Stocks/H.TO

H.TO

Hydro One Limitedv3 4.0/10 · 2026-11-08
Utilities·Regulated Electric
57.14 CAD
34.3B CAD market cap
1.8% div yield
v3 Rating
4.0/103.0–5.0
Setup
3.5/102.5–4.5
Fair Value
49.00 CAD42.00 CAD–56.00 CAD-14%
DCF (10%)
49.00 CAD-14%
Base IRR
+7%+3%–+10%
Visibility
clear±14%
Rating
Revenue (TTM)
9.7B CAD
Owner Earnings
C$1.6B
Next-Yr Owner Earnings
C$1.6B
Growth
+7.5% × 15y
P / Next-Yr OE
21.2x
Net Debt
C$19.9B

Hydro One Limited, through its various subsidiaries, functions as a prominent electric utility, overseeing the transmission and distribution of power throughout Ontario, Canada. The company organizes its operations across three primary segments: Transmission, Distribution, and other business activities. Its infrastructure portfolio includes approximately 30,000 circuit kilometers of high-voltage transmission lines and a vast 125,000 circuit kilometers of its main low-voltage distribution network. This robust system delivers electricity to around 1.5 million clients, encompassing residential households, small businesses, commercial enterprises, and industrial facilities. Beyond its core power delivery, Hydro One also provides essential telecommunications support for its grid operations and offers a range of information and communication technology (ICT) services and solutions. Incorporated in 2015, the company's corporate headquarters are situated in Toronto.

2-Year Price History

$57.60+34.1%
$45$50$55$60volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-08

Rating
4.03.0–5.0
Setup
3.52.5–4.5
Fair value (CAD)
49.0042.00 – 56.00
Upside vs 57.14
-14%
DCF (10%)
49.0042.00 – 56.00-14%
Base IRR
7%3% – 10%
Visibility
clearrange ±14%
Sentiment
7/10
Reputation
4/10
2026-11-08 · claude-opus-5-5 · priced at 57.68

Hydro One is Ontario's regulated transmission and distribution monopoly (98% of the provincial high-voltage grid, 1.5M mostly rural distribution customers), 47.1% owned by the Province of Ontario, 99% rate-regulated, A-rated, and about as predictable as a listed equity gets: 2025 revenue net of purchased power C$4,555M, EBITDA ~C$3,349M, net income to common C$1,339M, EPS $2.23, and H1 2026 EPS of $1.27 tracking to roughly $2.40 for the year. On 8 October 2026 Hydro One Networks filed the 2028-2032 joint rate application: ~C$37B of investment (vs ~C$3.1B/yr of capex today), transmission rate base from C$19.2B in 2028 to C$28.5B in 2032, and a request to lift deemed equity thickness from 40% to 45%. That is a genuine acceleration of rate-base compounding and, if approved, supports 8-10% EPS growth for a decade. The problem is entirely price. At C$57.68 the stock is 24x 2026E EPS, ~15.5x EV/EBITDA, ~1.85x rate base and ~2.3x book for an asset whose allowed ROE is 9.11% (2026 OEB parameter) and whose own debt costs 3.8-4.7% — Jefferies cut it to Underperform at C$48 precisely for the '40%+ premium to US utility peers'. On the owner-earnings lens the picture is worse: strip maintenance capex and unlevered owner earnings are only ~C$1.5-1.6B against a C$54.9B EV (~35x), the dividend (2.45% yield, C$848M) is funded with new debt, and the next rate period requires an ATM/hybrid equity program that dilutes. Two independent routes (exit multiple on 2031 EPS, and 1.7x 2032 rate base less future net debt) both land at a C$48-50 fair value, a base-case return of only ~6-7%/yr from here, and no takeover optionality (the Electricity Act caps any other holder at 10%). This is a wonderful business at a full price sitting at 90% of its three-year range, consensus Hold with targets clustered at the share price — the opposite of blood on the ground. Rating 4.0: nothing to short (profitable, government-anchored, low vol so even covered calls pay little) but nothing to buy either. Research rating 3.5: the open question (how much of the C$37B and the 45% equity thickness the OEB grants in 2027) is worth tracking, but no plausible version of it makes the stock 40% cheap today.

A deep dive would have to establish: How much of the C$37B 2028-2032 plan and the 45% deemed equity thickness the OEB actually grants in 2027, and how much common equity Hydro One must issue to fund it — the two inputs that decide whether EPS growth steps up to 8-10% or the 24x multiple compresses.

Owner earnings, TTM
C$1.6BC$1.2B – C$2.3B
Realistic peak profit
C$2.3BC$1.9B – C$2.8B
Growth rate
7.5%5.0% – 9.5%
Years of growth
1510 – 25
Market cap
C$35BC$34B – C$35B
EV
C$55BC$54B – C$56B
Net debt
C$20BC$19B – C$21B
Capital return / cap
85000.0%80000.0% – 90000.0%
P/E
24.0×22.5× – 25.5×
EV/EBITDA
15.5×14.5× – 16.5×
FCF yield
2.6%1.5% – 4.0%
Projected FCF, base case (CAD millions)
Y1C$1.6BC$1.4B – C$1.9B
Y2C$1.7BC$1.4B – C$2.1B
Y3C$1.9BC$1.4B – C$2.3B
Y4C$2.0BC$1.5B – C$2.5B
Y5C$2.1BC$1.6B – C$2.7B
Competition: A statutory monopoly on 98% of Ontario transmission and the largest distributor in the province, with the only real competition being the IESO's new competitive procurement of selected large transmission projects, where Hydro One is one of six registered transmitters.
Governance: No accounting or integrity concerns, but the Province of Ontario owns 47.1% and appoints directors under a governance agreement, so provincial affordability politics can trump shareholder returns — a structural, fully disclosed conflict.
Research (expand)

What it does. Ontario's grid monopoly: ~30,000 km of transmission (98% of the province's high-voltage system) and ~125,000 km of distribution serving ~1.5M mostly rural customers. 99% of revenue is rate-regulated by the Ontario Energy Board. The Province owns 47.1% (legal floor 40%); no other holder may exceed 10%, so a buyout is impossible by statute.

What it earns. 2025: revenue net of purchased power C$4,555M, OM&A C$1,206M, D&A and asset removal C$1,111M, financing charges C$679M, tax C$219M, net income to common C$1,339M (EPS $2.23). EBITDA ~C$3,349M. 2026 is tracking to revenue net of purchased power ~C$4.8B, EBITDA ~C$3.55B and EPS ~$2.40 (H1 $1.27; Q2 +13.1% net income). Capex C$3,063M in 2025, C$1,527M in H1 2026; net debt C$19,385M at 30 June 2026, FFO/net debt 14.1% vs an 11% downgrade trigger.

Real owner earnings are much thinner than EPS. EBITDA ~3,535 less cash taxes ~150 (effective rate 15.6%, heavily sheltered by accelerated CCA) less maintenance capex — sustainment/operations spend of roughly C$1.9B, at minimum the C$1.15B of depreciation — gives unlevered owner earnings of about C$1.5-1.6B (high case ~C$2.2B). Against a C$54.9B EV (600.1M shares at 57.68 = C$34.6B, plus C$19.9B net debt and C$418M preferreds) that is ~35x; counting only cash taxes it is ~16x. After-tax interest of ~C$620M leaves ~C$900M of levered owner earnings, a 2.6% yield on the market cap. Post-growth-capex free cash flow is negative every year: the C$848M dividend is funded with new debt.

Five years. Projected unlevered owner earnings (after maintenance capex, before growth capex, in C$M): 2027 1,620 / 2028 1,730 / 2029 1,860 / 2030 1,990 / 2031 2,130. After the C$2-3.5B/yr of growth capex the strip is -C$0.3B to -C$1.5B a year, closed with debt plus an ATM/hybrid equity program management has said is inevitable. In 2031 this is the same company, roughly 50% larger: rate base ~C$43-46B, EPS ~$3.50, still growing 8%. Confidence in that is unusually high — the only question is the multiple.

Fair value. Exit 2031 EPS of $3.50 at 20x plus five years of dividends, discounted at 10%, gives ~C$50. A rate-base route (1.7x C$43B 2032 rate base, less ~C$29B future net debt, 650M shares) gives ~C$48. Base IRR from today ~6.5%. Fair value C$49, ~15% below the price. At 24x forward EPS, 1.85x rate base and 2.3x book on a 9.11% allowed ROE, the premium to US and Canadian peers is the whole debate.

Management, risk, competition. New CEO Megan Telford (June 2026) and CFRO Harry Taylor are credible, candid on dilution and credit metrics, and delivered C$254M of 2025 productivity savings; the 50-50 First Nation equity model is best-in-class and recycles capital. Risks: OEB trimming the C$37B ask or refusing 45% equity thickness (the ice-storm Z-factor denial shows the board can say no), Ontario affordability politics with cost of living now voters' #1 issue, wildfire exposure, rate-base-sized equity issuance, bond-proxy multiple compression if long rates rise, and IESO competitive procurement of some new lines (Hydro One is one of six registered transmitters).

Sentiment 7/10. Loved as a safe grid/electrification proxy and near its high; but 13 analysts average Hold with targets at the price (Desjardins C$61 buy, Barclays C$57, CIBC C$56, Jefferies Underperform C$48). No capitulation, no forced seller — the Province's only possible sell-down (47.1% to 40%) would be an overhang, not a bargain.

Reputation 4/10. Ontario ratepayers have long resented delivery charges and rural outage times, and the legacy of the executive-pay fight still colours the brand; OEB customer-satisfaction and storm-response metrics are improving and employer awards are real, so the trend is mildly better, but affordability anger is rising.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · CAD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue9709+9%9041+7%8484+8%7844+1%7780
Gross profit2339-5%2510+28%1967+7%1842+1%1832
Operating expenses0.00-100%2430.000.000.00
▸Adj EBITDA3480+6%3349+10%3033+7%2838+1%2798
▸Adj OCF2736+9%2642+16%2285+6%2160-2%2199
CapEx-2903-2999-2808-2476-2086
Adj FCF-167-357-523-316-380%113
Interest expense731692649584495
▸Adj net income1413+6%1363+18%1152+6%1083+3%1048
▸Owner's earnings1400--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA14803100%2747100%3336100%3061100%2852100%2807100%
FCF (OCF−capex)-594-4%-126-5%-304-9%-274-9%-64.0-2%1746%
Net income580439%117443%133940%115638%108538%105037%
▸Capital returned146210%62723%32.01%-609-20%74026%67224%
Buybacks-3.000.000.000.000.00-3.00
Dividends3516623788743700662
Interest paid2972552692649584495
Debt paid down-5023-548-1448-2001-544-482
▸Reinvestment1242684%209676%296589%281492%247087%208174%
Capex (PP&E)1246720982999280824762086
Intangibles & M&A-32.0-24.0-8.000.000.000.00
Leases signed (net Δ)-9.0022.0-26.06.00-6.00-5.00
Retained / other9486%-177-6%36411%98432%-220-8%-3.000%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

Balance SheetTTM2025202420232022
▸Assets (total)4162939671366823285231457
▸Liabilities (total)2831326925245092108720065
Net debt (incl. leases)1961018640170181565914662
Net debt / Adj EBITDA5.645.575.615.525.24
Net debt / Adj FCF--------130
Adj EBITDA / interest4.764.844.674.865.65
Shares outstanding600600599599599
Dilution (YoY)+0.0%+0.1%+0.1%+0.1%-0.3%
Employees7261--------
MarginsTTM2025202420232022
Gross margin24.1%-3.527.8%+4.623.2%-0.323.5%-0.123.6%
Adj EBITDA margin35.8%-1.237.0%+1.335.8%-0.436.2%+0.236.0%
Adj OCF margin28.2%+0.029.2%+2.326.9%-0.627.5%-0.728.3%
Adj FCF margin-1.7%+2.5-4.0%+2.2-6.2%-2.1-4.0%-5.51.4%
Net income margin14.5%-0.214.8%+1.213.6%-0.213.8%+0.313.5%
Adj NI margin14.6%-0.515.1%+1.513.6%-0.213.8%+0.313.5%
ROIC (adj, after-tax)6.2%6.1%5.7%5.8%5.4%
Cost of debt3.7%3.7%3.8%3.8%3.4%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-08-12

Hydro One delivered a solid second quarter, with net income attributable to common shareholders increasing 13.1% year over year and basic EPS rising to $0.62 from $0.54. Revenue net of purchased power grew 5.5%, driven by higher OEB-approved 2026 rates, a 0.5% increase in average monthly transmission peak demand, 4% higher distribution energy volumes and a 0.8% increase in distribution customers. Lower depreciation, amortization and asset-removal costs—particularly reduced storm-related removal costs—also supported earnings. Offsetting factors included higher OM&A, emergency restoration and line-maintenance spending, increased interest expense following additional debt issuance, and higher income taxes. OM&A rose 3.4%, while capital expenditures declined 11.1% to $812 million due to lower station refurbishment, equipment replacement and storm-related spending. Assets placed in service increased 9.0% to $644 million, largely reflecting transmission timing. The board declared a $0.3531 quarterly dividend, and management maintained its expectation for 6%–8% annual EPS growth during the current rate period. Megan Telford used her first call as President and CEO to emphasize strategic continuity, safety and execution. She reaffirmed the four pillars of customers, growth, solutions and partnerships, while highlighting the need to strengthen reliability and resilience amid aging infrastructure, changing weather and accelerating electrification. Hydro One was designated to develop the Red Lake transmission line in Northwestern Ontario, a 230 kV project expected in service in the early 2030s and structured around the company’s 50-50 First Nation equity partnership model. During the quarter, Hydro One filed lead-to-construct applications for the $3.4 billion Northeast Power Line, Longwood to Lakeshore Line and Durham Kawartha Line, all expected in service between 2029 and 2030. It also filed for the approximately $100 million Orleans Area Reinforcement Project, targeted for 2029. Management’s principal strategic focus is the upcoming 2028–2032 joint rate application, expected to be filed in October. Executives declined to preview specific requested parameters, but said the filing will propose substantial reliability, resilience, electrification and economic-growth investment while addressing Ontario’s cost-of-living pressures and mitigating customer bill impacts. The application is in its final documentation phase after extensive customer engagement and expert analysis, with management reporting strong customer support. The larger capital program will pressure the balance sheet early in the next rate period because construction spending precedes rate-base inclusion and cash-flow generation. Hydro One’s June 30 FFO-to-net-debt ratio was 14.1%, compared with an 11% downgrade threshold. Management intends to preserve its A credit rating and maintain a meaningful cushion, using hybrid debt for its equity credit and considering an ATM or larger equity issuance once capital needs are known. First Nations’ post-energization purchases of project interests should recycle capital later in the period and reduce pressure over time. The company expects to provide a detailed funding outlook at an Investor Day after rate approval. Hydro One is proactively addressing supply-chain and workforce risks through early contractor involvement, long-lead equipment commitments, supplier production slots and multiyear project visibility. Wildfires have affected some Northern Ontario infrastructure but have not caused major operational disruption or been attributed to Hydro One assets. Restoration costs would generally enter rate base through normal regulatory treatment, while current conditions are far below Z-factor eligibility. The company is monitoring competitive transmission procurement, data-center load growth and potential investments elsewhere in Canada, but remains focused primarily on Ontario. Its inaugural $1 billion U.S. dollar bond issue, swapped to a 3.835% Canadian-equivalent rate, was chiefly a diversification initiative and provides flexibility as future funding requirements grow.

Analyst Q&A (17)
▸
Asked what the 2028–2032 joint rate application might include beyond a larger capital program, including whether Hydro One may seek greater equity thickness or a higher earnings-sharing threshold.
Michael Lonegan · Barclays
Taylor said management cannot preview the October filing. He emphasized preserving Hydro One’s A credit rating and staying comfortably above the 11% FFO-to-debt downgrade threshold. Hybrid debt would be considered first because of its 50% equity credit, but equity will inevitably be needed. An ATM is attractive for minimizing dilution, although a larger offering remains possible depending on capital needs and market conditions.
▸
Asked what portion of incremental capital expenditures might be equity financed, whether an ATM would be used, and what FFO-to-debt target management would pursue.
Michael Lonegan · Barclays
Taylor reiterated that financing requirements will be determined after the rate application is approved. Hydro One is considering hybrid debt, an ATM program and potentially a larger equity issue, while keeping the FFO-to-debt ratio safely above the downgrade threshold.
▸
Asked which of Hydro One’s four strategic pillars—customers, growth, solutions and partnerships—would receive the most attention during her first 12 months as CEO.
Maurice Choy · RBC Capital Markets
Telford said the four pillars are equally important. Customers remain central, while aging infrastructure, severe weather and electrification create urgent needs that must be addressed through growth, solutions and partnerships.
▸
Asked what management has heard from customers since engagement for the joint rate application ended and how customers are responding to the upcoming filing.
Maurice Choy · RBC Capital Markets
Management has completed customer engagement and reported strong support for the proposals to be filed in October. However, the application will also reflect affordability concerns, with investments designed to improve reliability and resilience while mitigating bill and rate impacts.
▸
Asked how management defines the appropriate cushion above the 11% FFO-to-debt downgrade threshold and whether the metric could rebuild toward 14% by the end of the next five-year period.
Maurice Choy · RBC Capital Markets
Taylor described the early part of the next rate period as the most financially pressured because of the lag between investment, project completion, rate-base inclusion and cash-flow generation. He said 100 basis points above the 11% downgrade threshold is a flashing yellow light and 50 basis points is a flashing red light; management will use forecasts and equity support to maintain an adequate cushion.
▸
Asked how her leadership style compares with Lebeter’s and whether the CEO transition could change customer engagement, procurement, growth or project execution.
Mark Jarvi · CIBC
Telford said she and former CEO David Lebeter differ in professional backgrounds but share similar values and an on-the-ground leadership style. She expects continuity in strategy, with increased emphasis over time on storms, wildfires, electrification and delivering for customers as those challenges intensify.
▸
Asked what she learned from her listening tour about the concerns of industrial, commercial and residential customers, including potential tensions between growth-related demand and affordability.
Mark Jarvi · CIBC
Industrial customers want dependable electricity and greater reliability to support their businesses, while residential customers are focused on everyday affordability pressures. Both groups support Ontario’s growth and electrification but want Hydro One to manage the resulting bill impacts thoughtfully.
▸
Asked what remaining issues are consuming management’s time before the joint rate application is filed, such as project scope, cost estimates or affordability measures.
Mark Jarvi · CIBC
Taylor said the substantive work is complete and the team is finalizing extensive expert evidence, analysis and documentation. The filing will balance customer concerns, affordability, grid reliability, resilience, provincial economic growth and shareholder returns. Telford added that the leadership transition is allowing management to review the application carefully and with fresh eyes.
▸
Asked how Hydro One will fund rising capital requirements while accounting for capital returned when First Nations acquire equity interests in major projects.
Robert Hope · Scotiabank
Taylor said the funding plan is being developed around the early-period pressure created by construction spending and the lag before projects enter rate base. For transmission projects, First Nations partners can buy their 50% interests during the year after energization, recycling capital. Hydro One intends to protect its credit rating while limiting dilution, and plans an Investor Day after approval to outline its capital and funding plans.
▸
Asked whether Hydro One is organizationally prepared to execute a much larger transmission program and whether supply-chain constraints could hinder the ramp-up.
Robert Hope · Scotiabank
Management has visibility into workforce, materials and project timing, but acknowledges that global electrification is creating significant supply-chain and labor demand. Hydro One is engaging suppliers and contractors early, securing long-lead production slots several years ahead, using early contractor involvement and providing visibility into a multiyear project pipeline.
▸
Asked how wildfire damage would be treated financially and regulatorily, including whether Hydro One could seek Z-factor recovery, and how credit-rating agencies view wildfire risk for Canadian utilities.
Benjamin Pham · BMO
Telford said wildfire activity has affected some Northern Ontario infrastructure, but Hydro One has strong preparedness programs, close coordination with authorities and dedicated crews focused on public and employee safety and rapid restoration. Taylor said recovery costs would generally be added to rate base like storm restoration. A Z-factor would require much more severe losses, and current conditions are nowhere near that threshold.
▸
Asked about the timing of the remaining priority transmission project filings and whether a material number could be submitted before the upcoming joint rate application.
Benjamin Pham · BMO
Future transmission lines developed through First Nations partnerships would be addressed through their own rate applications rather than Hydro One Networks’ joint application. Hydro One will file additional Section 92 lead-to-construct applications only when estimates are sufficiently credible; one or two could be filed before October, but the company will not rush projects that will not enter service until 2031 or 2032.
▸
Asked how Hydro One views broader competition in future transmission procurement and, specifically, its approach to the upcoming competitive RFP for Toronto’s third line.
John Mould · TD Securities
Telford said Hydro One is well positioned to compete in the IESO’s framework and is evaluating the Toronto third-line opportunity as the rules develop. She noted that substantial competition already exists among contractors bidding to build Hydro One projects. The company is participating in IESO consultations and will update investors as the opportunity becomes clearer.
▸
Asked whether Hydro One is seeing potential investment opportunities outside Ontario that fit its previously stated strategic and geographic criteria.
John Mould · TD Securities
Hydro One is not pursuing growth outside Ontario for its own sake because the province already offers a substantial growth agenda. The company could consider opportunities elsewhere if they fit its capabilities, geographic and strategic criteria, support the national agenda and do not distract from delivering Ontario projects safely, on time and on budget.
▸
Asked how quickly Hydro One might become a regular U.S. debt issuer and what percentage of annual issuance could eventually be raised there.
John Mould · TD Securities
U.S. issuance will depend on relative all-in borrowing costs and market conditions. Hydro One has no fixed allocation target but could ultimately place at least one-third of its debt in the U.S., potentially more or less. The company views access to both markets as flexibility rather than a rigid funding mix.
▸
Asked how discussions with the province and data-center developers are progressing, where supporting generation may come from and whether additional transmission investment will be needed.
Patrick Kenny · National Bank Capital Markets
Telford said Hydro One is closely monitoring data-center development but does not set policy. The province is expected to establish rules for municipalities and utilities and ensure data centers pay fairly rather than shifting costs to ratepayers. Data centers generally enter through the IESO connection queue, and Hydro One will connect projects deemed necessary. Management expects Ontario to apply lessons from U.S. data-center growth more thoughtfully.
▸
Asked whether future U.S. bond issuance is intended mainly to diversify funding or to accelerate EPS growth, and how management is thinking about its cadence and duration.
Patrick Kenny · National Bank Capital Markets
Taylor said the U.S. bond issue was primarily intended to diversify funding sources and reduce interest costs, although the swap produced an especially attractive rate. Hydro One will continue issuing in Canada while accessing larger global pools of capital ahead of significantly higher future funding needs. Establishing a U.S. investor base should provide flexibility and avoid excessive concentration of Hydro One debt in any one market.

Web Traffic

hydroone.com
Web rank#539,286
Est. visits/mo755K
Traffic YoY▲ 10.8%
Traffic QoQ (12w)▼ 7.3%
Web Rank History
#539,286-139,562
rankest. visits/mo
400k500k600k700k800k900k1.0m535K691K848K1.0M1.2M06-0209-1512-1503-1606-1509-1411-16

Cash Runway

29.8months
WATCH

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
JOHN G ULLMAN & ASSOCIATES INC$1.2M$30.02+$0+$0—$824M
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

093K186K279K372K$30$37$44$51$592021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
Hexavest Inc.—Mn Services Vermogensbeheer B.V.—Nearwater Capital Markets, Ltd—Desjardins Global Asset Management Inc.—JOHN G ULLMAN & ASSOCIATES INC30KMARSHALL WACE, LLP—Gulf International Bank (UK) Ltd—

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2015 Q41.4B373M120M$0.20$0.18 – $0.238
2016 Q12.0B500M199M$0.36$0.33 – $0.3810
2016 Q21.5B458M159M$0.23$0.20 – $0.2610
2016 Q31.6B494M172M$0.32$0.27 – $0.3613
2016 Q41.7B592M240M$0.23$0.20 – $0.2814
2017 Q11.8B467M142M$0.32$0.27 – $0.3715
2017 Q21.6B482M151M$0.25$0.20 – $0.3012
2017 Q31.8B486M136M$0.37$0.28 – $0.4514
2017 Q41.6B581M207M$0.26$0.24 – $0.3213
2018 Q11.8B528M181M$0.34$0.27 – $0.3913
2018 Q21.5B549M182M$0.25$0.21 – $0.2914
2018 Q31.6B609M226M$0.35$0.30 – $0.3914
2018 Q41.6B572M194M$0.29$0.24 – $0.3713
2019 Q11.7B-399M-753M$0.44$0.44 – $0.446
2019 Q21.4B523M152M$0.27$0.27 – $0.276
2019 Q31.7B560M186M$0.37$0.37 – $0.376
2019 Q41.6B626M237M$0.32$0.32 – $0.327
2020 Q11.8B618M239M$0.37$0.37 – $0.376
2020 Q21.6B583M209M$0.31$0.31 – $0.317
2020 Q31.8B1.8B1.2B$0.44$0.44 – $0.448
2020 Q41.6B1.5B966M$0.28$0.28 – $0.289
2021 Q12.0B1.9B1.3B$0.42$0.42 – $0.429
2021 Q21.7B591M222M$0.37$0.37 – $0.375
2021 Q32.1B673M276M$0.46$0.46 – $0.463
2021 Q41.8B563M161M$0.27$0.27 – $0.275
2022 Q12.0B699M291M$0.48$0.48 – $0.484
2022 Q21.9B679M253M$0.42$0.42 – $0.426
2022 Q32.2B714M292M$0.49$0.49 – $0.494
2022 Q41.8B570M168M$0.28$0.28 – $0.286
2023 Q12.2B742M290M$0.48$0.48 – $0.483
2023 Q22.0B693M251M$0.42$0.42 – $0.425
2023 Q32.1B798M339M$0.56$0.53 – $0.588
2023 Q41.9B613M179M$0.30$0.28 – $0.347
2024 Q12.1B762M292M$0.49$0.48 – $0.509
2024 Q21.9B771M290M$0.48$0.48 – $0.485
2024 Q32.0B852M356M$0.59$0.54 – $0.618
2024 Q42.1B673M187M$0.31$0.30 – $0.329
2025 Q12.3B821M326M$0.54$0.51 – $0.5611
2025 Q22.1B829M310M$0.52$0.50 – $0.529
2025 Q32.3B894M398M$0.66$0.62 – $0.6811
2025 Q42.2B730M221M$0.37$0.33 – $0.3810
2026 Q12.5B911M386M$0.64$0.61 – $0.6610
2026 Q22.2B877M345M$0.57$0.56 – $0.5911
2026 Q32.4B993M419M$0.70$0.68 – $0.7110
2026 Q42.3B751M206M$0.34$0.32 – $0.359
2027 Q12.7B1.0B408M$0.68$0.64 – $0.703
2027 Q22.5B1.0B377M$0.63$0.63 – $0.631
2027 Q32.8B1.1B445M$0.74$0.74 – $0.741
2027 Q41.5B828M210M$0.35$0.35 – $0.351
2028 Q12.8B1.2B475M$0.79$0.79 – $0.792
2028 Q22.5B1.1B410M$0.68$0.68 – $0.682
2028 Q32.9B1.2B482M$0.80$0.80 – $0.802
2028 Q41.5B828M158M$0.26$0.26 – $0.262
2029 Q12.9B1.2B483M$0.80$0.80 – $0.801
2029 Q22.9B1.2B410M$0.68$0.68 – $0.681
2029 Q33.0B1.3B483M$0.80$0.80 – $0.801
2029 Q43.0B985M222M$0.37$0.37 – $0.371
v2 analysis (legacy, 2026-08-13) — for comparison onlyclick to expand

Thesis

Hydro One is a high-quality regulated infrastructure franchise with unusually visible Ontario-specific growth. Revenue, EBITDA and adjusted net income have compounded steadily, while electrification, industrial demand, aging infrastructure and new transmission projects provide a long runway for rate-base expansion. The new CEO appears strategically continuous, and the First Nations partnership model can broaden project access while recycling capital after energization. The central constraint is not demand but funding. Net debt is already CAD 19.1B, or 5.6x adjusted EBITDA, and free cash flow is structurally negative because annual capital spending is around CAD 3B. The next rate period will require spending before projects enter rate base, increasing dependence on hybrids and potentially an ATM or larger equity issue. Regulatory recovery is generally supportive but not automatic, as shown by the denied storm-recovery claim. The likely path is continued earnings growth with moderate dilution and a valuation that remains below the most optimistic infrastructure-growth multiples.

Trade Signal

Trade rating
-5.4/10
Short
Horizon
~4mo
gpt-5.6-luna2026-08-13 · saw 56.08 CAD+1.9% since

Short Hydro One modestly: the regulated franchise is high quality, but CAD 56.45 prices in the bull case while negative free cash flow, heavy capital needs and probable equity funding undermine the analyst's fair value of roughly CAD 21B.

Temporary mispricing-1.5

The stock rose from roughly CAD 43 at the end of 2024 to CAD 54 by late 2025 and then reached CAD 60.19 in March and July 2026, supported by utility defensiveness, regulated earnings growth and enthusiasm around transmission, electrification and data-center demand. It subsequently drifted down about 6% from the July high to CAD 56.45 as investors absorbed the OEB's April denial of CAD 223M of storm-cost recovery, the May US$1B bond issue, CEO transition and rising funding requirements. The latest earnings produced only a roughly 1% move despite solid EPS growth. This is not a panic overshoot; it is a durable premium repricing that has only modestly begun to reflect financing and regulatory risks. The market may have missed the significance of negative FCF and future dilution, but the gap is likely to close gradually rather than through an immediate shock.

Market view+3.5

The market appears constructive and willing to pay a premium for Hydro One's regulated quality, visible rate-base growth and Ontario data-center/electrification exposure. The stock has risen 14% over the past year and remains close to its 52-week high despite negative free cash flow. Bulls emphasize regulated recovery, priority transmission projects and 6%–8% EPS growth; bears emphasize 5.6x adjusted EBITDA net leverage, capital intensity, the denied storm-cost recovery and likely equity funding. The post-earnings reaction was essentially flat to slightly positive, suggesting investors are not yet pricing the balance-sheet risks aggressively. Positioning data are limited, so this is better described as a well-liked, attention-rich utility than a confirmed crowded long.

Inflectionwindow ~2mo-3.0

The upcoming JRAP filing is the key potential inflection, but the study's own bear and base cases imply that the market is already discounting a constructive rate-base expansion and strong Ontario electrification. The near-term evidence is more likely to highlight funding pressure, higher interest expense and affordability constraints than an unexpected step-up in per-share profitability. The bull case at CAD 56.99 is effectively the current price, leaving little valuation support if execution is merely solid rather than exceptional.

Catalysts
  • ▼2026-10 · 2028–2032 Joint Rate Application filing — Expected in October 2026; an affordability-conscious plan or weaker-than-expected allowed returns could challenge the premium valuation, while a highly constructive filing is the main upside risk to a short.
  • •2026-11 · Q3 2026 earnings — Watch EPS growth, rate-base additions, capital spending, FFO-to-debt and any indication of equity-financing needs; the print could clarify whether recent growth is translating into shareholder cash returns.
  • ▼2027 H1–H2 · Funding outlook / Investor Day — Management is expected to provide greater detail after rate approval; disclosure of substantial equity issuance or weaker leverage headroom would reinforce the valuation downside.
  • •2027–2028 · OEB review and approval of JRAP 2.0 — The regulatory outcome determines the pace of rate-base growth, allowed returns and customer-bill constraints; timing and terms are more important than the filing headline alone.
  • •2027-02 to 2027-05 · Q4 2026 and Q1 2027 earnings — These reports should show the impact of higher financing costs, capital intensity and the new rate period preparation on earnings quality and balance-sheet capacity.
Flow-3.5

No buyback support is evident and the dividend yield is only about 2%. Capital spending is structurally above internally generated cash flow, debt is already approximately CAD 19.1B, and management has explicitly discussed an ATM or larger equity issuance as the capital program becomes clearer. First Nations capital recycling may help later, but near-term financing supply is a negative risk.

Floor / Ceiling-1.5

The regulated asset base, investment-grade credit profile and recoverability of prudent spending provide a meaningful fundamental floor below the current price, but not a hard floor near CAD 56. Hydro One has no meaningful FCF yield or active buyback supporting the stock, while the need for hybrids or equity issuance creates a ceiling if the price rallies. The current valuation already capitalizes much of the long-term Ontario transmission opportunity.

Buyability

A high-quality, regulated Canadian utility is genuinely buyable for income and defensive growth investors, and Ontario electrification provides a credible long-term story. However, the 2% dividend yield, negative free cash flow and likely need for equity funding make the stock difficult to justify at 24x TTM earnings and 3.65x sales; the next buyer needs to underwrite premium growth that is not yet visible in per-share economics.

Fear vs Greedfear 4/10 (+2.0)greed 7/10 (+3.0)

Fear pulls harder than greed at CAD 56.45: this is an excellent franchise, but the market is paying a premium multiple for growth that will require substantial capital and may be diluted before it becomes accretive. The principal risk is not business failure; it is a slow valuation unwind as financing and regulatory constraints become harder to ignore.

Valuation

Our Target
21.0B CAD-39%
Market Should Pay
21.6B CAD-37%
target ×1.03 (greed premium)
Current Market Cap
34.3B CADBullish
What Changed
transcript · 2026-08-12
+3%fair value on this information

The genuinely new information was the first detailed discussion of the next rate-period funding problem: construction spending will precede rate-base inclusion, management expects equity support to be inevitable, and it is considering an ATM or larger equity issuance after the rate filing. Against that concern, Q2 showed 13.1% net-income growth, lower capital spending, higher assets placed in service and continued 6%-8% EPS guidance. The new CEO also delivered a continuity message, while the pipeline of major transmission projects became more concrete.

▸ How the cases moved

Following Q2, the bull case rises modestly from CAD 33,000M to CAD 34,200M as earnings growth remained strong, the transmission pipeline expanded and management reaffirmed 6%-8% EPS growth. The base case rises from CAD 25,800M to CAD 26,350M because the rate filing remains on schedule and operating execution was solid, but the probability of the base case increases slightly as management emphasized affordability and funding uncertainty. The bear case moves from CAD 18,000M to CAD 18,200M, while its probability rises from 0.18 to 0.20 because management still could not quantify equity needs and acknowledged early-period balance-sheet pressure. Overall probabilities move from bear/base/bull 0.18/0.57/0.25 to 0.20/0.55/0.25.

2-Year Plausible Outcomes
bear20%
18.2B CAD
rev +2%/yrOE $1300M

The 2028-2032 rate application is more conservative than investors expect, capital spending remains elevated, and financing is increasingly supported by equity issuance. Hydro One still earns regulated returns, but higher interest expense, affordability pressure and competitive transmission procurement constrain growth and the valuation multiple.

▸ Valuation

14x CAD 1,300M owner earnings = CAD 18,200M equity value

base55%
26.4B CAD
rev +5%/yrOE $1550M

Hydro One files and receives a constructive but affordability-conscious rate plan. Transmission and distribution rate base expand steadily, Ontario electrification supports roughly mid-single-digit revenue growth, and management funds the program with a mix of debt, hybrids, recycled First Nations capital and moderate equity issuance. Earnings grow, but leverage and regulatory execution prevent a premium multiple.

▸ Valuation

17x CAD 1,550M owner earnings = CAD 26,350M equity value

bull25%
34.2B CAD
rev +8%/yrOE $1800M

The JRAP produces a strong, executable investment plan, Ontario demand growth accelerates through industrial load and data centers, and Hydro One wins a substantial share of priority transmission work. First Nations partnerships recycle capital efficiently, funding is raised without materially impairing per-share economics, and the market rewards the company as a high-visibility regulated growth utility.

▸ Valuation

19x CAD 1,800M owner earnings = CAD 34,200M equity value

▸ Target Rationale

The probability-weighted scenario value discounted at 12% is CAD 21,346M. I set the analytical target modestly lower at CAD 21,000M because the scenario arithmetic does not fully capture the near-term balance-sheet strain, probable equity financing and uncertainty around the 2028-2032 rate application. The discount is limited because Hydro One has regulated assets, investment-grade credit metrics and credible mechanisms for rate-base recovery and First Nations capital recycling.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality8/10
Situation now7/10
Trajectory8/10
Risk4/10
Governance7/10
Insolvency prob (2yr)1.5%
Outcome uncertainty5/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • CEO Transition: Megan Telford officially succeeded David Lebeter as President and CEO of Hydro One on June 9, 2026. Melissa Sonberg continues as Chair, and Perrin Beatty joined the board as a new director, while long-serving directors Helga Reidel and Mitch Panciuk retired.
  • Q1 2026 Financial Results: On May 13, 2026, Hydro One reported a solid start to the fiscal year. First-quarter basic earnings per share (EPS) grew to $0.65 from $0.60 in Q1 2025. Net income attributable to common shareholders rose to $391 million, up from $358 million in the previous year. Revenues increased to $2,648 million, primarily driven by higher OEB-approved rates and higher peak demand, which was partially offset by higher financing charges and depreciation. Capital investments for the quarter reached $715 million.
  • Major Regulatory Setback: On April 7, 2026, the Ontario Energy Board (OEB) issued a decision denying Hydro One's Z-factor application to recover approximately $223 million in storm-restoration costs (equivalent to a $69 million incremental revenue requirement) resulting from a severe, widespread ice storm in March 2025. While the OEB acknowledged the storm was beyond the utility’s control, it ruled that Hydro One possessed the financial resilience and scale to absorb the costs within its existing rates without materially impairing operations or financial stability.
  • Priority Transmission Projects: Hydro One continues to secure growth-oriented infrastructure awards. The utility was selected to develop several critical transmission lines in Ontario, including the Greenstone, Sudbury-to-Barrie, and Red Lake transmission projects. Additionally, in June 2026, Hydro One Networks filed for OEB approval to build the Durham Kawartha Power Line.
  • Capital Markets Activity: On May 20, 2026, Hydro One Inc. priced its inaugural offering of US$1.0 billion in 5-year senior notes to support long-term funding requirements under its Sustainable Financing Framework.
▸ Thesis-test Findings
  • Ontario IESO electricity demand growth forecast data centers 2026: This represents a key fundamental driver supporting the long-term bull case. The Independent Electricity System Operator's (IESO) 2026 Annual Planning Outlook (APO) projects that Ontario's long-term electricity demand will grow by 65% through 2050 (with other base scenarios pointing to up to 75% growth). Crucially, the 2026 APO reveals that data centers are forecast to account for 8.6% of the province's total electricity demand by 2050, reflecting a 60% upward revision compared to prior projections. While short-term demand growth is expected to slow to 0.5% in 2026 due to macroeconomic factors, a strong rebound is anticipated for 2027. This structural demand shift indicates massive connection and transmission volume opportunities for Hydro One over the coming decades.
  • Hydro One Joint Rate Application JRAP 2028-2032 OEB filing details: This represents a critical near-term regulatory milestone that supports the visibility of Hydro One’s rate-base expansion. The utility's current approved custom joint rate application runs through 2027. During the Q1 2026 analyst call, management confirmed they are on track to file the next five-year JRAP (JRAP 2.0, covering 2028–2032) in Q3 2026. Hydro One has finalized its customer engagement process, reporting substantial consumer backing for its upcoming distribution and transmission investment plans. Furthermore, affiliate utilities such as Sault Ste. Marie (HOSSM) are being integrated into this joint rebasing application to streamline regulatory recovery. Successful execution of JRAP 2.0 is highly anticipated to act as a catalyst for accelerated EPS growth starting in 2028.
  • Ontario Local Distribution Company consolidation Pulse Panel 2026: This initiative acts as a meaningful inorganic growth catalyst for the distribution side of Hydro One's business. In late 2025, Ontario's Minister of Energy launched the Panel for Utility Leadership and Service Excellence (PULSE) to find capital models and municipal consolidation strategies to fund the grid’s modernization. Though Ontario's local distribution companies (LDCs) have already consolidated from over 300 down to fewer than 60, progress has slowed because larger municipal utilities have been hesitant to lose dividend streams. The ongoing work of the PULSE panel in 2026 is designed to incentivize further scale-building, which could open up significant acquisition or partnership runways for Hydro One—the province's largest player with a proven track record of absorbing smaller municipal utilities.