Stocks/HOT.DE

HOT.DE

Hochtief AGv3 4.0/10 · 2026-11-26
Industrials·Engineering & Construction
341.40 EUR
25.5B EUR market cap
2.0% div yield
v3 Rating
4.0/103.0–5.5
Setup
3.0/102.0–4.5
Fair Value
260.00 EUR170.00 EUR–400.00 EUR-24%
DCF (10%)
235.00 EUR-31%
Base IRR
+2%-10%–+12%
Visibility
wide±44%
Rating
Revenue (TTM)
42.2B EUR
Owner Earnings
€1.1B
Next-Yr Owner Earnings
€1.2B
Growth
+6.0% × 3y
P / Next-Yr OE
21.4x
Net Debt
€300M

HOCHTIEF Aktiengesellschaft operates as a global construction and infrastructure enterprise. The company manages its diverse operations through several key divisions: HOCHTIEF Americas, which provides building and transportation infrastructure solutions across the United States and Canada; HOCHTIEF Asia Pacific, delivering a wide array of services including infrastructure development, resource and mineral processing, engineering, and maintenance, alongside involvement in public-private partnership (PPP) projects throughout the Asia-Pacific region. Its HOCHTIEF Europe division concentrates on infrastructure and building construction ventures, engaging in PPPs across transportation, energy, social, and urban sectors. This European arm also offers specialized engineering (such as virtual construction), facility management, and a comprehensive lifecycle approach to real estate and infrastructure projects, from design and development to operation and management. Additionally, the Abertis Investment segment oversees the management and operation of toll roads in France, Spain, North America, Brazil, Chile, and Mexico. The company further extends its offerings to include insurance and reinsurance policies, specifically tailored for contractors' casualty, surety, subcontractor default, liability, and occupational accident risks. Established in 1873, Hochtief AG maintains its corporate headquarters in Essen, Germany, and functions as a subsidiary of ACS, Actividades de Construcción y Servicios, S.A.

2-Year Price History

$325.60+189.4%
$200$300$400$500Initial target $260.00 · 2026-11-26volNov 24Mar 25Jul 25Nov 25Mar 26Jul 26Nov 26

Valuation v3 Opus worker · 2026-11-26

Rating
4.03.0–5.5
Setup
3.02.0–4.5
Fair value (EUR)
260.00170.00 – 400.00
Upside vs 341.40
-24%
DCF (10%)
235.00130.00 – 420.00-31%
Base IRR
2%-10% – 12%
Visibility
widerange ±44%
Sentiment
5/10
Flow
5/10
2026-11-26 · claude-opus-5-5 · priced at 325.60

Hochtief is the listed holding over Turner (the leading US construction manager for hyperscale data centers), CIMIC/Thiess (Australian contracting and mining services), German engineering & construction and 20% of Abertis, controlled about three-quarters by ACS. The business is in a genuine boom: 9M 2026 operational net profit +40% to EUR 752m, Q3 orders +63%, backlog a record EUR 89.7bn, Turner's margin up from under 2.5% in 2022 to about 4%, and FY26 guidance of EUR 1,025-1,100m (30-40% growth). The stock has fallen about 40% from its EUR 549 May high to EUR 325.60 (close 2026-11-25) on fears of hyperscaler capex overbuild. Even after that fall it trades at ~23x 2026 operational earnings (~19x 2027) for a contractor whose profit is mostly one capex cycle; a 10% DCF that lets profit grow another ~30% and then caps it at a cycle-aware 14x gives about EUR 235/share, and only a no-slowdown case (profit compounding ~15% a year to 2031 and a 20x exit) reaches EUR 400+. The market is not obviously wrong here: it is paying for the boom continuing, which is possible but not something we can see better than the market. Rating 4.0 (modestly overvalued on base DCF, wide range, not a short: quality operator, net cash, strong order book); setup 3.0 (no variant perception, no buyback, the next test is the Feb 2027 FY results and 2027 guidance).

Flow: Nothing large under way: ACS holds about three-quarters and has historically nibbled at Hochtief shares, there is no Hochtief buyback or issuance, and the DAX-inclusion demand that inflated the spring 2026 run has passed; the ~2.5% dividend is paid each July.

A deep dive would have to establish: Does Turner's data-center work keep growing past 2027, or does profit peak with the hyperscaler capex cycle so that 23x earnings proves to be a peak multiple on peak profit?

Owner earnings, TTM
€1.1B€950M – €1.3B
Realistic peak profit
€1.6B€1.3B – €2.1B
Growth rate
6.0%-5.0% – 15.0%
Years of growth
31 – 6
Market cap
€25B€24B – €25B
EV
€25B€24B – €26B
Net debt
€300M-€500M – €1.2B
Capital return / cap
2.6%2.0% – 3.0%
P/E
23.0×21.0× – 26.0×
EV/EBITDA
10.0×9.0× – 11.5×
FCF yield
4.5%3.5% – 5.5%
Projected FCF, base case (EUR millions)
Y1€1.2B€950M – €1.4B
Y2€1.4B€900M – €1.6B
Y3€1.4B€750M – €1.9B
Y4€1.4B€650M – €2.0B
Y5€1.4B€600M – €2.1B
Competition: Turner competes with DPR, Holder, Clayco, Hunt/AECOM and the EPC majors for hyperscale campuses, winning on scale, labour mobility and modular self-perform; CIMIC and E&C face local contractors on thin margins.
Governance: ACS controls about 76% with a small free float, so capital allocation (dividend-heavy, no buybacks, intra-group deals such as Abertis) serves the parent first.
Research (expand)

What it does. Hochtief (ACS ~76%) owns Turner (US construction management; ~70% of group sales, data centers about half of Turner orders), CIMIC (Australia: CPB, UGL, Sedgman, and since July 2026 100% of Thiess mining services), Engineering & Construction (Germany/Central Europe, edge data centers, PPPs) and 20% of Abertis toll roads. It is an asset-light contractor: Turner carries almost no capital and works open-book/cost-plus, so margins are thin (~4% PBT) but the risk per project is low; Thiess is the capital-heavy piece (mining fleet).

What the market believes. The stock quadrupled from ~EUR 90 (late 2023) to EUR 549 (May 2026) as the AI data-center build made Turner a winner, then fell 40% on hyperscaler-capex fear (AI sell-off in November) and after the DAX-inclusion bid passed. At EUR 325.60 the market still pays ~23x 2026E operational EPS (~EUR 14) and ~10x EV/EBITDA: it believes the boom runs several more years.

What it earns. 2026E operational net profit ~EUR 1,060m (guidance EUR 1,025-1,100m; 9M EUR 752m, EPS EUR 9.99). LTM operating cash flow pre-factoring EUR 2.7bn is flattered by customer advances on a growing backlog (float) and is before Thiess fleet capex; I take unlevered owner earnings at ~EUR 1.1bn, about equal to operational net profit (net debt is near zero, SBC negligible). Note ~EUR 0.7bn was spent in July buying out Thiess minorities, so net debt at Q3 is probably a few hundred million.

Next 5 years (base). FCF 2027-31: EUR 1.2bn, 1.35bn, 1.4bn, 1.4bn, 1.4bn - 2027 is well covered by the EUR 90bn backlog and the Thiess accretion (~EUR 80m), after which data-center construction normalises from a historic peak. In year 5 this is 'neither': a world-class, low-capital contractor whose profit no longer grows fast; 12-16x FCF. At 10%: PV of FCF ~EUR 5.1bn + terminal (14x 1.4bn) ~EUR 12.2bn = ~EUR 17.3bn, ~EUR 230-240/share. Bull (15% growth to 2031, 20x): ~EUR 420. Bear (DC bust, profit back to EUR 0.8bn, 10x): ~EUR 130. Base IRR from EUR 325.60 is roughly zero plus a ~2.5% dividend.

Fair value ~EUR 260 (base DCF plus some credit for a boom that keeps surprising; management says demand is accelerating and hyperscaler capex guides for 2026 roughly doubled).

Management, risks, competition. Santamaria has executed very well (Turner margin, de-risked contract book ~90% lower-risk, net debt cut by EUR 1.5bn) but is promotional ('infinite demand'). ACS control means a small free float, payout policy set by the parent, and capital recycled up to ACS; minority holders get dividends (~65% payout) but no buybacks. Risks: data-center order cliff (capex cuts, co-lo leverage, grid/permitting moratoria), labour cost blowouts on fixed-price work at CIMIC, Thiess commodity cycle, euro strength vs USD. Competitors: AECOM/Hunt, DPR, Holder, Clayco, Fluor/Bechtel in mega-campuses; Turner's scale and self-perform/modular are real advantages.

Sentiment: 5/10 - loved into May, now de-rated on AI-capex worry but still at a premium to European contractors.

Financials — Adjusted

Adjusted · TTM 2026-Q3 · EUR

TTM & Fiscal-Year P&LTTM2025202420232022
Revenue42178+11%38236+15%33301+20%27756+6%26219
Gross profit5277-34%6131+4%5906+6%5559-12%6321
Operating expenses3564-50%4524-17%5419+17%4634-15%5447
▸Adj EBITDA2362+54%2277+110%1082-13%1246+2%1218
▸Adj OCF1721-12%1787-2%1822+30%1400+96%714
CapEx-394-425-474-211-188
Adj FCF1327-6%1362+1%1348+13%1189+126%527
Interest expense519508433300249
▸Adj net income836+920%802+67%480-53%1026+70%602
▸Owner's earnings1250--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD

Where the Cash WentTotal2026YTD2025202420232022
▸Claimed: EBITDA7404100%1683100%2435100%1902100%965100%420100%
FCF (OCF−capex)587679%61937%161366%165687%1124117%863206%
Net income341046%72843%90237%77641%52354%482115%
▸Capital returned110715%-119-7%29012%-97.4-5%75778%27566%
Buybacks576-1.99-1.730.000.00579
Dividends14630.00509411381162
Interest paid1889399508433300249
Debt paid down-2821-516-725-94175.4-715
▸Reinvestment354948%37722%130454%121864%11812%532127%
Capex (PP&E)1637340425474211188
Intangibles & M&A1569-46.31026391-61.3260
Leases signed (net Δ)34383.4-147353-31.585.4
Retained / other508969%118370%80533%179594%72976%577138%

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 3.8 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2025202420232022
▸Assets (total)2740024943246551933018300
▸Liabilities (total)2577623553234591806417070
Net debt (incl. leases)184018051953-272730
Net debt / Adj EBITDA0.780.791.81-0.220.60
Net debt / Adj FCF1.391.331.45-0.231.39
Adj EBITDA / interest4.554.482.504.154.89
Shares outstanding75.275.275.275.275.2
Dilution (YoY)+0.0%+0.0%+0.0%+0.0%+10.3%
Employees54035--------
MarginsTTM2025202420232022
Gross margin12.5%-8.516.0%-1.717.7%-2.320.0%-4.124.1%
Adj EBITDA margin5.6%+1.66.0%+2.73.3%-1.24.5%-0.14.6%
Adj OCF margin4.1%-1.14.7%-0.85.5%+0.45.0%+2.32.7%
Adj FCF margin3.1%-0.63.6%-0.54.0%-0.24.3%+2.32.0%
Net income margin2.3%+0.12.4%+0.02.3%+0.51.9%+0.01.8%
Adj NI margin2.0%+1.82.1%+0.71.4%-2.33.7%+1.42.3%
ROIC (adj, after-tax)10.9%11.1%4.5%10.3%9.6%
Cost of debt5.7%6.2%5.7%17.5%14.2%

Earnings Calls

8 calls

Earnings Call · 2026 Q2

2026-07-27

HOCHTIEF delivered a strong first half of 2026, combining accelerating growth, higher margins, strong cash generation, and record orders. FX-adjusted sales increased 13% year-on-year to EUR 20.1 billion, while operational net profit rose 35% to EUR 480 million. Operating cash flow improved by EUR 280 million year-on-year, or EUR 297 million before factoring, and trailing-12-month operating cash flow before factoring reached EUR 2.4 billion. The group finished June with EUR 72 million of net cash, a EUR 1.5 billion improvement from the prior year. New orders grew 25% FX-adjusted to EUR 31.5 billion, taking backlog to almost EUR 85 billion, up 23% and providing broad visibility. Management raised 2026 operational net profit guidance to EUR 1.025 billion-EUR 1.1 billion, versus EUR 950 million-EUR 1.025 billion previously, now targeting 30%-40% growth. Turner was the principal growth engine. Sales rose 23% FX-adjusted to EUR 14.1 billion, operational PBT increased 49%, and the margin expanded 70 basis points to 3.9%. Data-center activity more than doubled, while sports, pharmaceuticals, and airports also contributed. Turner’s operational net profit rose 50% to EUR 400 million, and pre-factoring operating cash flow reached EUR 416 million. New orders increased 39% FX-adjusted to nearly EUR 21 billion, pushing backlog up 39% to EUR 46.1 billion. Turner’s 2026 PBT guidance was raised to USD 1.4 billion-USD 1.46 billion. Management expects margins to keep improving through self-performance, modularization, prefabrication, engineering, and supply-chain capabilities. CIMIC delivered steady performance, with comparable sales slightly higher, operational PBT up 8% to EUR 236 million, improved cash flow, and a 12% increase in comparable backlog to EUR 23.7 billion. HOCHTIEF completed the purchase of the remaining 40% of Thiess on July 1, regaining full ownership. Management expects recurring earnings accretion of approximately EUR 80 million annually from 2027 through minority dividend savings and refinancing benefits, partly offset by acquisition financing costs. CIMIC’s guidance remained unchanged at EUR 780 million-EUR 830 million of 2026 operational PBT. Engineering & Construction produced 37% PBT growth to EUR 55 million despite stable revenue, with backlog up 17% to EUR 14.9 billion and guidance maintained at EUR 125 million-EUR 140 million. Abertis also performed solidly, supported by higher traffic and tariffs, while HOCHTIEF continued receiving its 20% contribution. Strategically, HOCHTIEF is expanding across data centers, semiconductors, energy and nuclear, critical minerals, defense, healthcare, transport, and German infrastructure. Data-center orders reached approximately EUR 13.3 billion in the first half, up 50%. Management sees no meaningful slowdown from hyperscalers and believes projects are more likely to shift location or timing than be canceled. Germany’s infrastructure fund, renewable and nuclear investment, critical-mineral demand, defense spending, and PPP opportunities provide additional long-term growth avenues. The group also paid approximately EUR 500 million in dividends and emphasized disciplined capital allocation and continued investment in strategic capabilities.

Analyst Q&A (5)
▸
Asked how the Louisiana Meta expansion and Canadian data-center project are reflected in Turner’s backlog, how revenue will phase, and whether HOCHTIEF still plans acquisitions or investment to expand self-performance, industrialized construction, and modularization.
Graham Hunt · Jefferies
Management said the Louisiana expansion is not included in either Turner’s EUR 22 billion construction backlog or its roughly EUR 20 billion awarded-but-not-yet-under-construction bucket. The additional 5 GW represents about EUR 50 billion of total investment, with roughly EUR 27 billion of addressable construction work to be shared between two contractors. For the Canadian project, approximately CAD 11 billion is involved: about EUR 5 billion is in the awarded/design bucket and EUR 6 billion is outside the two backlog buckets. Management said self-performance, engineering, modularization, prefabrication, and mechanical and electrical capabilities improve margins, resilience, flexibility, and execution capacity. HOCHTIEF has already insourced engineering and intends to keep expanding organically and through potential bolt-on acquisitions, with further investment as needed.
▸
Asked whether Turner’s approximately 4% margin can rise further, whether the higher 2026 guidance signals confidence in 2027 and beyond, and what operational, governance, synergy, or cost benefits result from acquiring the remaining 40% of Thiess.
Marcin Wojtal · Bank of America
Management said Turner’s margin has risen from below 2.5% in 2022 to approximately 4% in the first half of 2026 and is expected to increase further through modularization, self-performance, supply-chain initiatives, and related capabilities, although no specific ceiling was provided. The guidance upgrade reflects both stronger 2026 performance and greater confidence in 2027 and beyond, supported by orders, backlog, and continued hyperscaler capital spending. Full ownership of Thiess changes governance and enables financial and operational benefits. From 2027, eliminating minority dividend leakage should add about EUR 95 million annually, refinancing benefits about EUR 15 million, and acquisition-related financing costs reduce earnings by roughly EUR 30 million post-tax, implying approximately EUR 80 million of recurring annual earnings accretion. Thiess is also improving productivity, geographic diversification, and commodity exposure.
▸
Asked for Turner’s data-center revenue and order intake, how the company is addressing potential bottlenecks such as grid connections and local opposition, and when German infrastructure-fund activity should accelerate further.
Dario Maglione · BNP Paribas
Management reported Turner’s first-half order book at approximately EUR 22 billion, up 74% year-on-year, with EUR 13.5 billion of new orders, up 54%; last-twelve-month orders were approximately EUR 23 billion, up 100%. Management acknowledged market bottlenecks, but said Turner’s capacity depends on scope: general construction management and EPCM capacity is effectively scalable, while self-perform and modularization are more constrained but expanding rapidly. Turner benefits from its brand, scale, geographic diversity, workforce mobility, training, and global footprint. Data-center projects are planned across multiple locations to manage grid, water, permitting, labor, and political constraints; projects generally shift location or timing rather than disappear. In Germany, management expects strong growth from the EUR 500 billion, 12-year infrastructure fund. Approximately EUR 129 billion of investment was awarded in the first year, versus EUR 75 billion previously, supporting rail, bridges, transmission, energy, data centers, and defense. Germany’s reported revenue understates activity because many joint ventures are equity-accounted; German stimulus-linked backlog was growing, and overall German growth was expected to be well above group guidance.
▸
Asked whether the long-term data-center outlook beyond 2029-2030 remains valid, including the prior global capacity assumptions, and whether modularization investments could become a fixed-cost burden if the market weakens.
Luis Prieto · Kepler Cheuvreux
Management said HOCHTIEF is seeing no slowdown in data-center activity, with most exposure concentrated in hyperscalers or platforms backed by hyperscalers rather than more leveraged colocation operators. Management acknowledged that prior 2030 targets need updating because the group has reached its earlier revenue ambitions much sooner than expected; a previous EUR 30 billion 2030 figure is being reassessed. Modularization and self-performance are intended to serve a broad range of high-tech and industrialized facilities, including biopharma, biotechnology, semiconductor fabs, manufacturing, and life sciences, rather than only data centers. Existing workshops will be developed organically, while potential acquisitions would add engineering and other capabilities applicable across these markets. Management said the strategy and investment plan remain controlled and sound.
▸
Asked how Turner handles supply-chain price pressure, the nature of its relationships and cost-plus arrangements with clients and subcontractors, and how much of the German E&C order backlog is already attributable to the German infrastructure stimulus.
José Manuel Arroyas · Santander
Management said Turner plans data-center projects openly with clients, evaluating location, energy, permitting, environmental, labor, political, modularization, and cost considerations across several potential sites. Once a project and delivery model are selected, inflation, labor costs, logistics, and other expected costs—including bringing workers from other states—are incorporated into the open-book commercial arrangement and transferred to the client. Management characterized Turner’s contracts as structured this way. In Germany, only about EUR 1 billion of the EUR 4.3 billion first-half 2026 backlog was confidently identifiable as directly linked to the infrastructure stimulus plan. The stimulus is flowing gradually through Deutsche Bahn, Autobahn, defense, and other public-sector procurement processes, but management expects the attributable portion to increase significantly.

Web Traffic

hochtief.com
Web rank#641,683
Est. visits/mo701K

Institutional Ownership

note: probably the least-tested part of this site, take with a grain of salt
Holder behavior (holder profile)source: holder
On big dips (−10%+)
-25.7%
how holders react when this stock falls
On quiet Qs
-16.4%
−10% to +10% baseline
On rallies (+10%+)
-8.9%
how they react when this stock rises
Holders' portfolio flow this Q
+42.9%
inflows — adds are organic
Sellers' portfolio flow this Q
+0.0%
Sellers' overall flow ~ flat.

Ownership Over Time

Ownership composition

Active
0.0%
1 filers
hedge / family / endowment
Retail funds
—
Fidelity, Schwab, 401(k)
Passive
0.0%
0 filers
Vanguard, iShares, SPDR
Market makers
0.0%
0 filers
Citadel, Susquehanna
Insiders
—
Form 4 — latest per insider
Not enough quarterly ownership history to chart yet.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2004 Q33.0B305M15M$0.20$0.20 – $0.212
2005 Q23.4B305M20M$0.20$0.20 – $0.212
2006 Q13.0B283M8M$0.10$0.10 – $0.113
2006 Q33.9B294M20M$0.26$0.24 – $0.283
2007 Q33.9B332M50M$0.66$0.64 – $0.692
2007 Q44.6B371M81M$1.07$0.97 – $1.183
2008 Q13.9B336M59M$0.29$0.27 – $0.303
2008 Q24.5B301M38M$0.66$0.59 – $0.743
2008 Q34.7B287M31M$0.37$0.26 – $0.483
2008 Q44.8B277M26M$0.97$0.71 – $1.585
2009 Q14.0B232M57M$0.37$0.29 – $0.456
2009 Q24.9B276M50M$0.98$0.83 – $1.195
2009 Q35.0B251M49M$0.61$0.39 – $0.774
2009 Q44.7B267M34M$0.93$0.81 – $1.085
2010 Q14.4B299M66M$0.54$0.36 – $0.895
2010 Q25.0B378M38M$0.78$0.69 – $0.968
2010 Q35.0B206M55M$0.76$0.54 – $1.176
2010 Q44.7B443M52M$1.36$1.20 – $1.524
2011 Q14.8B458M149M$-0.93$-2.47 – $0.705
2011 Q25.4B177M-190M$0.20$0.07 – $0.425
2011 Q35.0B249M13M$0.18$-0.89 – $1.714
2011 Q46.2B585M123M$-1.44$-1.48 – $-1.413
2012 Q15.5B183M-91M$-0.25$-0.54 – $0.347
2012 Q26.2B291M-40M$1.01$0.42 – $1.716
2012 Q36.4B325M-16M$1.46$0.38 – $2.096
2012 Q47.3B475M161M$1.51$1.23 – $2.044
2013 Q15.8B355M51M$0.47$0.37 – $0.586
2013 Q26.5B388M49M$0.60$0.34 – $0.825
2013 Q36.4B407M83M$1.27$0.66 – $2.135
2013 Q46.9B268M26M$0.59$0.44 – $0.754
2014 Q15.5B217M16M$0.61$0.34 – $0.915
2014 Q26.8B278M55M$0.93$0.70 – $1.375
2014 Q36.1B252M51M$0.78$0.63 – $0.904
2014 Q46.8B270M61M$0.68$0.20 – $1.193
2015 Q14.9B280M68M$0.77$0.64 – $0.885
2015 Q25.8B282M64M$1.17$0.87 – $1.774
2015 Q35.6B241M54M$0.86$0.67 – $1.014
2015 Q46.2B174M48M$1.36$0.99 – $1.763
2016 Q14.4B178M41M$1.03$0.97 – $1.124
2016 Q24.9B219M71M$1.13$1.08 – $1.194
2016 Q35.1B233M79M$1.19$1.15 – $1.253
2017 Q15.2B188M25M$1.39$1.28 – $1.523
2017 Q45.8B163M28M$1.94$1.80 – $2.113
2018 Q15.2B310M121M$1.60$1.55 – $1.662
2018 Q26.0B295M113M$1.93$1.87 – $2.012
2018 Q46.5B278M123M$2.07$1.65 – $2.533
2019 Q15.7B413M125M$1.89$1.89 – $1.891
2019 Q26.2B—0M$0.00$0.00 – $0.001
2019 Q36.3B422M138M$2.27$2.27 – $2.271
2019 Q46.9B470M189M$-8.49$-8.49 – $-8.491
2020 Q15.8B-215M-450M$1.55$1.55 – $1.554
2020 Q25.7B357M108M$1.26$1.26 – $1.264
2020 Q33.1B406M132M$2.04$2.04 – $2.044
2021 Q13.6B—0M$0.00$0.00 – $0.004
2021 Q25.2B286M110M$1.46$1.46 – $1.464
2021 Q33.9B261M101M$1.34$1.34 – $1.344
2021 Q45.5B873M551M$-1.16$-1.16 – $-1.164
2022 Q26.1B332M123M$1.63$1.63 – $1.631
2022 Q36.9B339M123M$1.63$1.63 – $1.631
2022 Q47.1B1.0B609M$1.54$1.54 – $1.541
2023 Q16.0B328M128M$1.70$1.70 – $1.701
2023 Q26.8B321M123M$1.64$1.64 – $1.641
2023 Q36.9B345M135M$1.80$1.80 – $1.801
2023 Q47.2B380M146M$1.94$1.94 – $1.941
2024 Q16.6B332M126M$1.68$1.68 – $1.681
2024 Q27.9B481M150M$2.00$2.00 – $2.001
2024 Q38.7B502M138M$1.83$1.73 – $1.932
2024 Q48.9B501M143M$1.90$1.90 – $1.901
2025 Q18.1B526M167M$2.22$2.22 – $2.221
2025 Q29.1B—0M$0.00$0.00 – $0.000
2025 Q39.3B—0M$0.00$0.00 – $0.000
2025 Q410.4B—0M$0.00$0.00 – $0.000
2026 Q19.5B—0M$0.00$0.00 – $0.000
2026 Q210.6B—0M$0.00$0.00 – $0.000
2026 Q311.3B—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-07-31) — for comparison onlyclick to expand

Thesis

HOCHTIEF is transitioning from a conventional cyclical contractor into a global infrastructure and advanced-technology construction platform. Turner is the central asset: its data-center backlog and margin progression are unusually strong, while the broader group adds CIMIC, Thiess, German infrastructure, energy, defense and critical-minerals exposure. The EUR 85B backlog provides considerable visibility, but backlog is not automatically profit: construction execution, labor availability, cost control, working capital and contract risk remain meaningful. The latest quarter strengthens the trajectory. Revenue, orders, backlog, margins and cash generation all moved positively, and management raised 2026 operational net-profit guidance. However, the valuation should not assume that current AI infrastructure demand remains at peak intensity or that every backlog euro converts at Turner-like economics. A normalized owner-earnings estimate of EUR 1,250M is therefore below the bull-case earnings outcome but above older-cycle levels.

Trade Signal

Trade rating
-6.4/10
Short
Horizon
~4mo
gpt-5.6-luna2026-07-31 · saw 443.20 EUR-23.0% since

Short: Hochtief is executing strongly, but the market price near EUR33.3bn capitalizes an aggressive AI/infrastructure bull case and is roughly twice the analyst's probability-weighted fair value.

Temporary mispricing-1.0

The major move was a durable narrative and earnings re-rating: the stock advanced from EUR337 at 2025 year-end to EUR549 in May 2026 amid accelerating Turner/data-center demand, record orders, infrastructure/defense themes and DAX inclusion. It then fell to EUR443 as investors took profits and began questioning whether the AI-capex trajectory and margins justify the valuation; the post-earnings move from EUR447.4 to EUR443.2 was only -1% despite strong results. The recent decline is not a clear panic overshoot; it looks like a justified early de-rating or consolidation after a very large run, while the muted earnings response suggests good news was already priced. Any temporary gap is modest and more likely to close through further earnings proof than through an immediate rebound.

Market view+4.0

The stock was re-rated from roughly EUR90 in late 2023 to a EUR549 52-week high as investors embraced AI/data-center construction, infrastructure spending and improving execution. DAX inclusion added recognition and passive demand. The recent decline to EUR443 and muted reaction to strong Q2 results indicate that expectations are high and the market may be shifting from narrative expansion to scrutiny of cash conversion, margins and backlog quality. Bulls see record orders, Turner growth and defense/infrastructure optionality; bears see a cyclical contractor trading at a technology-like valuation. Sentiment is still constructive but less euphoric, with likely crowded ownership and increasing sensitivity to any AI-capex disappointment.

Inflectionwindow ~3mo-2.0

Operationally, the company is in a positive inflection: H1 sales rose 13%, operational net profit 35%, orders 25%, backlog reached nearly EUR85bn, and guidance was raised. But the evidence has already been delivered and the stock has risen 131% over one year. The analyst's bull case requires a further structural step-up toward EUR2.1bn of owner earnings, sustained data-center growth, margin expansion and successful defense execution; that is materially above the base case and is not clearly supported by consensus or by the historically volatile, low-margin economics. The next inflection is therefore more likely a proof-or-disappointment event than an unrecognized earnings surprise.

Catalysts
  • ▲2026-10 · Q3 2026 earnings and order/backlog update — A further guidance raise, continued data-center order growth and cash conversion could support the premium valuation; any backlog slowdown would pressure the shares.
  • ▲2027-02 · FY 2026 results and 2027 guidance — The market will test whether the raised EUR1.025–1.1bn operational net-profit target is achieved and whether growth persists beyond the current AI-infrastructure cycle.
  • ▲H2 2026–2027 · Turner data-center backlog conversion — Execution on large hyperscaler and AI-capacity projects could validate a structurally higher margin and earnings profile.
  • ▲H2 2026–2027 · CIMIC/CPB Australian defense awards — Additional awards from the AUD425bn long-term defense program could extend backlog visibility, although timing is uncertain.
  • ▼Next 6–12 months · AI/data-center capex digestion or project delays — The valuation is highly dependent on continued hyperscaler spending and successful conversion of a large backlog; cancellations, postponements or labor-cost pressure would expose multiple risk.
Flow+1.0

Dilution was approximately zero TTM and the company paid about EUR500m in dividends. DAX inclusion should have generated passive demand and improves institutional access, but there is no stated large buyback or imminent tender offer. The principal future flow risk is not share issuance but valuation-sensitive holders selling if AI-capex expectations weaken; the recent 19% decline from the high suggests some de-risking is already occurring.

Floor / Ceiling+2.0

There is some support from approximately EUR1.2bn of owner earnings, a roughly 6% reported FCF yield, a 2% dividend, improving net cash and a record backlog. This is not a hard asset floor: construction cash flows are working-capital intensive, backlog is not equivalent to equity value, and the business remains cyclical and low-margin. The main ceiling is valuation: at about 15x EV/EBITDA and 18x EV/FCF, any disappointment could force a substantial multiple reset, while the AI narrative may already capitalize much of the upside.

Buyability

Real buyers can own the improving Turner/data-center, CIMIC defense and Dornan infrastructure exposure, with DAX inclusion improving visibility and liquidity. However, at roughly 43x P/E and 18x P/FCF, the stock requires sustained growth and margin expansion; it is no longer an obvious value purchase for generalist investors.

Fear vs Greedfear 4/10 (-2.0)greed 8/10 (+3.0)

Fear is stronger than greed at EUR443: the business is executing well, but the price appears to capitalize a bull-case transformation from contractor to infrastructure compounder. The asymmetric risk is that good operating results are no longer enough to offset a de-rating from an unusually elevated construction-sector multiple.

Valuation

Our Target
14.5B EUR-43%
Market Should Pay
14.8B EUR-42%
target ×1.02 (greed premium)
Current Market Cap
25.5B EURSlightly bullish
What Changed
transcript · 2026-07-27
+10%fair value on this information

The genuinely new information is the raised 2026 operational net-profit guidance to EUR 1.025-1.1B, the acceleration in orders and backlog to nearly EUR 85B, stronger-than-expected Turner margin and data-center order momentum, and management's quantified expectation of approximately EUR 80M of recurring annual Thiess accretion from 2027. The call also provided more detail on capacity constraints and project timing, rather than merely repeating the earlier AI thesis.

▸ How the cases moved

The prior base case was already constructive because the 2025 record, 2026 guidance and AI-infrastructure backlog were known. The new quarter raises the bull terminal value from roughly EUR 26,000M to EUR 29,100M and its probability from 0.22 to 0.25, reflecting stronger orders, a EUR 85B backlog and evidence of further Turner margin expansion. The base value rises from roughly EUR 17,000M to EUR 18,200M and its probability from 0.58 to 0.55; the bear value is broadly unchanged at EUR 7,350M but its probability falls from 0.20 to 0.20 because execution and cycle risks remain. Thiess's completed full acquisition adds confidence to the 2027 earnings bridge, but its benefits were substantially telegraphed before the release.

2-Year Plausible Outcomes
bear20%
7.3B EUR
rev +2%/yrOE $700M

The data-center cycle moderates, project timing slips, and Turner margins retreat toward 3%. Germany and Australian infrastructure spending arrives slowly, while execution and working-capital demands remain elevated. HOCHTIEF remains solvent and profitable, but owner earnings settle below the current run rate and the market applies a cautious construction multiple.

▸ Valuation

9x EUR 950M EBITDA = EUR 8,550M EV - EUR 1,200M net debt = EUR 7,350M equity

base55%
18.2B EUR
rev +7%/yrOE $1500M

Turner continues to compound through data centers, biopharma and advanced technology construction, but margins improve gradually rather than explosively. CIMIC and Thiess contribute the expected earnings accretion, while German infrastructure spending builds progressively. Revenue grows at a healthy mid-single-digit rate and normalized cash earnings rise as backlog converts.

▸ Valuation

11x EUR 1,700M EBITDA = EUR 18,700M EV - EUR 500M net debt = EUR 18,200M equity

bull25%
29.1B EUR
rev +12%/yrOE $1900M

Hyperscaler and AI infrastructure demand remains exceptionally strong through 2028, Turner expands margins through self-performance and modularization, and HOCHTIEF captures a substantial share of German, energy, defense and critical-minerals investment. Thiess synergies arrive as planned and the group is re-rated as a higher-quality infrastructure platform. The higher EBITDA multiple is supported by owner earnings approaching EBITDA as execution improves and working-capital conversion normalizes.

▸ Valuation

13x EUR 2,200M EBITDA = EUR 28,600M EV - EUR -500M net debt = EUR 29,100M equity

▸ Target Rationale

The probability-weighted scenario value is EUR 18,755M at the two-year terminal date, or EUR 15,004M discounted at 12% for two years. I set the analytical target at EUR 14,500M, below the mechanical model, because the model necessarily relies on management's strong backlog and margin trajectory while underweighting construction execution risk, working-capital volatility, acquisition integration and the limited history of current Turner economics. The balance sheet is sound enough that leverage does not consume the equity, but the valuation still deserves a modest conservatism adjustment.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality7/10
Situation now8/10
Trajectory8/10
Risk4/10
Governance6/10
Insolvency prob (2yr)2%
Outcome uncertainty7/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Inclusion in the DAX Index: On June 4, 2026, Deutsche Börse announced that HOCHTIEF AG will be included in Germany's blue-chip DAX index of the 40 leading listed companies, effective June 22, 2026. Management highlighted that this promotion reflects the successful execution of the group's global infrastructure strategy across high-growth sectors.
  • Q1 2026 Financial Results: In May 2026, HOCHTIEF reported strong operational momentum for the first quarter of 2026. Sales increased by 14% (FX-adjusted) year-over-year to EUR 9.4 billion, driven by robust activity across all divisions. Trailing twelve-month (LTM) operating cash flow pre-factoring stood at EUR 2.5 billion, and net debt improved by EUR 1.1 billion year-over-year to EUR 884 million.
  • Record Backlog and Guidance: The group's order backlog reached a new record high of EUR 79.3 billion (up 17% FX-adjusted). Q1 2026 new orders rose 27% (FX-adjusted) to EUR 15.2 billion, with roughly 60% of these orders concentrated in strategic growth markets (such as digital, AI, energy, and critical minerals). Management reiterated its full-year 2026 operational net profit guidance of EUR 950–1,025 million, representing an expected 20% to 30% year-over-year growth.
  • Leadership Transition: In June 2026, HOCHTIEF appointed Peter Hingott as the new Chief Executive Officer of HOCHTIEF Infrastructure to oversee its civil and engineering operations.
▸ Thesis-test Findings
Turner Construction Data Center Pipeline & Backlog 2026

Turner Construction (HOCHTIEF’s major North American subsidiary) is experiencing an unprecedented surge in demand driven by the AI and cloud infrastructure boom. In Q1 2026, Turner’s backlog grew 34% year-over-year to reach $48.9 billion, climbing approximately 10% sequentially from $44.3 billion at the end of 2025. New orders for the quarter surged 48% year-over-year to $12.1 billion. Demonstrating the growing scale of its mega-projects, Turner has already been awarded 10 projects valued at over $1 billion each in 2026 to date—surpassing its total count of billion-dollar project wins for the entirety of 2025. Key projects pushing this pipeline include a $10 billion joint-venture data center for Meta in Lebanon, Indiana, and a $6 billion joint venture for a CoreWeave facility in Lancaster, Pennsylvania.

Dornan Engineering European Expansion & Data Center Contract Wins

Following Turner’s full acquisition of Dornan Group in January 2025, the Irish mechanical, electrical, and engineering specialist has expanded aggressively across Europe, capitalizing on the transition of tech companies to high-density AI infrastructure. Dornan's revenues surged past €1 billion in 2025 (up from €734 million in 2024, entering 2025 with a €1.6 billion backlog), driven primarily by data center developments in the UK and continental Europe (including Denmark, Belgium, the Netherlands, and Germany). In 2026, Dornan is rolling out a specialized "GC2" (General Contractor 2) strategy to manage complex high-density data center fit-outs directly. Key expansion milestones in 2026 include an international consortium memorandum signed in May 2026 to construct a 50-to-200 MW data center in Kazakhstan, valued between $1.5 billion and $3 billion.

CIMIC Australian Defense Infrastructure Spending Outlook

CIMIC Group, operating primarily through CPB Contractors, is highly leveraged to capture a significant wave of long-term public capital deployment in Australia. The Australian government’s 2026–27 Federal Budget committed an additional AUD 14 billion over four years and AUD 53 billion over the next decade to fund the National Defence Strategy, lifting total planned defense capability investments to AUD 425 billion by 2035–36. This funding supports massive sovereign infrastructure programs, including naval precinct developments and northern base hardening. To capture this pipeline, CPB Contractors has successfully entered the delivery phase (running through late 2031) of the joint-venture Riverina Redevelopment Program to upgrade regional ADF training and living accommodations. Furthermore, in January 2026, CPB Contractors was shortlisted as one of the managing contractors to tender for the major Mulwala and Benalla Munitions Facility Redevelopment.