Stocks/HZR.AX

HZR.AX

Hazer Group Limitedv3 3.5/10 · 2026-10-20
Basic Materials·Chemicals
0.25 AUD
71M AUD market cap
v3 Rating
3.5/102.5–5.0
Setup
3.5/102.0–5.5
Fair Value
0.21 AUD0.05 AUD–0.75 AUD-14%
DCF (10%)
0.20 AUD-18%
Base IRR
+1%-40%–+40%
Visibility
wide±167%
Rating
Revenue (TTM)
0.0M AUD
Owner Earnings
-A$9M
Next-Yr Owner Earnings
-A$10M
Growth
+25.0% × 6y
P / Next-Yr OE
--
Net Debt
-A$11M

Hazer Group Limited is an Australian clean technology firm dedicated to commercializing its unique Hazer Process. This innovative technology allows for the production of low-carbon hydrogen and graphite by converting natural gas and comparable raw materials. The company targets the industrial hydrogen, hydrogen for transportation, and synthetic graphite markets. Founded in 2010, Hazer Group Limited is headquartered in Perth, Australia.

2-Year Price History

$0.28-20.0%
$0.25$0.30$0.35$0.40$0.45$0.50$0.55Initial target $0.21 · 2026-10-20volNov 24Mar 25Jul 25Oct 25Feb 26Jun 26Oct 26

Valuation v3 Opus worker · 2026-10-20

Rating
3.52.5–5.0
Setup
3.52.0–5.5
Fair value (AUD)
0.210.05 – 0.75
Upside vs 0.25
-14%
DCF (10%)
0.200.04 – 0.80-18%
Base IRR
1%-40% – 40%
Visibility
very widerange ±167%
Sentiment
3/10
2026-10-20 · claude-opus-5-5 · priced at 0.30

Hazer Group is a pre-revenue Perth clean-tech licensor. Its methane pyrolysis process uses an iron-ore catalyst to turn natural gas into hydrogen and graphite. It has been 'approaching commercial inflection' for roughly a decade. The September 2026 quarter again had zero customer receipts. Net operating outflow was A$2.3m and cash was A$8.3m, or about A$10.6m including the A$2.3m R&D refund received on 15 October. Real free cash flow, after A$3.3m a year of stock comp, is about -A$9 to -10m a year. The stock trades at A$0.30, near the bottom of its 3-year range. That is about A$80m of market cap on 267.8m shares, or about A$70m EV, for an option on licensing deals. The pipeline is real but slow and every item in it is non-binding or study-stage: the KBR alliance and 30ktpa design package, a paid KBR-led Japanese utility study, FortisBC (2,500tpa, still pre-FID after two years), EnergyPathways UK, POSCO, Kemira, and M Resources' bid for Whyalla against Jindal (decision Q1 2027, with no binding Hazer licence even if M Resources wins). Big incumbents (BASF/ExxonMobil) are entering methane pyrolysis. In my base case one licensed project reaches FID around FY29-30 and fee income starts by FY31. That gives a DCF value of about A$0.20 a share (10% discount, 20x year-5 FCF of A$5m, plus A$10.6m net cash), about a third below the price. The upside cases (Whyalla plus a Middle East or Japan win) could be worth A$0.60-0.80. The failure case is a slow drain through repeated placements. Funding covers about 4-5 quarters before grant milestones, so another raise in 2027 is likely. Rating 3.5/10: no cash flow, chronic dilution, and binary deal risk, far from the cash-generative, fear-discounted profile we look for. Research rating 3.5/10: the key questions (Whyalla outcome, licence fee terms, timing of a first FID) are decided by third parties over 6-24 months, and desk work cannot resolve them much sooner.

A deep dive would have to establish: Whether any pipeline project (Whyalla via M Resources, the Japanese utility, FortisBC, EPP or the Middle East tier-1) will reach a binding licence with disclosed Hazer fee economics before the company has to raise another A$15-25m at depressed prices.

Owner earnings, TTM
-A$9M-A$11M – -A$8M
Realistic peak profit
A$15MA$0M – A$60M
Growth rate
25.0%0.0% – 80.0%
Years of growth
60 – 12
Market cap
A$80MA$78M – A$83M
EV
A$70MA$67M – A$74M
Net debt
-A$11M-A$13M – -A$8M
Capital return / cap
-15.0%-35.0% – -3.0%
P/E
-7.7×-9.5× – -6.0×
EV/EBITDA
-7.3×-9.0× – -5.5×
FCF yield
-11.5%-14.0% – -9.0%
Projected FCF, base case (AUD millions)
Y1-A$10M-A$12M – -A$8M
Y2-A$9M-A$12M – -A$4M
Y3-A$7M-A$11M – A$5M
Y4-A$2M-A$10M – A$18M
Y5A$5M-A$10M – A$40M
Competition: Methane pyrolysis is getting crowded (BASF/ExxonMobil demonstration plant, Monolith, Hycamite, Ekona), and incumbent SMR+CCS and electrolysis licensors compete for the same hydrogen buyers; Hazer's edge rests on its KBR scale design and catalyst patents, not on commercial references.
Governance: No fraud or governance red flags; the main shareholder issue is chronic dilution (A$3.3m of stock comp a year, repeated placements, and a 7.1A placement capacity sought at the November 2026 AGM).
Research (expand)

What the company does

Hazer Group (ASX: HZR) owns the Hazer Process. It is a fluidised-bed methane pyrolysis technology in which natural gas (or biogas) passes over a cheap iron-ore catalyst and splits into hydrogen and solid graphitic carbon, with no direct process CO2. The business model is licensing: Hazer plus KBR (its exclusive global partner for ammonia/methanol, and a collaborator elsewhere) sell process design, licence fees and catalyst/graphite know-how to plant owners. Hazer does not plan to own plants. The company has run a 100tpa Commercial Demonstration Plant (CDP) in Western Australia. With KBR it finished a 30,000tpa Process Design Package (PDP) in April 2026, which supports 10-50ktpa single trains and multi-train plants above 100ktpa. Management claims hydrogen at cost parity with unabated steam methane reforming (SMR), about one-third the cost of SMR+CCS and about one-seventh of electrolysis, at 8-10 kWh/kg H2 against roughly 55 for electrolysers. The graphite co-product is being qualified for steel recarburiser, asphalt/bitumen replacement (Boral testing, Sept 2026), concrete additives and, longer term, battery-grade material (99.99% after thermal purification, per ANZAPLAN).

The investment case (bull)

  • Category tailwind. The IEA's 2026 Global Hydrogen Review lists Hazer/KBR as the largest-scale methane pyrolysis design. Low-emissions hydrogen demand grew 20% in 2025. Australia is moving to include pyrolysis in its Guarantee of Origin scheme. Middle East supply disruption has pushed energy-security buyers toward local hydrogen.
  • Pipeline. About 9 live projects plus a broader set of opportunities:

- a KBR-originated paid pre-feasibility study for a Japanese utility at 30ktpa and 300ktpa, due by end-2026;

- FortisBC (BC, Canada; binding project development agreement, CAD 11m government support, now a 2,500tpa facility);

- EnergyPathways MESH (UK; phase 1 done, phase 2 under discussion);

- POSCO (MOU extended to 2028);

- Kemira (hydrogen peroxide, moving to commercial discussions);

- a Middle East tier-1 shortlist;

- US data-centre power;

- M Resources' Whyalla bid (one of two finalists with Jindal; decision pushed to Q1 2027).

  • Licence economics. Management has said one 50ktpa project could bring A$80-100m of licence revenue, gross and lumpy, with an unknown KBR split. A single win is meaningful against an A$80m market cap.
  • Cost discipline. Gross operating burn is about A$2.3m a quarter, down about 30% year on year.

What it earns today (real free cash flow)

  • FY26 (June year-end): receipts from customers A$0.14m. Operating cash flow -A$5.2m, but that includes a A$4.58m R&D rebate. Capex A$0.16m. Share-based payments A$3.27m (up from A$1.40m, used to replace cash pay). Statutory loss A$10.4m.
  • Real FCF: counting stock comp as a cost, FY26 real FCF was about -A$8.6m.
  • Forward run-rate: quarterly gross outflow is about A$2.3-2.4m. The FY26 R&D refund was only A$2.3m (versus A$4.6m the prior year), and stock comp is about A$2.5-3m a year. That puts the forward run-rate at about -A$9 to -10m a year.
  • Q1 FY27 (Sept 2026): zero receipts, -A$2.33m operating cash flow, cash A$8.3m (including A$0.82m restricted).
  • Funding: the pro-forma 'funding position' of A$12.9m adds the A$2.3m R&D refund received 15 Oct and A$2.3m of WA DEED grant milestones not yet earned. There is no debt.
  • Share count: 267.8m shares plus about 24m unquoted options. The AGM (18 Nov 2026) seeks a 10% placement capacity under Listing Rule 7.1A, a tell that another raise is being kept available. The last raise was in June/July 2025: A$8m placement plus A$2.6m SPP at A$0.31.

Projected free cash flow (A$m, real, after stock comp)

| Year | Base FCF | Notes |

|---|---|---|

| FY27 | -9.5 | study fees from the Japan/EPP work are small |

| FY28 | -9 | FEED-stage fees on one or two projects |

| FY29 | -7 | first licence/basic-engineering fees if a project reaches FID |

| FY30 | -2 | |

| FY31 | +5 | licence fee tranches begin |

The ranges are very wide. In a no-deal world FCF stays at about -A$10m a year, funded by placements. In a two-wins world FY31 could be A$30-40m of lumpy licence fees.

In 5 years: this is either (a) a young licensor with 1-3 reference plants under construction, recurring licence/catalyst/graphite-marketing income and a decade of growth (the 'income stream' outcome), or (b) still a pre-revenue R&D shell that has raised another A$30-40m at low prices (a slow corpse). I put roughly 40-50% on (a) in some form within 5 years. Confidence in the projection is low: large industrial counterparties (FortisBC, POSCO, EPP) have moved slowly for years, and none of the deals is binding on licence economics.

Fair value and multiples

DCF at a 10% discount (base case):

  • PV of FY27-31 FCF: about -A$19.6m.
  • Year-5 value: 20x FY31 FCF of A$5m (an early-stage growing licensor) = A$100m, worth A$62m today.
  • Add net cash of A$10.6m.
  • Equity of about A$53m, or A$0.20 a share.

At A$0.30 the market is paying for something better than my base case: a first FID inside 3-4 years. The bull case (Whyalla plus a Middle East or Japan licence by FY29, FY31 FCF of A$25m+) gives A$0.60-0.80. The bear case (no FID, dilution) gives A$0.05-0.10. Today's multiples are not meaningful:

  • P/E about -7.7x (A$80m market cap on a A$10.4m loss);
  • EV/EBITDA about -7x;
  • FCF yield about -11%.

There is no path to a 10x FCF multiple within 3-4 years unless a licence is signed by 2027-28.

Management, risks and competition

  • Management. CEO Glenn Corrie (ex-energy/industrial executive) has cut cash burn and moved pay toward options. He communicates well, but Hazer has a long history of promotional 'inflection' language. Payments to related parties are modest (A$0.22m a quarter). There is no fraud history and no governance red flag. There is no capital return; this is a capital consumer.
  • Risks:

- dilution and a raise likely within 12 months, at or near the lows;

- Whyalla goes to Jindal, or M Resources wins but builds gas-DRI first, with no binding Hazer licence;

- FortisBC and EPP stall;

- KBR revenue sharing dilutes Hazer's take;

- the graphite co-product (US$300-700/t drop-in markets) is unproven at scale, and project economics depend on it;

- hydrogen policy volatility; cheap SMR and blue hydrogen; the US 45V uncertainty.

  • Competition. BASF and ExxonMobil are building a 2,000tpa pyrolysis demonstration plant at Baytown. Other players include Monolith (plasma, carbon-black focused), Hycamite (Finland, already sitting next to Hazer at EPP for niche battery carbon), Ekona and Modern Hydrogen, plus incumbent SMR+CCS licensors (Topsoe, Air Liquide, Johnson Matthey) and electrolysers. Hazer's edge is the KBR partnership and scale of design. Its moat is patents (about 100) and the catalyst know-how, and is not yet proven commercially.

Sentiment: 3/10 (out of favour)

The stock is down about 35-45% from its 2025-26 highs (A$0.57 in Oct 2025) and sits about 2% above its 1-year low and near its 3-year low. Retail holders are fatigued by repeated delays (Whyalla pushed to 2027, FortisBC slow) and expect dilution. The only active broker, Shaw and Partners (Philip Pepe; also lead manager on the 2025 raise, so conflicted), rates it Buy with a A$0.70 target. There are no meaningful estimate revisions. No forced seller, buyback or insider buying was identified. This is not a covered-call setup: there are no listed options of note and no earnings floor.

Financials — Adjusted

Adjusted · TTM 2026-Q4 · AUD

TTM & Fiscal-Year P&LTTM2026202520242023
Revenue0.02-99%0.02-99%2.72-18%3.31+38%2.40
Gross profit-0.09-103%-0.09-103%2.67-18%3.26+42%2.29
Operating expenses13.5-15%13.5-15%16.0-22%20.4+34%15.2
▸Adj EBITDA-13.5-13.5-13.2-17.0-12.8
▸Adj OCF-7.55-7.55-6.56-17.5-8.90
CapEx-0.16-0.16-1.45-7.50-4.50
Adj FCF-7.71-7.71-8.00-25.0-13.4
Interest expense0.060.060.070.170.37
▸Adj net income-10.9-10.9-9.79-14.0-11.9
▸Owner's earnings-9.00--------

claimed profit vs where the cash actually went — % = share of claimed EBITDA; Total = FY2023→FY2026

Where the Cash WentTotal2026202520242023
▸Claimed: EBITDA-52.8-13.5-9.12-17.1-13.1
FCF (OCF−capex)-41.2-5.40-6.60-23.4-5.77
Net income-49.3-10.4-7.62-19.1-12.2
▸Capital returned-19.7-3.62-6.31-13.13.29
Buybacks-23.5-3.68-6.45-13.40.02
Dividends0.000.000.000.000.00
Interest paid0.670.060.070.170.37
Debt paid down3.120.000.070.152.90
▸Reinvestment13.60.161.457.504.50
Capex (PP&E)13.60.161.457.504.50
Intangibles & M&A0.000.000.000.000.00
Leases signed (net Δ)----------
Retained / other-20.8-1.72-0.22-10.1-8.69

negative buybacks = net dilution (capital raised); negative debt paid down = debt GREW.

Leases signed (net Δ) = non-cash growth in lease obligations — reinvestment committed with no cash out; '--' = no opening balance on file.

Retained / other = operating cash kept on the balance sheet, net of other investing/financing (security trades, FX).

SBC over the Total window: 4.1 — a real cost the cash-flow statement adds back; its dilution lands in Buybacks.

Balance SheetTTM2026202520242023
▸Assets (total)13.613.617.718.612.7
▸Liabilities (total)3.203.204.045.018.73
Net debt (incl. leases)-10.6-10.6-12.2-12.6-9.02
Net debt / Adj EBITDA----------
Net debt / Adj FCF----------
Adj EBITDA / interest-220-220-190-99.2-34.4
Shares outstanding268267234219175
Dilution (YoY)+13.7%+13.7%+7.1%+25.1%+2.5%
Employees36.0--------
MarginsTTM2026202520242023
Gross margin-450.8%-548.9-450.8%-548.998.1%-0.198.2%+2.895.4%
Adj EBITDA margin-68992.9%-68508.7-68992.9%-68508.7-484.2%+28.6-512.8%+18.0-530.8%
Adj OCF margin-38601.1%-38360.3-38601.1%-38360.3-240.8%+286.4-527.2%-156.9-370.3%
Adj FCF margin-39401.6%-39107.7-39401.6%-39107.7-293.9%+459.4-753.4%-195.9-557.5%
Net income margin-53030.0%-52750.2-53030.0%-52750.2-279.8%+295.4-575.2%-67.2-508.0%
Adj NI margin-55584.9%-55225.3-55584.9%-55225.3-359.6%+63.2-422.9%+74.4-497.3%
ROIC (adj, after-tax)-102.8%-102.8%-74.7%-98.0%-241.9%
Cost of debt--------14.5%

Earnings Calls

2 calls

Earnings Call · 2027 Q1

2026-10-19

Hazer Group held its September quarter investor webinar, presented by MD and CEO Glenn Corrie and COO Tom Coolican, with Simon Pitaro moderating. Hazer's technology converts natural gas or other methane-rich gas into two products: clean hydrogen and high-purity graphite. The process has no direct process emissions and uses a proprietary iron ore catalyst. Management said the quarter was important for building momentum across all pillars of the business and described the company as approaching an inflection point, with a de-risked technology, growing market traction and a expanding pipeline of material opportunities. On cost, management said Hazer can deliver one of the lowest-cost hydrogen pathways. It claimed cost parity with conventional steam methane reforming (SMR), roughly one-third the cost of SMR plus carbon capture and storage, and about one-seventh the cost of electrolytic green hydrogen. Drivers include the catalyst, capital efficiency from a design package being developed with KBR over nine months, and energy consumption of under 10 kWh per kg of hydrogen versus about 55 kWh/kg for electrolyzers. On emissions, management said SMR produces about 10 tonnes of CO2 per tonne of hydrogen, and that Hazer, by allocating emissions across its two products, could cut emissions versus SMR by over 80% even on today's relatively dirty grid. Management said policy is shifting, citing Australia's GO scheme now including methane pyrolysis as a viable hydrogen pathway. On funding, the company ended the quarter with just under $13 million in cash. It received a $2.3 million R&D rebate after quarter end, expects an international expenditure rebate in the next quarter, and still has a $2.3 million Western Australian grant to earn. Cash burn was lowered 30% year on year to roughly $2 million to $2.3 million per quarter, which management said gives a runway of more than 12 months. The KBR alliance was highlighted as delivering real value. KBR secured a first paid study for a large Japanese utility evaluating hydrogen for up to 300,000 tonnes per annum, roughly ten times the initial PDP scale. Management said Japan is a strong fit because CCS options are limited, and it has partnerships with Mitsui and Chubu Electric. The International Energy Agency's 2026 Global Hydrogen Review recognized Hazer and KBR as the biggest listed scale design in its report. Management said a 30,000 tonne per annum plant design is the reference point, and that scale is key to displacing SMR. On projects, Whyalla is a major catalyst. The decision timeline has slipped to the first quarter of next year, though the state government wants it completed by year end, and the blast furnace is being decommissioned as the site moves toward DRI and electric arc furnace production. M Resources' bid was described as a strong fit, with no binding terms signed yet because the company must win first. In Canada, Fortis, a utility with 1.3 million domestic users, is progressing toward a formal engineering project with KBR but moves slowly. The UK's EPP project of national significance has a 20,000 tonne per annum minimum target, and Hazer's first phase is complete. Hazer is also engaging with Hycamite, a niche battery graphite player, which management sees as complementary. POSCO is evaluating Hazer for its HyREX direct reduced iron technology. Kemira, a European chemicals company, is exploring integrating the technology into its hydrogen peroxide business. A Middle East tier 1 partner opportunity is on a very short list, and management said the company is competitive. The pipeline now includes about nine live projects, and US data center power is an emerging opportunity. Management's stated vision is a FEED and FID each year over the next 10 years. On graphite, steelmaking is the first high-value target with commercial movement, including an offtake letter of intent with Generation Steel in Western Australia. Concrete has progressed through qualification, and asphalt testing has shown improved strength and durability with reduced carbon content. Testing so far covers about 15% of the mix, with a one-to-one bitumen-to-graphite substitution indicated. Battery-grade graphite requires purification from roughly 85% to 95% up to 99.95%, and thermal purification reaches 99.99%, but it is energy intensive. Hazer is researching its patented electrochemical purification as a more efficient first step, although it is at a low technology readiness level. Battery performance testing, requiring 100 to 500-plus cycles, should yield results around year end or the first quarter of next year. Market context included an IEA estimate of hydrogen demand above 100 million tonnes per annum, and a DNV estimate of a $240 billion annual market. Low-emission hydrogen grew more than 1 million tonnes per annum, or about 20%, over the past year. Management said energy security concerns, particularly Middle East tensions, are supporting local production. Management also said Australia relies on gas for 30% to 40% of its energy mix, so gas-based decarbonization is needed. Looking ahead, management said Whyalla could resolve within three months, with further updates expected in Canada, EPP and other projects, along with graphite offtake progress and a deepening KBR relationship. Glenn Corrie acknowledged that the share price is not where the company wants it and said the focus is on delivering the underlying business.

Analyst Q&A (12)
▸
Funding position and runway, including questions received overnight.
Management said the company ended the quarter with just under $13 million, received $2.3 million in R&D rebate after quarter end, expects an international rebate next quarter, and still has a $2.3 million WA grant to earn. Cash burn is about $2 million to $2.3 million per quarter, giving a runway of more than 12 months.
▸
Status and timing of the Whyalla decision.
The process is still live, but the decision has been pushed to the first quarter of next year, while the state government is aiming to finish by year end. The blast furnace is being decommissioned, which management sees as a signpost toward DRI and electric arc furnace production. Management said M Resources' bid has strong stakeholder support.
▸
Questions on project progress, including EPP and the overlap with Hycamite's niche graphite work.
Dave
Management said EPP is an early-stage national significance project with a 20,000 tonne per annum minimum target, Hazer remains its preferred pyrolysis technology, and the first phase is complete. Hycamite is pursuing niche battery carbon, which management sees as complementary, while Hazer and KBR are preferred for the large-scale opportunity.
▸
Whether a Middle East opportunity is progressing and how competitive the company is.
Management said it is on a very short list for a major tier 1 partner opportunity, is competitive, and has KBR's support given its strong Middle East relationships. It acknowledged the process is not moving as fast as hoped, and a win would be a game changer.
▸
Results and status of asphalt graphite mix testing.
Roughly 15% of the mix has been tested with good results, and testing is continuing. Management is considering a one-to-one substitution of kilograms of bitumen for kilograms of graphite where possible, which gives an indication of base price points.
▸
Battery-grade graphite, including whether electrochemical purification can be combined with thermal purification.
Dave Sewell
Purification is the gatekeeper for batteries. Electrochemical purification could bring purity up, with thermal purification completing the final step to reduce energy use. This is early, low technology readiness research. Battery modification and performance testing is underway, with results expected around year end or the first quarter of next year.
▸
Whether bitumen testing covers binder only or the total asphalt mix.
Andrew
Management said it has tested both, but current testing focuses on binder, which is the bitumen from refineries. More details on binder effects are expected after the next round of testing.
▸
A similar question about bitumen testing.
David
Management referred to the earlier answer, saying testing is ongoing and it will share more on binder effects once the next round of results is in.
▸
Whether the company is talking with Hyundai.
David
Management said it talks with Hyundai frequently and noted Hyundai's new hydrogen fuel cell car line. Korea is a target market, and the POSCO partnership is a natural extension.
▸
Whether binding terms and license agreements are in place with M Resources if it is selected.
Andrew
Not yet. Management said that is part of the agreement, and the immediate priority is winning the bid. It described the pit-to-port integrated solution as a strong fit for Australia, with binding terms to follow in a later step.
▸
How revenue from the Japanese paid study will flow to the company.
Andrew
Management said the Japanese paid study was a KBR-led project, so revenue will come through KBR first and is expected to appear in Hazer's receipts around the first quarter of next year.
▸
Status of the Kemira project.
Management said initial work was quite positive and Kemira is now considering how to integrate the technology into its hydrogen peroxide business in Europe. Tom Coolican said European carbon legislation supports a capex opportunity, and management said the relationship is strong.

Analyst Coverage

Analyst Coverage
Consensus Estimates
QuarterRevenueEBITDANet IncEPSEPS Range# Analysts
2026 Q20M—0M$0.00$0.00 – $0.000
2026 Q40M—0M$0.00$0.00 – $0.000
v2 analysis (legacy, 2026-07-04) — for comparison onlyclick to expand

Thesis

Hazer is a pre-revenue clean-tech licensor betting on methane pyrolysis for hydrogen and graphite. Revenue is negligible (~$0.6M TTM) and shrinking as one-off engineering fee revenue winds down. The company burns ~$4-8M/year in cash against a ~$17M cash balance, funded by R&D rebates, capital raises and share dilution (shares up 14.4x since 2022, ongoing dilution every year). The commercial thesis rests on converting a pipeline of MOUs/LOIs (FortisBC, POSCO, Green Steel WA, Hallett, Whyalla) into binding licensing deals with upfront/royalty economics via its capital-light KBR partnership model. No project has reached FID. Competitive entry by BASF/ExxonMobil validates the technology category but threatens Hazer's differentiation and negotiating leverage. This is a binary/optionality story: if even one 20-30k tpa license converts to signed economics in the next 2 years, equity value could re-rate sharply; if not, continued cash burn forces further dilutive raises with runway extending only ~2-3 years at current burn.

Trade Signal

Trade rating
-4.5/10
No trade
Horizon
~9mo
Claude2026-07-04 · saw 0.30 AUD-18.3% since

Short/avoid: at $80M market cap against a probability-weighted fair value near $57-60M, with shrinking revenue, heavy ongoing dilution, and no binding contracts despite years of MOU headlines, the risk/reward skews to further derating toward the base/bear scenarios.

Temporary mispricing+1.0

The stock drifted down steadily from ~0.51 in Jan 2026 to 0.30 today (-41% over 6mo), with no single crash event tied to the Jan 28 earnings print — instead it's a grinding derate as revenue actually collapsed (-84% TTM) even as MOU/LOI headlines (Hallett, biofuel, KBR PDP, FortisBC fast-track, Green Steel WA) kept coming. The market has largely looked through the news-flow and focused on the lack of binding revenue and ongoing dilution; this looks like a fair, if not slightly overdone, drift given deteriorating fundamentals and heavy dilution, not a panic overreaction to any one catalyst.

Market view-2.0

Consensus is skeptical to indifferent: this is a micro-cap pre-revenue story stock trading on a pipeline of non-binding MOUs/LOIs with no FID anywhere, funded by continual dilutive raises (shares up 14.4x since 2022). Bulls point to KBR's completed standardized design package, POSCO/Whyalla/FortisBC engagement, and a widening 50+ lead pipeline as de-risking the model; bears note zero binding contracts, shrinking revenue, cash burn against $17M cash, and now BASF/ExxonMobil entering methane pyrolysis as a serious long-term competitive threat. Retail-driven, thinly traded ($0.1M/day), high volatility (58% ann) — sentiment has cooled from the Oct/Nov 2025 highs but isn't at capitulation/hated extremes.

Inflectionwindow ~9mo-2.0

Nothing here suggests a near-term step-change in profitability — the company remains deeply loss-making (OE -9M), revenue is shrinking, and every 'catalyst' cited (PDP completion, MOUs, LOIs) is pre-binding and pre-FID. The bull case (FID conversions, binding license fees) is 1-2+ years out at best, and consensus/market pricing already embeds substantial optionality value (P/S 127x) for a story with near-zero revenue. If anything the near-term trajectory (declining TTM revenue, cash burn) is a mild negative inflection the market may still be underpricing on the downside.

Catalysts
  • ▲H2 2026 · FortisBC FEED/FID progress update — KBR-accelerated engineering could produce a binding milestone; failure to progress is a negative marker
  • •2026 · Whyalla Steelworks bid outcome (M Resources) — Binding win would be major de-risking event; loss would remove a key pipeline story
  • ▼2026-08 to 2026-09 · H1 FY26 / FY26 annual results — Likely to show continued negligible revenue and cash burn, testing patience of holders
  • ▼H2 2026-H1 2027 · Further capital raise / dilution event — Cash runway pressure (~$17M vs $4-8M/yr burn) likely forces another dilutive raise
  • ▲late 2026 · Green Steel of WA / Hallett graphite offtake conversion to binding — Would provide first real commercial reference pricing for graphite
  • ▼2026-2027 · BASF/ExxonMobil demo plant progress — Competitive validation narrative could also highlight Hazer's lagging scale/funding relative to majors
Flow-6.0

Heavy dilution history (shares up 14.4x since 2022, TTM dilution 14%) with cash burn of $4-8M/yr against $17M cash implying another raise likely within 12-18 months. No buyback, no insider buying disclosed, no index-inclusion catalysts. Net flow is negative for existing holders via continued share count growth.

Floor / Ceiling-4.0

Net cash ~$8-17M provides a modest liquidation-style floor (bear case ~$25M/~$0.09), well below current $80M market cap, so there's real downside room before hitting hard asset support. No buyback or committed bid; on the upside, any rally likely triggers further capital raises (dilution overhang) capping gains, and the story-stock nature means sentiment swings could cut both ways violently given 58% annualized vol.

Buyability

This is buyable by momentum/story investors and hydrogen-thematic retail on any positive MOU headline, but institutional buyers will struggle given zero binding revenue, persistent dilution, and insolvency-risk framing (analyst pegs 2yr insolvency probability at 10/10 axis). The realistic next buyer is retail chasing news-flow, not value or growth investors — this caps sustainable re-rating potential even if optionality value is real.

Fear vs Greedfear 7/10 (-2.0)greed 6/10 (+1.0)

Fear dominates — this is a cash-burning, dilution-heavy pre-revenue story trading at 127x sales with no binding contracts, and the analyst's own $57-60M fair value (vs $80M market cap) plus a 45% bear-case weighting to a $25M liquidation outcome makes the risk/reward for owning it here unattractive; the MOU headlines feel like they're sustaining a valuation the fundamentals don't yet support.

Valuation

Our Target
60M AUD-15%
Market Should Pay
54M AUD-24%
target ×0.9 (fear discount)
Current Market Cap
71M AUDNeutral
What Changed
transcript · 2026-01-28
+8%fair value on this information

The quarter confirms continued cash burn reduction (opex down 30% QoQ, 40% YoY) and a healthier cash position (~$17.2M) after an R&D rebate and capital raise, extending runway. New commercial validation points not fully priced in before: extension of POSCO partnership after successful graphite testing, binding MOU with M Resources on Whyalla Steelworks bid, and pipeline expansion to 50+ leads / 1.5Mtpa TAM. These are incremental positive signals but none are binding revenue-generating contracts — still pre-FID across all major projects.

▸ How the cases moved

Base case equity value nudges up modestly (from ~$65M to $75M) reflecting improved cash runway and pipeline breadth reducing near-term dilution risk; bull case unchanged in structure but probability nudged up slightly (0.12->0.15) given KBR PDP maturity and multiple parallel workstreams (Whyalla, POSCO, FortisBC); bear case probability trimmed slightly (0.50->0.45) as immediate insolvency risk recedes with stronger cash balance.

2-Year Plausible Outcomes
bear45%
25M AUD
rev +5%/yrOE $-10M

Pipeline MOUs/LOIs fail to convert to binding, economically material licenses within 2 years. Competitive pressure from BASF/Exxon and slow FID processes (FortisBC, Whyalla) stall momentum. Continued cash burn forces further dilutive capital raises, diluting shareholders further. Company remains pre-revenue, trades as a speculative shell with declining cash runway.

▸ Valuation

Liquidation/NAV-style: ~$8M net cash and minimal IP value ascribed = $25M equity value (reflecting residual optionality and remaining cash, heavily diluted)

base40%
75M AUD
rev +40%/yrOE $-8M

One or two smaller licensing deals (e.g., FortisBC FEED progresses to a modest license fee, graphite offtake with Green Steel WA or Hallett becomes commercial) generate initial royalty/license revenue of $5-10M by 2027-28, but Hazer remains loss-making, funded by further dilution. Market ascribes call-option value to the broader pipeline.

▸ Valuation

Early-stage licensing revenue multiple: 8x $8M forward revenue = $64M EV, + net cash $10M (still net cash positive) = $74M equity value

bull15%
185M AUD
rev +300%/yrOE $5M

FortisBC reaches FID, KBR-driven standardized design accelerates multiple licensing signings (steel decarbonization, POSCO graphite, Whyalla), and Hazer secures 2-3 binding license agreements worth $80-100M each in staged fees plus royalty streams, turning cash-flow positive on license fees within 2 years.

▸ Valuation

Blended license-fee + royalty NPV: 3x forward-year license revenue run-rate of $60M = $180M EV + net cash $5M = $185M equity value

▸ Target Rationale

Model arithmetic (probability-weighted, discounted) lands near $57M. I nudge slightly up to $60M reflecting the genuine strategic validation from KBR's completed standardized PDP and the widening pipeline (50+ leads, 1.5Mtpa TAM), which reduces execution risk versus a pure paper-MOU story, while still recognizing this is a story stock with near-zero revenue and heavy dilution risk. The target stays well below any 'blue-sky' hydrogen-market valuation given zero binding revenue-generating contracts to date.

Business Quality & Sentiment

Business Quality (price-independent)
Business quality4/10
Situation now2/10
Trajectory6/10
Risk8/10
Governance5/10
Insolvency prob (2yr)10%
Outcome uncertainty9/10

Recent Research & News

Recent Research & News

2026-06-21

Company news

  • Hallett Group Graphite Collaboration (June 2026): Hazer entered a binding Memorandum of Understanding (MOU) with Hallett Group (South Australia's largest integrated building, construction, and mining materials supplier). Under this agreement, Hallett will evaluate using Hazer Graphite in low-emissions concrete. Hazer granted Hallett exclusive SA concrete market rights until January 2027, representing a key commercial step in monetizing its graphite byproduct.
  • Biofuel Project Expansion (May 2026): Hazer expanded its market reach by signing an MOU to explore integrating its technology into a sustainable aviation fuel (SAF) and renewable diesel biofuel project in Kwinana.
  • KBR Process Design Package Completion (April 2026): Hazer and its global alliance partner KBR completed a comprehensive commercial-scale Process Design Package (PDP). This standardized design targets a 30,000 tonnes per annum (tpa) hydrogen capacity, confirming technical maturity and allowing KBR to market a standardized, ready-to-deploy design to global customers.
  • FortisBC Project Fast-Tracking (March 2026): Hazer engaged KBR to fast-track and refine engineering and economics for its Canadian hydrogen project with FortisBC. The 2,500 tpa clean hydrogen and 9,500 tpa graphite facility will be fully funded and operated by FortisBC under Hazer’s capital-light licensing model.
  • Green Steel of WA Graphite Offtake LOI (March 2026): Hazer signed a non-binding Letter of Intent (LOI) with Green Steel of WA to supply up to 85,000 tonnes of graphite over 10 years starting in 2030. This provides an early commercial reference point, linking graphite pricing to the landed price of anthracite (estimated at ~A$400/tonne).
▸ Thesis-test Findings
Hazer Group FortisBC project update 2026

In March 2026, Hazer announced that its global engineering alliance partner, KBR, has been engaged to fast-track and expedite site-specific engineering and refine the economic modeling for the 2,500 tpa Canadian facility. The project has received CAD 11 million in government backing. Under the binding agreement, FortisBC will fully fund, own, and operate the facility, while Hazer licenses its proprietary technology and provides engineering services. This validates Hazer's capital-light technology licensing strategy, though the project remains in the project maturation and Front-End Engineering Design (FEED) stage prior to a Final Investment Decision (FID).

KBR Hazer commercial design pipeline hydrogen

In April 2026, Hazer and KBR finalized a comprehensive, standardized commercial-scale Process Design Package (PDP). Designed for a large-scale capacity of 30,000 tpa of hydrogen, the PDP serves as a consistent engineering baseline that significantly reduces project planning timelines and enables KBR to market a standardized design globally. The collaboration focuses on upscaling Hazer's technology for ammonia, methanol, and general decarbonizing hydrogen markets, strengthening Hazer's bull case by providing a mature, repeatable blueprint for global licensing.

Methane pyrolysis commercial competitor developments BASF Exxon

Methane pyrolysis is seeing intense competitive development from major global players. In late 2025, BASF and ExxonMobil signed a joint development agreement to co-develop their own methane pyrolysis technology. The partners plan to build a demonstration plant at ExxonMobil's Baytown Complex in Texas designed to produce up to 2,000 tonnes of low-emission hydrogen and 6,000 tonnes of solid carbon annually. While the entry of these oil and chemical giants strongly validates the commercial viability of methane pyrolysis and the dual-product (hydrogen + solid carbon) model, it presents a formidable competitive threat to Hazer's long-term market share.