GMIN.TO
G Mining Ventures Corp.v3 6.2/10 · 2026-11-03G Mining Ventures Corp. focuses on identifying, investigating, assessing, and developing mineral assets. Its primary undertaking is the Tocantinzinho gold project, located in Brazil's Pará State. This substantial endeavor comprises two mining permits totaling 12,889 hectares, 23 exploration permits encompassing 76,116 hectares, and two ongoing applications for additional exploration licenses covering 10,569 hectares. The organization, which was previously known as Kanadario Gold Inc., was established in 2017 and operates out of Québec, Canada.
2-Year Price History
Valuation v3 Opus worker · 2026-11-03
G Mining Ventures is a well-run builder-operator: its Tocantinzinho (TZ) mine in Brazil came in on time and on budget, and the team is now building Oko West in Guyana (first gold H2 2027, about 44% spent and 65% committed by mid-2026). The July 2026 all-share purchase of G2 Goldfields joined Oko West to the neighbouring Oko-Ghanie deposit, and management is aiming for about 500 koz/yr from the combined Oko complex from 2029 onward, plus TZ (about 160-220 koz/yr) and Gurupi as a third mine. At C$38.80 (Nov 3 close, verified; 296.25M basic and 300.2M fully diluted shares) the market cap is about C$11.5B and the EV about C$11.3B with a small net cash position. That is about 24x today's TZ-only unlevered owner earnings (about C$475M at $3,950 spot gold) and about 16.5x run-rate EBITDA. On 2028 EBITDA, with Oko producing, it drops to about 6x. The stock has fallen 33% from its C$58 high, almost entirely because gold dropped from about $5,600 to about $3,930 in a margin-call liquidation (October was gold's worst month since 2008). All 13 analysts still rate it a Buy, with C$59-70 targets. My DCF at flat $3,950 gold (2027-31 unlevered FCF of roughly C$0.16B, 0.9B, 1.3B, 1.7B and 1.7B, then 10x year-5 FCF, discounted at 10%) gives about C$49.5/share, a base IRR of about 16%. The value depends mostly on the gold price (each $500/oz moves it about 25%) and partly on Oko execution; the 500 koz combined plan is not yet backed by a feasibility study. Rating 6.2: good management, a funded and de-risking build, and a real 5-year production step-up, but at spot gold it is about 25% undervalued, not 40%. Getting to a 50% return needs a gold rebound. Research 6.5: the open questions (Q3 numbers on Nov 12, Oko budget and schedule, combined-plan capex, gold) can be tracked, but the main swing factor is the gold price rather than the company.
A deep dive would have to establish: Whether the combined Oko-West/Oko-Ghanie plan can really deliver about 500 koz/yr from 2029 at under $1,300 AISC for modest expansion capex while the base Oko build stays on budget, so that the company earns about $1.2B of FCF by 2030 even with gold below $4,000.
Research (expand)
What the company does
G Mining Ventures (TSX: GMIN, OTCQX: GMINF) is a Quebec-based gold producer run by the Gignac family's G Mining team. Before GMIN, that team built and ran mines for others, including Merian and Fekola. Its assets:
- Tocantinzinho (TZ), Pará, Brazil. 100% owned. Commercial production since Sep 2024, built on time and on budget. 1.9 Moz reserve, about 11-year life, about 155 koz/yr life-of-mine average. 2026 guidance is 160-190 koz at $1,330-1,544 AISC (raised because the Brazilian real strengthened and royalties rise with gold). 2027 guidance is 200-235 koz at $977-1,146 AISC as higher-grade Phase 2 ore arrives. Q3 2026 output was 44,960 oz (+22% QoQ), with 113.7 koz year to date. Franco-Nevada's gold sale agreement takes about 12-13% of ounces at 20% of spot, so realized price is about 10% below spot (a $231M contract liability, accounted for here as lost revenue, not debt).
- Oko West, Guyana. Under construction. The feasibility study (Apr 2025) shows 350 koz/yr over 12 years at a $1,123 AISC (at $2,500 gold), with $973M initial capex. As of Jun 30 2026, $423M was spent and $628M committed. First gold is due H2 2027, commercial production Jan 2028, with 315 koz planned for 2028.
- Oko-Ghanie (from G2, closed Jul 29 2026). GMIN issued about 59.3M shares (0.212 GMIN per G2 share, about C$2.3B). The combined Oko complex has about 7 Moz M&I and 2.3 Moz inferred. Management targets about 500 koz/yr through a 25-30% throughput expansion from 2029 and claims more than C$1B of synergies. An integrated feasibility study is due mid-2027, and long-lead items (a second ball mill, gensets) are being ordered now.
- Gurupi, Brazil. 1.8 Moz indicated plus 0.8 Moz inferred. A PEA (planned to be slightly larger than TZ) and ESIA filing are due at year-end 2026.
Investment case
This is a growth producer bought on a gold-led drawdown. Production should go from about 175 koz (2026) to about 500 koz (2028) and about 650-700 koz (2030) without new equity: about $576M of liquidity at Jun 30 covers the roughly $550M of remaining Oko capex. The team has a strong record of building mines on budget. The stock is down 33% from its C$58 peak because gold fell about 29% from its high in a forced-liquidation selloff, not because of anything company-specific; the Q3 production beat came during the decline. A small NCIB (7.54M shares, 2.5%) was authorized from Sep 1 2026.
What it earns today (real free cash flow)
These figures are in USD (the company's reporting currency) and are converted to CAD at 1.40 in the JSON.
- Q2 2026: revenue $157M, adj. EBITDA $114M, operating cash flow $104M, company-defined FCF $85M (before Oko capex).
- TZ run-rate at $3,950 spot: about 190 koz × (about $3,560 cash received per oz after the Franco haircut − about $1,350 AISC) ≈ $420M pre-tax. AISC already includes sustaining capex, capitalized stripping and corporate G&A with SBC.
- Cash taxes are low because of Brazil's SUDAM incentive (H1 effective rate about 19%), about $75M.
- Unlevered owner earnings: about $340M (about C$475M). Interest is negligible (debt is $33M of equipment finance).
- Reported consolidated FCF after Oko capex is negative through 2027. All of that is growth capex, so it is added back.
- About 70% of EBITDA reaches owners (EBITDA about $485M at spot gold, owner earnings about $340M).
Five-year free cash flow (unlevered, after all capex, flat $3,950 gold, USD)
- 2027: about $0.11-0.13B. TZ at about 217 koz earns about $430-450M after tax, less about $230M of Oko capex, about $100M of expansion long-lead items and $45M of exploration, plus some pre-commercial Oko gold.
- 2028: about $0.64B. TZ about $360M plus Oko at 315 koz × about $2,650 margin after about 20% tax (about $730M), less about $400M of expansion capex and $50M of exploration.
- 2029: about $0.94B. Expanded Oko ramps toward 400 koz, with about $200M of residual expansion capex.
- 2030: about $1.25B. Oko about 500 koz plus TZ about 160 koz.
- 2031: about $1.23B.
- Gurupi build capex (about $400-500M in 2029-31) and its value are excluded; they roughly offset in NPV terms.
Growth runs about 4 more years. After that, it is a flat 650-700 koz/yr producer with Oko and TZ reserve lives of 10-15 years and exploration upside in a new district. In 5 years it should be a valuable mid-tier producer generating about $1.2B/yr at today's gold price. That is a growing cash stream, not a corpse, but its value depends on gold. Confidence is moderate: ounces and costs are fairly visible (TZ is operating, Oko is mostly committed), but the expanded Oko plan has no feasibility study yet, and gold dominates the result.
Fair value and multiples
- DCF: 5 years of FCF (PV about $2.96B) plus 10x year-5 FCF as a flat, durable but commodity-exposed producer (PV about $7.6B), plus about $0.1B of year-end net cash, gives about $10.7B, or about C$14.9B. Per fully diluted share that is about C$49.5, +28%. The implied IRR at today's price is about 16%.
- Gold sensitivity: about ±25% per ±$500/oz. At $3,000 gold, value is about C$31; at $4,500, about C$62; at $5,000, about C$72. Consensus targets of C$59-70 look like they assume gold above $4,300.
- Multiples at C$38.80:
- EV/owner earnings about 24x (TZ only).
- EV/EBITDA about 16.5x on run-rate and about 5.7x on 2028E (about $1.4B EBITDA).
- P/E about 17x trailing and about 17x 2027E at spot.
- Owner-earnings yield about 4%.
- Fair value about C$46. This is a small discount to the DCF because of unbudgeted expansion capex, Guyana and Brazil risk, and the GMS related-party contract.
- Not a covered-call setup: earnings are not predictable at a valuation floor, although implied volatility is high after the gold crash.
Management, risks and competition
Management. Management is trustworthy. TZ was delivered on time and on budget, and Oko is tracking on schedule. There is no equity raise for Oko apart from La Mancha's (Sawiris family) top-up at C$45.89. Insiders and strategic holders are aligned.
Governance watch-points:
- G Mining Services (Gignac-related) is paid as Oko's EPCM contractor ($11M in H1). The arrangement is disclosed and arm's-length in form, but it is a related-party flow.
- The G2 deal was a big all-share deal (+25% shares) at a 72% premium, near the top of the gold market.
Risks:
- Gold price (the dominant factor).
- BRL strength pushing up TZ costs.
- Oko construction and ramp-up, and the expansion capex size (unknown until the mid-2027 study).
- Guyana: new jurisdiction, labour, and Venezuela's Essequibo claim covering Region 7.
- TZ grade variability and tailings (GISTM gap assessment shows 61% alignment).
- Capital return will stay minimal until 2028.
Competition. Gold is a price-taker commodity. The moat is cost position: TZ is second-quartile now and first-quartile in 2027, and Oko is projected first-to-second quartile.
How investors feel (5/10)
The sell side is uniformly bullish: 13 analysts, all Buy, average target about C$63.9 (low C$59, high C$70). CIBC raised its target to C$60 and RBC (C$59) and Jefferies (C$68) maintained theirs in mid-October. The tape is fearful: gold miners fell as much as 8% in a day during October's forced liquidation, GMIN touched C$26-ish intraday in a flush (an OTC print), and it now sits at 41% of its 1-year range. This is a fearful moment for gold miners rather than capitulation in this specific name. The December 9 FOMC (about 85% hike odds priced) is the near-term catalyst for gold. Score 5: loved by analysts, sold by macro and momentum holders.
- /Users/gregwo/stocks2/data/analysisv3/context/GMIN.TO.md (price history, 2024Q4/2025Q1 summaries, 2026Q2 call transcript)
- https://s21.q4cdn.com/753203377/files/doc_earnings/2026/q2/generic/MDA-Q226.pdf
- https://www.globenewswire.com/news-release/2026/10/08/3377071/0/en/g-mining-ventures-reports-q3-2026-preliminary-production-results.html
- https://thedeepdive.ca/g-mining-ventures-lifts-q3-gold-output-22-to-44960-ounces-at-tocantinzinho/
- https://www.globenewswire.com/news-release/2026/04/09/3270752/0/en/G-Mining-Ventures-Announces-Uniquely-Synergistic-Acquisition-of-G2-Goldfields-Creating-a-Tier-One-Gold-Mining-Hub-in-Guyana-and-One-of-the-Largest-Lowest-Cost-Gold-Operations-in-th.html
- https://www.cruxinvestor.com/posts/g-mining-acquires-g2-goldfields---oko-west-first-gold-remains-on-track-by-h2-2027
- https://www.mining-technology.com/news/g-mining-ventures-to-acquire-g2-goldfields/
- https://gmin.gold/news/g-mining-ventures-delivers-robust-feasibility-study-for-high-grade-oko-west-gold-project-in-guyana
- https://investingnews.com/g-mining-ventures-announces-normal-course-issuer-bid-for-common-shares/
- https://stockanalysis.com/quote/tsx/GMIN/
- https://stockanalysis.com/quote/tsx/GMIN/forecast/
- https://www.naturalnews.com/2026-11-02-gold-falls-one-year-low-silver-tops.html
- https://discoveryalert.com/analysis/gold-silver-selloff-margin-calls-bear-market-november-2026/
- https://www.cnbc.com/amp/select/the-price-of-gold-today-nov-3-2026/
- https://www.usagold.com/daily-precious-metals-market-report-november-3-2026/
- https://www.defenseworld.net/2026/10/31/g-mining-ventures-otcmktsgminf-shares-down-7-4-whats-next.html
Financials — Adjusted
Adjusted · TTM 2026-Q3 · USD
| TTM & Fiscal-Year P&L | TTM | 2025 | 2023 | 2022 | 2020 |
|---|---|---|---|---|---|
| Revenue | 659+34% | 584 | 0.00 | 0.00 | 0.00 |
| Gross profit | 445+37% | 402 | 0.00 | 0.00 | 0.00 |
| Operating expenses | 17.6-1% | 17.9+147% | 7.23+39% | 5.19+518% | 0.84 |
| ▸Adj EBITDA | 470+26% | 441 | -6.93 | -4.85 | -0.73 |
| ▸Adj OCF | 416+22% | 394+58% | 250 | -2.11 | -0.74 |
| CapEx | -425 | -269 | -303 | -64.2 | -0.01 |
| Adj FCF | -9.49-110% | 124 | -52.9 | -66.3 | -0.75 |
| Interest expense | 11.6 | 23.0 | 0.00 | 0.00 | 0.00 |
| ▸Adj net income | 343+49% | 300 | -3.47 | -2.41 | -0.80 |
| ▸Owner's earnings | 100 | -- | -- | -- | -- |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2020→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2023 | 2022 | 2020 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | 792100% | 319100% | 486100% | -6.97 | -5.22 | -0.86 |
| FCF (OCF−capex) | -205-26% | -155-49% | 78.816% | -62.4 | -65.5 | -0.62 |
| Net income | 52967% | 25078% | 28960% | -7.18 | -1.90 | -0.99 |
| ▸Capital returned | -341-43% | -185-58% | 31.56% | -31.5 | -123 | -32.8 |
| Buybacks | -479 | -312 | -11.1 | -0.02 | -123 | -32.8 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 30.6 | 7.62 | 23.0 | 0.00 | 0.00 | 0.00 |
| Debt paid down | 107 | 119 | 19.6 | -31.5 | 0.05 | 0.00 |
| ▸Reinvestment | 1012128% | 376118% | 26955% | 303 | 64.2 | 0.01 |
| Capex (PP&E) | 1008 | 371 | 269 | 303 | 64.2 | 0.01 |
| Intangibles & M&A | 4.25 | 4.27 | 0.00 | -0.01 | -0.01 | 0.00 |
| Leases signed (net Δ) | -0.08 | -- | -0.10 | -- | -- | -- |
| Retained / other | 16321% | 33.210% | 70.314% | -30.9 | 57.6 | 32.2 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 3.4 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2023 | 2022 | 2020 |
|---|---|---|---|---|---|
| ▸Assets (total) | 4135 | 1948 | 583 | 259 | 33.0 |
| ▸Liabilities (total) | 431 | 532 | 322 | 15.5 | 0.30 |
| Net debt (incl. leases) | -129 | 6.88 | -19.7 | -82.7 | -32.6 |
| Net debt / Adj EBITDA | -0.27 | 0.02 | -- | -- | -- |
| Net debt / Adj FCF | -- | 0.06 | -- | -- | -- |
| Adj EBITDA / interest | 40.4 | 19.2 | -- | -- | -- |
| Shares outstanding | 296 | 231 | 398 | 449 | 85.3 |
| Dilution (YoY) | +22.4% | -- | -11.3% | -- | +574.1% |
| Employees | 1157 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2023 | 2022 | 2020 |
|---|---|---|---|---|---|
| Gross margin | 67.4%+1.6 | 68.9% | -- | -- | -- |
| Adj EBITDA margin | 71.3%-4.4 | 75.5% | -- | -- | -- |
| Adj OCF margin | 63.1%-6.2 | 67.5% | -- | -- | -- |
| Adj FCF margin | -1.4%-21.7 | 21.3% | -- | -- | -- |
| Net income margin | 51.9%+2.1 | 49.6% | -- | -- | -- |
| Adj NI margin | 52.0%+5.2 | 51.4% | -- | -- | -- |
| ROIC (adj, after-tax) | 9.5% | 20.4% | -1.9% | -1.7% | -2.0% |
| Cost of debt | -- | 19.1% | 0.0% | -- | -- |
Earnings Calls
Earnings Call · 2026 Q2
G Mining Ventures delivered a strong second quarter of 2026 across operations, financial performance, and project development. Management highlighted continued safe execution, with zero lost-time injuries, while consolidating the transformational G2 acquisition. The transaction combines GMIN’s Oko West project with G2 Goldfields’ adjacent Oko-Ghanie project, creating the foundation for a large-scale, long-life gold complex in Guyana. The company is now focused on validating an integrated district development plan and establishing a potentially Tier 1 production profile. Tocantinzinho was the primary operating and cash-flow contributor. Gold production reached 36,845 ounces, a 16% increase from the first quarter, while sales totaled 37,439 ounces. The improvement reflected a higher-grade mining sequence, stable mill performance, strong recoveries, and increasing access to Phase 2 mineralization. The plant processed just over 1 million tonnes during the quarter at an average throughput of 11,120 tonnes per day, a process grade of 1.23 grams per tonne, and recovery of 91.9%. Open-pit mining also set a record, with 6.3 million tonnes of ore and waste moved, up 15% sequentially. Management expects grades to rise in Q3 and potentially again in Q4, while additional trucks and a forthcoming front-end loader should support further mining-rate growth. TZ generated $85 million of free cash flow, more than 50% above Q1, equivalent to approximately $2,300 per ounce produced. Revenue increased 21% year over year to $157 million, net income rose 48% to $72 million, and adjusted net income reached $79 million. The average realized gold price was a record $4,197 per ounce. Cash costs were $1,046 per ounce sold and AISC was $1,690, with the sequential cost increase largely attributable to appreciation of the Brazilian real. Consequently, 2026 cash-cost guidance was increased to $836–$965 per ounce and AISC guidance to $1,330–$1,544. Production guidance remains 160,000–190,000 ounces for 2026, with approximately 61% expected in the second half. For 2027, production is expected at 200,000–235,000 ounces, with lower cash costs of $633–$743 and AISC of $977–$1,146 per ounce. Oko West remains on schedule and budget, reaching 28% earned-value progress at quarter-end. Engineering is expected to finish in Q3 2026 and procurement is 99% complete. Construction is advancing across the process plant, power plant, tailings, camp, and site infrastructure. The power plant is targeted for July 2027, mill commissioning milestones are expected in August 2027, first gold is targeted for the second half of 2027, and commercial production for January 2028. Capital guidance remains $514–$568 million in 2026 and $217–$240 million in 2027. Cumulative Oko spending is approximately $423 million, with $550 million remaining; commitments represent 65% of the approved budget. GMIN is also considering expansion long-lead items, including another ball mill and generators, and has government authorization for initial Ghanie mining to support optimization. Gurupi remains on track for a resource update, PEA, and ESIA filing by year-end. Drilling is continuing so the PEA can incorporate the maximum available resource information, with management characterizing the prospective project as somewhat larger than TZ. GMIN ended the quarter with $226 million in cash, $193 million of net cash, and approximately $576 million of available liquidity including its undrawn $350 million revolver. Oko West staffing approached 1,800 workers, with Guyanese nationals representing 77%, and is expected to approach or exceed 2,000 by year-end.
▸Asked whether the June 2026 tailings-governance implementation roadmap could affect TZ operations, growth capital, or sustaining capital, and whether GMIN is ordering long-lead equipment for a potential Oko expansion that could pull future spending into 2027.Ralph Profiti · Stifel
▸Asked whether the combined Oko-Oko-Ghanie development could result in near-term changes to the mine plan, mining sequence, stripping, or stockpiling before the expansion case is finalized.Andrew Mikitchook · BMO Capital Markets
▸Asked which construction milestones, site activities, or equipment deliveries investors should monitor in monthly photos and project updates.Andrew Mikitchook · BMO Capital Markets
▸Asked why higher 2026 cost guidance did not lead to a change in the 2027 cost outlook.Anita Soni · CIBC
▸Asked how TZ grades should trend as Phase 2 enters a better part of the mining sequence, both over the next few quarters and into 2027.Andrew Mikitchook · BMO Capital Markets
▸Asked for estimated Oko West commercial production in 2028 and the expected average grade for that year.Raymond McCormick · Capstone Partners
▸Asked when the exchange of G Mining Ventures shares for G2 Goldfields shares would be completed for U.S. holders of GUYGF, noting that the transaction appeared incomplete despite prior representations.
▸Asked for more detail on the planned Gurupi resource update and PEA, including how investors should frame the study after the substantial drilling completed since the prior update.Rabi Nizami · National Bank of Canada
▸Asked whether TZ stripping and mining rates would continue increasing in coming quarters or stabilize after the recent fleet expansion.Rabi Nizami · National Bank of Canada
▸Asked about labor availability and hiring progress at Oko West, including expected staffing levels by year-end.Rabi Nizami · National Bank of Canada
Institutional Ownership
| Fund | $ value | Cost basis | Δ QoQ | Δ YoY | α life | Fund AUM |
|---|---|---|---|---|---|---|
| WELLINGTON-ALTUS USA INC. | $38K | $41.49 | +$0 | +$38K | — | $138M |
Ownership Over Time
5-year share-count history (top 10 holders by peak, incl. exited) + price
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2023 Q3 | 2M | -3M | -3M | $-0.01 | $-0.01 – $-0.01 | 1 |
| 2023 Q4 | 2M | -3M | -3M | $-0.01 | $-0.01 – $-0.01 | 2 |
| 2024 Q1 | 1M | -10M | -10M | $-0.04 | $-0.09 – $-0.04 | 2 |
| 2024 Q2 | 0M | -2M | -5M | $-0.02 | $-0.02 – $-0.02 | 2 |
| 2024 Q3 | 62M | 17M | 11M | $0.04 | $0.04 – $0.04 | 2 |
| 2024 Q4 | 98M | 83M | 48M | $0.17 | $0.13 – $0.22 | 7 |
| 2025 Q1 | 119M | 95M | 59M | $0.21 | $0.16 – $0.25 | 8 |
| 2025 Q2 | 141M | 111M | 73M | $0.26 | $0.23 – $0.30 | 8 |
| 2025 Q3 | 168M | 132M | 90M | $0.32 | $0.28 – $0.39 | 7 |
| 2025 Q4 | 200M | 158M | 110M | $0.39 | $0.18 – $0.49 | 9 |
| 2026 Q1 | 164M | 139M | 97M | $0.34 | $0.25 – $0.43 | 7 |
| 2026 Q2 | 165M | 131M | 90M | $0.32 | $0.28 – $0.38 | 6 |
| 2026 Q3 | 170M | 131M | 88M | $0.31 | $0.26 – $0.35 | 9 |
| 2026 Q4 | 165M | 161M | 111M | $0.39 | $0.33 – $0.49 | 4 |
| 2027 Q1 | 178M | 196M | 138M | $0.49 | $0.43 – $0.55 | 2 |
| 2027 Q2 | 183M | 198M | 138M | $0.49 | $0.49 – $0.49 | 1 |
| 2027 Q3 | 232M | 214M | 149M | $0.53 | $0.53 – $0.53 | 1 |
| 2027 Q4 | 308M | 286M | 204M | $0.72 | $0.72 – $0.72 | 1 |
| 2028 Q1 | 441M | 349M | 250M | $0.89 | $0.89 – $0.89 | 1 |
| 2028 Q2 | 443M | 353M | 250M | $0.89 | $0.89 – $0.89 | 1 |
| 2028 Q3 | 468M | 372M | 262M | $0.93 | $0.93 – $0.93 | 1 |
| 2028 Q4 | 469M | 497M | 357M | $1.27 | $1.27 – $1.27 | 1 |
| 2029 Q1 | 480M | 300M | 198M | $0.70 | $0.70 – $0.70 | 1 |
| 2029 Q2 | 481M | 306M | 199M | $0.71 | $0.71 – $0.71 | 1 |
| 2029 Q3 | 437M | 255M | 157M | $0.56 | $0.56 – $0.56 | 1 |
| 2029 Q4 | 438M | 264M | 161M | $0.57 | $0.57 – $0.57 | 1 |
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand
Thesis
GMIN has successfully transformed Tocantinzinho into a high-margin operating gold mine, producing substantial cash even while funding the construction of Oko West. The latest quarter was operationally encouraging: production rebounded, grades are expected to improve, and quarterly free cash flow reached approximately $85M. The company also retains meaningful liquidity and net cash, making near-term insolvency very unlikely. The central investment case is the conversion of TZ's cash flow into a second, substantially larger operation. Oko West is materially advanced, with procurement nearly complete and first gold targeted for the second half of 2027. The G2 transaction expands the strategic potential of the Guyana district, but also adds integration, permitting, construction and capital-allocation complexity. Gold-price exposure, Brazilian foreign-exchange risk, rising 2026 cost guidance and the large remaining Oko capital requirement keep the range of outcomes wide. At the end of two years, the most likely outcome is a company transitioning from one profitable mine to a two-asset producer, with owner earnings improving as Oko construction spending rolls off. Gurupi is valuable optionality but is not included materially in the base valuation.
Trade Signal
Short: the market capitalization discounts a highly successful Oko West/Oko-Ghanie transformation and sustained gold strength, while current cash flow and asset support are nowhere near sufficient to justify the valuation.
The stock has risen 181% over the last year, from C$17.40 to C$48.88, with major upward legs through late 2025 and early 2026 as TZ reached commercial production, gold prices strengthened, and the market capitalized Oko West growth. It then corrected sharply from the February high near C$56 to roughly C$35 in June, before rebounding to above C$50 in August as operating execution improved and the G2/Oko district narrative regained attention. The latest earnings release was operationally strong, yet the stock fell about 2%, indicating that the good news was largely anticipated. This looks more like a durable speculative repricing toward future growth than a single panic overshoot, but the current rebound appears to have outrun demonstrated cash flow and is vulnerable to a valuation reset once the market focuses on delivery and capital requirements.
The market appears strongly constructive and momentum-oriented rather than genuinely skeptical. The 181% one-year gain, elevated volatility, 16.7x sales multiple, and premium attached to TZ, Oko West, and the G2 combination indicate that investors are paying for a future mid-tier growth producer. Bulls point to high gold prices, TZ cash flow, Oko West progress, and district-scale optionality. Bears point to extreme current multiples, country and construction risk, future capital needs, and the fact that much of the value lies in an unbuilt or early-stage asset base. The latest strong earnings produced a roughly 2% decline, suggesting expectations are already high and incremental good news is being discounted.
The business is improving operationally, with TZ producing meaningful free cash flow and Oko West advancing. However, the major earnings inflection is not expected until Oko West reaches production in 2027-28. The analyst's base case already assumes roughly $500M of EBITDA and $350M of owner earnings as the second operation ramps, while the stock trades at a valuation that requires something close to the bull case or a persistently extreme gold-price environment. Near-term consensus is therefore unlikely to be materially surprised to the upside; the more immediate asymmetric evidence is execution or cost disappointment.
- ▲November 2026 · Q3 2026 earnings and production update — Higher grades and approximately 61% of 2026 production weighted to the second half could support a strong print, though much of the recovery appears expected.
- ▲Q3 2026 · G2 Goldfields acquisition close — Expected Q3 closing would consolidate Oko-Ghanie and reinforce the district-scale growth narrative, but also increases execution and capital intensity.
- ▲Late 2026 · Gurupi resource update, PEA and ESIA filing — A positive resource and economic study could add optionality, but it is unlikely to justify the current valuation by itself.
- •Q3-Q4 2026 · Oko West engineering completion and construction milestones — Engineering is expected to finish in Q3; milestones should test whether the project remains on schedule and budget toward first gold in H2 2027.
- ▼Q1 2027 · 2026 year-end capex, cost and production update — Higher Brazilian costs, weaker grades, guidance cuts, or evidence of Oko West cost overruns would expose the gap between current price and modeled value.
- ▲H2 2027 · Oko West commissioning and first-gold milestones — Successful power-plant and mill commissioning could sustain the growth premium, although these are well beyond the near-term earnings horizon.
There is no disclosed buyback or near-term tender support. TTM dilution is approximately 2%, and the major risk is future equity or other financing if Oko West, Oko-Ghanie expansion, or Gurupi requires more capital than planned. Strong operating cash flow limits immediate dilution risk, but a rising stock could facilitate acquisition-related issuance and create supply.
The $193M of net cash and approximately $576M of total liquidity provide a real solvency floor, but they are immaterial relative to a roughly $14.5B equity value. TZ's demonstrated cash generation offers some support, yet current valuation already capitalizes a large portion of future Oko West and Oko-Ghanie success. There is no hard takeover or asset-value floor, while the principal ceiling is the need for future EBITDA to grow dramatically before the multiple can be defended.
The company is a credible, operating gold producer with strong recent TZ execution, net cash, and a visible Oko West growth pipeline, so it remains buyable in a strong gold market. However, at roughly 16.7x sales and nearly 300x FCF, the next buyer must underwrite sustained high gold prices, successful Oko West delivery, and substantial future earnings growth; the valuation is not supported by current cash generation.
Fear pulls harder than greed at C$48.88: the operating quarter was good, but the stock price implies a successful multi-asset transformation and sustained exceptional gold economics years before the cash flows arrive. The risk is not insolvency; it is paying a speculative growth multiple for execution that is still unproven.
Valuation
The quarter newly demonstrated a strong TZ recovery, including 36,845 ounces of production and approximately $85M of free cash flow, while management maintained the Oko West schedule and disclosed approximately 315,000 ounces of expected 2028 commercial production. The Q&A also clarified that higher 2026 costs are primarily foreign-exchange, gold-price and royalty effects rather than a deterioration in the 2027 cost outlook. The main negative new information was the higher 2026 cost guidance and the possibility of ordering expansion-related long-lead equipment before the integrated district plan is finalized.
▸ How the cases moved
Versus the day before the Q2 results, the bear case is modestly reduced from roughly $1,700M to $1,800M because TZ production recovered and liquidity remained strong, but its probability rises slightly on higher 2026 cost guidance and continued capital intensity. The base case rises from approximately $3,750M to $4,250M as Q2 free cash flow, Phase 2 grade improvement and Oko construction progress support the planned two-asset transition; base probability rises from 0.50 to 0.55. The bull case rises from approximately $6,000M to $6,600M because the combined Oko-Oko-Ghanie district and potential synergies become more credible, with probability increasing from 0.18 to 0.20. The residual probability shifts mainly away from the delayed-development outcome.
Tocantinzinho remains profitable but experiences higher Brazilian costs, weaker gold prices and lower-than-expected grades. Oko West reaches production later or materially above budget, leaving GMIN as a single-asset or early-ramp producer with limited free cash flow. EBITDA is valued at a restrained 7x multiple, with the equity benefit of net cash retained.
▸ Valuation
7x $230M EBITDA = $1,610M EV − (-$190M net debt) = $1,800M equity
Tocantinzinho delivers near guidance and continues generating substantial cash, while Oko West begins production around early 2028 broadly near plan. Development spending moderates after construction, allowing owner earnings to rise toward $350M annually. The 8x EBITDA valuation reflects a credible two-asset producer but discounts execution, country and gold-price risk.
▸ Valuation
8x $500M EBITDA = $4,000M EV − (-$250M net debt) = $4,250M equity
Tocantinzinho performs at the upper end of guidance, gold remains strong, and Oko West starts on schedule with a rapid ramp toward approximately 315,000 ounces in 2028. The integrated Oko-Oko-Ghanie district creates meaningful throughput and infrastructure synergies, while Gurupi adds further optionality. Owner earnings approach $500M as construction capex falls sharply and the market awards a 9x multiple to a growing mid-tier producer.
▸ Valuation
9x $700M EBITDA = $6,300M EV − (-$300M net debt) = $6,600M equity
▸ Target Rationale
The probability-weighted, discounted scenario value is $3,286M. I set the analytical target at $3,000M, below the model, because the arithmetic gives substantial credit to Oko West's future EBITDA before its full construction, ramp-up and integration risks are proven. It also does not fully capture potential dilution or cost overruns associated with the expanded Oko-Oko-Ghanie district. Net cash and demonstrated TZ execution prevent a larger discount.
Business Quality & Sentiment
Recent Research & News
Recent Research & News
2026-06-21Company news
- Acquisition of G2 Goldfields Approved: In April 2026, G Mining Ventures announced an agreement to acquire G2 Goldfields Inc.. On June 15, 2026, G2 Goldfields' shareholders overwhelmingly approved the transaction, which consolidates GMIN's fully permitted Oko West Project with G2's adjacent Oko-Ghanie Project in Guyana. The combination creates a district-scale gold hub with life-of-mine (LOM) average production expected to exceed 500,000 ounces per year. The transaction is expected to close in Q3 2026 and unlock over C$1 billion in capital, operating, and throughput synergies due to shared infrastructure and optimized mine sequencing.
- Q1 2026 Financial and Operating Results: On May 13, 2026, GMIN reported its financial and operational results for the quarter ended March 31, 2026. Preliminary gold production was 31,846 ounces, a 33% decline compared to Q4 2025. This reduction was planned, as the company prioritized waste stripping and pit advancement to access higher-grade Phase 2 ore. Heavy waste stripping (strip ratio of 4.40x) increased All-In Sustaining Costs (AISC) to $1,588 per ounce for the quarter. GMIN reaffirmed its full-year 2026 production guidance of 160,000 to 190,000 ounces, noting that approximately 62% of annual output is back-weighted to the second half of 2026.
- Tocantinzinho Commercial Performance: For the full year ended December 31, 2025, GMIN's flagship Tocantinzinho (TZ) mine in Brazil completed its first full year of commercial production, producing 171,871 ounces of gold and generating $255 million in mine-site free cash flow. This cash flow strengthens GMIN's balance sheet to fund the ongoing construction of Oko West.
▸ Thesis-test Findings
Oko West Guyana construction updates and permitting progress
The Oko West Gold Project in Guyana continues to advance on schedule and on budget, with first gold pour targeted for the second half of 2027 and commercial production expected in January 2028. As of the Q1 2026 update, overall project completion stood at 19.7% based on earned value. GMIN has spent approximately US$292 million (~30% of the initial capital estimate of US$973 million) and committed US$525 million (~54% of initial capital). Detailed engineering and procurement are both roughly 80% complete, and long-lead equipment has been largely secured. On the permitting front, Guyana’s Environmental Protection Agency issued the final Environmental Permit in September 2025, authorizing construction and operations through July 2030. Furthermore, the newly approved acquisition of G2 Goldfields is expected to simplify and accelerate the permitting pathway for adjacent Oko-Ghanie deposits by integrating them with Oko West's already-established development plan.
G Mining Ventures Tocantinzinho production performance Q2 2025
During Q2 2025, the Tocantinzinho (TZ) mine in Brazil achieved nameplate capacity and delivered steady-state operations, resulting in a step-change in quarterly gold production. TZ produced 42,587 ounces of gold, representing a 20% increase over the previous quarter. The mine generated robust quarterly free cash flow of US$60.2 million and net income of US$48.6 million. Total cash costs during Q2 2025 were US$763 per ounce, while AISC was reported at US$1,170 per ounce of gold sold (or US$1,355 per ounce of gold produced depending on accounting adjustments). This strong performance established the operational stability of TZ as the primary cash engine to fund GMIN's organic growth pipeline.
Guyana gold mining regulatory environment and tax updates 2025
In Guyana, large-scale mining operations are governed by specific Mineral Agreements, which standardise tax and royalty metrics. The standard royalty is 5% of gross production value, but large-scale agreements typically apply an elevated 8% royalty when gold prices exceed US$1,000/oz. Guyana's 2026 National Budget (tabled in January 2026) introduced several tax relief measures that directly benefit miners by lowering operating costs in difficult terrain. These measures include the removal of import duties and taxes on all-terrain vehicles (ATVs), tax relief on outboard engines up to 150 horsepower, and a simplified flat-tax regime for double-cab pickups used to transport tools and personnel. Additionally, the government maintained a zero percent excise tax on petroleum products, cushioning operators against high fuel prices, which remain one of the largest operational expenses in the sector.