HydrogenPro ASAv3 3.5/10 · 2026-11-11Based in Porsgrunn, Norway, and established in 2013, HydrogenPro ASA specializes in engineering and delivering bespoke hydrogen production facilities, notably offering advanced high-pressure alkaline electrolyser technology.
2-Year Price History
Valuation v3 Opus worker · 2026-11-11
HydrogenPro is a Norwegian maker of high-pressure alkaline electrolysers. It has large references at ACES (220MW) and SALCOS (100MW), but it is a going concern in name only. The H1 2026 report has an explicit going-concern uncertainty note (runway 'limited', 'dependent on securing additional external financing in the near term'). Underlying burn is about NOK 25-28m a quarter. The pitch's -60m a year is too low; it is closer to -100m once the NOK 12m materials reversal and NOK 2m raise costs are stripped from Q2's -16m EBITDA. Q3 cash is likely only NOK 30-45m against NOK 90m of current liabilities. At NOK 0.368 x 138.3m shares, the NOK 51m market cap sits roughly on net cash, so the market prices the operating business at zero. That is broadly right. The two 'close to NOK 300m' contracts were guided to close in Q3, had not been announced by 11 Nov, and still sit behind 'regulatory approval and technical review'. Even if they land, the margin on them does not cover two years of a ~NOK 130m cost base, so more equity is needed either way. The strategic holders (ANDRITZ about 11.6%, LONGi about 9%, MHI) did not visibly fund the June NOK 0.50 rescue raise; ANDRITZ only lent shares for settlement. That weakens the 'strategic backstop' argument. The challenger was right that the pitch's 0.28 depends heavily on the dilution price and is within the noise of Thursday's (13 Nov) Q3 cash figure. But correcting the burn more than offsets the higher raise price. My probability-weighted DCF is about NOK 0.22: roughly 45% odds of a viable niche OEM worth about 0.45-0.6 a share after funding, and failure or recapitalisation near zero otherwise. The upside tail is real (a contract award could double the stock). Rating 3.5: unattractive to own, a mild short in principle, but too small, too binary and too hard to borrow to act on with conviction.
A deep dive would have to establish: Does the 13 Nov Q3 report show the NOK 300m contracts signed with down-payments, and enough cash or a committed strategic financing to fund the business through 2027 without another raise at or below NOK 0.50?
Research (expand)
What the company does
HydrogenPro designs high-pressure alkaline electrolysers (cell stacks plus gas-separation skids). It makes its own nickel-free-coating electrodes on a new plating line in Aarhus, Denmark (about NOK 56m capitalised, depreciating from Q2 2026). Stack manufacturing moved from its own Tianjin plant (closed; NOK 32m impairment in Q2, mostly goodwill; machinery being sold, NOK 6.6m held for sale) to an OEM agreement with LONGi in Wuxi. Its reference projects are ACES Delta (220MW, Utah, with Mitsubishi Power) and SALCOS (100MW, Salzgitter, with ANDRITZ). Strategic shareholders are ANDRITZ (about 16.0m shares, about 11.6%), LONGi Hydrogen (12.7m shares bought at NOK 5.50 in May 2025, about 9%) and MHI.
The investment case (and why it mostly fails)
The bull case: near-zero EV for proven 100MW-scale technology; two selected-supplier contracts worth close to NOK 300m (about 6x the market cap); a strategic review run by Clarksons since May. Against it:
- The H1 2026 report carries an explicit going-concern uncertainty note (Note 11): cash runway is 'limited', the group is 'dependent on securing additional external financing in the near term', and there is 'no assurance that such financing will be obtained on acceptable terms, or at all'. The June business update raised voluntary liquidation as a worst case.
- The two contracts were guided to 'conclude in Q3 2026' (June business update). By 21 Aug they were still 'pending regulatory clearance and technical review'. No award had been announced by 11 Nov.
- FIDs keep slipping (2025, then 2026, now '2026-2027').
- The electrolyser industry is in oversupply. Chinese alkaline makers undercut on price. Western peers (McPhy, Green Hydrogen Systems) went to liquidation, with assets bought cheaply and equity wiped out.
What it earns today (real free cash flow)
Q2 2026 EBITDA was -16m, but that includes a NOK 12m reversal of prior-year direct material charges and NOK 2m of raise costs. Underlying EBITDA is about -26m a quarter: payroll 25m plus other opex about 13m, against gross profit of about 12m on 15m of revenue. Add capex of about 2-3m a quarter and lease payments of about 1.3m a quarter. Further cuts are targeted (about NOK 20m a year). Unlevered owner earnings run at about NOK -100 to -110m a year, not the pitch's -60m. There is no stock-comp distortion of note (about NOK 1m a year).
Cash bridge:
- End of Q2 cash: NOK 59m.
- Plus about 6m from the July repair offering, less Q3 burn and capex of about 28m, plus or minus working capital and asset sales.
- That gives Q3 cash of about NOK 30-45m (mid about 38m). Lease liabilities are about NOK 12m.
On the balance sheet:
- Current liabilities are NOK 90m, including NOK 24m of 'other provisions' for settlements and claims, NOK 15m of current warranty provisions and NOK 35m of other current liabilities.
- Trade receivables are only NOK 0.5m.
- A USD 3m DG Fuels convertible note is carried at NOK 12m and is of doubtful value.
In liquidation, equity would be worth about nothing.
Free cash flow for the next 5 years, and what it is in year 5
The base path assumes the NOK 300m contracts land in 2027, down-payments partly fund working capital, the cost base is cut further, and LONGi OEM margins are 20-30%. FCF before interest (NOK m): 2027 -70, 2028 -40, 2029 -15, 2030 +5, 2031 +20. The 2027 burn is deeper than the pitch's -50 because the true run-rate burn is higher.
In year 5 it is at best a small niche technology OEM: electrodes, gas separation and licensing on top of Chinese-built stacks. At about 10x FCF that is roughly NOK 200m. At worst it is a corpse.
This is a 'don't know' case, so I ran it both ways:
- Success path. PV of 2027-31 FCF is about -92m, PV of the terminal value about +124m, and net cash about +26m, so about NOK 58m of equity value before funding. It needs about NOK 100-130m of new equity. If that is raised near fair value, existing holders keep about 0.42 a share. If the stock rerates on the award and the raise happens at 0.6-0.7 (the challenger's case), they keep about 0.5-0.6.
- Failure or distressed recapitalisation. Equity is worth about 0 to 0.1.
At about 45% odds of success, the probability-weighted DCF is about NOK 0.22 a share (range about 0 to 0.9). I have low confidence in the year-5 picture.
Fair value and multiples
- Market cap is about NOK 51m. EV is about NOK 25m (net cash about 26m after leases, using estimated Q3 cash).
- EV/EBITDA and P/E are negative and meaningless. FCF yield on the market cap is about -200%.
- There is no capital return, and dilution is the direction of travel: the share count went from 95.5m to 138.3m in 2026 alone.
- Fair value is about NOK 0.22 against 0.368, roughly 40% below the price, with a fat right tail.
Management, risks and competition
Management is credible on technology but has a long record of over-optimistic order timing (four 'near-term' FIDs worth NOK 1bn flagged in Feb 2026; two contracts guided for Q3 and still pending). The founding Espeseth family has sold down below 5%. There is no fraud history. The June raise was priced about 76% below the prior close, with unnamed 'new investors and an existing shareholder'. ANDRITZ acted only as share lender, and LONGi and MHI did not visibly participate. The strategics are not writing rescue cheques.
Risks:
- running out of cash, or a rescue at a deep discount;
- contract slippage or loss;
- dependence on LONGi;
- ACES warranty and rework exposure (Hydrogen Insight reported 'unexpected costs'; the USD 3.4m figure is unverified);
- the EU Hydrogen Bank cap on Chinese-sourced stacks;
- US 45V policy;
- Oslo rules pushing a reverse split below NOK 1.
Competition: oversupplied. Chinese alkaline makers (LONGi, Peric, Sungrow) sell at a fraction of Western prices. Nel, thyssenkrupp nucera, Sunfire and John Cockerill are also starved of FIDs.
Sentiment: 1.5/10
The stock is down about 98% from its peak and sits at the all-time low (1-yr range 0.34-3.99; 0.368 is 1% up the range). The June placement at 0.50 is underwater. There are no options. This is capitulation, but in a business with a going-concern note, so it is not a blood-in-the-streets buy.
Thesis test
- Objection 1 (success branch diluted at failure prices): partly right, and the net effect favours the pitch. A contract award would likely let the company raise above 0.50, so the pitch's assumption of 2-3x dilution at 0.30 is too harsh for that branch. But the pitch's success-branch value of about 115m was itself inflated by a burn understated by about 40m a year and Q3 cash overstated by about 10-15m. Redone, the success branch is about 0.42-0.6 a share, not 0.73-0.78. Weighted at about 45% that gives about 0.22, not 0.37-0.47.
- Objection 2 (gap of about NOK 12m is within noise; Q3 due 13 Nov): right on the size, wrong on direction. The point estimate is noisy and Thursday's cash will move it. But the challenger's own correction (Q3 cash about 35-45m, burn about -100m a year) moves the value down, not up. The gap is real but small in absolute NOK, so it is not a high-conviction short.
- Objection 3 (near-term binary, right-skewed): right that the distribution is skewed; it does not change the mid. The contracts missed their own Q3 guidance, and that is evidence too. My ranges now carry the tail (DCF high 0.9). Even an award does not end the need for equity, because NOK 300m at 20-30% margin over about two years does not cover a NOK 130m-a-year cost base.
- Objection 4 (strategic holders and the review): the pitch is right. ANDRITZ, LONGi (in at NOK 5.50) and MHI together hold about 25%, yet the June 0.50 rescue came from unnamed new investors, with ANDRITZ only lending shares. Peer precedent (McPhy to John Cockerill, GHS to Nucera and GeoPura) shows strategics take assets, not equity. A partner-led recap above 0.50 is a small tail, not a base case.
- Objection 5 (hard to short): right, and it matters for the rating, not the value. A NOK 51m, top-25-holders-own-87% stock with the main lender recalling its shares, plus a 13 Nov binary event, makes a short of about 40% expected gain impractical at size.
- Missed by both: the explicit going-concern note in the H1 report; NOK 24m of claims and settlement provisions plus NOK 15m of current warranty provisions in current liabilities; and no Q3 webcast invitation or contract news on mfn through 11 Nov.
Conclusion: the pitch's direction holds. The market's zero for the operating business is fair to generous. Fair value is about NOK 0.22 (0.03-0.8). Rating 3.5: avoid, a mild short in principle. Not a clean trade, because of the binary contract tail, the Q3 print on 13 Nov, and borrow constraints.
- /Users/gregwo/stocks2/data/analysisv3/context/HYPRO.OL.md
- https://storage.mfn.se/467be757-20f2-4ec2-98f0-5cbd2792d5b9/hypro-first-half-year-and-q2-2026-report-final.pdf
- https://www.placera.se/pressmeddelanden/hydrogenpro-hydrogenpro-asa--first-half-year-and-second-quarter-2026-financial-results-20260821
- https://www.placera.se/pressmeddelanden/hydrogenpro-hydrogenpro-asa-secures-nok-15-million-from-new-investors-20260622
- https://mfn.se/a/hydrogenpro/business-update
- https://mfn.se/all/a/hydrogenpro
- https://mfn.se/all/a/hydrogenpro/hydrogenpro-asa-new-share-capital-1
- https://live.euronext.com/en/products/equities/company-news/2025-05-27-hydrogenpro-asa-resolution-issue-new-shares-longi
- https://www.boerse-express.com/news/articles/hydrogenpro-aktie-kuhlefelt-zehnfacht-engagement-930185
- https://live.euronext.com/nb/products/equities/company-news/2026-04-01-flagge-melding
- https://www.hydrogeninsight.com/electrolysers/john-cockerill-takes-over-most-of-mcphys-assets-with-remainder-of-the-green-hydrogen-tech-firm-liquidated/2-1-1843928
- https://renewablesnow.com/news/green-hydrogen-systems-faces-bankruptcy-nucera-to-buy-assets-1277225/
- /Users/gregwo/stocks2/data/analysisv3/HYPRO.OL/pitch/2026-11-11.md
- /Users/gregwo/stocks2/data/analysisv3/HYPRO.OL/2026-11-11.challenge.md
Financials — Adjusted
Adjusted · TTM 2026-Q3 · NOK
| TTM & Fiscal-Year P&L | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Revenue | 72.9-59% | 84.8-57% | 196-66% | 568+907% | 56.4 |
| Gross profit | -116-302% | -54.0 | -9.62-110% | 96.2+699% | 12.0 |
| Operating expenses | 62.4-76% | 161-26% | 218+41% | 155+18% | 131 |
| ▸Adj EBITDA | -157 | -193 | -204 | -36.0 | -111 |
| ▸Adj OCF | -150 | -193 | -180 | -38.9 | -101 |
| CapEx | -16.4 | -34.8 | -25.1 | -19.9 | -14.7 |
| Adj FCF | -167 | -228 | -205 | -58.8 | -116 |
| Interest expense | 1.12 | 2.26 | 42.1 | 21.4 | 11.7 |
| ▸Adj net income | -162 | -198 | -200 | -20.3 | -107 |
claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2022→FY2025 +2026YTD
| Where the Cash Went | Total | 2026YTD | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|---|
| ▸Claimed: EBITDA | -564 | -66.4 | -226 | -140 | -49.4 | -82.5 |
| FCF (OCF−capex) | -639 | -81.6 | -223 | -43.9 | -207 | -84.1 |
| Net income | -670 | -80.6 | -240 | -200 | -64.5 | -84.9 |
| ▸Capital returned | -272 | -5.86 | -135 | -42.1 | -100 | 11.7 |
| Buybacks | -352 | -6.38 | -140 | -84.2 | -122 | 0.00 |
| Dividends | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 | 0.00 |
| Interest paid | 78.0 | 0.53 | 2.26 | 42.1 | 21.4 | 11.7 |
| Debt paid down | 2.15 | 0.00 | 2.15 | 0.00 | 0.00 | 0.00 |
| ▸Reinvestment | 144 | -2.65 | 33.3 | 22.7 | 23.8 | 67.0 |
| Capex (PP&E) | 100 | 5.77 | 34.8 | 25.1 | 19.9 | 14.7 |
| Intangibles & M&A | 38.8 | 0.00 | 0.00 | 0.00 | 0.00 | 38.8 |
| Leases signed (net Δ) | 5.09 | -8.42 | -1.48 | -2.40 | 3.90 | 13.5 |
| Retained / other | -328 | -75.2 | -85.1 | 40.3 | -84.6 | -123 |
negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.
Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.
Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).
SBC over the Total window: 16 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.
| Balance Sheet | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| ▸Assets (total) | 231 | 367 | 582 | 644 | 573 |
| ▸Liabilities (total) | 106 | 120 | 233 | 190 | 135 |
| Net debt (incl. leases) | -16.1 | -69.3 | -173 | -140 | -241 |
| Net debt / Adj EBITDA | -- | -- | -- | -- | -- |
| Net debt / Adj FCF | -- | -- | -- | -- | -- |
| Adj EBITDA / interest | -140 | -85.4 | -4.85 | -1.68 | -9.53 |
| Shares outstanding | 95.4 | 92.7 | 68.3 | 63.3 | 58.0 |
| Dilution (YoY) | +32.7% | +35.7% | +7.9% | +9.1% | +0.8% |
| Employees | 151 | -- | -- | -- | -- |
| Margins | TTM | 2025 | 2024 | 2023 | 2022 |
|---|---|---|---|---|---|
| Gross margin | -159.1%-191.6 | -63.6%-58.7 | -4.9%-21.9 | 16.9%-4.4 | 21.4% |
| Adj EBITDA margin | -215.3%-112.9 | -227.6%-123.3 | -104.3%-98.0 | -6.3%+190.5 | -196.9% |
| Adj OCF margin | -206.5%-103.6 | -227.4%-135.6 | -91.8%-84.9 | -6.8%+172.4 | -179.3% |
| Adj FCF margin | -229.0%-98.7 | -268.4%-163.8 | -104.6%-94.3 | -10.3%+195.0 | -205.3% |
| Net income margin | -245.8%-122.4 | -282.5%-180.0 | -102.5%-91.1 | -11.3%+139.1 | -150.5% |
| Adj NI margin | -222.1%-117.3 | -233.2%-130.7 | -102.5%-98.9 | -3.6%+186.1 | -189.7% |
| ROIC (adj, after-tax) | -103.6% | -59.9% | -49.4% | -9.9% | -22.0% |
| Cost of debt | 6.1% | 10.1% | -- | -- | -- |
Earnings Calls
Earnings Call · 2026 Q2
HydrogenPro presented its Q2 2026 update, with CEO Jarle Dragvik covering business, technology and market, and CFO Martin Holtet covering the financials. HydrogenPro develops, manufactures and delivers key components for green hydrogen plants, mainly electrolyzer cell stacks and gas separation skids for hydrogen and oxygen. It works through strategic EPC partners to offer full-scope, turnkey solutions and targets decarbonization in refining, fertilizer and ammonia, steel, and synthetic fuels. Management says its installed projects are among the largest green hydrogen projects in the world, which is a key differentiator with prospective customers. The quarter's four milestones were technology improvements in stack design and electrodes, the launch of a strategic review and a capital raise in July, restructuring in China through an OEM agreement with LONGi, and progress converting the pipeline. Management said 2026 has been a slower market than expected, with few final investment decisions so far. The pipeline is growing in absolute terms and new requests keep arriving, but customers are delaying expected FIDs. Management reports few outright cancellations, particularly among mature projects. The outlook is maintained, based on projects under negotiation with target FIDs across 2026 and 2027, some competitive against one to three rivals and others exclusive. Several near-term projects where HydrogenPro has been selected as supplier are close to finalization, but final contracts depend on regulatory approval and technical reviews. Management says it remains confident in these projects. On the financials, Martin Holtet said revenue in Q2 was NOK 15 million, mainly from the SALCOS project, with some on-site work at the ACES site in Utah. Direct materials were a negative NOK 9 million, reflecting a reversal of about NOK 12 million recognized in the prior year. Payroll fell to NOK 25 million from NOK 30 million in Q1, reflecting downsizing mainly in China. Other operating expenses rose to NOK 15 million from NOK 11 million, but Q1 included a reversal of prior-year provisions and Q2 included about NOK 2 million of capital raise costs, so the underlying trend is a continued reduction in other operating costs. EBITDA was negative NOK 16 million. Following the decision to outsource production to LONGi, HydrogenPro is divesting equipment and machinery in Tianjin, resulting in a NOK 32 million impairment mainly on intangible assets tied to Tianjin operations. Depreciation was about NOK 5 million, including the start of depreciation on the Denmark investment in Q2. The net result was negative NOK 51 million. Net cash rose by NOK 3 million to NOK 59 million from NOK 56 million at the end of Q1, driven by positive working capital from customer payments and a June private placement of about NOK 15 million, less about NOK 1 million in leasing costs. A subsequent offering in July brought in about NOK 6 million. Capital expenditure was NOK 3 million, and the manufacturing line is now fully operational. Backlog stood at NOK 262 million, up from NOK 252 million in the prior quarter. Management stressed a lean cost base built on strong partners and said further cost measures will be implemented in line with market activity while preserving valuable competence. On technology, the company has optimized stack design to make stacks lighter with less steel, lowering transport and installation costs and supporting modular, easy-to-install systems. Efficiency gains come from improved electrodes and a new design that reduces shunt currents, which otherwise waste energy as heat, and this reduces cooling needs. Management says it has reached energy consumption below 4.5 kWh per normal cubic meter by continuing to optimize its electrode coating. HydrogenPro is also focusing on degradation, the gradual wear of electrodes over time, which affects lifetime and performance guarantees. Its Aarhus, Denmark R&D center runs a test facility 24/7 that simulates continuous and dynamic operation, and this has been running for more than a year. The latest-generation electrodes are now produced stably at full scale on the new production line, and the last stacks in production will use this technology in a real production setting. A 30 bar pilot electrolyzer is being developed with Thermax in India. Management also observed the installation of its electrolyzer at the Salzgitter plant with ANDRITZ in June. On markets, the green hydrogen sector still depends on regulatory incentives. Management cited six EU policies targeting large emission sectors, with ReFuelEU Aviation as an example. Under that policy, e-SAF production requires substantial electrolysis capacity, and management estimated that a modest 1.2% blend in 2030 would require about 3 gigawatts, equal to the capacity of 600 HydrogenPro electrolyzers. Management expects electrolyzer orders to be placed in 2027 and 2028 to meet these requirements, with airlines facing penalties if they do not comply. For the rest of 2026, management's three priorities are converting the pipeline into orders and building backlog, delivering and handing over reference projects including electrode development, and maintaining financial discipline. Management said it remains optimistic and maintains its outlook. In the Q&A, analysts asked about the strategic review, the preferred form of investor, and China margins. Jarle Dragvik said the strategic review is ongoing, that one transaction has been completed, and that more information will follow in due course. Martin Holtet said building the industry takes patience, and that combining funding with a strategic or commercial partner, likely a long-term strategic investor, makes sense, while the company remains open to all investor types. On the China OEM arrangement, Holtet said the LONGi partnership lowers both fixed and variable costs compared with producing in Tianjin. Stack manufacturing is becoming more commodity-like, while HydrogenPro keeps 100 percent ownership of its electrode technology and focuses on higher-margin European work. Dragvik added that HydrogenPro still controls electrolyzer technology, electrode technology and gas separation technology, which he described as the real value of the company.
▸Where does the strategic review stand today, and should shareholders expect the outcome to be a financing transaction, strategic partnership, sale of assets, or a broader strategic transaction involving the company?
▸Follow-up: Does HydrogenPro prefer to bring in a strategic industrial investor who can contribute capital and commercial and technology capabilities, or rely solely on conversion or equity financing?
▸After exiting equipment manufacturing in China and moving to an OEM model with LONGi, what is the gross margin, and is it sufficient to cover the company's cost base?
Analyst Coverage
| Quarter | Revenue | EBITDA | Net Inc | EPS | EPS Range | # Analysts |
|---|---|---|---|---|---|---|
| 2020 Q3 | 5M | -12M | -18M | $-0.19 | $-0.19 – $-0.19 | 1 |
| 2020 Q4 | 4M | -3M | -9M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2021 Q1 | 1M | -14M | -16M | $-0.17 | $-0.17 – $-0.17 | 1 |
| 2021 Q3 | 1M | -12M | -14M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2021 Q4 | 9M | -4M | -7M | $-0.08 | $-0.08 – $-0.08 | 1 |
| 2022 Q1 | 4M | -15M | -20M | $-0.21 | $-0.21 – $-0.21 | 1 |
| 2022 Q2 | 9M | -15M | -18M | $-0.19 | $-0.19 – $-0.19 | 1 |
| 2022 Q3 | 24M | -22M | -25M | $-0.26 | $-0.26 – $-0.26 | 1 |
| 2022 Q4 | 19M | -10M | -24M | $-0.25 | $-0.25 – $-0.25 | 1 |
| 2023 Q1 | 26M | -22M | -28M | $-0.29 | $-0.29 – $-0.29 | 1 |
| 2023 Q2 | 25M | -55M | -66M | $-0.70 | $-0.70 – $-0.70 | 1 |
| 2023 Q3 | 48M | -11M | -24M | $-0.25 | $-0.25 – $-0.25 | 1 |
| 2023 Q4 | 149M | 7M | -6M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2024 Q1 | 122M | -10M | -22M | $-0.23 | $-0.23 – $-0.23 | 1 |
| 2024 Q2 | 63M | -26M | -47M | $-0.50 | $-0.50 – $-0.50 | 1 |
| 2024 Q3 | 12M | -38M | -50M | $-0.51 | $-0.51 – $-0.51 | 1 |
| 2024 Q4 | 54M | -30M | -51M | $-0.47 | $-0.47 – $-0.47 | 1 |
| 2025 Q1 | 147M | -23M | -30M | $-0.27 | $-0.27 – $-0.27 | 1 |
| 2025 Q2 | 89M | -46M | -52M | $-0.48 | $-0.48 – $-0.48 | 1 |
| 2026 Q1 | 1M | -13M | -18M | $-0.17 | $-0.17 – $-0.17 | 1 |
| 2026 Q2 | 1M | -13M | -18M | $-0.17 | $-0.17 – $-0.17 | 1 |
| 2026 Q3 | 4M | -5M | -10M | $-0.09 | $-0.09 – $-0.09 | 1 |
| 2026 Q4 | 1M | -11M | -16M | $-0.14 | $-0.14 – $-0.14 | 1 |
| 2027 Q1 | 9M | -4M | -8M | $-0.08 | $-0.08 – $-0.08 | 1 |
| 2027 Q2 | 4M | -18M | -23M | $-0.21 | $-0.21 – $-0.21 | 1 |
| 2027 Q3 | 9M | -16M | -21M | $-0.19 | $-0.19 – $-0.19 | 1 |
| 2027 Q4 | 24M | -24M | -29M | $-0.26 | $-0.26 – $-0.26 | 1 |
| 2028 Q1 | 19M | -22M | -27M | $-0.25 | $-0.25 – $-0.25 | 1 |
| 2028 Q2 | 26M | -27M | -32M | $-0.29 | $-0.29 – $-0.29 | 1 |
| 2028 Q3 | 25M | -71M | -76M | $-0.70 | $-0.70 – $-0.70 | 1 |
| 2028 Q4 | 48M | -21M | -27M | $-0.25 | $-0.25 – $-0.25 | 1 |
| 2029 Q1 | 149M | 2M | -7M | $-0.06 | $-0.06 – $-0.06 | 1 |
| 2029 Q2 | 122M | -15M | -25M | $-0.23 | $-0.23 – $-0.23 | 1 |
| 2029 Q3 | 63M | -43M | -54M | $-0.50 | $-0.50 – $-0.50 | 1 |
| 2029 Q4 | 12M | -46M | -56M | $-0.51 | $-0.51 – $-0.51 | 1 |
| 2030 Q1 | 54M | -40M | -51M | $-0.47 | $-0.47 – $-0.47 | 1 |
| 2030 Q2 | 147M | -16M | -30M | $-0.27 | $-0.27 – $-0.27 | 1 |
| 2030 Q3 | 89M | -38M | -52M | $-0.48 | $-0.48 – $-0.48 | 1 |
v2 analysis (legacy) — for comparison onlyclick to expand
Recent Research & News
Recent Research & News
2026-06-21Company news
- Q1 2026 Financial Performance: HydrogenPro reported Q1 2026 revenues of NOK 16 million (down slightly from NOK 17 million in Q4 2025) and an EBITDA of NOK -32 million. Although revenues remain low due to project-stage timings, the cash burn rate improved, and operating expenses dropped 27% year-over-year. The company's cash balance stood at NOK 56 million, down from NOK 102 million in the previous quarter, with an order backlog of NOK 252 million.
- ACES Project Commissioning: HydrogenPro successfully completed and fully commissioned the 220 MW Advanced Clean Energy Storage (ACES) project in Utah, USA. All 40 of its pressurized alkaline electrolyzers are now fully operational. This marks one of the largest pressurized alkaline deployments globally and is supported by an active 10-year service agreement, providing a strong reference case for the company.
- Manufacturing Restructuring & LONGi OEM Agreement: The company finalized a strategic partnership with LONGi Green Energy/LONGi Hydrogen, securing immediate access to 1 GW of scaled manufacturing capacity for electrolyzer components and gas separation units. This allowed HydrogenPro to mothball its own assembly facility in Tianjin, China, optimizing its cost base and streamlining global operations.
- Technology Improvements: Innovations in stack design and electrode performance have reduced overall energy consumption to 4.4 kWh/Nm³ while simultaneously lowering stack weight and shunt currents to improve longevity and durability.
- Annual General Meeting (June 2026): HydrogenPro held its AGM on June 3, 2026. Shareholders approved the election of the new board of directors, chaired by Asta Ellingsen Stenhagen. Notably, Haimeng Zhang (Vice President of LONGi) officially joined the board, cementing the strategic alignment between the companies.
▸ Thesis-test Findings
HydrogenPro LONGi OEM partnership agreement terms
The strategic partnership with LONGi Hydrogen Technology was fully realized with the regulatory approval and completion of LONGi's NOK 70 million equity investment, giving them an approximate 13.3% post-issuance stake in HydrogenPro subject to a 6-month lock-up. The accompanying Cooperation Agreement grants HydrogenPro immediate access to 1 GW of highly optimized manufacturing capacity in China for its high-pressure alkaline electrolyzer components and gas separation units. This structural change supports a strong bull case; it enabled HydrogenPro to mothball its capital-intensive Tianjin facility, lowering fixed operating costs while scaling its global supply chain under an asset-light, low-capex framework.
European Hydrogen Bank subsidy auction winners 2026
The European Hydrogen Bank (EHB) published the results of its third domestic production auction in May 2026, awarding €1.09 billion to nine green hydrogen projects representing 1.1 GW of capacity. While HydrogenPro was not named as a direct recipient, the auction results present a mixed outlook. On the bull side, HydrogenPro confirmed that it is fully compliant with the EHB's strict 25% cap on Chinese-sourced electrolyzer stack components, leveraging its Danish electrode production and German assembly partnership with ANDRITZ AG to bypass trade restrictions. On the bear side, the company noted that EHB's stringent compliance requirements drive up capital costs for European projects, and management identified slow "offtake maturity" (buyer commitments) as a major bottleneck delaying final investment decisions (FIDs) across the European market.
Thermax HydrogenPro JV commercial pipeline India
Following the August 2025 agreement where HydrogenPro licensed its alkaline technology to Indian energy leader Thermax (granting exclusive supply, packaging, and servicing rights in India), the commercial pipeline in India has shown notable progress. In early 2026, Thermax signed a Memorandum of Understanding (MoU) with Hindustan Petroleum Corporation Limited (HPCL) to collaborate on sustainable energy solutions, focusing heavily on green hydrogen applications for refineries. Although this MoU is non-binding, it establishes a clear commercial path for Thermax—and by extension, HydrogenPro's licensed technology—to bid on and deploy localized, high-pressure alkaline systems in line with India's goal to reach 15 GW of electrolysis capacity by 2030. This progress supports the bull case for HydrogenPro's royalty-backed, localized licensing expansion.