Stocks/HBM

HBM

Hudbay Minerals Inc.v3 4.5/10 · 2026-11-10
Basic Materials·Copper
$18.61
$7.9B market cap
0.1% div yield
v3 Rating
4.5/103.0–6.0
Setup
5.0/103.5–7.0
Fair Value
$20.00$12.00–$31.00+7%
DCF (10%)
$20.00+7%
Base IRR
+8%-5%–+20%
Visibility
wide±48%
Wall Street
$31.00 target(2 analysts last year)(12 buy, 8 hold)
Rating
Revenue (TTM)
$2.9B
Owner Earnings
$600M
Next-Yr Owner Earnings
$470M
Growth
+8.0% × 5y
P / Next-Yr OE
17.6x
Net Debt
-$80M

Hudbay Minerals Inc. operates as a diversified mining firm, encompassing its subsidiaries, focusing on the exploration, extraction, and commercialization of both industrial and precious metals across the North and South American continents. The company's primary products consist of copper concentrates (from which copper, gold, and silver are derived), silver-gold doré, molybdenum concentrates, and metallic zinc. Hudbay maintains a significant presence with three multi-metal mining operations, four ore processing facilities, and a dedicated zinc production plant, situated in northern Manitoba and Saskatchewan, Canada, and in Cusco, Peru. Furthermore, it is actively developing copper projects in the U.S. states of Arizona and Nevada. Founded in 1927, Hudbay Minerals Inc. is centrally managed from its headquarters in Toronto, Canada.

2-Year Price History

$21.95+157.9%
$10$15$20$25Initial target $25.00 · 2026-11-03Initial target $20.00 · 2026-11-10volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Oct 26

Valuation v3 Opus worker · 2026-11-10

Rating
4.53.0–6.0
Setup
5.03.5–7.0
Fair value (USD)
20.0012.00 – 31.00
Upside vs 18.61
+7%
DCF (10%)
20.0011.00 – 32.00+7%
Base IRR
8%-5% – 20%
Visibility
widerange ±48%
Sentiment
6/10
Reputation
5/10
2026-11-10 · claude-opus-5-5 · priced at 21.95

Hudbay is a copper-gold miner (Peru, Manitoba, British Columbia) with a net cash balance sheet, record trailing EBITDA of about $1.3B, a 24% copper production step-up guided for 2027 and the Copper World project (FID taken in October, about $2.07B total capex, Hudbay about 70%, first production 2H 2029) plus Cactus and Mason as a path to 500kt copper. The stock has fallen from $28.65 in August to about $22 on copper weakness and sector selling, but this is not capitulation: at roughly 17x unlevered owner earnings, 7.8x EBITDA and about 4-5% FCF yield, the market already pays for strong copper and gold prices and for the growth pipeline. My 5-year DCF (10%, about 11x year-5 FCF of about $900M) gives about $20 per share, a little below the price, with a very wide range because the result depends on commodity prices (gold above $3,500, copper near $5) and Copper World execution. No clear mispricing: fairly priced to slightly rich with good optionality, so rating 4.5 for attractiveness and 5 for a deep dive (Copper World capex and Q3 results on Nov 12 are the catalysts).

A deep dive would have to establish: Would Copper World's real all-in capex, Cactus economics, Manitoba mine life and a through-cycle copper/gold price deck still support more than $25 a share, or is the current price already at fair value?

Owner earnings, TTM
$600M$450M – $750M
Realistic peak profit
$1.3B$900M – $1.9B
Growth rate
8.0%2.0% – 14.0%
Years of growth
53 – 8
Market cap
$9.8B$9.0B – $11B
EV
$10B$9.3B – $11B
Net debt
-$80M-$300M – $200M
Capital return / cap
4000.0%1500.0% – 12000.0%
P/E
22.0×14.0× – 35.0×
EV/EBITDA
7.8×6.5× – 10.0×
FCF yield
4.6%2.0% – 7.0%
Projected FCF, base case (USD millions)
Y1$470M$250M – $700M
Y2$600M$250M – $900M
Y3$400M$100M – $750M
Y4$450M$100M – $850M
Y5$900M$300M – $1.5B
Competition: Mid-tier copper-gold producer price-taker against majors; edge is byproduct gold cost position and US development pipeline.
Governance: No serious issues; watch past Guatemala lawsuits (settled 2024), Peru community conflict and aggressive M&A.
Research (expand)

Business. Hudbay mines copper, gold, silver, zinc and moly: Constancia (Peru, about 19kt copper a quarter), Snow Lake/Lalor (Manitoba, gold-led, about 185koz a year target), Copper Mountain (BC, ramping to 50ktpd with a new SAG mill), plus Arizona and Nevada projects. Gold was 38% of Q2 revenue, which pushes consolidated cash cost to about negative $0.40/lb.

What the market believes. Shares rose 7x in three years on copper scarcity and gold; they are now down about 30% from the August high with short interest rising (about 9.9M shares, 2.3 days). Fear is about copper pullback, Copper World capex inflation (management said capex will be 'higher for sure'; DFS shows $2.07B initial, $1.84B net of the Wheaton stream deposit, IRR about 17% at $5/lb), Peru politics, and Manitoba labour shortages. Holders GMT and FIL have trimmed (FIL 8.4% to 6.3%). I do not see a forced seller or mispriced accounting: the balance sheet is net cash ($80M, with $334M restricted at Copper World), and results are strong. The market is mostly right; it already capitalizes record margins.

Earnings today (my estimate, 'vendor/primary' mix). TTM adjusted EBITDA about $1.3B; less cash taxes (about $200M), sustaining capex including capitalized stripping (about $430M), SBC and other (about $20M) gives unlevered owner earnings of about $600M. Reported FCF after sustaining capex was over $400M TTM. EV about $10.2B (market cap 9.75B on about 444M shares after 46.8M issued for Arizona Sonoran, minus net cash, plus Mitsubishi's 30% of Copper World), so about 17x owner earnings, about 45% of EBITDA reaches owners. Equity yield about 5%. This is not a 'mature year repeated' case: capitalizing $600M at 10% less net cash gives only about $14/share, so the price needs growth and high metal prices.

Projected FCF (after growth capex, SBC, Hudbay share of Copper World; $M). Y1 470, Y2 600 (copper up 24% to about 150kt, BC high-grade, Peru 34Mtpa), Y3 400 (Copper World contributions start 2028, about $500M total), Y4 450, Y5 900 (Copper World at 100kt+ a year, Manitoba gold declining toward flat). Year 5 company: a roughly 250kt copper producer with gold byproduct and a Cactus/Mason pipeline, growing mid single digits to about 8%; I assign about 11x FCF (about $10B), given cyclicality, Peru exposure and Pampacancha depletion. DCF about $20/share; range $11-32 depending on $4-6 copper and gold $3,000-4,500.

Fair value. About $20, roughly 0.9x the price: expect about 8% a year from here in the base case, not a 50% setup. Paying 7.8x EBITDA looks cheap but converts to 17x owner earnings.

Skeptic test. Bull case: $6 copper makes Copper World NPV $2.3B and 150kt+ copper plus Cactus is under-priced; sell-side may have copper at spot. Bear case: capex inflation and tariffs, Peruvian blockades (2025 precedent), Lalor labour/grade shortfalls, gold falling toward $3,500 (management's cost guidance holds down to that), and 30% of Copper World belonging to Mitsubishi. I could not verify Q3 numbers (due Nov 12) or the share count from the filing, so the range stays wide.

Management. CEO Kukielski, new President/CFO Lei and new COO Carter; record of meeting copper guidance 11 years running, deleveraging, first dividend increase in a decade (still tiny, $0.01 a quarter). Capital allocation is growth-first; M&A appetite continues (Arizona Sonoran at a full price), a mild governance watch. Community opposition in Arizona and legal challenge to New Ingerbelle are risks.

Sentiment: 6/10. Bullish on copper, but the August to October drop and rising shorts show nerves; no capitulation.

Run history
datepriceratingresearchfair valueDCFbase IRRsentiment
2026-11-0321.445.56.025.0022.5011%5
2026-11-1021.954.55.020.0020.008%6

Financials — Adjusted

Adjusted · TTM 2026-Q3 · USD

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue2900+41%2211+9%2021+20%1690+16%1461
Gross profit1221+86%743+34%554+41%393+42%277
Operating expenses179+9%182+28%142+49%95.4+52%62.6
▸Adj EBITDA1490+65%1003+19%840+22%690+25%553
▸Adj OCF841+58%608+6%573+19%480+51%318
CapEx-643-469-347-281-309
Adj FCF198+80%139-39%226+14%1998.91
Interest expense66.874.188.687.174.7
▸Adj net income490+242%166+1%164+24%133+14%117
▸Owner's earnings330--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA4510100%1178100%1443100%785100%601100%503100%
FCF (OCF−capex)110524%17115%23817%32141%19633%17936%
Net income125328%47140%56939%76.710%66.411%70.414%
▸Capital returned70616%28824%21915%-80.3-10%16527%11523%
Buybacks-421-2.97-20.5-3980.110.00
Dividends28.58.735.655.534.484.11
Interest paid37449.474.188.687.174.7
Debt paid down72523316022473.135.8
▸Reinvestment142732%81.67%41929%36446%27045%29258%
Capex (PP&E)1906499469347281309
Intangibles & M&A-428-415-4.502.76-11.10.00
Leases signed (net Δ)-51.3-2.52-45.613.70.10-17.0
Retained / other91120%29825%39.73%41953%72.412%89.918%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 116 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)83376212548852854326
▸Liabilities (total)29382987284030902754
Net debt (incl. leases)51.052460111201020
Net debt / Adj EBITDA0.030.520.711.621.84
Net debt / Adj FCF0.263.782.665.64114
Adj EBITDA / interest22.313.59.487.927.41
Shares outstanding444396395395395
Dilution (YoY)+0.1%+0.1%+12.9%+33.2%+0.2%
Employees22330.000.000.000.00
MarginsTTM2025202420232022
Gross margin42.1%+10.233.6%+6.227.4%+4.223.2%+4.318.9%
Adj EBITDA margin51.4%+7.545.4%+3.841.6%+0.740.8%+3.037.9%
Adj OCF margin29.0%+3.227.5%-0.828.3%+0.028.4%+6.621.8%
Adj FCF margin6.8%+1.56.3%-4.911.2%-0.611.8%+11.10.6%
Net income margin20.7%-1.725.7%+21.93.8%-0.13.9%-0.94.8%
Adj NI margin16.9%+10.07.5%-0.68.1%+0.27.9%-0.18.0%
ROIC (adj, after-tax)11.6%8.5%7.2%5.6%5.6%
Cost of debt6.8%6.5%7.1%6.2%6.0%

Earnings Calls

11 calls

Earnings Call · 2026 Q2

2026-07-29

Hudbay Minerals reported steady second quarter 2026 results on July 29, 2026, with record trailing 12-month adjusted EBITDA of $1.3 billion, driven by copper and gold diversification and cost control. Consolidated copper production was 28,000 tonnes and gold production was 51,000 ounces. Copper output rose from the first quarter on higher British Columbia mill throughput, which more than offset lower planned throughput in Peru. Gold output fell mainly on lower milled grades. Management reaffirmed full-year production guidance for all metals and said consolidated cash costs were negative $0.40 per pound of copper, with sustaining cash costs of $1.39 per pound. Gold by-product credits offset external cost pressures such as higher fuel and consumable prices, and management improved its 2026 consolidated cash cost guidance. Quarterly revenue was $631 million, adjusted EBITDA was $321 million, operating cash flow before working capital changes was $210 million, and adjusted net earnings were $114 million, or $0.28 per share. Gold made up 38% of gross revenue. Free cash flow after sustaining capital but before growth investment exceeded $100 million in the quarter, and over $400 million over the last twelve months. Liquidity exceeded $1 billion at June 30, including $890 million of cash and $154 million available under revolving credit facilities. The company held a net cash position of $80 million, and its net debt-to-EBITDA ratio was negative 0.1x, the lowest in more than a decade. Peru: Production was 19,000 tonnes of copper, 5,000 ounces of gold, 565,000 ounces of silver and 277 tonnes of molybdenum, slightly below the first quarter because of the planned semiannual plant maintenance shutdown. Total material moved reached 24 million tonnes, the highest monthly total in ten years was set in May, and mill throughput averaged about 86,000 tonnes per day. Permit amendments raised Constancia's annual milling capacity to 34 million tonnes from 31 million. Pebble crushers are being installed to lift throughput from the third quarter. Concentrate sales were delayed by ocean swells that closed the port, deferring about 10,000 dry metric tons into early July. Peru cash costs were $1.66 per pound of copper, up on lower gold credits after the Pampacancha stockpile depleted, higher fuel prices and the maintenance shutdown, but still better than the low end of full-year guidance. Manitoba: Production was 40,000 ounces of gold, 2,300 tonnes of copper, 4,800 tonnes of zinc and 209,000 ounces of silver, down from the first quarter on lower tonnes milled. Labor availability constraints were addressed by engaging an experienced mining contractor to advance the 1901 deposit, freeing internal crews for other development work, and onboarding and upskilling new employees. Lalor hoisted about 3,500 tonnes of ore per day. An unplanned hoist gearbox failure in early June was repaired within days using a critical spare. The 1901 deposit is expected to reach full production in late 2027. New Britannia gold recoveries were about 90%, and the Stall mill recovered 71% of gold. Early works on new tailings lines between the two mills are underway. Manitoba gold cash costs were $776 per ounce, within guidance, and second-half production is expected to exceed the first half. British Columbia: Copper Mountain produced 6,500 tonnes of copper, 5,600 ounces of gold and 71,000 ounces of silver, with all metals up from the first quarter. Recoveries declined as higher throughput exposed a grinding constraint in the ball mills, and grinding and flotation control initiatives are underway. Cash costs were $3.22 per pound of copper, above the 2026 range, but full-year guidance is expected to be met. Mining reached a record 30 million tonnes and 331,000 tonnes per day under an accelerated stripping program. Mill throughput rose 17% to 3.6 million tonnes, averaging about 40,000 tonnes per day, the highest quarterly average since acquisition. The primary SAG mill was shut down in late June for about a month to replace its feed end head and restarted recently. The second SAG mill continues to operate and is targeted at 50,000 tonnes per day capacity in the second half of 2026. The New Ingerbelle expansion held its groundbreaking, and the project was added to British Columbia's priority resource projects list. It is designed to access higher-grade ore with a stripping ratio about 3x lower, and growth capital in British Columbia for 2026 rises by about $30 million to $115 million. Growth: Brownfield investments are expected to lift consolidated copper production 24% to about 150,000 tonnes next year. At Copper World, engineering is 95% complete and the sanction decision is on track for later in 2026. The definitive feasibility study will show higher capital than the 2023 pre-feasibility study, due to inflation and scope changes that preserve future mill expansion optionality. Copper World received $52 million of U.S. municipal bonds at 4.5%. Hudbay completed the acquisition of Arizona Sonoran in June, adding the Cactus copper oxide project. Cactus will be developed after Copper World, with about $30 million planned for the second half of 2026 on a pre-feasibility update, site derisking and exploration, and completion expected in the second half of 2027. The Mason project in Nevada has begun pre-feasibility work, due in the second half of 2027. Management outlined a path to about 250,000 tonnes of copper from Copper World by the end of the decade and a line of sight to 500,000 tonnes by the middle of the next decade. Leadership: Eugene Lei was promoted to President and Chief Financial Officer, and Rob Carter was named Chief Operating Officer, succeeding Andre Lauzon, who retires at the end of September. In the Q&A, analysts focused on Lalor labor recovery, Copper World capital and timing, Cactus spending and capital intensity, Copper Mountain throughput and grades, Constancia capacity expansion, cost guidance drivers, tariffs, and M&A appetite. Management said the Copper World sanction would likely come in early Q4, with first production in the second half of 2029, and that capital estimates would be refined as contractor data arrives.

Analyst Q&A (18)
▸
Has the labor availability issue at Lalor been fully cleared, and have mining rates returned to normal at the start of the third quarter?
Orest Wowkodaw · Scotiabank
Yes. Andre Lauzon said the team hired about 100 people, launched local training programs, and used embedded and temporary contractors, including one taking over the 1901 deposit. Efficiencies improved about 10% over the last month. Rob Carter added that heavy lifting was done in Q2, and production has seen a significant uptick since June and July.
▸
Can investors still expect an updated Manitoba mine plan technical report around September?
Orest Wowkodaw · Scotiabank
Peter Kukielski said exploration and engineering could add production and mine life at Snow Lake, but management is confident it can show an improved long-term profile based on reserves alone. Further comment would come at a planned Manitoba site visit later in the year.
▸
How large is the expected increase in Copper World capital versus the 2023 pre-feasibility study, and what is the potential for future mill expansion optionality?
Richard Garchitorena · Barclays
Peter Kukielski said inflation and scope changes for future mill expansion optionality will increase capital, but he does not expect a blowout. Higher copper prices should offset cost changes and keep economics robust. Capital is not yet final because integrated project delivery contractors are providing data. The renegotiated Wheaton stream includes an extra payment if the mill is expanded by year 5. Synergies with Cactus and Mason include shared teams and a concentrate leach facility providing acid.
▸
With about $30 million planned at Cactus in 2026 and a pre-feasibility study in 2027, should investors expect more capital spending next year?
Richard Garchitorena · Barclays
Yes, absolutely. Details will be provided as capital reviews proceed later in the year.
▸
Is the Copper World pre-feasibility study likely before the end of Q3, or with Q3 results in late October or early November?
Lawson Winder · Bank of America
Peter Kukielski said timing is later rather than earlier because internal target processes and Mitsubishi's processes must be completed first, so early Q4 is more likely than Q3. Eugene Lei added that the final investment decision is on track for later in 2026, with first production in the second half of 2029.
▸
What was the root cause of the Lalor gearbox failure, and was it an isolated equipment event or something structural?
Lawson Winder · Bank of America
Andre Lauzon called it an isolated event, repaired within days using a critical spare. Rob Carter said a premature shaft-in-gear failure occurred, the root cause is under review, and the failed unit is being refurbished to serve as the new critical spare. He does not foresee a recurring problem.
▸
Is it fair to expect no meaningful impact from the gearbox failure on Q3 or Q4?
Lawson Winder · Bank of America
Yes. Rob Carter said the failure was an isolated incident in the first 10 days of June, operations resumed within several days, and the unit has been operating well since.
▸
How will Copper Mountain throughput evolve in Q3 and Q4, and what should SAG 1 run at when it returns to service?
Anita Soni · CIBC World Markets
Rob Carter said second-quarter throughput was a record since acquisition. The second SAG mill averaged about 12,000 tonnes per day and ramped to about 20,000 in late June and early July, and will run consistently at 15,000 to 18,000. The primary SAG restarted recently after about a month offline, with commissioning ahead. Several days in the quarter reached 45,000 to 50,000 tonnes per day, and management is fairly confident of reaching 50,000 later in the second half.
▸
What is the nameplate capacity of SAG 1?
Anita Soni · CIBC World Markets
Rob Carter said nameplate is about 40,000 tonnes per day, and it will operate around 35,000 to 45,000 tonnes per day, complementing SAG 2.
▸
What operational efficiencies behind the improved cost guidance can you point to in Manitoba or Peru?
Fahad Tariq · Jefferies
Eugene Lei said stronger throughput in the first half, especially in British Columbia at its highest quarterly average since acquisition, higher expected second-half Manitoba production, and pebble crushers in Peru support the guidance. Year-to-date cash costs are about negative $1 per pound, well below the initial negative $0.10 to negative $0.30 range. The forecast allows gold prices to fall below $3,500 and still meet guidance. Each $10 change in WTI oil, budgeted at $65 and now near $95, moves cash costs about $0.04 per pound, so the company is fairly insulated.
▸
Why would Cactus come before Copper World Phase 2 in the sequencing shown in the final slide?
Fahad Tariq · Jefferies
Peter Kukielski said permitting is the main reason. Cactus will be fully permitted by then, allowing the workforce to move directly from one project to the other. Phase 2 would not be permitted before Phase 1 is operating, and U.S. permitting takes several years even in a constructive environment.
▸
Should throughput during the primary SAG downtime have been around 15,000 to 20,000 tonnes per day, and will grades pick up materially in the second half?
Craig Hutchison · TD Cowen
Andre Lauzon said SAG 2 ran most of the month with a short liner change, and the tonnage estimate is close. Copper Mountain has stripped at high rates and built a large stockpile of about 350,000 tonnes in front of the crusher, which should support much higher grades in the last quarter of the year. Combined SAG 1 and SAG 2 capacity around 60,000 tonnes per day gives confidence in throughput even at 80% availability.
▸
Can investors expect a PEA or scoping-level study on a Manitoba mine life extension, around the site visit later this year?
Craig Hutchison · TD Cowen
Rob Carter said that seems reasonable. Underground exploration at Lalor, 1901 and satellite deposits supports work toward a five-year enhanced gold production profile for Snow Lake, with reserve updates in progress.
▸
Is there a plan to increase Constancia throughput beyond 34 million tonnes toward 37 million, and when?
Dalton Baretto · Canaccord Genuity
Andre Lauzon said the mine is improving fragmentation and real-time pit analysis, with spot days above 100,000 tonnes per day versus the low 90s normally. Two pebble crushers should be in by about September, with instrumentation, and modifications to ball sizes are being trialed. Management aims to reach higher levels without a third line expansion. Eugene Lei added that guidance is based on 34 million tonnes for the next three years, so any operation above that would be upside.
▸
Can major construction inputs be locked in at sanction, given tariff uncertainty?
Dalton Baretto · Canaccord Genuity
Eugene Lei said tariffs are considered across sourcing, and the company is working with suppliers and its integrated delivery partners. Long-lead items were ordered in last year's budget, putting Hudbay in the queue. Policy is still evolving, so trade-offs on cost and availability will be reflected in the capital estimate in the second half of 2026. Tariffs could also benefit revenue, since U.S. COMEX copper trades at a 3% to 12% premium to LME, which benefits cathode production at Copper World and Cactus.
▸
What is the scale of the future mill optionality at Copper World, and does it read through to bringing Phase 2 forward?
Dalton Baretto · Canaccord Genuity
Andre Lauzon said the expansion is not very large but the initial SAG mill is sized to allow future optionality with a ball mill later. Pumping configurations, foundations, tailings lines and infrastructure are being set up for future expansion to avoid delays. The cost is modest and not prohibitive.
▸
Does Hudbay still have appetite for M&A in North American copper, and does the region offer consolidation potential?
Lawson Winder · Bank of America
Peter Kukielski said the strategy has not changed. Hudbay has an attractive pipeline of brownfield and greenfield opportunities but will pursue acquisitions only if they meet stringent criteria and are accretive to shareholders. It will look at U.S. opportunities in a very disciplined manner.
▸
What could the final Cactus capital cost be, given its simpler conventional open pit and heap leach design, and could Hudbay's approach push capital higher?
Emerson Vieira · Goldman Sachs
Eugene Lei said it is premature to give capital estimates because Hudbay was only one month post-closing and is about to start its pre-feasibility study. The company sees significant synergies with Copper World and expects Cactus to produce upwards of 100,000 tonnes of copper per year, bringing total copper to 350,000 tonnes. As the highest-grade undeveloped oxide project in the region, its capital intensity should be among the lowest, but no numbers will be given until the study is complete. Peter Kukielski praised the Arizona Sonoran team's work and said the project will be brought up to Hudbay's standards without diverting focus.

Options

Chain Snapshot (daily)

Call IV (ATM)72%
Put IV (ATM)49%
ATM Spread1.9%
Call $OI (near money)$1.3M
Put $OI (near money)$2.0M
ATM ExpiryDecember 18, 2026 (44D)
ATM Strike$22.5
Major Expirations3
Near-money chain · December 18, 2026
StrikeCall Bid/AskCall OIPut Bid/AskPut OI
$15.00$6.90/$7.600--/$0.404
$17.50$4.70/$5.3071$0.20/$0.4550
$20.00$2.90/$3.404$0.75/$1.00102
$22.50$1.55/$1.9525$1.80/$2.207
$25.00$0.80/$0.95158$3.40/$3.905
$30.00$0.10/$0.2533$7.70/$8.303
$35.00--/$0.353$12.10/$13.500
Snapshot: 2026-11-04

Short Interest

Short % of Float2.3%
Short Shares10.0M
Days to Cover1.9
Change (vs Prior)+0.9%
Short % Float History
2.30%+1.00pp
1.0%1.5%2.0%2.5%3.0%3.5%10-1512-3103-1305-2908-1410-30

Web Traffic

hudbayminerals.com
Web rank#956,282
Est. visits/mo591K

Institutional Ownership

Fund$ valueCost basisΔ QoQΔ YoYα lifeFund AUM
FIL Ltd$668M$16.67−$54.4M+$668M—$139.12B
MIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.$470M$13.74+$51.7M+$246M—$83.85B
MACKENZIE FINANCIAL CORP$436M$13.91+$53.3M+$266M—$99.88B
GMT CAPITAL CORP$432M$4.98−$85.5M−$321M—$1.92B
Hancock Prospecting Pty Ltd$374M$11.48+$0+$31.8M—$5.71B
ROYAL BANK OF CANADA$350M$15.66+$155M+$206M—$589.47B
VANGUARD CAPITAL MANAGEMENT LLCPassive$293M$21.21+$33.2M+$293M—$4.68T
L1 Capital Pty Ltd$236M$7.21+$37.7M−$120M—$2.97B
BANK OF MONTREAL /CAN/$222M$12.76+$31.1M+$126M—$268.37B
CIBC Asset Management Inc$209M$19.22−$32.6M+$175M—$45.61B
Cost basis is a volume-weighted estimate from accumulation periods within our 13F history; holders who built their position before our window started will show a stale basis. % above the cost basis is the unrealized gain at the current price.

Ownership Over Time

5-year share-count history (top 10 holders by peak, incl. exited) + price

034.3M68.7M103.0M137.4M$4.01$8.91$14$19$242021-092022-092023-092024-092025-092026-06
hover the chart for per-quarter detailprice (right axis)
FIL Ltd28.3MGMT CAPITAL CORP18.3MMIRAE ASSET GLOBAL ETFS HOLDINGS Ltd.19.9MMACKENZIE FINANCIAL CORP13.0MHancock Prospecting Pty Ltd15.9MROYAL BANK OF CANADA14.8MWaterton Global Resource Management, Inc.—L1 Capital Pty Ltd10.0MACADIAN ASSET MANAGEMENT LLC7.8MBANK OF MONTREAL /CAN/9.4M

Related Stocks

Investors who own this also own

Stocks held by the same active managers as this one, ranked by score — how much more often these appear together than random chance (1× = baseline). Excludes index ETFs and market makers; minimum 3 shared holders.

TickerNameCo-holdersScore
DNNDenison Mines Corp.3195.81×
OGCOceanaGold Corporation3108.78×
AAAlcoa Corporation3108.78×
IAGIamgold Corporation4100.42×
NXENexGen Energy Ltd.4100.42×
CGAUCenterra Gold Inc.389.00×
TECKTeck Resources Limited344.50×
BMOBank of Montreal442.11×
CMCanadian Imperial Bank of Commerce340.79×
BNSThe Bank of Nova Scotia336.26×
CLSCelestica Inc.323.88×
RYRoyal Bank of Canada420.72×

Analyst Coverage

Analyst Coverage
Price Targets
Last Year (2 analysts)$31.00+73.4%
Current Price$17.88
Analyst Ratings
12
8
Buy: 12Hold: 8Consensus: Buy
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2005 Q2167M26M9M$0.21$0.17 – $0.2519
2005 Q3122M31M11M$0.11$0.09 – $0.139
2006 Q1142M69M35M$0.24$0.19 – $0.2919
2006 Q2251M255M146M$0.86$0.69 – $1.0319
2006 Q3240M205M118M$0.70$0.56 – $0.848
2007 Q1396M134M72M$0.97$0.78 – $1.1611
2007 Q2417M153M81M$0.96$0.77 – $1.1514
2007 Q3338M140M70M$0.64$0.51 – $0.777
2008 Q1378M72M30M$0.53$0.42 – $0.6411
2008 Q2310M81M36M$0.32$0.26 – $0.3820
2008 Q3231M21M2M$0.11$0.09 – $0.137
2009 Q1130M13M-3M$-0.01$-0.01 – $-0.0115
2009 Q2411M314M181M$0.32$0.26 – $0.399
2009 Q3163M57M17M$0.11$0.09 – $0.139
2010 Q1298M52M13M$0.27$0.22 – $0.3214
2010 Q2230M41M5M$0.17$0.14 – $0.2016
2010 Q3202M27M-2M$0.12$0.10 – $0.148
2011 Q1327M63M22M$0.26$0.21 – $0.3110
2011 Q2244M-131M-165M$0.21$0.17 – $0.2514
2011 Q3361M-26M-51M$0.25$0.20 – $0.3018
2012 Q1320M29M6M$0.15$0.12 – $0.1819
2012 Q2301M-17M-39M$0.11$0.09 – $0.137
2012 Q3120M14M-4M$0.02$0.02 – $0.0318
2013 Q1238M19M3M$0.03$0.02 – $0.0320
2013 Q2255M-45M-69M$-0.02$-0.03 – $-0.0213
2013 Q3125M30M5M$0.02$0.02 – $0.0212
2013 Q4700M-264M-286M$0.05$0.04 – $0.0612
2014 Q148M-73M-89M$0.07$0.06 – $0.097
2014 Q2233M24M0M$0.05$0.04 – $0.0613
2014 Q3426M189M100M$0.11$0.09 – $0.1310
2014 Q4507M335M196M$0.05$0.04 – $0.0619
2015 Q1723M-85M-111M$0.11$0.09 – $0.1318
2015 Q2226M-61M-106M$0.22$0.17 – $0.2614
2015 Q3540M76M-16M$0.11$0.09 – $0.137
2015 Q4404M-179M-298M$0.07$0.06 – $0.089
2016 Q172M77M-21M$-0.02$-0.03 – $-0.0210
2016 Q2556M76M-13M$0.09$0.07 – $0.1120
2016 Q3289M161M31M$0.06$0.04 – $0.0717
2016 Q4352M103M-52M$0.11$0.09 – $0.137
2017 Q2392M136M22M$0.16$0.13 – $0.1914
2017 Q3326M153M30M$0.15$0.12 – $0.1815
2017 Q4408M308M91M$0.24$0.19 – $0.2914
2018 Q1432M172M46M$0.21$0.17 – $0.259
2018 Q2578M155M34M$0.19$0.15 – $0.2310
2018 Q470M153M-9M$0.03$0.02 – $0.038
2019 Q1319M100M-19M$0.02$0.02 – $0.024
2019 Q2312M112M1M$0.00$0.00 – $0.006
2019 Q3288M-134M-236M$-0.08$-0.09 – $-0.074
2019 Q4300M117M-1M$-0.07$-0.08 – $-0.067
2020 Q1243M53M-70M$-0.13$-0.15 – $-0.113
2020 Q2166M39M-65M$-0.20$-0.23 – $-0.185
2020 Q3273M92M-28M$-0.12$-0.14 – $-0.113
2020 Q4297M139M10M$-0.07$-0.09 – $-0.076
2021 Q1353M-109M-216M$0.03$0.03 – $0.043
2021 Q2417M113M-5M$0.09$0.08 – $0.104
2021 Q3382M-352M-460M$0.05$0.04 – $0.064
2021 Q4438M98M-10M$0.12$0.11 – $0.146
2022 Q1397M269M104M$0.09$0.08 – $0.1110
2022 Q2426M99M-7M$0.12$0.10 – $0.145
2022 Q3286M-398M-506M$-0.08$-0.10 – $-0.075
2022 Q4396M87M-11M$0.03$0.03 – $0.048
2023 Q1325M272M115M$0.05$0.04 – $0.054
2023 Q2341M100M-9M$0.09$0.08 – $0.114
2023 Q3508M-502M-640M$0.11$0.01 – $0.1911
2023 Q4553M134M-13M$0.14$0.05 – $0.2911
2024 Q1488M337M126M$0.01$-0.01 – $0.0311
2024 Q2441M166M26M$0.07$0.01 – $0.1211
2024 Q3454M147M18M$0.04$-0.01 – $0.1110
2024 Q4588M285M89M$0.20$0.11 – $0.3612
2025 Q1534M205M48M$0.11$0.04 – $0.1911
2025 Q2521M190M46M$0.10$0.06 – $0.2214
2025 Q3463M146M28M$0.06$-0.14 – $0.2112
2025 Q4736M447M171M$0.38$0.31 – $0.4414
2026 Q1685M357M148M$0.33$0.22 – $0.4212
2026 Q2632M291M115M$0.26$0.18 – $0.3210
2026 Q3730M364M151M$0.34$0.29 – $0.3810
2026 Q4814M408M177M$0.40$0.32 – $0.487
2027 Q1873M464M209M$0.47$0.44 – $0.526
2027 Q2884M478M216M$0.48$0.47 – $0.492
2027 Q3945M499M226M$0.51$0.50 – $0.522
2027 Q4948M504M227M$0.51$0.50 – $0.522
2028 Q1996M639M308M$0.69$0.68 – $0.705
2028 Q2993M639M306M$0.69$0.67 – $0.705
2028 Q3990M642M306M$0.69$0.67 – $0.705
2028 Q4988M646M306M$0.69$0.67 – $0.705
v2 analysis (legacy, 2026-07-29) — for comparison onlyclick to expand

Thesis

Hudbay is a diversified base/precious-metals miner (copper primary, meaningful gold byproduct) operating in Peru, Manitoba and BC, with a transformative growth pipeline in Arizona (Copper World, now including the pending Arizona Sonoran/Cactus combination) and BC (New Ingerbelle). The balance sheet has been transformed: net debt is near zero after the Mitsubishi $600M JV for 30% of Copper World (with $420M already received) and strong FCF generation through the 2024-2025 gold/copper price cycle. Q1 2026 was a record quarter across revenue, EBITDA and adjusted earnings, driven by strong margins and a favorable commodity mix that lets gold byproduct credits offset cost inflation. The company is entering a multi-year, multi-project capital cycle (Copper World Phase 1 FID due later in 2026, Cactus integration, New Ingerbelle construction) that will consume most FCF for the next several years but, if executed, sets up a materially larger, longer-life production base (path to 500kt Cu/yr by mid-2030s). Key swing factors: commodity prices (copper/gold), capex inflation on Copper World (management already flagging overruns vs 2023 PFS), and the LSIB judicial review of New Ingerbelle permits, which is a real but likely surmountable legal risk given permits were granted and construction has already broken ground.

Trade Signal

Trade rating
-4.5/10
No trade
Horizon
~9mo
Claude2026-07-29 · saw $21.97-15.3% since

HBM's growth pipeline is real and de-risked versus a year ago, but at $22/share (~52% above the analyst's ~$6.4B fair value and 8.8x EV/EBITDA with a 2% FCF yield) the market is already paying up for a mid-2030s vision during a multi-year capex-heavy period with no near-term earnings inflection — favoring a short/underweight stance rather than chasing consensus optimism.

Temporary mispricing-2.0

Stock is up ~123% over 1y and had run from ~$9 to a 52w high of $31.87 in late Jan/June 2026 on record earnings, Mitsubishi JV closing, S&P upgrade, and copper/gold cycle strength — a durable re-rating on real fundamental progress. But the last 3 months show a pullback (-19% 6m off high, -2% 3m) with high realized vol (72% ann) as the market digests capex inflation risk, LSIB litigation, and ASCU integration uncertainty ahead of Copper World FID. The move around the actual May 1 earnings print was modest (-5% into a record quarter), suggesting the 'record results' were already priced in. This looks less like a temporary dislocation and more like a stock that ran too far, too fast on a construction-heavy multi-year growth story, now consolidating/correcting toward fair value.

Market view+6.0

Consensus is enthusiastic — 12 buy/0 sell ratings, average target $31 (+41% from here), narrative centered on a transformative Arizona copper hub, near-zero net debt, Mitsubishi de-risking, and gold-hedge margin resilience. Retail attention has been elevated (share price 4x since mid-2025) but short interest is low (2.7% of float) and options skew is roughly balanced call/put IV, showing no acute fear or crowding either way. The market has bought into the 'transformational growth miner' story; this looks like a loved, actively re-rated stock with room for the euphoria to fade if execution disappoints during the heavy capex years ahead.

Inflectionwindow ~18mo-2.0

The big profitability step-up (500kt Cu by mid-2030s, Copper World + Cactus combo) is 2+ years out and requires FID, construction, and successful integration — consensus estimates already show EBITDA roughly flat-to-declining into 2027-2028 ($358M→$322M) as near-term production normalizes (Pampacancha depletion) before the new capacity arrives. So the market is NOT modeling an imminent inflection; if anything consensus sees a lull, and the real re-rating catalyst (FID, then production ramp) is likely 2027+ before it shows up in reported numbers. Near-term (next 12mo) there isn't a profitability inflection — it's a capex/dilution-of-FCF period, which is a mild negative for the multiple, not a positive surprise.

Catalysts
  • •mid-2026 · Copper World DFS release — Will reveal actual capex inflation vs 2023 PFS $1.3B; key swing factor for base vs bear case
  • •H2 2026 · Copper World FID — Sanctioning decision; positive if on-budget, negative if capex blows out further
  • •Q2/Q3 2026 · ASCU/Cactus acquisition close — Integration execution risk; dilutive share issuance to ASCU holders
  • ▼H2 2026/2027 · LSIB judicial review ruling — Could delay or narrow New Ingerbelle permits if LSIB prevails
  • •2026-08 / 2026-11 · Q2/Q3 2026 earnings — Watch for Pampacancha depletion impact on Peru output and cost guidance
  • •ongoing · Copper/gold price moves — Stock highly levered to metals tape; cycle rollover would hit multiple hard
Flow+1.0

No major near-term dilution beyond the ASCU all-share deal (already announced/priced in); buyback program renewed alongside a nominal dividend increase, but at this valuation buybacks are a modest offset. No lockup overhang disclosed. Insider activity not highlighted as notable. Net flow is roughly neutral to mildly positive (buyback vs. modest M&A share issuance).

Floor / Ceiling-2.0

Near-zero net debt and $1.4B liquidity provide a decent balance-sheet floor, and the business generates real (if currently low-yielding, 2% FCF yield) cash flow. However, there's no hard net-cash floor at current levels — EV/FCF of 56x is priced for a growth premium the analyst doesn't validate, and multiple expansion has already happened (EV/EBITDA up from 3.9x in 2022 to 8.8x TTM). Ceiling risk: heavy capex years ahead depress reported FCF/EPS, ASCU share issuance adds supply, and analyst upside target ($15.86 fair 'should pay') sits far below the market price, meaning the stock is trading well above what fundamentals currently support — a soft ceiling from valuation gravity rather than a hard structural cap.

Buyability

Real buyers exist — this is a well-covered, liquid, analyst-loved growth copper story with a credible pipeline and improving balance sheet, so there's no 'uninvestable' problem. The issue is price: at 8.8x EV/EBITDA TTM and 56x FCF for a miner mid-construction-cycle, buyers are paying for the mid-2030s vision now. Momentum/growth investors will keep buying dips on the growth-hub narrative, but value-oriented buyers are shut out at this multiple, and analyst consensus targets ($31) look to be extrapolating the growth story without discounting execution/capex risk enough.

Fear vs Greedfear 4/10 (-2.0)greed 7/10 (+1.0)

Greed is what's driving this stock — the market is pricing an idealized outcome (Copper World + Cactus hub, low capex inflation, litigation resolved favorably) rather than base-rate mining execution risk over a multi-year heavy-capex buildout; fear of missing the growth story outweighs healthy skepticism about near-term capex/FCF drag.

Valuation

Our Target
$6.4B-19%
Market Should Pay
$7.0B-11%
target ×1.1 (greed premium)
Current Market Cap
$7.9BNeutral
What Changed
financials release · 2026-05-01
+4%fair value on this information

Q1 2026 confirms record revenue/EBITDA/adjusted earnings and near-zero net debt, but the major structural catalysts (Mitsubishi JV closing and $420M cash receipt, ASCU/Cactus acquisition announcement, New Ingerbelle permits and S&P upgrade) were already known to the market from prior announcements in Jan-March 2026. The incremental new information is mainly confirmation of continued strong operating execution (record Peru throughput, BC SAG commissioning, Manitoba gold prioritization) and management's acknowledgment of Copper World cost inflation risk plus mitigation plans (hedging 20-30% of capex), alongside reiterated 2026 guidance.

▸ How the cases moved

Base case probability nudges up slightly (0.45→0.5) and bear down (0.25→0.2) reflecting one more quarter of clean execution and de-risked balance sheet reducing near-term financial fragility; equity values in each case are largely unchanged from pre-print levels since the big re-rating catalysts (Mitsubishi close, ASCU deal, permits) had already been priced in over the prior two months.

2-Year Plausible Outcomes
bear20%
$2.9B
rev +3%/yrOE $190M

Copper/gold prices roll over from cycle highs, Copper World capex inflation proves worse than guided (contractor/steel/labor costs keep rising), the LSIB judicial review delays or narrows New Ingerbelle, and the ASCU/Cactus integration disappoints. Net debt rises materially as construction capital is drawn while cash flow from operations softens. Market re-rates the stock to a depressed, single-digit multiple reflecting execution/regulatory risk and a weaker metals tape.

▸ Valuation

4.5x $900M EBITDA = $4,050M EV − $1,200M net debt = $2,850M equity

base50%
$7.2B
rev +9%/yrOE $360M

Operations continue to perform (Constancia, Copper Mountain SAG upgrade, Snow Lake), Copper World reaches FID with moderate cost inflation absorbed via Mitsubishi's pro-rata funding, ASCU/Cactus closes and integrates reasonably, and New Ingerbelle proceeds despite the LSIB litigation (which is resolved in Hudbay's favor or settled). Metal prices stay roughly at current elevated-but-not-extreme levels. EBITDA grows steadily as new capacity comes online; net debt increases modestly to fund the construction phase.

▸ Valuation

6.0x $1,300M EBITDA = $7,800M EV − $600M net debt = $7,200M equity

bull30%
$11.9B
rev +16%/yrOE $520M

Copper prices stay strong/rise on structural supply deficit and electrification demand; Copper World FID is sanctioned on budget with Mitsubishi funding most of the capex; Cactus/ASCU integration creates the anticipated 350kt+/yr North American copper hub ahead of schedule; New Ingerbelle and Snow Lake mine-life extensions deliver as planned. The market awards a premium growth-miner multiple given the credible path to a much larger, longer-life production base and gold-hedge cash flow resilience.

▸ Valuation

7.5x $1,700M EBITDA = $12,750M EV − $800M net debt = $11,950M equity

▸ Target Rationale

Model math implies ~$6.2B; I nudge slightly above given the tangible de-risking already achieved (near-zero net debt, Mitsubishi capital commitment, S&P upgrade, permits in hand and groundbreaking done at New Ingerbelle) which reduces the probability-weighted tail risk more than the mechanical scenario spread captures. I don't go further above because the next two years are genuinely a heavy capex/execution period (Copper World FID, Cactus integration, New Ingerbelle construction) with real cost-inflation and litigation overhangs that could still surprise negatively, and near-term reported FCF/EPS will likely stay depressed relative to EBITDA throughout the build phase, which could cap multiple expansion in the interim.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality6/10
Situation now8/10
Trajectory7/10
Risk5/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty6/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Arizona Sonoran Acquisition: On March 2, 2026, Hudbay announced a definitive agreement to acquire all outstanding shares of Arizona Sonoran Copper Company (ASCU). The all-share transaction is structured at an exchange ratio of 0.242 Hudbay shares for each ASCU share, consolidating ASCU's Cactus project with Hudbay’s Copper World project to form the third-largest copper district in North America. The transaction, which received a positive recommendation from proxy advisor ISS in May 2026, is expected to close in Q2 2026, scaling Hudbay’s potential copper production to over 350,000 tonnes per year over time.
  • Record Financial Performance & Credit Upgrade: On May 1, 2026, Hudbay reported record Q1 2026 revenue of $757.3 million and record adjusted EBITDA of $421.9 million, driven by strong margins and low consolidated cash costs. This followed record FY2025 results. In response to the company’s robust free cash flow and successful debt reduction, S&P Global Ratings upgraded Hudbay’s issuer credit rating to 'BB-' from 'B+' on February 26, 2026.
  • New Ingerbelle Permit and Groundbreaking: On February 20, 2026, Hudbay received key amended Mines Act and Environmental Management Act permits for its New Ingerbelle expansion at the Copper Mountain mine in British Columbia. On June 16, 2026, the company officially broke ground on the expansion, which is projected to extend the mine's operational life to 2045.
  • Sustained Mine Life Extensions: On March 27, 2026, Hudbay released its annual reserve and resource update, extending the mine life of Snow Lake by four years to 2041 and Copper Mountain by two years to 2045, boosting its three-year consolidated copper production outlook.
  • Copper World Municipal Bond Financing: On June 17, 2026, Hudbay priced a private offering of $52 million in 4.50% Solid Waste Disposal Revenue Bonds through the Arizona Industrial Development Authority to help finance eligible expenditures at Copper World.
▸ Thesis-test Findings
Lower Similkameen Indian Band legal challenge Hudbay New Ingerbelle
  • Findings: In late February 2026, the British Columbia government approved key permits for the New Ingerbelle expansion. While Hudbay refreshed its Participation Agreements with local First Nations, the Lower Similkameen Indian Band (LSIB) formally expressed disappointment with the B.C. government’s "unilateral" and rushed approval process. Consequently, on March 23, 2026, the LSIB submitted an application for judicial review to challenge the regulatory decision. Despite this active litigation, the bull case remains physically on track: Hudbay officially broke ground on the project on June 16, 2026, in a ceremony attended by B.C.'s mining minister and the Chief of the neighboring Upper Similkameen Indian Band. Hudbay remains highly confident that the court will ultimately uphold the robust regulatory permitting process.
Hudbay Minerals Copper World DFS capital expenditure inflation
  • Findings: Inflation continues to present a key headwind for the project's capital expenditures. Market analysis highlights that North American contractor markets remain tight, with sticky inflation across steel, explosives, equipment, and labor. During the Q1 2026 earnings call on May 1, 2026, Hudbay management openly acknowledged that they expect "some cost inflation" compared to the 2023 pre-feasibility study (which originally estimated Phase I initial capex at $1.3 billion). To mitigate this bear-case risk, management is evaluating hedging or locking in approximately 20% to 30% of the capex over the next 12 months. The highly anticipated Definitive Feasibility Study (DFS) was over 85% complete as of late March and is on track for a mid-2026 release, with a final sanctioning decision expected later in 2026.
Mitsubishi Hudbay Arizona copper joint venture terms
  • Findings: The joint venture transaction represents a highly positive, de-risking milestone for the bull case. Officially closed on January 12, 2026, the terms dictate that Mitsubishi Corporation acquired a 30% minority interest in Copper World LLC for a total cash consideration of $600 million. At closing, Mitsubishi contributed $420 million in cash, with the remaining $180 million due within 18 months. Crucially, Mitsubishi has also committed to funding its pro-rata 30% share of all future construction equity capital. This transaction dramatically reduces Hudbay’s estimated share of remaining capital contributions to approximately $200 million (based on PFS estimates), defers Hudbay's first capital contribution to 2028 at the earliest, and boosts the project's levered internal rate of return (IRR) for Hudbay to approximately 90%.