moderates. The long-term franchise is attractive, but the range of outcomes remains wide because of project finance, commodity exposure, construction risk and emerging-market counterparties.

Trade Signal

Trade rating
-4.8/10
No trade
Horizon
~9mo
gpt-5.6-luna2026-08-13 · saw $50.96-20.6% since

Short, but not aggressively: GLNG's excellent FLNG growth story is already capitalized at $51, while negative FCF, leverage and Argentina execution risk leave the stock roughly 32% above the analyst's fair value.

Temporary mispricing-1.0

The stock rallied from about $37 at year-end 2025 to $57 in May, likely as the market capitalized Q1's 158% year-over-year EBITDA growth, Gimi's first full quarter and progress toward the Argentina platform. It then fell to roughly $49-$51 through June and July as investors digested valuation, the investment cycle and execution risk, before drifting modestly higher into earnings. Q2 was operationally strong and included the fourth-FLNG order, yet the price moved only from $51.07 to $51.21 on the earnings day. That is not a panic overreaction; if anything, the lack of a positive response indicates the favorable news was already priced. The move is mostly a durable valuation repricing risk rather than a temporary dislocation, although an unexpected refinancing or charter could force a further upside squeeze.

Market view+5.0

The market is constructive to bullish: analyst consensus is Buy, the average one-year target is $59.67, and the stock has risen 30% over the past year despite a modest pullback from $57.36. Bulls emphasize scarce FLNG capacity, strong operating performance, long-term contracts and the Argentina growth platform. Bears focus on negative FCF, 6.8x net debt/adjusted EBITDA, capital intensity, commodity exposure, Argentina infrastructure risk and valuation. The near-zero reaction to strong Q2 results suggests good news is already well anticipated rather than ignored. Short interest has declined from roughly 11% early in 2026 to 7.9%, consistent with a less-bearish positioning backdrop, while call open interest is materially larger than put open interest.

Inflectionwindow ~9mo+3.0

The operational trajectory is genuinely positive: Gimi is outperforming, Hilli has completed its existing contract successfully, and Hilli plus Esperanza should materially increase contracted earnings from 2027-2028 onward. However, the inflection is substantially visible in consensus estimates, which show EBITDA rising sharply into late 2028, and the current price already reflects a successful transition. The unchartered fourth unit is optionality rather than present value, while Argentina pipeline timing and refinancing are unresolved execution variables.

Catalysts
  • ▲2026-11 · Q3 2026 earnings and Hilli transition update — Investors will assess Gimi utilization, Hilli's shipyard progress, transition spending and any confirmation that the Argentina redeployment remains on schedule.
  • ▲H2 2026 · Hilli Singapore upgrade and refinancing milestones — Completion of the shipyard work and asset-level financing could reduce balance-sheet concerns and release substantial liquidity, though execution or cost overruns would be negative.
  • ▲Late 2026 to 2027 · Fourth FLNG charter / final investment commitment — A high-quality long-term charter would validate the expansion strategy and support management's $1.2B-plus 2030 contracted EBITDA outlook; ordering without a charter would increase risk.
  • ▲H2 2027 · Hilli Argentina contract commencement — The planned 20-year contract is the key earnings step-up, but the San Matías pipeline timing creates meaningful risk to the targeted H2 2027 start.
  • ▲Late 2027 to H2 2028 · Esperanza sail-away and Argentina start-up — On-time, on-budget delivery would provide the next major contracted EBITDA inflection; delays or cost pressure would expose the valuation premium.
Flow+1.0

No major buyback or imminent tender is identified. Reported share-count dilution is modestly favorable at -3% TTM, while the dividend supports demand; however, ongoing project capex, financing needs and possible equity or equity-linked funding remain risks. Short interest is 7.9% of float with 8.3 days to cover, providing some squeeze fuel against a short. Passive holders are stable and active-holder churn appears limited.

Floor / Ceiling+2.0

There is no hard floor near today's price. Golar has valuable contracted FLNG assets, approximately $1.5B of liquidity and potential refinancing proceeds, but net debt is about $1.7B, adjusted FCF is negative $571M and the business remains in a heavy investment cycle. Asset value and long-term contracts provide support well below the current price, while the $31.74-$34.91 analyst value range is a more credible near-term anchor than the current quotation. There is also no absolute ceiling, but the stock's high valuation and likely sellers around the $55-$57 prior high constrain upside.

Buyability

Highly buyable as a listed, liquid FLNG pure play with contracted 20-year cash flows, a growing platform, institutional ownership and a recurring dividend. The next marginal buyers are growth-oriented energy and infrastructure investors, but at $51 the stock already requires successful execution of Hilli, Esperanza and future units; the negative current FCF and Argentina exposure limit its appeal to value buyers.

Fear vs Greedfear 6/10 (+1.0)greed 8/10 (+3.0)

Fear is slightly stronger than greed at $51: the business is operationally impressive, but the price discounts much of the 2027-2028 earnings ramp while current owner earnings and FCF remain weak. The main risk is not business failure but paying today for successful execution several years ahead.

Valuation

Our Target
$3.4B-15%
Market Should Pay
$3.2B-19%
target ×0.95 (fear discount)
Current Market Cap
$4.0BNeutral
What Changed
transcript · 2026-08-13
+8%fair value on this information

The genuinely new information is the firm order for a fourth Mark II FLNG, targeted for 2029, together with a potential 41% increase in controlled liquefaction capacity and management's estimate of more than $1.2B of contracted EBITDA annually by 2030 if the unit is chartered on comparable terms. The quarter also provided new evidence of operating momentum, with Q2 EBITDA up about 20% sequentially and liquidity including a new $600M revolver. The unit-four charter is not yet signed, and the strategic-review outcome remains undisclosed.

▸ How the cases moved

The Q2 event raises the base case from roughly $4,100M to $4,480M as EBITDA reached $127M, Hilli's Argentine redeployment remained on budget, and the fourth-unit order became firm. The bull case rises from roughly $6,200M to $7,008M because unit four, options on unit five and additional yard arrangements make a scaled platform more credible; bull probability increases from 0.20 to 0.25. The bear case is little changed in absolute value at $1,800M, but its probability falls from 0.30 to 0.25 because liquidity increased to approximately $1.5B and unit-four payment terms reduce near-term cash pressure. Base probability rises from 0.50 to 0.50 after the offsetting probability changes.

2-Year Plausible Outcomes
bear25%
$1.8B
rev +5%/yrOE $180M

Hilli's redeployment or the Argentine pipeline is delayed, Gimi remains below peak utilization, and Esperanza reaches service late or with cost pressure. Golar remains a valuable contracted FLNG operator, but heavy project spending and leverage prevent much deleveraging. Growth capex continues to depress owner earnings, and investors apply a conservative earnings multiple.

▸ Valuation

10x $180M owner earnings = $1,800M equity value

base50%
$4.5B
rev +25%/yrOE $320M

Hilli begins its Argentine contract during 2027 and Esperanza starts operations in the second half of 2028, with broadly on-budget execution. The existing three-unit platform approaches management's roughly $800M EBITDA run-rate, though commodity-linked earnings remain variable. Asset-level refinancing releases liquidity and keeps corporate leverage manageable. Owner earnings improve as construction spending transitions toward maintenance and contract cash flow, but remain below EBITDA because of interest, taxes and residual project investment.

▸ Valuation

14x $320M owner earnings = $4,480M equity value

bull25%
$7.0B
rev +40%/yrOE $438M

Gimi continues to outperform, Hilli redeploys smoothly, Esperanza reaches service on schedule, and strong LNG pricing materially enhances Hilli, Esperanza and SESA-linked economics. Golar secures a high-quality charter for unit four and demonstrates that its conversion model can scale without balance-sheet stress. Owner earnings approach a substantial portion of the contracted EBITDA base as asset-level financing and operating cash flow absorb the growth investment.

▸ Valuation

16x $438M owner earnings = $7,008M equity value

▸ Target Rationale

The probability-weighted, discounted scenario value is $3,553.6M. I set the analytical target at $3,400M, below the model value, because the arithmetic does not fully capture the risk that large project capex, capitalized interest, Argentine infrastructure timing and refinancing requirements consume equity value before the contracted earnings arrive. I also give no substantial present value to the unchartered fourth unit beyond its strategic optionality. The discount is analytical rather than an additional sentiment penalty; sentiment is handled separately in the fear-greed modifier.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now7/10
Trajectory9/10
Risk6/10
Governance7/10
Insolvency prob (2yr)5%
Outcome uncertainty8/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

Golar LNG Limited (Golar) reported strong operational and financial performance in its Q1 2026 earnings release on May 20, 2026.

  • Financial Performance: Net income attributable to Golar rose significantly to $84 million in Q1 2026, compared to $8.2 million in Q1 2025. Adjusted EBITDA increased 158% year-over-year to $106 million. The company ended the quarter with $1.0 billion in total cash. Golar declared a dividend of $0.25 per share for the quarter.
  • Core FLNG Operations: The primary driver of the earnings surge was the *FLNG Gimi*, which completed its first full quarter under its 20-year lease and overproduced by 19% compared to its contractually committed volume. *FLNG Hilli* maintained 100% economic uptime and offloaded its 150th cargo during the quarter.
  • Argentina Export Milestones: Southern Energy S.A. (SESA, the joint venture enabling Argentina’s LNG exports) signed an 8-year LNG supply agreement with Securing Energy for Europe (SEFE) for up to 2 million tonnes of LNG per annum, commencing in 2027. The conversion of Golar’s third vessel, *MKII FLNG* (slated for Argentine deployment in 2028), remains on time and on budget.
  • Strategic Initiatives: Golar divested its non-core investment in OLT Offshore Toscana S.p.A. and exited its remaining FSRU operations and maintenance contract to focus purely on FLNG. Most notably, the company engaged Goldman Sachs to evaluate strategic alternatives to maximize stakeholder value. It maintains a target to order its 4th FLNG vessel within 2026.
▸ Thesis-test Findings
Golar LNG Hilli Singapore shipyard upgrade status

Following the conclusion of its current contract in Cameroon in July 2026, the *FLNG Hilli* is scheduled to enter Seatrium's Singapore shipyard in the third quarter of 2026. Golar and Seatrium finalized the upgrade contract, which includes technical modifications, engineering, procurement of long-lead items, winterization, and the installation of a new soft-yoke mooring system. The upgrades and life-extension works are designed to prepare the vessel for its 20-year charter offshore Argentina, expected to begin in the second half of 2027. Golar has budgeted approximately $350 million to cover the upgrade, positioning, fuel, insurance, and operating costs during this transition period. This confirms that the critical shipyard slot is secured and budgeted, supporting the bull case for a seamless transition to the highly lucrative Argentine contract.

Argentina Vaca Muerta LNG export terminal pipeline San Matias progress

The infrastructure required to feed Golar's planned Argentine operations made substantial regulatory and physical progress in the first half of 2026. In April 2026, the San Matías Pipeline consortium—composed of YPF, Pan American Energy, Pampa Energía, Harbour Energy, and Golar LNG—unanimously awarded a $1.3 billion EPC contract for the pipeline’s construction to a joint venture between Italy's Sicim and Argentina’s Víctor Contreras. This followed a previous pipe-supply contract awarded to India's Welspun Group. Furthermore, in June 2026, Argentina’s RIGI committee officially approved the project under the country’s Large Investment Incentive Regime. The 471-kilometer, 36-inch pipeline will transport up to 27 million cubic meters of gas per day from Vaca Muerta to the San Matías Gulf. While physical progress is accelerating, the pipeline is expected to be fully operational before the winter of 2028. This represents a potential minor timeline mismatch (bear case) relative to the *Hilli's* targeted H2 2027 startup, though it fully aligns with the late-2028 arrival of Golar's second vessel, the *MKII*.

FLNG market competitors cost per ton liquefaction 2026

Recent industry reports indicate that Golar’s conversion-heavy business model remains highly cost-competitive compared to both onshore projects and peer FLNG developments. Historically, pioneer newbuild FLNG projects like Shell's *Prelude* suffered from extreme cost inflation, ballooning to $2,114 per ton for liquefaction. As the FLNG industry has matured, average capital intensity for sanctioned FLNGs settled at roughly $850 per ton between 2023 and 2026, representing a 29% discount compared to onshore builds. Competitor projects utilizing newbuild or semi-modular models, such as the proposed US Gulf Coast projects (e.g., Delfin FLNG at $1,134/ton) and Eni’s Coral South in Mozambique ($1,062/ton), exhibit higher unit costs. In comparison, Golar’s focus on utilizing vessel conversions (such as the $1.2 billion conversion of the *Hilli* completed in 36 months) provides a stark capital-expenditure advantage and a faster time-to-market, reinforcing Golar's position as a low-cost, high-return leader in the FLNG space.