Stocks/HCC.NS

HCC.NS

Hindustan Construction Company Limitedv3 4.5/10 · 2026-11-26
Industrials·Engineering & Construction
16.05 INR
41.3B INR market cap
v3 Rating
4.5/103.5–5.5
Setup
3.0/102.0–4.5
Fair Value
15.50 INR9.00 INR–24.00 INR-3%
DCF (10%)
16.60 INR+3%
Base IRR
+9%-8%–+25%
Visibility
wide±48%
Rating
Revenue (TTM)
38.1B INR
Owner Earnings
INR 3.0B
Next-Yr Owner Earnings
INR 2.0B
Growth
+7.0% × 5y
P / Next-Yr OE
21.0x
Net Debt
INR 15.0B

Hindustan Construction Company Limited, established in 1926 in Mumbai, India, primarily offers extensive engineering and construction services across the nation. Its comprehensive project portfolio includes developing critical transportation networks such as roads, highways, expressways, bridges, elevated corridors, railways, metro systems, ports, and marine structures. The company is also proficient in constructing large-scale water management and power infrastructure, including dams, barrages, tunnels, powerhouses, shafts, and various underground works. Furthermore, HCC builds specialized facilities for nuclear power (reactors, auxiliary buildings, control buildings), integrated water supply systems, bulk water transmission projects, irrigation infrastructure, water and sewage treatment plants, and aqueducts. Its expertise extends to industrial construction like hydrocarbon, metals, and process plants, factories, along with a broad range of residential, commercial, and institutional buildings. Beyond its core construction activities, HCC diversifies into services such as real estate development, power generation, toll management, IT consulting, township development, and various ventures in hospitality, entertainment, education, retail, and urban management, including parking solutions. The company also engages in watersports, club management, adventure sports, and manufactures and sells bamboo articles.

2-Year Price History

$15.82-63.1%
$15$20$25$30$35$40$45Initial target $15.50 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.53.5–5.5
Setup
3.02.0–4.5
Fair value (INR)
15.509.00 – 24.00
Upside vs 16.05
-3%
DCF (10%)
16.608.00 – 26.00+3%
Base IRR
9%-8% – 25%
Visibility
widerange ±48%
Sentiment
3/10
Flow
4/10
2026-11-26 · claude-opus-5-5 · priced at 15.82

Hindustan Construction Company is a 100-year-old Indian civil contractor (tunnels, hydro, metros, nuclear civil works) that spent a decade under a debt pile from Lavasa and slow government payments. In 2025-26 it fixed the balance sheet with arbitration settlements and rights issues (the latest raised Rs 1,000 cr at Rs 12.50 in Dec 2025, taking the share count to ~2.62bn) and moved its debt and guarantees out of the way. The bull pitch is that a clean HCC can grow into India's infrastructure, hydro and nuclear spending, with ~Rs 1,700 cr of arbitration awards still to collect over 3-4 years and interest falling as debt is prepaid. The problem is the operating business: revenue is shrinking (H1 FY27 standalone Rs 1,878 cr, -7%), EBITDA margin fell to 11-12% from 15-16%, and order intake was only ~Rs 650 cr in H1 against a Rs 15,000 cr target, so the Rs 12,900 cr backlog is not being refilled. At Rs 15.82 (Nov 26 close; stock at the bottom of its 3-year range, down ~70% from the 2024 peak) the market cap is ~Rs 4,140 cr; with roughly Rs 1,500 cr of debt-like obligations (finance cost still ~Rs 330 cr a year) the EV is ~19x my ~Rs 300 cr of unlevered owner earnings. My DCF (revenue to ~Rs 5,500 cr by FY31 at 13% margin, 12x terminal FCF, awards collected at a haircut) gives ~Rs 16.6 a share: about the price. Rating 4.5 (fairly priced, a pass); setup 3: the variant view would be that order intake is about to inflect, but management has promised that every quarter and a further Rs 600 cr equity raise is board-approved.

Flow: The Rs 1,000 cr rights issue (Dec 2025, ~44% more shares) is done, but the board has approved a further ~Rs 600 cr raise (~15% of the market cap at today's price) to be used 'at the right time' for growth capital; promoter stake is shrinking and pledged to lenders. No buyback, no dividend.

A deep dive would have to establish: Will HCC actually convert its ~Rs 35,000 cr of bids into orders and grow revenue 20% in FY28 at 13%+ margins, or keep shrinking while it dilutes?

Owner earnings, TTM
INR 3.0BINR 1.5B – INR 4.2B
Realistic peak profit
INR 6.0BINR 4.0B – INR 8.5B
Growth rate
7.0%-5.0% – 18.0%
Years of growth
52 – 8
Market cap
INR 41BINR 41B – INR 42B
EV
INR 56BINR 48B – INR 68B
Net debt
INR 15BINR 6.0B – INR 25B
Capital return / cap
-5.0%-25.0% – 0.0%
P/E
28.0×18.0× – 45.0×
EV/EBITDA
12.0×9.0× – 16.0×
FCF yield
5.0%0.0% – 8.0%
Projected FCF, base case (INR millions)
Y1INR 2.0B-INR 1.0B – INR 3.5B
Y2INR 3.0BINR 0M – INR 4.8B
Y3INR 3.8BINR 500M – INR 5.8B
Y4INR 4.4BINR 1.0B – INR 6.8B
Y5INR 5.0BINR 1.5B – INR 8.0B
Competition: A price-bidding contractor against L&T, Afcons, Megha and Tata Projects; its only edge is tunnelling/hydro/nuclear-civil experience, and it is winning far less than its peers.
Governance: Auditor qualifications on the Rs 1,032 cr HCC Infrastructure investment and deferred tax assets, Lavasa/Prolific Resolution legacy guarantees, pledged promoter shares and repeated dilutive rights issues.
Research (expand)

What it does. HCC builds hard civil infrastructure in India: hydro tunnels and dams (Vishnugad Pipalkoti, Tapovan), underground metros (Indore, Patna), bridges, water schemes and the civil work on most of India's existing nuclear plants. Backlog Rs 12,901 cr at Sep 2026: transport 62%, hydro 19%, water 16%.

What the market believes. A long-time value destroyer (Lavasa, years of receivables and arbitration stuck with government clients, repeated dilution) that has just finished cleaning its balance sheet but has not yet shown it can win and execute profitable work. The stock has fallen from Rs 55 (Jul 2024) to Rs 15.8, near its 3-year low, as revenue fell and order wins stalled.

The bull case. Debt was cut by ~Rs 1,500 cr in FY26, the Dec 2025 rights issue raised Rs 1,000 cr, ratings rose to investment grade, finance cost fell from Rs 112 cr to Rs 83 cr a quarter, and a further Rs 208 cr of prepayment is underway. ~Rs 1,700 cr of arbitration awards (a Rs 210 cr Supreme Court win due in Q3 FY27) could clear the remaining debt. Bids of ~Rs 34,800 cr are under evaluation and Rs 1,557 cr is L1; management targets 20%+ revenue growth in FY28; nuclear (SHANTI Act rules) and hydro are real tailwinds.

What it earns. FY27 standalone revenue is tracking ~Rs 3,800-3,900 cr (flat to down) at ~11-13% EBITDA, ~Rs 450-500 cr. Less ~Rs 50 cr D&A/maintenance capex and normal tax, unlevered owner earnings are ~Rs 300 cr (Rs 3,000m), before working capital, which in Indian government contracting usually absorbs cash. Standalone PAT runs ~Rs 150 cr a year (P/E ~28x); consolidated PAT is lower (Rs 22.6 cr in Q2).

Five years. FCF (INR m): FY27 ~2,000, FY28 ~3,000, FY29 ~3,800, FY30 ~4,400, FY31 ~5,000, assuming the backlog is refilled and revenue reaches ~Rs 5,500 cr. In year 5 it is a 'neither' business: a cyclical, low-ROIC contractor growing roughly with Indian capex, worth ~12x FCF. Low confidence: order intake is the whole question.

Fair value. DCF at 10%: PV of FCF ~13,300m + PV of terminal value ~37,300m + awards at a haircut ~8,000m - net debt ~15,000m = ~43,500m, Rs 16.6 a share vs Rs 15.82. EV ~Rs 5,600 cr = ~19x owner earnings, ~12x EBITDA. Not the 30% discount we need.

Management and risks. The Gulabchand family (promoter stake shrinking, shares pledged to lenders) and MD Arjun Dhawan. Auditors qualify the Rs 1,032 cr investment in HCC Infrastructure and Rs 153 cr of deferred tax assets; contingent exposure to the Lavasa-era Prolific Resolution vehicle; finance cost far above what Rs 800 cr of reported borrowings would imply, so there are debt-like items outside reported debt. Competes with L&T, Afcons, Megha, Tata Projects on price: it is a bidding business with no moat beyond tunnelling know-how.

Sentiment: 3/10. Retail-heavy stock that has fallen ~70% from its peak; a rights issue overhang and broken order-intake promises.

Financials — Adjusted

Adjusted · TTM 2027-Q2 · INR

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue38078-14%39696-29%56034-27%76450-22%98566
Gross profit10425-33%12810-15%15077-23%19520-3%20169
Operating expenses6197-19%7434+9%6810-49%13267-13%15258
▸Adj EBITDA4454-53%5652-44%10093+38%7317+18%6196
▸Adj OCF0.00-100%68360.00-100%1767-8%1927
CapEx0.00-2580.000.000.00
Adj FCF0.00-100%65780.00-100%1767-8%1927
Interest expense403946945997721510043
▸Adj net income-574108-1836-2682-230%2061

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026 +2027YTD

Where the Cash WentTotal2027YTD2026202520242023
▸Claimed: EBITDA49938100%2074100%6911100%14146100%16729100%10078100%
FCF (OCF−capex)478410%0.000%108916%0.000%176911%192719%
Net income798516%73636%165524%11268%478229%-315-3%
▸Capital returned3053561%176385%551680%599742%721543%10043100%
Buybacks0.000.000.000.000.000.00
Dividends0.000.000.000.000.000.00
Interest paid29712176346945997721510043
Debt paid down8220.008220.000.000.00
▸Reinvestment-876-2%0.000%2584%-7.100%-1030-6%-97.7-1%
Capex (PP&E)2580.002580.000.000.00
Intangibles & M&A0.000.000.000.000.000.00
Leases signed (net Δ)-1135-----7.10-1030-97.7
Retained / other39628%0.000%2664%0.000%176911%192719%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 2.0 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)84763849188088390594131799
▸Liabilities (total)63085636467182692279138943
Net debt (incl. leases)4148420092711649542604
Net debt / Adj EBITDA0.930.740.922.256.88
Net debt / Adj FCF--0.64--9.3422.1
Adj EBITDA / interest1.101.201.681.010.62
Shares outstanding26192183180215131576
Dilution (YoY)+44.0%+21.2%+19.1%-4.0%+3.6%
Employees4001--------
MarginsTTM2026202520242023
Gross margin27.4%-7.832.3%+5.426.9%+1.425.5%+5.120.5%
Adj EBITDA margin11.7%-9.514.2%-3.818.0%+8.49.6%+3.36.3%
Adj OCF margin0.0%-15.417.2%+17.20.0%-2.32.3%+0.41.9%
Adj FCF margin0.0%-14.816.6%+16.60.0%-2.32.3%+0.41.9%
Net income margin3.7%+0.34.2%+2.22.0%-4.26.3%+6.6-0.3%
Adj NI margin-1.5%+1.10.3%+3.5-3.3%+0.2-3.5%-5.62.1%
ROIC (adj, after-tax)8.8%12.7%20.8%18.4%7.0%
Cost of debt--------35.8%

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2005 Q45.6B—0M$0.00$0.00 – $0.000
2006 Q18.7B84M-1.0B$0.00$0.00 – $0.001
2006 Q26.2B636M-475M$0.00$0.00 – $0.001
2006 Q34.6B619M-492M$0.00$0.00 – $0.001
2006 Q46.3B219M-893M$0.00$0.00 – $0.001
2007 Q19.1B158M-956M$0.00$0.00 – $0.001
2007 Q27.4B576M-539M$0.00$0.00 – $0.001
2007 Q35.7B609M-507M$0.14$0.09 – $0.193
2007 Q47.3B272M-845M$0.29$0.26 – $0.334
2008 Q111.2B93M-1.0B$0.69$0.57 – $0.804
2008 Q37.2B696M-426M$0.23$0.22 – $0.242
2008 Q49.5B252M-872M$0.34$0.31 – $0.384
2009 Q112.7B243M-886M$0.50$0.40 – $0.613
2009 Q210.5B588M-543M$0.73$0.48 – $0.993
2009 Q38.3B607M-525M$0.34$0.26 – $0.405
2009 Q49.7B361M-773M$0.33$0.12 – $0.474
2010 Q112.2B309M-829M$0.82$0.79 – $0.852
2010 Q210.0B598M-541M$0.57$0.35 – $0.814
2010 Q39.0B543M-598M$0.39$0.37 – $0.402
2010 Q411.0B342M-800M$0.39$0.34 – $0.474
2011 Q112.8B383M-763M$0.33$0.18 – $0.425
2011 Q211.3B564M-584M$0.10$0.10 – $0.104
2011 Q39.9B571M-578M$0.06$0.06 – $0.072
2011 Q410.3B461M-690M$-0.24$-0.35 – $-0.133
2012 Q111.6B409M-744M$-0.15$-0.16 – $-0.152
2012 Q210.8B540M-615M$-0.33$-0.34 – $-0.322
2012 Q38.9B609M-545M$-0.54$-0.57 – $-0.532
2013 Q112.2B253M-904M$0.00$0.00 – $0.001
2013 Q39.3B652M-505M$-0.72$-0.75 – $-0.702
2013 Q410.6B409M-750M$0.00$0.00 – $0.003
2014 Q139.5B-1.3B-2.5B$-1.26$-1.26 – $-1.266
2014 Q39.7B1.0B-163M$-0.63$-0.66 – $-0.622
2014 Q410.4B469M-709M$-0.27$-0.28 – $-0.262
2015 Q111.7B437M-742M$0.18$0.18 – $0.192
2015 Q210.8B571M-608M$0.09$0.09 – $0.092
2015 Q410.6B526M-653M$0.18$0.18 – $0.192
2016 Q141.7B-1.4B-2.6B$0.78$0.53 – $1.136
2016 Q310.2B1.0B-162M$0.18$0.18 – $0.192
2016 Q410.9B491M-706M$0.09$0.09 – $0.092
2017 Q111.4B506M-691M$0.27$0.26 – $0.282
2017 Q211.0B560M-637M$-0.05$-0.18 – $0.093
2017 Q39.8B595M-600M$0.24$0.23 – $0.253
2017 Q411.7B430M-766M$0.00$0.00 – $0.000
2019 Q143.7B-831M-2.5B$0.10$0.10 – $0.112
2019 Q29.8B—0M$0.00$0.00 – $0.001
2019 Q38.6B—0M$0.00$0.00 – $0.001
2019 Q412.3B—0M$0.00$0.00 – $0.001
2020 Q111.7B2.6B373M$0.20$0.20 – $0.212
2020 Q24.5B3.0B349M$0.19$0.19 – $0.191
2020 Q37.2B—0M$0.00$0.00 – $0.000
2021 Q19.2B3.9B555M$0.30$0.29 – $0.322
2021 Q24.7B—0M$0.00$0.00 – $0.000
2021 Q39.8B—0M$0.00$0.00 – $0.000
2021 Q48.6B—0M$0.00$0.00 – $0.000
2022 Q112.3B3.4B928M$0.51$0.49 – $0.532
2022 Q211.7B—0M$0.00$0.00 – $0.001
2022 Q311.7B3.2B349M$0.19$0.19 – $0.191
2022 Q44.5B3.0B294M$0.16$0.16 – $0.161
2023 Q17.2B—0M$0.00$0.00 – $0.000
2023 Q29.2B—0M$0.00$0.00 – $0.000
2023 Q34.7B—0M$0.00$0.00 – $0.000
2023 Q410.1B—0M$0.00$0.00 – $0.000
2024 Q212.0B—0M$0.00$0.00 – $0.000
2024 Q312.0B—0M$0.00$0.00 – $0.000
2024 Q412.7B—0M$0.00$0.00 – $0.000
2025 Q112.7B—0M$0.00$0.00 – $0.000
2025 Q211.9B—0M$0.00$0.00 – $0.000
2025 Q312.3B—0M$0.00$0.00 – $0.000
2025 Q411.4B—0M$0.00$0.00 – $0.000
2026 Q19.7B—0M$0.00$0.00 – $0.000
2026 Q39.7B—0M$0.00$0.00 – $0.000