Stocks/GMG.AX

GMG.AX

Goodman Groupv3 4.5/10 · 2026-10-16
Real Estate·REIT - Diversified
28.31 AUD
57.6B AUD market cap
1.1% div yield
v3 Rating
4.5/103.5–6.0
Setup
4.0/102.5–6.0
Fair Value
23.50 AUD17.00 AUD–32.00 AUD-17%
DCF (10%)
15.00 AUD-47%
Base IRR
+7%-5%–+14%
Visibility
moderate±32%
Rating
Revenue (TTM)
2.7B AUD
Owner Earnings
A$2.2B
Next-Yr Owner Earnings
A$895M
Growth
+9.0% × 6y
P / Next-Yr OE
64.7x
Net Debt
A$2.3B

Goodman Group operates as a globally integrated real estate enterprise, with active operations spanning Australia, New Zealand, Asia, Continental Europe, the United Kingdom, North America, and Brazil. Comprising the stapled entities Goodman Limited, Goodman Industrial Trust, and Goodman Logistics (HK) Limited, it is recognized as the leading industrial property firm listed on the Australian Securities Exchange. Additionally, it ranks among the world's foremost publicly traded specialist investment managers focused on industrial real estate and commercial business spaces. By utilizing its vast global property expertise, an integrated service model encompassing property ownership, development, and management, and a substantial investment management platform, Goodman is equipped to deliver innovative property solutions that precisely match individual client requirements, all while aiming to achieve sustained long-term returns for its investors.

2-Year Price History

$27.31-22.5%
$24$26$28$30$32$34$36Initial target $23.50 · 2026-10-16volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-16

Rating
4.53.5–6.0
Setup
4.02.5–6.0
Fair value (AUD)
23.5017.00 – 32.00
Upside vs 28.31
-17%
DCF (10%)
15.0011.00 – 23.00-47%
Base IRR
7%-5% – 14%
Visibility
moderaterange ±32%
Sentiment
5/10
2026-10-16 · claude-opus-5-5 · priced at 26.39

Goodman Group (ASX:GMG; A$26.39 on 16 Oct 2026, the latest quote I could find; the pack's A$26.61 is stale) is the A$89bn global industrial-property developer and fund manager that has turned itself into a metro data-centre developer. Data centres are 78% of its A$19.7bn development work-in-progress (WIP): 0.5 GW is under construction and its power bank is 6.4 GW. About 90% of the data-centre program is held in partnerships with CPPIB, PGGM, APG and others. The machine is working: FY26 operating EPS rose 10.1% to 129.9c, FY27 is guided +9%, gearing is 6.5%, the founder-CEO owns ~37m securities, and a 20-year hyperscaler lease was signed in Tokyo. But the price still asks a lot. It is 20.3x trailing and 18.6x FY27 operating EPS, and that headline excludes a A$466m share-based-pay bill (17% of operating profit, up 31% y/y). After stock pay the stock trades at ~24.6x trailing earnings and 2.24x NTA, with a 1.1% yield. Free cash flow is negative because retained earnings pour into a WIP that is only 25% committed (13% of FY26 starts were pre-leased). The macro has turned against the model. The Australian 10-year is ~5.4% (a 15-year high) and the RBA is hiking, so the risk-free rate now sits above Goodman's 5.0% portfolio cap rate. AirTrunk pulled its Singapore data-centre REIT even at a 6% yield, and Firmus abandoned its float. That is the exit market Goodman needs for selling stabilised data centres. A 10%-discount DCF gives ~A$15: the business earns ~11-13% on its equity, so at a 10% hurdle it is worth little more than 1.3x book. My blended fair value is ~A$23.5, and the base case returns ~6-7% a year from here. Rating 4.5/10: a top-quality franchise priced for its success. It is not a short: leverage is low, the founder is aligned, and leasing at LAX, Hong Kong and Amsterdam plus the Australian data-centre partnership due 1H FY27 could re-rate it 20-30%. But it falls well short of a 14% hurdle. Research 4/10: a heavily covered mega-cap where the one question that matters is what stabilised data centres actually sell for in 2027 against Goodman's 9-11% yield on cost. That gets resolved by watching deals, not by digging.

A deep dive would have to establish: Whether stabilised, hyperscaler-leased metro data centres can still be sold or partnered at ~5.5% yields in 2027 (versus AirTrunk failing at 6%) fast enough to convert Goodman's mostly uncommitted A$15bn data-centre WIP into 9%+ EPS growth after stock-based pay, which is what the 2.2x-NTA price requires.

Owner earnings, TTM
A$2.2BA$1.9B – A$2.5B
Realistic peak profit
A$3.8BA$2.8B – A$5.5B
Growth rate
9.0%3.0% – 13.0%
Years of growth
63 – 10
Market cap
A$54BA$54B – A$54B
EV
A$56BA$56B – A$57B
Net debt
A$2.3BA$1.9B – A$3.0B
Capital return / cap
1.1%0.9% – 1.2%
P/E
22.5×18.4× – 24.6×
EV/EBITDA
20.2×18.5× – 24.3×
FCF yield
4.0%-1.6% – 4.5%
Projected FCF, base case (AUD millions)
Y1A$895M-A$800M – A$1.3B
Y2A$980M-A$600M – A$1.4B
Y3A$1.1B-A$300M – A$1.6B
Y4A$1.2BA$0M – A$1.9B
Y5A$1.3BA$200M – A$2.1B
Competition: Logistics peers Prologis, Segro, ESR, CapitaLand/Mapletree and Blackstone, plus data-centre developers and operators AirTrunk (Blackstone), NextDC, CDC, Equinix, Digital Realty, Vantage and STACK, with hyperscaler self-build; Goodman's edge is secured power and planning on metro land it already owns, plus captive long-dated partnership capital.
Governance: A$466m of share-based pay (17% of operating profit, up 31% y/y) is excluded from the operating EPS that also sets LTIP vesting; part of development profit comes from selling powered sites into Goodman-managed partnerships where it is both manager and 50% owner; only 84.4% backed the 2025 remuneration report; offset by founder-CEO Greg Goodman owning ~37m securities (~A$975m).
Research (expand)
What the company does

Goodman is a stapled group (Goodman Limited / Goodman Industrial Trust / Goodman Logistics HK) that owns, develops and manages industrial property and, increasingly, data centres in gateway cities across Australia/NZ, Asia, Europe/UK and the Americas. Total portfolio is A$89.0bn. Of that, A$75.4bn is third-party partnership AUM across 26 partnerships, where Goodman is manager and cornerstone co-investor. Goodman's own share of property is ~A$31bn look-through. It earns money three ways:

| FY26 (A$m) | Amount | Notes |

|---|---|---|

| Property investment | 722.1 | +7%; mostly its share of partnership earnings (partnerships flat at A$521.6m); LFL NPI +4.0%, occupancy 95.6% (from 96.5%), WACR 5.0% |

| Management | 690.1 | −18%: base fees + property services A$483.9m (~0.70% of A$68.7bn avg stabilised AUM), performance/transaction fees fell to A$206m from A$372m |

| Development | 1,792.2 | +34%; includes A$733.7m realisation of prior-year revaluation gains and sales of Paris/Amsterdam/Frankfurt data-centre sites to its own 50%-owned European DC partnership (GEDCDP I, with CPPIB) and the LA site to a DataBank JV |

| Operating expenses | (419.7) | flattered by higher capitalisation of staff costs into developments |

| Net interest | +109.1 | includes FX hedge gains and capitalised interest; management guides FY27 to ~zero |

| Tax | (219.3) | |

| Operating profit | 2,674.5 | 129.9c/security on 2,058.7m diluted |

| Share-based pay (excluded) | (465.8) | 356.2 in FY25; equity-settled 282.6, cash-settled 135.8 (funded by issuing securities), other 47.4 |

| Statutory profit | 2,778.7 | includes A$3.1bn of gross valuation gains (Group share A$963m) and A$380m derivative gains |

The investment case

1. Powered metro land is the scarce input for AI inference and cloud. Goodman spent five years assembling a 6.4 GW power bank (3.6 GW secured) in 16 cities on land it already owned or bought, plus planning know-how and long-dated capital partners. It is now converting this into fully fitted data centres: A$15.4bn of DC WIP, 10 projects in 8 cities, delivery staged 2027-2030 with most first ready-for-service dates in calendar 2028. Commencements are underwritten at a 9.2% yield on cost, and management says 9.5-11% for fitted DCs outside Japan and Hong Kong. Against stabilised DC values at ~5.5-6.5% yields, that is a 30-40% margin on end value.

2. The capital-light flywheel. Goodman originates the development and sells or partners it into vehicles it manages (FY26: four new partnerships, ~A$3.2bn of third-party equity, US$455m raised for the HK DC partnership in Sept 2026 from PGGM, APG, CPPIB, CBRE IM and others). It collects development profit, development-management fees, then ~0.9% base fees on stabilised AUM, plus performance fees and its co-investment share. The production rate rose to >A$7.5bn/yr from A$6.1bn.

3. Balance-sheet optionality. Gearing is 6.5% (19.5% look-through), with A$6.4bn of Group liquidity plus A$12.4bn in the partnerships. Debt is BBB+/Baa1, with 7.5-year average maturity and a ~1% net hedged cost.

4. Track record. Operating EPS went 65.6c (FY21) → 81.3 → 94.3 → 107.5 → 118.0 → 129.9c (FY26), a 14.6% 5-year CAGR, beating guidance each year. TSR was 424% over 10 years.

5. Logistics is not dead. Large automated, power-hungry warehouses could be a A$3bn development opportunity in Australia alone (management).

What it earns today
  • Headline: A$2,675m operating profit (129.9c).
  • What I count as real: operating profit minus stock pay = A$2,209m (107c). SBC is a real cost: securities on issue rose 2,031.2m → 2,044.8m and the FY26 LTIP cash was funded by issuing A$123m of new stock.
  • Cash conversion: operating cash flow A$1,921m (A$960m FY25). The gap to operating profit is development profit booked in investing cash flows (A$440m), working capital and performance fees taken in units. Group free cash flow after investing was −A$0.84bn in FY26 and −A$2.5bn in FY25, which was funded by a A$4bn placement.
  • Distribution policy: distribution is held flat at 30c (A$611m paid), so ~75% of operating profit is retained for WIP and co-investment.
  • Quality notes: FY26 had A$734m of crystallised revaluation gains, one-off powered-land sales into Goodman-managed partnerships (Goodman sits on both sides as manager and 50% owner), capitalised interest and staff costs, and A$100m+ of FX/hedge-driven interest income that won't repeat. Development earnings are guided to be "not below FY26" and back-half weighted, and Tokyo will not be sold down in FY27.
What it could earn at maturity
  • The DC book: if the A$15bn DC WIP leases and stabilises over 2027-2030, it drives development profit, base fees on +A$20-30bn of AUM and co-investment income.
  • Base case: a realistic run-rate around FY31-33 is ~A$4.5bn of operating profit, or ~A$3.8bn after stock pay. That is ~9% compound growth: development ~A$2.5bn on an A$9-10bn production rate, base fees ~A$0.9-1.0bn, investment ~A$1.0bn.
  • Bull case: continuous DC leasing across the 6.4 GW bank, holdco sell-downs at ~5.5% yields and logistics automation give 12-13% growth and A$5bn+.
  • Bear case: leasing slips, exit yields move to 6.5-7% and transactions stall. Development earnings fall back toward FY24-25 levels (A$1.3bn) and growth runs at 0-4%.
  • Capital returns: incremental return on equity has run ~11-13% on an operating basis, with history flattered by a decade of cap-rate compression that is now reversing.
Fair value and the multiples we are paying
  • Market value: market cap A$53.96bn (2,044.8m securities × A$26.39). Balance-sheet net debt was A$1.95bn at 30 June; I assume ~A$2.25bn now given data-centre spending. Look-through net debt including partnerships is ~A$7.5-8bn.
  • P/E: 20.3x trailing operating EPS and 18.6x the FY27 target (consensus 143.4c → 18.4x). After stock pay it is 24.6x trailing and ~22.5x FY27.
  • EV/EBIT: ~20x on operating EBIT of A$2,785m, or ~24x after stock pay.
  • Book and yield: P/NTA is 2.24x (NTA A$11.79) and the distribution yield is 1.1%. The market-cap premium to NTA has shrunk from A$47bn (June 2025) to ~A$30bn.
  • Historical multiples: at 30 June the stock traded at 22x (FY22), 21x (FY23), 32x (FY24), 29x (FY25) and 24x (FY26) trailing operating EPS. Today's 20x is the bottom of that range, but the Australian 10-year is ~5.4%, not 3-4%.
  • DCF at 10% (A$15/security):

- Base case: FCF to equity = earnings after stock pay minus the reinvestment needed for growth (9.5% growth at a 15% incremental return on equity, so 37% of earnings is free) for 5 years. Terminal: 4.5% growth at 13% ROE. Range A$11 (bear) to A$23 (13% growth, 20% ROE).

- Why it is so far below the price: at a 10% cost of equity, a business earning ~11-13% on book is worth ~1.2-1.5x book. The market's 2.2x requires either an ~8% discount rate or a long runway of 15%+ incremental returns.

  • Sum of the parts (~A$19-22):

- NTA risk-adjusted to ~A$11 for cap rates at 5.0% sitting below the bond yield

- fund management ~A$3.2

- development platform ~A$7-8 (≈A$1.35bn after-tax normalised development profit at 10-12x)

- minus stock pay capitalised at 12x (−A$2.7)

  • Fair value ~A$23.5 (range A$17-32), blending 17x FY27 operating EPS (A$24), the sum of the parts and the DCF.
  • Base IRR ~6.5%: stock-pay-adjusted EPS grows ~9.5%/yr to ~169c in FY31, exits at 20x and collects 30c a year in distributions. If the 22.5x multiple holds, the IRR is ~8.5%. Sell-side targets are A$30-35 (consensus A$33.75); Morningstar's fair value is A$29.
Risks and competition
  • Exit-market risk (the big one): the business model needs institutional buyers for stabilised data centres. AirTrunk's US$1.5bn Singapore DC REIT was pulled in October 2026 despite raising the yield from 5.5% to 6% and cutting asset values by ~S$400m, and Firmus abandoned its ASX float. Partners are still writing cheques (HK US$455m, Sept 2026), but holdco pricing at 6%+ would cut development margins and the performance fees tied to them.
  • Speculative build: only 13% of FY26 commencements and 25% of WIP were committed at 30 June (excluding Tokyo). "Advanced negotiations" at LAX, Hong Kong and Amsterdam have not yet become signed leases, and the Australian DC partnership slipped while new investors finish diligence. Goodman is also now an operator of fitted facilities (Tokyo), which is a new skill set.
  • Rates and NTA: the portfolio cap rate was compressed 12bp to 5.0% in FY26 while bond yields rose. With the Australian 10-year at ~5.4%, the RBA cash rate at 4.60% and more hikes priced, a 50bp cap-rate rise would cut ~A$1.4/security from NTA.
  • Tenant credit: hyperscaler CDS spreads have widened, and Goodman says it will favour the strongest credits. Capex growth is forecast to slow sharply after 2026 (UBS: +25% in 2027, +6% in 2028).
  • Earnings quality: stock pay is excluded from the KPI that also drives LTIP vesting (hurdles of 6-11% operating EPS CAGR to 177.7c in FY29). Profits come partly from selling land to self-managed vehicles. Performance fees swing ±A$150m.
  • Competition:

- Logistics: Prologis, Segro, ESR, CapitaLand/Mapletree, Blackstone, Charter Hall

- Data centres: AirTrunk (Blackstone), NextDC, CDC, Equinix, Digital Realty, Vantage, STACK, Keppel DC REIT, plus hyperscaler self-build

- Planning and power queues are a moat for incumbents with secured power. Goodman's ~30% share of Hong Kong DC capacity and its Tokyo/Sydney metro sites are hard to replicate.

How investors feel right now: 5/10
  • The stock: down ~24% from its A$34.78 52-week high, −17% over 12 months, −15% since 30 June (A$31.13), and −8% since the results (A$28.78). It fell 3.9% on 15 Oct on the AirTrunk news.
  • The sell-side is still constructive (UBS Buy A$33.66, Jarden OW A$32 cut from A$35.14, Macquarie Buy ~A$34.7, Goldman Buy A$32). But Bell Potter moved to Hold (A$30.10) and the tone is "execution and capital-intensity year". Commentary describes the market as no longer willing to pay the premium, and the multiple is compressing faster than estimates.
  • Short interest is low (~1%), so this is de-rating, not a bear raid.
  • Other: a shareholder-requisitioned resolution on data-centre community and environmental risk goes to the 19 Nov AGM.
  • Overall: respected but out of favour, a classic "great company, which multiple?" debate.
What to watch
  • Q1 FY27 operational update (~early-mid November)
  • AGM on 19 November
  • Signed leases at LAX, Hong Kong (HKG10) and Amsterdam (AMS01)
  • Closing of the Australian data-centre partnership (1H FY27)
  • Any holdco or stabilised data-centre transaction yields
  • Whether FY27 development earnings land in 2H as guided
Sources

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue2690+22%2690+22%2207+12%1962+0%1964
Gross profit1909+35%1909+35%1417+1%1406+6%1325
Operating expenses522-33%522-33%775-13%894+2%880
▸Adj EBITDA1387+117%1387+117%639+29%497+25%397
▸Adj OCF1921+153%1921+153%760-13%874-9%964
CapEx-41.3-41.3-6.40-10.5-13.0
Adj FCF1879+149%1879+149%753-13%864-9%951
Interest expense9.409.4051.569.565.2
▸Adj net income1309+170%1309+170%484-1282-713%209
▸Owner's earnings1150--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA5268100%2991100%2181100%-351447100%
FCF (OCF−capex)5282100%187963%95344%11781271284%
Net income5906112%277993%166676%-98.91560349%
▸Capital returned-6204-118%-1715-57%-5005-229%20730969%
Buybacks-4306-123-4045-70.3-67.2
Dividends14140.00285567562
Interest paid1969.4051.569.565.2
Debt paid down-3509-1601-1297-360-251
▸Reinvestment175133%23.61%188787%-22263.114%
Capex (PP&E)71.241.36.4010.513.0
Intangibles & M&A1704-24.61877-20153.0
Leases signed (net Δ)-24.26.903.20-31.4-2.90
Retained / other9977189%3629121%4132189%1242975218%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 966 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)3360333603315652382824073
▸Liabilities (total)86558655825562906048
Net debt (incl. leases)20102010131819382001
Net debt / Adj EBITDA1.451.452.063.905.04
Net debt / Adj FCF1.071.071.752.242.10
Adj EBITDA / interest14814812.47.156.08
Shares outstanding20552092199518991936
Dilution (YoY)+4.8%+4.8%+5.1%-1.9%+1.0%
Employees900--------
MarginsTTM2026202520242023
Gross margin71.0%+6.871.0%+6.864.2%-7.571.7%+4.267.5%
Adj EBITDA margin51.5%+22.651.5%+22.628.9%+3.625.3%+5.120.2%
Adj OCF margin71.4%+37.071.4%+37.034.4%-10.144.6%-4.549.1%
Adj FCF margin69.8%+35.769.8%+35.734.1%-9.944.0%-4.448.4%
Net income margin103.3%+27.8103.3%+27.875.5%+80.6-5.0%-84.579.4%
Adj NI margin48.6%+26.748.6%+26.721.9%+87.3-65.3%-76.010.7%
ROIC (adj, after-tax)4.2%4.2%2.0%1.8%1.6%
Cost of debt0.2%0.2%0.9%2.0%2.0%

Earnings Calls

2 calls

Earnings Call · 2026 Q4

2026-08-19

Goodman Group reported FY26 operating profit of $2.675 billion, with operating earnings per security up 10.1%, and is targeting 9% EPS growth in FY27. Management said its five-year strategy of repositioning toward large-scale logistics and digital infrastructure is gaining momentum. The group has sold or repositioned more than $8 billion of assets, while building a portfolio approaching $90 billion and a work-in-progress (WIP) book of almost $20 billion. Data centers now represent the central growth opportunity, with more than $15 billion of data-center WIP across 10 developments in eight metropolitan markets, representing nearly 500 megawatts of capacity. Around 90% of the data-center program is held through partnerships, supporting capital efficiency and risk sharing. The first 50-megawatt phase of the 1-gigawatt Tsukuba Tech Central project in Tokyo has been leased to a global hyperscaler under a 20-year agreement. The fully fitted and Goodman-operated facility is scheduled for service in early 2028. Management highlighted the lease as an important validation of its strategy, reflecting the value of securing land, power, fiber, planning and construction capability before signing customers. Leasing discussions are progressing at LAX, Hong Kong and Amsterdam, which management identified as the most advanced projects, with additional negotiations in Paris, Frankfurt, Sydney and Madrid. Further leases are expected during the calendar year, while additional projects outside the current WIP are expected to enter development as customer commitments progress. FY26 investment earnings rose 7%, or $44 million, despite a $16 million foreign-exchange translation headwind. Like-for-like rental growth contributed $20 million, while changes in investment holdings accounted for the balance. Management revenue declined by $147 million because performance and transactional revenue fell to $206 million from $372 million, although recurring management-services revenue increased by $28 million on a constant-currency basis. Third-party stabilized assets under management averaged $68.7 billion and ended the year at $75.4 billion of external AUM overall. Goodman continues to expect fee revenue to average approximately 0.9% of third-party stabilized AUM over time. Realized development earnings increased by $454 million, including $734 million from reversing previously recognized valuation gains on properties sold. Current WIP implies an annualized production rate above $7.5 billion, compared with $6 billion a year earlier. The mix has shifted toward more complex, fully fitted data centers, which require longer lead times and higher margins, while a larger proportion of work is being originated on balance sheet or in development partnerships, increasing the share of earnings realized in cash-based results. FY27 development earnings are expected to be weighted toward the second half. Goodman ended FY26 with 6.5% gearing, $6.4 billion of cash and undrawn facilities, and substantial remaining development capacity. Net weighted average cost of debt after hedging is about 1%, although FY27 net interest income will depend heavily on foreign exchange and cash balances. The group invested $2.4 billion into partnerships and raised significant debt and third-party equity during the year. Management emphasized disciplined capital deployment, continued partnering and selective risk-taking. It does not use a fixed development-assets-to-total-assets cap; instead, risks are assessed dynamically based on capital, earnings sensitivity, liquidity and project characteristics. Planning and power constraints are intensifying globally, but Goodman views its global footprint, approvals expertise, capital access and customer relationships as competitive advantages. Logistics is also expected to grow, with larger, more automated and power-intensive facilities potentially making Australia alone a $3 billion opportunity.

Analyst Q&A (34)
▸
Which data-center sites are in the most advanced leasing negotiations, and how should investors interpret the different negotiation labels on Slides 14 and 15?
Simon Chan · Morgan Stanley
LAX, Hong Kong and Amsterdam are the most advanced. Paris, Frankfurt, Sydney and Madrid are progressing but are at earlier stages; additional opportunities outside the current power bank are also being pursued. Goodman is deliberately patient to ensure construction and delivery risks are controlled before signing leases.
▸
Are the years shown on Slide 15 calendar years or fiscal years?
Simon Chan · Morgan Stanley
They are calendar years.
▸
How much data-center-related earnings, particularly in Europe, was included in FY26 EBITDA?
Simon Chan · Morgan Stanley
Management would not provide project-specific earnings because contract structures differ. Investors should assess activity levels, development-book profitability and fee income on stabilized AUM. Just under $6 billion of the approximately $90 billion portfolio is currently associated with data-center income, while development earnings have a high data-center component.
▸
Does management expect additional data centers to enter WIP beyond the projects shown on Slides 14 and 15?
Simon Chan · Morgan Stanley
Yes. The data-center program is expected to progress through FY27, with additional projects entering WIP, generally alongside customer commitments.
▸
For a leased data-center contract such as Tsukuba, how do management fees, development returns and eventual rental income flow through FY27-FY29?
Howard Penny · Citi
Recognition depends on the sale structure, which can range from presale to sale on completion. Development profit and performance fees are recognized according to the contract, development-management revenue accrues during construction, and the approximately 90-basis-point management fee begins once the asset enters stabilized third-party AUM. Goodman's equity share contributes investment income after stabilization.
▸
How has data-center investment affected operating cash flow relative to underlying operating earnings over the last three to four years?
Howard Penny · Citi
Because Goodman is growing, investment in inventory and development has typically exceeded the stabilized earnings run rate, weighing on operating cash flow. In addition, profits retained and reinvested within equity-accounted partnerships do not appear in operating cash flow. These accounting and reinvestment effects explain most of the gap; the group has retained earnings and capital to fund continued growth.
▸
Why has the Australian data-center partnership been delayed, and is the issue related to capital or power?
Cody Shield · UBS
The delay is unrelated to construction, power or site progress. Goodman is completing diligence and educating new gate investors who have not previously invested in a development partnership. Construction at Artarmon is progressing well, and marketing is expected to become more serious early next year.
▸
Where could logistics commencements reach in FY27, and could they exceed approximately $4 billion?
Cody Shield · UBS
Management said logistics should not be underestimated. Australia alone could represent about $3 billion, with larger, highly automated, power-intensive facilities increasing project values. The logistics opportunity is expected to be substantial over the next four to five years.
▸
Will the two San Jose sites be an FY27 opportunity, and are they still expected to be delivered as shells?
Cody Shield · UBS
The San Jose projects are progressing and should contribute in FY27. Management did not provide further detail on the shell configuration, emphasizing that many other opportunities are also being advanced from a global pipeline exceeding 10 gigawatts.
▸
How much Goodman and third-party capital currently supports the $19.7 billion data-center WIP, and how might that balance change over the next three years?
Tom Bodor · Jarden
About 90% of the projects are already in third-party arrangements and are largely funded with pre-agreed equity, with debt capacity also available in the partnerships. Management would not disclose the dollar amount because it would reveal project costs, but expects continued partnering and capital recycling.
▸
How long might it take for the next 0.5 gigawatts of data-center capacity to enter production after the approximately 0.5 gigawatts already commenced?
Tom Bodor · Jarden
Management did not provide a timetable. It wants to progress the existing nearly $20 billion WIP, add projects only when supported by customers, and avoid moving too quickly or taking excessive capital risk.
▸
Is the hyperscaler leasing the 50-megawatt Tokyo facility likely to deploy elsewhere in Goodman's global portfolio, or are decisions site-specific?
Tom Bodor · Jarden
Management would not comment on that customer specifically, but said it is discussing similar deployments with customers across multiple countries. Customer credit quality and contract certainty are critical to future holdco transactions, so Goodman will remain selective and patient.
▸
Why is the yield on cost for recent commencements approximately 9.1%, seemingly below the double-digit levels discussed six to twelve months ago, despite most data centers being fully fitted?
Adam Calvetti · Bank of America
Yields vary by geography, customer and facility type. Outside Japan and Hong Kong, fully fitted projects are generally in the high-9% to 11% range. A long-term hyperscaler prelease will sit toward the lower end, while colo facilities with enterprise users can achieve higher yields. The reported average also includes lower-yielding industrial projects and uses conservative assumptions; rents are rising while costs are largely locked.
▸
What leasing milestones are embedded in the 9% FY27 EPS-growth target, and does it include a potential Tokyo sell-down?
Adam Calvetti · Bank of America
There is no planned Tokyo sell-down assumption; Goodman expects to own the Tokyo asset long term with partners. Few assets are expected to be completed in FY27, so transfers may be limited, though presales are possible. The target includes a range of opportunities across projects at different stages, with additional partnerships likely to be created.
▸
How many data-center sites outside the 0.5 gigawatts already commenced have started site works?
Adam Calvetti · Bank of America
Early works, including earthmoving, have begun on many secured sites. Generally, Goodman does not undertake substantial site works on projects where power and other requirements are not secured; only minor works are occurring at a couple of other sites.
▸
Is there a quantitative limit on the amount of development risk Goodman will take, and does it distinguish speculative developments from contracted projects?
Callum Bramah · Macquarie
Goodman has general limits based on capital and earnings at risk, and considers speculative development separately. However, there is no single disclosed percentage cap; risk is assessed dynamically based on gearing, liquidity, earnings sensitivity and project-specific risks, with oversight from management, the Board and the Risk and Compliance Committee.
▸
Is there a fixed cap, such as 20%-25% of total assets, on development exposure?
Callum Bramah · Macquarie
No. The framework is more granular and dynamic than a fixed percentage of total assets, with risk prioritization and multiple financial and operational measures used instead.
▸
At LAX, is the prospective whole-building customer the same customer considering a single data hall, and does the Tokyo customer have an option over more of the 1-gigawatt project?
Callum Bramah · Macquarie
The LAX prospective customer is new to the site, and Goodman is considering either a single-building customer or multiple customers. The Tokyo customer does not have an option over additional capacity in the broader project.
▸
Of the $4.1 billion of fourth-quarter commencements, how much was added through upsizing existing projects versus new starts?
Callum Bramah · Macquarie
Approximately $1 billion was upsizing of existing projects and the remainder represented new starts.
▸
What drove the large fourth-quarter contribution from the 'other and FX' category in the WIP roll-forward?
Callum Bramah · Macquarie
It represents the net effect of foreign-exchange movements reducing the figure and additions to WIP increasing it, rather than FX alone.
▸
How do the projects on Slide 15 relate to capital spending and profit recognition, and has LAX been sold 50% to DataBank?
Callum Bramah · Macquarie
LAX is held in partnership with DataBank, which has contributed its 50% share of equity. Goodman generally partners development assets, then moves them to holdcos as customer contracts progress, choosing the timing of sale, transfer or retention based on leasing, returns and capital needs. Slide 14 provides ownership percentages; SYD01 and MAD01 are the only wholly owned projects currently on balance sheet, with SYD01 the significant one.
▸
What should investors assume for management income in FY27 as a percentage of external stabilized AUM?
Benjamin Brayshaw · Barrenjoey
Approximately 0.9%.
▸
Given FY26 net interest income benefited from more than $100 million of realized gains, where might net interest expense or income go in FY27?
Andrew MacFarlane · Bell Potter
The FX component is difficult to predict and will be a major driver. On a constant-currency basis, net weighted average cost of debt is about 1%, with some capitalized interest from directly owned WIP. All else equal, net interest income should be closer to zero, although it may remain positive.
▸
Does the 25% precommitment of development WIP include Tokyo?
Richard Jones · JPMorgan
No.
▸
What is the expected mix of FY27 earnings growth between development and management activities?
Richard Jones · JPMorgan
Development is expected to remain the largest opportunity and should not be below FY26's actual level. Investment income should grow moderately from rental growth, new partnership investments and the full-period effect of prior asset sales. Base management fees should continue rising, while performance fees are uncertain; recurring fees should grow around the 0.9% AUM rate.
▸
Will Artarmon, Vernon, Moorabbin and Brickworks be major FY27 realization contributors?
Richard Jones · JPMorgan
Management would not identify specific projects. Any of roughly 50 developments in process, or projects not yet in process, could contribute, and the company ranks and selects opportunities based on execution, capital management and overall returns.
▸
Have Moorabbin and Brickworks already been recognized, or are they still future contributions?
Richard Jones · JPMorgan
They were settled and booked in FY26. Brickworks was an acquisition rather than a development realization.
▸
Of the 1.3 gigawatts of data-center capacity, how much planning has been secured, and what planning challenges has Goodman encountered globally?
Claire McKew · Green Street
Projects in the secured power category must generally have planning approval or a credible pathway to approval, and active construction projects are understood to have planning in place. Planning is increasingly challenging globally, though the UK is more constrained by power. Goodman believes its global footprint and ability to shift deployments among markets are advantages.
▸
Is the full 1.3 gigawatts approved or nearly approved, and have any planning applications been rejected?
Claire McKew · Green Street
The approximately 500 megawatts under construction should have planning, while the secured 1.3-gigawatt bucket is understood to have approval or a viable pathway. Management said planning is not straightforward anywhere and did not describe a record of outright rejections, emphasizing that timing and difficulty vary by location.
▸
How is Goodman adjusting tenant-credit underwriting as credit-default-swap spreads widen for some hyperscalers, particularly regarding lease terms and duration?
Claire McKew · Green Street
The widening spreads reinforce the need to prioritize the strongest credits and consider ultimate asset value, not just initial yield. Credit considerations may differ between well-located metro colo facilities and specialized non-metro campuses, so Goodman is incorporating market-credit conditions into underwriting and lease decisions.
▸
How is Goodman managing long-lead equipment for the delivery schedule, and has it placed orders for major equipment?
Paul Mason · E&P
It is ordering long-lead items early, supported by substantial liquidity and procurement programs. Goodman cited a roughly $130 million equipment order for an Australian project and said delivery certainty requires removing procurement risks well before promising customer dates.
▸
How does operating a fully fitted data center for a hyperscaler differ from providing a power shell, particularly in negotiation, staffing and contracting?
Paul Mason · E&P
The commercial process is broadly similar, but Goodman must demonstrate operating teams, systems and processes. It has been building that capability and will operate Tokyo because the customer requested it. MEP installation for customers is not new, although operating the facility adds operational competency requirements.
▸
Should data-center development profits correlate directly with the delivery dates shown on Slide 15?
Donald Chua · Bank of America
Not necessarily. Revenue depends on the contract structure, timing and whether projects are presold, sold during development or sold on completion. Leases improve liquidity and transaction eligibility, but earnings can arise from other projects and do not map one-for-one to delivery dates.
▸
What was the total net FX impact on FY26 operating profit?
Donald Chua · Bank of America
Approximately zero, because hedges largely offset the foreign-exchange translation impact, consistent with the group's practice over many years.

Web Traffic

goodman.com
Web rank#844,419
Est. visits/mo623K
Traffic YoY▼ 1.7%
Traffic QoQ (12w)▲ 0.7%
Web Rank History
#844,419+75,331
rankest. visits/mo
700k800k900k1.0m573K608K644K679K715K08-2504-2006-1508-1010-0511-09

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2012 Q4306M—356M$0.17$0.16 – $0.172
2013 Q2360M418M182M$0.16$0.16 – $0.173
2013 Q4504M326M255M$0.17$0.17 – $0.184
2014 Q2820M552M426M$0.18$0.17 – $0.193
2015 Q2784M558M436M$0.19$0.18 – $0.202
2015 Q4492M354M278M$0.20$0.20 – $0.213
2016 Q2561M469M368M$0.20$0.20 – $0.214
2017 Q21.1B802M627M$0.22$0.21 – $0.234
2018 Q21.3B980M769M$0.23$0.23 – $0.256
2018 Q4656M483M380M$0.25$0.25 – $0.264
2019 Q2681M744M544M$0.26$0.25 – $0.274
2019 Q4726M761M565M$0.27$0.25 – $0.294
2020 Q2800M641M457M$0.29$0.27 – $0.305
2020 Q4826M634M471M$0.30$0.29 – $0.335
2021 Q21.1B660M501M$0.32$0.32 – $0.323
2021 Q41.2B694M527M$0.39$0.39 – $0.391
2022 Q21.4B724M538M$0.39$0.39 – $0.394
2022 Q41.7B1.3B990M$0.47$0.47 – $0.472
2023 Q21.8B1.3B994M$0.48$0.48 – $0.483
2023 Q41.9B1.4B1.1B$0.52$0.52 – $0.521
2024 Q22.0B1.3B1.0B$0.48$0.48 – $0.483
2025 Q22.1B1.5B1.1B$0.55$0.55 – $0.551
2025 Q42.4B1.5B1.1B$0.54$0.54 – $0.541
2026 Q23.1B1.9B1.5B$0.71$0.71 – $0.711
2026 Q42.3B1.6B1.3B$0.60$0.60 – $0.601
2027 Q23.0B2.2B1.7B$0.83$0.83 – $0.831
2027 Q42.9B1.9B1.5B$0.72$0.72 – $0.721
2028 Q22.9B2.4B1.8B$0.88$0.88 – $0.881
2028 Q41.8B2.2B1.7B$0.81$0.81 – $0.811
2029 Q21.9B—2.0B$0.95$0.95 – $0.951
2029 Q41.9B—2.0B$0.95$0.95 – $0.951
2030 Q22.0B—2.0B$0.95$0.95 – $0.951
v2 analysis (legacy, 2026-08-21) — for comparison onlyclick to expand

Thesis

Goodman is transitioning from a high-quality global logistics developer and fund manager into a major digital-infrastructure developer. The opportunity is substantial: scarce power, constrained metropolitan land, long-term hyperscaler demand and a large data-center work-in-progress pipeline. Its partnership model limits direct balance-sheet risk while retaining development, management and investment income. The near-term earnings profile is unusually lumpy. FY26 benefited from large development realizations and valuation reversals, while management income is recurring but comparatively modest. The latest quarter validated execution, including the Tokyo hyperscaler lease and continued WIP expansion, but did not eliminate leasing, construction, customer-credit or capital-recycling risks. The most likely outcome is continued double-digit growth in owner earnings, though below the exceptional FY26 reported cash-flow rate as development profits normalize. Goodman's balance sheet is a major strength: net debt is only about 1.4x adjusted EBITDA, liquidity is substantial and interest coverage is very high. The principal risk is not insolvency but overbuilding or mispricing a capital-intensive data-center pipeline before customer commitments are secured. I therefore value the business on normalized owner earnings rather than applying a full high-growth multiple to FY26 adjusted FCF.

Trade Signal

Trade rating
-6.2/10
Short
Horizon
~6mo
gpt-5.6-luna2026-08-21 · saw 27.27 AUD+3.8% since

Short Goodman Group: an exceptional franchise and credible data-center opportunity are already heavily capitalized, while the analyst's conservative fair value is roughly 60% below the current price and near-term earnings remain unusually lumpy.

Temporary mispricing-1.5

GMG fell from roughly A$35.45 over the past year to A$27.29, with the decline occurring in several legs: the broad 2025–26 derating from the prior A$34–37 range, a July–August slide as elevated valuation and rate sensitivity persisted, and a sharp post-earnings move from A$30.47 on August 18 to A$27.29 on August 21 despite solid FY26 results. The latest leg reflects investor concern that FY26 development realizations and valuation reversals were unusually high, that data-center earnings are back-end loaded, and that only 37% of WIP is pre-committed. The market has not entirely missed the long-term data-center opportunity, but it has likely only partially repriced the unusually high valuation and execution risk. The decline is directionally justified rather than a panic overshoot; any rebound would more likely be temporary than a correction to fair value.

Market view+3.0

Goodman remains a high-quality, institutionally owned growth property platform with a strong balance sheet, scarce power access, logistics exposure and a large data-center pipeline. Bulls argue that hyperscaler demand, constrained power and land, partnership capital and recurring AUM fees justify a premium multiple. Bears point to a roughly 30x EV/FCF valuation, 3% FCF yield, lumpy development profits, build-before-lease exposure, construction-cost inflation and 5% trailing dilution. The recent selloff has cooled sentiment, but the stock is not hated or ignored: its premium valuation still embeds substantial confidence in successful data-center conversion. Positioning evidence is limited in the study, so the best read is constructive but less euphoric than earlier in the cycle.

Inflectionwindow ~4mo+2.5

The business has a credible positive operating inflection: FY27 operating earnings are guided to grow 9%, development production is rising, the Tokyo project has secured a 20-year hyperscaler lease, and additional LAX, Hong Kong and European leasing could validate the data-center strategy. However, the broad theme is already central to the investment case and the stock trades at approximately 30.7x EV/FCF and 20.7x sales. The analyst's more conservative owner-earnings path already gives substantial credit to data centers, while the key upside scenario requires multiple additional leases and sustained high-margin development realizations. Thus the operational inflection is positive but not clearly unanticipated enough to offset the valuation gap.

Catalysts
  • ▼2027-02 · FY27 first-half earnings and development-earnings update — The first major test of whether the 9% FY27 earnings target and back-end-loaded development pipeline are converting into recurring cash earnings.
  • ▲2026-12 · LAX2 first 6MW data-center capacity scheduled to open — Opening and customer progress would validate execution, but delays or weak leasing would challenge the data-center premium.
  • ▲H2 2026 · Additional hyperscaler leasing announcements at LAX, Hong Kong, Amsterdam or other WIP sites — New commitments are the clearest near-term evidence that the power bank and build-before-lease strategy can monetize.
  • •Late 2026 to early 2027 · FY27 operating update / quarterly portfolio and WIP disclosure — Watch pre-commitment rates, construction costs, development starts, capital recycling and external AUM growth.
  • •2026-12 · Interim distribution and capital-allocation update — Capital recycling, partnership funding and any equity issuance will affect both confidence in the platform and per-security value.
Flow-2.5

The balance sheet is a meaningful strength, with A$6.4 billion of cash and undrawn facilities, low reported gearing and substantial partnership capacity. Against that, the group is deploying capital into developments and partnerships, raised debt and third-party equity during the year, and shows approximately 5% trailing share dilution. There is no stated large buyback, the dividend yield is only about 1%, and ongoing equity issuance/SBC or partnership funding can dilute upside. Capital recycling reduces financing risk but is not an unequivocal positive share-flow catalyst.

Floor / Ceiling-2.5

There is a real financial floor from low gearing, liquidity, quality logistics assets, partnership access and a viable operating platform; insolvency risk is very low. However, the floor is well below the current price and is not equivalent to net cash per share because the business is valued on a premium platform and development multiple. At A$27, the valuation itself creates a substantial ceiling: the analyst's fair equity value is A$22.3 billion, only about 40% of the current A$55.8 billion market capitalization, while the 3% FCF yield leaves little protection if cap rates rise, leasing slips or development earnings normalize.

Buyability

Goodman is highly buyable as a business: it is liquid, institutionally credible, financially resilient and offers a compelling strategic position in logistics and digital infrastructure. That quality is precisely why it can sustain a premium. At the current price, however, the next buyer must underwrite a large amount of successful future data-center development and continued premium multiples despite limited current cash yield and 5% dilution. A value-oriented buyer could be attracted after a much larger decline, while a growth buyer may continue to own it, but the present entry point is not compelling for a new long.

Fear vs Greedfear 4/10 (-1.0)greed 9/10 (+3.0)

Fear is stronger than greed at A$27.29—not because the franchise is fragile, but because the market price still capitalizes an optimistic data-center conversion story at a valuation that leaves little room for leasing delays, cost inflation, or normalization of FY26 development gains. The quality can support a rebound, but quality does not by itself close a roughly 60% gap to conservative fair value.

Valuation

Our Target
21.5B AUD-63%
Market Should Pay
23.2B AUD-60%
target ×1.08 (greed premium)
Current Market Cap
57.6B AUDExtremely bullish
What Changed
financials release · 2026-08-21
+8%fair value on this information

The quarter newly confirmed a strong FY26 finish, 10.1% growth in operating earnings per security, reaffirmed approximately 9% FY27 EPS growth, continued expansion of the data-center WIP pipeline and the first major Tokyo hyperscaler lease validation. It also clarified that FY27 net interest income may fall back toward zero and that management would not quantify project-level data-center earnings or provide a timetable for the next 0.5GW of capacity. Much of the broader data-center thesis and low gearing was already known before the release.

▸ How the cases moved

Versus the day before, the bull equity value rises from AUD 39,000M to AUD 41,800M as the Tokyo lease validates demand and the execution pipeline remains active; bull probability rises from 0.22 to 0.25. The base value rises from AUD 26,000M to AUD 27,000M, while base probability rises from 0.53 to 0.55 because FY26 execution and FY27 guidance were reaffirmed. Bear value falls only slightly from AUD 12,800M to AUD 12,600M because the quarter did not remove build-first/lease-later and cost risks; bear probability declines from 0.25 to 0.20. The improved case mix implies an approximately 8% higher fair value before considering any market multiple reaction.

2-Year Plausible Outcomes
bear20%
12.6B AUD
rev +5%/yrOE $900M

Data-center leasing takes longer than expected, construction costs and customer-credit requirements pressure returns, and development realizations normalize sharply. Logistics remains sound but growth is modest. The group retains liquidity and avoids a balance-sheet crisis, but owner earnings settle below FY26's unusually strong level and the market applies a lower-quality REIT/developer multiple.

▸ Valuation

14x AUD 900M owner earnings = AUD 12,600M equity value

base55%
27.0B AUD
rev +12%/yrOE $1500M

Goodman delivers its approximately 9% FY27 operating-earnings objective and compounds from there as data-center projects enter production, partnerships recycle capital and recurring management fees grow with external AUM. Some projects are delayed and performance fees remain lumpy, but the Tokyo lease and constrained power position support continued development demand. Owner earnings become more representative of recurring cash economics without assuming the full FY26 spike persists.

▸ Valuation

18x AUD 1,500M owner earnings = AUD 27,000M equity value

bull25%
41.8B AUD
rev +18%/yrOE $1900M

Goodman converts its power bank and metropolitan land advantage into a broad series of leased data centers, with additional hyperscaler commitments at LAX, Hong Kong, Amsterdam and other sites. High-margin development profits, rising rents, strong partnership demand and growing stabilized fee income combine to produce sustained earnings acceleration. The capital-light partnership structure keeps leverage controlled while investors award a premium growth multiple.

▸ Valuation

22x AUD 1,900M owner earnings = AUD 41,800M equity value

▸ Target Rationale

The probability-weighted terminal value is AUD 27,820M, discounted by 1.25 to AUD 22,256M. I set the analytical target below that arithmetic result at AUD 21,500M because FY26 owner earnings are flattered by development realizations, the data-center pipeline has substantial timing and leasing uncertainty, and management does not disclose enough project-level economics to underwrite the bull case confidently. The discount is partly offset by the exceptionally strong balance sheet, liquidity and demonstrated capital-partnership capability.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality9/10
Situation now8/10
Trajectory9/10
Risk4/10
Governance8/10
Insolvency prob (2yr)1%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • A$2.65 Billion Portfolio Buyout from Soul Patts (June 2026): Goodman Group’s capital partnership fund, the Goodman Australia Industrial Partnership (GAIP), agreed to purchase Washington H. Soul Pattinson & Co.'s (Soul Patts) 50% stake in their joint Australian industrial portfolio for A$2.65 billion. The transaction gives Goodman and GAIP 100% control of 1.3 million square meters of premium stabilized logistics properties in Sydney and Brisbane, as well as the Oakdale Industrial Estates development pipeline. GAIP is funding the acquisition with A$2.3 billion from capital recycling and liquid reserves alongside a A$350 million equity contribution from Goodman.
  • 32MW US Data Center Joint Venture (April 2026): Goodman formed a 50/50 joint venture with US operator DataBank to develop a 32MW facility (LAX2) in Vernon, Los Angeles—one of the most supply-constrained data center markets in the US. The first 6MW of capacity is scheduled to open in December 2026.
  • Q3 FY26 Operational Update (May 2026): Goodman reported a total portfolio value of A$87.1 billion and development work in progress (WIP) of A$14.5 billion. Like-for-like net property income (NPI) grew by 4.1% (6.1% excluding Greater China). The company reaffirmed its FY26 operating earnings growth target of at least 9%.
  • 1H26 Financial Results (February 2026): For the half-year ending December 31, 2025, Goodman reported operating profits of A$1.2 billion and maintained a low gearing ratio of 4.1% (17.8% look-through).
  • Ongoing Capital Recycling (May 2026): The group announced agreements to divest Moorabbin Airport and unveiled plans for a new data center campus development in Sagamihara City, Greater Tokyo.
  • Distribution Timetable (June 2026): Goodman confirmed an estimated distribution of 15.0 cents per stapled security for the six months ending June 30, 2026.
▸ Thesis-test Findings
Goodman Group power bank execution timeline and utility approvals 2026

Goodman Group has made rapid progress in securing power and infrastructure approvals, expanding its global data center power bank to 6.4 GW as of its Q3 FY26 update. This pipeline consists of 3.6 GW of secured power (fully approved grid connections) and 2.8 GW in advanced stages of procurement. The group expects to have 0.5 GW of data center capacity in active development (WIP) by June 30, 2026, backed by more than A$14 billion in project end value. Crucially, all active projects benefit from secured power and are located on land owned directly by Goodman or its partnerships. Major projects currently in progress include AMS01 (Amsterdam), FRA02 (Frankfurt), and SYD01 (Sydney, a 90MW facility aiming for service in early 2028). While the bull case is supported by the speed-to-market of these pre-approved sites, a key bear case risk is Goodman's "build first, lease later" strategy. Only 37% of its total WIP is pre-committed, leaving substantial near-term leasing risks on long-lead developments, although management defends this as a way to capture optimal rental terms closer to completion.

Hyperscale data center rental rates and cap rate trends Europe APAC

The macro-environment remains highly supportive for data center operators, reinforcing the bull case for Goodman's pipeline. Driven by power constraints and surging AI and cloud demand, the cost of securing large-scale data center capacity across Europe's primary markets is projected to rise by an average of 12% in 2026. European vacancy rates are expected to fall to a record low of 6.5% by the close of 2026. Frankfurt currently commands the highest rents in Europe ($235–$265 per kW/month), while Singapore ($403 per kW/month) and Tokyo ($280) lead pricing in APAC. Transaction cap rates remain highly compressed, showing deep institutional demand for stabilized platform assets; direct investment in APAC data centers hit a record $11.6 billion in 2025, with transaction cap rates around 4.4% for major metropolitan colocation assets in Sydney. However, a potential bear case is the rising cost of construction (up an average of 10% YoY in APAC) and regulatory pressures (such as the EU's strict Energy Efficiency Directive), which are pushing developers toward capital-intensive platform joint ventures rather than single-asset trades.

Australian industrial logistics property transaction yields 2026

The Australian industrial property market entered 2026 in a stabilization and early-recovery phase following a cyclical downturn. Transaction yields have largely stabilized, with Sydney’s prime assets trading at cap rates of 4.8%–5.0%, Melbourne at 5.0%–5.2% (with prime yields steady at 5.85% as of Q1 2026), and Brisbane at 5.2%–5.4%. While persistent inflation prompted the Reserve Bank of Australia to hike the cash rate twice in early 2026 to 4.10%, which marginally expanded midpoint national super prime yields to 5.7% in Q1 2026, the sector remains well-positioned to absorb these changes. Low vacancy rates (ranging from 2.7% in Perth to 4.0% in Melbourne) and steady prime rental growth (up 3.6% to 5.5% YoY) continue to underpin asset valuations. On the supply side, the 2026 national development pipeline has contracted by 27% compared to late-2025 forecasts. This supply constraint supports the bull case, though a potential bear case lies in the softening of occupier demand for big-box formats (>20,000 sqm) due to corporate caution and high energy costs, which may limit the speed of near-term lease-ups.